Institute Name: Saveetha Institute of Medical and Technical Sciences (IR-E-I-1441)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

National Institutional Ranking Framework

Ministry of Education
Government of India
Data Submitted by Institution for India Rankings '2023'
Institute Name: Saveetha Institute of Medical and Technical Sciences [IR-E-I-1441]

Sanctioned (Approved) Intake


Academic Year 2021-22 2020-21 2019-20 2018-19 2017-18 2016-17

UG [4 Years Program(s)] 1320 1320 1320 1320 - -

PG [2 Year Program(s)] 30 30 - - - -

Total Actual Student Strength (Program(s) Offered by your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 3961 1411 5372 1101 4268 3 1278 3382 23 2060 0 2577
Program(s)]

PG [2 Year 36 25 61 35 26 0 13 45 0 45 1 12
Program(s)]

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & Higher Studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed graduates per selected for Higher
year the year Lateral entry minimum stipulated annum(Amount in Studies
time Rs.)

2016-17 1320 1320 2017-18 15 2019-20 1069 233 392000(Three Lakh 51


Ninety Two Thousand)

2017-18 1320 1320 2018-19 14 2020-21 1080 272 350000(THREE LAKH 20


FIFTY THOUSAND)

2018-19 1320 1320 2019-20 26 2021-22 1154 331 359000(Three Lakh 72


Fifty Nine Thousand)

PG [2 Years Program(s)]: Placement & Higher Studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed graduates per selected for Higher
year the year annum(Amount in Studies
Rs.)

2018-19 30 30 2019-20 29 25 450000(Four Lakh Fifty 1


Thousand Only)

2019-20 30 30 2020-21 28 25 450000(Four Lakh Fifty 1


Thousand Only)

2020-21 30 30 2021-22 29 28 450000(Four Lakh Fifty 1


Thousand Only)
Ph.D Student Details
Ph.D (Student pursuing doctoral program till 2021-22)

Total Students

Full Time 143

Part Time 101

No. of Ph.D students graduated (including Integrated Ph.D)

2021-22 2020-21 2019-20

Full Time 12 3 1

Part Time 24 10 8

Financial Resources: Utilised Amount for the Capital Expenditure for previous 3 years
Financial Year 2021-22 2020-21 2019-20

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library ( Books, Journals and e-Resources only) 9592069 (Ninety Five Lakh Ninety Two Thousand Sixty Nine 8720063 (Eighty Seven Lakh Twenty Thousand Sixty Three 7927330 (Seventy Nine Lakh Twenty Seven Thousand Three
Only) Only) Hundred Thirty Only)

New Equipment and software for Laboratories 51859120 (Five Crore Eighteen Lakh Fifty Nine Thousand One 38131706 (Three Crore Eighty One Lakh Thirty One Thousand 34665187 (Three Crore Forty Six Lakh Sixty Five Thousand
Hundred Twenty Only) Seven Hundred Six Only) One Hundred Eighty Seven Only)

Engineering Workshops 43947066 (Four Crore Thirty Nine Lakh Forty Seven Thousand 39951878 (Three Crore Ninety Nine Lakh Fifty One Thousand 36319889 (Three Crore Sixty Three Lakh Nineteen Thousand
Sixty Six Only) Eight Hundred Seventy Eight Only) Eight Hundred Eighty Nine Only)

Other expenditure on creation of Capital Assets (For setting up 18789499 (One Crore Eighty Seven Lakh Eighty Nine 16323854 (One Crore Sixty Three Lakh Twenty Three 4477425 (Forty Four Lakh Seventy Seven Thousand Four
classrooms, seminar hall, conference hall , library, Lab, Engg Thousand Four Hundred And Ninety Nine) Thousand Eight Hundred And Fifty Four) Hundred And Twenty Five)
workshops excluding expenditure on Land and Building)

Financial Resources: Utilised Amount for the Operational Expenditure for previous 3 years
Financial Year 2021-22 2020-21 2019-20

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 415380284 (Forty One Crore Fifty Three Lakh Eighty 303198039 (Thirty Crore Thirty One Lakh Ninety Eight 294753897 (Twenty Nine Crore Forty Seven Lakh Fifty Three
Thousand Two Hundred Eighty Four Only) Thousand Thirty Nine Only) Thousand Eight Hundred Ninety Seven Only)

Maintenance of Academic Infrastructure or consumables and 639645115 (Sixty Three Crore Ninety Six Lakh Forty Five 650362387 (Sixty Five Crore Three Lakh Sixty Two Thousand 182037716 (Crore Twenty Lakh Thirty Seven Thousand Seven
other running expenditures(excluding maintenance of hostels Thousand One Hundred And Fifteen) Three Hundred And Eighty Seven) Hundred And Sixteen)
and allied services,rent of the building, depreciation cost, etc)

Seminars/Conferences/Workshops 6676109 (Sixty Six Lakh Seventy Six Thousand One Hundred 4421264 (Forty Four Lakh Twenty One Thousand Two 4019331 (Forty Lakh Nineteen Thousand Three Hundred Thirty
Nine Only) Hundred Sixty Four Only) One Only)

Sponsored Research Details


Financial Year 2021-22 2020-21 2019-20

Total no. of Sponsored Projects 0 0 0

Total no. of Funding Agencies 0 0 0


Total Amount Received (Amount in Rupees) 0 0 0

Amount Received in Words Zero Zero Zero

Consultancy Project Details


Financial Year 2021-22 2020-21 2019-20

Total no. of Consultancy Projects 65 65 73

Total no. of Client Organizations 59 59 43

Total Amount Received (Amount in Rupees) 50077718 41314765 16455315

Amount Received in Words Five Crore Seventy Seven Thousand Seven Hundred And Four Crore Thirteen Lakh Fourteen Thousand Seven Hundred One Crore Sixty Four Lakh Fifty Five Thousand Three Hundred
Eighteen Only Sixty Five Only Fifteen Only

PCS Facilities: Facilities of Physically Challenged Students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, including wheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

Faculty Details
Number of faculty members entered 358

You might also like