Institute Name: Koneru Lakshmaiah Education Foundation University (K L College of Engineering) (IR-E-U-0020)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

National Institutional Ranking Framework

Ministry of Education
Government of India
Data Submitted by Institution for India Rankings '2023'
Institute Name: Koneru Lakshmaiah Education Foundation University (K L College of Engineering) [IR-E-U-0020]

Sanctioned (Approved) Intake


Academic Year 2021-22 2020-21 2019-20 2018-19 2017-18 2016-17

UG [4 Years Program(s)] 3060 3180 3480 3180 - -

PG [2 Year Program(s)] 342 324 - - - -

Total Actual Student Strength (Program(s) Offered by your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 7842 4661 12503 7290 4951 262 78 889 0 389 0 578
Program(s)]

PG [2 Year 328 221 549 426 115 8 9 97 2 43 0 61


Program(s)]

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & Higher Studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed graduates per selected for Higher
year the year Lateral entry minimum stipulated annum(Amount in Studies
time Rs.)

2016-17 3740 3740 2017-18 0 2019-20 3123 1565 435000(Four lakhs 310
thirty five thousand)

2017-18 3180 3180 2018-19 0 2020-21 2644 1717 500000(Five lakhs) 379

2018-19 3180 3180 2019-20 0 2021-22 2648 1752 660000(six lakhs sixty 405
thousand)

PG [2 Years Program(s)]: Placement & Higher Studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed graduates per selected for Higher
year the year annum(Amount in Studies
Rs.)

2018-19 372 354 2019-20 316 106 450000(four lakhs fifty 58


thousand)

2019-20 540 401 2020-21 392 153 450000(four lakhs fifty 63


thousand)

2020-21 324 296 2021-22 241 88 476000(four lakhs 96


seventy six thousand)
Ph.D Student Details
Ph.D (Student pursuing doctoral program till 2021-22)

Total Students

Full Time 326

Part Time 411

No. of Ph.D students graduated (including Integrated Ph.D)

2021-22 2020-21 2019-20

Full Time 69 48 34

Part Time 73 80 78

Financial Resources: Utilised Amount for the Capital Expenditure for previous 3 years
Financial Year 2021-22 2020-21 2019-20

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library ( Books, Journals and e-Resources only) 52646291 (Five crore twenty six lakhs forty six thousand two 27503769 (Two Crore Seventy Five Lakh Three Thousand 38775711 (Three Crore Eighty Seven Lakhs Seventy Five
hundred and ninety one) Seven Hundred Sixty Nine) Thousand Seven Hundred eleven)

New Equipment and software for Laboratories 81223069 (Eight crores twelve lakhs twenty three thousand 28808653 (Two Crore Eighty Eight Lakhs Eight Thousand Six 74610702 (Seven crore forty six lakh ten thousand seven
and sixty nine) Hundred Fifty three) hundred and two)

Engineering Workshops 3258081 (Thirty two lakhs fifty eight thousand and eighty one) 4615440 (Forty six lakhs fifteen thousand four hundred forty) 6695514 (sixty six lakh ninety five thousand five hundred
fourteen)

Other expenditure on creation of Capital Assets (For setting up 43004039 (Four crores thirty lakhs four thousand and thirty 31791848 (Three crore seventeen lakh ninety one thousand 68132918 (six crore eighty one lakh thirty two thousand nine
classrooms, seminar hall, conference hall , library, Lab, Engg nine ) eight hundred forty eight) hundred eighteen)
workshops excluding expenditure on Land and Building)

Financial Resources: Utilised Amount for the Operational Expenditure for previous 3 years
Financial Year 2021-22 2020-21 2019-20

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 1135043255 (one hundred and thirteen crore fifty lakhs forty 1034501194 (One Hundred and three crore forty five lakh one 1030799599 (one hundred and three crore seven lakh ninety
three thousand two hundred fifty five) thousand one hundred ninety four) nine thousand five hundred and ninety nine)

Maintenance of Academic Infrastructure or consumables and 991474775 (ninety nine crore fourteen lakhs seventy four 396179060 (Thirty nine crore sixty one lakh seventy nine 570659639 (fifty seven crore six lakh fifty nine thousand six
other running expenditures(excluding maintenance of hostels thousand seven hundred and seventy five) thousand sixty) hundred thirty nine)
and allied services,rent of the building, depreciation cost, etc)

Seminars/Conferences/Workshops 10085436 (one crore and eighty five thousand four hundred 7399633 (seventy three lakh ninety nine thousand six hundred 14786328 (one crore forty seven lakh eighty six thousand three
thirty six) thirty three) hundred twenty eight)

Sponsored Research Details


Financial Year 2021-22 2020-21 2019-20

Total no. of Sponsored Projects 153 139 109

Total no. of Funding Agencies 14 16 12


Total Amount Received (Amount in Rupees) 75045000 73130000 67369541

Amount Received in Words Seven crore fifty lakhs forty five thousand Seven crore thirty one lakh thirty thousand six crore seventy three lakh sixty nine thousand five hundred
forty one

Consultancy Project Details


Financial Year 2021-22 2020-21 2019-20

Total no. of Consultancy Projects 253 169 90

Total no. of Client Organizations 183 169 90

Total Amount Received (Amount in Rupees) 14124995 14945528 13687116

Amount Received in Words One crore forty one lakhs twenty four thousand nine hundred One Crore Forty Nine Lakhs Forty Five Thousand Five One Crore Thirty Six Lakhs Eighty Seven thousand One
and ninety five Hundred twenty eight Hundred Sixteen

PCS Facilities: Facilities of Physically Challenged Students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, including wheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

Faculty Details
Number of faculty members entered 928

You might also like