RKH WS Bpae 20 Maret 2024

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

PALMA SERASIH GROUP


ESTATE BPAE
DEPARTMENT TEHNIK

Time
Configurasi MP Mechanic Name Remaks Component Planner
(Hour)
Masuk 6 Mufti 5,0 Masuk 4
Job Order Man Power Izin 7,0
0 Ahmad Suryadi Masuk
Work Shop Sakit 0 Yosep Apring 3,0 Masuk 1
Cuti 0 Surahman 3,0 Masuk 0 0 0 0 0 0
Hari / Tanggal : Mandah 0 Sulaiman 5,0 Masuk
20 Maret 2024 Mangkir 0 Satria Bima 3,0 Masuk
Dinas 0 0 Toris Siswoyo
TOTAL MP 6 0 Head Mechanic
MAN POWER TARGET JAM PENGERJAAN
TINDAKAN
NO CODE UNIT HM / KM DATE BD JENIS KERUSAKAN COMPONENT RFU KETERANGAN
PERBAIKAN
NAME STATUS TAG START FINISH JUMLAH (JAM)

1 GP21TRUK02 - 19/03/24 Ganti Gasket Head Minor Overhaul Engine Ahmad Suryadi B0 3 19.03.2024 07:00 16:00 7,0 On Progres

2 GP21TRUK05 - 01/07/23 Engine OVH Assembly - - B1 00.01.1900 00:00 00:00 0,0 Waiting Parts

3 GP21TRUK07 - 20/03/24 Turbocore Bocor Replace Engine Mufti B0 3 20.03.2024 07:00 12:00 5,0 On Progres
4 GP21TRUK09 - 20/03/24 Periodic Service Service Schedule Engine Satria Bima B0 3 20.03.2024 07:00 10:00 3,0 On Progres
5 GP21TRUK11 - 20/03/24 Fuel System Repair Engine Surahman B0 3 20.03.2024 07:00 10:00 3,0 On Progres
6 GP21TRAC01 - 20/03/24 Fabrikasi Engine Hood Repair - Yosep Apring B0 2 20.03.2024 07:00 10:00 3,0 On Progres
7 GP21GRAD01 - 20/03/24 Ganti Ban 6 EA Replace Tyre Sulaiman B0 3 20.03.2024 07:00 12:00 5,0 On Progres
0
0
0
0
0
0
0
0
0
0
0

Status : B0 = Under Repair, B1 = Tunggu Parts, B2 = Tunggu mekanik, B3 = Accident, B4 = Weather, NA = Scheduling repair / overhaul

Mekanik
Electrican
Welder CUACA : CERAH