ANALISA STRKTUR RUMAH DINAS BANK BRI

ANALISA STRUKTUR

PEKERJAAN :
PEMBANGUNAN RUMAH DINAS BANK BRI
LOKASI :
M
JL. NUSANTARA KEL. CONDONG KEC. SINGKAWANG TENGAH
KOTA SINGKAWANG
Job No Sheet No Rev
1
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Job Information
Engineer Checked Approved

Name:
Date: 20-Mar-23

Structure Type SPACE FRAME

Number of Nodes 116 Highest Node 116


Number of Elements 211 Highest Beam 211

Number of Basic Load Cases -2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 BM
Primary 2 BH
Combination 3 COMBINATION LOAD CASE 3

Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
1 Rect 0.40x0.20 800.000 26.7E+3 107E+3 73.2E+3 CONCRETE
2 Rect 0.30x0.30 900.000 67.5E+3 67.5E+3 114E+3 CONCRETE
3 Rect 0.30x0.15 450.000 8.44E+3 33.8E+3 23.2E+3 CONCRETE

Materials
Mat Name E  Density 
(kN/mm 2) (kg/m3) (/°C)
1 CONCRETE 21.718 0.170 2.4E+3 10E -6

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

3 COMBINATION LOAD CASE 3 1 BM 1.20


2 BH 1.60

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 6
Job No Sheet No Rev
2
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

3D Rendered View (Input data was modified after picture taken)

R3 R3
R3 R3 R3 R3
R2
R3 R3 R3 R3
R2 R3 R2
R3 R3 R3 R3
R2 R3 R2
R1 R1 R3 R1 R3 R3
R2 R1 R3 R2
R3 R2 R3 R3
R1
R3 R1
R3 R1 R1 R3 R3
R1 R2 R3 R2 R2 R3
R2
R1 R1
R3 R1
R3 R2 R3 R1
R2
R2 R2 R3
R1 R2 R3 R3
R1 R1 R2 R1 R1
R3
R2 R3
R1 R3 R3 R3 R2
R3
R2
R1 R2 R1 R1 R2R1 R1 R2 R1
R2 R1 R1 R2
R1 R2 R1 R1 R2
R2 R1 R2R1 R2
R1 R2
R2R1 R1 R1
R1 R1 R2 R2 R1
R2 R2
R1 R2R1 R2
R1 R2 R2 R1 R1
R2
R2 R1
R1 R1 R1
R2R1 R1 R2 R2 R1 R2R1
R1
R2 R1
R1 R1 R1 R1 R1 R2
R2 R1
R2 R2 R1 R2R2
R1
R1 R2
R1 R2 R1 R1 R2 R2
R1 R2R1 R2 R2 R1 R1
R1 R2R2
R2 R1 R2
R2R1 R2
R1 R2 R1 R1
R1 R2R1
Y R2 R1 R1 R2
X R1
R2 R1 R1
R2
R1
Z R2 Load 3
R2
R2

Whole Structure (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 6
Job No Sheet No Rev
3
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 1

Whole Structure (Input data was modified after picture taken)

Y
X
Z Load 1

Whole Structure (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 6
Job No Sheet No Rev
4
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 1

Whole Structure (Input data was modified after picture taken)

Y
X
Z Load 1

Whole Structure (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 6
Job No Sheet No Rev
5
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 2

Whole Structure (Input data was modified after picture taken)

Y
X
Z Load 2

Whole Structure (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 6
Job No Sheet No Rev
6
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 3

Whole Structure (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 6
PERHITUNGAN BALOK (20/40)

A. DATA BALOK LANTAI 1

BAHAN STRUKTUR
Kuat tekan beton, fc ' = 22,5 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 250 mm
Tinggi balok h= 500 mm
Diameter tulangan (deform) yang digunakan, D= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, M u+ = 0,377 kNm
-
Momen rencana negatif akibat beban terfaktor, Mu = 9,130 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 10,872 kN

B. PERHITUNGAN TULANGAN

Untuk : fc' ≤ 30 MPa, b1 = 0,85


Untuk : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,0228
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5,8271
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 54,00 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 3,84
Digunakan jumlah tulangan dalam satu baris, ns = 4 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - n s * D - 2 * d s ) / ( ns - 1 ) = 31,33 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 37,00 mm
1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, M n = M u+ / f = 0,471 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 80 mm
Tinggi efektif balok, d = h - d' = 420,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,0107
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00003
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, rmin = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 350 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 3,095
Digunakan tulangan, 4 D 12
Luas tulangan terpakai,
2
As = n * p / 4 * D = 452 mm2
Jumlah baris tulangan, nb = n / n s = 1,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * y i
1 3 54,00 162,00
2 2 91,00 182,00
3 0 0,00 0,00
n= 5 S [ ni * y i ] = 344
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 68,80 mm
68,80 < 80  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 431,20 mm
a = As * fy / ( 0.85 * fc' * b ) = 39,739 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 78,154 kNm
Tahanan momen balok, f * Mn = 62,523 kNm
Syarat : f * Mn ≥ M u+
62,523 > 0,377  AMAN (OK)

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, M n = M u- / f = 11,413 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 80 mm
Tinggi efektif balok, d = h - d' = 420,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,2588
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00062
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, r min = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 350 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 3,095
Digunakan tulangan, 4 D 12
Luas tulangan terpakai,
2
As = n * p / 4 * D = 452 mm2
Jumlah baris tulangan, nb = n / n s = 1,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * y i
1 3 54,00 162,00
2 2 91,00 182,00
3 0 0,00 0,00
n= 5 S [ ni * y i ] = 344
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 68,80 mm
68,80 < 80  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 431,2 mm
a = As * fy / ( 0.85 * fc' * b ) = 39,739 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 78,154 kNm
Tahanan momen balok, f * Mn = 62,523 kNm
Syarat : f * Mn ≥ M u-
62,523 > 9,130  AMAN (OK)

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 10,872 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 280 MPa
Kuat geser beton, Vc = (√ fc') / 6 * b * d * 10-3 = 83,010 kN
Tahanan geser beton, f * Vc = 49,806 kN
 Hanya perlu tul.geser min
Tahanan geser sengkang, f * Vs = V u - f * Vc = - kN
Kuat geser sengkang, Vs = 10,872 kN
Digunakan sengkang berpenampang : 2 P 8
Luas tulangan geser sengkang,
2
Av = n s * p / 4 * P = 100,53 mm2
Jarak sengkang yang diperlukan : s = Av * fy * d / ( Vs * 103 ) = 1087,42 mm
Jarak sengkang maksimum, smax = d / 2 = 215,60 mm
Jarak sengkang maksimum, smax = 150,00 mm
Jarak sengkang yang harus digunakan, s= 150,00 mm
Diambil jarak sengkang :  s= 150 mm
Digunakan sengkang, 2 P 8 150
PERHITUNGAN RING BALOK (15/30)

A. DATA RING BALOK

BAHAN STRUKTUR
Kuat tekan beton, fc' = 22,5 MPa
Tegangan leleh baja (polos) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 150 mm
Tinggi balok h= 300 mm
Diameter tulangan (deform) yang digunakan, P= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, Mu+ = 0,102 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 0,517 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 0,194 kN

B. PERHITUNGAN TULANGAN

Untuk : fc' ≤ 30 MPa, b1 = 0,85


Untuk : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,0228
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5,8271
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 54,00 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 1,14
Digunakan jumlah tulangan dalam satu baris, ns = 2 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 18,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 37,00 mm
1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 0,128 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 60 mm
Tinggi efektif balok, d = h - d' = 240,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,0148
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00004
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, rmin = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 120 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 1,061
Digunakan tulangan, 3 D 12
Luas tulangan terpakai, As = n * p / 4 * D2 = 339 mm2
Jumlah baris tulangan, nb = n / n s = 1,50
nb < 3  (OK)

Baris Jumlah Jarak Juml. Jarak


ke ni yi ni * y i
1 2 54,00 108,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 2 S [ ni * y i ] = 108
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 54,00 mm
54,00 < 60  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 246,00 mm
a = As * fy / ( 0.85 * fc' * b ) = 49,674 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 31,516 kNm
Tahanan momen balok, f * Mn = 25,213 kNm
Syarat : f * Mn ≥ Mu+
25,213 > 0,102  AMAN (OK)

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 0,646 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 60 mm
Tinggi efektif balok, d = h - d' = 240,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,0748
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00018
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, r min = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 120 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 1,061
Digunakan tulangan, 2 D 12
Luas tulangan terpakai, As = n * p / 4 * D2 = 226 mm2
Jumlah baris tulangan, nb = n / n s = 1,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * y i
1 3 54,00 162,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 3 S [ ni * y i ] = 162
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 54,00 mm
54,00 < 60  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 246,0 mm
a = As * fy / ( 0.85 * fc' * b ) = 33,116 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 21,797 kNm
Tahanan momen balok, f * Mn = 17,438 kNm
Syarat : f * Mn ≥ Mu-
17,438 > 0,517  AMAN (OK)

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 0,194 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 280 MPa
Kuat geser beton, Vc = (√ fc') / 6 * b * d * 10-3 = 28,460 kN
Tahanan geser beton, f * Vc = 17,076 kN
 Hanya perlu tul.geser min
Tahanan geser sengkang, f * Vs = Vu - f * Vc = - kN
Kuat geser sengkang, Vs = 0,194 kN
Digunakan sengkang berpenampang : 2 P 8
Luas tulangan geser sengkang, Av = ns * p / 4 * P2 = 100,53 mm2
Jarak sengkang yang diperlukan : s = Av * fy * d / ( Vs * 103 ) = 34823,10 mm
Jarak sengkang maksimum, smax = d / 2 = 123,00 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 123,00 mm
Diambil jarak sengkang :  s= 120 mm
Digunakan sengkang, 2 P 8 120
Job No Sheet No Rev
1
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 3 : Displacement

Whole Structure Displacements 1000mm:1m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)

Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 3
Job No Sheet No Rev
2
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Y
X
Z Load 3 : Bending Z

Whole Structure Mz 100kNm:1m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)

Y
X
Z Load 3 : Beam Stress

Whole Structure Beam Stress 5e+007mm:m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)

Failed Members
There is no data of this type.

Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 3
Job No Sheet No Rev
3
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref

By Date20-Mar-23 Chd

Client File Date/Time


ANALISA STRUKTUR RUMAH DINAS
20-Mar-2023
BRI KOTA20:38
SINGKAWANG.

Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 32 3:COMBINATION LOAD CASE 102.475
4.222 3 -2.625 -0.746 -0.011 -1.105
Min FX 42 3:COMBINATION LOAD CASE 367.761
-4.315 -0.761 0.015 -0.002 1.279
Max FY 70 3:COMBINATION LOAD
-0.067
CASE 242.620
3 2.184 0.544 -0.007 0.005
Min FY 36 2:BH 0.186 3.643 -0.166 -0.048 -0.002 -0.042
Max FZ 86 3:COMBINATION LOAD
-2.990
CASE 397.466 4.895 1.492 -0.012 0.873
Min FZ 46 3:COMBINATION LOAD
-1.440
CASE 387.535 -5.128 -1.194 -0.020 0.415
Max MX 50 3:COMBINATION LOAD
-2.024
CASE 176.245
3 4.873 1.580 -0.009 0.571
Min MX 64 3:COMBINATION LOAD
2.772
CASE 178.254
3 -4.241 -1.316 -0.014 -0.779
Max MY 48 2:BH -0.080 11.398 -0.332 -0.102 0.013 0.027
Min MY 36 3:COMBINATION LOAD
1.263
CASE 353.895 -0.900 -0.182 -0.037 -0.226
Max MZ 42 3:COMBINATION LOAD
-4.315
CASE 367.761 -0.761 0.015 -0.002 1.279
Min MZ 32 3:COMBINATION LOAD
4.222
CASE 102.475
3 -2.625 -0.746 -0.011 -1.105

Statics Check Results


L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
1:BM Loads 0.000 -2.7E+3 0.000 -19.9E+3 0.000 -17.1E+3
1:BM Reactions -0.000 2.7E+3 0.000 19.9E+3 0.000 17.1E+3
Difference -0.000 0.000 0.000 -0.000 0.000 -0.000
2:BH Loads 0.000 -487.340 0.000 -3.63E+3 0.000 -3.09E+3
2:BH Reactions -0.000 487.340 -0.000 3.63E+3 0.000 3.09E+3
Difference -0.000 0.000 -0.000 -0.000 0.000 -0.000

Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 3
ANALISA STRUKTUR PEMBANGUNAN RUMAH DINAS BANK BRI KOTA SINGKAWANG
PERHITUNGAN KOLOM 30/30 LANTAI 1
Data-data :
a. Penampang Beton
Lebar = 30 cm
Tinggi = 30 cm
b. Momen beban terfaktor
Pud = 19570,89816 kg
Mud = 41084,36622 kg-cm
c. Penulangan
f = 12
nst = 8 buah
fs = 8 mm - 150 mm (sengkang)
selimut beton = 4 cm
f c' = 225 kg/cm 2
fy = 4282,81 kg/cm 2
faktor reduksi = 0,75

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 26095 kg
Mnd = 54779 kg-cm
Luas tulangan total :
Ast = 9,05 cm2 = 1,01% Ab
Kondisi penampang mengalami tekan murni :
Po = 209145 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 167316 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 24,6 cm
s = 5,4 cm
Luas tulangan tekan & tulangan tarik :
As = 4,52 cm2
A s' = 4,52 cm2
Tinggi garis netral pada kondisi berimbang :
xb = 14,64 cm
b1 = 0,85
ab = 12,45 cm

Regangan dan tegangan baja tulangan tekan :


e s' = 0,00189
ey = 0,00204

f s' = 3976,944146 kg/cm 2


Gaya-gaya nominal pada kondisi berimbang :
Cc = 71419 kg
Cs = 17991 kg
Ts = 19375 kg
Pnb = 70036 kg
Mnb = 985499 kg-cm

Pn < Pnb : Zona kontrol tarik


x = 20,00 cm < 14,64 cm
a = 17,00 cm
Regangan dan tegangan baja tulangan :
e s' = 0,00219
ey = 0,00204
f s' = 4282,81 kg/cm 2
es = 0,00069
fs = 1449 kg/cm 2
Gaya-gaya nominal penampang :
Cc = 97538 kg
Cs = 19375 kg
Ts = 6555 kg
Pnk = 110357 kg > 26095 kg O.K. !
Mnk = 882923 kg-cm > 54779 kg-cm O.K. !
Puk = 77 ton 18,27 ton
Muk = 6 ton-m 0,41 ton-m
PERHITUNGAN KOLOM LANTAI 2 (30/30)
Data-data :
a. Penampang Beton
Lebar = 30 cm
Tinggi = 30 cm
b. Momen beban terfaktor
Pud = 3760,14375 kg
Mud = 76662,26489 kg-cm
c. Penulangan
f = 12
nst = 8 buah
fs = 8 mm - 150 mm (sengkang)
selimut beton = 4 cm
f c' = 225 kg/cm 2
fy = 4200 kg/cm 2
faktor reduksi = 0,75

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 5014 kg
Mnd = 102216 kg-cm
Luas tulangan total :
Ast = 9,05 cm2 = 1,01% Ab
Kondisi penampang mengalami tekan murni :
Po = 208395 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 166716 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 24,6 cm
s = 5,4 cm
Luas tulangan tekan & tulangan tarik :
As = 4,52 cm2
A s' = 4,52 cm2
Tinggi garis netral pada kondisi berimbang :
xb = 14,76 cm
b1 = 0,85
ab = 12,55 cm

Regangan dan tegangan baja tulangan tekan :


e s' = 0,00190
ey = 0,00200

f s' = 3995,121951 kg/cm 2


Gaya-gaya nominal pada kondisi berimbang :
Cc = 71983 kg
Cs = 18074 kg
Ts = 19000 kg
Pnb = 71056 kg
Mnb = 984102 kg-cm

Pn < Pnb : Zona kontrol tarik


x = 20,00 cm < 14,76 cm
a = 17,00 cm
Regangan dan tegangan baja tulangan :
e s' = 0,00219
ey = 0,00200
f s' = 4200,00 kg/cm 2
es = 0,00069
fs = 1449 kg/cm 2
Gaya-gaya nominal penampang :
Cc = 97538 kg
Cs = 19000 kg
Ts = 6555 kg
Pnk = 109983 kg > 5014 kg O.K. !
Mnk = 879326 kg-cm > 102216 kg-cm O.K. !
Puk = 77 ton 3,51 ton
Muk = 6 ton-m 0,77 ton-m
Pondasi Tapak Beton Type Bujursangkar

Project : RUMAH DINAS BANK BRI KOTA SINGKAWANG


Client : BANK BRI
Engineer Checked Approved
Name
Date 20/03/2023 20:27

Data Struktur : Pu

Mu
1 Dimensi Kolom b = 300 mm b
h = 300 mm Muka Tanah
Type Kolom αs = 40
2 Dimensi Pondasi B = 0,80 m ha
L = 0,80 m B=L
ht = 0,30 m
3 Mutu Beton fc' = 22,5 Mpa ht
4 Mutu Baja fy' = 420 Mpa
5 Besi tulangan D = 12
(dipakai) L
6 BJ Beton γc = 24 KN/m3
L
Data Tanah :

6 Daya dukung tanah σt = 1020 Kpa


7 Berat tanah γt = 1,20 KN/m3
8 Tebal tanah diatas ha = 0,80 m
pondasi
h
B
Data Beban :
B=L
9 Beban P ultimate Pult = 242,62 KN
10 Beban M ultimate Mult = 0,544 KNm

Result
Cek Status Pondasi :

Tegangan yang terjadi pada tanah σmaks = 393,6288 < 1020 OK!
σmin = 380,8788 < 1020 OK!

Kontrol gaya geser 1 arah Ø.Vc = 103,881


Vu = 9,756 < 103,881 OK!

Kontrol gaya geser 2 arah Ø.Vc = 539,141


Vu = 143,531 < 539,141 OK!

Penulangan Pondasi
Arah X = Y D 12 - 163
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27

Analisa

q = Berat Fondasi + Berat Tanah


= ht x γc + ha x γt
= 0,30 x 24 + 0,80 x 1,20
= 8,16 KN/m2

Cek Fondasi Terhadap Tegangan Izin Tanah

Tegangan yang terjadi pada tanah

Pult Mult
σmaks = + + q ≤ σt
B x L 1/6 B x L2

242,62 0,544
= + + 8,16 ≤ 1020
2
0,80 x 0,80 1/6 0,80 x 0,80

= 379,0938 + 6,375 + 8,16

= 393,629 ≤ 105 Not Save

Pult Mult
σmin = - + q ≤ σt
B x L 1/6 B x L2

242,62 0,544
= - + 8,16 ≤ 1020
2
0,80 x 0,80 1/6 0,80 x 0,80

= 379,0938 - 6,375 + 8,16

= 380,879 ≤ 105 Not Save

Kontrol Tegangan Geser 1 Arah

0,30
ds = 75 + D/2
= 75 + 6,00
= 81,00 mm

d = ht - ds
= 300 - 81,00
0,30 = 219,00

L = 0,80 a = B/2 - b/2 - d


= 400 - 150 - 219,00
0,80 = 31,00 mm
= 0,031 m

σa = σmin + B - a x σmaks - σmin b

= 380,879 + 0,80 - 0,031 x 393,629 - 380,879 0,80


0,80
0,3 = 393,135 KN/m2

Gaya tekan ke atas dari tanah (Vu)

Vu = a x B x σmaks + σa 2
0,3
= 0,031 x 0,80 x 393,629 + 393,135 2

= 9,756 KN
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27

0,30 0,219 0,031 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)

fc'
Ø.Vc = Ø x x B x d
6
22,5
= 0,75 x x 0,80 x 219,00
6
0,219
= 103,881 KN
0,80
Ø.Vc = 103,881 > Vu = 9,756 ......... Save!

σmin σa σmaks
380,879 393,135 393,629

Kontrol Tegangan Geser 2 Arah (Geser Pons)

Dimensi Kolom, b = 300


h = 300

b + d = 300,00 + 219,00 = 519,00 mm = 0,519 m


h + d = 300 + 219,00 = 519,00 mm = 0,519 m

Gaya Tekan Ke Atas (Geser Pons)

σmaks + σmin
2
Vu = B - b + d x h + d x
2

393,629 + 380,879
2
= 0,80 - 0,519 x 0,519 x
2
= 143,5313

hk 300
βc = = = 1,000
Bk 300

bo = 2 x bk + d + hk + d

bo = 2 x 300 + 219,00 + 300 + 219,00

= 2076 mm

Gaya geser yang ditahan oleh beton

2 fc' bo d
Vc1 = 1 + x
βc 6
0,110
2 22,5 2076 219,00
0,30
Vc1 = 1 + x
1,000 6
0,110
Vc1 = 1078282,923 N
= 1078,283 KN

0,141 0,110 0,30 0,110 0,141


αs d fc' bo d
Vc2 = 2 + x
bo 12

40 219,00 22,5 2076 219,00


Vc2 = 2 + x
0,219 2076 12

0,081 Vc2 = 938043,815 N


0,80 = 938,044 KN
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27

1
Vc3 = x fc' bo d
3
1
σmin Vc3 = x 22,5 2076 219,00
380,879 σmaks 3
393,629
= 718855,2823 N
= 718,855 KN

Jadi

Vc1 = 1078,283
Vc2 = 938,044 Diambil yang terkecil
Vc3 = 718,855

Vc = 718,855 KN
Ø.Vc = 0,75 x 718,855
= 539,141 KN

Ø.Vc = 539,141 > Vu = 143,531 ......... Save!

Hitungan Penulangan Fondasi

0,30 ds = 75 + 12 + 6
= 93,000 mm
≈ 0,093 m
0,25
0,40 d = ht - ds
= 0,30 - 0,093
= 0,207 m
0,30 0,207 = 207 mm
0,093
B h
0,80 x = -
2 2

800 300
x = -
2 2
σmin σx σmaks x = 250 mm
380,879 389,644 393,629 = 0,25 m

σx = σmin + B - x x σmaks - σmin B

σx = 380,879 + 0,80 - 0,25 x 393,629 - 380,879 0,80


`
= 389,644 KN/m3

σmaks - σx
2 2
Mu = 0,5 σx x + x
3
393,629 - 389,644
2 2
= 0,5 389,644 0 + 0,25
3
= 12,259 KNm

Mu
K =
2
Ø x b x d

12259394,531
=
2
0,8 x 1000 x 207

= 0,358 Mpa
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27

382,5 x 0,85 x 600 + fy - 225 x β1 fc'


Kmaks =
2
600 + fy

382,5 x 0,85 x 600 + 420 - 225 x 0,85 22,5


Kmaks =
2
600 + 420

= 5,827 Mpa

K < Kmaks
K = 0,358 < Kmaks = 5,827 ......... OK!

2 x K
a' = 1 - 1 - d
0,85 x fc'

2 x 0,358
= 1 - 1 - 207
0,85 x 22,5

= 3,908 mm

0,85 x fc' x a' x b


As(1) =
fy

0,85 x 22,5 x 3,908 x 1000


=
420
= 177,942 mm2

Jika
fc' ≤ 31,36 Mpa
maka
1,4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

Jika
fc' > 31,36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

fc' = 22,5 < 31,36


maka yang dipakai adalah pers ..................... (R.1)

1,4 x b x d fc' x b x d
As(2) = ....... (R.1) As(2') = ....... (R.2)
fy 4 fy

1,4 x 1000 x 207 0 x 0 x 0


= =
420 4 0

= 690,000 mm2 ........... As dipakai = #DIV/0! mm2 ........... As tidak Dipakai!

Dipilih yang terbesar dari As(1) dan As(2)......... Sehingga,

As(1) = 177,942 mm2


As = 690,000 mm2
As(2) = 690,000 mm2
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27
Jarak tulangan,

2
0,25 x phi x D x S
s =
As

2
0,25 x 3,14 x 12 x 1000
=
690,000

= 163,826 mm

s ≤ 2 x ht
≤ 2 x 300
≤ 600

s ≤ 450 mm

Dipilih (s) yang terkecil = 163,826 mm

Jadi dipakai tulangan = D 12 - 163


Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27

Cek Panjang Penyaluran Tegangan Tulangan

9 x fy x α β x γ x λ
Panjang penyaluran tegangan (λd) = db
c + Ktr
10 fc'
db

9 x 420 x 1 1 x 0,8 x 1
= 12
75 + 0
10 22,5
12

9 x 420 x 1 1 x 0,8 x 1
= 12

10 22,5 2,5

= 306,007 mm > 300 mm


≈ 307 mm

B Bk
Panjang Tersedia (λt) = - - 75
2 2

800 300
= - - 75
2 2

= 175

Panjang Tersedia (λt) > Panjang penyaluran tegangan (λd)


175 > 307 ....... NOK!

Kuat Dukung Fondasi

Pu = Ø x 0,85 x fc' x A

= 0,7 x 0,85 x 22,5 x 90000

= 1204875 N

= 1204,875 KN

Pu,k = 242,62 KN

Pu = 1204,875 > Pu,k = 242,62 ....... OK!


Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27

SKSNI 03-2847-2002
Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27
Job No. Sheet No
3
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27

0,80

0,80

D 12 - 163

DETAIL PONDASI
Non Scale

300

D 12 - 163

300 207

93
800

POTONGAN 1-1
Non Scale

SNI 03-2847-2002 (Pasal 17.4.3)

SNI 03-2847-2002 (Pasal 17.7)

SNI 03-2847-2002 (Pasal 9.7.1)


PERHITUNGAN PLAT LANTAI

A. DATA BAHAN STRUKTUR

Kuat tekan beton, fc' = 22,5 MPa


Tegangan leleh baja untuk tulangan lentur, fy = 240 MPa

B. DATA PLAT LANTAI

Panjang bentang plat arah x, Lx = 3,40 m


Panjang bentang plat arah y, Ly = 4,00 m
Tebal plat lantai, h= 120 mm
Koefisien momen plat untuk : Ly / Lx = 1,18 KOEFISIEN MOMEN PLAT
DUA ARAH karena Ly/Lx<2
Lapangan x Clx = 25
Lapangan y Cly = 21
Tumpuan x Ctx = 59
Tumpuan y Cty = 54
Tabel 2 dengan 4 sisi terjepit

Diameter tulangan yang digunakan, = 8 mm


Tebal bersih selimut beton, ts = 40 mm

C. BEBAN PLAT LANTAI


1. BEBAN MATI (DEAD LOAD )

No Jenis Beban Mati Berat satuan Tebal (m) Q (kN/m2)


1 Berat sendiri plat lantai (kN/m3) 24,0 0,12 2,880
2 Berat finishing lantai (kN/m3) 0,1 0,05 0,005
3 Berat plafon dan rangka (kN/m2) 0,2 - 0,200
4 Berat instalasi ME (kN/m2) 0,5 - 0,500
5 Berat mesin genset 0,0 0,000
Total beban mati, QD = 3,585

2. BEBAN HIDUP (LIVE LOAD )

Beban hidup pada lantai bangunan = 250 kg/m2


 QL = 2,5 kN/m2

3. BEBAN RENCANA TERFAKTOR

2
Beban rencana terfaktor, Qu = 1.2 * QD + 1.6 * QL = 8,302 kN/m
4. MOMEN PLAT AKIBAT BEBAN TERFAKTOR

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 = 2,399 kNm/m


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Lx2 = 2,015 kNm/m
2
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx = 5,662 kNm/m
2
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Lx = 5,182 kNm/m
Momen rencana (maksimum) plat,  Mu = 5,662 kNm/m

D. PENULANGAN PLAT

Untuk : fc' ≤ 30 MPa, b1 = 0,85


Untuk : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0,0484
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] = 6,7259
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  / 2 = 44,0 mm
Tebal efektif plat lantai, d = h - ds = 76,0 mm
Ditinjau plat lantai selebar 1 m,  b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 7,078 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 1,22539
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc' / fy * [ 1 -  [ 1 – 2 * Rn / ( 0.85 * fc' ) ] = 0,0053
Rasio tulangan minimum, rmin = 0,0025
Rasio tulangan yang digunakan,  r= 0,0053
Luas tulangan yang diperlukan, As = r * b * d = 401 mm2
2
Jarak tulangan yang diperlukan, s = p / 4 *  * b / As = 125 mm
Jarak tulangan maksimum, smax = 2 * h = 240 mm
Jarak tulangan maksimum, smax = 200 mm
Jarak sengkang yang harus digunakan, s= 125 mm
Diambil jarak sengkang :  s= 120 mm
Digunakan tulangan, 8 - 120
Luas tulangan terpakai,
2
As = p / 4 *  * b / s = 419 mm2

E. KONTROL LENDUTAN PLAT


Mpa = N/mm2
Modulus elastis beton, Ec = 4700*√ fc' = 22294 MPa
Modulus elastis baja tulangan, Es = 2,10E+05 MPa
Beban merata (tak terfaktor) padaplat, Q = QD + QL = 6,085 N/mm
Panjang bentang plat, Lx = 3400 mm
Batas lendutan maksimum yang diijinkan, Lx / 240 = 14,167 mm
Momen inersia brutto penampang plat, Ig = 1/12 * b * h3 = 144000000 mm3
Modulus keruntuhan lentur beton, fr = 0.7 * √ fc' = 3,320 MPa
Nilai perbandingan modulus elastis, n = Es / Ec = 9,42
Jarak garis netral terhadap sisi atas beton, c = n * As / b = 3,946 mm
Momen inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :
3 2
Icr = 1/3 * b * c + n * As * ( d - c ) = 20505627 mm4
yt = h / 2 = 60 mm
Momen retak : Mcr = fr * Ig / yt = 7968940 Nmm
Momen maksimum akibat beban (tanpa faktor beban) :
Ma = 1 / 8 * Q * Lx2 = 8792825 Nmm
Inersia efektif untuk perhitungan lendutan,
3 3
Ie = ( Mcr / Ma ) * Ig + [ 1 - ( Mcr / Ma ) ] * Icr = 112436948 mm4
Lendutan elastis seketika akibat beban mati dan beban hidup :
de = 5 / 384 * Q * Lx4 / ( Ec * Ie ) = 4,224 mm
Rasio tulangan slab lantai : r = As / ( b * d ) = 0,0055
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :
z= 2,0
l = z / ( 1 + 50 * r ) = 1,5679

Lendutan jangka panjang akibat rangkak dan susut :


dg = l * 5 / 384 * Q * Lx4 / ( Ec * Ie ) = 6,623 mm
Lendutan total, dtot = de + dg = 10,847 mm
Syarat : dtot ≤ Lx / 240
10,847 < 14,167  AMAN (OK)
PERHITUNGAN BALOK SLOOF (20/40)

A. DATA SLOOF

BAHAN STRUKTUR
Kuat tekan beton, fc' = 22,5 MPa
Tegangan leleh baja (polos) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 200 mm
Tinggi balok h= 400 mm
Diameter tulangan (deform) yang digunakan, P= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, Mu+ = 0,054 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 0,303 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 2,095 kNm

B. PERHITUNGAN TULANGAN

Untuk : fc' ≤ 30 MPa, b1 = 0,85


Untuk : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,0228
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5,8271
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 54,00 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 2,49
Digunakan jumlah tulangan dalam satu baris, ns = 3 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 28,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 37,00 mm
1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 0,068 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 60 mm
Tinggi efektif balok, d = h - d' = 340,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,0029
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00001
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, rmin = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 227 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 2,004
Digunakan tulangan, 3 D 12
Luas tulangan terpakai, As = n * p / 4 * D2 = 339 mm2
Jumlah baris tulangan, nb = n / n s = 1,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * y i
1 3 54,00 162,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 3 S [ ni * y i ] = 162
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 54,00 mm
54,00 < 60  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 346,00 mm
a = As * fy / ( 0.85 * fc' * b ) = 37,256 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 46,651 kNm
Tahanan momen balok, f * Mn = 37,321 kNm
Syarat : f * Mn ≥ Mu+
37,321 > 0,054  AMAN (OK)

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 0,379 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 60 mm
Tinggi efektif balok, d = h - d' = 340,00 mm
Faktor tahanan momen, Rn = Mn * 106 / ( b * d2 ) = 0,0164
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0,00004
Rasio tulangan minimum, rmin =  fc' / ( 4 * fy ) = 0,00282
Rasio tulangan minimum, r min = 1.4 / fy = 0,00333
Rasio tulangan yang digunakan,  r= 0,00333
Luas tulangan yang diperlukan, As = r * b * d = 227 mm2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 2,004
Digunakan tulangan, 3 D 12
Luas tulangan terpakai, As = n * p / 4 * D2 = 339 mm2
Jumlah baris tulangan, nb = n / n s = 1,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * y i
1 3 54,00 162,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 3 S [ ni * y i ] = 162
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 54,00 mm
54,00 < 60  perkiraan d' (OK)
Tinggi efektif balok, d = h - d' = 346,0 mm
a = As * fy / ( 0.85 * fc' * b ) = 37,256 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 46,651 kNm
Tahanan momen balok, f * Mn = 37,321 kNm
Syarat : f * Mn ≥ Mu-
37,321 > 0,303  AMAN (OK)

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 2,095 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 280 MPa
Kuat geser beton, Vc = (√ fc') / 6 * b * d * 10-3 = 53,759 kN
Tahanan geser beton, f * Vc = 32,255 kN
 Hanya perlu tul.geser min
Tahanan geser sengkang, f * Vs = Vu - f * Vc = - kN
Kuat geser sengkang, Vs = 2,095 kN
Digunakan sengkang berpenampang : 2 P 8
Luas tulangan geser sengkang, Av = ns * p / 4 * P2 = 100,53 mm2
Jarak sengkang yang diperlukan : s = Av * fy * d / ( Vs * 103 ) = 4568,28 mm
Jarak sengkang maksimum, smax = d / 2 = 173,00 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 173,00 mm
Diambil jarak sengkang :  s= 170 mm
Digunakan sengkang, 2 P 8 170