ANALISA STRUKTUR
PEKERJAAN :
PEMBANGUNAN RUMAH DINAS BANK BRI
LOKASI :
M
JL. NUSANTARA KEL. CONDONG KEC. SINGKAWANG TENGAH
KOTA SINGKAWANG
Job No Sheet No Rev
1
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Job Information
Engineer Checked Approved
Name:
Date: 20-Mar-23
Primary 1 BM
Primary 2 BH
Combination 3 COMBINATION LOAD CASE 3
Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
1 Rect 0.40x0.20 800.000 26.7E+3 107E+3 73.2E+3 CONCRETE
2 Rect 0.30x0.30 900.000 67.5E+3 67.5E+3 114E+3 CONCRETE
3 Rect 0.30x0.15 450.000 8.44E+3 33.8E+3 23.2E+3 CONCRETE
Materials
Mat Name E Density
(kN/mm 2) (kg/m3) (/°C)
1 CONCRETE 21.718 0.170 2.4E+3 10E -6
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 6
Job No Sheet No Rev
2
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
R3 R3
R3 R3 R3 R3
R2
R3 R3 R3 R3
R2 R3 R2
R3 R3 R3 R3
R2 R3 R2
R1 R1 R3 R1 R3 R3
R2 R1 R3 R2
R3 R2 R3 R3
R1
R3 R1
R3 R1 R1 R3 R3
R1 R2 R3 R2 R2 R3
R2
R1 R1
R3 R1
R3 R2 R3 R1
R2
R2 R2 R3
R1 R2 R3 R3
R1 R1 R2 R1 R1
R3
R2 R3
R1 R3 R3 R3 R2
R3
R2
R1 R2 R1 R1 R2R1 R1 R2 R1
R2 R1 R1 R2
R1 R2 R1 R1 R2
R2 R1 R2R1 R2
R1 R2
R2R1 R1 R1
R1 R1 R2 R2 R1
R2 R2
R1 R2R1 R2
R1 R2 R2 R1 R1
R2
R2 R1
R1 R1 R1
R2R1 R1 R2 R2 R1 R2R1
R1
R2 R1
R1 R1 R1 R1 R1 R2
R2 R1
R2 R2 R1 R2R2
R1
R1 R2
R1 R2 R1 R1 R2 R2
R1 R2R1 R2 R2 R1 R1
R1 R2R2
R2 R1 R2
R2R1 R2
R1 R2 R1 R1
R1 R2R1
Y R2 R1 R1 R2
X R1
R2 R1 R1
R2
R1
Z R2 Load 3
R2
R2
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 6
Job No Sheet No Rev
3
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Y
X
Z Load 1
Y
X
Z Load 1
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 6
Job No Sheet No Rev
4
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Y
X
Z Load 1
Y
X
Z Load 1
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 6
Job No Sheet No Rev
5
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Y
X
Z Load 2
Y
X
Z Load 2
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 6
Job No Sheet No Rev
6
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Y
X
Z Load 3
Print Time/Date: 20/03/2023 20:40 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 6
PERHITUNGAN BALOK (20/40)
BAHAN STRUKTUR
Kuat tekan beton, fc ' = 22,5 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 250 mm
Tinggi balok h= 500 mm
Diameter tulangan (deform) yang digunakan, D= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, M u+ = 0,377 kNm
-
Momen rencana negatif akibat beban terfaktor, Mu = 9,130 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 10,872 kN
B. PERHITUNGAN TULANGAN
3. TULANGAN GESER
BAHAN STRUKTUR
Kuat tekan beton, fc' = 22,5 MPa
Tegangan leleh baja (polos) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 150 mm
Tinggi balok h= 300 mm
Diameter tulangan (deform) yang digunakan, P= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, Mu+ = 0,102 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 0,517 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 0,194 kN
B. PERHITUNGAN TULANGAN
3. TULANGAN GESER
By Date20-Mar-23 Chd
Y
X
Z Load 3 : Displacement
Whole Structure Displacements 1000mm:1m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)
Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 3
Job No Sheet No Rev
2
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Y
X
Z Load 3 : Bending Z
Whole Structure Mz 100kNm:1m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)
Y
X
Z Load 3 : Beam Stress
Whole Structure Beam Stress 5e+007mm:m 3 COMBINATION LOAD CASE 3 (Input data was modified after picture taken)
Failed Members
There is no data of this type.
Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 3
Job No Sheet No Rev
3
Part
Software licensed to
Job Title ANALISA STRUKTUR RUMAH DINAS BANK BRI KOTA SINGKAWANG Ref
By Date20-Mar-23 Chd
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 32 3:COMBINATION LOAD CASE 102.475
4.222 3 -2.625 -0.746 -0.011 -1.105
Min FX 42 3:COMBINATION LOAD CASE 367.761
-4.315 -0.761 0.015 -0.002 1.279
Max FY 70 3:COMBINATION LOAD
-0.067
CASE 242.620
3 2.184 0.544 -0.007 0.005
Min FY 36 2:BH 0.186 3.643 -0.166 -0.048 -0.002 -0.042
Max FZ 86 3:COMBINATION LOAD
-2.990
CASE 397.466 4.895 1.492 -0.012 0.873
Min FZ 46 3:COMBINATION LOAD
-1.440
CASE 387.535 -5.128 -1.194 -0.020 0.415
Max MX 50 3:COMBINATION LOAD
-2.024
CASE 176.245
3 4.873 1.580 -0.009 0.571
Min MX 64 3:COMBINATION LOAD
2.772
CASE 178.254
3 -4.241 -1.316 -0.014 -0.779
Max MY 48 2:BH -0.080 11.398 -0.332 -0.102 0.013 0.027
Min MY 36 3:COMBINATION LOAD
1.263
CASE 353.895 -0.900 -0.182 -0.037 -0.226
Max MZ 42 3:COMBINATION LOAD
-4.315
CASE 367.761 -0.761 0.015 -0.002 1.279
Min MZ 32 3:COMBINATION LOAD
4.222
CASE 102.475
3 -2.625 -0.746 -0.011 -1.105
Print Time/Date: 20/03/2023 20:42 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 3
ANALISA STRUKTUR PEMBANGUNAN RUMAH DINAS BANK BRI KOTA SINGKAWANG
PERHITUNGAN KOLOM 30/30 LANTAI 1
Data-data :
a. Penampang Beton
Lebar = 30 cm
Tinggi = 30 cm
b. Momen beban terfaktor
Pud = 19570,89816 kg
Mud = 41084,36622 kg-cm
c. Penulangan
f = 12
nst = 8 buah
fs = 8 mm - 150 mm (sengkang)
selimut beton = 4 cm
f c' = 225 kg/cm 2
fy = 4282,81 kg/cm 2
faktor reduksi = 0,75
Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 26095 kg
Mnd = 54779 kg-cm
Luas tulangan total :
Ast = 9,05 cm2 = 1,01% Ab
Kondisi penampang mengalami tekan murni :
Po = 209145 kg
Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 5014 kg
Mnd = 102216 kg-cm
Luas tulangan total :
Ast = 9,05 cm2 = 1,01% Ab
Kondisi penampang mengalami tekan murni :
Po = 208395 kg
Data Struktur : Pu
Mu
1 Dimensi Kolom b = 300 mm b
h = 300 mm Muka Tanah
Type Kolom αs = 40
2 Dimensi Pondasi B = 0,80 m ha
L = 0,80 m B=L
ht = 0,30 m
3 Mutu Beton fc' = 22,5 Mpa ht
4 Mutu Baja fy' = 420 Mpa
5 Besi tulangan D = 12
(dipakai) L
6 BJ Beton γc = 24 KN/m3
L
Data Tanah :
Result
Cek Status Pondasi :
Tegangan yang terjadi pada tanah σmaks = 393,6288 < 1020 OK!
σmin = 380,8788 < 1020 OK!
Penulangan Pondasi
Arah X = Y D 12 - 163
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27
Analisa
Pult Mult
σmaks = + + q ≤ σt
B x L 1/6 B x L2
242,62 0,544
= + + 8,16 ≤ 1020
2
0,80 x 0,80 1/6 0,80 x 0,80
Pult Mult
σmin = - + q ≤ σt
B x L 1/6 B x L2
242,62 0,544
= - + 8,16 ≤ 1020
2
0,80 x 0,80 1/6 0,80 x 0,80
0,30
ds = 75 + D/2
= 75 + 6,00
= 81,00 mm
d = ht - ds
= 300 - 81,00
0,30 = 219,00
Vu = a x B x σmaks + σa 2
0,3
= 0,031 x 0,80 x 393,629 + 393,135 2
= 9,756 KN
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27
0,30 0,219 0,031 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)
fc'
Ø.Vc = Ø x x B x d
6
22,5
= 0,75 x x 0,80 x 219,00
6
0,219
= 103,881 KN
0,80
Ø.Vc = 103,881 > Vu = 9,756 ......... Save!
σmin σa σmaks
380,879 393,135 393,629
σmaks + σmin
2
Vu = B - b + d x h + d x
2
393,629 + 380,879
2
= 0,80 - 0,519 x 0,519 x
2
= 143,5313
hk 300
βc = = = 1,000
Bk 300
bo = 2 x bk + d + hk + d
= 2076 mm
2 fc' bo d
Vc1 = 1 + x
βc 6
0,110
2 22,5 2076 219,00
0,30
Vc1 = 1 + x
1,000 6
0,110
Vc1 = 1078282,923 N
= 1078,283 KN
1
Vc3 = x fc' bo d
3
1
σmin Vc3 = x 22,5 2076 219,00
380,879 σmaks 3
393,629
= 718855,2823 N
= 718,855 KN
Jadi
Vc1 = 1078,283
Vc2 = 938,044 Diambil yang terkecil
Vc3 = 718,855
Vc = 718,855 KN
Ø.Vc = 0,75 x 718,855
= 539,141 KN
0,30 ds = 75 + 12 + 6
= 93,000 mm
≈ 0,093 m
0,25
0,40 d = ht - ds
= 0,30 - 0,093
= 0,207 m
0,30 0,207 = 207 mm
0,093
B h
0,80 x = -
2 2
800 300
x = -
2 2
σmin σx σmaks x = 250 mm
380,879 389,644 393,629 = 0,25 m
σmaks - σx
2 2
Mu = 0,5 σx x + x
3
393,629 - 389,644
2 2
= 0,5 389,644 0 + 0,25
3
= 12,259 KNm
Mu
K =
2
Ø x b x d
12259394,531
=
2
0,8 x 1000 x 207
= 0,358 Mpa
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner 0,00 Date
Client. BANK BRI File Date/time 20/03/2023 20:27
= 5,827 Mpa
K < Kmaks
K = 0,358 < Kmaks = 5,827 ......... OK!
2 x K
a' = 1 - 1 - d
0,85 x fc'
2 x 0,358
= 1 - 1 - 207
0,85 x 22,5
= 3,908 mm
Jika
fc' ≤ 31,36 Mpa
maka
1,4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03-2847-2002 (Pasal 12.5.1)
Jika
fc' > 31,36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03-2847-2002 (Pasal 12.5.1)
1,4 x b x d fc' x b x d
As(2) = ....... (R.1) As(2') = ....... (R.2)
fy 4 fy
2
0,25 x phi x D x S
s =
As
2
0,25 x 3,14 x 12 x 1000
=
690,000
= 163,826 mm
s ≤ 2 x ht
≤ 2 x 300
≤ 600
s ≤ 450 mm
9 x fy x α β x γ x λ
Panjang penyaluran tegangan (λd) = db
c + Ktr
10 fc'
db
9 x 420 x 1 1 x 0,8 x 1
= 12
75 + 0
10 22,5
12
9 x 420 x 1 1 x 0,8 x 1
= 12
10 22,5 2,5
B Bk
Panjang Tersedia (λt) = - - 75
2 2
800 300
= - - 75
2 2
= 175
Pu = Ø x 0,85 x fc' x A
= 1204875 N
= 1204,875 KN
Pu,k = 242,62 KN
SKSNI 03-2847-2002
Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27
Job No. Sheet No
3
Program Hitung Pondasi Tapak
Part
Job Title Ref
RUMAH DINAS BANK BRI KOTA SINGKAWANG Enginner Date
Client. BANK BRI File Date/time 20/03/2023 20:27
0,80
0,80
D 12 - 163
DETAIL PONDASI
Non Scale
300
D 12 - 163
300 207
93
800
POTONGAN 1-1
Non Scale
2
Beban rencana terfaktor, Qu = 1.2 * QD + 1.6 * QL = 8,302 kN/m
4. MOMEN PLAT AKIBAT BEBAN TERFAKTOR
D. PENULANGAN PLAT
A. DATA SLOOF
BAHAN STRUKTUR
Kuat tekan beton, fc' = 22,5 MPa
Tegangan leleh baja (polos) untuk tulangan lentur, fy = 420 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 280 MPa
DIMENSI BALOK
Lebar balok b= 200 mm
Tinggi balok h= 400 mm
Diameter tulangan (deform) yang digunakan, P= 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 40 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, Mu+ = 0,054 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 0,303 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 2,095 kNm
B. PERHITUNGAN TULANGAN
3. TULANGAN GESER