Blank BOQ

Company: DAN's Build Co., Ltd


Address: Land Nº 63, Street 272, Sangkat Chatuk Muk, Khan Daun Penh, Phnom
Penh.
Tel:
Email:
VAT tin:

Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
I Structure work
A Primary Work
1 Demolise the old building lot 1.00
2 site clean m² 550.00
3 warehouse & workshop set 1.00
4 Safety net m² 4700.00
5 Electric & water supply Month 30.00
6 Temporary office set 1.00
7 Temporary fence set 1.00
B Foundation
1 Bore Pile
1.1 Bore Pilling dia. 1.00mx28.5m m 997.50
1.2 Bore Pilling dia. 1.00mx27.5m m 110.00
1.3 Cutting pile head pcs 39.00
2 Footing & Slab
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2.1 Soil Excavation m³ 868.83
2.2 Soil backfill and compact m³ 282.78
2.3 Stone compact m³ 147.77
2.4 Lean compact m³ 73.89
2.5 Concrete fck = 40MPa m³ 370.33
2.6 Steel bar f'y = 390MPa kg 45293.81
2.7 Form work m² 261.46
C Concrete Work
1 Basement
1.1 Concrete Wall
1.1.1 Concrete fck = 40MPa m³ 62.10
1.1.2 Steel Main bar f'y = 390MPa kg 5109.41
1.1.3 Form work m² 630.32
1.2 Car Ramp Beam
1.2.1 Concrete fck = 40MPa m³ 13.50
1.2.2 Steel Main bar f'y = 390MPa kg 1771.93
1.2.3 Steel Rond bar f'y = 250MPa kg 1999.83
1.2.4 Form work m² 125.30
1.3 Car Ramp Slab
1.3.1 Concrete fck = 40MPa m³ 3.96
1.3.2 Steel Main bar f'y = 390MPa kg 377.79
1.3.3 Form work m² 22.53
1.4 Elevator Pit
1.4.1 Concrete fck = 40MPa m³ 10.33
1.4.2 Steel Main bar f'y = 390MPa kg 849.98
1.4.3 Form work m² 104.86
1.5 Column
1.5.1 Concrete fck = 40MPa m³ 14.41
1.5.2 Steel Main bar f'y = 390MPa kg 5923.60
1.5.3 Steel Rond bar f'y = 250MPa kg 1574.41
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
1.5.4 Form work m² 132.07
1.6 Stair
1.6.1 Concrete fck = 40MPa m³ 8.64
1.6.2 Steel Main bar f'y = 390MPa kg 888.12
1.6.3 Form work m² 116.30
2 Ground Floor
2.1 Column
2.1.1 Concrete fck = 40MPa m³ 19.87
2.1.2 Steel Main bar f'y = 390MPa kg 7499.03
2.1.3 Steel Rond bar f'y = 250MPa kg 2170.78
2.1.4 Form work m² 182.09
2.2 Beam
2.2.1 Concrete fck = 30MPa m³ 41.06
2.2.2 Steel Main bar f'y = 390MPa kg 10078.48
2.2.3 Steel Rond bar f'y = 250MPa kg 3373.94
2.2.4 Form work m² 320.01
2.3 Slab
2.3.1 Concrete fck = 30MPa m³ 66.89
2.3.2 Steel Main bar f'y = 390MPa kg 8979.43
2.3.3 Form work m² 386.90
2.4 Elevator Pit
2.4.1 Concrete fck = 40MPa m³ 9.23
2.4.2 Steel Main bar f'y = 390MPa kg 759.56
2.4.3 Form work m² 93.70
2.5 Stair
2.5.1 Concrete fck = 40MPa m³ 2.27
2.5.2 Steel Main bar f'y = 390MPa kg 233.05
2.5.3 Form work m² 35.65
3 1st Floor
3.1 Column
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
3.1.1 Concrete fck = 40MPa m³ 12.24
3.1.2 Steel Main bar f'y = 390MPa kg 3540.14
3.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
3.1.4 Form work m² 113.85
3.2 Beam
3.2.1 Concrete fck = 30MPa m³ 40.63
3.2.2 Steel Main bar f'y = 390MPa kg 9815.33
3.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
3.2.4 Form work m² 374.62
3.3 Slab
3.3.1 Concrete fck = 30MPa m³ 44.36
3.3.2 Steel Main bar f'y = 390MPa kg 9924.63
3.3.3 Form work m² 427.05
3.4 Elevator Pit
3.4.1 Concrete fck = 40MPa m³ 7.25
3.4.2 Steel Main bar f'y = 390MPa kg 596.80
3.4.3 Form work m² 73.62
3.5 Stair
3.5.1 Concrete fck = 40MPa m³ 2.44
3.5.2 Steel Main bar f'y = 390MPa kg 250.53
3.5.3 Form work m² 38.07
4 2nd Floor
4.1 Column
4.1.1 Concrete fck = 40MPa m³ 12.24
4.1.2 Steel Main bar f'y = 390MPa kg 3540.14
4.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
4.1.4 Form work m² 113.85
4.2 Beam
4.2.1 Concrete fck = 30MPa m³ 40.63
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
4.2.2 Steel Main bar f'y = 390MPa kg 9815.33
4.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
4.2.4 Form work m² 374.62
4.3 Slab
4.3.1 Concrete fck = 30MPa m³ 44.36
4.3.2 Steel Main bar f'y = 390MPa kg 9924.63
4.3.3 Form work m² 427.05
4.4 Elevator Pit
4.4.1 Concrete fck = 40MPa m³ 7.25
4.4.2 Steel Main bar f'y = 390MPa kg 596.80
4.4.3 Form work m² 73.62
4.5 Stair
4.5.1 Concrete fck = 40MPa m³ 2.44
4.5.2 Steel Main bar f'y = 390MPa kg 250.53
4.5.3 Form work m² 38.07
5 3rd Floor
5.1 Column
5.1.1 Concrete fck = 40MPa m³ 12.24
5.1.2 Steel Main bar f'y = 390MPa kg 3540.14
5.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
5.1.4 Form work m² 113.85
5.2 Beam
5.2.1 Concrete fck = 30MPa m³ 40.63
5.2.2 Steel Main bar f'y = 390MPa kg 9815.33
5.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
5.2.4 Form work m² 374.62
5.3 Slab
5.3.1 Concrete fck = 30MPa m³ 44.36
5.3.2 Steel Main bar f'y = 390MPa kg 9924.63
5.3.3 Form work m² 427.05
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
5.4 Elevator Pit
5.4.1 Concrete fck = 40MPa m³ 7.25
5.4.2 Steel Main bar f'y = 390MPa kg 596.80
5.4.3 Form work m² 73.62
5.5 Stair
5.5.1 Concrete fck = 40MPa m³ 2.44
5.5.2 Steel Main bar f'y = 390MPa kg 250.53
5.5.3 Form work m² 38.07
6 4th Floor
6.1 Column
6.1.1 Concrete fck = 40MPa m³ 12.24
6.1.2 Steel Main bar f'y = 390MPa kg 3014.38
6.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
6.1.4 Form work m² 113.85
6.2 Beam
6.2.1 Concrete fck = 30MPa m³ 40.63
6.2.2 Steel Main bar f'y = 390MPa kg 9815.33
6.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
6.2.4 Form work m² 374.62
6.3 Slab
6.3.1 Concrete fck = 30MPa m³ 44.36
6.3.2 Steel Main bar f'y = 390MPa kg 9924.63
6.3.3 Form work m² 427.05
6.4 Elevator Pit
6.4.1 Concrete fck = 40MPa m³ 7.25
6.4.2 Steel Main bar f'y = 390MPa kg 596.80
6.4.3 Form work m² 73.62
6.5 Stair
6.5.1 Concrete fck = 40MPa m³ 2.44
6.5.2 Steel Main bar f'y = 390MPa kg 250.53
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
6.5.3 Form work m² 38.07
7 5th Floor
7.1 Column
7.1.1 Concrete fck = 40MPa m³ 12.24
7.1.2 Steel Main bar f'y = 390MPa kg 3014.38
7.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
7.1.4 Form work m² 113.85
7.2 Beam
7.2.1 Concrete fck = 30MPa m³ 40.63
7.2.2 Steel Main bar f'y = 390MPa kg 9815.33
7.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
7.2.4 Form work m² 374.62
7.3 Slab
7.3.1 Concrete fck = 30MPa m³ 44.36
7.3.2 Steel Main bar f'y = 390MPa kg 9924.63
7.3.3 Form work m² 427.05
7.4 Elevator Pit
7.4.1 Concrete fck = 40MPa m³ 7.25
7.4.2 Steel Main bar f'y = 390MPa kg 596.80
7.4.3 Form work m² 73.62
7.5 Stair
7.5.1 Concrete fck = 40MPa m³ 2.44
7.5.2 Steel Main bar f'y = 390MPa kg 250.53
7.5.3 Form work m² 38.07
8 6th Floor
8.1 Column
8.1.1 Concrete fck = 40MPa m³ 12.24
8.1.2 Steel Main bar f'y = 390MPa kg 3014.38
8.1.3 Steel Rond bar f'y = 250MPa kg 1359.40
8.1.4 Form work m² 113.85
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
8.2 Beam
8.2.1 Concrete fck = 30MPa m³ 40.63
8.2.2 Steel Main bar f'y = 390MPa kg 9815.33
8.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
8.2.4 Form work m² 374.62
8.3 Slab
8.3.1 Concrete fck = 30MPa m³ 44.36
8.3.2 Steel Main bar f'y = 390MPa kg 9924.63
8.3.3 Form work m² 427.05
8.4 Elevator Pit
8.4.1 Concrete fck = 40MPa m³ 7.25
8.4.2 Steel Main bar f'y = 390MPa kg 596.80
8.4.3 Form work m² 73.62
8.5 Stair
8.5.1 Concrete fck = 40MPa m³ 2.44
8.5.2 Steel Main bar f'y = 390MPa kg 250.53
8.5.3 Form work m² 38.07
9 7th Floor
9.1 Column
9.1.1 Concrete fck = 40MPa m³ 11.69
9.1.2 Steel Main bar f'y = 390MPa kg 2558.72
9.1.3 Steel Rond bar f'y = 250MPa kg 717.03
9.1.4 Form work m² 110.81
9.2 Beam
9.2.1 Concrete fck = 30MPa m³ 40.63
9.2.2 Steel Main bar f'y = 390MPa kg 9815.33
9.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
9.2.4 Form work m² 374.62
9.3 Slab
9.3.1 Concrete fck = 30MPa m³ 44.36
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
9.3.2 Steel Main bar f'y = 390MPa kg 9924.63
9.3.3 Form work m² 427.05
9.4 Elevator Pit
9.4.1 Concrete fck = 40MPa m³ 7.25
9.4.2 Steel Main bar f'y = 390MPa kg 596.80
9.4.3 Form work m² 73.62
9.5 Stair
9.5.1 Concrete fck = 40MPa m³ 2.44
9.5.2 Steel Main bar f'y = 390MPa kg 250.53
9.5.3 Form work m² 38.07
10 8th Floor
10.1 Column
10.1.1 Concrete fck = 40MPa m³ 11.69
10.1.2 Steel Main bar f'y = 390MPa kg 2558.72
10.1.3 Steel Rond bar f'y = 250MPa kg 717.03
10.1.4 Form work m² 110.81
10.2 Beam
10.2.1 Concrete fck = 30MPa m³ 40.63
10.2.2 Steel Main bar f'y = 390MPa kg 9815.33
10.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
10.2.4 Form work m² 374.62
10.3 Slab
10.3.1 Concrete fck = 30MPa m³ 44.36
10.3.2 Steel Main bar f'y = 390MPa kg 9924.63
10.3.3 Form work m² 427.05
10.4 Elevator Pit
10.4.1 Concrete fck = 40MPa m³ 7.25
10.4.2 Steel Main bar f'y = 390MPa kg 596.80
10.4.3 Form work m² 73.62
10.5 Stair
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
10.5.1 Concrete fck = 40MPa m³ 2.44
10.5.2 Steel Main bar f'y = 390MPa kg 250.53
10.5.3 Form work m² 38.07
11 9th Floor
11.1 Column
11.1.1 Concrete fck = 40MPa m³ 11.69
11.1.2 Steel Main bar f'y = 390MPa kg 2558.72
11.1.3 Steel Rond bar f'y = 250MPa kg 717.03
11.1.4 Form work m² 110.81
11.2 Beam
11.2.1 Concrete fck = 30MPa m³ 40.63
11.2.2 Steel Main bar f'y = 390MPa kg 9815.33
11.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
11.2.4 Form work m² 374.62
11.3 Slab
11.3.1 Concrete fck = 30MPa m³ 44.36
11.3.2 Steel Main bar f'y = 390MPa kg 9924.63
11.3.3 Form work m² 427.05
11.4 Elevator Pit
11.4.1 Concrete fck = 40MPa m³ 7.25
11.4.2 Steel Main bar f'y = 390MPa kg 596.80
11.4.3 Form work m² 73.62
11.5 Stair
11.5.1 Concrete fck = 40MPa m³ 2.44
11.5.2 Steel Main bar f'y = 390MPa kg 250.53
11.5.3 Form work m² 38.07
12 10th Floor
12.1 Column
12.1.1 Concrete fck = 40MPa m³ 11.69
12.1.2 Steel Main bar f'y = 390MPa kg 2032.95
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
12.1.3 Steel Rond bar f'y = 250MPa kg 717.03
12.1.4 Form work m² 110.81
12.2 Beam
12.2.1 Concrete fck = 30MPa m³ 40.63
12.2.2 Steel Main bar f'y = 390MPa kg 9815.33
12.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
12.2.4 Form work m² 374.62
12.3 Slab
12.3.1 Concrete fck = 30MPa m³ 44.36
12.3.2 Steel Main bar f'y = 390MPa kg 9924.63
12.3.3 Form work m² 427.05
12.4 Elevator Pit
12.4.1 Concrete fck = 40MPa m³ 7.25
12.4.2 Steel Main bar f'y = 390MPa kg 596.80
12.4.3 Form work m² 73.62
12.5 Stair
12.5.1 Concrete fck = 40MPa m³ 2.44
12.5.2 Steel Main bar f'y = 390MPa kg 250.53
12.5.3 Form work m² 38.07
13 11th Floor
13.1 Column
13.1.1 Concrete fck = 40MPa m³ 11.69
13.1.2 Steel Main bar f'y = 390MPa kg 2032.95
13.1.3 Steel Rond bar f'y = 250MPa kg 717.03
13.1.4 Form work m² 110.81
13.2 Beam
13.2.1 Concrete fck = 30MPa m³ 40.63
13.2.2 Steel Main bar f'y = 390MPa kg 9815.33
13.2.3 Steel Rond bar f'y = 250MPa kg 3954.07
13.2.4 Form work m² 374.62
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
13.3 Slab
13.3.1 Concrete fck = 30MPa m³ 44.36
13.3.2 Steel Main bar f'y = 390MPa kg 9924.63
13.3.3 Form work m² 427.05
13.4 Elevator Pit
13.4.1 Concrete fck = 40MPa m³ 7.25
13.4.2 Steel Main bar f'y = 390MPa kg 596.80
13.4.3 Form work m² 73.62
13.5 Stair
13.5.1 Concrete fck = 40MPa m³ 2.44
13.5.2 Steel Main bar f'y = 390MPa kg 250.53
13.5.3 Form work m² 38.07
14 12th Floor
14.1 Column
14.1.1 Concrete fck = 40MPa m³ 17.72
14.1.2 Steel Main bar f'y = 390MPa kg 2768.28
14.1.3 Steel Rond bar f'y = 250MPa kg 1086.40
14.1.4 Form work m² 167.90
14.2 Beam
14.2.1 Concrete fck = 30MPa m³ 34.49
14.2.2 Steel Main bar f'y = 390MPa kg 8723.68
14.2.3 Steel Rond bar f'y = 250MPa kg 4311.70
14.2.4 Form work m² 341.69
14.3 Slab
14.3.1 Concrete fck = 30MPa m³ 49.91
14.3.2 Steel Main bar f'y = 390MPa kg 11166.77
14.3.3 Form work m² 484.62
14.4 Elevator Pit
14.4.1 Concrete fck = 40MPa m³ 10.99
14.4.2 Steel Main bar f'y = 390MPa kg 904.24
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
14.4.3 Form work m² 111.55
14.5 Stair
14.5.1 Concrete fck = 40MPa m³ 3.66
14.5.2 Steel Main bar f'y = 390MPa kg 376.38
14.5.3 Form work m² 57.25
15 Terrase Floor
15.1 Beam
15.1.1 Concrete fck = 30MPa m³ 25.80
15.1.2 Steel Main bar f'y = 390MPa kg 4176.28
15.1.3 Steel Rond bar f'y = 250MPa kg 3614.24
15.1.4 Form work m² 249.67
15.2 Slab
15.2.1 Concrete fck = 30MPa m³ 24.73
15.2.2 Steel Main bar f'y = 390MPa kg 5532.67
15.2.3 Form work m² 240.49
II Architect Fit out
1 Basement
1.1 Partition work
1.1.1 Brick Wall 10cm m² 71.05
1.1.2 Brick Wall 20cm m² 16.80
1.1.3 Plastering m² 445.20
1.1.4 Painting m² 445.20
1.1.5 Column Paint, Corner & Plaster set 11.00
1.1.6 Bottow Stair plastering m² 40.00
1.2 Parking Item
1.2.1 Floor Epoxy m² 283.34
1.2.2 Road Map Painting m 40.00
1.2.3 Ramp surfacing m² 64.13
1.2.4 Ramp Curb m² 18.60
1.2.5 Car Curb 2.00m pcs 8.00
1.2.6 Car Map Painting m 39.06
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
1.2.7 Moto Map Painting m 24.00
1.2.8 Moto Curb 0.40m m 18.00
1.2.9 Parking Badges m² 5.00
1.3 Finishing work
1.3.1 Ceiling m² 30.50
1.3.2 Ceiling moulding m 35.60
1.3.3 Elevator Pit Marble m² 15.05
1.3.4 Stair Marble m² 9.50
1.3.5 Stair Skirting Marble m 8.90
1.3.5 Stair handrail m² 7.80
1.4 WC (Restroom)
1.4.1 Toilet Floor tiles m² 6.00
1.4.2 Toilet Wall tiles m² 44.80
1.4.3 Toilet flash set 1.00
1.4.4 Lavabor set 1.00
1.4.5 Water Trap set 1.00
1.4.6 Faucet (spare reparing) set 1.00
1.4.7 Riser box set 1.00
1.5 Window, Door and Glass work
1.5.1 Temper Glass thk 10mm m² 24.00
1.5.2 Glass door 0.90 x 2.00 m set 1.00
1.5.3 Safety door 0.90 x 2.20 m set 1.00
1.5.4 Steel door 1.10 x 2.20 m set 1.00
1.5.5 Plastic Single door 0.80 x 2.00 m set 1.00
2 Ground Floor
2.1 Partition work
2.1.1 Brick work 10cm thk m² 57.33
2.1.2 Brick work 20cm thk m² 110.04
2.1.3 Internal Plastering m² 224.70
2.1.4 Column Paint, Corner & Plaster pcs 15.00
2.1.5 Painting m² 350.70
2.1.6 Isolation wall m² 16.17
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2.2 Parking Item
2.2.1 Floor Epoxy m² 261.20
2.2.2 Road Map Painting m 68.00
2.2.3 Ramp Handrail m² 21.00
2.2.4 Car Curb 2.00m pcs 5.00
2.2.5 Car Map Painting m 35.00
2.3 Finishing work
2.3.1 Ceiling m² 71.35
2.3.2 Ceiling moulding m 106.40
2.3.3 Floor tiles m² 67.70
2.3.4 Skirting m 106.40
2.3.5 Elevator Pit Marble m² 18.06
2.3.6 Stair Marble m² 19.76
2.3.7 Stair handrail m² 6.15
2.3.12 Coffee counter + Sink m 5.20
2.4 Counter
2.4.1 Receptionist Desk m 3.70
2.4.2 Wall backdrop m² 15.54
2.4.3 Partition décor m² 9.66
2.4.4 Ceiling décor m² 33.65
2.5 WC (Restroom)
2.5.1 Toilet Floor tiles m² 3.65
2.5.2 Toilet Wall tiles m² 23.25
2.5.3 Toilet flash set 1.00
2.5.4 Lavabor set 1.00
2.5.5 Water Trap set 1.00
2.5.6 Faucet (spare reparing) set 1.00
2.5.7 Riser box set 1.00
2.6 Landscape
2.6.1 Garden m² 69.00
2.6.2 Canopy m 31.00
2.6.3 Pavement set 45.80
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2.6.4 Parking curb m 16.58
2.6.5 Brick Fence H 2.80m m 83.49
2.7 Window, Door and Glass work
2.7.1 Temper glass with frame thk 10mm m² 72.00
2.7.2 Temper glass with frame thk 5mm m² 1.32
2.7.3 Glass sticker m² 73.32
2.7.4 Double glass door 1.80 x 2.40 m set 1.00
2.7.5 Entrance glass & door m² 10.36
2.7.6 Double door 1.80 x 2.20 m set 1.00
2.7.7 Modern Single door 0.80 x 2.00 m set 2.00
2.7.8 Plastic Single door 0.80 x 2.00 m set 1.00
3 1st Floor
3.1 Partition work
3.1.1 Brick work 10cm thk m² 417.45
3.1.2 Brick work 20cm thk m² 322.41
3.1.3 Internal Plastering m² 1157.31
3.1.4 Painting m² 1157.31
3.1.5 Décor wood wall m² 27.06
3.1.6 Isolation wall m² 18.48
3.2 Finishing work
3.2.1 Ceiling m² 323.00
3.2.2 Ceiling moulding m 320.00
3.2.3 Ceramic Floor tiles in room m² 287.00
3.2.4 Skirting m 263.00
3.2.5 Elevator Pit Marble m² 14.19
3.2.6 Stair Marble m² 16.60
3.2.7 Stair Marble Skirt m 11.35
3.2.8 Stair handrail m 5.50
3.3 Balcony
3.3.1 Floor tiles (Balcony) m² 30.00
3.3.2 Handrail m 30.00
3.3.3 Curb m 30.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
3.3.4 Ventilation brick m² 15.00
3.4 Window, Door and Glass work
3.4.1 Entrance door 0.90 x 2.80 m set 5.00
3.4.2 Wood sliding door set 4.00
3.4.3 Unit Single door 0.90 x 2.20 m set 6.00
3.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
3.4.5 Single glass door 0.90 x 2.40 m set 1.00
3.4.6 Double glass door 1.80 x 2.40 m set 7.00
3.4.7 Window glass 300x600mm set 4.00 Hung window
3.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
3.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
3.4.10 Window glass 2,000x1,900mm set 3.00
3.4.11 Window glass H 0.30m m² 1.59
3.5 Loose furniture
3.5.1 Kitchen cabinet L 2.85m set 4.00
3.5.2 Sink set 4.00
3.5.3 Electronic cooktops set 4.00
3.5.4 Mount set 4.00
3.6 WC (Restroom)
3.6.1 Toilet Floor tiles m² 36.00
3.6.2 Toilet Wall tiles m² 171.00
3.6.3 Toilet flash+Spray+Tissue holder set 6.00
3.6.4 Lavabor & Mirror set 6.00
3.6.5 Shower include glass set 6.00
3.6.6 Wall cloth rack set 6.00
3.6.7 Shampoo holder set 6.00
3.6.8 Water Trap set 6.00
3.6.9 Faucet (spare reparing) set 6.00
3.6.10 Riser box set 6.00
4 2nd Floor
4.1 Partition work
4.1.1 Brick work 10cm thk m² 417.45
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
4.1.2 Brick work 20cm thk m² 322.41
4.1.3 Internal Plastering m² 1157.31
4.1.4 Painting m² 1157.31
4.1.5 Décor wood wall m² 27.06
4.1.6 Isolation wall m² 18.48
4.2 Finishing work
4.2.1 Ceiling m² 323.00
4.2.2 Ceiling moulding m 320.00
4.2.3 Ceramic Floor tiles in room m² 287.00
4.2.4 Skirting m 263.00
4.2.5 Elevator Pit Marble m² 14.19
4.2.6 Stair Marble m² 16.60
4.2.7 Stair Marble Skirt m 11.35
4.2.7 Stair handrail m 5.50
4.3 Balcony
4.3.1 Floor tiles (Balcony) m² 30.00
4.3.2 Handrail m 30.00
4.3.3 Curb m 30.00
4.3.4 Ventilation brick m² 15.00
4.4 Window, Door and Glass work
4.4.1 Entrance door 0.90 x 2.80 m set 5.00
4.4.2 Wood sliding door set 4.00
4.4.3 Unit Single door 0.90 x 2.20 m set 6.00
4.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
4.4.5 Single glass door 0.90 x 2.40 m set 1.00
4.4.6 Double glass door 1.80 x 2.40 m set 7.00
4.4.7 Window glass 300x600mm set 4.00 Hung window
4.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
4.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
4.4.10 Window glass 2,000x1,900mm set 3.00
4.4.11 Window glass H 0.30m m² 1.59
4.5 Loose furniture
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
4.5.1 Kitchen cabinet L 2.85m set 4.00
4.5.2 Sink set 4.00
4.5.3 Electronic cooktops set 4.00
4.5.4 Mount set 4.00
4.6 WC (Restroom)
4.6.1 Toilet Floor tiles m² 36.00
4.6.2 Toilet Wall tiles m² 171.00
4.6.3 Toilet flash+Spray+Tissue holder set 6.00
4.6.4 Lavabor & Mirror set 6.00
4.6.5 Shower include glass set 6.00
4.6.6 Wall cloth rack set 6.00
4.6.7 Shampoo holder set 6.00
4.6.8 Water Trap set 6.00
4.6.9 Faucet (spare reparing) set 6.00
4.6.10 Riser box set 6.00
5 3rd Floor
5.1 Partition work
5.1.1 Brick work 10cm thk m² 417.45
5.1.2 Brick work 20cm thk m² 322.41
5.1.3 Internal Plastering m² 1157.31
5.1.4 Painting m² 1157.31
5.1.5 Décor wood wall m² 27.06
5.1.6 Isolation wall m² 18.48
5.2 Finishing work
5.2.1 Ceiling m² 323.00
5.2.2 Ceiling moulding m 320.00
5.2.3 Ceramic Floor tiles in room m² 287.00
5.2.4 Skirting m 263.00
5.2.5 Elevator Pit Marble m² 14.19
5.2.6 Stair Marble m² 16.60
5.2.7 Stair Marble Skirt m 11.35
5.2.7 Stair handrail m 5.50
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
5.3 Balcony
5.3.1 Floor tiles (Balcony) m² 30.00
5.3.2 Handrail m 30.00
5.3.3 Curb m 30.00
5.3.4 Ventilation brick m² 15.00
5.4 Window, Door and Glass work
5.4.1 Entrance door 0.90 x 2.80 m set 5.00
5.4.2 Wood sliding door set 4.00
5.4.3 Unit Single door 0.90 x 2.20 m set 6.00
5.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
5.4.5 Single glass door 0.90 x 2.40 m set 1.00
5.4.6 Double glass door 1.80 x 2.40 m set 7.00
5.4.7 Window glass 300x600mm set 4.00 Hung window
5.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
5.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
5.4.10 Window glass 2,000x1,900mm set 3.00
5.4.11 Window glass H 0.30m m² 1.59
5.5 Loose furniture
5.5.1 Kitchen cabinet L 2.85m set 4.00
5.5.2 Sink set 4.00
5.5.3 Electronic cooktops set 4.00
5.5.4 Mount set 4.00
5.6 WC (Restroom)
5.6.1 Toilet Floor tiles m² 36.00
5.6.2 Toilet Wall tiles m² 171.00
5.6.3 Toilet flash+Spray+Tissue holder set 6.00
5.6.4 Lavabor & Mirror set 6.00
5.6.5 Shower include glass set 6.00
5.6.6 Wall cloth rack set 6.00
5.6.7 Shampoo holder set 6.00
5.6.8 Water Trap set 6.00
5.6.9 Faucet (spare reparing) set 6.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
5.6.10 Riser box set 6.00
6 4th Floor
6.1 Partition work
6.1.1 Brick work 10cm thk m² 417.45
6.1.2 Brick work 20cm thk m² 322.41
6.1.3 Internal Plastering m² 1157.31
6.1.4 Painting m² 1157.31
6.1.5 Décor wood wall m² 27.06
6.1.6 Isolation wall m² 18.48
6.2 Finishing work
6.2.1 Ceiling m² 323.00
6.2.2 Ceiling moulding m 320.00
6.2.3 Ceramic Floor tiles in room m² 287.00
6.2.4 Skirting m 263.00
6.2.5 Elevator Pit Marble m² 14.19
6.2.6 Stair Marble m² 16.60
6.2.7 Stair Marble Skirt m 11.35
6.2.7 Stair handrail m 5.50
6.3 Balcony
6.3.1 Floor tiles (Balcony) m² 30.00
6.3.2 Handrail m 30.00
6.3.3 Curb m 30.00
6.3.4 Ventilation brick m² 15.00
6.4 Window, Door and Glass work
6.4.1 Entrance door 0.90 x 2.80 m set 5.00
6.4.2 Wood sliding door set 4.00
6.4.3 Unit Single door 0.90 x 2.20 m set 6.00
6.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
6.4.5 Single glass door 0.90 x 2.40 m set 1.00
6.4.6 Double glass door 1.80 x 2.40 m set 7.00
6.4.7 Window glass 300x600mm set 4.00 Hung window
6.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
6.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
6.4.10 Window glass 2,000x1,900mm set 3.00
6.4.11 Window glass H 0.30m m² 1.59
6.5 Loose furniture
6.5.1 Kitchen cabinet L 2.85m set 4.00
6.5.2 Sink set 4.00
6.5.3 Electronic cooktops set 4.00
6.5.4 Mount set 4.00
6.6 WC (Restroom)
6.6.1 Toilet Floor tiles m² 36.00
6.6.2 Toilet Wall tiles m² 171.00
6.6.3 Toilet flash+Spray+Tissue holder set 6.00
6.6.4 Lavabor & Mirror set 6.00
6.6.5 Shower include glass set 6.00
6.6.6 Wall cloth rack set 6.00
6.6.7 Shampoo holder set 6.00
6.6.8 Water Trap set 6.00
6.6.9 Faucet (spare reparing) set 6.00
6.6.10 Riser box set 6.00
7 5th Floor
7.1 Partition work
7.1.1 Brick work 10cm thk m² 417.45
7.1.2 Brick work 20cm thk m² 322.41
7.1.3 Internal Plastering m² 1157.31
7.1.4 Painting m² 1157.31
7.1.5 Décor wood wall m² 27.06
7.1.6 Isolation wall m² 18.48
7.2 Finishing work
7.2.1 Ceiling m² 323.00
7.2.2 Ceiling moulding m 320.00
7.2.3 Ceramic Floor tiles in room m² 287.00
7.2.4 Skirting m 263.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
7.2.5 Elevator Pit Marble m² 14.19
7.2.6 Stair Marble m² 16.60
7.2.7 Stair Marble Skirt m 11.35
7.2.7 Stair handrail m 5.50
7.3 Balcony
7.3.1 Floor tiles (Balcony) m² 30.00
7.3.2 Handrail m 30.00
7.3.3 Curb m 30.00
7.3.4 Ventilation brick m² 15.00
7.4 Window, Door and Glass work
7.4.1 Entrance door 0.90 x 2.80 m set 5.00
7.4.2 Wood sliding door set 4.00
7.4.3 Unit Single door 0.90 x 2.20 m set 6.00
7.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
7.4.5 Single glass door 0.90 x 2.40 m set 1.00
7.4.6 Double glass door 1.80 x 2.40 m set 7.00
7.4.7 Window glass 300x600mm set 4.00 Hung window
7.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
7.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
7.4.10 Window glass 2,000x1,900mm set 3.00
7.4.11 Window glass H 0.30m m² 1.59
7.5 Loose furniture
7.5.1 Kitchen cabinet L 2.85m set 4.00
7.5.2 Sink set 4.00
7.5.3 Electronic cooktops set 4.00
7.5.4 Mount set 4.00
7.6 WC (Restroom)
7.6.1 Toilet Floor tiles m² 36.00
7.6.2 Toilet Wall tiles m² 171.00
7.6.3 Toilet flash+Spray+Tissue holder set 6.00
7.6.4 Lavabor & Mirror set 6.00
7.6.5 Shower include glass set 6.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
7.6.6 Wall cloth rack set 6.00
7.6.7 Shampoo holder set 6.00
7.6.8 Water Trap set 6.00
7.6.9 Faucet (spare reparing) set 6.00
7.6.10 Riser box set 6.00
8 6th Floor
8.1 Partition work
8.1.1 Brick work 10cm thk m² 417.45
8.1.2 Brick work 20cm thk m² 322.41
8.1.3 Internal Plastering m² 1157.31
8.1.4 Painting m² 1157.31
8.1.5 Décor wood wall m² 27.06
8.1.6 Isolation wall m² 18.48
8.2 Finishing work
8.2.1 Ceiling m² 323.00
8.2.2 Ceiling moulding m 320.00
8.2.3 Ceramic Floor tiles in room m² 287.00
8.2.4 Skirting m 263.00
8.2.5 Elevator Pit Marble m² 14.19
8.2.6 Stair Marble m² 16.60
8.2.7 Stair Marble Skirt m 11.35
8.2.7 Stair handrail m 5.50
8.3 Balcony
8.3.1 Floor tiles (Balcony) m² 30.00
8.3.2 Handrail m 30.00
8.3.3 Curb m 30.00
8.3.4 Ventilation brick m² 15.00
8.4 Window, Door and Glass work
8.4.1 Entrance door 0.90 x 2.80 m set 5.00
8.4.2 Wood sliding door set 4.00
8.4.3 Unit Single door 0.90 x 2.20 m set 6.00
8.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
8.4.5 Single glass door 0.90 x 2.40 m set 1.00
8.4.6 Double glass door 1.80 x 2.40 m set 7.00
8.4.7 Window glass 300x600mm set 4.00 Hung window
8.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
8.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
8.4.10 Window glass 2,000x1,900mm set 3.00
8.4.11 Window glass H 0.30m m² 1.59
8.5 Loose furniture
8.5.1 Kitchen cabinet L 2.85m set 4.00
8.5.2 Sink set 4.00
8.5.3 Electronic cooktops set 4.00
8.5.4 Mount set 4.00
8.6 WC (Restroom)
8.6.1 Toilet Floor tiles m² 36.00
8.6.2 Toilet Wall tiles m² 171.00
8.6.3 Toilet flash+Spray+Tissue holder set 6.00
8.6.4 Lavabor & Mirror set 6.00
8.6.5 Shower include glass set 6.00
8.6.6 Wall cloth rack set 6.00
8.6.7 Shampoo holder set 6.00
8.6.8 Water Trap set 6.00
8.6.9 Faucet (spare reparing) set 6.00
8.6.10 Riser box set 6.00
9 7th Floor
9.1 Partition work
9.1.1 Brick work 10cm thk m² 417.45
9.1.2 Brick work 20cm thk m² 322.41
9.1.3 Internal Plastering m² 1157.31
9.1.4 Painting m² 1157.31
9.1.5 Décor wood wall m² 27.06
9.1.6 Isolation wall m² 18.48
9.2 Finishing work
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
9.2.1 Ceiling m² 323.00
9.2.2 Ceiling moulding m 320.00
9.2.3 Ceramic Floor tiles in room m² 287.00
9.2.4 Skirting m 263.00
9.2.5 Elevator Pit Marble m² 14.19
9.2.6 Stair Marble m² 16.60
9.2.7 Stair Marble Skirt m 11.35
9.2.7 Stair handrail m 5.50
9.3 Balcony
9.3.1 Floor tiles (Balcony) m² 30.00
9.3.2 Handrail m 30.00
9.3.3 Curb m 30.00
9.3.4 Ventilation brick m² 15.00
9.4 Window, Door and Glass work
9.4.1 Entrance door 0.90 x 2.80 m set 5.00
9.4.2 Wood sliding door set 4.00
9.4.3 Unit Single door 0.90 x 2.20 m set 6.00
9.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
9.4.5 Single glass door 0.90 x 2.40 m set 1.00
9.4.6 Double glass door 1.80 x 2.40 m set 7.00
9.4.7 Window glass 300x600mm set 4.00 Hung window
9.4.9 Window glass 1,900x600mm set 6.00 Doulbe slide
9.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
9.4.10 Window glass 2,000x1,900mm set 3.00
9.4.11 Window glass H 0.30m m² 1.59
9.5 Loose furniture
9.5.1 Kitchen cabinet L 2.85m set 4.00
9.5.2 Sink set 4.00
9.5.3 Electronic cooktops set 4.00
9.5.4 Mount set 4.00
9.6 WC (Restroom)
9.6.1 Toilet Floor tiles m² 36.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
9.6.2 Toilet Wall tiles m² 171.00
9.6.3 Toilet flash+Spray+Tissue holder set 6.00
9.6.4 Lavabor & Mirror set 6.00
9.6.5 Shower include glass set 6.00
9.6.6 Wall cloth rack set 6.00
9.6.7 Shampoo holder set 6.00
9.6.8 Water Trap set 6.00
9.6.9 Faucet (spare reparing) set 6.00
9.6.10 Riser box set 6.00
10 8th Floor
10.1 Partition work
10.1.1 Brick work 10cm thk m² 417.45
10.1.2 Brick work 20cm thk m² 322.41
10.1.3 Internal Plastering m² 1157.31
10.1.4 Painting m² 1157.31
10.1.5 Décor wood wall m² 27.06
10.1.6 Isolation wall m² 18.48
10.2 Finishing work
10.2.1 Ceiling m² 323.00
10.2.2 Ceiling moulding m 320.00
10.2.3 Ceramic Floor tiles in room m² 287.00
10.2.4 Skirting m 263.00
10.2.5 Elevator Pit Marble m² 14.19
10.2.6 Stair Marble m² 16.60
10.2.7 Stair Marble Skirt m 11.35
10.2.7 Stair handrail m 5.50
10.3 Balcony
10.3.1 Floor tiles (Balcony) m² 30.00
10.3.2 Handrail m 30.00
10.3.3 Curb m 30.00
10.3.4 Ventilation brick m² 15.00
10.4 Window, Door and Glass work
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
10.4.1 Entrance door 0.90 x 2.80 m set 5.00
10.4.2 Wood sliding door set 4.00
10.4.3 Unit Single door 0.90 x 2.20 m set 6.00
10.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
10.4.5 Single glass door 0.90 x 2.40 m set 1.00
10.4.6 Double glass door 1.80 x 2.40 m set 7.00
10.4.7 Window glass 300x600mm set 4.00 Hung window
10.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
10.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
10.4.10 Window glass 2,000x1,900mm set 3.00
10.4.11 Window glass H 0.30m m² 1.59
10.5 Loose furniture
10.5.1 Kitchen cabinet L 2.85m set 4.00
10.5.2 Sink set 4.00
10.5.3 Electronic cooktops set 4.00
10.5.4 Mount set 4.00
10.6 WC (Restroom)
10.6.1 Toilet Floor tiles m² 36.00
10.6.2 Toilet Wall tiles m² 171.00
10.6.3 Toilet flash+Spray+Tissue holder set 6.00
10.6.4 Lavabor & Mirror set 6.00
10.6.5 Shower include glass set 6.00
10.6.6 Wall cloth rack set 6.00
10.6.7 Shampoo holder set 6.00
10.6.8 Water Trap set 6.00
10.6.9 Faucet (spare reparing) set 6.00
10.6.10 Riser box set 6.00
11 9th Floor
11.1 Partition work
11.1.1 Brick work 10cm thk m² 417.45
11.1.2 Brick work 20cm thk m² 322.41
11.1.3 Internal Plastering m² 1157.31
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
11.1.4 Painting m² 1157.31
11.1.5 Décor wood wall m² 27.06
11.1.6 Isolation wall m² 18.48
11.2 Finishing work
11.2.1 Ceiling m² 323.00
11.2.2 Ceiling moulding m 320.00
11.2.3 Ceramic Floor tiles in room m² 287.00
11.2.4 Skirting m 263.00
11.2.5 Elevator Pit Marble m² 14.19
11.2.6 Stair Marble m² 16.60
11.2.7 Stair Marble Skirt m 11.35
11.2.7 Stair handrail m 5.50
11.3 Balcony
11.3.1 Floor tiles (Balcony) m² 30.00
11.3.2 Handrail m 30.00
11.3.3 Curb m 30.00
11.3.4 Ventilation brick m² 15.00
11.4 Window, Door and Glass work
11.4.1 Entrance door 0.90 x 2.80 m set 5.00
11.4.2 Wood sliding door set 4.00
11.4.3 Unit Single door 0.90 x 2.20 m set 6.00
11.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
11.4.5 Single glass door 0.90 x 2.40 m set 1.00
11.4.6 Double glass door 1.80 x 2.40 m set 7.00
11.4.7 Window glass 300x600mm set 4.00 Hung window
11.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
11.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
11.4.10 Window glass 2,000x1,900mm set 3.00
11.4.11 Window glass H 0.30m m² 1.59
11.5 Loose furniture
11.5.1 Kitchen cabinet L 2.85m set 4.00
11.5.2 Sink set 4.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
11.5.3 Electronic cooktops set 4.00
11.5.4 Mount set 4.00
11.6 WC (Restroom)
11.6.1 Toilet Floor tiles m² 36.00
11.6.2 Toilet Wall tiles m² 171.00
11.6.3 Toilet flash+Spray+Tissue holder set 6.00
11.6.4 Lavabor & Mirror set 6.00
11.6.5 Shower include glass set 6.00
11.6.6 Wall cloth rack set 6.00
11.6.7 Shampoo holder set 6.00
11.6.8 Water Trap set 6.00
11.6.9 Faucet (spare reparing) set 6.00
11.6.10 Riser box set 6.00
12 10th Floor
12.1 Partition work
12.1.1 Brick work 10cm thk m² 417.45
12.1.2 Brick work 20cm thk m² 322.41
12.1.3 Internal Plastering m² 1157.31
12.1.4 Painting m² 1157.31
12.1.5 Décor wood wall m² 27.06
12.1.6 Isolation wall m² 18.48
12.2 Finishing work
12.2.1 Ceiling m² 323.00
12.2.2 Ceiling moulding m 320.00
12.2.3 Ceramic Floor tiles in room m² 287.00
12.2.4 Skirting m 263.00
12.2.5 Elevator Pit Marble m² 14.19
12.2.6 Stair Marble m² 16.60
12.2.7 Stair Marble Skirt m 11.35
12.2.7 Stair handrail m 5.50
12.3 Balcony
12.3.1 Floor tiles (Balcony) m² 30.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
12.3.2 Handrail m 30.00
12.3.3 Curb m 30.00
12.3.4 Ventilation brick m² 15.00
12.4 Window, Door and Glass work
12.4.1 Entrance door 0.90 x 2.80 m set 5.00
12.4.2 Wood sliding door set 4.00
12.4.3 Unit Single door 0.90 x 2.20 m set 6.00
12.4.4 Plastic Single door 0.80 x 2.00 m set 6.00
12.4.5 Single glass door 0.90 x 2.40 m set 1.00
12.4.6 Double glass door 1.80 x 2.40 m set 7.00
12.4.7 Window glass 300x600mm set 4.00 Hung window
12.4.8 Window glass 1,900x600mm set 6.00 Doulbe slide
12.4.9 Window glass 1,900x1,900mm set 2.00 Hung window
12.4.10 Window glass 2,000x1,900mm set 3.00
12.4.11 Window glass H 0.30m m² 1.59
12.5 Loose furniture
12.5.1 Kitchen cabinet L 2.85m set 4.00
12.5.2 Sink set 4.00
12.5.3 Electronic cooktops set 4.00
12.5.4 Mount set 4.00
12.6 WC (Restroom)
12.6.1 Toilet Floor tiles m² 36.00
12.6.2 Toilet Wall tiles m² 171.00
12.6.3 Toilet flash+Spray+Tissue holder set 6.00
12.6.4 Lavabor & Mirror set 6.00
12.6.5 Shower include glass set 6.00
12.6.6 Wall cloth rack set 6.00
12.6.7 Shampoo holder set 6.00
12.6.8 Water Trap set 6.00
12.6.9 Faucet (spare reparing) set 6.00
12.6.10 Riser box set 6.00
13 11th Floor
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
13.1 Partition work
13.1.1 Brick work 10cm thk m² 402.60
13.1.2 Brick work 20cm thk m² 387.75
13.1.3 Internal Plastering m² 1192.95
13.1.4 Painting m² 1192.95
13.1.5 Décor wood wall m² 16.50
13.1.6 Isolation wall m² 21.45
13.2 Finishing work
13.2.1 Ceiling m² 286.00
13.2.2 Ceiling moulding m 322.00
13.2.3 Ceramic Floor tiles in room m² 248.25
13.2.4 Skirting m 253.80
13.2.5 Elevator Pit Marble m² 14.19
13.2.6 Stair Marble m² 16.60
13.2.7 Stair Skirt Marble m 11.35
13.2.7 Stair handrail m 5.50
13.3 Balcony
13.3.1 Floor tiles (Balcony) m² 33.00
13.3.2 Handrail m 24.30
13.3.3 Curb m 24.30
13.3.4 Ventilation brick 12.50
13.4 Window, Door and Glass work
13.4.1 Entrance door 0.90 x 2.80 m set 3.00
13.4.2 Wood sliding door set 2.00
13.4.3 Unit Single door 0.90 x 2.20 m set 7.00
13.4.4 Single glass door 0.90 x 2.40 m set 7.00
13.4.5 Double glass door 1.80 x 2.40 m set 1.00
13.4.6 5 sliding glass door 3.10 x 2.40 m set 2.00
13.4.7 3 sliding glass door 2.30 x 2.40 m set 2.00
13.4.8 Window glass 300x600mm set 5.00 Hung window
13.4.9 Window glass 1,900x600mm set 6.00 Doulbe slide
13.4.10 Window glass 1,900x1,900mm set 1.00 Hung window
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
13.4.11 Window glass 2,000x1,900mm set 2.00
13.4.12 Window glass H 0.30m m² 1.59
13.5 Loose furniture
13.5.1 Kitchen cabinet m 2.00
13.5.2 Sink set 2.00
13.5.3 Electronic cooktops set 2.00
13.5.4 Mount set 2.00
13.6 WC (Restroom)
13.6.1 Toilet Floor tiles m² 37.75
13.6.2 Toilet Wall tiles m² 204.60
13.6.3 Toilet flash+Spray+Tissue holder set 7.00
13.6.4 Bathtubs set 2.00
13.6.5 Lavabor & Mirror set 7.00
13.6.6 Shower include glass set 5.00
13.6.7 Wall cloth rack set 7.00
13.6.8 Shampoo holder set 7.00
13.6.9 Water Trap set 7.00
13.6.10 Faucet (spare reparing) set 7.00
13.6.11 Riser box set 7.00
14 12th Floor
14.1 Partition work
14.1.1 Brick work 10cm thk m² 224.00
14.1.2 Brick work 20cm thk m² 273.00
14.1.3 Internal Plastering m² 721.00
14.1.4 Painting m² 721.00
14.1.5 Décor wall marble m² 16.00
14.1.6 Isolation wall m² 31.00
14.2 Finishing work
14.2.1 Ceiling m² 122.25
14.2.2 Ceiling moulding m 114.00
14.2.3 Ceramic Floor tiles in room m² 120.25
14.2.4 Skirting m 117.00
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
14.2.5 Floor rubber (Gym) m² 44.72
14.2.6 Elevator Pit Marble m² 21.50
14.2.7 Stair Marble m² 27.66
14.2.7 Stair Skirt Marble m² 16.75
14.2.8 Stair handrail m 10.90
14.3 Window, Door and Glass work
14.3.1 Single door 0.90 x 2.20 m set 1.00
14.3.3 Double glass door 1.80 x 2.40 m set 1.00
14.3.4 Single glass door 0.90 x 2.40 m set 1.00
14.3.5 Plastic Single door 0.80 x 2.00 m set 2.00
14.3.6 Window temper glass m² 14.00
14.6 WC (Restroom)
14.6.1 Toilet Floor tiles m² 10.96
14.6.2 Toilet Wall tiles m² 60.45
14.6.3 Toilet flash+Spray+Tissue holder set 2.00
14.6.4 Lavabor & Mirror set 2.00
14.6.5 Shower include glass set 1.00
14.6.6 Wall cloth rack set 1.00
14.6.7 Shampoo holder set 1.00
14.6.8 Water Trap set 3.00
14.6.9 Faucet (spare reparing) set 3.00
14.6.10 Riser box set 1.00
14.6.11 Curtain (Shower) m² 6.15
14.3 Pool Area
14.3.1 Glass handrail H 1.20 m m 26.00
14.3.3 Floor decking m² 44.90
14.3.4 Garden landscape m² 14.75
14.3.5 Water Trap belong poo m 18.10
14.3.6 Shower floor tiles m² 4.20
14.3.7 Shower wall tiles m² 24.60
14.3.8 Pool tiles m² 135.00
III MEP
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
A LOW VOLTAGE WORKS (LV)
A.1 LIGHTING
A.1.1 BASEMENT FLOOR
1 LED ceiling reccessed downlight 9W Set 6
2 Fluorecent light 1.20m - 2x36W Set 30
3 Fluorecent light 1.20m - 1x36W Set 1
4 Emergency wall light 2x8W (30min) Set 1
5 1 gang switch Set 2
6 2 gang switch Set 3
7 1 gang switch 2way Set 1
8 Gang Box Pcs 6
9 Cable Cu/PVC 1x1.5mm2 (Red) M -
10 Cable Cu/PVC 1x1.5mm2 (Black) M -
11 Flixible Conduit Ø20mm M -
12 PVC Conduit Ø20mm M 280
13 Accessary Lot 1

A.1.2 GROUND FLOOR


1 LED ceiling reccessed downlight 9W Set 46
2 LED Serface mounted downlight 24W (indoor) Set 5
3 LED Wall Light 24W (Outdoor) Set 11
4 Grystal light 1x45W Set 1
5 Hanging light 1x18W Set 3
6 Fluorecent light 1.20m - 2x36W Set 24
7 Fluorecent light 1.20m - 1x36W Set 1
8 Emergency wall light 2x8W (30min) Set 1
9 1 gang switch Set 2
10 2 gang switch Set 2
11 3 gang switch Set 2
12 1 gang switch 2way Set 2
13 2 gang switch 2way Set 1
14 Gang Box Pcs 9
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2
15 Cable Cu/PVC 1x1.5mm (Red) M -
16 Cable Cu/PVC 1x1.5mm2 (Black) M -
17 Flixible Conduit Ø20mm M -
18 PVC Conduit Ø20mm M 140
19 Accessary Lot 1

A.1.3 1-10 FLOOR


1 LED ceiling reccessed downlight 9W Set 1,140
2 LED Serface mounted downlight 24W (Outdoor) Set 40
3 LED Serface mounted downlight 24W (indoor) Set 100
4 Grystal light 1x45W Set 40
5 Hanging light 1x18W Set 120
6 Strip Light 1x5W M 200
7 Fluorecent light 1.2m - 1x36W Set 10
8 Fluorecent light 0.60m - 1x36W Set 10
9 Emergency wall light 2x8W (30min) Set 10
10 1 gang switch Set 100
11 2 gang switch Set 240
12 3 gang switch Set 40
13 Gang Box Pcs 380
14 Cable Cu/PVC 1x1.5mm2 (Red) M -
15 Cable Cu/PVC 1x1.5mm2 (Black) M -
16 PVC Conduit Ø20mm M -
17 Accessary Lot 1

A.1.4 11 FLOOR
1 LED ceiling reccessed downlight 9W Set 107
2 LED Serface mounted downlight 24W (Outdoor) Set 7
3 LED Serface mounted downlight 24W (indoor) Set 3
4 Grystal light 1x45W Set 4
5 Hanging light 1x18W Set 11
6 Strip Light 1x5W M 80
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
7 Fluorecent light 1.2m - 1x36W Set 1
8 Fluorecent light 0.60m - 1x36W Set 1
9 Emergency wall light 2x8W (30min) Set 1
10 1 gang switch Set 100
11 2 gang switch Set 200
12 3 gang switch Set 40
13 Gang Box Pcs 340
2
14 Cable Cu/PVC 1x1.5mm (Red) M -
2
15 Cable Cu/PVC 1x1.5mm (Black) M -
16 PVC Conduit Ø20mm M -
17 Accessary Lot 1

A.1.5 ROOF FLOOR


1 LED ceiling reccessed downlight 9W Set 40
2 LED Serface mounted downlight 24W (indoor) Set 12
3 LED Wall Light 24W (Outdoor) Set 5
4 Ceiling fluorecent light 1.2m - 3x36W Set 3
5 Emergency wall light 2x8W (30min) Set 1
6 LED ceiling Sqare downlight 24W Set 18
7 Double Sqare downlight Hanging 25W Set 2
8 Fluorecent light 1.2m - 1x36W Set 1
9 1 gang switch 2way Set 5
10 2 gang switch 2way Set 6
11 Gang Box Pcs 11
12 Cable Cu/PVC 1x1.5mm2 (Red) M -
2
13 Cable Cu/PVC 1x1.5mm (Black) M -
14 PVC Conduit Ø20mm M -
15 Accessary Lot 1
A.2 SOCKET
A.2.1 BASEMENT FLOOR
1 Power socket - 13A
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2 Gang Box Set 7
3 Cable Cu/PVC 1x2.5mm2 (Red) Pcs 7
2
4 Cable Cu/PVC 1x2.5mm (Black) M -
5 Cable Cu/PVC 1x1.5mm2 (Yello/Green) M -
6 Flixible Conduit Ø20mm M -
7 Accessary M -
Lot 1
A.2.2 GROUND FLOOR
1 Power socket - 13A
2 Power socket -16A Set 15
3 Gang Box Set 5
4 Cable Cu/PVC 1x2.5mm2 (Red) Pcs 20
5 Cable Cu/PVC 1x2.5mm2 (Black) M -
2
6 Cable Cu/PVC 1x1.5mm (Yello/Green) M -
7 Flixible Conduit Ø20mm M -
8 Accessary M -
Lot 1
A.2.3 1-10 FLOOR
1 Powre socket - 13A
2 Power socket - 16A Set 210
3 Power socket with USB - 13A Set 160
4 Water proof power socket - 13A Pcs 120
5 Gang Box M 120
6 Cable Cu/PVC 1x2.5mm2 (Red) M 610
7 Cable Cu/PVC 1x2.5mm2 (Black) M -
2
8 Cable Cu/PVC 1x1.5mm (Yello/Green) -
9 PVC Conduit Ø20mm -
10 Accessary M -
Lot 1
A.2.4 11 FLOOR
1 Powre socket - 13A
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2 Power socket - 16A Set 21
3 Power socket with USB - 13A Set 16
4 Water proof power socket - 13A Set 12
5 Gang Box Set 12
6 Cable Cu/PVC 1x2.5mm2 (Red) Pcs 61
2
7 Cable Cu/PVC 1x2.5mm (Black) M -
8 Cable Cu/PVC 1x1.5mm2 (Yello/Green) M -
9 PVC Conduit Ø20mm M -
10 Accessary M -
Lot 1
A.2.5 12 FLOOR
1 Power socket - 13A
2 Water proof power socket - 13A Set 15
3 Gang Box Set 2
4 Cable Cu/PVC 1x2.5mm2 (Red) Pcs 17
5 Cable Cu/PVC 1x2.5mm2 (Black) M -
6 Cable Cu/PVC 1x1.5mm2 (Yello/Green) M -
7 PVC Conduit Ø20mm M -
8 Accessary M -
A.3 ELECTRICAL MAIN CABLE Lot 1
A.3.1 BASEMENT FLOOR
1 Cable 4 x 240mm² Cu/XLPE/PVC
2 Cable 2 x 16mm² +1C x 10mm² E/Cu/PVC/PVC
3 Cable 4 x 6mm² +1C x 4mm² E/Cu/PVC/PVC M 40
M 50
A.3.2 GROUND FLOOR M 100
1 Cable 4 x 240mm² Cu/XLPE/PVC
2 Cable 4 x 16mm² +1C x 10mm² E/Cu/PVC/PVC
M 50
A.3.3 1-10 FLOOR M 10
1 Cable 4 x 16mm² +1C x 10mm² E/Cu/PVC/PVC
Rate Amount
Nº Description Unit Quantity Total Descrip
Material Labor Material Labor
2 Cable 2 x 10mm² +1C x 6mm² E/Cu/PVC/PVC
3 Cable 2 x 6mm² +1C x 4mm² E/Cu/PVC/PVC M 425
M 180
A.3.4 11 FLOOR M 150
1 Cable 4 x 16mm² +1C x 10mm² E/Cu/PVC/PVC
2 Cable 2 x 10mm² +1C x 6mm² E/Cu/PVC/PVC
3 Cable 2 x 6mm² +1C x 4mm² E/Cu/PVC/PVC M 70
M 10
A.3.5 ROOF FLOOR M 15
1 Cable 4 x 35mm² +1C x 25mm² E/Cu/PVC/PVC
2 Cable 2 x 16mm² +1C x 10mm² E/Cu/PVC/PVC
3 Cable 2 x 10mm² +1C x 6mm² E/Cu/PVC/PVC M 90
4 Cable 2 x 6mm² +1C x 4mm² E/Cu/PVC/PVC M 80
A.4 ELECTRICAL DISTRIBUTION BOARD M 50
A.4.1 BASEMENT FLOOR M 70
1 MDB&ATS -01 (400A-4P )
2 DB-TP-01 (63A-3P )
3 DB-BP-01 (32A-3P )
4 DB-FP -01 (32A-3P ) Set 1
Set 1
A.4.2 GROUND FLOOR Set 1
1 DB-LOBBY&ELV - (63A-3P ) Set 1
2 DB-GF - (63A-3P)

A.4.3 1-10 FLOOR Set 1


1 DB-1F-10F - ( 50A-3P) Set 1
2 DB-Unit Condo ( 32A-2P)
3 DB-Unit Condo ( 40A-2P)