Professional Documents
Culture Documents
Detailed Unit Price Analysis: Proposed One Storey Residential Building
Detailed Unit Price Analysis: Proposed One Storey Residential Building
A. Labor
a. Construction Foreman/Engineering Assistant 1 2.000 800.00 1,600.00
b. Skilled Laborer 2 2.000 600.00 2,400.00
b. Laborer 6 2.000 450.00 5,400.00
Name and Capacity No. of Units No. of Days Daily Rate Amount
B. Equipment
a. Bar Cutter 1 1.00 1,840.00 1,840.00
b. Bar Bender 1 1.00 1,200.00 1,200.00
c. Cargo Truck/Hauling Truck 1 0.30 1,800.00 540.00
E. Materials
a. Deformed Reinforcing Steel Bar (Grade 40) 1350.00 kgs. 75.00 101,250.00
b. #16 G.I. Tie-wire 20.25 kgs. 90.00 1,822.50
Consumables (5% of Materials Cost) 5,153.63