NO LAMBUNG

WORK ORDER
HAUL ROAD UPGRADES SERVICES IN WEDA BAY DT 118

Work / Service Order Number WDB_PM_DT 118_18/03/2024 Equipment Number b223

Description Alat DUMP TRUCK BESAR


Jenis Pekerjaan Periodic Service / PS 2000
HINO

Remark Progress Project Type FM 260 JD

Lokasi Fungsional MDO Area S/N & No Pol J08EUFR19585/MJEFM8JN1MJE 36060

Tanggal & Waktu In (Diisi Mekanik) 18/3/2024 HM/KM (Diisi Mekanik)


Tanggal & Waktu Out (Diisi Mekanik) Diterbitkan Oleh Ridha Ikhsan
SERVICE REPORT
Proses Pencucian
Pre Inspection
Result
No Daftar Pekerjaan Activity Backlog
(√/X)
1 Start Engine, Check Noise Recheck
2 Travel Function Recheck
3 Brake Function Recheck
4 Attachment Function Recheck
5 Stall Performance Recheck
6 Electrical Function Recheck
7 Warning Lamp Recheck
Proses Perbaikan
Checklist
No Job / Part Name Part Number QTY ST Hasil Pekerjaan
Spareparts Gudang
1 Engine Oil Filter 15607-2190L/15613 HOP 1 Pcs
2 Fuel Filter 234011332L 1 Pcs
3 Element Fuel Filter (Pre) 23401LBH30 1 Pcs
4 Filter Oli Transmisi 32915-LVA10 1 Pcs
5 Filter Oli Gardan 156072060L 1 Pcs
6 Air Cleaner Inner Element 178013391L 1 Pcs
7 Air Cleaner Outter Element 178013380L 1 Pcs
8 Engine Oil SAE 15W-40 15 Liter
9 Transmision Oil SAE 90 10 Liter
10 Differential Oil SAE 140 16 Liter
11 Hydraulic Oil SAE 10 60 Liter
12
13
14
15
BACKLOG / REPLACE or CHECKING
1 CHECK AND ADJUST VALVE
2 RUBBER STOPPER BELAKANG 48306-JAF90 4 PCS
3
4
5
6
7
8
9

PENDING JOB

Mekanik : Safety : Azis TTD Mekanik Status Alat

Partsman : Koordinator Alat : Sukron Salasa *RFU/BD