Approach Road - Barkot
Approach Road - Barkot
Road Work
1 Excavation Cum 5,757.781 4,158.922 9,916.702
2 Filling Cum 13,786.781 257.131 14,043.912
3 Subgrade Cum 1,492.068 170.424 1,662.492
4 Granular Sub-Base Cum 592.375 67.721 660.096
5 Wet Mix Macadam Cum 736.809 84.254 821.063
6 Dence Bituminous Macadam Cum 309.506 33.879 343.384
7 Bituminous Concrete Cum 123.594 13.532 137.126
8 Filter Media / Granular Fill Cum 1,375.915 26.106 1,402.021
Retaining Wall
1 PCC Grade M15 Cum -
2 Footing Grade _____ Cum -
3 Wall Grade ______ Cum -
4 HYSD Bars MT -
5 PVC Pipes for Weep Holes RMT -
6 Geotextile Sqm -
Crash Barrier
1 Concrete Grade _______ Cum 78.400 3.136 81.536
2 HYSD Bars MT -
CC Drain
1 Concrete Grade _______ Cum 44.136 10.298 54.434
Retaining
Wall
Ht. above
PCC Footing Wall
Ground
bottom
Left Right Middle triangle
rec.
Counter
Fort
1.00 85.576 0
1.50 97.564 0
4.00 258.273 0
7.00 623.499 0
10.00 1376.946 11 15146.41
13.00 2443.859 0
4885.717 11.00 15146.41
15.146 MT
Concrete
Wall Length PCC Qty
Qty
bottom top
Concrete
Quantity Length PCC Qty
Qty
Left Rec. Left
middle Triangle
Silkyara Side
Silkyara Side
Silkyara Side
Barkot Side
907 5.2254
910 3 5.2349 5.23015 15.69045
920 10 5.2254 5.23015 52.3015
930 10 5.2349 5.23015 52.3015
940 10 4.7913 5.0131 50.131
170.4245
GSB
Silkyara Side
Silkyara Side
Silkyara Side
Silkyara Side
Silkyara Side
CC Drain
Silkyara Side
Length Area Quantity
240 0.1839 44.136
44.136
Silkyara Side