Air Compressor and Air Receiver Installation at Hamriyah Port
Air Compressor and Air Receiver Installation at Hamriyah Port
Exclusions:
• Permissions.
• Existing service relocation.
• Shut down.
• Any works other than the above scope of work
• Any kind of authority approvals/fees.
01 50-ton Crane -1,000 aed
Material: 760 aed
• MS Channel 150x75x6.5mm = 01nos (6mtr long) = 260 x 1= 375 aed
• MS Channel 100x50x6mm = 01 nos (6mtr long) = 150 x 1= 185 aed
• Extra = 200 aed
02 Material: 575aed
• SCH 40 GI 1” pipe= 12 mtrs= 140aed
• SCH 40 GI ½” pipe=12 mtrs= 74aed
• 1” SS ball valves – 3=210aed
• ½” SS Ball Valve – 1=38aed
• Extra-113aed
Manpower = 2 days * 4 people *18aed/hr *10hr/day = 1440 aed
Pass and others =100 aed
Miscellaneous =300 aed
Total Expense: 2,415 aed
Margin: 2,415 aed
Grand total: 4,830 aed
03 Material: 1220aed
• 50 x 50 x 3mm sq tube =04nos = 320aed
• 0.7mm thk Single skin corrugated sheet, Size: 5.5mtr x 1.2mtr. =300aed
• Marine paint=400aed
• Extra-200aed
Manpower = 4 days * 4 people *18aed/hr *10hr/day = 2880 aed
Pass and others =160 aed
Miscellaneous =300 aed
Total Expense: 4560 aed
Margin: 4560 aed
Grand total: 9,120 aed