Professional Documents
Culture Documents
Kode Sumber Daya
Kode Sumber Daya
Kode Sumber Daya
C Upah
E Subkon
D Alat
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10201
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10202
Alat D D10224
Alat D D10203
Alat D D10204
Alat D D10205
Alat D D10206
Alat D D10207
Alat D D10208
Alat D D10209
Alat D D10210
Alat D D10211
Alat D D10212
Alat D D10213
Alat D D10214
Alat D D10215
Alat D D10216
Alat D D10217
Alat D D10218
Alat D D10219
Alat D D10220
Alat D D10224
Alat D D10225
Alat D D10226
Alat D D10227
Upah C C10227
Material A A10221
Alat D D10222
Material A A10223
A
200100 Pekerjaan Tanah dan Saluran
Upah C C20101
Upah C C20102
Upah C C20103
Upah C C20104
Upah C C20105
Upah C C20106
Upah C C20107
P Upah C C20108 JANGAN DIPOSTING DISINI
200200 Lantai Kerja Urugan Pasir t=10cm
Material A 1 A20109
Upah C 2 C20110
200300 Pekerjaan Bobokan Pile
Upah C 3 C20111
Upah C 4 C20112
200400 Pekerjaan Anti Rayap
Subkontraktor E 5 E20113
200500 Pekerjaan Dewatering
Subkontraktor C 6 C20114
Subkontraktor C 7 C20114
200600 Pekerjaan Straus Pile
Subkontraktor E 7 E20115
200700 Pekerjaan Bekisting Batako
Material A 8 A20116
Material A 9 A20117
Material A 10 A20118
Upah C 10 C20118
Upah C 11 C20119
200800 Pekerjaan Lantai Kerja
Material A 12 A20120
Upah C 1 C20120
Upah C 13 C20121
200900 Pekerjaan Pengecoran Beton Ready Mix
Material A 20201 A20201
Material A 20202 A20202
Material A 20203 A20203
Material A 20204 A20204
Material A 20205 A20205
Material A 20206 A20206
Subkontraktor E 20207 E20207
Upah C 20208 C20208
Material A 20209 A20209
Upah C 20210 C20210
Material A 20211 A20211
201000 Pekerjaan Pembesian
Material A 20301 A20301
Material A 20302 A20302
Material A 20303 A20303
Upah C 20303 C20303
Upah C 20304 C20304
201100 Pekerjaan Bekistiing
Material A 20401 A20401
Material A 20402 A20402
Material A 20403 A20403
Material A 20404 A20404
Material A 20405 A20405
Material A 20406 A20406
Material A 20407 A20407
Material A 20408 A20408
Material A 20409 A20409
Material A 20410 A20490
Material A 20411 A20491
Material A 20412 A20492
Material A 20413 A20493
Material A 20410 A20494
Material A 20411 A20495
Upah C 20410 C20410
Upah C 20411 C20411
Upah C 20412 C20412
Upah C 20411 C20413
Upah C 20412 C20414
Upah C 20413 C20415
Upah C 20413 C20416
Upah C 20413 C20417
Upah C 20414 C20418
Upah C 20415 C20419
Upah C 20403 C20420
Upah C 20404 C20421
Upah C 20405 C20422
Upah C 20406 C20423
Upah C 20407 C20424
Upah C 20408 C20425
Upah C 20409 C20426
Upah C 20410 C20427
Upah C 20409 C20428
Upah C 20409 C20429
Upah C 20410 C20430
201200 Pekerjaan Bekisting Bondek
Material A 20501 A20501
Material A 20502 A20502
Upah C 20502 C20502
Upah C 20503 C20503
201300 Pembesian Wiremesh M6
Material A 20601 A20601
Upah C 20602 C20602
201400 Pekerjaan Waterproofing dan Floor Hardener
Subkontraktor E 20701 E20701
Subkontraktor E 20702 E20702
Subkontraktor E 20703 E20703
Material A 20712 C20712
201500 Pekerjaan Parapet Beton dan Railing
Subkontraktor C 20801 C20801
P Upah C 20802 C20802 JANGAN DIPOSTING DISINI
201600 Pekerjaan Baja
Subkontraktor E
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E 20901 E20901
Subkontraktor E
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E 20902 E20902
Subkontraktor E
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E 20903 E20903
Subkontraktor E
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E 20904 E20904
Subkontraktor E
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
Subkontraktor E 20905 E20905
B
300100 Pekerjaan Bata Ringan Tebal 10cm
Material A 30101 A30101
Material A 30102 A30102
Material A 30103 A30103
Material A 30104 A30104
Material A 30105 A30105
Material A 30106 A30106
Upah C 30107 C30107
Upah C 30108 C30108
Upah C 30109 C30109
300200 Pekerjaan Plester dan Aci dinding interior
Material A 30201 A30201
Material A 30202 A30202
Upah C 30203 C30203
Upah C 30204 C30204
Upah C 30204 C30205
300300 Pekerjaan exposed ceiling & dinding interior
Upah C 30301 C30301
Material A 30302 A30302
Upah C 30303 C30303
Upah C 30304 C30304
Upah C 30304 C30305
300400 Pekerjaan Screeding Atap
Material A 30401 A30401
Material A 30403 A30401
Material A 30404 A30401
Material A 30404 A30402
Upah C 30402 C30402
Upah C 30404 C30403
300500 Pekerjaan SCREED 4 cm di bawah Keramik,FH,Parke
Material A A30403
Material A A30403
Material A A30403
Material A A30404
Material A A30405
Material A A30405
Material A A30406
Material A A30407
Upah C C30408
Subkontraktor E E20704
Subkontraktor E E20704
Subkontraktor E E20704
Subkontraktor E E20704
Subkontraktor E E20705
Subkontraktor E E20706
Subkontraktor E E20707
Subkontraktor E E20708
Material A A20709
Material A A20710
Upah C C20711
300600 Pekerjaan Finishing Lantai dan Skirtingnya
Material A A30409
Material A A30410
Material A A30411
Material A A30412
Material A A30419
Material A A30413
Material A A30414
Material A A30418
Material A A30415
Material A A30416
Upah C C30417
Upah C C30418
Upah C C30419
300700 Pekerjaan Skirting Lantai
Material A A30418
Material A A30419
Material A A30420
Material A A30421
Upah C C30422
Upah C C30423
Upah C C30423
300800 Pekerjaan Lantai Marmer
Material A A30424
Upah C C30425
Upah C C30425
Upah C C30425
300900 Pekerjaan Lantai Vynil
Material A A30426
Material A A30426
Upah C C30426
Upah C C30427
301000 Pekerjaan Kayu Parquet Solid
Material A A30428
Material A A30428
Upah C C30428
Upah C C30429
301100 Pekerjaan Keramik Step Nosing
Material A A30430
Upah C C30430
Upah C C30431
301200 Pekerjaan Finishing DINDING Keramik dan HT
Material A A30501
Material A A30502
Material A A30503
Material A A30504
Upah C C30505
Upah C C30505
Upah C C30505
301300 Pekerjaan Finishing Mozaik
Material A A30506
Upah C C30507
Upah C C30507
301400 Pekerjaan Finishing Dinding Marmer
Material A A30508
Upah C C30509
301500 Pekerjaan Batu Andesit
Material A A30510
Material A A30511
Upah C C30512
301600 Pekerjaan Conwood
Material A A30513
Material A A30514
Upah C C30515
Upah C C30515
301700 Pekerjaan Wall Covering
Subkontraktor E E30601
Upah C C30601
Subkontraktor E E30602
301800 Pekerjaan Shower Glass
Subkontraktor E E30603
Upah C C30516
301900 Pekerjaan Pengecatan
Subkontraktor E E30701
Subkontraktor E E30702
Subkontraktor E E30703
Subkontraktor E E30704
Subkontraktor E E30705
Subkontraktor E E30706
Upah C C30517
302000 Pekerjaan Pintu Dan Jendela
Subkontraktor E
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Subkontraktor E E30801
Upah C C30801
Subkontraktor E
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30802
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Subkontraktor E E30803
Material A A30806
Upah C C30808
Subkontraktor E E30804
Subkontraktor E E30804
Subkontraktor E E30804
Subkontraktor E E30804
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Material A A30806
Upah C C30807
Upah C C30808
302100 Pekerjaan Plafond Gypsum dan GRC
Subkontraktor E 30901 E30901
Subkontraktor E 30902 E30902
Subkontraktor E 30903 E30903
Subkontraktor E 30904 E30904
Subkontraktor E 30905 E30905
Subkontraktor E 30906 E30906
Subkontraktor E E30906
Subkontraktor E E30906
Subkontraktor E E30906
Subkontraktor E E30906
Subkontraktor E E30906
Subkontraktor E 30907 E30907
Subkontraktor E E30907
Subkontraktor E E30907
Subkontraktor E E30907
Subkontraktor E E30907
Subkontraktor E E30907
Subkontraktor E E30907
Subkontraktor E 30908 E30908
Subkontraktor E E30908
Subkontraktor E E30908
Subkontraktor E E30908
Subkontraktor E E30908
Subkontraktor E E30908
Subkontraktor E E30908
Subkontraktor E E30908
302200 Pekerjaan Sanitair dan Instalainya
Subkontraktor E E31001
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31002
Upah C C31003
Upah C C31003
302300 Pekerjaan Meja Kitchen Lebar 600mm
Subkontraktor E E32001
Upah C C32002
Material A A32001
Material A A32002
302400 Pekerjaan Meja Lavatory Lapis Marmer Lebar 600mm
Subkontraktor E E33001
Upah C C33002
Upah C C33003
Material A A33001
Material A A33002
Material A A33003
Material A A33004
302500 Pekerjaan Façade
Subkontraktor E E34001
Subkontraktor E E34002
Subkontraktor E E34003
Subkontraktor E E34004
Subkontraktor E E34005
Upah C C34006
Upah C C31004
Material A A31004
Material A A31005
Material A A31006
Material A A31007
302600 Pekerjaan Lain-Lain
Upah C C35001
Upah C C35002
Upah C C35003
Upah C C35004
Upah C C35005
Upah C C35006
Material A A35006
Material A A35007
Material A A35008
Material A A35009
Subkontraktor E E35006
Upah C C35007
Upah C C35008
Upah C C35009
Upah C C35010
Upah C C35012
Upah C C35011
Subkontraktor E E35012
Subkontraktor E E35013
Subkontraktor E E35014
Upah C C35020
Subkontraktor E E35015
Upah C C35016
Subkontraktor E E35017
Subkontraktor E E35018
Upah C C20803
302700 Pekerjaan Luar
Upah C C36001
Subkontraktor E E36001
Subkontraktor E E36002
Subkontraktor E E36003
Subkontraktor E E36002
Material A A36003
Upah C C36004
Subkontraktor E E36005
Upah C C36006
Upah C C36007
Upah C C36008
Upah C C36009
Subkontraktor E E36009
Subkontraktor E E36010
Subkontraktor E E36011
Upah C C36012
Subkontraktor E E36013
Material A A36014
Material A A36015
Subkontraktor E E36014
Subkontraktor E E36015
Subkontraktor E E36016
Upah C C36017
Subkontraktor E E36017
Upah C C36018
Subkontraktor E E36017
Material A A36016
Material A A36017
Subkontraktor E E36018
Subkontraktor E E36019
Subkontraktor E E36020
Subkontraktor E E36021
Subkontraktor E E36022
Subkontraktor E E36023
Subkontraktor E E36024
Subkontraktor E E36025
Subkontraktor E E36026
Subkontraktor E E36027
Subkontraktor E E36028
Upah C 1 C36016 JANGAN DIPOSTING DISINI
Upah C 1 C20906 JANGAN DIPOSTING DISINI
302800 Biaya Provsum dan BWIC
UPAH E 37001 E37001
Biaya Pekerjaan MEP
PEKERJAAN PLUMBING
Subkontraktor E EPLB01
Subkontraktor E EPLB02
Subkontraktor E EPLB03
Subkontraktor E EPLB04
Subkontraktor E EPLB05
Subkontraktor E EPLB06
Subkontraktor E EPLB07
Subkontraktor E EPLB08
Upah C CPLB01
Upah C CPLB02
Subkontraktor E EPLB09
Subkontraktor E EPLB10
PEKERJAAN PEMADAM KEBAKARAN
Subkontraktor E EMED01
Upah C CMED01
Subkontraktor E EMED02
Subkontraktor E EMED03
PEKERJAAN TATA UDARA
Subkontraktor E EMAC01
Subkontraktor E EMAC02
Subkontraktor E EMAC03
Subkontraktor E EMAC04
Subkontraktor E EMAC05
Subkontraktor E EMAC06
Subkontraktor E EMAC07
Subkontraktor E EMAC08
Subkontraktor E EMAC09
Subkontraktor E EMAC10
Subkontraktor E EMAC11
Subkontraktor E EMAC12
Subkontraktor E EMAC13
PEKERJAAN LISTRIK
Subkontraktor E ELIS01
Subkontraktor E ELIS02
Subkontraktor E ELIS03
Subkontraktor E ELIS04
Subkontraktor E ELIS05
Subkontraktor E ELIS06
Subkontraktor E ELIS07
Subkontraktor E ELIS08
Subkontraktor E ELIS09
Subkontraktor E ELIS10
Subkontraktor E ELIS11
Subkontraktor E ELIS12
Subkontraktor E ELIS13
Upah C CLIS14
PEKERJAAN FIRE ALARM
Subkontraktor E EFIR01
Subkontraktor E EFIR02
Upah C CFIR01
PEKERJAAN SOUND SISTEM
Subkontraktor E ESND01
Subkontraktor E ESND02
Upah C CSND01
PEKERJAAN B A S
Subkontraktor E EBAS01
Upah C CBAS01
PEKERJAAN PENGADAN WATER HEATER 30 Liter
Material A AWTRHT
Upah C CDAM01
Upah C CSLO01
Upah C CKOM01
Upah C CEPEDA JANGAN DIPOSTING DISINI
Upah C CEMEDI JANGAN DIPOSTING DISINI
Anti Rayap m2
Dewatering permukaan ls
Sewa Pompa Summersible bln
Hebel Reject/Batako bh
PC (50 kg) zak
Pasir Pasang m3
Upah pasang crucuk m2
Upah pasang batako m2
Material bondek m2
Material Seng EndStop m2
Upah pasang bondek m2
Upah pabrikasi endstop m1
Wiremesh M6 struktur m2
Upah install wiremesh m2
oofing dan Floor Hardener
Waterproofing Integral struktur bawah m3
Waterproofing Integral lantai podium m'
Waterstop m'
material Floor Hardener m2
Beton dan Railing
Parapet Beton (besi, bekisting, beton) m'
Parapet tepi bangunan parkir t=20cm di finish cat m'
Crown Tower - 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Crown Tower - 2
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
Bangunan Halte
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 bj
0 bj
0 ttk
0 kg
Kanopi as D1/H1 - T1A/T1H
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 bj
0 bj
0 bj
0 bj
0 ttk
0 kg
Kanopi as T1.07/T1.09 - 06/09
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 kg
0 bj
0 bj
0 kg
Besi siku
PEKERJAAN ARSITEKTUR
ngan Tebal 10cm
Bata ringan m3
Thinbed (50kg) DUCON 40 KG zak
Semen PC 40kg zak
Pasir beton m³
Split m³
Besi kolom type KP 6 m'
Upah kolom praktis m'
Upah pemasangan bata ringan m2
Upah langsir material pekerjaan dinding m2
dan Aci dinding interior
Mortar plester 50kg DUCON 40 KG zak
Mortar acian 30kg DUCON 40 KG zak
Upah plester + aci m2
Upah grouting pertemuan dinding dg precast m1
Upah tali air + list almunium m1
ceiling & dinding interior
Persiapan permukaan beton m2
Mortar skimcoat DUCON 40 KG zak
Upah skimcoat dinding m2
Upah skimcoat gorden box include sudutan m1
Upah skimcoat dak & tangga m2
Material Vinyl m2
Material Plint Vinyl m1
Pekerjaan Lantai Vynil m2
Pekerjaan Skirting Vynil m'
Mozaik m2
Upah Pasang Mozaik motiv bunga m2
Upah NAT Mozaik m2
g Dinding Marmer
Marmer Slab m2
Upah Pasang Marmer+Poles m2
Material Conwood m2
Lantai kerja Conwood m2
Upah pemasangan Conwood (tanpa rangka holo) m2
Upah pemasangan RANGKA Conwood (incl holow galvaniz 4040) m2
Pekerjaan Provisional ls
1. Pengadaan Unit AC
1.a. Pengadaan Unit AC area Podium (VRF) Ls
1.b. Pengadaan Unit AC area Tower (VRF) Ls
1.c.. Pengadaan Unit AC area Unit Apartemen (Multi Split) Ls
1.d. Pengadaan Unit AC area Unit Apartemen (Singel Split) Ls
2. Pengadaan Unit Fan
2.a. Pengadaan Unit Fan Kitchen Area Tower Ls
2.b. Pengadaan unit Fan Area Publik Ls
2.c. Pengadaan unit Fan Area Toilet Ls
3. Subkontraktor AC
3.a. Subkontraktor AC Area Podium Ls
3.b. Subkontraktor AC Area Tower Ls
4. Instalasi kabel listrik AC Ls
Subkontraktor B A S Ls
Mandor pekerjaan BAS
GADAN WATER HEATER 30 Liter
Suplayer Water Heater
PERIJINAN DAMKAR Ls
Konsuil / SLO Ls
Testing Commisioning Ls
Upah Pekerjaan Plumbing ls
Upah Pekerjaan ME ls
Pekerjaan BWIC
Pekerjaan BWIC ls
Biaya Pemeliharaan %
N REPAIR & REWORK
Material perbaikan struktur
Material perbaikan arsitektur
Material perbaikan MEP
Upah perbaikan struktur
Upah perbaikan arsitektur
Upah perbaikan MEP
TING PADA STRUKTUR ls
TING PADA ARSITEKTUR ls
Astek ls
Biaya CAR & TPL ls
Deductable CAR ls
Jaminan Pelaksanaan ls
Jaminan Uang Muka ls
Biaya bank SKBDN dan Akseptasi ls
Laba Kotor
Resiko %
PPh 3%
JUMLAH TOTAL
Pekerjaan Persiapan
Alat Konstruksi dan Produksi
Pekerjaan Struktur
Pekerjaan Arsitektur
Provisional sum
Pekerjaan BWIC
Handling Sanitair
Pemasaran posting Struktur
Pemasaran posting Arsitektur
Alat penunjang dan kendaraan
Biaya Umum
Biaya Keuangan
Biaya Gaji Pegawai
BU Pusat
Biaya Pemeliharaan
Pemasaran
Risiko
PPh
Margin
2