ASSIGNMENT 3

UNDER THE ARC

PROJECT: MALL

LOCATION: GINGOOG, PHILIPPINES

COMPENSATION:

ARCHITECT: 80,000.00 MONTHLY

MAFPS CONSULTANT: 150,000 ANNUAL RATE

TECHNICAL STAFF MONTHLY SALARY: 20,000.00

PROBLEM: TRAFFIC FLOW IN 2 DAYS

ARCHITECT (MONTHLY) = 80,000/30 DAYS

= 2,666.66 x 2 DAYS (48 HRS.)

= PHP 5,333.66

MEFPS CONSULTANT (ANNUALLY)

= 150,000.00/365 DAYS

= 410.958 x 2 DAYS

= PHP 821.916

TECHNICAL STAFF MONTHLY (2 STAFF)

= 20,000/30 DAYS

= 666.666 x 2 DAYS

= 1,333.33 x 2 STAFFS

= PHP 2,666.66

DIRECT COST = 5,333.33 + 2,666.66

= PHP 8,821.906

FEE = COST x MULTIPLIER

= 8,821.906 x 1.5

= PHP 13,232.859

TOTAL COST TO CLIENT = 13,232.859 + R (TRANSPORTATION OF FOUR x 2 DAYS)

= 13,232.859 + ((270 x 4) x 2)

= PHP 15,392.859

PHP 270= TRANSPORTATION BACK AND FORTH FROM CDO TO GINGOOG