Download as pdf
Download as pdf
You are on page 1of 4
CONSTRUCTION OF ISOLATION BAY, VEHICULAR LANE, STROM WATER OPEN MANSOON DRAIN, CARGO APRON WITH LINK. "TAXI AND BASIC STRIP AT MAHARAJA AGARSEN AIRPORT HISAR Executive Engineer, Provis 'No-1I1,PWD Bi Contractor S.$, BUILDERS, SIEVE ANALYSIS FOR 20 MM AGGREGATE (IS CO! isample No Location ype of Material ‘Weight Retained (gms) Authority Engineer Total Wt of Sample ‘Cumulative % Retained ‘Cumulative Retained (gms) Client: HR. PWD B&R )DE 383-2016) [Date of Sampling Date of Testing % of Passing For Contractor's Rep. Checked by For AE/Authority's Rep. Scanned with CamScanner CONSTRUCTION OF ISOLATION BAY, VEHICULAR LANE, STROM WATER OPEN MANSOON DRAIN, ‘AT MAHARAJA AGARSEN AIRPORT HISAR ‘CARGO APRON WITH LINK ‘TAXI AND BASIC STRIP Executive Engineer Provincial Division No-IIl,PWO B&R,Hisar Authority Engineer TGeie mdyais ono nn accntontes Ste caehie Paka MORN eee rype of Material ISource Total Wt of Sampl Rclgeve Weight Retained | Cumulative Cumulative % (gms) Retained (gms) Retained 12.5 mm 10 mm 100 85-100 4.75 mm 2.36 mm Remark: Prepared by For Contractor's Rep. For AE/Authority's Rep. Scanned with CamScanner [CONSTRUCTION OF ISOLATION BAY, VEHICULAR LANE, STROM WATER OPEN MANSOON DRAIN, CARGO APRON WITH LINK TAX] ‘AND BASIC STRIP AT MAHARAJA AGARSEN AIRPORT HISAR Executive Engineer, Provincial Division No-I11,PWD B&R Hisar ™ Contractoi 5.6. BUILDERS" Authority Engineer Client: HR. PWD B&R ‘CUBE COMPRESSIVE STRENGTH TEST (15 CODE baer | fron [Cement Qty./Cum ors ces | atl oar eons [es Fa een ‘Weight of Cube Sigma) | Volume of cube | Density (gnvec) Strength in N/mm2, He a earl oo Remark: Prepared by Checked by For Contractor's Rep. For AE/Authority’s Rep. Scanned with CamScanner CONSTRUCTION OF ISOLATION BAY, VEHICULAR LANE, NK STROM WATER OPEN MANSOON DRAIN, CARGO APRON WITH LI TAXI AND BASIC STRIP AT MAHARAJA AGARSEN AIRPORT HISAR Executive Engineer, Provincial Division Cd, No-1I1, PWD B&R,Hisar Contractor i BR S.S. BUILDERS Authority Engineer Client: HR. PWD B: ‘Cumulative Retained (gms) For AE/ Authority's Rep. For Contractor's Rep. Scanned with CamScanner

You might also like