Construction of berms, shoulder embankment and completion of formation width Earth filling, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates
after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including compensation for earth taken from private land, field etc. and
compacted to meet requirement of table 300-2 of MorT&H specification clasue No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other
specification 1990 1st edition.
S. No. Bill No. Description of Items Side No. From To Length Width Depth Qty. Unit Remark
1 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 0 600 470 1.50 0.200 282.00 Cum 1st Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
2 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 0 600 470 1.50 0.200 282.00 Cum 2nd Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
3 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 0 600 470 1.50 0.200 282.00 Cum 3rd Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
4 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 0 600 470 1.50 0.075 105.75 Cum 4th Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
5 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 600 2460.91 1730.91 1.50 0.200 1038.55 Cum 1st Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
6 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 600 2460.91 1730.91 1.50 0.200 1038.55 Cum 2nd Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
7 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 600 2460.91 1730.91 1.50 0.200 1038.55 Cum 3rd Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
8 9 New Road Shoulder (Diversion of Barwala and Dhansu Road) BS 2 600 2460.91 1730.91 1.50 0.075 389.45 Cum 4th Layer Soil from PTT to Old Apron Road @Rd. 0 to -600 (300 m.
9 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 12.80 0.200 384.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
10 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 12.40 0.200 372.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
11 8 New Road 3rd Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 12.00 0.200 360.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
12 8 New Road 4th Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 11.60 0.200 348.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
13 8 New Road 5th Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 11.20 0.200 336.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
14 8 New Road 6th Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 10.80 0.200 324.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
15 8 New Road 7th Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 10.40 0.200 312.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
16 8 New Road 8th Layer (Diversion of Barwala and Dhansu Road) BS 1 0 150 150 10.00 0.200 300.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
17 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 500 1050 550 10.70 0.200 1177.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
18 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 500 1050 550 10.30 0.200 1133.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
19 8 New Road 3rd Layer (Diversion of Barwala and Dhansu Road) BS 1 500 1050 550 10.00 0.150 825.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
20 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 1050 1200 150 11.60 0.200 348.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
21 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1050 1280 230 11.20 0.200 515.20 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
22 8 New Road 3rd Layer (Diversion of Barwala and Dhansu Road) BS 1 1050 1280 230 10.80 0.200 496.80 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
23 8 New Road 4th Layer (Diversion of Barwala and Dhansu Road) BS 1 1050 1280 230 10.40 0.200 478.40 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
24 8 New Road 5th Layer (Diversion of Barwala and Dhansu Road) BS 1 1050 1280 230 10.00 0.200 460.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
25 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 1285.5 1400 114.5 12.30 0.200 281.67 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
26 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1285.5 1400 114.5 11.90 0.200 272.51 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
27 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1285.5 1400 114.5 11.50 0.200 263.35 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
28 8 New Road 3rd Layer (Diversion of Barwala and Dhansu Road) BS 1 1285.5 1400 114.5 11.10 0.200 254.19 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
29 8 New Road 4th Layer (Diversion of Barwala and Dhansu Road) BS 1 1285.5 1400 114.5 10.70 0.200 245.03 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
30 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 1400 1580 180 10.40 0.200 374.40 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
31 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1400 1580 180 10.00 0.200 360.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
32 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1860 2100 240 10.30 0.200 494.40 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
33 8 New Road 2nd Layer (Diversion of Barwala and Dhansu Road) BS 1 1860 2100 240 10.00 0.150 360.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
34 8 New Road 1st Layer (Diversion of Barwala and Dhansu Road) BS 1 1950 2100 150 10.70 0.200 321.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
35 6 Apron Area Ist Layer BS 1 1300 1718 418 100.00 0.200 8360.00 Cum Soil from Runway 340 to 388 (Dhansu Road portion) Av. Lead 1.5km.
36 6 Apron Area 2nd Layer BS 1 1300 1718 418 85.00 0.200 7106.00 Cum Soil from PTT 426 to 480 (Dhansu Road portion) Av. Lead 1.5km.
37 6 Apron Area 3rd Layer BS 1 1300 1718 418 70.00 0.200 5852.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
38 8 Apron Area 3rd Layer BS 1 1300 1718 418 11.20 0.200 936.32 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
39 8 Apron Area 4th Layer BS 1 1300 1718 418 11.00 0.200 919.60 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
40 8 Apron Area 5th Layer BS 1 1300 1718 418 10.80 0.200 902.88 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
41 6 Dhansu Road Diversion 1 375 7 0.200 525.00 Cum Soil from Stock Yard @ 1350 (300 m. RHS from Runway Centre) Av.
42 6 Barwala Road Diversion 1 400 10 0.200 800.00 Cum 9th Layer Soil from Stock Yard @ 1350 (300 m. RHS from Runway
43 6 PTT (Swimming Pool Area) BS 1 720 800 80 55.00 0.200 880.00 Cum 7th Layer Soil from Stock Yard @ 1350 (300 m. RHS from Runway
44 6 PTT (Swimming Pool Area) BS 1 720 800 80 55.00 0.200 880.00 Cum 8th Layer Soil from Stock Yard @ 1350 (300 m. RHS from Runway
45 6 PTT (Swimming Pool Area) BS 1 720 800 80 55.00 0.200 880.00 Cum 9th Layer Soil from Stock Yard @ 1350 (300 m. RHS from Runway
46 5 PTT's Shoulder LHS 1 1330 3000 1670 30.00 0.200 10020.00 Cum Soil from Link Taxi at Rd. 1011.5 to 2011.5 & Apron Lead 600 m
47 5 PTT's Shoulder BS 2 380 1200 820 30.00 0.200 9840.00 Cum Soil from Link Taxi at Rd. 1011.5 to 2011.5 & Apron Lead 600 m
48 5 PTT's Shoulder BS 2 380 1200 820 30.00 0.200 9840.00 Cum Soil from Link Taxi at Rd. 1011.5 to 2011.5 & Apron Lead 600 m
49 5 PTT's Shoulder BS 2 140 440 300 30.00 0.200 3600.00 Cum Soil from Link Taxi at Rd. 1011.5 to 2011.5 & Apron Lead 600 m
50 5 PTT's Shoulder BS 2 140 440 300 30.00 0.200 3600.00 Cum Soil from Link Taxi at Lead 600 m
51 5 Earthan Shou. 1st Layer (Off. -30.3 to -80.3) BS 2 0 210 210 50.00 0.200 4200.00 Cum Soil from Link Taxi at Lead 600 m
52 5 Earthan Shou. 2nd Layer (Off. -30.3 to -80.3) BS 2 0 210 210 50.00 0.200 4200.00 Cum Soil from Link Taxi at Lead 600 m
53 3 Earthan Shou. 1st Layer (Off. -30.3 to -85) LHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 1330 to 3000 Lead 1.6 km
54 3 Earthan Shou. 1st Layer (Off. -30.3 to -85) RHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 1330 to 3000 Lead 1.6 km
55 3 Earthan Shou. 2nd Layer (Off. -30.3 to -85) LHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 500 to 1050 Lead 0.7 km
56 3 Earthan Shou. 2nd Layer (Off. -30.3 to -85) RHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 500 to 1050 Lead 0.7 km
57 3 Earthan Shou. Top Layer (Off. -30.3 to -85) LHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 500 to 1050 Lead 0.7 km
58 3 Earthan Shou. Top Layer (Off. -30.3 to -85) RHS 1 50 210 160 54.70 0.200 1750.40 Cum Soil from 500 to 1050 Lead 0.7 km
59 3 Earthan Shou. Top Layer (Off. -30.3 to -85) LHS 1 390 1200 810 54.70 0.200 8861.40 Cum Soil from 400 to 600 Lead 0.6 km & From Stock Yard at Rd. 1400
60 3 Earthan Shou. Top Layer (Off. 30.3 to 85) RHS 1 390 1270 880 54.70 0.200 9627.20 Cum Soil from 700 to 1000 Lead 0.7 km
S. No. Bill No. Description of Items Side No. From To Length Width Depth Qty. Unit Remark
61 3 Earthan Shoulder Layer (Off. 180 to 250) RHS 1 390 1200 810 70.00 0.200 11340.00 Cum Soil from 1330 to 3000 Lead 0.8 km
62 2 Earthan Shou. 3rd Layer (Off. -30.3 to -80.3) LHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1800 to 2200 Lead 1.7 km
63 2 Earthan Shou. 3rd Layer (Off. 30.3 to 80.3) RHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1800 to 2200 Lead 1.7 km
64 2 Earthan Shou. 3rd Layer (Off. -30.3 to -80.3) LHS 1 390 1207 817 50.00 0.200 8170.00 Cum Soil from 1650 to 2000 Lead 1.4 km
65 2 Earthan Shou. 3rd Layer (Off. 30.3 to 80.3) RHS 1 390 1207 817 50.00 0.200 8170.00 Cum Soil from 2000 to 2300 Lead 1.7 km
66 2 Earthan Shou. 1st Layer (Off. 150 to 250) RHS 1 390 1207 817 100.00 0.200 16340.00 Cum Soil from 1370 to 2500 Lead 1.4 km
67 2 Earthan Shou. 2nd Layer (Off. 150 to 250) RHS 1 390 1207 817 100.00 0.200 16340.00 Cum Soil from 1370 to 2500 Lead 1.4 km
68 4 Earthan Shou. 1st Layer (Off. -163.2 to -150) RHS 1 500 1050 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .6 km
69 4 Earthan Shou. 1st Layer (Off. -201.8 to -220) LHS 1 500 1050 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .6 km
70 4 Earthan Shou. 2nd Layer (Off. -163.2 to -150) RHS 1 500 1050 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .6 km
71 4 Earthan Shou. 2nd Layer (Off. -201.8 to -220) LHS 1 500 1050 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .6 km
72 4 Earthan Shou. 3rd Layer (Off. -163.2 to -150) RHS 1 500 1050 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .6 km
73 4 Earthan Shou. 3rd Layer (Off. -201.8 to -220) LHS 1 500 1050 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .6 km
74 2 Earthan Shou. 3rd Layer (Off. 30.3 to 80.3 m) RHS 1 700 1150 450 50.00 0.200 4500.00 Cum Soil from 1800 to 2200 Lead 1.7 km
75 2 Earthan Shou. 1st Layer (Off. -30.3 to -80.3) LHS 1 1150 1270 120 50.00 0.200 1200.00 Cum Soil from 2000 to 2300 Lead 0.9 km
76 2 Earthan Shou. 1st Layer (Off. 30.3 to 80.3) RHS 1 1150 1207 57 50.00 0.200 570.00 Cum Soil from 1800 to 2200 Lead 0.9 km
77 2 Earthan Shou. 2nd Layer (Off. -30.3 to -80.3) LHS 1 1150 1270 120 50.00 0.200 1200.00 Cum Soil from 2000 to 2300 Lead 0.9 km
78 2 Earthan Shou. 2nd Layer (Off. 30.3 to 80.3) RHS 1 1150 1207 57 50.00 0.200 570.00 Cum Soil from 1800 to 2200 Lead 0.9 km
79 2 Earthan Shou. 3rd Layer (Off. -30.3 to -80.3) LHS 1 1150 1270 120 50.00 0.200 1200.00 Cum Soil from 2000 to 2300 Lead 0.9 km
80 2 Earthan Shou. 3rd Layer (Off. 30.3 to 80.3) RHS 1 1150 1207 57 50.00 0.200 570.00 Cum Soil from 1800 to 2200 Lead 0.9 km
81 4 Earthan Shou. 1st Layer (Off. -163.2 to -150) RHS 1 1330 1800 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .8 km
82 4 Earthan Shou. 1st Layer (Off. -201.8 to -220) LHS 1 1330 1800 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .8 km
83 4 Earthan Shou. 2nd Layer (Off. -163.2 to -150) RHS 1 1330 1800 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .8 km
84 4 Earthan Shou. 2nd Layer (Off. -201.8 to -220) LHS 1 1330 1800 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .8 km
85 4 Earthan Shou. 3rd Layer (Off. -163.2 to -150) RHS 1 1330 1800 470 13.20 0.200 1240.80 Cum Soil from 400 to 1200 Lead .8 km
86 4 Earthan Shou. 3rd Layer (Off. -201.8 to -220) LHS 1 1330 1800 470 18.20 0.200 1710.80 Cum Soil from 400 to 1200 Lead .8 km
87 3 Earthan Shou. Top Layer (Off. 30.3 to 70) LHS 1 1330 2950 1620 39.70 0.200 12862.80 Cum Soil from 1330 to 3000 Lead 0.6 km
88 3 Earthan Shou. Top Layer (Off. 30.3 to 70) RHS 1 1330 3060 1730 39.70 0.200 13736.20 Cum Soil from 1330 to 3000 Lead 0.6 km
89 2 Earthan Shou. 1st Layer (Off. 200 to 300) RHS 1 1600 1850 250 30.00 0.200 1500.00 Cum Soil from 2400 to 3000 Lead 0.6 km
90 2 Earthan Shou. 2nd Layer (Off. 200 to 300) RHS 1 1600 1850 250 30.00 0.200 1500.00 Cum Soil from 2000 to 2300 Lead 0.7 km
91 2 Earthan Shou. 1st Layer (Off. -200 to -300) LHS 1 1700 2500 800 100.00 0.200 16000.00 Cum Soil from 2400 to 3000 Lead 0.6 km
92 2 Earthan Shou. 2nd Layer (Off. -200 to -300) LHS 1 1700 2500 800 100.00 0.200 16000.00 Cum Soil from 2400 to 3000 Lead 0.6 km & From Stock Yard at Rd. 1380
93 2 Earthan Shou. 3rd Layer (Off. -200 to -300) LHS 1 1700 2500 800 100.00 0.200 16000.00 Cum Soil from 2400 to 3000 Lead 0.6 km & From Stock Yard at Rd. 1380
94 3 Earthan Shoulder Layer (Off. 200 to 280) LHS 1 1750 2500 750 80.00 0.200 12000.00 Cum Soil from 1330 to 3000 Lead 0.8 km
95 4 Earthan Shou. 1st Layer (Off. -163.2 to -150) RHS 1 1800 3000 1200 13.20 0.200 3168.00 Cum Soil from 400 to 1200 Lead 1.6 km
96 4 Earthan Shou. 1st Layer (Off. -201.8 to -220) LHS 1 1800 3000 1200 18.20 0.200 4368.00 Cum Soil from 400 to 1200 Lead 1.6 km
97 4 Earthan Shou. 2nd Layer (Off. -163.2 to -150) RHS 1 1800 3000 1200 13.20 0.200 3168.00 Cum Soil from 400 to 1200 Lead 1.6 km
98 4 Earthan Shou. 2nd Layer (Off. -201.8 to -220) LHS 1 1800 3000 1200 18.20 0.200 4368.00 Cum Soil from 400 to 1200 Lead 1.6 km
99 4 Earthan Shou. 3rd Layer (Off. -163.2 to -150) RHS 1 1800 3000 1200 13.20 0.200 3168.00 Cum Soil from 400 to 1200 Lead 1.6 km
100 4 Earthan Shou. 3rd Layer (Off. -201.8 to -220) LHS 1 1800 3000 1200 18.20 0.200 4368.00 Cum Soil from 400 to 1200 Lead 1.6 km
101 1 Earthan Shou. 1st Layer (Off. 30.3 to 70.3) LHS 1 2000 2950 950 40.00 0.200 7600.00 Cum Soil from 2600 to 2750 Lead 500 m
102 1 Earthan Shou. 2nd Layer (Off. 30.3 to 70.3) LHS 1 2000 2950 950 40.00 0.200 7600.00 Cum Soil from 2680 to 2900 Lead 500 m
103 1 Earthan Shou. 1st Layer (Off. 30.3 to 70.3) RHS 1 2000 2950 950 40.00 0.200 7600.00 Cum Soil from 2800 to 2950 Lead 500 km
104 1 Earthan Shou. 2nd Layer (Off. 30.3 to 70.3) RHS 1 2000 2950 950 40.00 0.200 7600.00 Cum Soil from 2800 to 3000 Lead 500 km
105 2 Earthan Shou. 1st Layer (Off. 200 to 300) RHS 1 2600 2900 300 30.00 0.200 1800.00 Cum Soil from 2000 to 2300 Lead 0.7 km
106 2 Earthan Shou. 2nd Layer (Off. 200 to 300) RHS 1 2600 2900 300 30.00 0.200 1800.00 Cum Soil from 2000 to 2300 Lead 0.7 km
107 2 Earthan Shou. 1st Layer (Off. -61 to -121) LHS 1 3000 3300 300 60.00 0.200 3600.00 Cum Soil from 2000 to 2300 Lead 1.1 km
108 2 Earthan Shou. 1st Layer (Off. 61 to 121) RHS 1 3000 3300 300 60.00 0.200 3600.00 Cum Soil from 2000 to 2300 Lead 1.1 km
109 2 Earthan Shou. 2nd Layer (Off. -61 to -121) LHS 1 3000 3300 300 60.00 0.200 3600.00 Cum Soil from 2000 to 2300 Lead 1.1 km
110 2 Earthan Shou. 2nd Layer (Off. 61 to 121) RHS 1 3000 3300 300 60.00 0.200 3600.00 Cum Soil from 2000 to 2300 Lead 1.1 km
111 1 Earthan Shou. 1st Layer (Off. -30.3 to -80.3) LHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1400 to 1750 Lead 1.3 km
112 1 Earthan Shou. 1st Layer (Off. 30.3 to 80.3) RHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1400 to 1750 Lead 1.3 km
113 1 Earthan Shou. 2nd Layer (Off. -30.3 to -80.3) LHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1400 to 1750 Lead 1.3 km
114 1 Earthan Shou. 2nd Layer (Off. 30.3 to 70.3) RHS 1 390 1150 760 50.00 0.200 7600.00 Cum Soil from 1400 to 1750 Lead 1.3 km
115 1 Earthan Shou. 1st Layer (Off. -30.3 to -80.3) LHS 1 650 900 250 50.00 0.200 2500.00 Cum Soil from 550 to 950 Lead 400 m
116 1 Earthan Shou. 2nd Layer (Off. -30.3 to -80.3) LHS 1 650 900 250 50.00 0.200 2500.00 Cum Soil from 950 to 1150 Lead 700 m
117 1 Earthan Shou. 1st Layer (Off. 30.3 to 80.3 & 150 to 220 m) RHS 1 700 1150 450 120.00 0.200 10800.00 Cum Soil from 750 to 950 Lead 500 m
118 1 Earthan Shou. 2nd Layer (Off. 30.3 to 80.3 & 150 to 220 m) RHS 1 700 1150 450 120.00 0.200 10800.00 Cum Soil from 750 to 950 Lead 500 m
119 2 Earthan Shou. 1st Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
120 2 Earthan Shou. 2nd Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
121 2 Earthan Shou. 3rd Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
122 2 Earthan Shou. 4th Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
123 2 Earthan Shou. 5th Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
124 2 Earthan Shou. 6th Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
125 2 Earthan Shou. 7th Layer (Off. -120 to -170) LHS 1 1020 1080 60 60.00 0.200 720.00 Cum Soil from Stock Yard at Rd. 1380 RHS Lead 0.75 km
126 1 Earthan Shou. 1st Layer (Off. -30.3 to -60.3) LHS 1 1330 2000 670 30.00 0.200 4020.00 Cum Soil from 2000 to 2250 Lead 1 km
S. No. Bill No. Description of Items Side No. From To Length Width Depth Qty. Unit Remark
127 1 Earthan Shou. 2nd Layer (Off. 30.3 to 70.3) LHS 1 1330 2000 670 30.00 0.200 4020.00 Cum Soil from 2200 to 2450 Lead 1 km
128 1 Earthan Shou. 1st Layer (Off. 30.3 to 70.3) RHS 1 1330 2000 670 30.00 0.200 4020.00 Cum Soil from 2400 to 2550 Lead 1.3 km
129 1 Earthan Shou. 2nd Layer (Off. 30.3 to 70.3) RHS 1 1330 2000 670 30.00 0.200 4020.00 Cum Soil from 2500 to 2750 Lead 1.5 km
130 1 Runway SG 1st Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 1750 to 1950 Lead 500 m)
131 1 Runway SG 2nd Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 1850 to 2000 Lead 600 m)
132 1 Runway SG 3rd Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 1900 to 2100 Lead 700 m)
133 1 Runway SG 4th Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 2000 to 2200 Lead 800 m)
134 1 Runway SG 5th Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 2100 to 2400 Lead 1 km)
135 1 Runway SG 6th Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 2200 to 2400 Lead 1 km)
136 1 Runway SG 7th Layer BS 1 1330 1750 420 60.60 0.200 5090.40 Cum Runway (Soil from 2300 to 2500 Lead 1 km)
137 1 Runway SG 1st Layer BS 1 749 951 202 60.60 0.200 2448.24 Cum Runway (Soil from 390 to 550 Lead 500 m)
138 1 Runway SG 2nd Layer BS 1 749 951 202 60.60 0.200 2448.24 Cum Runway (Soil from 390 to 550 Lead 500 m)
139 1 Runway SG 3rd Layer BS 1 749 951 202 60.60 0.200 2448.24 Cum Runway (Soil from 500 to 650 Lead 300 m)
140 1 Runway SG 4th Layer BS 1 749 951 202 60.60 0.200 2448.24 Cum Runway (Soil from 500 to 650 Lead 300 m)
141 1 Runway SG 5th Layer BS 1 749 951 202 60.60 0.200 2448.24 Cum Runway (Soil from 650 to 750 Lead 200 m)
142 1 Runway SG Top Layer BS 1 1800 2000 200 60.60 0.200 2424.00 Cum Runway (Soil from 1350 to 1550 Lead 500 m)
143 1 Runway SG 1st Layer BS 1 2000 2600 600 60.60 0.200 7272.00 Cum Runway (Soil from 1450 to 1750 Lead 500 m)
144 1 Runway SG 1st Layer BS 1 2600 3000 400 60.60 0.200 4848.00 Cum Runway (Soil from 1450 to 1750 Lead 1200 m)
145 1 Runway SG 1st Layer BS 1 3000 3060 60 60.60 0.200 727.20 Cum Runway (Soil from 1600 to 1950 Lead 1500 m)
146 1 Runway SG 2nd Layer BS 1 2000 2600 600 60.60 0.200 7272.00 Cum Runway (Soil from 1600 to 1950 Lead 500 m)
147 1 Runway SG 2nd Layer BS 1 2600 3000 400 60.60 0.200 4848.00 Cum Runway (Soil from 1600 to 1950 Lead 900 m)
148 1 Runway SG 2nd Layer BS 1 3000 3060 60 60.60 0.200 727.20 Cum Runway (Soil from 2000 to 2250 Lead 900 m)
149 1 RESA SG 1st Layer BS 1 3060 3300 240 125.00 0.200 6000.00 Cum Runway (Soil from 2000 to 2550 Lead 900 m)
150 1 RESA SG 2nd Layer BS 1 3060 3300 240 125.00 0.200 6000.00 Cum Runway (Soil from 2000 to 2550 Lead 900 m)
151 1 RESA SG 3rd Layer BS 1 3060 3300 240 125.00 0.200 6000.00 Cum Soil from 2000 to 2200 Lead 500 km (Off. 30.3 to 70.3)
152 12 Isolation Bay 1st Layer (Offset 358.25 to 408.25 m) BS 1 50 112.00 0.200 1120.00 Cum
153 12 Isolation Bay 2nd Layer (Offset 363.25 to 408.25 m) BS 1 45 112.00 0.200 1008.00 Cum
154 12 Isolation Bay 3rd Layer (Offset 368.25 to 408.25 m) BS 1 40 112.00 0.200 896.00 Cum
Total Qty. 557008.60 Cum