CRAWLER CRANE MONTHLY MAINTENANCE CHECKLIST

Company : China Railway First Group Co.,Ltd Date : 1/3/2024


Kobelco
Jobsite : N108 Project at Marymount Terrace Lp 6 Crane Type :
CKE1800-1F
Inspector : Toh Thing Wei LM Cert No : LM549756X

* Report of
A. General Remarks
Checking
1 Sufficient Tank Level for Fuel, Hydraulic Oil, Brake Oil, Gear Oil, Water R
2 Tyres are not worn or punctured NA
3 Brakes are effective R
4 Gauges, Meters, Wipers, Horn, Spark Arrestor in working condition R
5 Outrigger Steel Plates are in good condition NA
6 Valid Fire Extinguisher provided R
Head Light, Signal Light, Brake Light, Beacon Light and Reverse Horn Light in
7 R
working condition
8 All compressed air tanks are drained NA
9 Crane Cabin is clean and free from unnecessary materials R
B. Structural Inspection

1 Sheaves and wire ropes condition are satisfactory and positioned correctly R
2 Condition of boom, jib and hooks are satisfactory R
3 Linkages, swivels, pins and other retaining devices are in position R
4 Counterweights are in position and properly secured R
C. Operational Checks
1 Outriggers are functioning properly NA
2 All the Crane's Safety Devices and Load Indicator are functioning properly R
3 Electrical equipment not contaminated by oil, water, grease R
4 All the crane's control are functioning properly (without load) R
5 All Audible Warning Devices and Alarms are working satisfactorily R
6 All Limit Switches in working order R
7 Aeroplane Light & Flag Installed R
E. Any other checks as recommended by crane operator (pls. Specify)

* LEGENDS : R = Satisfactory T = Not Satisfactory NA = Not Applicable