L22 - Earth Soil Mud Flow Into SS6 01.09.24

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
‘cane rs) OSEND: Kh No. 28-4, Jalan 3101C, Cher Bains Centre, Taman Chora 56100 Kuss Lumpur. ‘TH: 9.9132 3169/3189. Fax: 0391323199" Ema: mnresenrcesaigmalcom Q M&L RESOURCES (M) SDN. BHD. as (ue Ref: MESBVTNBIMTMIL22-46 ate: 01 Nov 2028, LANDHON BUILERS SDN RED No. 1-39, Jalan Pater 8, Bandar Pate, 47100 Puchong, “Tels 03-8066 773 8066 7732 ‘Aun to: Me Yap Kian Hong / Mr: Kong Kin Meng Dear Sir/Madam, MAIN BUILDING WORKS FOR CADANGAN MEMBINA PENCAWANG ELEKTRIK INI DAN STESEN SUIS UTAMA (SSU) DIATAS LOT 1909 DAN LOT 1150, MUKIM. ULU SEMENYH, DAERAH ULU LANGA, SELANGOR DARUL EHSANMATERIALS "TNH SUB-STATION — FARTH / SOILIMUD FLOW INTO SUBSTATION 6 We refered to above TINB Station $86 and wish 1 highligh that soilemthinad lowed ino the substation external aren everytime during heavy rain, We have done some temporary nth desin at surrounding, but are unable to cope the flows of seiearthnud daving the heavy ain. Kindly ete to Appi A (Phots) ‘Your urgent ton to mitigate resolve the slope an alow uso sat ou exter werk at soonest wil be uch appreciation ‘Thank You. ‘Yours Fifuly, M&iL RESOURCES (M1 SDN. BHD. TapRean Eg 4 66 Goll Forte St. Bi. ‘YLD Profesional Sdo, Bh erundng PCT Sd, Bhd Clement Wong Architecture. KVA Cons (M0 Sn Bh Appendix A Picture take on 15 Ost 2023, ‘Picture show ~after rain the earth fom the slope ‘washes in the TNB station

You might also like