Schedule of rates for Roads, bridge and Culvert

works for national Highways under Assam P.W.


(building & NH) 2020-21

APWD, SOR (NATIONAL HIGHWAY)


Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of

Unit without GST

CHAPTER-1
CARRIAGE OF MATERIALS
1.1 Loading and unloading by mechanical means (Placing tipper at
loading point, loading with front end loader, dumping, turning for return
trip, excluding time for haultage and return trip)

A) Boulders cum 174.00


B) Stone aggregates cum 179.00
C) Sand/Moorum/flyash cum 168.00
1.2 Loading and Unloading by Manual Means
A) Boulders cum 219.00
B) Stone aggregates cum 224.00
C) Sand/Moorum/flyash cum 214.00
1.3 Loading and Unloading of Cement or Steel by Manual Means and
tonne 304.00
stacking.
1.4 Cost of Haulage Excluding Loading and Unloading
(i) Surfaced Road tonne.km 11.10
cum/km 20.20
(ii) Unsurfaced Gravelled Road tonne.km 13.30
cum/km 24.21
(iii) Katcha Track and Track in river bed / nallah bed and choe bed. tonne.km 26.80
cum/km 48.78
CHAPTER-2
SITE CLEARANCE
2.1 Cutting of Trees, including Cutting of Trunks, Branches and
Removal (Cutting of trees, including cutting of trunks, branches and
removal of stumps, roots, stacking of serviceable material with all lifts
201

and up to a lead of 1000 mtrs and earth filling in the depression/pit.

(i) Girth from 300 mm to 600 mm each 305.00


(ii) Girth from 600 mm to 900 mm each 608.00
(iii) Girth from 900 mm to 1800 mm each 1,090.00
(iv) Girth above 1800 mm each 1,988.00
2.2 Clearing Grass and Removal of Rubbish ( clearing grasss and
removal of rubbish upto a distance of 50m outside the periphery of the hectare 17,665.00
201

area.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

2.3 Clearing and Grubbing Road Land .(Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings
and trees girth up to 300 mm, removal of stumps of trees cut earlier
and disposal of unserviceable materials and stacking of serviceable
201

materials to be used or auctioned up to lead of 1000 metres including


removal and disposal of top organic soil not exceeding 150mm
thickness.
(i) By Manual Means
A In area of light jungle hectare 53,954.00
B In area of thorny jungle hectare 72,578.00
(ii) By Mechanical Means
A In area of light jungle hectare 36,215.00
B In area of thorny jungle hectare 44,170.00
2.4 Dismantling of Structures (Dismantling of existing structures like
culverts, bridges, retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
202

material,disposal of unserviceable material and stacking the


serviceable material with all lift and lead of 1000 metres)

(i) Lime /Cement Concrete


I By Manual Means
A Lime Concrete, cement concrete grade M-10 and below cum 490.00
B Cement Concrete Grade M-15 & M-20 cum 560.00
C Prestressed / Reinforced cement concrete grade M-20 & above
cum 1,322.00
II By Mechanical Means for items No. 202(b) & (c)
A Cement Concrete Grade M-15 & M-20 cum 805.00
B Prestressed / Reinforced cement concrete grade M-20 & above
cum 1,261.00
(ii) Dismantling Brick / Tile work
A In lime mortar cum 348.00
B In cement mortar cum 419.00
C In mud mortar cum 320.00
D Dry brick pitching or brick soling cum 306.00
(iii) Dismantling Stone Masonry
A Rubble stone masonry in lime mortar cum 377.00
B Rubble stone masonry in cement mortar. cum 419.00
C Rubble Stone Masonry in mud mortar. cum 348.00
D Dry rubble masonry cum 334.00
E Dismantling stone pitching/ dry stone spalls. cum 320.00
F Dismantling boulders laid in wire crates including opening of crates and
cum 348.00
stacking dismantled materials.
(iv) Wood work wrought framed and fixed in frames of trusses upto a
cum 742.00
height of 5 m above plinth level
(v) Steel work in all types of sections upto a height of 5 m above
plinth level excluding cutting of rivet.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A Including dismembering tonne 1,714.00


B Excluding dismembering. tonne 1,284.00
C Extra over item No (V) A and (V) B for cutting rivets. tonne 13.00
(vi) Scraping of bricks dismantled from brick work including stacking.

A In lime/Cement mortar 1000 numbers 1,237.00


B In mud mortar 1000 numbers 442.00
(vii) Scraping of Stone from dismantled stone masonry
A In cement and lime mortar cum 497.00
B In Mud mortar cum 105.00
(viii) Scarping plaster in lime or cement mortar from brick/ stone masonry
sqm 17.00
(ix) Removing all type of hume pipes and stacking within a lead of
1000 metres including earthwork and dismantling of masonry
works.
A Up to 600 mm dia metre 183.00
B Above 600 mm to 900 mm dia metre 249.00
C Above 900 mm metre 425.00
2.5 Dismantling of Flexible Pavements (Dismantling of flexible
pavements and disposal of dismantled materials up to a lead of 1000
metres, stacking serviceable and unserviceable materials separately)
202

I By Manual Means
A Bituminous courses cum 894.00
B Granular courses cum 670.00
II By Mechanical Means
A Bituminous course cum 470.00
2.6 Dismantling of Cement Concrete Pavement (Dismantling of cement
concrete pavement by mechanical means using pneumatic tools,
breaking to pieces not exceeding 0.02 cum in volume and stock piling
at designated locations and disposal of dismantled materials up to a cum 1,834.00
202

lead of 1000metres ,stacking serviceable materials and unserviceable


materials separately.)

2.7 Dismantling Guard Rails (Dismantling guard rails by manual means


and disposal of dismantled material with all lifts and up to a lead of
metre 101.00
1000 metres, stacking serviceable materials and unserviceable
202

materials separately.)
2.8 Dismantling Kerb Stone (Dismantling kerb stone by manual means
and disposal of dismantled material with all lifts and up to a lead of metre 25.00
202

1000 metre)
2.9 Dismantling Kerb Stone channel (Dismantling kerb stone channel by
manual means and disposal of dismantled material with all lifts and up metre 37.00
202

to a lead of 1000 metre)


2.10 Dismantling Kilometre Stone (Dismantling of kilometre stone
including cutting of earth, foundation and disposal of dismantled
material with all lifts and lead upto 1000 m and back filling of pit.)
202
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A 5th KM stone each 469.00


B Ordinary KM Stone each 272.00
C Hectometre Stone/200-M stone each 54.00
2.11 Dismantling of Fencing (Dismantling of barbed wire fencing/ wire
mesh fencing including posts, foundation concrete, back filling of pit by
manual means including disposal of dismantled material with all lifts
metre 56.00
and up to a lead of 1000 metres, stacking serviceable materials and
202

unserviceable materials separately.)

2.12 Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line


600 mm dia including disposal with all lifts and lead upto 1000 metres
and stacking of serviceable material and unserviceable material metre 187.00
202

separately under supervision of concerned department.)

2.13 Removal of Cement Concrete Pipe of Sewer Gutter (Removal of


cement concrete pipe of sewer gutter 1500 mm dia under the
supervision of concerned department including disposal with all lifts
and up to a lead of 1000 metres and stacking of serviceable and metre 253.00
202

unserviceable materials separatelyb but excluding earth excavation


and dismantling of masonry works.)

2.14 Removal of Telephone / Electric Poles and Lines (Removal of


telephone / Electric poles including excavation and dismantling of
foundation concrete and lines under the supervision of concerned
each 208.00
department, disposal with all lifts and up to a lead of 1000 metres and
202

stacking serviceable materials and unserviceable materials separately.)

CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
3.1 Excavation in Soil by Manual Means. (a) (Excavation for roadway in
soil using manual means including loading in truck for carrying of cut
cum 244.00
earth to embankment site with all lifts and lead upto1000 metres.)
301

(b) (Excavation for roadway in soil using manual means using cut earth
cum 132.00
to embankment in the immediate vicinity.)
3.2 Excavation in ordinary rock by manual means (a) (Excavation in
ordinary rock using manual means including loading in a truck and
cum 318.00
carrying of excavated material to embankment site with in all lifts and
leads upto 1000 metres )
301

(b) (Excavation in ordinary rock using manual means, where there is a


situation where the cross-section is of cut and fill and cut earth is
cum 206.00
required to be used in embankment in the immediate vicinity.

3.3 Excavation in Soil with Dozer with lead upto 100 metres
(Excavation for road way in soil by mechanical means including cutting
and pushing the earth to site of embankment upto a distance of 100
cum 117.00
metres (average lead 50 metres), including trimming bottom and side
slopes in accordance with requirements of lines,grades and cross
sections.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

3.4 Excavation in Ordinary Rock with Dozer with lead upto 100 metres
(Excavation for roadway in ordinary rock by deploying a dozer, 80 HP
including cutting and pushing the cut earth to site of embankment upto
a distance of 100 metres ( average lead 50 metres including trimming cum 198.00
301

bottom and side slopes in accordance with requirements of


lines,grades and cross sections.)

3.5 Excavation in Hard Rock (requiring blasting) with disposal upto


1000 metres (Excavation for roadway in hard rock (requiring blasting)
by drilling, blasting and breaking, trimming of bottom and side slopes in
accordance with requirements of lines, grades and cross cum 270.00
301

sections,loading and disposal of cut road with in all lifts and leads upto
1000 metres)

3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers


with disposal upto 1000 metres. (Excavation for roadwork in soil with
hydraulic excavator of 0.9 cum bucket capacity including cutting and
loading in tippers, trimming bottom and side slopes,in accordance with cum 104.00
301

requirements of lines, grades and cross sections,loading and disposal


of cut road with in all lifts and leads upto 1000 metres)

3.7 Excavation in Ordinary Rock using Hydraulic ExcavatorCK-90 and


Tippers with disposal upto 1000 metres. (Excavation for roadway in
ordinary rock with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, transporting to embankment
cum 122.00
site within all lift and lead up to 1000metres, trimming of bottom and
301

side slopes in accordance with requirements of lines, grades and cross


sections.)

3.8 Excavation in Hard Rock (blasting prohibited) (Excavation for


roadway in hard rock (blasting prohibited) with rock breakers including
breaking rock, loading in tippers and disposal within all lifts and lead
upto 1000 metres, trimming of bottom and side slopes in accordance
301

with requirements of lines, grades and cross sections.)

A Mechanised cum 618.00


B Manual Method cum 1,334.00
3.9 Excavation in Hard Rock (controlled blasting) with disposal upto
1000 metres (Excavation for roadway in hard rock with controlled
blasting by drilling, blasting and breaking, trimming of bottom and side
cum 283.00
slopes in accordance with requirements of lines, grades and cross
301

sections,loading and disposal of cut road with in all lifts and leads upto
1000 metres)
3.10 Excavation in Marshy Soil (Excavation for roadway in marshy soil
with hydraulic excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with in all lifts and lead upto 1000
cum 112.00
metres, trimming of bottom and side slopes in accordance with
301

requirements of lines, grades and cross sections.)


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

3.11 Removal of Unserviceable Soil with Disposal upto 1000 metres


(Removal of unserviceable soil including excavation, loading and
disposal upto 1000 metres lead but excluding replacement by suitable cum 105.00
301

soil which shall be paid separately as per clause 305.)

3.12 Pre-splitting of Rock Excavation Slopes (Carrying out excavation in


hard rock to achieve a specified slope of the rock face by controlled
use of explosives and blasting accessories in properly aligned and
spaced drill holes, collection of the excavated rock by a 80 HP Dozer, sqm 121.00
303

loading in a tipper by a front enf loader and disposing of material with


all lift and lead up to 1000metres all in specified as cl. no. 303.

3.13 Excavation for Structures (Earth work in excavation of foundation of


structures as per drawing and technical specification, including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom,backfilling the
304

excavated earth to the extent required and utilising theremaining earth


locally for road work.)

(i) Ordinary soil


A Manual Means (Depth upto 3 m)( Without dewatering ) cum 283.00
Manual Means (Depth upto 3 m)( With dewatering ) cum 308.00
B Mechanical Means (Depth upto 3 m))( Without dewatering ) cum 46.00
Mechanical Means (Depth upto 3 m))( With dewatering ) cum 48.00
(ii) Ordinary rock (not requiring blasting)
A Manual Means (Depth upto 3 m)( Without dewatering ) cum 353.00
Manual Means (Depth upto 3 m)( With dewatering ) cum 385.00
B Mechanical Means (Depth upto 3 m))( Without dewatering ) cum 61.00
Mechanical Means (Depth upto 3 m))( With dewatering ) cum 64.00
(iii) Hard rock ( requiring blasting )
A Manual Means ( Without dewatering ) cum 568.00
Manual Means ( With dewatering ) cum 611.00
(iv) Hard rock ( blasting prohibited )
A Mechanical Means ( Without dewatering ) cum 979.00
Mechanical Means ( With dewatering ) cum 1,023.00
(v) Marshy soil
A Manual means ( upto 3 m depth)(without dewatering) cum 931.00
Manual means ( upto 3 m depth)(with dewatering) cum 1,027.00
B Mechanical means ( upto 3 m depth)(without dewatering) cum 496.00
Mechanical means ( upto 3 m depth)(with dewatering) cum 498.00
3.14 Scarifying Existing Granular Surface to a Depth of 50 mm by
Manual Means (Scarifying the existing granular road surface to a
305.4.3

sqm 34.00
depth of 50 mm and disposal of scarified material within all lifts and
leads upto 1000 metres. )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

3.15 Scarifying existing bituminous surface to a depth of 50 mm by


mechanical means (Scarifying the existing bituminous road surface to
305.4.3

sqm 9.00
a depth of 50 mm and disposal of scarified material with in all lifts and
lead upto 1000 metres.)
3.16 Embankment Construction with Material Obtained from Borrow
Pits (Construction of embankment with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting to meet requirment of table
300-2 ( including compensation of earth.)( Including cost of testing of
materials at site and laboratory as directed by the deptt.)
305

(a) from private land cum 475.00


(b)( from Govt land ) cum 316.00
Extra lead beyond initial lead of 3.0 Km. cum/km 24.21
3.17 Construction of Embankment with Material Deposited from
Roadway Cutting (Construction of embankment with approved
materials deposited at site from roadway cutting and excavation from cum 224.00
305

drain and foundation of other structures graded and compacted to


meet requirement of table 300-2 )
3.18 Construction of Subgrade and Earthen Shoulders (Construction of
subgrade and earthen shoulders with approved material obtained from
borrow pits with all lifts & leads, transporting to site, spreading, grading
to required slope and compacted to meet requirement of table (300-2) (
including compensation of earth.)(a), ( Including cost of testing of
materials at site and laboratory as directed by the deptt.)
305

(a) from private land cum 514.00


(b) from Govt land cum 355.00
Extra lead beyond initial lead of 3.0 Km. cum/km 24.21
3.19 Compacting Original Ground
305.3.4

Case-I Compacting original ground supporting subgrade (Loosening of


the ground upto a level of 500 mm below the subgrade level, watered,
cum 95.00
graded and compacted in layers to meet requirement of table 300-2 for
subgrade construction.)
Case-II Compacting original ground supporting embankment cum 60.00
3.20 Stripping and Storing Top Soil (Stripping, storing of top soil by road
side at 15 m internal and re-application on embankment slopes, cut
slopes and other areas in localities where the available embankment cum 210.00
305

material is not conducive to plant growth)

3.21 Stripping, storing and re-laying top soil from borrow areas in
agriculture fields. (Stripping of top soil from borrow areas located in
agriculture fields, storing at a suitable place, spreading and re-laying
cum 70.00
after taking the borrow earth to maintain fertility of agricultural
field,finishing it to the reqd. levels and satisfaction of the farmer.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

3.22 Turfing with Sods (Furnishing and laying of the live sods of perennial
turf forming grass on embankment slope, verges or other locations
shown on the drawing or as directed by the engineer including sqm 99.00
307

preparation of ground, fetching of rods and watering)

3.23 Seeding and Mulching (Preparation of seed bed on previously laid top
soil, furnishing and placing of seeds, fertilizer, mulching material,
applying bituminous emulsion at the rate of 0.23 litres per sqm and sqm 359.00
laying and fixing jute netting, including watering)

3.24 Surface Drains in Soil (Construction of unlined surface drains of


average cross sectional area 0.40 sqm in soil to specified lines, grades,
levels and dimensions to the requirement of clause 301 and 309.
309

Excavated material to be used in embankment within a lead of 50m (


Average lead 25m )
A Mechanical means metre 70.00
B Manual Means metre 71.00
3.25 Surface Drains in Ordinary Rock (Construction of unlined surface
drain of average cross sectional area 0.4 sqm in ordinary rock to
specified lines, grades, levels and dimensions as per approved design
and to the requirement of clause 301 to 309. Excavated to be used in
309

embankment at site.)

A Mechanical Means metre 141.00


B Manual Means metre 106.00
3.26 Surface Drains in Hard Rock (Rate per metre may be worked out
metre
based on quantity of hard rock as per design.)
309

3.27 Sub Surface Drains with Perforated Pipe (Construction of


subsurface drain with perforated pipe of 100 mm internal diameter of
metal/ asbestos cement/ cement concrete/PVC, closely jointed,
perforations ranging from 3 mm to 6 mm depending upon size of
material surrounding the pipe,with 150mm bedding below the pipe and metre 869.00
309

300mm cushion above the pipe,cross section of excavation


450mmx550mm. excavated material to be utilised in road way at site.)

3.28 Aggregate Sub- Surface Drains (Construction of aggregate sub


surface drain 300 mm x 450 mm with aggregates conforming to table
metre 387.00
300-4, excavated material to be utilised in roadway )
309

3.29 Underground Drain at Edge of Pavement (Construction of an


underground drain 1 m x 1 m (inside dimensions) lined with RCC-20
metre 4,429.00
cm thick and covered with RCC slab10 cm in thickness on urban
309

roads)
3.30 Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture
content, trimming to the required line, grade, profile and rolling with 8- sqm 5.00
310.00

10 tonne smooth wheeled roller, complete as


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

3.31 Construction of Rock fill Embankment (Construction of rock fill


embankment with broken hard rock fragments of size not exceeding
300 mm laid in layers not exceeding 500 mm thick including filling of cum 119.00
313

surface voids with stone spalls, blinding top layer with vibratory road
roller,complete as per cl. 313.)
3.32 Excavation in Hill Area in Soil by Mechanical Means (Excavation in
soil in hilly area by mechanical means including cutting and trimming of
side slopes
(a) Disposing of excavated earth with all lifts and lead upto 1000
301

cum 203.00
metres)
(b) Disposing of excavated earth on the barren valley side.) cum 86.00
3.33 Excavation in Hilly Area in Ordinary Rock by Mechanical Means
not Requiring Blasting. (Excavation in hilly area in ordinary rock not
requiring ballasting by mechanical means including cutting and cum 278.00
trimming of slopes
301

(a) Disposal of cut material with all lift and lead up to 1000m.)
(b) Disposal of cut material on the barren valley side. cum 136.00
3.34 Excavation in Hilly Areas in Hard Rock Requiring Blasting
(Excavation in hilly areas in hard rock requiring blasting, by mechanical
means including trimming of slopes cum 331.00
(a) disposal of cut material with all lifts and lead upto 1000 metres.)
301

(b) Disposal of cut material on the barren valley side. cum 190.00
3.36 Embankment Construction with Fly ash/Pond ash available from
coal or lignite burning Thermal Plants as waste material.
(Construction of embankment with fly ash conforming to table 1 of IRC:
SP: 58 - 2001 obtained from coal or lignite burning thermal power
cum 188.00
stations as waste materials,spread and compacted in layers of 200mm
thickness each at OMC,as specified in IRC:SP:58-2001 and as per
approved plans ( with an initial lead of 5 Km.)

3.37 Slope Protection by Vetiver System


(A) Plantation Part: Supply of approved variety of vetiver plant
certified by The Vetiver Network International (TVNI) or its affiliate in
India including pouching of tiller with selected soil for agricultural use
mixed with farmyard manure in 8”x 6” poly pouch, maintaining the
pouched plants for at least 1(one) month with application of growth
promoter, fertilizer, watering, weeding etc., dressing of the area of RM 198.00
plantation, planting the pouched plants as per design approved by The
Vetiver Network International (TVNI) or its affiliate in India. (Excluding
jungle clearance, earth work in trimming, cutting, filling etc.)

(B) Maintenance Part: Maintenance of the vetiver plants by watering,


pruning, weeding, mulching, application of manure, fertilizer, growth
RM 31.00
promoter etc. for 4 (four) months after completion of plantation.

CHAPTER-4
SUB-BASES, BASES (NON- BITUMINOUS) AND SHOULDERS
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
401
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A Plant Mix Method (Construction of granular sub-base by providing


close graded Material, mixing in a mechanical mix plant at OMC,
carriage of mixed Material to work site, spreading in uniform layers with
motor grader on prepared surface and compacting with vibratory power
roller to achieve the desired density,complete as per cl. 401 (with an
initial lead of 5 Km.) (Including cost of testing of materials at site and
laboratory as directed by the deptt.)

(i) for grading- I Material cum 3,755.00


(ii) for grading- II Material cum 3,762.00
(iii) for grading-III Material cum 3,741.00
B By Mix in Place Method (Construction of granular sub-base by
providing close graded material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with vibratory roller to achieve the
desired density,complete as per cl. 401( with an initial lead of 5 Km.)(
Including cost of testing of materials at site and laboratory as directed
by the deptt.)
(i) for grading- I Material cum 3,414.00
(ii) for grading- II Material cum 3,421.00
(iii) for grading-III Material cum 3,400.00
4.2 Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2)
(Construction of granular sub-base by providing coarse graded
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC,and
401

compacting with vibratory roller to achieve the desired


density,complete as per cl. 401( with an initial lead of 5 Km.)

(i) for grading- I Material cum 3,317.00


(ii) for grading- II Material cum 3,305.00
(iii) for grading-III Material cum 3,120.00
4.3 Lime Stabilisation for Improving Subgrade (Laying and spreading
available soil in the subgrade on a prepared surface, pulverising,
mixing the spread soil in place with rotavator with 3 % slaked lime
having minimum content of 70% of CaO, grading with motor grader
402

and compacting with road roller at OMC to achieve the desired density
to form a layer of improved sub grade ( with an initial lead of 5 Km.)

A By Mechanical Means cum 513.00


B By Manual Means cum 499.00
4.4 Lime Treated Soil for Sub- Base (Providing, laying and spreading soil
on a prepared sub grade, pulverising, mixing the spread soil in place
with rotavator with 3 % slaked lime with minimum content of 70% of
CaO, grading with motor grader and compacting with road at OMC to cum 572.00
402

achieve at least 98% of the maximum dry density to form a layer of sub
base .( with an initial lead of 5 Km.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

4.5 Cement Treated Soil Sub Base/ Base (Providing, laying and
spreading soil on a prepared sub grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with
rotavator, grading with the motor grader and compacting with the road cum 889.00
403

roller at OMC to achieve the desired unconfined compressive strength


and to form a layer of sub base / base.)

4.6 Cement Treated Crushed Rock or combination as per clause 403.2


and table 400.4 in Sub base/ Base (Providing, laying and spreading
Material on a prepared sub grade, adding the designed quantity of
cement to the spread Material, mixing in place with rotavator grading
with motor grader and compacting with road roller at OMC to achieve
desired unconfined compressive strength and to form a layer of sub
base / base.)

(i) For Sub-Base course cum 4,185.00


(ii) For Base course cum 3,887.00
4.7 Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows,
25mm deep, 450 to the center line of the road and at one metre
404.3.1

interval in the existing thin bituminous wearing coarse including sqm 9.00
sweeping and disposal of excavated material within 1000 metres lead.)

4.8 Inverted Choke (Construction of inverted choke by providing, laying,


spreading and compacting screening B type/ coarse sand of specified
404.3.2

grade in uniform layer on a prepared surface with motor grader and cum 1,695.00
compacting with power roller etc)

4.9 Water Bound Macadam (Providing, laying, spreading and compacting


stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing,
rolling with vibratory roller 8-10 tonnes in stages to proper grade and
camber, applying and brooming requisite type of screening/binding
404

material to fillup the interstices of coarse aggregate,watering and


compacting to the reqd. density ( with an initial lead of 5.0 km. )

A By Manual Means
(I) Grading I
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,221.00
(b) Using Screening Type-A (13.2mm Agg.) cum 4,804.00
(ii) Grading- II
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,260.00
(b) Using Screening Type-A (13.2mm Agg.) cum 4,527.00
(c) Using Screening Type-B (11.2mm Agg.) cum 4,750.00
(iii) Grading- III
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,237.00
(b) Using Screening Type-B (11.2mm Agg.) cum 4,727.00
B By Mechanical Means:
(i) Grading- I
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,051.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(b) Using Screening Type-A (13.2mm Agg.) cum 4,634.00


(ii) Grading- II
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,090.00
(b) Using Screening Type-A (13.2mm Agg.) cum 4,357.00
(c) Using Screening Type-B (11.2mm Agg.) cum 4,580.00
(iii) Grading- III
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,067.00
(b) Using Screening Type-B (11.2mm Agg.) cum 4,556.00
4.10 Crushed Cement Concrete Sub-base / Base (Breaking and crushing
of material obtained by breaking damaged cement concrete slabs to
size range not exceeding 75 mm as specified in table 400.7
transporting the aggregates obtained from breaking of cement concre
slabs at a lead of 10km, laying and compacting the same as sub cum 425.00
405

base/base course,constructed as WBM to cl. 404 except the use of


screening or binding material

4.11 Penetration Coat Over Top Layer of Crushed Cement Concrete


Base (Spraying of bitumen over cleaned dry surface of crushed
cement concrete base at the rate of 25 kg per 10 sqm by a bitumen
sqm 45.00
405.2

pressure distributor, spreading of key aggregates at the rate of 0.13


cum per 10 sqm by a mechanical gritter and rolling the surface as per
506.3.8
4.12 Wet Mix Macadam (Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers with
paver in sb-base/base course on well prepared surface and cum 3,963.00
406

compacting with vibratory roller to achieve the desired density (


including carriage up to initial lead of 5.0 km from quarry and carriage
of mixed materials up to 10.0 Km initial lead from mixing plant )

4.13 Construction of Median and Island with Soil Taken from Roadway
Cutting (Construction of Median and Island above road level with
approved material deposited at site from roadway cutting and
cum 384.00
excavation for drain and foundation of other structures, spread, graded
407

and compacted as per cl. 407

4.14 Construction of Median and Island with Soil Taken from Borrow
Areas (Construction of median and Island above road level with
cum 454.00
approved material brought from borrow pits, spread, sloped and
407

compacted as per clause 407)


4.16 Footpaths and Separators (Construction of footpath/separator by
providing a 150 mm compacted granular sub base as per clause 401
and 25 mm thick cement concrete grade M15, over laid with precast
sqm 3,352.00
concrete tiles in cement mortar 1:3 including provision of all drainage
arrangement but excluding kerb channel.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

4.17 Crusher Run Macadam Base (Providing crushed stone aggregate,


depositing on a prepared surface by hauling vehicles, spreading and
mixing with a motor grader, watering and compacting with a vibratory
410

roller to clause 410 to form a layer of sub-base/Base)

A By Mix in Place Method


(i) For 53 mm maximum size cum 3,640.00
(ii) For 45 mm maximum size cum 3,567.00
B By Mixing Plant :
(i) For 53 mm maximum size cum 3,906.00
(ii) For 45 mm maximum size cum 2,418.00
4.18 Lime, Fly ash stabalised soil sub-base (Construction of Sub-base using
lime - fly ash admixture with granular soil, free from organic matter/
deleterious material or clayey silts and low plasticity clays having PI
between 5 and 20 and liquid limit less than 25 and commercial dry
lime,slaked at site or pre slaked with CaO content not less than 50%,fly
ash to conform to gradation as per cl. 4.3 of IRC:88-1984,lime + fly ash cum 590.00
content ranging between 10 to 30%,the minimum unconfined
compressive strength and CBR value after 28 days curing and 4 days
soaking to be 7.5 kg per sq.cm. and 25% respectively all as specified
in IRC:88-1984.

CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1 Prime coat
502

(A) Prime coat (Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base including clearing of
road surface and spraying primer at the rate of 0.60 kg/sqm using
mechanical means.)( Including cost of testing of materials at site and
laboratory as directed by the deptt.)

(i) With bitumen emulsion-CSS-1h sqm 31.00


(ii) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) sqm 35.00
(B) Prime coat (Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base including clearing of
road surface and spraying primer at the rate of 1.00 kg/sqm using
mechanical means.)( Including cost of testing of materials at site and
laboratory as directed by the deptt.)

(i) With bitumen emulsion-CSS-1h sqm 49.00


(ii) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) sqm 56.00
5.2 Tack coat
503

Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom.( Including
cost of testing of materials at site and laboratory as directed by the
deptt.)
(I)With Bitumen emulsion CSS-1h
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(a) Normal bituminous surface sqm 11.00


(b) dry & hungry bituminous surface sqm 14.00
(c) Granular surfaces treated with primer sqm 14.00
(II)With Bitumen emulsion CSS-1 (IS:8887-2004)
(a) Normal bituminous surface sqm 13.00
(b) dry & hungry bituminous surface sqm 16.00
(c) Granular surfaces treated with primer sqm 16.00
(III)With Bitumen emulsion CRS-1
(a) Normal bituminous surface sqm 11.00
(b) dry & hungry bituminous surface sqm 14.00
(c) Granular surfaces treated with primer sqm 14.00
5.3 Bituminous Macadam (Providing and laying bituminous macadam
with 100-120 TPH hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified grading
premixed with bituminous binder, transported to site, laid over a
previously prepared surface with paver finisher to the required grade,
level and alignment and rolled as per clauses 501.6 and 501.7 to
achieve the desired compaction) (including carriage up to initial lead of
504

5.0 km from quarry and carriage of mixed materials up to 10.0 Km


initial lead from mixing plant) (Including cost of testing of materials at
site and laboratory as directed by the deptt.)

(a) Without anti stripping agent


(I)with 60/70 or VG-30 grade paved bitumen
(i) for Grading I (40 mm nominal size ) cum 8,105.00
(ii) for GradingII (19 mm nominal size) cum 7,493.00
(II)with Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size ) cum 10,373.00
(ii) for GradingII 19 mm nominal size) cum 10,325.00
(b) With anti stripping agent as per IS:14982 (Refer Appendix-5 of
MoRT&H specification)
(I) with 60/70 or VG-30 grade paved bitumen
(i) for Grading I ( 40 mm nominal size ) cum 8,769.00
(ii) for GradingII(19 mm nominal size) cum 8,720.00
(II) with Polymer modified bitumen 70
(i) for Grading I ( 40 mm nominal size ) cum 11,051.00
(ii) for GradingII (19 mm nominal size) cum 11,003.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

5.5 Built-Up-Spray Grout Providing, laying and rolling of built-up-spray


grout layer over prepared base consisting of a two layer composite
construction of compacted crushed coarse aggregates using motor
grader for aggregates. key stone chips spreader may be used with
application of bituminous binder after each layer, and with key
aggregates placed on top of the second layer to serve as a Base
506

conforming to the line, grades and cross-section specified, the


compacted layer thickness being 75 mm) ( including carriage up to
initial lead of 5.0 km from quarry) (Including cost of testing of materials
at site and laboratory as directed by the deptt.)

(a) Without anti stripping agent sqm 470.00


(b) With anti stripping agent as per IS:14982(Refer Appendix-5 of
sqm 498.00
MoRT&H specification)
5.6 Dense Graded Bituminous Macadam (Providing and laying dense
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix of mix and filler, transporting the hot mix to work
site, laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per
507

MoRT&H specification clause No. 507 complete in all respects) (


including carriage up to initial lead of 5.0 km from quarry and carriage
of mixed materials up to 10.0 Km initial lead from mixing plant )
(Including cost of testing of materials at site and laboratory as directed
by the deptt.)

(a) With hydrated lime/cement as filler ( refer table 500-9 of


MoRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading I ( 40 mm nominal size ) cum 9,004.00
(ii) for GradingII(19 mm nominal size) cum 9,060.00
(II)'with Polymer modified bitumen 70
(i) for Grading I ( 40 mm nominal size ) cum 12,095.00
(ii) for GradingII (19 mm nominal size) cum 12,151.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading I ( 40 mm nominal size ) cum 13,087.00
(i) for GradingII (19 mm nominal size) cum 13,143.00
(b) With rock dust as filler ( refer table 500-9 of MoRT&H
specification)
(I) with 60/70 or VG-30 grade bitumen
(i) for Grading I ( 40 mm nominal size ) cum 8,871.00
(ii) for GradingII(19 mm nominal size) cum 8,927.00
(II) with Polymer modified bitumen 70
(i) for Grading I ( 40 mm nominal size ) cum 11,962.00
(ii) for GradingII(19 mm nominal size) cum 12,018.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(III) with 30/40 or VG-40 grade Bitumen (msa>30)


(i) for Grading I ( 40 mm nominal size ) cum 12,955.00
(i) for GradingII (19 mm nominal size) cum 13,010.00
(c) With hydrated lime / cement as filler (refer table 500-9 of
MoRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoRT&H specification)
(I) with 60/70 or VG-30 grade bitumen
(i) for Grading I (40 mm nominal size ) cum 9,922.00
(ii) for GradingII (19 mm nominal size) cum 9,978.00
(II) with Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size ) cum 13,013.00
(ii) for GradingII (19 mm nominal size) cum 13,069.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading I (40 mm nominal size ) cum 14,135.00
(i) for GradingII (19 mm nominal size) cum 14,190.00
(a) With rock dust as filler (refer table 500-9 of MoRT&H
specification) & anti stripping agent as per IS:14982 (Refer
Appendix-5 of MoRT&H specification)
(A) (I)'with 60/70 or VG-30 grade bitumen
(i) for Grading I (40 mm nominal size ) cum 9,789.00
(ii) for GradingII (19 mm nominal size) cum 9,845.00
(B) (ii)'with Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size ) cum 12,880.00
(ii) for GradingII (19 mm nominal size) cum 12,936.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading I ( 40 mm nominal size ) cum 14,003.00
(i) for GradingII (19 mm nominal size) cum 14,058.00
5.7 Semi - Dense Bituminous Concrete Providing and laying semi dense
bituminous concrete with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix
and filler, transporting the hot mix to work site, laying with a hydrostatic
paver finisher with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MoRT&H specification clause
508

No. 508 complete in all respects) (including carriage up to initial lead of


5.0 km from quarry and carriage of mixed materials up to 10.0 Km
initial lead from mixing plant) (Including cost of testing of materials at
site and laboratory as directed by the deptt.)

(a) With hydrated lime/cement as filler (refer table 500-9 of


MoRT&H specification)
(I) with 60/70 or VG-30 grade bitumen
(i) for Grading I ( 13 mm nominal size ) cum 9,277.00
(ii) for GradingII(10 mm nominal size) cum 9,720.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(II)with Polymer modified bitumen 70


(i) for Grading I ( 13 mm nominal size ) cum 9,277.00
(ii) for GradingII(10 mm nominal size) cum 9,720.00
(III)with CRMB 55
(i) for Grading I ( 13 mm nominal size ) cum 9,528.00
(ii) for GradingII (10 mm nominal size) cum 9,999.00
(b) With rockdust as filler ( refer table 500-9 of MoRT&H
specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading I ( 13 mm nominal size ) cum 9,144.00
(ii) for GradingII (10 mm nominal size) cum 9,586.00
(II)with Polymer modified bitumen 70
(i) for Grading I ( 13 mm nominal size ) cum 12,416.00
(ii) for GradingII (10 mm nominal size) cum 13,222.00
(III)with CRMB 55
(i) for Grading I (13 mm nominal size ) cum 9,395.00
(ii) for GradingII (10 mm nominal size) cum 9,866.00
(c) With hydrated lime / cement as filler (refer table 500-9 of
MoRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoRT&H specification)
(I) with 60/70 or VG-30 grade bitumen
(i) for Grading I (13 mm nominal size ) cum 10,249.00
(ii) for GradingII (10 mm nominal size) cum 10,799.00
(II)with Polymer modified bitumen 70
(i) for Grading I ( 13 mm nominal size ) cum 13,521.00
(ii) for GradingII (10 mm nominal size) cum 14,435.00
(III) with CRMB 55
(i) for Grading I (13 mm nominal size ) cum 10,500.00
(ii) for GradingII (10 mm nominal size) cum 11,079.00
(d) With rock dust as filler ( refer table 500-9 of MoRT&H
specification) & anti stripping agent as per IS:14982 (Refer
Appendix-5 of MoRT&H specification)
(I) with 60/70 or VG-30 grade bitumen
(i) for Grading I ( 13 mm nominal size ) cum 10,116.00
(ii) for GradingII(10 mm nominal size) cum 10,666.00
(II) with Polymer modified bitumen 70
(i) for Grading I ( 13 mm nominal size ) cum 13,387.00
(ii) for GradingII(10 mm nominal size) cum 14,302.00
(III) with CRMB 55
(i) for Grading I ( 13 mm nominal size ) cum 10,475.00
(ii) for GradingII(10 mm nominal size) cum 10,945.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

5.8 Bituminous Concrete (Providing and laying bituminous concrete with


100-120 TPH batch type hot mix plant producing an average output of
75 tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MoRT&H specification clause No. 509
509

complete in all respects) (including carriage up to initial lead of 5.0 km


from quarry and carriage of mixed materials up to 10.0 Km initial lead
from mixing plant )( Including cost of testing of materials at site and
laboratory as directed by the deptt.)

(a) With hydrated lime/cement as filler (refer table 500-9 of


MoRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading-I ( 19 mm nominal size ) cum 9,930.00
(ii) for Grading-II (13 mm nominal size) cum 9,883.00
(II)with Polymer modified bitumen 70
(i) for Grading-I ( 19 mm nominal size ) cum 13,642.00
(ii) for Grading-II (13 mm nominal size) cum 13,594.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading-I ( 19 mm nominal size ) cum 10,162.00
(ii) for Grading-II (13 mm nominal size) cum 10,115.00
(b) With rock dust as filler ( refer table 500-9 of MoRT&H
specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading-I (19 mm nominal size ) cum 9,794.00
(ii) for Grading-II (13 mm nominal size) cum 9,747.00
(II)with Polymer modified bitumen 70
(i) for Grading-I (19 mm nominal size ) cum 13,506.00
(ii) for Grading-II(13 mm nominal size) cum 13,458.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading-I (19 mm nominal size ) cum 10,028.00
(ii) for Grading-II (13 mm nominal size) cum 9,981.00
(c) With hydrated lime / cement as filler (refer table 500-9 of
MoRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading-I (19 mm nominal size ) cum 11,002.00
(ii) for Grading-II (13 mm nominal size) cum 10,955.00
(II) with Polymer modified bitumen 70
(i) for Grading-I (19 mm nominal size ) cum 14,714.00
(ii) for Grading-II (13 mm nominal size) cum 14,666.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(i) for Grading-I (19 mm nominal size ) cum 11,397.00


(ii) for Grading-II (13 mm nominal size) cum 11,349.00
(d) With rock dust as filler ( refer table 500-9 of MoRT&H
specification) & anti stripping agent as per IS:14982 (Refer
Appendix-5 of MoRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
(i) for Grading-I ( 19 mm nominal size ) cum 10,897.00
(ii) for Grading-II (13 mm nominal size) cum 10,849.00
(II)with Polymer modified bitumen 70
(i) for Grading-I ( 19 mm nominal size ) cum 14,608.00
(ii) for Grading-II (13 mm nominal size) cum 14,560.00
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
(i) for Grading-I (19 mm nominal size ) cum 11,262.00
(ii) for Grading-II (13 mm nominal size) cum 11,215.00
5.9 Surface Dressing (Providing and laying surface dressing as wearing
course in single coat using crushed stone aggregates of specified size
on a layer of bituminous binder laid on prepared surface and rolling
with 8-10 tonne smooth wheeled steel roller) (including carriage up to
initial lead of 5.0 km) (The penetration grade bitumen shall have
510

kinematic viscosity lying in the range 1x10 to 7x10 centistokes)


4 5

(Including cost of testing of materials at site and laboratory as directed


by the deptt.)

(a) Without anti stripping agent


(I)' Paving bitumen 60/70 or VG-30 grade
Case -1 19 mm nominal chipping size sqm 101.00
Case - II 13 mm nominal size chipping sqm 77.00
(II)with bitumen emulsion (CSS-1) (IS:8887-2004)
Case -1 19 mm nominal chipping size sqm 114.00
Case - II 13 mm nominal size chipping sqm 88.00
(b)With anti stripping agent as per IS:14982 (Refer Appendix-5 of
MoRT&H specification)
(I)' Paving bitumen 60/70 or VG-30 grade
Case -1 19 mm nominal chipping size sqm 112.00
Case - II 13 mm nominal size chipping sqm 87.00
(ii)with bitumen emulsion (CRS-2)
Case -1 19 mm nominal chipping size sqm 112.00
Case - II 13 mm nominal size chipping sqm 87.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

5.10 Open - Graded Premix Surfacing (Providing, laying and rolling of


open - graded premix surfacing of 20 mm thickness composed of 13.2
mm to 5.6 mm aggregates either using penetration grade bitumen or
cut-back or emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a
suitable plant, laying and rolling with a smooth wheeled roller 8-10
tonne capacity, finished to required level and grades) (including
511

carriage up to initial lead of 5.0 km from quarry and carriage of mixed


materials up to 10.0 Km initial lead from mixing plant) (Including cost of
testing of materials at site and laboratory as directed by the deptt.)

A Without anti stripping agent


(i) Mechanical method using Penetration grade Bitumen ( 60/70 or VG-30
grade) and HMP of appropriate capacity not less than 75 tonnes / hour sqm 157.00
.
(ii) Mechanical method using CRMB-55 and HMP of appropriate capacity
sqm 160.00
not less than 75 tonnes / hour .
(iii) Mechanical method using PMB and HMP of appropriate capacity not
sqm 203.00
less than 75 tonnes / hour .
(iv) Open-Graded Premix Surfacing using cationic Bitumen Emulsion CMS
sqm 205.00
B With anti stripping agent as per IS:14982 (Refer Appendix-5 of
MoRT&H specification)
(i) Mechanical method using Penetration grade Bitumen (60/70 or VG-
30Garde)and HMP of appropriate capacity not less than 75 tonnes / sqm 171.00
hour .
(ii) Mechanical method using crumb rubber modified bitumen (CRMB-55)
and HMP of appropriate capacity not less than 75 tonnes / hour . sqm 174.00

(iii) Mechanical method using polymer modified bitumen (PMB) and HMP
of appropriate capacity not less than 75 tonnes / hour . sqm 217.00

5.11 Close Graded Premix Surfacing/ Mixed Seal Surfacing (Mechanical


means using HMP of appropriate capacity not less than 75
tonnes/hour. Providing, laying and rolling of close-graded premix
surfacing material of 20 mm thickness composed of 11.2 mm to 0.09
mm (Type-A) or 13.2mm to 0.09mm (Type-B) aggregate using
penetration grade bitumen (60/70 or VG-30 grade) to required line,
grade and level to serve as wearing coarse on a previously prepared
base, including mixing in a suitable plant laying and rolling with a
512

smooth wheeled roller 8-10 T capacity to yhe reqd. level and grade. (
including carriage up to initial lead of 5.0 km from quarry and carriage
of mixed materials up to 10.0 Km initial lead from mixing plant )(
Including cost of testing of materials at site and laboratory as directed
by the deptt.)

(a)Without anti stripping agent


(ii) ( Type-A ) sqm 186.00
(i) Type-B sqm 173.00
(b)With anti stripping agent as per IS:14982( Refer Appendix-5 of
MoSRT&H specification)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(ii) ( Type-A ) sqm 188.00


(i) Type-B 190.00
5.12 Seal Coat (Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and cross fall
using Type A and B seal coats) (including carriage up to initial lead of
5.0 km from quarry) (Including cost of testing of materials at site and
513

laboratory as directed by the deptt.)

(a) Without anti stripping agent


(i) Case - I : Type A (Providing and laying liquid seal coat comprising of a
layer of bituminous binder ( paving bitumen 60/70 or VG-30 grade,
followed by a cover of crushed stone chipping of specified grade. sqm 69.00
(including carriage up to initial lead of 5.0 km from quarry)

(ii) Case - II : Type B (Providing and laying of premix seal coat with HMP
of appropriate capacity not less than 75 tonnes/ hours using crushed
stone chipping 6.7 mm size and penetration bitumen of 60/70 or VG-30 sqm 51.00
grade.) (including carriage up to initial lead of 5.0 km from quarry )

(b) With anti stripping agent as per IS:14982 (Refer Appendix-5 of


MoRT&H specification)
(i) Case - I : Type A (Providing and laying liquid seal coat comprising of a
layer of bituminous binder ( paving bitumen 60/70 or VG-30 grade,
followed by a cover of crushed stone chipping of specified grade.( sqm 80.00
including carriage up to initial lead of 5.0 km from quarry )

(ii) Case - II : Type B (Providing and laying of premix seal coat with HMP
of appropriate capacity not less than 75 tonnes/ hours using crushed
stone chipping 6.7 mm size and penetration bitumen of 60/70 or VG-30 sqm 59.00
grade.) (including carriage up to initial lead of 5.0 km from quarry )

5.14 Mastic Asphalt (Providing and laying mastic asphalt wearing course
with paving grade bitumen meeting the requirements given in table 500-
29 (binder having penetration as (15+/- 5) at 25 deg. centrigrade),
prepared by using mastic cooker and laid to required level and slope
after cleaning the surface, including providing anti skid surface with
bitumen pre coated fine grained hard stone ships of 13.2mm nominal
size at the rate of .005cum per 10 sqm. and at an approximate spacing
515.00

of 10 cm center tpo center in both direction , pressed into surface


when the temperature of surfaces not less than 1000C, protuding 1mm
to 4mm over mastic surface , all complete as per clause 515 .(
including carriage up to initial lead of 5.0 km from quarry.)

(i) Thickness=25mm sqm 753.00


(ii) Thickness=40mm sqm 1,206.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

5.15 Slurry Seal Providing and laying slurry seal consisting of a mixture of
fine aggregates conforming to specification of Table 500-33 of
MoRT&H specifiactionfor road & bridge works (4th revision,2001),
portland cement filler, bituminous emulsion as per specification and
water on a road surface including cleaning of surface, mixing of slurry
seal in a suitable mobile plant/ concrete mixer or using hand mixing as
per specification at Clause 516.2.1 of MoRT&H specifiactionfor road &
516

bridge works (4th revision,2001), laying and compacting with a


pneumatic tyred roller having an invidual wheel load between 0.75 and
1.5 Tonne to provide even riding surface complete as per specication
and as directed by Engineer-in-Charge.

(i) 5 mm thickness sqm 75.00


(ii) 3 mm thickness sqm 51.00
(iii) 1.5 mm thickness sqm 31.00
5.16 Recycling of Bituminous Pavement with Central Recycling Plant
(Recycling pavement by cold milling of existing bituminous layers,
planning the surface after cold milling, reclaiming excavated material to
the extent of 30 % of the required quantity, hauling and stock pilling the
reclaimed material near the central recycling plant after carrying out
necessary checks and evaluation, adding fresh materials includind cum 7,574.00
517

rejuvenators as required, mixing in a hot mix plant, tranporting and


laying at site and compacting to the required grade, level and
thickness, all as specified in clause 517

5.17 Fog Spray Providing and applying low viscosity bitumen emulsion (CSS-
1/CSS-1h) for sealing crack less than 3mm wide on incipient frepping
for dis integration in existing surfacing.
518

(I)With Bitumen emulsion CSS-1 (IS:8887-2004)


(I) without blinding sqm 41.00
(ii)'Extra for blinding the fox spray sqm 8.00
(II) With bitumen emulsion-CSS-1h
(I) without blinding sqm 36.00
(ii)'Extra for blinding the fox spray sqm 8.00
5.18 Bituminous Cold Mix (Including Gravel Emulsion) (Providing, laying
and rolling of bituminous cold mix on prepared base consisting of a
mixture of unheated mineral aggregate and emulsified bitumen (CSS-
1/CSS-1h), including mixing in a plant of suitable type and capacity,
transporting, laying, compacting and finishing to specified grades and
levels.( including carriage up to initial lead of 5.0 km from quarry and
519

carriage of mixed materials up to 10.0 Km initial lead from mixing plant)


(Including cost of testing of materials at site and laboratory as directed
by the deptt.)

(I)With Bitumen emulsion CSS-1 (IS:8887-2004)


(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size
cum 13,517.00
aggregate
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size


cum 13,568.00
aggregate
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size
cum 9,317.00
aggregate
(iv) Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate
cum 9,322.00
(II) With bitumen emulsion-CSS-1h
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size
cum 9,317.00
aggregate
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size
cum 9,322.00
aggregate
5.19 Sand Asphalt Base Course (Providing, laying and rolling sand-asphalt
base course composed of sand, mineral filler and bituminous binder (
paving bitumen of 60/70 or VG-30 grade) on a prepared sub-grade or
sub-base to the lines, levels, grades and cross sections as per the
drawings including mixing in a plant of suitable type and capacity, cum 7,461.00
520

transporting, laying and compacting and finishing.) (Including cost of


testing of materials at site and laboratory as directed by the deptt.)

5.21 Crack Prevention Courses


522

(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm


(Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width below 6 mm after cleaning with a
mechanical broom, using modified binder( PMB-70) complying with
clause 521 sprayed @ 9kg per 10 sqm spreading 5.6mm crushed
stone agreegate @ 0.11 cum per 10 sqm. with hydraulic chipps grader sqm 95.00
sweeping the surface for uniform spread of agreegates and surface
finished to conform to cl. no. 902. (Including cost of testing of materials
at site and laboratory as directed by the deptt.)

(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9


mm (Providing and laying of a stress absorbing membrane over a
cracked road surface, with crack width 6 to 9 mm after cleaning with a
mechanical broom, using modified binder( PMB-70) complying with
clause 521 sprayed @ 11kg per 10 sqm and spreading 11.5mm
sqm 112.00
crushed stone agreegate @ 0.12 cum per 10 sqm. sweeping the
surface for uniform spread of agreegates and surface finished to
conform to cl. no. 902.( Including cost of testing of materials at site and
laboratory as directed by the deptt.)

(iii) Stress Absorbing Membrane (SAM) crack width above 9 mm and


cracked area above 50 % (Providing and laying of a stress absorbing
membrane over a cracked road surface, with crack width above 9mm
and cracked area above 50% after cleaning with a mechanical broom,
using modified binder( PMB-70) complying with clause 521 sprayed @
15kg per 10 sqm spreading 11.2mm crushed stone agreegate @ 0.12 sqm 147.00
cum per 10 sqm. with hydraulic chipps grader sweeping the surface for
uniform spread of agreegates and surface finished to conform to cl. no.
902. (Including cost of testing of materials at site and laboratory as
directed by the deptt.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(iv) Case - IV : Bitumen Impregnated Geotextile (Providing and laying a


bitumen impregnated geotextile layer after cleaning the road surface,
geotextile conforming to requirements of clause 704.3, laid over a tack sqm 128.00
coat with 1.05 kg per sqm of paving grade bitu

5.22 Recipe Cold Mix (Providing and laying of premix of crushed stone
aggregates and emulsion binder, mixed in a batch type cold mixing
plant, laid over prepared surface, by paver finisher, rolled with a
pneumatic tyred roller initially and finished with a smo

(i) 75 mm thickness cum 10,085.00


(ii) 40 mm thickness cum 12,997.00
(iii) 25 mm thickness cum 12,465.00
5.23 Providing and laying of inter locking concrete block pavement (ICBP)
with cement concrete paver blocks as per IS 15658-2006 of thickness
80mm and of specific 28 days compressive strength over a layer of
bedding sand of compacted thickness 30mm, laid either in stretcher/
running/ herringbone pattern of bonds as directed by the engineer in
charge and in proper level and grade and compacted with appropriate sqm 937.68
equipment such as plate vibrator along with spreading of a thin layer of
joint filling sand to fill up the gaps between blocks including
construction of edge restraint wherever required complete as per
drawing and technical specification clause 1504 of MORD.

5.24 Providing and laying microsurfacing consisting of a mixture of coarse


aggregates,fine aggregate (stone dust) portland cement filler, polymer
Modified emulsion on a road surface including cleaning of surface,
mixing in a suitable mobile microsurfacing equipment & laying to
required thickness complete as directed

8mm thickness sqm 211.00


10mm thickness sqm 379.00
5.25 Resurfacing of bituminous pavement by Hot-in-place recycling
technique using AR 2000 SUPER RECYCLER or equivalent with
recycle train
a) recycling of existing 25mm SDBC layer to 40mm compacted BC
sqm 1,28,338.00
(35:65blend of addl mix & existing milled mix)
b) recycling of existing 40mm BC layer to 50mm compacted BC
sqm 1,28,397.00
(35:65blend of addl mix & existing milled mix)
5.26 Providing pre-engineering of existing road surface
(a)Core investigation including tests for garding,Density
test,penetration test bitument content test etc. complete as directed by sqm 1.31
the department
(b)Benkelman Beam deflection test for determination of adequacy of
sqm 2.17
pavement thickness
CHAPTER-6
CEMENT CONCRETE PAVEMENTS
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

6.1 Dry Lean Cement Concrete Sub- base (Construction of dry lean
cement concrete Sub- base over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the size of coarse aggregate
not exceeding 25 mm, aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per table 600:1 , cement
concrete not to be less than 150kg/cum, optimum moisture content to
be determined during the trial length construction, concrete strength
not to be less than 10Mpa at 7 days, mixed in a batching plant, cum 4,738.00
601

transported to the site, laid with a paver with electronic sensor,


compacting with 8-10 tonnes vibratory roller, finishing and curing.)
(Including carriage up to initial lead of 5Km. from quarry and carriage of
mixed materials up to 10.0 Km initial lead from mixing plant.)

6.2 Cement Concrete Pavement


602

(A) Construction of un-reinforced, dowel jointed, plain cement concrete


pavement over a prepared sub base with 43 grade cement @ 400 kg
per cum, coarse and fine aggregate conforming to IS 383, maximum
size of coarse aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mixed design, transported to the site,
laid with a fixed form or slip form paver, spread , compacted and
finished in a continuous operation includuing provision of contraction,
expansion, construction and longitudinal joints, joint filler, seperation cum 8,916.00
membrane, sealent primer, sealent joint , debonding strips dowel bar,
tie rod, admixured as approved, curing compopund, finishing to lines
and grades as per drawing. (Including carriage up to initial lead of 5Km.
from quarry and carriage of mixed materials up to 10.0 Km initial lead
from mixing plant.)

(B) Construction of un-reinforced, dowel jointed, plain cement concrete


pavement over a prepared sub base with 43 grade cement @ 400 kg
per cum, coarse and fine aggregate conforming to IS 383, maximum
size of coarse aggregate not exceeding 25 mm, mixed with Recron 3S
fibre of Reliance Industries Ltd. or its equivalent @ 0.125 Kg. per bag
of cement mixed in a batching and mixing plant as per approved mixed
design, transported to the site, laid with a fixed form or slip form paver,
spread , compacted and finished in a continuous operation includuing
provision of contraction, expansion, construction and longitudinal joints,
joint filler, seperation membrane, sealent primer, sealent joint , cum 9,031.00
debonding strips dowel bar, tie rod, admixured as approved, curing
compopund, finishing to lines and grades as per drawing. (Including
carriage up to initial lead of 5Km. from quarry and carriage of mixed
materials up to 10.0 Km initial lead from mixing plant.) as diected by
the Department complete at all levels.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(C) 'Cement Concrete Pavement (Construction of un-reinforced, dowel


jointed, plain cement concrete pavement over a prepared sub base
with 43 grade cement @ 400 kg per cum, coarse and fine aggregate
conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed with Virgin Polypropylene 18 microne Fibre
@ 600gms per cum of cement concrete with tear strength greater than
450 N/sqmm mixed in a batching and mixing plant as per approved
mixed design, transported to the site, laid with a fixed form or slip form
paver, spread , compacted and finished in a continuous operation
including provision of contraction, expansion, construction and cum 9,363.00
longitudinal joints, joint filler, seperation membrane, sealent primer,
sealent joint , debonding strips dowel bar, tie rod, admixured as
approved, curing compopund, finishing to lines and grades as per
drawing. (Including carriage up to initial lead of 5Km. from quarry and
carriage of mixed materials up to 10.0 Km initial lead from mixing
plant.) as diected by tl height of 6' in the back and taperi

6.3 Rolled Cement Concrete Base


603

(A) Construction of rolled cement concrete base course with coarse


and fine aggregate conforming to IS:383, the size of coarse aggregate
not exceeding 25 mm with minimum, aggregate cement ratio15:1 and
minimum cement content of 200 Kgs/cum, aggregate gradation as per
table 600-4 after blending, mixing in a batching plant at optimum
moisture content, transporting to site, laying with a paver with cum 5,125.00
electronic sensor, compacting with 8-10 tonnes smooth wheeled
vibratory roller to achive the designed flexure strength, finishing and
curing.

(B) Construction of rolled cement concrete base course with coarse


and fine aggregate conforming to IS:383, the size of coarse aggregate
not exceeding 25 mm with minimum, aggregate cement ratio15:1 and
minimum cement content of 200 Kgs/cum, aggregate gradation as per
table 600-4 after blending,mixed with Recron 3S fibre of Reliance
Industries Ltd. or its equivalent @ 0.125 Kg. per bag of cement mixing
in a batching plant at optimum moisture content, transporting to site, cum 5,156.00
laying with a paver with electronic sensor, compacting with 8-10 tonnes
smooth wheeled vibratory roller to achive the designed flexure
strength, finishing and curing as diected by the Department complete
at all levels.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(C) Construction of rolled cement concrete base course with coarse


and fine aggregate conforming to IS:383, the size of coarse aggregate
not exceeding 25 mm with minimum, aggregate cement ratio15:1 and
minimum cement content of 200 Kgs/cum, aggregate gradation as per
table 600-4 after blending,mixed with Virgin Polypropylene 18 microne
Fibre @ 600gms per cum of cement concrete with tear strength greater
than 450 N/sqmm mixing in a batching plant at optimum moisture cum 5,568.00
content, transporting to site, laying with a paver with electronic sensor,
compacting with 8-10 tonnes smooth wheeled vibratory roller to achive
the designed flexure strength, finishing and curing as diected by the
Department complete at all levels.

6.5 Construction of Base/Sub-base of pavement with lean concrete -


fly ash. (Construction of Base/sub-base using cement, sand, fly ash
and coarse aggregates proportioned as per table 4 of IRC: 74/1979
and with water content ratio, slump and compressive strength as
defined in the said table , mix prepared in a batching and mixing plant
cum 4,820.00
and compacted with a vibratory roller 8-10 tonnes capacity within the
time limit laid down vide clause 7.6.3 of IRC: 74-1979, construction
joints properly formed at the end of the day's work, cured for 14 days,
all as specified in IRC:74-1979 and as per approved plans.

6.6 Cement - Fly ash concrete pavement. (Construction reinforced-


reinforced, dowel jointed, plain cement concrete pavement over a
prepared sub base with 43 grade cement, coarse and fine aggregate cum 26,760.00
conforming to IS 383, maximum size of coarse aggregate not exce

CHAPTER-7
GEOSYNTHETICS, REINFORCED EARTH & SOIL WATER PROOFING
7.1 Sub-Surface Drain with Geotextiles
(A) For the purpose of sub-surface drainage, supply of high strength,
high flow, composite flat panel HDPE core with all accessories (end-
cap, side-out, end-out etc as per the drawing required for laying the
drainage line) having following properties: nominal panel height of
310mm (ASTM D2122), width >40mm (ASTM D2122), slot size (min)
2mmx25mm (ASTM D2412), compressive strength >200KPa (ASTM
D2412). Panel shall be wrapped with non-woven, spun-bound, needle- metre 1,088.82
punched PET geotextile having 140gsm weight (ASTM D5261), AOS of
150 microns (max) (ASTM D4751), & Permittivity of 3.29 (ASTM
D4491). Panel to be provided in rolls of 50 or 100m each.

(B) Laying of composite flat drainage panel including excavating a drain


(60mm wider & 50mm deeper than the panel width at a level which is
25mm above sub-grade level) and filling it back with 85% aggregates metre 119.70
retained between 10mm and 20mm & 15% passing the lower size
sieve.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

7.2 Narrow Filter Sub-Surface Drain :'Construction of a narrow filter sub-


surface drain consisting of porous or perforated pipe laid in narrow
trench surrounded by a geotextile filter fabric, with a minimum of 450
metre 813.00
mm overlap of fabric and installed as per clause 702.3 and 309.3.5
including excavation and backfilling .

7.3 'Laying Paving Fabric Beneath a Pavement Overlay : Supply and


laying of Paving Fabric as per MoSRT&H Sec:703.3.1 with PET fiber
geotextile. Conformance shall be assessed as per ASTM D4759 and
sampling for testing as per ASTM D4354, and a tack coat of bitumen
grade 80-100 @0.7Kg/m2 with margins and laps as per MoSRT&H. sqm 62.51
Laying to be done with FDF (Fabric Dispensing Frame) fitted with
rubber shoe at its bottom to provide adequate tension to the fabric
while being laid over the tack-coat.(tackcoat shall be paid separately)

7.4 Laying Boulder Apron in Crates of Synthetic Geogrids :'Providing,


preparing and laying of geogrid crated apron 1 m x 5 m, 600 mm thick
including excavation and backfilling with baffles at 1 metre interval,
made with geogrids having characteristics as per clause 704.2, joining
sides with connectors/ring staple, top corners to be tie tensioned ,
placing of suitable crioss interval ties in layers of 300 mm connecting
opposite side with lateral braces and tied with polymer braids to avoid
bulging , constructed as per clause 704.3 filled with stone with cum 1,962.00
minimum size of 200mm and specific gravity not less than 2.65,
packed witkh stone spalls, keyed to the foundation recess in case of
sloping ground and laid over a layer of Geotextile to prevent migration
of fines , all as per clause 704 and laid as per clause 2503.3 and
approved design.

7.5 Reinforced Earth Retaining Wall Providing and laying precast concrete facia wall of approved design and specified
3100

(i) Facing elements of RCC sqm 1,341.00


(ii) Assembling, joining and laying of reinforcing elements.
a)With galvanized Carbon Steel strips metre 446.00
b)With Copper strips metre 1,946.00
c)With Aluminium strips metre 882.00
d)With Stainless Steel strips metre 1,173.00
e)With .Glass reinforced polymer/fibre reinforced polymer/polymeric strips
metre 1,173.00
f)HA(40 mm wide 5 mm thick) /HAR (45 mm wide 5 mm thick)
metre 747.00
Galvanized Steel Strip
7.6 Sub-Grade Stabilization:
(A) Providing and laying one layer of Non-Woven geotextile of
minimum mass per unit area of 130 -500 gms/sqm.having minimum
roll width of 5.0m with physical properties as given in clause no
702.2.3. over 25mm thick compacted sand layer on a prepared
700

subgrade as a filter media with necessary overlaps as per drawing and


technical specification and as directed by the Engineer in charge
complete.complete.
130 GSM , PP sqm 53.35
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

200 GSM , PP sqm 72.59


250 GSM , PP sqm 88.27
300 GSM , PP sqm 103.95
400 GSM, PP sqm 157.71
(B) Providing and Laying woven multifillament Polyester Geotextile
(Type-B) indigenously manufactured from high quality polyester fibers
for soil reinforcement and stabilisation on the prepared subgrade with sqm 189.00
700

necessary overlaps and as per drawing.

(C) Providing and laying one layer of Biaxial P.V.C.Knitted coated


polyster Geogrid of unit roll width of 5.0m having minimum tensile
strength of 40KN/m in both direction at a maximum elongation of 15%
in th direction of the length of the roll and satisfying all requirements of
IS Code/BIS code of practice and tests prescribed in ASTM or British
standards or ISO on prepared subgrade as a seperator cum sqm 151.00
700

reinforceing agent with necessary overlaps as per drawing and


technical specification and as directed by the Executive Engineer in
charge complete.

(D) Providing and Laying Knitted and PVC coated Polyester Uniaxial
Geogrid, Type-I(40 Kn/m Ultimate Tensile Strength) indigenously
manufactured from selected high tenacity polyester yarn with high
molecular weight (> 25000 g/mol), and low carboxyl end group
(<30mmol/kg) for reinforced soil wall and slope application with sqm 137.00
700

granular fill as per design prepared by technolgy provider of reinforced


earth wall and slope.

7.7 Soil Stabilization with RBI grade 81


Providing laying spreading & compacting available soil (Excluding clay
soil) in sub-grade course including in-situ mixing of RBI 81 product,
spreading in uniform layers with motor grader on a prepared base
including watering and compacting with 8 to 10tonne Vibratory power
roller to achive the desired density including all materials, labour, HOM
of machinery etc. complete as per specifications and as directed by
the Engineer in charge.

i) With 2% of RBI product Cum 1,519.00


ii) With 3% of RBI product Cum 2,059.00
ii) With 4% of RBI product Cum 2,599.00
7.8 Soil Stabilization with RBI additive and RBI grade 81 product(Clay
soil)
Providing, laying, spreading & compacting available clay soil in sub-
grade course including in-situ mixing of RBI 81 additive and RBI 81
product, spreading in uniform layers with motor grader on a prepared
base including watering and compacting with 8 to 10tonne Vibratory
power roller to achive the desired density including all materials, labour,
HOM of machinery etc. complete as per specifications and as directed
by the Engineer in charge.

i) With 4% RBI additive & 2% of RBI product Cum 1,534.00


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

ii) With 4% RBI additive & 4% of RBI product Cum 2,614.00


7.9 Soil Water proofing
Providing soil water proofing with two applications of Terrasil or
equivalent compound on prepared subgrade with proctor density of
95% at optimum moisture content complete as per specifications and
as directed by the Engineer-in-charge.
A) Clay soil Sqm 32.00
B) Sandy-Silty soil Sqm 16.00
7.10 Gabian Structure with Geo-synthetics
Providing and Laying Copper & polypropylene rope Gabions
indigenously manufactured from high strength rope for slope protection
and erosion control for river bank and sea-shore protection. Exclusive
700

of providing & filling stones complete as per specifications and as


directed by the Engineer in charge.
A) Type A (size 1M x1M x 1M, aperture 100mm x 100mm) Each 1,474.00
B) Type A (size 1M x1M x 2M, aperture 100mm x 100mm) Each 2,579.00
C) Type A (size 1M x1M x 3M, aperture 100mm x 100mm) Each 3,798.00
D) Type B (size 1M x1M x 1M, aperture 150mm x 150mm) Each 1,357.00
7.11 Providing & making Gabion structure with Mechanically Woven Double
Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS
16014:2012,MORTH Clause 2500, of required size, Mesh Type
10x12(D=100 mm with tolerance of ±2%), Zinc + PVC coated, Mesh
wire diameter 2.7/3.7mm (ID/OD), mechanically edged/selvedged with
partitions at every 1m interval and shall have minimum 10 numbers of
openings per meter of mesh perpendicular to twist, tying with lacing cum 2,738.09
700

wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of


Gabion boxes, filled with boulders with least dimension of 200 mm, as
per drawing, all complete as per directions of Engineer- in-charge.

7.13 Supplying & laying of bi-axial extruded high modulus polypropylene


geogrid conforming to MORTH SPECIFICATION for base/sub-base
reinforcement having minimum tensile strength 40kN/m in the
longitudinal and transverse direction, with 14kN/m and 28kN/m tensile
strength at 2% and 5% strain respectively in the longitudinal and sqm 327.92
transverse direction, junction efficiency not less than 95% and with
38mm X 38mm mesh opening.

7.14 High Strength flexible GeoGrid for Soil Reinforcement/ Basal


reinforcement
Supplying and laying high strength flexible geogrids (HSFG) as soil
reinforcement / basal reinforcement as per MORTH 3100 and IRC 113,
made of high tenacity polyester core with polyethylene coating with
minimum Long Term Design Strength (LTDS) of more than 50% of
ultimate tensile strength at 30 degree Celsius corresponding to 12 %
strain & Ultimate tensile strength-

1. Ultimate tensile strength- 100 kN/m sqm 200.00


2. Ultimate tensile strength- 150 kN/m sqm
3. Ultimate tensile strength- 200kN/m sqm 300.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

4. Ultimate tensile strength- 250kN/m sqm


5. Ultimate tensile strength- 300kN/m sqm 350.00
6. Ultimate tensile strength- 350kN/m sqm
7. Ultimate tensile strength- 400kN/m sqm 420.00
8. Ultimate tensile strength- 450kN/m sqm
9. Ultimate tensile strength- 500kN/m sqm 550.00
7.15 HDPE Geocell
a)Geocell Depth 75 mm
Providing & laying HDPE Geocell having density grater than 0.935
g/cm3 with a multitude rhombodial indentations, textured & perforated
with horizontal rows of maximum 10mm dia holes . Performations
within each row shall be 19mm on center. The quantity of perforations
shall remove +/- 17% of cell wall area having 75 mm cell depth with
minimum sheet thickness of 1.20 mm & having yield strength of 18 sqm 280.20
kN/m as per specifications including cost of material,T&P, labour
scaffolding etc. to complete the job as per drawing & direction of
Engineer-In-Charge

b)Geocell Depth 100 mm


Providing & laying HDPE Geocell having density grater than 0.935
g/cm3 with a multitude rhombodial indentations, textured & perforated
with horizontal rows of maximum 10mm dia holes . Performations
within each row shall be 19mm on center. The quantity of perforations
shall remove +/- 17% of cell wall area having 100mm cell depth with
minimum sheet thickness of 1.20 mm & having yield strength of 18 sqm 351.00
kN/m as per specifications including cost of material,T&P, labour
scaffolding etc. to complete the job as per drawing & direction of
Engineer-In-Charge

c )Geocell Depth 150 mm


Providing & laying HDPE Geocell having density grater than 0.935
g/cm3 with a multitude rhombodial indentations, textured & perforated
with horizontal rows of maximum 10mm dia holes . Performations
within each row shall be 19mm on center. The quantity of perforations
shall remove +/- 17% of cell wall area having 150mm cell depth with
minimum sheet thickness of 1.20 mm & having yield strength of 18 sqm 450.55
kN/m as per specifications including cost of material,T&P, labour
scaffolding etc. to complete the job as per drawing & direction of
Engineer-In-Charge

d )Geocell Depth 200 mm


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Providing & laying HDPE Geocell having density grater than 0.935
g/cm3 with a multitude rhombodial indentations, textured & perforated
with horizontal rows of maximum 10mm dia holes . Performations
within each row shall be 19mm on center. The quantity of perforations
shall remove +/- 17% of cell wall area having 200mm cell depth with
minimum sheet thickness of 1.20 mm & having yield strength of 18 sqm 496.57
kN/m as per specifications including cost of material,T&P, labour
scaffolding etc. to complete the job as per drawing & direction of
Engineer-In-Charge

NEOLOY GEOCELL
7.16 (a)Geo-cell Depth 75mm
Providing & laying NEOLOY Geocell ( made of Noval Pollymeric alloy)
having density grater than 1 g/cm3 with a multitude rhombodial
indentations, textured & perforated with horizontal rows of maximum
10mm dia holes . Resistance to UV Index isgreater than
1600minutes.Performations within each row shall be 19mm on center.
The quantity of perforations shall remove +/- 22% of cell wall area
having 75 mm cell depth with minimum sheet thickness of 1.20 mm & sqm 403.83
having yield strength greater than 23 kN/m as per specifications
including cost of material,T&P, labour scaffolding etc. to complete the
job as per drawing & direction of Engineer-In-Charge.The design life is
upto 75 years with less than 3% deformation.

(b)Geo-cell Depth 100mm


Providing & laying NEOLOY Geocell ( made of Noval Pollymeric alloy)
having density grater than 1 g/cm3 with a multitude rhombodial
indentations, textured & perforated with horizontal rows of maximum
10mm dia holes . Resistance to UV Index isgreater than
1600minutes.Performations within each row shall be 19mm on center.
The quantity of perforations shall remove +/- 22% of cell wall area
having 100 mm cell depth with minimum sheet thickness of 1.20 mm sqm 533.04
& having yield strength greater than 23 kN/m as per specifications
including cost of material,T&P, labour scaffolding etc. to complete the
job as per drawing & direction of Engineer-In-Charge.The design life is
upto 75 years with less than 3% deformation

(c)Geo-cell Depth 150mm


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Providing & laying NEOLOY Geocell ( made of Noval Pollymeric alloy)


having density grater than 1 g/cm3 with a multitude rhombodial
indentations, textured & perforated with horizontal rows of maximum
10mm dia holes . Resistance to UV Index isgreater than
1600minutes.Performations within each row shall be 19mm on center.
The quantity of perforations shall remove +/- 22% of cell wall area
having 150 mm cell depth with minimum sheet thickness of 1.20 mm sqm 758.42
& having yield strength greater than 23 kN/m as per specifications
including cost of material,T&P, labour scaffolding etc. to complete the
job as per drawing & direction of Engineer-In-Charge.The design life is
upto 75 years with less than 3% deformation.

(d)Geo-cell Depth 200mm


Providing & laying NEOLOY Geocell ( made of Noval Pollymeric alloy)
having density grater than 1 g/cm3 with a multitude rhombodial
indentations, textured & perforated with horizontal rows of maximum
10mm dia holes . Resistance to UV Index isgreater than
1600minutes.Performations within each row shall be 19mm on center.
The quantity of perforations shall remove +/- 22% of cell wall area
having 200 mm cell depth with minimum sheet thickness of 1.20 mm sqm 1,032.18
& having yield strength greater than 23 kN/m as per specifications
including cost of material,T&P, labour scaffolding etc. to complete the
job as per drawing & direction of Engineer-In-Charge.The design life is
upto 75 years with less than 3% deformation.

7.17 Composite Drainage


Supplying & laying of drainage composite for use behind walls,
between two different fills, alongside-drains of road, below concrete
lining of canals etc. Geocomposite for planar drainage, realized by
thermo bonding a draining core in extruded monofilaments with two
filtering nonwoven geotextiles that may also be working as separation
or protecting layers. The draining three dimensional core will have a
“W” configuration as longitudinal parallel channels. Minimum thickness
to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven
geotextile of minimum thickness of 0.75mm characteristic opening size
(O90) of 1 10 micron and tensile strength of 8.0 kN/m that will be sqm 743.66
working as separation or protecting layer, geocomposite having in
plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20
kPa pressure and tensile strength of 18 kN/m , with mass per unit area
of 740 gsm, supplied in the form of roll for easy transportation to site of
work as per detailed specification all complete as per dl height of 6' in
the back and t

Rockfall Mitigation with wiremesh


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

7.18 Providing and fixing steel Rhombodial/high strength clip shaped Mesh
panels/Nets of 10 millimeter diameter of steel diameter wire rope of
size 300X300 millimeter,including top and bottom support rope,lacing
wire or rope required to connect the nets and all accessories such as
Uclamps, turn buckles,thimbles,including safety,all other ancillary sqm 4,950.00
works,material,machinary,labour etc complete as per technical
specifications and directed by Engineer-in -charge.

7.19 Providing and fixing steel steel wire grid/mesh double twisted
Hexagonal shaped wire mesh interlaced during manufacturing with 8
millimeter steel wire rope in longitudinal direction,top support,bottom
support rope,lacing wire,U clamps,thimbles,turn buckles with all other
accesorries including loading unloading of the material(mesh wire dia
2.7millimeter/3.7 millimeter heavily Zn+ PVC coated) including sqm 3,500.00
safety,all ancillary,labour,etc complete as per technical specifications
and as directed by Engineer In charge(The diameter of Zink coated
mesh wire is 2.7 millimeter over which 0.5 millimeter PVC coating shall
be provided.

7.20 Supplying and laying of 3D Reinforced Geocomposite made of


Polypropylene Polymer made three dimensional matrix of minimum
mass per unit area 500 grams/sqm extruded onto a mechanically
woven double twisted hexagonal shaped steel wire Mesh of Mesh wire
Dia. 2.2mm and Mesh Type 6 x 8 having Zn coating as per EN 10244-
2, the composite shall have a combined mass per unit area equal or sqm 839.00
more than 1680 Grams / Sq.m and nominal thickness more than
10mm , at easily accessible location including top and bottom, with all
leads and lifts, manpower and machinery, materials,labour etc.
complete and as directed by Engineer - In - Charge.

Slope Protection -Geosynthetics reinforced wall


Slope protection
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

7.21 Supply and installation of Geo synthectics Reinforced Wall (GRW)


Chain of 32 m length as per specification below
a) Vertical height 6 feet and bottom width 8 feet, 35 chambers @ 3' x 3'
make 1 chain - 105 feet long; interconnected baffle walls and
peripheral surfaces of HSP manufactured with minimum 20 p
laminated film. b) Ultimate tensile strength of 27 Kn/m in CD/MD as
per ASTM D4595.
Gesynthectics Reinforced Wall
c) Wide width tensile elongation of 17%.
d) Trapezoidal tear of 445 N (ASTM D4533).
e) Mullen burst of 2930 Kpa (ASTM D3786).
f) Permittivity of 0.05/sec (ASTM D4491). g) UV of min 70% @ 500
hours (ASTM D154). All above values are MARV except UV which is
nos 2,30,480.00
TYP of the agreed primary sample lot and all are deducted as per
sampling procedures defined in ASTM D4354 for all 3 - levels of
testing. The trap-bag shall have 3'x3' top opening for filling and vertical
height of 6' in the back and tapering off into a slope in front which ends
in 1' vertical drop to meet the bottom layer measuring 8' from the rear
vertical face. 35 such chambers form 1 chain with waterproof joining
arrangements at its both ends that shall end in flaps to cover the first
cell of the connected chain. Stitching (as per ASTM D4884) shall be
along the cellular periphery only with not lesst than 300 denier PET
thread while ensuring the bends are curves and not rectangles ,

7.22 Item : Supply , laying , fitting and fixing of double layered Geo textile,
fabricated to form a three dimensional mattresses after filling sand at
design slope, filled up with sand by pump, anchoring by cutting trench
at the upper and lower end of slope of depth 1.00m x 0.75 m placing
the mat by bending it into the trench, filling the trench by earth filled
cement bags, sides of mattresses in sloping direction stitched by
Polyester/Polypropylene thread with double locking chain stitch not less
than 3 stitches per 2.50 cm to achieve minimum stream strength sqm 1,539.49
including all handling and carriage charge complete as directed.
(Polyester/Polypropylene thread will be supplied by the department free
of cost) (Anchorage arrangement for holding the Geo Mat at both end
of the slope shall be measured and paid separately) - 650 GSM
GEOMATTRES

7.23 Supply & installation of 3D turf reinforcement mat ( Pyramat) made with
high strength polypropylene woven permeable fabric with the following
parameters . Minimum tensile strength 68 KN/m (MD) & 38 KN/m
(CD) ASTM D 6818, UV @ 70 % minimum, 1000 hrs having green sqm 740.35
coloured to be used in slope protection works.

Geo Bags
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

7.24 Supply and laying of of Geo Bags Type-B (Size 2.00m x 1.50m)( pillow
Type) made of composite layers of geo-textile as per specifications
below : Woven Geo-textile for the outer cover. The woven geo textile is
woven with UV resistant slit film tape fibre with MAVR values of the
following properties. Geo-textile used to manufacture geo-textile bags
should have high mechanical properties for enhanced durability along
with enhanced puncture, abrasion and U.V. resistance characteristics.
Geo-textile should be inert to biological degradation and resistant to
naturally encountered chemicals, alkalis, and acids. Weight (ISO-
9864/ASTMD 5261) ≥210 Gms/Sqm. Tensile strength ( ASTMD 4595)
= ≥35 kN/m Tensile Elongation ( ASTMD 4595)= ≥5% ≤30% Tensile
strength ( ASTMD 4632) = 1.5 Kn UV resistance( ASTMD 4355) =
70%/500 hrs Non woven Geo-textile for the inner layer It is needle
punched non woven geo-textile made of 100% polypropylene staple
fibers which are formed into a random network for dimensional stability.
l height of 6' in the back and tapering off into a slope in front which nos 815..35
ends in 1' vertical drop to meet the bottom layer measuring 8' from the
rear vertical face. 35 such chambers form 1 chain with waterproof
joining arrangements at its both ends that shall end in flaps to cover
the first cell of the connected chain. Stitching (as per ASTM D4884)
shall be along the cellular periphery only with not lesst than 300 denier
PET thread while ensuring the bends are curves and not rectangles ,
component, the cost of all mock ups at site, cost of all samples of the
individual components for testing in an approved laboratory, field tests
on the assembled working curtain wall with aluminium composi

Bioengineering for Erosion Control and revegetation measure


7.25 Supply and spraying of High Performance-Flexible Growth Medium (HP-
FGM) which is 100% biodegradable, composed of 100% recycled,
thermally refined (within a pressurized vessel) virgin wood fibers,
crimped interlocking biodegradable fibers, mineral activators, and
wetting agents (including high-viscosity colloidal polysaccharides, cross-
linked biopolymers and water absorbents) along with STANDARD sqm 567.00
prescriptive agronomic formulations such as fertilizer, extended-term
dyes, soil pH modifiers, bio stimulant materials and seeds which is
hydraulically applied for Erosion control.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

7.26 Supply and application of Biotic Soil Media (BSM) - a combination of


recycled Thermally RefinedR bark and wood fibers with a proprietary
blend of biopolymers,biochar, seaweed extract, humic acid,
endomycorrhizae and other beneficial constituents. All components of
the Biotic Soil Media blend shall be of naturally derived and renewable,
and engineered to optimize moisture retention, growth
andestablishment of vegetation. This item can be adopted where the sqm 497.00
organic matter is found to be deficient in the soil substrate, as desired
and as per BSM specificationsalong with standard prescriptive
agronomic formulations such as fertilizer, extended term dyes, soil pH
modifiers, bio stimulant materials, seeds etc as specified.

7.27 ASPHALT REINFORCEMENT WITH GEOGRID-Providing Asphalt


Reinforcement Geogrid consisting of Geogrid connected with low
Sqm 233.03
weight non woven polypropylene fabric conforming to Morth 5th
700

Specification.
7.28 ASPHALT REINFORCEMENT WITH GLASSGRID -Providing Glass
Fibre Grid of strength 50 KN/m and aperture size 25mm X 25mm and
Sqm 89.82
specifications meeting Morth 5th edition table no. 700-17 to be used as
700

asphalt reinforcement.
7.29 ASPHALT REINFORCEMENT WITH Glassgrid composite -Providing
Glassgrid composite of strength 50 KN/m and aperture size 25mm X
25mm with woven geotextile chemically or mechanically bonded to the
Sqm 119.45
grid and specifications meeting Morth 5th edition table no. 700-17 to be
700

used as asphalt reinforcement.

7.30 Soil Stabilization With Traxial Geogrid-


A)Providing of Triaxial Geogrid(TX150), made from virgin high density
polyproylene, having apertures in triangle shape for better interlocking
and minimum junction efficiency 90%. The minimum radial stiffness Sqm 159.09
700

ration should have 0.8 (with a tolerance of - 0.15) and radial secant
stiffness at 0.5% strain should be 360 kn /m (with a tolerance of -75
kn/m).
7.31 B)Providing of Triaxial Geogrid(TX160), made from virgin high density
polyproylene, having apertures in triangle shape for better interlocking
and minimum junction efficiency 90%. The minimum radial stiffness
ration should have 0.8 (with a tolerance of - 0.15) and radial secant Sqm 171.74
700

stiffness at 0.5% strain should be 360 kn /m (with a tolerance of -75


kn/m).
7.32 C) Providing of Triaxial Geogrid(TX170), made from virgin high density
polyproylene, having apertures in triangle shape for better interlocking
and minimum junction efficiency 90%. The minimum radial stiffness
ration should have 0.8 (with a tolerance of - 0.15) and radial secant Sqm 190.72
700

stiffness at 0.5% strain should be 360 kn /m (with a tolerance of -75


kn/m).
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.1 Cast in Situ Cement Concrete M20 kerb (Construction of cement


concrete kerb with top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm
thick, foundation having 50 mm projection beyond kerb stone, kerb
408

stone laid with kerb laying machine, foundation concrete laid manually,
all complete as per clause 408.

A Using Concrete Mixer metre 505.00


B Using Concrete Batching and Mixing Plant metre 507.00
8.2 Cast in Situ Cement Concrete M 20 Kerb with Channel
(Construction of cement concrete kerb with channel with top and
bottom width 115 and 165 mm respectively, 250 mm high in M 20
grade PCC on M10 grade foundation 150 mm thick, kerb channel 300
mm wide, 50 mm thick in PCC M20 grade , sloped towards the kerb,
408

kerb stone with channel laid with kerb laying machine,foundation


concrete manually all complete as per clause 408.)

A Using Concrete Mixer metre 889.00


B Using Concrete Batching and Mixing Plant metre 889.00
8.3 Printing new letter and figures of any shade (Printing new letter and
figures of any shade with synthetic enamel paint black or any other
801

approved colour to give an even shade)


(i) Hindi ( Matras commas and the like not to be measured and paid for
cm height per letter 1.10
Half letter shall be counted as half )
(ii) English and Roman cm height per letter 0.70
8.4 Retro reflectorised Traffic sign:
Providing and erecting of Retro-Reflectrorised cautionary, mandatory &
informatory sign as per IRC: 67 made of high intensity encapsulated
lens type reflective sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported
on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the
ground by means of properly design foundation with M-15 grade
Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as
per approved drawing and sign. ( All the Steel work must be
Tata/Sail/or any other approved brand)

(i) 90cm equilateral traingle each 4,900.00


(ii) 60cm equilateral traingle each 3,595.00
(iii) 60cm circular each 4,200.00
(iv) 80cmm x 60 cm rectangular each 5,300.00
(v) 60cmm x 45 cm rectangular each 5,200.00
(vi) 60cmm x 60 cm square each 5,200.00
(vii) 90cm high octagon each 7,850.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.5 Direction and place identification sign upto 0.9sqm size board.
Providing and erecting direction and place identification retro-
Reflectrorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide clause 801.3 fixed over aluminium sheeting,
2mm thick with area not exceeding 0.9sqm fixed on an angle iron of
25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x
6mm firmly fixed to the ground by means of properly design foundation sqm 10,000.00
801

with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below
ground level as per approved drawing and sign. ( All the Steel work
must be Tata/Sail/or any other approved brand)

8.6 'Direction and place identification sign more than 0.9sqm size
board.
Providing and erecting direction and place identification retro-
Reflectrorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide clause 801.3 fixed over aluminium sheeting,
2mm thick with area exceeding 0.9sqm fixed on an angle iron of
25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x sqm 11,000.00
801

6mm, 2 nos. firmly fixed to the ground by means of properly design


foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm,
60cm below ground level as per approved drawing and sign. . ( All the
Steel work must be Tata/Sail/or any other approved brand)

8.7 'Over head sign:


A Providing and erecting overhead signs of anti-corrosive steel ( All the
steel work must be TATA/SAIL/any other approved brand.) tubular
framed structure for retro reflective signage boards made of high
intensity grade encapsulated lens type retro Reflective sheeting
conforming to ASTMD4956 type B III specifications and having
approved pattern over its entire surface bonded on to 2.00 mm thick
aluminium sheet with back supporting angle iron frame of 35x35x4mm
angle iron duly riveted with solid MS & aluminum rivets. The entire face
of the sign shall be covered & bounded with yellow/white/red/blue high
intensity encapsulated lens reflective sheeting with distinctive hoed
pattern on front site (no plain surface) with heat lamp vacuum tonne 98,500.00
applicator machine only. The yellow/white/red/blue portion of the board
shall be screen printed on the high intensity shed base including fixing
the board on portal/support/wall/dowel rod etc., with contractors
clamps/cleats/bolts/rivets/wells including all contractors materials, labl
height of 6' in the back and tapering off into a slope in front which ends
in 1' vertical drop to meet the bottom layer measuring 8' from the rear
vertical face. 35 such c

B. Providing retro reflective sign board of high intensity grade reflective


sheeting conforming to ASTMD4956 BIII specifications having
approved pattern over its entire surface bonded on to 2 mm thick
aluminium sheeting, the entire face of the sign shall be covered & sqm 6,000.00
bounded with yellow/ white/red/blue high intensity grade with distinctive
nod pattern on front site with heat lamp vacuum applicator machine
only.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

C. Foundation work comprises earth work in foundation trenches, cement


concrete 1:4:8,RCC 1:2:4 &earth filling etc.(Size 2.1x2.1x2.1m)

i) Plain /Reinforced cement in open foundation complete as per drawing


& technicla specifications as MoSRT&H, 1500, 1700, 2100 PCC grade cum 5,788.00
M20
ii) Plain /Reinforced cement in open foundation complete as per drawing
& technicla specifications as MoSRT&H, 1500, 1700, 2100 RCC grade cum 5,822.00
M20 using concrete mixure
iii) Earth work in excavation in foundation of structures as per drawing &
techniclal specifications including setting out, construction of soring and
bracing, removal of stumps and other deletarious matter, dressing of
sides and bottom and backfilling with approved material as MoRT&H cum 283.00
304 inordinary soil by manual means (without dewatring: upto 3M
depth)
8.8 Painting Two Coats on New Concrete Surfaces'
Painting two coats after filling the surface with synthetic enamel paint in
sqm 88.00
all shades on new plastered concrete surfaces
803

8.9 Painting on Steel Surfaces (Providing and applying two coats of


ready mix paint of approved brand on steel surface after through sqm 77.00
803

cleaning of surface to give an even shade)


8.10 Painting on Wood Surfaces (Providing and applying two coats of
ready mix paint of approved brand on wood surface after through sqm 86.00
803

cleaning of surface to give an even shade)


8.11 Painting Lines, Dashes, Arrows etc on Roads in Two Coats on
New Work (Painting lines, dashes, arrows etc on roads in two coats
on new work with ready mixed road marking paint conforming to IS:164
on bituminous surface, including cleaning the surface of all dirts, dusts
803

and other foreign matter, demarcation at site and traffic control.)

(i) Over 10 cm in width sqm 136.00


(ii) Up to 10 cm in width sqm 116.00
8.12 Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old
Work (Painting lines, dashes, arrows etc on roads in two coats on old
work with ready mixed road marking paint confirming to IS: 164 on
bituminous surface, including cleaning the surface of all dirts, dusts and
803

other foreign matter, demarcation at site and traffic control.)

(i) Over 10 cm in width sqm 91.00


(ii) Up to 10 cm in width sqm 98.00
8.13 Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as per
IRC:35 .The finished surface to be level, uniform and free from streaks sqm 750.00
803

and holes and conforming to the MoRT&H specifications

8.14 Kilo Metre Stone (Reinforced cement concrete M15grade kilometre


stone of standard design as per IRC:8-1980, fixing in position including
804

painting and printing etc)


(i) 5th kilometre stone (precast) each 5,429.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(ii) Ordinary Kilometer stone (Precast) each 3,289.00


(iii) Hectometer stone (Precast) each 862.00
(iv) 200th meter stone (Precast) as per IRC:26-1967. each 862.00
8.16 Boundary pillar (Reinforced cement concrete M15 grade boundary
pillars of standard design as per IRC:25-1967, fixed in position
each 937.00
including finishing and lettering but excluding painting)
806

8.17 G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2
metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm
x 40 mm x 6 mm placed every 3 metres center to center founded in
M15 grade cement concrete, 0.6 metre below ground level, every 15th
piost, last but one end post and corner post shall be strutted on both metre 259.00
807

sides and end post on one side only and provided with 9 horizontal
lines and 2 digonals interwoven with horizontal wiers, fixed with GI
staples, turn buckles etc complete as per clause 807.

8.18 G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8
metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm
x 50 mm x 6 mm placed every 3 metres center to center founded in
M15 grade cement concrete, 0.6 metre below ground level,every 15th
piost, last but one end post and corner post shall be strutted on both metre 436.00
807

sides and end post on one side only and provided with 12 horizontal
lines and 2 digonals interwoven with horizontal wiers, fixed with GI
staples, turn buckles etc complete as per clause 807.

8.19 Fencing with welded steel wire Fabric 75 mm x 50 mm


(Suggestive) (Providing 1.20 metre high fencing with angle iron posts
50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre
embedded in M15 grade cement concrete, corner, end and every 10th
metre 1,856.00
post to be strutted , provided with welded steel wire fabrics of
75mmX50mm mesh or 75mmx25mm mesh and fixed to iron posts by
flat iron 50mmX5mm and bolts etc. complete in all respects.)

8.20 Tubular Steel Railing on Medium Weight steel channel ( ISMC


series) 100 mm x 50 mm (Providing, fixing and erecting 50 mm dia
steel pipe railing in 3 rows duly painted on medium weight steel
metre 3,145.00
channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above
808

ground, 2m center to center, complete as per approved drawings.

8.21 Tubular Steel Railing on Precast RCC posts, 1.2 m high above
ground level (Providing, fencing and erecting 50 mm dia painted steel
pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8
metre 2,694.00
metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed
808

2meters center to center, complete as per approved drawing.


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.22 Reinforced Cement Concrete Crash Barrier (Provision of an


Reinforced cement concrete crash barrier at the edges of the road,
approaches to bridge structures and medians, constructed with M-20
grade concrete with HYSD reinforcement conforming to IRC:21 and
dowel bar 25mm dia, 450mm long at expansion joints filled with pre
moulded asphalt filler board, keyed to the structure on which it is built
809

and installed as per design given in the enclouser to MoRT&H circular


No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in
the approved drawing and at locations directed by the engineer, all as
specified.

(i) M 20 grade concrete metre 4,359.00


(i) M 40 grade concrete metre 4,582.00
8.23 Metal Beam Crash Barrier
810

A Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a


"W" metal beam crash barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2m center to
center, 1.8 m high, 1.1m below ground/road level, all steel parts and
fitments to be galvanized by hot dip process, all fitting to conform to metre 3,475.00
IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post
with a spacer of channel section 150mmX75mmX5mm, 330mm long
complete as per clause 810.)

B Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and


erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 85 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced
2m center to center, 12 m high, 1.15m below ground level, all steel
parts and fitments to be galvanized by hot dip process, all fitting to metre 4,952.00
conform to IS:1367 and IS:1364, metal beam rail to be fixed on the
vertical post with a spacer of channel section 150mmX75mmX5mm,
546mm long complete as per clause 810.)

8.25 Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and
erecting a wire rope safety barrier with vertical posts of medium weight
RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long
0.85 m above ground and 0.65 m below ground level, split at the
bottom for better grip , embeded in M-15 grade cement concrete
450mmX450mmX450mm, 1.50m center to center with 4 horizantal
steel wier rope 40mm dia and anchored at terminal posts 15m apart.
Terminal posts to be embeded in M15 grade cement concrete metre 8,969.00
foundation 2400X450X900mm(Depth), strengthed by a strut of Rs
joists 100X75mm. 2m long at 450 inclination and a tie 100 X 8mm,
1.50m long at the bottom, all embeded in foundation concrete as per
approved design and drawing rate excluding excavation and cement
concrete.)

8.26 Anti - Glare Devices in Median


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Plantation (Plantation of shrubs and plants of approved species in the


median. apart from cutting off glare from vehicle coming from opposite
direction, these plants provide a pleasant envoirenment and are eco-
friendly. The rate for this item is available in the chapetr 11 on
horticulture.
A Anti - Glare Screen with 25 mm steel pipe framework fixed with
circular and rectangular vans (Providing and erecting an anti - glare
screen with 25 mm dia vertical pipes fabricated and framed in the form
of panels of one metre length and 1.75 mtr height fixed with circular
vane 250mm dia at top and rectangular vane 600mmX300mm at the
metre 6,525.00
middle, made out of steel sheet of 3 mm thickness, end vertical pipes
of the panel made larger for embedding in foundation concrete,
applying 2 coats of paints on all exopsed surfaces, all as per approved
design and drawings.

B Anti - Glare Screen with Rectangular Vane of MS sheet (Providing


and erecting anti - glare screen with rectangular vanes of size 750 x
500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x
50 x 6 mm at an angle of 450 to the direction of flow traffic, 1.5m
center to center, top edge of the screen 1.75m above th ground level, metre 958.00
vertical posts firmly embeded in cement concrete foundation 0.60 m
below ground level, applying two coats of paints on the exposed faces,
all complete as per approved drawing and designs.)

8.28 Lighting on Bridges


Providing and fixing lighting on bridges, mounted on steel hollow
circular poles of standard specifications, 5 m high fixed on parapets
Each 24,762.00
with cement concrete, 20 m apart and fitted with sodium vapour lamp

8.29 Cable Duct Across the Road (Providing and laying of a reinforced
cement concrete pipe duct, 300 mm dia, across the road (new
construction), extending from drain to drain in cuts and toe of slope to
toe of slope in fills, constructing head walls at both ends, providing a
minimum fill of granular material over top and sides of RCC pipe as per
IRC:98-1997, bedded on a 0.3 mm thick layer of gtranular material free
of rock pieces, outer to outer distance of pipe at least half dia of pipe
subject to minimum 450mm in case of double and triple row ducts, joint
to be made leak proof , invert level of duct to be above higher than
ground level to prevent entry of water and dirt, all as per IRC: 98-1997
and approved drawings.

(i) Single Row for one utility service metre 4,516.00


(ii) Double Row for two utility services metre 8,654.00
(iii) Triple Row for three utility services metre 12,811.00
8.42 Traffic Impact Attenuators at Abutments and Piers
A With Scrap Tyres (Provision and installation of traffic attenuators at
abutment/pier of flyovers bridges using scrap tyres of size 100 x 20
retrieved from trucks laid in 2 rows and 4 tiers, one above the other sqm 2,852.00
and tied with 20 mm wire rope as per approved design and drawing.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

B Using Plastic/Steel Barrel, Filled with Sand (Provision and


installation of traffic impact attenuator at abutment/pier of flyovers
bridges using plastic/steel barrels 0.60 m dia and 1.0 m in height, filled sqm 1,114.00
with sand in three rows and tied with 20 mm steel wire rope as per
approved design and drawings.)
8.43 Portable Barricade in Construction Zone (Installation of a steel
portable barricade with horizontal rail 300 mm wide, 2.5 m in length
fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5
m in height, horizontal rail painted (2 coats) with yellow and white each 3,159.00
stripes , 150mmin width at an angle of 450, 'A' frame painted with 2
coats of yellow paint, complete as per IRC:SP:55-2001.

8.44 Permanent Type Barricade in Construction Zone


A With Steel Components (Construction of a permanent type barricade
made of steel components, 1.5 m high from road level, fitted with 3
horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle
each 4,970.00
iron vertical support, painted with yellow and white strips 150mm in
width at an angle of 450, complete as per IRC:SP:55-2001.

B With Wooden Components (Construction of a permanent type


barricade made of wooden components, 1.5 m high from road level,
fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x
each 11,613.00
100mm wooden vertical post, painted with yellow and white striups,
150mm in width at an angle of 450, complete as per IRC:SP:55-2001.

C With Bricks (Construction of a permanent type barricade made with


brick work in mud mortar, 1.5 m high, 4 m long, 600 mm thick,
each 26,432.00
plastered with cement mortar 1:6, painted with yellow and white strips)

8.45 Drum Delineator in Construction Zone (Provision of metal


drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm
high, filled with earth for stability, painted in circumferential strips of
each 499.00
alternate black and white 100 mm wide fitted with reflector 3 Nos of 7.5
cm dia, all as per IRC:SP:55-2001.

8.46 Flagman (Positioning of a smart flagman with a yellow vest and a


yellow cap and a red flag 600 x 600 mm securely fastened to a staff 1 each 521.00
m in length for guiding the traffic)
8.47 Providing ‘Sparkle Solar Road Studs, manufactured by Tata B.P. Solar
India Ltd. Of size (125mmx125mm), 90mm height (from bottom of
shank to the top of stud) with detachable battery, m6LEDs-three on
each side for Bi-directional studs/3 LEDs on one side for unidirectional
studs, ultra bright LED in amber and red colour, weight per stud
700+25 gms, flash rate of 50-65 times per minute completely water
resistant and weather proof with replacement warranty and free
maintenance fro one year from the date of installation of stud on road-
(installation should be made using adhesives and procedures
recommended by manufacturer under the supervision of their
competent technician).

a) Bi-directional Stud- each 3,500.00


b) Uni-directional Stud- each 3,400.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.48 Providing spring post of 750mm height, 80mm dia with round base of
200mm dia made of poly urethane with 3 white reflective bands made
each 1,500.00
of HIG retro-reflectorised sheeting and fixing to the ground as per
specifications of manufacturers
8.49 Tree reflector made of heigh intensity grade retro-reflectorised sheeting
fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with
necessary galvanized nail.
a)100mm dia/100mmx100mm. each 89.00
b)150mm dia/150mmx150mm. each 110.00
8.50 Providing Linear Delineator System with Diamond grade reflective
sheeting of size 80cmx10cm, fixing over thin gauge crimped aluminium
sheeting with single colour panels of Yellow/Red/White and fixing to the each 480.00
object as per specification of the manufacturer.

8.51 Providing reflective pavement marker with Micro prismatic lens in both
direction having thermoplastic body adhering to the specification and
guidelines of MoRT&H’s fixed to the road surface using the adhesives
and the procedures recommended by the manufacturers with three each 298.00
months replacement warranty and free maintenance.

8.52 Traffic cones: With rubber base and reflective of 7 inch sleeve, height= 750mm,
eachbottom square: 385mm and weight 4
700.00
8.53 Inter linking chain link for traffic cones. Rm 45.00
8.54 Providing metal tubular delineator (50mm dia and 1.25mm thick) with
15cm reflector made of heigh intensity grade retro reflectorised
sheeting around the pipe at top covered with wire mesh of 20cm length
with two nos of similar reflective bands and bottom fastener M.S.
angle including firmly fixing the delineator to the ground by means of
CC(M-15) foundation of size-(25cmx25cmx25cm), 25cm below ground
to the true line and level as directed by the deptt. With six months
replacement warranty and free maintenance.

a a) 1000mm height. each 596.00


b b) 750mm height. each 510.00
8.55 Providing and erecting of city stud of dimension 220x100x40 mm
plastic body with
a a) One- way reflective- with 1x179 glass element Each 1,300.00
b b) Two- way reflective- with 2x179 glass element Each 1,345.00
8.56 Providing and erecting city stud with shank of dimension 220x100x40
mm
a a) One- way reflective- with 1x179 glass element and 2 anchoring
Each 1,375.00
shanks
b b) Two- way reflective- with 2x179 glass element and 2 anchoring
Each 2,000.00
shanks
8.57 Providing and erecting FT Marker with dimensions
a a) One- way reflective- with dimensions: Dia 100mm x 19 mm, shank length 50 mm, dia of shank
Each 445.0024 mm plastic bo
b b) Two- way reflective- with dimensions 100mm x 19 mm, shank length 50 mm, dia of shank
Each 24 mm plastic body w
640.00
8.58 Providing and erecting Ministar Road studs
a a) One- way reflective(with butyl adhesive) with dimensions :68 x
Each 250.00
34x9.8mm Plastic body with 1x8 glass elements.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

b b) Two- way reflective(with butyl adhesive) with dimensions : 68 x


Each 400.00
34x9.8mm Plastic body with 2x8 glass elements.
8.59 Providing and fixing Reflector for Guard rails for large profile metal
bracket with dimensions:
a a) One- way reflective with 1x213 glass elements. Each 600.00
b b) Two- way reflective with 2x213 glass elements. Each 720.00
8.60 Providing and fixing Reflector for Guard rails for all profile metal
bracket with dimensions:
a a) One- way reflective with 1x166 glass elements. Each 600.00
b b) Two- way reflective with 2x166 glass elements. Each 720.00
8.61 Providing and fixing Reflector for Guard rails for B profile with
dimensions
a a) One- way reflective with 1x166 glass elements.. Each 600.00
b b) Two- way reflective with 2x166 glass elements. Each 720.00
8.62 Providing and fixing Acoustic Wildlife Warning Module(WWA) on
alternate roadside posts,facing away from the road, with screws and
installation can be made on existing wooden, plastic or metal road side Each 1,700.00
posts above the optical wildlife warning reflector.Dimension : Height
125 mm, width 81 mm
8.63 Providing and fixing Optical Wildlife Warning Reflector(WWR) with
colour white or red Dimensions: height 184 mm, width 81mm Each 2,000.00

8.64 Providing and fixing metal road studs for permanent marking comply
with standard EN1463 and BS 873(Part:IV) according to the CIL Each 600.00
requirements to ASTM D 4280 standard.
8.65 Providing and fixing Globemarker with dimensions120x60x16.5

a a) One- way reflective with 1x39 glass elements. Each 515.00


b (b) Two- way reflective with 2x39 glass elements. Each 675.00
8.66 Providing and fixing metal road stud with dimensions 100x100x19.8
mm Length anchoring shank:50 mm Aluminum body with

a a) One- way reflective with 1x43 glass elements Each 500.00


b b) Two- way reflective with 2x43 glass elements Each 600.00
8.67 Providing and fixing metal road stud with dimensions 100x50x20mm
Length anchoring shank:60.4 mm Aluminum body with

a a) One- way reflective with 1x43 glass elements. Each 495.00


b b) Two- way reflective with 2x43 glass elements.. Each 620.00
8.68 Providing and fixing metal road stud with dimensions 149x149x27mm
Length anchoring shank:80 mm Aluminum body with.

a a) One- way reflective with 1x28 glass elements Each 600.00


b b) Two- way reflective with 2x28 glass elements Each 700.00
8.69 Providing and fixing Special road stud with dimensions 220x100x40
mm two anchoring shank plastic body with
a a) One- way reflective with 1x179 glass elements Each 790.00
b b) Two- way reflective with 2x179 glass elements. Each 1,000.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.70 Providing and fixing lane divider with dimensions 220x150x285 mm


base plate 25 mm high Two- way reflective with 1 or 2x128 glass
Each 1,200.00
elements rubber flag with 2 round glass reflectors

8.72 Providing and fixing reflective inserts for road studs with dimensions
112.7x18.25 mm with 76 pieces of glass elements Each 550.00

8.73 Providing and fixing vertical marking with dia.104 mm 256 glass
Each 550.00
elements, distance between the two holes are 56 mm.
8.74 Providing and fixing vertical marking with dia.60 mm 80 glass
Each 300.00
elements, with central hole.
8.75 Providing and erecting Median Markers which shall be made of tough,
high impact resistant, injection-moulded, thermoplastic body with an
isosceles trapezoid structure of length, width and height not less than
15cm, 10cm and 10cm respectively and thickness shall not be less
than 1.8 mm. The palstic used for moulding the Median Marker shall
have a minimum notched izod impact strength value 600 J/m at room
temparature, when tested in accordance with ASTM D256 shall retain
70% of this value when sujected to accelerated weathering for 1000
hours as per ASTM G 155. The logo of the manufacturer shall be
embossed on either side of the body in the injection molding process.
The median marker shall have fluroscent yellow color retro-reflective
sheeting of size not les than 8.5cmX8.5cm and with fully reflective
each 720.00
microprismatic cube corners as its retro-reflective elements and meets
ASTM D 4956 type IX specification. The retro-reflective sheeting shall
be on both sides of the median marker and shall be edge protected wil
height of 6' in the back and tapering off into a slope in front which ends
in 1' vertical drop to meet the bottom layer measuring 8' from the rear
vertical face. 35 such chambers form 1 chain with waterproof joining
arrangements at its both ends that shall end in flaps to cover the first
cell of the connected chain

8.76 Providing and fixing reflectors for concrete barriers with dimensions
(Wallflex Top) 146x88 mm mounting with
a a)One- way reflective with 1x188 glass elements Each 120.00
b b) Two- way reflective with 2x188 glass elements. Each 150.00
8.77 Providing and fixing reflectors for concrete barriers with dimensions
(Wallflex Side) 128x110 mm mounting with
a a) One- way reflective with 1x346 glass elements. Each 120.00
b b) Two- way reflective with 2x346 glass elements Each 150.00
8.78 Providing and fixing signflash A630 solar flashing LED unit width 630
mm. integrated control unit and battery.(warning system for pedestrian Each 2,500.00
crossing)
8.79 Providing and fixing swaroline module100 6 LEDs per side one or two
Each 2,700.00
way with dimensions 100x105x19 mm.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.80 Aluminium backed Flexible Prismatic Sheeting (AFP) : Supplying,fitting,


fixing of yellow colored alumunium backed flexible prismatic
retroreflective sheeting of 1 ft. width with screen pointed arrow/slant
line pattern in black and a continous roll format,laminated at the back
with a 50 micron Alumunim (AL) foil with pressure sensitive adhesive
and liner and the flexibility,retro-reflectivity and other relevant
properties confirming to Type-VI as ASTM D4956-09 for rebound
devices.Above sheeting shall be flexible and conformable enough to be sqm 950.00
directly applicable on rough concrete,wood or masonry surfaces with a
high performances contact adhesive.The edges of above sheeting shall
be sealed on all four sides after application with a two part epoxy based
structural adhesive and shall be extremely resistant to peel off.

8.81 Supplying of roll sign assembly(temporary portable sign) comprising of


3'x3' rhombus shaped fluorescent orange coloured sign fascia made of
micro prismatic retro-reflective sheeting of type-VI as per ASTMD 4956-
09 depicting work zone signage message which is supported with two
FRP ribs atleast 4mm thick and 3mm wide whose ends are inserted
into the polyester pocket at the back of sign fascia. This assembly is
mounted on the top pole of HE9 or 6069 alumunium square channel
with at least 2mm thickness inserted into a central stand with
adjustable height of range 1600 to 1700 mm from the ground secured
with a tensioned spring.This centre stand shall have a circular quick Each 4,500.00
locking flange with holes and shall be erected upon and fastened to
rectangular rubber based of minimum length,width and height of
700,4000,50 mm respectively and weighting at least 15 kg. The rolled
sign assembly,assisted by tensioned spring,shall be capable of
bending up to 45 deg. and recovering effectively when faced with wind
gusts up to 8l height of 6' in the back and tapering o

8.82 Supplying of delineators(Roadway indicators) not less than 800 mm


high above ground level.The delineators shall have a core and shell
construction which shall be made of tough,high impact
resistant,injection molded thermoplastic outer body.The inner core shall
consist of powdered coated or painted mild steel of minimum thickness
1.00 mm.The delineator should consist of top retro-reflective unit
consisting of white colored micro prismatic non-metallic retro-reflo-
reflective sheeting of minimum exposed area 125sqcm and bottom
retro-reflective unit consist of red colured micro prismatic non -metallic Each 800.00
retro-reflective sheeting with 35 sqcm of minimum exposed area
conforming with IRC-67-210 type x1 standards.The delineator shall be
fixed i into the ground by inserting the root of the delineator up to the
marked portion and by firm concrete filling as per the instruction by
Engineer in Charge.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

8.83 White and yellow coloured retroreflective preformed patterened


pavement markings with pre coated pressure sensitive adhesive of 4"
and/ or 6" width shall be used for marking the roads for improved
visibility in the night time. The retroreflective preformed patterened
pavement markings shall consists of a mixture of high quality polymeric
materials, pigments and glass beads distributed through out its base
cross sectional area, with a reflective layer of micro crystalline ceramic
beads bonded to a durable polyurethane top coat surface. The
patterned surface shall have approximately 50% +/- 15% of the surface
area raised and presenting a near vertical face (B angle of 0 to 60) to RM 850.00
traffic from any direction. The channels between the raised areas shall
be substancially free of exposed beads or particles retroreflectance.
The white and yellow markings shall have the initial expected
retroreflectance values of 500 mcd for white and 250 for yellow under
dry, wet and rainy condition when measured as per ASTM's upto.

8.84 Providing fitting and fixing Solar Traffic Blinker of Diameter 300 mm
Each
of size 365x365x185mm
2,250.00 supported
8.85 Supply of Roll Up Sign for work zone to enhance night time safetyEachfor workers working on the project sit
750.00
8.86 Supply and installation of Reflective Delineator made of high impactEach
resistant plastic i.e.
1,300.00 ABS for outer p
8.87 Supply of Safety Jacket ade from flourescence orange/green/ yellow Each
colour good quality,
185.00polyester fabric
8.88 Supply and applying of AD lite Retro-Reflective paint is a Sqm 90.00
reliable solution to enhance nightime visibility for better road
safety. Using Glass Bead technology, AD lite Retro-Reflective
paint capture,intensifies and reflects light back to the source
making the road objects highly conspicuous. The paint can
easily be applied to varied surfaces like wood, stone, concrete,
plastics etc. , making the paint a single solution for almost all
kinds of ovjects and surfaces. Retro-reflective paint is a
modern tool to increase visibility and reduce accidents

8.89 Supply and installation of Flexible Median Marker made of Each 320.00
flexible thermoplastic body and Avery Dennison’s world class
Type XI Fluorescent Yellow Reflective Sheeting. Flexible
Median Marker helps to make the medians visible at night time
thereby making roads safer for the commuters. Together with
its flexible body, unique bounce-back quality and also it’s
moulded shank design ensures that there is no displacement
and disorientation thereby making the product more durable
and reducing the replacement cost

8.90 Supply & installation of Retro-Reflective Signboards Omnicube Sqm 775.00


Type XI Microprismatic Retro Reflective Sheeting as per ASTM
D4956 and IRC 67 - 2012 Class C made out of 3 mm Thick
ACP Sheet ( 0.25 mm thickness of Aluminium sheet) / 2 mm
Thick Aluminium Sheet as per IRC Guidelines with 10 years
warranty certificate in original from the reflective sheeting
manufacturer
CHAPTER-9
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

PIPE CULVERTS
9.1 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with
crushed stone aggregate 40 mm nominal size mechanically mixed,
cum 6,734.00
placed in foundation and compacted by vibration including curing for 14
408

days.)
9.2 Labour for laying Reinforced cement concrete pipe
NP4/NP3/prestressed concrete pipe for culverts on first class bedding
of granular material /cc M-15 in single row including fixing collar with
cement mortar 1:2,and cost of granular bedding but excluding
2900

excavation, protection works, backfilling, concrete and masonry work in


head wall and parapet,cost of pipe and cost of CC bedding.

(I) With 1st class bedding of granular material


A 1000 mm dia metre 949.00
B 1200 mm dia metre 1,131.00
C 1800 mm dia metre 1,677.00
(II) With 1st class bedding of cc M-15
A 1000 mm dia metre 176.00
B 1200 mm dia metre 272.00
C 1800 mm dia metre 560.00
9.3 Labour for laying Reinforced cement concrete pipe
NP4/NP3/prestressed concrete pipe for culverts on first class bedding
of granular material /cc M-15 in double row including fixing collar with
cement mortar 1:2,and cost of granular bedding but excluding
2900

excavation, protection works, backfilling, concrete and masonry work in


head wall and parapet,cost of pipe and cost of CC bedding.

(I) With 1st class bedding of granular material


A 1000 mm dia metre 2,304.00
B 1200 mm dia metre 3,098.00
C 1800 mm dia metre 5,479.00
(I) With 1st class bedding of cc M-15
A 1000 mm dia metre 352.00
B 1200 mm dia metre 951.00
C 1800 mm dia metre 2,746.00
CHAPTER-10
MAINTENANCE OF ROADS
10.1 Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum,
gravel or a mixture of these, clearing the loose soil, benching for 300
mm width, laying fresh material in layers not exceeding 250 mm and
cum 140.00
3002

compacting with plate compactor or power rammer to restore the


original alignments, levels and slopes.

10.2 Maintenance of Earthen Shoulder (filling with fresh soil) (Making


up loss of material/ irregularities on shoulder( Average 150mm filling
sqm 66.00
3003

)to the design level by adding fresh approved soil and compacting it
with appropriate equipment.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

10.3 Maintenance of Earth Shoulder (stripping excess soil) (Stripping


excess soil from the shoulder ( Average depth of 75mm )surface to
sqm 22.00
3003

achieve the approved level and compacting with plate compactor)

10.4 Filling Pot- holes and Patch Repairs with open - graded Premix
surfacing, 20mm. (Removal of all failed material, trimming of
completed excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat of bitumen emulsion on the sides and
base of excavation as per clause 503, back filling the pot holes with hot
3004.2

bituminous material with paving bitumen 60/70 as per clause 511,


compacting , trimming and finishing the surface to form a smooth
continuous surface, all as per clause 3004.2.

(i)Using Bitumen emulsion CSS-1h as Tack coat sqm 174.00


(ii)Using Bitumen emulsion CSS-1 ( IS:8887-2004) as Tack coat
sqm 176.00
(iii)Using Bitumen emulsion RS-1 as Tack coat sqm 174.00
10.5 Filling Pot- holes and Patch Repairs with - Bituminous concrete,
40mm. (Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface, painting
of tack coat on the sides and base of excavation as per clause 503,
backfilling the pot holes with hot bituminous material as per clause 504,
3004.2

compacting , trimming and finishing the surface to form a smooth


continuous surface, all as per clause 3004.2. ( including carriage up to
initial lead of 5.0Km. from quarry and carriage of mixed materials upto
10.0km. initial lead from mixing plant.)

(i) for grading I Material sqm 405.00


(ii) for grading II Material sqm 412.00
10.6(A) Crack Filling (Filling of crack using slow - curing bitumen emulsion
3004.3.3

and applying crusher dust in case crack are wider than 3mm.) metre 4.29

10.6(B) Filling of Pot Holes with Ready mix Material like HINCOL Road
Bond or Equivalent by removal of all failed materials trimming of
excavated materials to achieve firm vertical faces cleaning of surface
sqm 1,075.00
,application of tackcoat on sides and base of excavation as per
specification and backfilling with HINCOL road Bond or equivalent
complete as directed
10.7 Dusting (Applying crusher dust to areas of road where bleeding of
sqm 3.38
3004.3.4 3004.3.2 3004.4

excess bitumen has occurred.)

10.8 A Fog Seal (ref item 5.17)


sqm 50.00

B Crack Prevention courses. (ref item 5.21)

(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm


sqm 95.00
(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm
sqm 112.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(iii) Stress Absorbing Membrane (SAM) crack width above 9 mm and


sqm 147.00
cracked area above 50 %
(iv) Bitumen Impregnated Geotextile sqm 221.00
C Slurry Seal (ref item 5.15)
3004.5

(i) 5 mm thickness sqm 80.00


(ii) 3 mm thickness sqm 55.00
(iii) 1.5 mm thickness sqm 36.00
D Surface Dressing for maintance works. (ref item 5.9)
3004.6

(i) 19 mm nominal chipping size sqm 101.00


(ii) 13 mm nominal size chipping sqm 77.00
10.9 Repair of joint Grooves with Epoxy Mortar Repair of spalled joint
grooves of contraction joints, longitudinal joints and expansion joints in
metre 1,373.00
3005.1

concrete pavements using epoxy mortar or epoxy concrete)

10.10 Repair of old Joints Sealant (Removal of existing sealant and re


sealing of contraction, longitudinal or expansion joints in concrete metre 116.00
3000 3005.2

pavement with fresh sealant material)


10.11 Hill Side Drain Clearance (Removal of earth from the choked hill side
metre 38.00
drain and disposing it on the valley side manually)
10.12 Land Slide Clearance in soil (Clearance of land slides in soil and
ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the cum 60.00
3000

same on the valley side)


10.13 Land slide Clearance in Hard Rock Requiring Blasting (Clearing of
land slide in hard rock requiring blasting for 50% of the boulders and cum 110.00
3000

disposal of the same on the valley side.)


10.14 Snow Clearance on Roads with Dozer (Snow clearance from road
surface by a bull- dozer 165 Hp and disposing it on the valley side) cum 4.00

CHAPTER-11
HORTICULTURE
11.1 Spreading of Sludge Farm Yard Manure or/and good Earth
(Spreading of sludge farm yard manure or/ and good earth in required
cum 24.00
thickness (cost of sludge, farm- yard manure or/and good earth to be
307

paid for separately))


11.2 Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including
watering and maintenance of the lawn for 30 days or more till the grass
forms a thick lawn free from weeds and fit for moving including
307

supplying good earth if needed)


(i) In rows 15 cm apart in either direction sqm 73.00
(ii) In rows 7.5 cm apart in either direction sqm 139.00
11.3 Making Lawns including Ploughing and Dragging with 'Swagha'
Breaking of Clod (Making lawns including ploughing and breaking of
clod, removal of rubbish, dressing and supplying doobs grass roots
sqm 104.00
and planting at 15 cm apart, including supplying and spreading of farm
307

yard manure at rate of 0.18cum per 100 sqm


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

11.4 Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns


or Turfing of slopes (rough grassing) for a period of one year sqm 628.00
307

including watering etc)


11.5 Turfing Lawns with Fine Grassing including Ploughing, Dressing
(Turfing lawns with fine grassing including ploughing, dressing
including breaking of clods, removal of rubbish, dressing and
sqm 109.00
supplying doobs grass roots at 10 cm apart, including supplying and
307

spreading of farm yard manure at a rate of 0.60 cum per 100 sqm

11.6 Maintenance of Lawns with Fine Grassing for the First Year
Maintenance of lawns with fine grassing for the first year including sqm 550.00
307

watering etc.
11.7 a) Planting Permanent Hedges including Digging of Trenches
(Planting permanent hedges including digging of trenches, 60 cm wide
and 45 cm deep, refilling the excavated earth mixed with farmyard
metre 1,032.00
manure, supplied at the rate of 4.65 cum per 100 metres and
307

supplying and planting hedge plants at 30cm apart

b). Maintenance of Hedge for one year metre 414.00


11.8 a) Planting Flowering Plants and Shrubs in Central Verge
km 1,10,096.00
307.00

b). Maintenance of Flowering Plants and Shrubs in Central Verge for


km 3,40,718.00
one Year
11.9 Planting of Trees and their Maintenance for one Year (Planting of
trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep
dug in the ground, mixing the soil with decayed farm yard/sludge
each 1,763.00
mannure, planting the saplings, backfilling the trenches, watering ,
307

fixing the tree guatrd and maintaining the plants for one year.

11.10 Renovation Lawns including, Weeding, Forking the Ground, Top


Dressing with Forked Soil (Renovation lawns including, weeding,
forking the ground, top dressing with forked soil, watering and
maintenance the lawns, for 30 days or more, till the grass forms a
sqm 30.00
thick lawns, free from weeds, and fit for moving and disposal of rubbish
308

as directed, including supplying good earth, if needed but excluding the


cost of well decayed farm yard manure.

11.11 Supply at Site Well Decayed Farm Yard Manure (Supply at site of
work well decayed farm yard manure, from any available source,
cum
308.20

approved by the engineer in charge including screening and stacking)

11.12 Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of
work/ store- deoiled neem cake duly packed in used gunny bags) quintal

11.13 Supplying Sludge (Supplying sludge duly stacked at site/ store)


cum
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

11.14 Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre
1.25 metres, and height 1.2 metres, above ground and 0.20 metre
below ground bottom two course laid dry, and top tree courses in
cement mortar 1:6 (1cement 6 sand) and the intermediate coursees
being in dry honey comb masonry, as per design complete. (Half brick each 3,284.00
circular tree guard, in 2nd class brick, internal diametre 1.25 metres,
and height 1.2 meter.)

11.15 Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd
class bricks, laid dry lengthwise, including excavation, refilling,
metre 68.00
consolidation, with a hand packing and spreading nearly surplus earth
within a lead of 50 metres)
11.16 Making Tree Guard 53 cm dia and 1.3 m high as per design from
empty bitumen drum (Making tree guard 53 cm dia and 1.3 m high as
per design from empty bitumen drum, slit suitably to permit sun and
air, (supplied by the department at stock issue rate) including providing each 490.00
and fixing 2 nos MS sheet rings 50mmX0.5mm with rivets, complete in
all respects.

11.17 Making Tree Guard 53 cm dia and 2 metres high as per design
from empty bitumen drums (Making tree guard 53 cm dia and 2
metres high as per design from empty bitumen drums, slit suitably to
permit sun and air, ( supplied by the department at stock issue rate.)
each 980.00
including providing and fixing four legs 40 cm long of 30mmx 3mm MS
riveted to tree guard and providing and fixing 2 nos. MS sheet ring
50mm with rivets complete in alll respects.

11.18 Wrought Iron and Mild Steel Welded Work (Wrought iron and mild
steel welded work) (using angles, square bars, tees and channel
grills, grating frames, gates and tree guards of any size and design
etc. including cost of screens and welding rods or bolt and nuts quintal 8,871.00
complete fixed in position but without the cost of excavation and
concrete for mixing which will be paid separately.

11.19 Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60
cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6
mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm)
iron rings in two halves, bolted together with 8 mm dia and 30mm longeach tree guard 2,174.00
bolts including painting two coats with paint pf approved brand over a
coat of priming , complete in alll respects.

11.20 Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing
tree guard 0.60 metre square, 2.00 metre high fabricated with MS
angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire 3 mmeach tree guard 3,285.00
dia welded and fabricated as per design in two halves bolted together.

11.21 Compensatory Afforestation (Planting trees as compensatory


afforestation at the rate of 290 trees per hectare at a spacing of 6 m by
grubbing and leveling the ground upto a depth of 150 mm, digging
hectare 2,02,068.00
holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil ,
planting of sapling 2m high with 25cm dia stem, backfilling the hole and
watering.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

CHAPTER-12
FOUNDATIONS
12.1 Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification, including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with
304

approved material.

I Ordinary soil
A Manual Means
(I) Without dewatering
(i) upto 3 m depth cum 135.00
(ii) 3 m to 6 m depth cum 173.00
(iii) Above 6 m depth cum 231.00
(II) With dewatering
(i) upto 3 m depth cum 148.00
(ii) 3 m to 6 m depth cum 199.00
(iii) Above 6 m depth cum 278.00
B Mechanical Means
(I) Without dewatering
(i) Depth upto 3 m cum 63.00
(ii) Depth 3 m to 6 m cum 72.00
(iii) Depth above 6m cum 88.00
(II) With dewatering
(i) Depth upto 3 m cum 66.00
(ii) Depth 3 m to 6 m cum 77.00
(iii) Depth above 6m cum 96.00
II Ordinary rock (not requiring blasting)
A Manual Means
(I) Without dewatering
Depth upto 3 m cum 193.00
(ii)With dewatering
Depth upto 3 m cum 212.00
B Mechanical Means
(I) Without dewatering
Depth upto 3 m cum 80.00
(ii) With dewatering
Depth upto 3 m 86.00
III Hard rock ( requiring blasting )
A Manual Means
(I) Without dewatering cum 501.00
(ii) With dewatering cum 506.00
IV Hard rock ( blasting prohibited )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A Mechanical Means
(I) Without dewatering cum 906.00
(ii) With dewatering cum 981.00
V Marshy soil
(i) upto 3 m depth
A Manual means
(I) Without dewatering cum 665.00
(ii) With dewatering cum 761.00
B Mechanical Means
(I) Without dewatering cum 190.00
(ii) With dewatering cum 221.00
VI Back Filling in Marshy Foundation Pits cum 541.00
12.2 Filling Annular Space Around Footing in Rock (Lean cement
concrete 1:3:6 nominal mix. Rate may be taken as per items 12.4.) cum 7,267.00
304

12.3 Sand Filling in Foundation Trenches as per Drawing & Technical


cum 1,713.00
Specification
304

12.4 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in
foundation with crushed stone aggregate 40 mm nominal size
cum 7,267.00
2100

mechanically mixed, placed in foundation and compacted by vibration


including curing for 14 days.)
12.5 Brick masonry work in cement mortar 1:3 in foundation complete
excluding pointing and plastering, as per drawing and technical cum 9,548.00
1300

specifications
12.6 A Cement mortar1:3 (1cement :3 sand) cum 4,605.00
B Cement mortar1:2 (1cement :2 sand) cum 5,511.00
C Cement mortar1:4 (1cement :4 sand) cum 3,998.00
D Cement mortar1:6 (1cement :6 sand) cum 3,491.00
12.7 Stone masonry work in cement mortar 1:3 in foundation complete as
1400

drawing and Technical Specification


(a) Square Rubble Coursed rubble masonry( first sort ) cum 7,509.00
(b) Random Rubble Masonry
cum 6,026.00
1500,1700 & 2100 1405.3

12.8 Plain/Reinforced cement concrete, in open foundation complete


as per drawing and technical specification including steel
shuttering formwork.

(N) Without plasticiser


A PCC Grade M15 cum 7,336.00
B PCC Grade M20 cum 7,945.00
C (I)RCC Grade M20
Case I Using concrete mixer cum 7,992.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7,680.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

D PCC Grade M25


Case I Using concrete Mixer cum 8,408.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,100.00
E RCC Grade M25
Case I Using concrete Mixer cum 8,461.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,150.00
F PCC Grade M30
Case I Using Concrete Mixer cum 8,441.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,128.00
G RCC Grade M30
Case I Using Concrete Mixer cum 8,470.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,160.00
H RCC Grade M35
Case I Using Concrete Mixer cum 8,562.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,254.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
1500,1700 & 2100

entraining and water reducing plasticiser ( Masterplast PAE or


equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.

A PCC Grade M15 cum 8,210.00


B PCC Grade M20 cum 9,037.00
C (I)RCC Grade M20
Case I Using concrete mixer cum 9,095.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,781.00
D PCC Grade M25
Case I Using concrete Mixer cum 9,720.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,412.00
E RCC Grade M25
Case I Using concrete Mixer cum 9,786.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,473.00
F PCC Grade M30
Case I Using Concrete Mixer cum 9,768.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,454.00
G RCC Grade M30
Case I Using Concrete Mixer cum 9,802.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,492.00
H RCC Grade M35
Case I Using Concrete Mixer cum 9,937.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,629.00
12.9 Providing and constructing temporary island 16 m diameter for
1200

construction of well foundation for 8m dia. Well.


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A Assuming depth of water 1.0 m and height of island to be 1.25m.


each 1,40,803.00
B Assuming depth of water 4.0 m and height of island 4.5 m. each 10,28,368.00
C Providing and constructing one span service road to reach island
metre 5,715.00
location from one pier location to another pier location
12.10 Providing and laying cutting edge of mild steel weighing 40 kg per
1900

metre for well foundation complete as per drawing and technical


specification.
tonne 98,181.00
1200, 1500 & 1700 1200 &

12.11 Plain/Reinforced cement concrete, in well foundation complete as


per drawing and technical specification including steel shuttering
formwork.

(N) Without plasticiser


A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 9,222.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,894.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 9,788.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,458.00
(iii) RCC M30 Grade
Case I Using concrete mixer cum 9,821.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,493.00
(iv) RCC M35 Grade
Case I Using concrete mixer cum 9,976.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,648.00
B Well steining
(I) PCC M15 Grade cum 7,935.00
(ii) PCC M20 Grade cum 8,404.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 8,454.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,153.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 8,915.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,618.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 8,972.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,670.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(vi) PCC M30 Grade


Case I Using concrete mixer cum 8,970.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,668.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 9,002.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,702.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 9,145.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8,844.00
(ix) RCC M40 Grade (With Batching Plant, Transit Mixer and Concrete
cum 8,888.00
Pump)
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 8,663.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,910.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 8,893.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8,166.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 8,975.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8,222.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 9,099.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8,342.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 8,305.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,577.00
(ii) Grade M25 PCC
Case I Using Concrete Mixer cum 8,552.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,821.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 8,602.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,874.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 7,214.00
(ii) Grade M20 PCC
Case I Using Concrete Mixer cum 7,640.00
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 8,105.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,834.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(iv) Grade M30 PCC


Case I Using Concrete Mixer cum 8,155.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7,880.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 7,940.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7,626.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 8,461.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,150.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 8,470.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,159.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 8,562.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,253.00
(v) RCC M40 Grade cum 8,366.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
entraining and water reducing plasticiser ( Masterplast PAE or
1200, 1500 & 1700

equivalent) and accelerating plasticiser ( Masterplast ACPL or


equivalent) conforming to IS-9103-1999.

A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 10,494.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,165.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 11,319.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,990.00
(iii) RCC M30 Grade
Case I Using concrete mixer cum 11,365.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 11,039.00
(iv) RCC M35 Grade
Case I Using concrete mixer cum 11,579.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 11,251.00
B Well steining
(I) PCC M15 Grade cum 9,101.00
(ii) PCC M20 Grade cum 9,570.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 9,620.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,317.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(iv) PCC M25 Grade


Case I Using concrete mixer cum 10,306.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,009.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 10,376.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,074.00
(vi) PCC M30 Grade
Case I Using concrete mixer cum 10,382.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,078.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 10,418.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,119.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 10,614.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,314.00
(ix) RCC M40 Grade cum 10,385.00
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 9,849.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,096.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 10,249.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,492.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 10,322.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,569.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 10,492.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,735.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 9,434.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8,707.00
(ii) Grade M25 PCC
Case I Using Concrete Mixer cum 9,816.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,084.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 9,885.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,194.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 8,274.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(ii) Grade M20 PCC


Case I Using Concrete Mixer cum 8,700.00
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 9,369.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,099.00
(iv) Grade M30 PCC
Case I Using Concrete Mixer cum 9,438.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 9,162.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 9,023.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8,708.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 9,786.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,475.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 9,802.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,491.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 9,937.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 9,629.00
(v) RCC M40 Grade Using Batching Plant, Transit Mixer and Concrete
cum 9,784.00
Pump
12.12 Sinking of 6 m external diameter well ( other than pneumatic
method of sinking ) through all types of strata namely sandy soil,
clayey soil and rock as shown against each case, complete as
1200

per drawing and technical specifications. Depth of sinking is


rekonewedfrom bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 7,199.00
(ii) Beyond 3m upto 10m depth metre 10,445.00
(iii) Beyond 10m upto 20m metre 13,795.00
(iv) Beyond 20m upto 30 m
a For sinking metre 25,876.00
b For sinking including kentledge metre 31,052.00
(v) Beyond 30m upto 40 m
a For sinking metre 61,479.00
b For sinking including kentledge metre 73,775.00
B Clayey soil ( 6m dia. Well )
(i) Depth below bed level upto 3.0 M metre 10,467.00
(ii) Beyond 3m upto 10m depth metre 23,548.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 31,099.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

b For sinking including kentledge metre 32,654.00


(iv) Beyond 20m upto 30 m
a For sinking metre 58,336.00
b For sinking including kentledge metre 72,921.00
c For sinking including kentledge & dewatering if required. metre 76,567.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,38,601.00
b For sinking including kentledge metre 1,66,321.00
c For sinking including kentledge & dewatering if required. metre 1,74,637.00
C Soft rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 28,179.00
D Hard rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 30,182.00
12.13 Sinking of 7 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 10,999.00
(ii) Beyond 3m upto 10m depth metre 15,138.00
(iii) Beyond 10m upto 20m metre 19,993.00
(iv) Beyond 20m upto 30 m
a For sinking metre 37,499.00
b For sinking including kentledge metre 44,999.00
(v) Beyond 30m upto 40 m
a For sinking metre 89,093.00
b For sinking including kentledge metre 1,06,912.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 15,138.00
(ii) Beyond 3m upto 10m depth metre 24,444.00
(iii) Beyond 10 m upto 20 m
(a) For sinking metre 32,282.00
b For sinking including dewatering, if required., if required metre 33,897.00
(iv) Beyond 20m upto 30 m
a For sinking metre 60,554.00
b For sinking including kentledge metre 75,692.00
c For sinking including kentledge & dewatering, if required. metre 79,477.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,43,866.00
b For sinking including kentledge metre 1,72,640.00
c For sinking including kentledge & dewatering, if required. metre 1,81,272.00
C Soft rock ( 7m dia well )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(i) Depth of soft rock strata upto 3m metre 26,012.00


D Hard rock ( 7m dia well )
(i) Depth upto 3 m metre 33,190.00
12.14 Sinking of 8 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 13,691.00
(ii) Beyond 3m upto 10m depth metre 16,964.00
(iii) Beyond 10m upto 20m metre 22,405.00
(iv) Beyond 20m upto 30 m
a For sinking metre 42,027.00
b For sinking including kentledge metre 50,432.00
(v) Beyond 30m upto 40 m
a For sinking metre 99,851.00
b For sinking including kentledge metre 1,19,821.00
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 18,516.00
(ii) Beyond 3m upto 10m depth metre 25,270.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 33,374.00
b Adding for dewatering @ 5% of cost, if required. metre 35,043.00
(iv) Beyond 20m upto 30 m
a For sinking metre 62,602.00
b For sinking including kentledge metre 78,252.00
c For sinking including kentledge & dewatering, if required. metre 82,165.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,48,733.00
b For sinking including kentledge metre 1,78,479.00
c For sinking including kentledge & dewatering, if required. metre 1,87,403.00
C Soft rock ( 8m dia well )
(i) Depth in soft rock strata upto 3m metre 28,687.00
D Hard rock ( 8m dia well )
(i) Depth in hard rock strata upto 3 m metre 32,559.00
12.15 Sinking of 9 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 13,802.00
(ii) Beyond 3m upto 10m depth metre 18,632.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(iii) Beyond 10m upto 20m metre 24,605.00


(iv) Beyond 20m upto 30 m
a For sinking metre 46,153.00
b Adding 20% of cost for Kentledge including supports, loading
metre 55,384.00
arrangement and Labour .
(v) Beyond 30m upto 40 m
a For sinking metre 1,09,654.00
b For sinking including kentledge metre 1,31,585.00
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 19,482.00
(ii) Beyond 3m upto 10m depth metre 27,264.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 36,007.00
b For sinking including dewatering, if required metre 37,807.00
(iv) Beyond 20m upto 30 m
a For sinking metre 67,540.00
b For sinking including kentledge metre 84,425.00
c For sinking including kentledge & dewatering, if required. metre 88,646.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,60,464.00
b For sinking including kentledge metre 1,92,556.00
c For sinking including kentledge & dewatering, if required. metre 2,02,184.00
C Soft rock ( 9m dia well )
(i) Depth upto 3m metre 34,621.00
D Hard rock ( 9m dia well )
(i) Depth of hard rock strata upto 3 m metre 37,615.00
12.16 Sinking of 10 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 16,805.00
(ii) Beyond 3m upto 10m depth metre 19,611.00
(iii) Beyond 10m upto 20m metre 25,900.00
(iv) Beyond 20m upto 30 m
a For sinking metre 48,583.00
b For sinking including kentledge metre 58,299.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,15,428.00
b Adding 20% of cost for Kentledge including supports, loading
metre 1,38,514.00
arrangement, and Labour etc.
B Clayey soil (10m dia. Well )
(i) Depth below bed level upto 3.0 M metre 21,066.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(ii) Beyond 3m upto 10m depth metre 26,644.00


(iii) Beyond 10 m upto 20 m
a For sinking metre 35,188.00
b Adding for dewatering @ 5% of cost, if required. metre 36,947.00
(iv) Beyond 20m upto 30 m
a For sinking metre 66,004.00
b For sinking including kentledge metre 82,505.00
c For sinking including kentledge & dewatering, if required. metre 86,630.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,56,818.00
b For sinking including kentledge metre 1,88,182.00
c For sinking including kentledge & dewatering, if required. metre 1,97,591.00
C Soft rock (10m dia well )
(i) Depth of soft rock strata upto 3m metre 37,035.00
D Hard rock (10m dia well )
(i) Depth of hard rock strata upto 3 m metre 44,899.00
12.17 Sinking of 11 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 39,242.00
(ii) Beyond 3m upto 10m depth metre 29,320.00
(iii) Beyond 10m upto 20m metre 38,722.00
(iv) Beyond 20m upto 30 m
a For sinking metre 72,633.00
b For sinking including kentledge metre 87,159.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,72,564.00
b For sinking including kentledge metre 2,07,077.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 35,111.00
(ii) Beyond 3m upto 10m depth metre 54,691.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 72,230.00
b For sinking including dewatering, if required metre 75,842.00
(iv) Beyond 20m upto 30 m
a For sinking metre 1,35,485.00
b For sinking including kentledge metre 1,69,356.00
c For sinking including kentledge & dewatering, if required. metre 1,77,824.00
(v) Beyond 30m upto 40 m
a For sinking metre 3,21,892.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

b For sinking including kentledge metre 3,86,271.00


c For sinking including kentledge & dewatering, if required. metre 4,05,584.00
C Soft rock (11m dia well )
(i) Depth of soft rock strata upto 3m metre 82,966.00
D Hard rock (11m dia well )
(i) Depth of hard rock upto 3 m metre 1,01,879.00
12.18 Sinking of 12 m external diameter well ( other than pneumatic method
of sinking ) through all types of strata namely sandy soil, clayey soil
and rock as shown against each case, complete as per drawing and
1200

technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 80,179.00
(ii) Beyond 3m upto 10m depth metre 89,117.00
(iii) Beyond 10m upto 20m metre 1,17,695.00
(iv) Beyond 20m upto 30 m
a For sinking metre 2,20,766.00
b For sinking including kentledge metre 2,64,919.00
(v) Beyond 30m upto 40 m
a For sinking metre 5,24,507.00
b For sinking including kentledge metre 6,29,408.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 86,628.00
(ii) Beyond 3m upto 10m depth metre 1,38,697.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 1,83,175.00
b For sinking including dewatering, if required metre 1,92,333.00
(iv) Beyond 20m upto 30 m
a For sinking metre 3,43,586.00
b For sinking including kentledge metre 4,29,483.00
c For sinking including kentledge & dewatering, if required. metre 4,50,957.00
(v) Beyond 30m upto 40 m
a For sinking metre 8,16,311.00
b For sinking including kentledge metre 9,79,574.00
c For sinking including kentledge & dewatering metre 10,28,552.00
C Soft rock (12m dia well )
(i) Depth of soft rock strata upto 3m metre 1,96,226.00
D Hard rock (12m dia well )
(i) Depth of hard rock strata upto 3 m metre 2,37,085.00
12.19 Sinking of Twin D Type well ( other than pneumatic method of sinking )
through all types of strata namely sandy soil, clayey soil and rock as
shown against each case, complete as per drawing and technical
1200

specifications. Depth of sinking is reckoned from bed level.


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 18,230.00
(ii) Beyond 3m upto 10m depth metre 19,625.00
(iii) Beyond 10m upto 20m metre 25,918.00
(iv) Beyond 20m upto 30 m
a For sinking metre 48,616.00
b For sinking including kentledge metre 58,340.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,15,508.00
b For sinking including kentledge metre 1,38,609.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 21,171.00
(ii) Beyond 3m upto 10m depth metre 29,602.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 39,094.00
b For sinking including dewatering, if required metre 41,049.00
(iv) Beyond 20m upto 30 m
a For sinking metre 73,331.00
b For sinking including kentledge metre 91,664.00
c For sinking including kentledge & dewatering, if required. metre 96,248.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,74,226.00
b For sinking including kentledge metre 2,09,072.00
c For sinking including kentledge & dewatering, if required. metre 2,19,525.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 43,360.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 49,346.00
12.20 Pneumatic sinking of wells with equipment of approved design, drawing
and specifications worked by competent and trained personnel and
comprising of compression and decompression chambers, reducers,
two air locks separately for men and plant & materials

12.21 Sand filling in wells complete as per drawing and technical


cum 1,713.00
1900 1207

specifications
12.22 Providing steel liner 10 mm thick for curbs and 6mm thick for steining
of wells including fabricating and setting out as per detailed drawing

tonne 86,179.00
&
1200
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

12.23A
1700 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750
mm) metre 8,932.00
&
1100

12.23B Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


complete as per drawing and technical specifications and removal of
1700

excavated earth with all lifts and lead upto 1000 m. including providing
plasticiser (Masterplast PL-1/SPL-2 or equivalent), air entraining and
water reducing plasticiser ( asterplast PAE or equivalent) and metre 9,468.00
accelerating plasticiser (Masterplast ACPL or equivalent) conforming to
&

IS-9103-1999 (Pile diameter-750 mm)


1101

12.24A Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


1700

complete as per drawing and technical specifications and removal of


excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000
mm)
metre 14,415.00
1701 1100,1600 &

12.24B Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. including providing
plasticiser (Masterplast PL-1/SPL-2 or equivalent ), air entraining and
metre 15,508.00
1100&1700 1100,1600 &

water reducing plasticiser ( Masterplast PAE or equivalent) and


accelerating plasticiser ( Masterplast ACPL or equivalent) conforming
to IS-9103-1999) (Pile diameter-1000 mm)

12.25A Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 metre 18,270.00
mm)

12.25B Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. including providing
1100&1701

plasticiser (Masterplast PL-1/SPL-2 or equivalent ), air entraining and


water reducing plasticiser ( Masterplast PAE or equivalent) and metre 19,844.00
accelerating plasticiser ( Masterplast ACPL or equivalent) conforming
to IS-9103-1999 (Pile diameter-1200 mm)

12.26A Driven cast-in-place vertical M35 grade R.C.C. pile excluding


1700

reinforcement complete as per drawing and & Technical Specification


(Pile diameter - 750 mm)
metre 5,980.00
1100 &
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

12.26B Driven cast-in-place vertical M35 grade R.C.C. pile excluding


reinforcement complete as per drawing and & Technical Specification
1700

including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),


air entraining and water reducing plasticiser ( Masterplast PAE or metre 6,595.00
equivalent) and accelerating plasticiser ( Masterplast ACPL or
1101 &

equivalent) conforming to IS-9103-1999 (Pile diameter - 750 mm)

12.27A Driven cast-in-place vertical M35 grade R.C.C. piles excluding


1700

reinforcement complete as per drawing and & Technical Specification


(Pile diameter - 1000 mm)
metre 9,643.00
&
1700 1100

12.27B Driven cast-in-place vertical M35 grade R.C.C. piles excluding


reinforcement complete as per drawing and & Technical Specification
including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),
air entraining and water reducing plasticiser ( Masterplast PAE or metre 10,736.00
equivalent) and accelerating plasticiser ( Masterplast ACPL or
&

equivalent) conforming to IS-9103-1999 (Pile diameter - 1000 mm)


1100&1700 1100

12.28A Driven cast-in-place vertical M35 grade R.C.C. piles excluding


reinforcement complete as per drawing and & Technical Specification
(Pile diameter - 1200 mm) metre 14,054.00

12.28B Driven cast-in-place vertical M35 grade R.C.C. piles excluding


reinforcement complete as per drawing and & Technical Specification
including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),
1100&1701

air entraining and water reducing plasticiser ( Masterplast PAE or metre 15,628.00
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999 (Pile diameter - 1200 mm)

12.35 Driven vertical steel piles complete as per drawing and &
Technical Specification (Section of the pile - H Section steel column metre 6,286.00
400 x 250 mm (ISHB Series) )
12.36 Driven vertical steel piles complete as per drawing and &
Technical Specification (Section of the pile - H Section steel column metre 7,105.00
450 x 250 mm (ISHB Series) )
12.37 Pile load test on single vertical pile in accordance with
Ton 363.00
1100

IS:2911(Part-IV). i) Initial and Routine load test.


ii) Lateral load test Ton 6,050.00
12.38 (I) Cement concrete for reinforced concrete in pile cap complete as
1100, 1500 & 1700

per drawing and Technical Specification.

A RCC Grade M20


(i) Using Concrete Mixer cum 7,941.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7,672.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

B RCC Grade M25


(i) Using concrete mixer. cum 8,448.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8,179.00
C RCC Grade M30
(i) Using concrete mixer. cum 8,512.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8,243.00
D RCC Grade M35
(i) Using concrete mixer. cum 8,646.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8,377.00
12.38 (II) Cement concrete for reinforced concrete in pile cap complete as per
drawing and Technical Specification including providing plasticiser (
1100, 1500 & 1700

Masterplast PL-1/SPL-2 or equivalent ), air entraining and water


reducing plasticiser ( Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-
1999.

A RCC Grade M20


(i) Using Concrete Mixer cum 9,024.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8,755.00
B RCC Grade M25
(i) Using concrete mixer. cum 9,762.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 9,493.00
C RCC Grade M30
(i) Using concrete mixer. cum 9,851.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 9,582.00
D RCC Grade M35
(i) Using concrete mixer. cum 10,035.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 9,766.00
12.39 Levelling course for Pile cap
1100 &1700

cum 7,029.00

12.40 Reinforcement in Foundation: Supplying, fitting and placing un-


coated TMT bar reinforcement in foundation complete as per drawing
1600

and technical specifications


(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500 N/mmtonne 68,070.00
(ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm
2
tonne 68,255.00
12.41 Supplying, fitting and placing un-coated Mild steel reinforcement
complete in foundation as per drawing and technical specification tonne 63,129.00
1600

CHAPTER-13
SUB-STRUCTURE
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

13.1 Brick masonry work in 1:3 in sub-structure complete excluding pointing


and plastering, as per drawing and technical specifications
1400 & 2200 1300 & 2200 1300 & 2200 1300 & 2200

cum 9,699.00

13.2 Pointing with cement mortar (1:3 ) on brick work in substructure as per
Technical specifications
sqm 72.00

13.3 Plastering with cement mortar (1:3 ) on brick work in sub-structure as


per Technical specifications
sqm 141.00

13.4 Stone masonry work in cement mortar 1:3 for substructure complete as
per drawing and Technical Specifications

A Random Rubble Masonry cum 5,968.00


B Coursed rubble masonry (first sort ) cum 6,356.00
C Ashlar masonry ( first sort ) cum 9,117.00
13.5 (N) Plain/Reinforced cement concrete, in sub structure complete as per
drawing and technical specification and steel shuttering formwork
1500,1700 & 2200

(N) Without plasticiser


A PCC Grade M15 cum 7,935.00
Height upto 5m
B PCC Grade M20 cum 8,404.00
Height upto 5m
C PCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 8,915.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,618.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,239.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,931.00
c Height above 10m
Case I Using concrete Mixer cum 9,645.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,323.00
D PCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 8,970.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,668.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,297.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,984.00
c Height above 10m
Case I Using concrete Mixer cum 9,704.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,378.00
E RCC Grade M20
a Height upto 5m
Case I Using concrete Mixer cum 8,454.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,153.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8,761.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,449.00
c Height above 10m
Case I Using concrete Mixer cum 9,145.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,820.00
F RCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 8,972.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,670.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,266.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,954.00
c Height above 10m
Case I Using concrete Mixer cum 9,706.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,379.00
G RCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 9,002.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,702.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,256.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,947.00
c Height above 10m
Case I Using concrete Mixer cum 9,698.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,374.00
H RCC Grade M35
a Height upto 5m
Case I Using concrete Mixer cum 9,145.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,844.00
b Height 5m to 10m
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Case I Using concrete Mixer cum 9,344.00


CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,037.00
c Height above 10m
Case I Using concrete Mixer cum 9,643.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,327.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
entraining and water reducing plasticiser ( Masterplast PAE or
equivalent) and accelerating plasticiser( Masterplast ACPL or
equivalent) conforming to IS-9103-1999
A PCC Grade M15
Height upto 5m cum 9,101.00
B PCC Grade M20
Height upto 5m cum 9,570.00
C PCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 10,306.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,009.00
b Height 5m to 10m
Case I Using concrete Mixer cum 10,681.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,931.00
c Height above 10m
Case I Using concrete Mixer cum 11,150.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,828.00
D PCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 10,382.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,078.00
b Height 5m to 10m
Case I Using concrete Mixer cum 10,759.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,445.00
c Height above 10m
Case I Using concrete Mixer cum 11,231.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,903.00
E RCC Grade M20
a Height upto 5m
Case I Using concrete Mixer cum 9,620.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,317.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,969.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,656.00
c Height above 10m
Case I Using concrete Mixer cum 10,407.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,080.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

F RCC Grade M25


a Height upto 5m
Case I Using concrete Mixer cum 10,376.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,074.00
b Height 5m to 10m
Case I Using concrete Mixer cum 10,716.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,404.00
c Height above 10m
Case I Using concrete Mixer cum 11,225.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,898.00
G RCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 10,418.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,119.00
b Height 5m to 10m
Case I Using concrete Mixer cum 10,712.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,404.00
c Height above 10m
Case I Using concrete Mixer cum 11,128.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,809.00
H RCC Grade M35
a Height upto 5m
Case I Using concrete Mixer cum 10,614.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,314.00
b Height 5m to 10m
Case I Using concrete Mixer cum 10,846.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,539.00
c Height above 10m
Case I Using concrete Mixer cum 11,193.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 10,876.00
13.6 Supplying, fitting and placing TMT bar reinforcement in sub-structure
complete as per drawing and technical specifications

(i) 'TMT CRS ( Fe-500)reinforcement bar tonne 68,210.00


(ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm
2
tonne 71,860.00
(iii)TMT reinforcement bar (Fe-415) tonne 68,395.00
13.7 Supplying, fitting and placing Mild steel reinforcement complete in sub-
structure as per drawing and technical specification tonne 62,175.00

13.8 Providing weep holes in Brick masonry/Plain/Reinforced concrete


abutment, wing wall/return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of 1V :20H towards each 275.00
drawing foce. Complete as per drawing and Technical specification.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

13.9 Back filling behind abutment, wing wall and return wall complete as
per drawing and Technical specification
A Granular material cum 3,178.00
B Sandy material cum 1,967.00
13.10 Providing and laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRTH specifications to a thickness of not less than 600
mm with smaller size towards the soil and bigger size toeards the wall
and provided over the entire surfaces behind the abutement, wing wall cum 3,598.00
and return wall to the full height compacted to firm condition complete
as per drawing and technical specification.

13.11 Supplying, fitting and fixing in position true to line and level cast steel
rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003
of MoRTH specifications complete including all accessories as pertonne capacity 733.00
drawing and Technical Specifications.

13.12 Supplying, fitting and fixing in position true to line and level forged
steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause
2003 of MoRTH specifications complete including all accessories astonne capacity 767.00
per drawing and Technical Specifications.

13.13 Supplying, fitting and fixing in position true to line and level sliding
plate bearing with PTFE surface sliding on stainless steel complete
including all accessories as per drawing and Technical Specificationstonne capacity 206.00
and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of
MORT&H specification.
13.14 Supplying, fitting and fixing in position true to line and level elastomeric
bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of
cubic centimetre 0.64
MoRTH specifications complete including all accessories as per
drawing and Technical Specifications.
13.15 Supplying, fitting and fixing in position true to line and level sliding
plate bearing with stainless steel plate sliding on stainless steel plate
tonne capacity 200.00
with mild steel matrix complete including all accessories as per drawing
and Technical Specifications.
13.16 Supplying, fitting and fixing in position true to line and level POT-PTFE
bearing consisting of a metal piston supported by a disc or
unreinforced elastomer confined within a metal cylinder, sealing rings,
dust seals, PTFE surface sliding against stainlesssteel matting
surfaces, complete assembly to be of cast steel/fabricated structural
steel, meatal and elastomer elements to be as per IRC:83 part-I &IItonne capacity 200.00
respectively and parts conforming to BS:5400, section 9.1 & 9.2 and
clause 2006 of MORTH&S Specification complete as per drawing and
approved technical specification.

CHAPTER-14
SUPER-STRUCTURE
14.1 Furnishing and Placing Reinforced/Prestressed cement concrete
in super-structure as per drawing and Technical Specification'
including steel shuttering formwork.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(N) Without Plasticiser


A RCC Grade M20
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 9,161.00
b Height 5m to 10m cum 9,543.00
c Height above 10m cum 9,925.00
(ii) For T-beam & slab
a Height upto 5m cum 9,543.00
b Height 5m to 10m cum 9,925.00
c Height above 10m cum 10,306.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 8,799.00
b Height 5m to 10m cum 9,166.00
c Height above 10m cum 9,532.00
(ii) For T-beam & slab
a Height upto 5m cum 9,166.00
b Height 5m to 10m cum 9,532.00
c Height above 10m cum 9,899.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 9,747.00
b Height 5m to 10m cum 10,153.00
c Height above 10m cum 10,559.00
(ii) For T-beam & slab
a Height upto 5m cum 10,153.00
b Height 5m to 10m cum 10,559.00
c Height above 10m cum 10,965.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9,393.00
b Height 5m to 10m cum 9,784.00
c Height above 10m cum 10,175.00
(ii) For T-beam & slab
a Height upto 5m cum 9,784.00
b Height 5m to 10m cum 10,175.00
c Height above 10m cum 10,567.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

a Height upto 5m cum 9,852.00


b Height 5m to 10m cum 10,262.00
c Height above 10m cum 10,673.00
(ii) For T-beam & slab
a Height upto 5m cum 10,262.00
b Height 5m to 10m cum 10,673.00
c Height above 10m cum 11,083.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure
a Height upto 5m cum 9,473.00
b Height 5m to 10m cum 9,867.00
c Height above 10m cum 10,262.00
(ii) For T-beam & slab
a Height upto 5m cum 9,867.00
b Height 5m to 10m cum 10,262.00
c Height above 10m cum 10,657.00
D RCC/PSC Grade M35
Case I Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 9,839.00
b Height 5m to 10m cum 10,256.00
c Height above 10m cum 10,673.00
(ii) For T-beam & slab
a Height upto 5m cum 10,256.00
b Height 5m to 10m cum 10,673.00
c Height above 10m cum 11,090.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 11,507.00
b Height 5m to 10m cum 12,341.00
c Height above 10m cum 13,175.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9,459.00
b Height 5m to 10m cum 9,860.00
c Height above 10m cum 10,261.00
(ii) For T-beam & slab
a Height upto 5m cum 9,860.00
b Height 5m to 10m cum 10,261.00
c Height above 10m cum 10,662.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 11,063.00
b Height 5m to 10m cum 11,864.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

c Height above 10m cum 12,666.00


E PSC Grade M-40
Case I Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 10,145.00
b Height 5m to 10m cum 10,568.00
c Height above 10m cum 10,991.00
(ii) For T-beam & slab
a Height upto 5m cum 10,568.00
b Height 5m to 10m cum 10,991.00
c Height above 10m cum 11,413.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9,546.00
b Height 5m to 10m cum 9,950.00
c Height above 10m cum 10,355.00
(ii) For T-beam & slab
a Height upto 5m cum 9,950.00
b Height 5m to 10m cum 10,355.00
c Height above 10m cum 10,759.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 11,164.00
b Height 5m to 10m cum 11,973.00
c Height above 10m cum 12,782.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure
a Height upto 5m cum 9,725.00
b Height 5m to 10m cum 10,145.00
c Height above 10m cum 10,564.00
(ii) For I-beam & slab including launching of precast girders by
launching truss upto 40 m span
a Height upto 5m cum 10,145.00
b Height 5m to 10m cum 10,564.00
c Height above 10m cum 10,983.00
(iii) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 11,402.00
b Height 5m to 10m cum 12,240.00
c Height above 10m cum 13,079.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 11,602.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

b Height 5m to 10m cum 12,461.00


c Height above 10m cum 13,321.00
H PSC Grade M- 55
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 12,046.00
b Height 5m to 10m cum 12,938.00
c Height above 10m cum 13,831.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
entraining and water reducing plasticiser ( Masterplast PAE or
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
A RCC Grade M20
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 10,412.00
b Height 5m to 10m cum 10,846.00
c Height above 10m cum 11,280.00
(ii) For T-beam & slab
a Height upto 5m cum 10,846.00
b Height 5m to 10m cum 11,280.00
c Height above 10m cum 11,714.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 10,048.00
b Height 5m to 10m cum 10,467.00
c Height above 10m cum 10,885.00
(ii) For T-beam & slab
a Height upto 5m cum 10,467.00
b Height 5m to 10m cum 10,885.00
c Height above 10m cum 11,304.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 11,264.00
b Height 5m to 10m cum 11,733.00
c Height above 10m cum 12,202.00
(ii) For T-beam & slab
a Height upto 5m cum 11,733.00
b Height 5m to 10m cum 12,202.00
c Height above 10m cum 12,672.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

a Height upto 5m cum 10,910.00


b Height 5m to 10m cum 11,365.00
c Height above 10m cum 11,820.00
(ii) For T-beam & slab
a Height upto 5m cum 11,365.00
b Height 5m to 10m cum 11,820.00
c Height above 10m cum 12,274.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 11,396.00
b Height 5m to 10m cum 11,871.00
c Height above 10m cum 12,346.00
(ii) For T-beam & slab
a Height upto 5m cum 11,871.00
b Height 5m to 10m cum 12,346.00
c Height above 10m cum 12,821.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure
a Height upto 5m cum 11,017.00
b Height 5m to 10m cum 11,476.00
c Height above 10m cum 11,935.00
(ii) For T-beam & slab
a Height upto 5m cum 11,476.00
b Height 5m to 10m cum 11,935.00
c Height above 10m cum 12,394.00
D RCC/PSC Grade M35
Case I Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 11,416.00
b Height 5m to 10m cum 11,899.00
c Height above 10m cum 12,383.00
(ii) For T-beam & slab
a Height upto 5m cum 11,899.00
b Height 5m to 10m cum 12,383.00
c Height above 10m cum 12,867.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 13,351.00
b Height 5m to 10m cum 14,318.00
c Height above 10m cum 15,285.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

a Height upto 5m cum 11,036.00


b Height 5m to 10m cum 11,503.00
c Height above 10m cum 11,971.00
(ii) For T-beam & slab
a Height upto 5m cum 11,503.00
b Height 5m to 10m cum 11,971.00
c Height above 10m cum 12,439.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 12,906.00
b Height 5m to 10m cum 13,841.00
c Height above 10m cum 14,777.00
E PSC Grade M-40
Case I Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 11,779.00
b Height 5m to 10m cum 12,269.00
c Height above 10m cum 12,760.00
(ii) For T-beam & slab
a Height upto 5m cum 12,269.00
b Height 5m to 10m cum 12,760.00
c Height above 10m cum 13,251.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 11,152.00
b Height 5m to 10m cum 11,625.00
c Height above 10m cum 12,097.00
(ii) For T-beam & slab
a Height upto 5m cum 11,625.00
b Height 5m to 10m cum 12,097.00
c Height above 10m cum 12,570.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 13,042.00
b Height 5m to 10m cum 13,987.00
c Height above 10m cum 14,932.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure
a Height upto 5m cum 11,433.00
b Height 5m to 10m cum 11,925.00
c Height above 10m cum 12,418.00
(ii) For I-beam & slab including launching of precast girders by
launching truss upto 40 m span
a Height upto 5m cum 11,925.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

b Height 5m to 10m cum 12,418.00


c Height above 10m cum 12,911.00
(iii) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 13,404.00
b Height 5m to 10m cum 14,389.00
c Height above 10m cum 15,375.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 13,696.00
b Height 5m to 10m cum 14,710.00
c Height above 10m cum 15,725.00
H PSC Grade M- 55
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 40,369.00
b Height 5m to 10m cum 43,359.00
c Height above 10m cum 46,350.00
14.2 Reinforcement in Super Structure: Supplying, fitting and placing
TMT bar reinforcement in super-structure including splicing complete
as per drawing and technical specifications
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500
tonne 72,951.00
N/mm2
(ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm
2
tonne 73,144.00
(b) Other make ISI approved TMT reinforcement bar of Fe-415 N/mm2
tonne 72,951.00
14.3 High tensile steel wires/strands including all accessories for stressing,
stressing operations and grouting complete as per drawing and tonne 1,25,808.00
Technical Specifications
14.4 Providing and laying Cement concrete wearing coat M-30 grade
including reinforcement complete as per drawing and Technical cum 13,352.00
Specifications
14.5 Mastic Asphalt
(A) Providing and laying 12 mm thick mastic asphalt wearing course on top
of deck slab excluding prime coat with paving grade bitumen meeting
the requirements given in table 500-29, prepared by using mastic
cooker and laid to required level and slope aftering cleaning the
surface, including providing antiskid surface with bitumen pre coated
fine grained hard stone shipping of 9.5mm nominal size at the rate of
.005 cum per 10sqm and at approximate spaciong of 10cm center to sqm 462.00
center in both directions, pressed into surfaces when temperature of
the surfaces not less than 100 degC. , protuding 1mm to 4mm over
mastic surfaces, all complete as per clause 515.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(B) Providing and laying Bituminous wearing course comprising of tack


coat with bitumen emulsion CSS-1h as per APWD SOR item no 5.2 &
MOSRT&H Specification Nos 503, 6mm thick mastic asphalt as per
APWD SOR item no 14.5 & MOSRT&H Specification Nos 515 & 2702
and 2 layers of 25 mm thick Asphalt concrete including of close Graded sqm 617.00
Premix Surfacing(CGPS) materials with Type -a aggregate as per
APWD SOR tem no 5.11 & MOSRT&H Specification Nos 512
including all lead and lift as directed.

14.6 Construction of precast RCC railing of M30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolurence of vertical RCC
post not to exceed 1 in 500, centre to centre spacing between vertical
post not to exceed 2000 mm, leaving adequat space between vertical metre 2,076.00
posts for expansion, complete as per approved drawings and technical
specifications.

14.7 Construction of RCC railing of M30 Grade in-situ with 20 mm nominal


size aggregate, true to line and grade, tolurence of vertical RCC post
not to exceed 1 in 500, centre to centre spacing between vertical post
not to exceed 2000 mm, leaving adequat space between vertical posts metre 2,025.00
for expansion, complete as per approved drawings and technical
specifications.

14.8 Providing, fitting and fixing mild steel railing complete as per drawing
metre 3,425.00
and Technical Specification
14.9 Drainage Spouts complete as per drawing and Technical specification
Each 7,737.00
14.10 PCC M15 Grade leveling course below approach slab complete as per
cum 7,214.00
drawing and Technical specification
14.11 Reinforced cement concrete approach slab including reinforcement
and formwork complete as per drawing and Technical specification

(a) (i) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500
cum 12,862.00
N/mm2
(b) (ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm
2
cum 12,871.00
(c) Other make ISI approved TMT reinforcement bar of Fe-415 N/mm2
cum 9,660.00
14.13 Precast - pretensioned Girders (Providing, precasting,
transportation and placing in position precast pretensioned concrete cum 25,326.00
girders as per drawing and technical specifications)
14.14 Providing and fixing Helical pipes in voided concrete slabs metre 694.00
14.15 Crash Barriers (The rate analysis for rigid crash barrier in reinforced
cement concrete, semi-rigid crash barrier with metal beam and flexible
crash barrier with wire ropes have been made and included in chapter-
8 on Traffic and Transportation.)

14.16 Painting on concrete surface (Providing and applying 2 coats of


water based cement paint to unplastered concrete surface after
cleaning the surface of dirt, dust, oil, grease, efflorescence and
applying paint @ of 1 litre for 2 Sq.m. )
(A) For Plain surface sqm 296.00
(B) For RCC Railing RM 1,053.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

14.17 Burried Joint (Providing and laying a burried expansion joint,


expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide
galvanised wieldable structural steel plate as per IS: 2062, placed
symmetrical to centre line of the joint, resting freely over the top
surfaces of the deck concrete, welding of 8mm dia, 100mm long metre 1,177.00
galvanized nails spaced 300mm C/C along the center line of the plate ,
all as specified in clause 2604.)

14.18 Filler joint


(i) Providing & fixing 2 mm thick corrugated copper plate in expansion
joint complete as per drawing & Technical Specification. metre 704.00

(ii) Providing & fixing 20 mm thick compressible fibre board in expansion


joint complete as per drawing & Technical Specification. metre 123.00

(iii) Providing and fixing in position 20 mm thick premoulded joint filler in


expansion joint for fixed ends of simply supported spans not exceeding
10 m to cater for a horizontal movement upto 20 mm, covered with metre 480.00
sealant complete as per drawing and technical specification.

(iv) Providing and filling joint sealing compound as per drawings and
technical specifications with coarse sand and 6% bitumen by weight metre 25.00

14.19 Asphaltic Plug joint (Providing and laying of asphaltic plug joint to
provide for horizontal movement of 25 mm and vertical movement of 2
mm, depth of joint varying from 75 mm to 100 mm, width varying from
500 mm to 750 mm (in traffic direction), covered with a closure plate
200mmX 6mm of wiedable structural steel conforming to IS:2062,
asphaltic plug consist of polymer modified bitumen binder, carefully metre 2,109.00
selected singl;e size aggregate of 12.5mm nominal size and heat
resistant foam caulking/backer rod, all as per approved drawing and
specifications.)

14.20 Elastomeric Slab Steel Expansion Joint (Providing and laying of an


elastomeric slab steel expansion joint, catering to right or skew (less
than 20 deg., moderately curved with maximum horizontal movement
upto 50 mm, complete as per approved drawings and standard
specification to be installed by the manufacture/supplier or their metre 45,099.00
authorisedrepresentative ensuring compliance to the manufacturers
instructios for installation and clause 2506 of MORTS&H specification
of bridge works.)

14.21 Compression Seal Joint (Providing and laying of compression seal


joint consisting of steel armoured nosing at two edges of the joint gap
suitably anchored to the deck concrete and a preformed chloroprene
elastomer or closed cell foam joint sealer compressed and fixed into metre 16,660.00
the gap with special adhesive binder to cater for a horizontal
movement up to 40mm and vertical movement of 3mm.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

14.22 Strip Seal Expansion Joint (Providing and laying of a strip seal
expansion joint catering to maximum horizontal movement upto 70
mm, complete as per approved drawings and standard specifications
to be installed by the manufacturer/supplier or their authorised metre 4,758.00
representative ensuring compliance to the manufacturer's instruction
for installation).

14.23 Modular Strip / Box Seal Joint


(Providing and laying of a modular strip Box steel expansion joint
including anchorage catering to a horizontal movement beyond 70 mm
and upto 140mm, complete as per approved drawings and standard
specifications to be installed by teh manufacture/supplier or their metre 36,350.00
authorised representative ensuring compliance to the manufacturer's
instruction for installation.)

14.24 Modular Strip / Box Seal Joint


(Providing and laying of a modular strip box seal expansion joint
catering to a horizontal movement beyond 140mm and upto 210mm,
complete as per approved drawings and standard specifications to be
installed by the manufactu/supplier or their authorised representative metre 73,322.00
ensuring compliance to the manufacturer's instruction for installation.)

14.25 Extra for providing water proofing compound


( Providing and applying cement mortar(1 cement 3 sand) with
sqm 495.00
MasterCrete M81or its equivalent as per specification and as directed
by the Department
14.26 Extra for providing water proofing compound
( Cleaning the surface and applying two coats of MasterCrete M81 or
sqm 310.00
its equivalent as per specification and as directed by the Department

CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
15.1 Providing and laying boulders apron on river bed for protection against
scour with stone boulders weighing not less than 40 kg each complete
2403

as per drawing and Technical specification.


A Boulder laid dry without wire crates. cum 3,070.00
15.2 Boulder apron laid in wire crates (Providing and laying of boulder
apron laid in wire crates made with 4mm dia GI wire conforming to IS:
280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including cum 5,212.00
2503

10% extra for laps and joints laid with stone boulders weighting not less
than 40Kg each.)
15.3 Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and
laying of apron with cement concrete blocks of size 0.5x0.5x0.5 m cast
in-situ and made with nominal mix of M-15 grade cement concrete with cum 7,652.00
2503

a minimum cement content of 250 kg/cum as per IRC: 21-2000.)

15.4 Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete
2504

as per drawing and Technical specifications

A Stone/Boulder cum 3,070.00


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

B Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement


cum 7,652.00
concrete of Grade M15
15.5 Providing and laying Filter material underneath pitching in slopes
cum 3,785.00
2505 2504

complete as per drawing and Technical specification


15.8 Providing and laying Flooring complete as per drawing and Technical
specifications laid over cement concrete bedding.
A Rubble stone laid in cement mortar 1:3 cum 7,307.00
B Cement Concrete blocks Grade M15 cum 11,558.00
15.9 Dry rubble Flooring, Construcytion of dry rubbl flooring at cross
cum 3,487.00
2507.2 2506

drainage works for relatively less important works.


15.10 Curtain wall complete as per drawing and Technical specification

A Stone masonry in cement mortar (1:3) cum 7,509.00


B Cement concrete Grade M15 cum 8,604.00
15.11 Flexible Apron :Construction of flexible apron 1 m thick comprising of
loose stone boulders weighing not less than 40 kg beyond curtain wall. cum 3,131.00
2507.2

15.12 Gabian Structure for Retaining Earth (Providing and construction of


a gabain structure for retaining earth with segments of wire crates of
size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross
netting, made from 4 mm galvanised steel wire @ 32Kgs per 10Sqm
having minimum tensil strength of 300Mpa conforming to IS:280 and
galvanizing coating conforming to IS:4826, woven into meshes with cum 5,655.00
2503.3

double twist, mesh size not exceeding to 100mmX100mm , firred with


boulders at least dimension of 200mm , all loose ends to be tied with
4mm galvenized steel wire.)

15.13 Gabian Structure for Erosion Control, River Training Works and
Protection works (Providing and constructing gabain structures for
erosion control, river training works and protection works with wire
crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments
by cross netting, made from 4 mm galvanised steel wire@ 32Kgs per
10Sqm having minimum tensil strength of 300Mpa conforming to
cum 9,227.00
2503.3

IS:280 and galvanizing coating conforming to IS:4826, woven into


meshes with double twist, mesh size not exceeding to 100mmX100mm
, firred with boulders at least dimension of 200mm , all loose ends to
be tied with 4mm galvenized steel wire.)

CHAPTER-16
REPAIR AND REHABILITATION
16.1 Removal of existing cement concrete wearing coat including its
disposal complete as per Technical specification without causing any
detrimental effect to any part of the bridge structure and removal of sqm 211.00
2809

dismantled material with all lifts and lead upto 1000.(Thickness 75mm.)

16.2 Removal of existing asphaltic wearing coat comprising of 50 mm thick


asphaltic concrete laid over 12 mm thick mastic asphalt including sqm 182.00
2809

disposal with all lift and lead upto 1000m.


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

16.3(A) Guniting concrete surface with cement mortar applied with compressor
after cleaning surface and spraying with epoxy complete as per sqm 1,622.00
2807

Technical specification
16.3(B) Guniting concrete surface with single component,fibre reinforced
shrinkage compensated,polymer modified structural grade repair
mortar like Fosroc Renderoc SP 40 or equivalent at a thickness of 25
mm. The repair mortar should have a compressive strength 45 sqm 1,821.00
N/mm²,flexture strength 7 N/mm² and tensile strength 2.5 N/mm² at 28
days.
16.4 Providing and inserting nipples with approved fixing compound after
drilling holes for grouting as per Technical Specifications including
subsequent cutting/removal and sealing of the hole as necessary of no 224.00
nipples after completion of grouting with Cement/Epoxy

16.5 Sealing of cracks/porous concrete by injection process through


nipples/Grouting complete as per Technical specification.
2806

A Cement Grout kg 260.00


B Cement mortar (1:1) Grouting kg 1,137.00
16.6(A) Patching of damaged concrete surface with polymer concrete and
curing compounds, initiator and promoter, available in present
sqm 1,753.00
2800

formulations, to be applied as per instructions of manufacturer and as


approved by the Engineer.
16.6(B) Patching of damaged concrete surface with structural grade polymer
modified reinstatement mortar to like Fosroc Renderoc S2 or
equivalent at a thickness of 10 to 20mm as per instructions of
manufacturer and as approved by the Engineer.The prepacked repair sqm 1,609.00
mortar should have a compressive strength 45 N/mm²,Flexture
strength 8 N/mm² at 28 Days.

16.7 Sealing of crack / porous concrete with Epoxy Grout by injection


kg 1,789.00
2803

through nipples complete as per clause 2803.1.


16.8(A) Applying epoxy mortar over leached, honey combed and spalled
concrete surface and exposed steel reinforcement complete as per sqm 1,542.00
2804

Technical specification
16.8(B) Applying a high strength,high performance epoxy rasin based repair
mortar like Nitomortar S of Fosroc Chemicals or MasterProtect 1890 of
BASF or equivalent, a three component epoxy resin with a density not
greater than 2000 kg/m3 over leached, honey combed and spalled
concrete surface. The cured mortar shall achieve a compressive sqm 1,593.00
strength of 60 N/mm2, a flexural strength of 20 N/mm2 and a tensile
strength of 10 N/mm2 when tested at 7 days.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

16.9(A) Removal of defective concrete, cleaning the surface thoroughly,


applying the shotcrete mixture mechanically with compressed air under
pressure, comprising of cement, sand, coarse aggregates, water
and quick setting compound in the proportion as per clause 2807.1.
sand and coarse aggregates conformiong to IS : 383 and table 1 of
IS:9012 respectively, water cement ratio ranging from 0.35 to 0.50, sqm 491.00
2807

density of gunite not less than 2000Kg/cum. , strength not less than
25Mpa and workmanship conforming to to clause no.2807.6

16.9(B) Removal of defective concrete, cleaning the surface thoroughly and


apply a single component,shrinkage compensated,structural grade ,dry
sprey applied polymer modified,repair mortar like fosroc Renderoc
DS40 or equivalent using compressed air under pressure at a sqm 1,575.00
thickness of 25mm.The repair mortar should have a compressive
strength of 45 N/mm² on 28 Days

16.10 Applying pre-packed cement based polymer mortar of strength 45


Mpa at 28 days for replacement of spalled concrete sqm 328.00
2800

16.11 Eproxy bonding of new concrete to old concrete


sqm 493.00
2805

16.12 Providing external prestressing with high tensile steel wires/strands


including drilling for passage of prestessing steel, all accessories for
stressing and stressing operation and grouting complete as per tonne 3,53,237.00
drawing and Technical specification(25 m span)

16.13 Providing external prestressing with high tensile steel wires/strands


including drilling for passage of prestessing steel, all accessories for
stressing and stressing operation and grouting complete as per tonne 3,15,965.00
drawing and Technical specification(50 metre span)

16.14 Providing external prestressing with high tensile steel wires/strands


including drilling for passage of prestessing steel, all accessories for
stressing and stressing operation and grouting complete as per tonne 2,85,910.00
drawing and Technical specification(100 metre span)

16.15 Labour for replacement of Bearings complete as per Technical


each 4,228.00
2808

Specification (Cost of bearing to be paid extra)


16.16 Labour for Lifting of superstructure span by jacking up from below i.e.
by placing the jacks on pier/abutment caps for span length of 30m.
2808

(Cost of bearing to be paid extra) (Rectification of Bearings as per


Technical Specifications)
A Lifting from the pier cap each 41,700.00
B Lifting with constructing auxilary structure upto 6M height including
each 4,00,000.00
dismentling and removal of same
16.17 Replacement of Expansion Joints complete as per drawings metre 4,122.00
16.18 Replacement of damaged concrete railing. metre 297.00
16.19 Replacement of crash barrier. metre 490.00
16.20 Replacement of damaged mild steel railing metre 259.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

16.21 Repair of crash barrier (Repair of concrete crash barrier with cement
concrete of M-30 grade by cutting and trimming the damaged portion to
a regular shape, cleaning the area to be repaired thoroughly, applying metre 259.00
cement concrete after erection of proper f

16.22 Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring
metre 250.00
it to the original shape.)
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original
metre 288.00
shape)
16.24 Chipping of deteriorated concrete and removal of all loose & friable
materials and fully exposing rusted reinforcement followed by proper
cleaning and removing of rusts and other foreign materials using sand
blasting/ emery cloths/ wire brush etc. including formwork as directed sqm 258.00
and specified by the department complete

16.25 Replacement of corroded reinforcement by cutting and welding new


reinforcement of minimum 25mm dia. including lapping on both sides
to the specified length as directed and as per relevant IS/IRC codes
and cost of gas ,welding rods,higher charge of welding machines etc. metre 404.00
including formwork as required.(Reinforcement to be measured and
paid seperately)

16.26 Providing and applying high strength epoxy concrete like Fosroc
Expocrete EC or equivalent as per maufracturer specification
specification.The epoxy concrete shall be paced at a minimum of
50mm thickness after proper surface preparation and priming the
substrate using Fosroc Nitoprime 25. The base, hardener and filler of
the Epoxy concrete shall be mixed thoroughly with using the heavy sqm 7,620.00
duty slow speed mixing machine and pour the course aggregate 6 mm
downgraded slowly and continue to mix 20 to 30 minutes until mix
thoroughly. The mixed material shall be poured in to the shuttering
surface, pack it with the help of steel trowel

16.27 Anticorrosive treatment sqm 539.00


A Supplying and applying two coats of Zinc rich anti-corrosive protective
coating with "Nitozinc primer" of Fosroc or euivalent @ 0.20 Lit per
Sqm over thoroughly cleaned and prepared steel bars including sqm 539.00
formwork as directed and specified by the department complete.

B Spplying and applying one coat of Zinc based epoxy anticorrosive


coating like MasterEmaco P 130 of BASF or euivalent @ 0.2 Lit per
Sqm all over the exposed reinforcement over thoroughly cleaned and
prepared steel bars including formwork as directed and specified by sqm 526.00
the department complete.

16.28 Bonding between old and new concret surfaces


A Supplying and applying Epoxy based bonding agent Nitobond EP of
Fosroc Chemicals or MasterBrace 1414 of BASF or euivalent @ 0.50
Lit pe sqm after totally saturating the cleaned concrete surface with
clean water for proper bonding of old and new concrete including sqm 913.00
formwork as specified and directed by the department complete.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

B Providing and applying coating of the cleaned patches with two part of
polymer based bonding agent Nitobond SBR of Fosroc or
MasterEmaco SBR 2 of BASF or equivalent @ 0.22 Lit per Sqm prior
to application of polymer modified mortar with brush after totally
saturating the cleaned concrete surface with clean water for proper sqm 469.00
bonding of old and new concrete including formwork as specified and
directed by the department complete.

16.29 Plastering the surface with high rich polymer modified mortar 10mm
thick with cement sand mortar in prop. 1:4 mixed with 100% acrylic
polymer hydroproof extra of Fosroc Chemicals or MasterEmaco 131 of
BASF or equivalent @15% by weight of cement followed by proper sqm 665.00
curing as specified and directed by the department complete including
formwork.
16.30 Concreting of the structure with free flow nonshrink cementitious
microconcrete with Renderoc RG of Fosroc or equivalent after proper
mixing with cleanwater including formwork followed by proper curing for
28 days as per manufacturer's specifications complete and as directed cum 1,29,750.00
by the Department .

16.31 Providing and laying Zinc anode unit Galvanized XP of Fosroc make or
equivalent, fixed to the reinforcement steel by means of wire ties to
allow attachment in horizontal, vertical and overhead locations with a
spacing of one piece per 0.5m c/c and ensuring good electrical each 2,293.00
continuity as per specification of manufacturer including cost of
labour,copnsumables, tools and tackles and formwork.

16.32 Structural Strengthening with carbon Fibre Wrapping:


A Patching in depression of concrete surface wherever necessary by
laying epoxy putty , Nitocote VF of Fosroc Chemicals or MasterBrace
ADH 2200 of BASF or equivalent @ 1 Lit per sqm after proper surface
preparation and proper scraping of concrete protrusion as specified sqm 2,508.00
and directed by the department complete including formwork .

B Applying Nitowrap 410 saturant Fosroc Chemicals or MasterBrace


4500 saturant of BASF or equivalent with wet film thickness @ 250
microns (0.27Lit per sqm) over a coat of saturant epoxy primer
Nitowrap 30 of Fosroc Chemicals or MasterBrace 3500 of BASF or
equivalent @ 0.11Lit per sqm with brush followed by fixing carbon fibre
composite system Nitowrap EP (CF) of Fosroc Chemicals or
MasterBrace Fibres (CF) of BASFor equivalent by pressing on the sqm 6,326.00
saturant and impregnate the same by applying a final coat of Nitowrap
410 saturant Fosroc Chemicals or MasterBrace 4500 saturant of BASF
or equivalent as specified and directed by the department complete
including formwork.

C Applying two coats of UV resistant coating Nitowrap 512 of Fosroc


Chemicals or MasterProtect of BASF or equivalent over fibre system
having wet film thickness of 100 micron @ 0.11Lit per sqm as sqm 541.00
specified and directed by the department complete including formwork.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

16.33 Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the
half of the thickness of the concrete structure.A grout slurry of neat
cement & chloride free expanding grout Cebex 100 of Fosroc
Chemicals or Mastergrout CPG-1 of Choksey Chemicals or
MasterFlow 150 of BASF or equivalent @ 0.5% by weight of cement
water cement ratio 0.35 to 0.40 and viscosity not more than 1.02
centipoise with grouting pressure till the refusal of injection grout . The
grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed sqm 1,025.00
nozzle after the grouting with a good cutter to make the surface free
from the grouting pipes and to seal the gap with plugging compound
Masterplug of Choksey Chemicals as per the specification and the
direction of the department complete including formwork.

16.34 Providing & fixing PVC pipes in a grid of 0.5m c/c throughout the crack
of the concrete structure.A low viscous Epoxy grout with Conbextra
EP10 of Fosroc Chemicals or equivalent should be inserted throughout
the crack to fill the crack.Cutting the exposed nozzle after the grouting
with a good cutter to make the surface free from the grouting pipes and m 1,334.00
to seal the gap with the appeared crack with Epoxy putty of Choksey
Chemicals as per the specification and the direction of the department
complete including formwork.

16.35 Fibre reinforcement


Extra for fibre reinforcing concrete/mortars by providing and mixing
Recron3S (CT 2024 12mm fibre cut length / CT 2012 6mm fibre cut
length) of Reliance Industries Ltd. @ 125gms per bag (50Kg) of
cement as specified and directed by the Department complete at all
levels.
A In concrete
(I) In M-20 grade. cum 126.00
(II) In M-25 grade. cum 146.00
(III) In M-30 grade. cum 147.00
(IV) In M-35 grade. cum 152.00
B In cement morter Plastering
(I) 1:3 (1 cement: 3 coarse sand) sqm 2.00
(II) 1:4 (1 cement: 4 coarse sand) sqm 1.00
16.36 Providing and applying Deckguard E 2000 or Masterseal 878 of BASf
or equivalent a High Performance Anticarbonation Protective Coating
System, over the prime surface using an airless spray or roller at right
angles to each other @ coverage of 5 Sqm per litre per coat @ 200
microns wft / 100 microns DFT with an intercoat period of minimum 12
hrs @ 35ºC. The coverage per litre for 2 coats shall be 2.5 Sqm @ 200
microns DFT. The protective coating system should have CO2 diffusion
resistance not less than 240mm equivalent of air thickness and 60cm sqm 646.00
equivalent of 30N concrete along with a water vapour transmission
resistance of less than 1.0 metre (Taywood method), the coating
should have static crack accommodation of not less than 2mm (BRE)
and adhesion greater than 1.0 N/mm² as per BS 1881.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

16.37 Applying a multicoat, anticorrosive, epoxy polyamide system approved


by CECR The protection system shall be Nitocote BCS 300
manufractured by Fosroc or equivalent product of other manufracturer
consist of redoxide primer at a dft of 50 microns micaceous iron oxide
middle coat at 100 microns, titanium dioxide topcoat at a dft of 100
microns. The finish coat shall be aliphatic polyurethane at a dft of not
less than 40 microns capable of providing ultraviolet resistance. The
total dft of the systemshall not be less than 300 microns. The cured film cum 889.00
shall provide a smooth surface. or equivalent with brush over exposed
portion of the concrete structure of the bridge & other structure works
etc. complete as desired to protect the reinforced concrete by
preventing the process of carbonation and directed by the department
including formwork.

16.38 Applying and placing Antiwash, non-shrink, cementatious, high


strength Renderoc UW of Fosroc Chemicals or MasterEmaco S 920
UV of BASF or equivalent by mixing with clean water to repair the
damaged and deteriorated underwater structural elements including cum 1,63,944.00
formwork as per the department's instructions with labour, tools
complete as specified and directed by the department including
formwork.
16.39 Drilling 14 mm dia holes on the concrete surface to a depth of 75mm
using a rotary cum hammering,drilling machine as per specification and
throughly cleaning the hole using compressed air & water jet and fixing
of shear connectors of 8mm dia and anchoring it with polyester resin
anchor grout Lokfix P of Fosroc india and as per manufacture's each 92.00
specifications.(Cost inclusive of drilling,cleaning,fixing,
steel,labour,tools and tackles)

16.40 Fabrication and fixing of steel pedestal support for bearing MT 33,124.00
16.41 Providing and fixing of Foundation bolts for steel pedestals. Each 1,006.20
16.42 Providing and fixing of Steel plates for placing of bearings MT 1,006.20
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data
storage facility for detection of cracks, voids and other imperfections in
16.43 Reinforced concrete structures and furnishing the findings thereof in Each 650.65
proper comprehensible format , complete as directed by the
department.
Non-destuctive testing with Profometer 5 Scanlog or equivalent
equipment with facility for built-in memory storage and statistical
analysis of data for detection of location and orientation of rebars in
16.44 Sqm 2,788.50
Reinforced concrete structures and furnishing the findings thereof in
proper comprehensible format , complete as directed by the
department.

Non-destuctive testing with Permeability Tester, without causing


damages to the structure, for determination the water permeability and
16.45 water absorption into the near surface zone of the concrete structure Each 715.00
and furnishing the findings thereof in proper comprehensible format ,
complete as directed by the department.

16.46 Conducting PH tests on concrete stucture, as per stipulated procedures, for Each
determination the 114.40
PH (alkalinity) of the co
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Conducting Carbonation tests on concrete stucture, as per stipulated


procedures, for determination the depth of carbonation of cover
16.47 concrete of the structures and furnishing the findings thereof in proper Each 114.40
comprehensible format , complete as directed by the department.

Conducting suitable tests on concrete stucture, including preparation of


samples etc. as per stipulated procedures, for determination the
chloride and sulphate concentration in the concrete of the structures
16.48 and furnishing the findings thereof in proper comprehensible format , Each 929.50
complete as directed by the department.

Conducting Concrete Core tests of 75mm diacores, on concrete


stucture, as per stipulated procedures, for determination the equivalent
cube compressive strength, concrete of the structures including
16.49 preparation and furnishing the report showing the findings thereof in Each 6,506.50
proper comprehensible format , complete as directed by the
department.

Evaluation of Loss of pre-stress in superstructure PSC girders


including measurement of deflection by suitable instruments and
necessary calculations for estimation of the probable loss in pre-stress
16.50 and furnishing the findings thereof in a proper comprehensible format Each Span 2,60,000.00
with all details, complete as directed by the department.

Stressing operation and grouting complete, including all accessories for


stressing of dummy cables, as per drawing and technical specifications
16.51
of section 1800 of MORTH Specification of Roads and Bridge Work . MT 14,119.30

Load testing of existng foundation to ensire no void/ gap/ loose pocket


below the foundation with a total weight of 250MT (in form of sand
bags filling with locally available sand/ soil etc. placed uniformly on top
of well-cap) placed concentric & uniform w.r.t existing well foundation,
16.52 including dewatering and making arrangement with atleast 4 nos dial Each 91,000.00
gauges, for measurement of settlement of foundation during
application and release of the load, all complete as per specification as
directed byb the department.

Non-destructive testing with rebound hammer for detection of


16.53 damage zones in Reinforced concrete structures and furnishing the Each 500.50
findings thereof in proper comprehensible format.

Non-destructive testing with corrosion analysis instrument ( Copper &


Copper Sulphate half cell potentiometer) with all accessories, for
16.54 deternination the risk of corrosion of rebars located within a concrete Each 4,644.90
structure and furnishing the findings thereof in proper comprehensible
format, complete as directed by the department.

Pile intrigity test Integrity testing of all piles by using pile driving
analyser or equivalent as approved by Engineer-in-Charge and detailed
16.55 Each 2,080.00
in specification.Test to be carried out by an approved reputed
agency.Item to include all incidental work to execute the job.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

Supply and fixing of rebarring chemical FOSROC LOKFIX E75- pure


Chemical anchor grout or equivalent for various diameters of
16.56 reinforcement bar provide embedment depth as per the manufacturer’s
specifications and instructions for use in concrete applications as
directed by Engineer in charge.
a) 8mm dia rebar at 120mm depth No. 252.00
b) 10mm dia rebar at 150mm depth No. 270.00
c) 12mm dia rebar at 180mm depth No. 402.00
d) 16mm dia rebar at 240mm depth No. 675.00
e) 20mm dia rebar at 300mm depth No. 1,004.00
f) 25mm dia rebar at 375mm depth No. 1,830.00
Supply and fixing of rebaring chemical Fosroc LOKFIX E55 S-
Vinylester Chemical anchor grout or equivalent for various diameters of
reinforcement bar at provided embedment depth as per the
16.57 manufacturer’s specification and instructions for use in concrete
applications as directed by Engineer in charge.

a) 8mm dia rebar at 120mm depth No. 230.00


b) 10mm dia rebar at 150mm depth No. 244.00
c) 12mm dia rebar at 180mm depth No. 395.00
d) 16mm dia rebar at 240mm depth No. 656.00
e) 20mm dia rebar at 300mm depth No. 908.00
f) 25mm dia rebar at 375mm depth No. 1,574.00
Concrete demolation below waist.
16.58 eachimpact energy:
Demolition by electric breaker. Breaker specification: Inbuilt AVR system, Single 9,555.00
26 J, Full hammering
16.59 each impact energy:
Demlolition by electric breaker. Breaker specification: Inbuilt AVR system, Single 9,682.00
21 J, Full hammerin
Slab/wall/coloumn/beam cutting by wall saw or wire saw
16.6 eachsurface area.
Cutting of slab/wall/coloumn by HILTI wall saw or wire saw. Unit Sqm of cutting 25,395.00
Chapter-17
Miscelloneous Item
17.1 Construction of cold weather Bamboo bridge overall width of 3.70m
and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos.
In each rows and rows being 2.1m. apart except for the navigable span
which should be 3m. Post to be driven at least 180cm. or more below
ground level including providing 20cm to 25cm center to center and
placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood
bracing collar fixed by bolts and nuts, straps etc. mature bholuka
Bamboo cross groth all closely packed and tied 75cm wide track way
made from 38mm thick 1st class local plank fixed on 75mmx100mm RM 11,741.86
first class local wood battens 120cm apart and 3 lines of jati bamboo
horizantal railing fixed in bholuka bamboo post placed at 210cm apart
and white washed including all necessary nuts and bolts, coir ropes,
struts, nails etc. complete with a layer of brushwood to exposed portion
out-side trackway with earth topping complete as per direction of the
department.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.2 Construction of temporary Bamboo bridge of 3.70m clear road way


with Bholuka or Barua Bamboo post 5nos. in each rows driven at
least180cm. below ground level and rows not more than 150cm apart
from center to center Bholuka or Barua Bamboo dham longitudinal
groth both closely placed and tied with half bamboo 90cm to 120cm
apart in both layers and ttwo layers of jati bamboo chattais ( top layer
should be digonally woven), 70 mm to 100 mm thick brushwood in
between chattias should be tied with half jati bamboo on both ends, RM 1,879.12
bamboo railing with bholuka or barua bamboo post placed at150cm
apart jati or betua bamboo hand rails of two lines both side of every
alternate rows.All tying must be done with cane or coir string and only
mature bamboo should be used in work.

17.3 Making 150mm wide bamboo foot bridge with 100mm Bholuka or
Barua bamboo posts driven 120 cm to 180 cm underground 3 Nos. in
each row and rows being 3m apart bholuka or Barua bamboo dham
placed over the posts and tied with cane or wire , Bholuka or barua
bamboo struts in each row both up and down stream, jati bamboo long
gorhs closely packed and tied with dham. Single layer of mat placed R.M. 669.37
over 75mm thick brush wood and tied with bholuka or Barua bamboo
rail stand fixed in one side of the bridge etc. complete.

17.4 Supplying and driving sal piles 25cm to 30cm dia. Dressed to heart
wood including making length in every 30 cm interval, coal tarring two
(2) coats with best tar applied hot (Rate inclusive of the cost of the
required quantity of tar.)
(a) With pile Engine
(i) Portion of pile actually driven underground. meter 4,935.44
(ii) Portion of pile remaining above rground. meter 4,744.85
(b) Using labour
(i) Portion of pile actually driven underground. meter 4,848.28
(ii) Portion of pile remaining above rground. meter 4,665.83
17.5 Supplying and driving Azar/Nahar/Nageswar/Zarul piles 25cm to 30cm
dia. Dressed to heart wood including making length in every 30 cm
interval, coal tarring two (2) coats with best tar applied hot (Rate
inclusive of the cost of the required quantity of tar.)

(a) With pile Engine


(i) Portion of pile actually driven underground. meter 3,060.97
(ii) Portion of pile remaining above ground. meter 2,916.87
(b) With hand shaking
(i) Portion of pile actually driven underground. meter 2,994.73
(ii) Portion of pile remaining above rground. meter 2,856.44
17.6 Sal work including supplying , fitting and fixing complete with
necessary M.S. bolts, nuts, nails, screw etc. and coal tarring two (2)
coats with best tar applied hot9 Rate is inclusive of the cost of the
required quantity of tar.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(a) undrssed in floor planks, collars, bracing, standards, wheel guards,


cum 60,559.36
struts and railings, runner belts, rail, posts etc.
(b) In track way planks (alternate nailing to be done with decking in a
cum 55,310.15
seggragate way.)
17.7 Azar or Nahar or Nageswar or zarul ofr sundi or gamari wood works
including supplying , foitting , and fixing complete with necessary M.S.
bolts, nuts, nails scerws etc. and coal tarring two coats (2) coats with
best tar applied hot (Rate is inclusive of the cost of the required
quantity of tar.)
(a) Undressed in floor planks, collars, bracing, standards, wheel guards,
cum 30,527.20
struts and railings, runner belts, rail, posts etc
(b) In track way planks (alternate nailing to be done with decking in a
cum 28,115.85
seggragate way.)
17.8 Supplying, fitting and fixing timber beam and bearing beam rectangular
in size fitted with M.S. etc. supplying spikes etc. as necessary and coal
tarring two (2) coats with best tar applied hot as directed (tRate is
inclusive of cost of the required quantity of tar.)

(a) Using Sal Timber cum 59,492.55


(b) Using Azar or Nahar or Nahar or Nageswar or Zarul sawn timber
cum 38,867.22
17.9 Supplying, fitting and fixing 25 cm to 30 cm dia. sal wood log beam
dressed to heartwood including supplying and fixing with 20mm dia
M.S. bolts and nuts etc.including coal tarring two (2) coats with best meter 4,857.58
tar applied hot as directed (Rate is inclusive of cost of the required
quantity of tar.)
17.10 Supplying, fitting and fixing Azar or Nahar or Nageswar or Zarul sawn
timber beam and bearing beam rectangular in size fitted with MS
cleats, straps etc. supplying spikes etc. as necessary and coal taring
two(2) coats with best tar applied hot as directed( Rate is inclusive of
cost of the required quantity if tar. 25 cm to 30 cm dia. sal wood log
beam dressed to heartwood including supplying and fixing with 20mm meter 3,002.87
dia M.S. bolts and nuts etc.including coal tarring two (2) coats with
best tar applied hot as directed (Rate is inclusive of cost of the required
quantity of tar.)

17.11 Guard Post


(A) RCC guard post:
Supplying,fitting and fixing RCC guard post size 15 cm dia,150cm
long,75cm above the ground and 75cm below the ground, with 4-
12mm Tor steel main steel and 6mm MS stirrups at 30cm c/c tied in
position with annealed black wire, cement concrete proportin 1:2:4 with
broken stone aggregate up to 20mm size including centering,moulding
the top.curing,painted black and white alternately in 23cm strips upto
0.75m from the top having reflective band 2 nos. of desired shade etc.
as per design and direction complete.

(i) 15 cm dia with 4-12mmTor bar Each 809.98


(ii) 30 cm dia with 6-12mmTor bar Each 1,637.40
(iii) 15cm x 20cm with 4-12mm Tor bar Each 1,251.58
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(B) Jungle Wood Dressed guard post:


Supplying,fitting and fixing Jungle Wood Dressed guard post size 20
cm to 25cm dia,150cm long,75cm above the ground and 75cm below
the ground, fitted with horizantal struts size 0.05x0.05x0.55m long at
bottom with necessary nails necessary nails including coal tarring one Each 496.22
coat blelow ground and painting black and white one coat alternately in
strips in the portion above the ground.

17.12 Labour for scarfing and joining piles 25 cm to 30 cm dia Dressed to


heartwood 90 cm. In length includng supplying, fitting and fixing with 2
each Joints 1,056.35
nos. of 50 mmX 10 mm MS FI clamps and 16 mm dia MS bolts and
nuts etc. complete as directed
17.13 Labour for taking out old piles of the bidge and stacking them at
each 979.65
suitable place as directed
17.14 Labour for dismanteling all members of the timber bridge (except piles)
and stacking them at sutiable places as directed( all members will be
under custody of the contractor till taken over by th
department.)scarfing and joining piles 25 cm to 30 cm dia Dressed to
heartwood 90 cm. In length includng supplying, fitting and fixing with 2 meter 665.88
nos. of 50 mmX 10 mm MS FI clamps and 16 mm dia MS bolts and
nuts etc. complete as directed

17.15 Labour for driving piles 25 cm to 30 cm dia Dressed to heartwood


marking length in every 30 cm. interval includng coalteringtwo (2) coats
with best tar applied hot including providing ncessary scaffolding or
staging( rate is inclusive of the cost of required quantityof tar.)

(a) With piles engine


(i) Portion of pile actually driven under ground meter 1,342.23
(ii) Portion of pile remaining over ground meter 474.14
(b) By use of labour
(i) Portion of pile actually driven under ground meter 678.67
(ii) Portion of pile remaining over ground meter 507.84
17.16 Labour for fitting and fixing RSJ beam, CI saddle etc. in position
including necessary scaffolding, cutting them to required size, drilling
holes and supplying and fixing ncessary bolts and nuts, painting two
coats complete (Tar-Steel paints to be supplied by the contractor at his Quintal 629.86
own costs) including carrying frm PWD Godown.

17.17 Labour for fitting and fixing RSJ beam, old CI saddle etc. in position
including necessary scaffolding, and fixing ncessary bolts and nuts,
Quintal 514.81
painting two (2) coats complete (Tar-Steel paints to be supplied by the
contractor at his own costs)
17.18 Labour for making and fitting MS F.I. Straps and cleats etc. in position
including drilling holes and carrying the same from PWD godown. Quintal 1,528.16

17.19 Supplying fitting and fixing "U" shapeed flat iron strap making
0.5mX0.3m size from 150mmX12mm size MS flat including providing
10 bolts holes and fitting with 0.35m long 20mm dia MS bolts including Each 1,454.95
fitting tightly withbearing beam, pile and RSJ beams etc. as diected by
the Department.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.20 Labour for fitting woodwork including sizing , supplying and fixing with
new MS bolts, nuts, nails, spikes, and coal tarring coat applied hot (
Coal tar to be supplid by the contractor at his own costs) including
carrying from the PWD godown.
(a) Applying 2 (two) coats cu.m. 2,714.67
(b) Applying 1 (one) coats cu.m. 2,429.95
17.21 Labour for fitting and fixing 25cm to 30 cm dia log beam including
supplying and fixing necessary MS nuts and bolts etc. and coal tarring
coats appiled hot as dirceted (coal tar to be supplied by the contractor
at his own cost.)
(a) Applying 2 (two) coats meter 462.52
(b) Applying 1 (one) coats meter 321.90
17.22 Labour for taking out old woodworks of bridge and the refitting the
same including supplying and fixing necessary new MS bolts, nuts,
cum 2,736.75
spikes, nail as directed (Coal tar to be supplied by the contractor at his
own costs.)
17.23 Labour for taking out old log beam of bridge and refitting the same
including supplying and fixing necessary new MS bolts, nuts, spikes,
nail etc an d coaltering on coat applied hot as directed (Coal tar to be meter 269.61
supplied by the contractor at his own costs.)

17.24 Single bamboo spur and palasiding of whole 2nd class bamboo (Jati or
Bethua) 65mmto 75mm dia closely packed 7 driven , including fitting
and fixing with half bamboo kamis horizantally in three rows with the
cane or tieing wire complete and struts 1500 mm apart longitudinally
and providing brush wood as per drawing and technical specification
clause 1302.5 of MORT&H

(A) Driven at least 900mm below and 1800 mm above the ground on
meter 517.13
average.
(B) Driven at least 900mm below and 900 mm above the ground on
meter 431.14
average
17.25 Pile shoes : supplying fitting and fixing the pile shoes made of 6mm
thick mild steel plate with necessary welding joints, size of pile shoe will
be 78.54 cm(circumferential length of at top.) X50cm(Depth) X
5cm(circumferential length at bottom) and inside 25cm inside diameter
at top, including fitting and fixing 39Three) nos. M.S. plate of size of
6mmX50mm, length 45cm at top of the pile shoe with necessary
welding and drilling three nos of holes in each plate including fitting and Each 1,359.66
fixing the pile shoes at the pile end with necessary patent nails etc. ,
complete as directed by the Department .The pile shoe should be
camphered to fit the pile shoe properly withnecessary grooving for
placing the MS plates and pile shoe.

17.26 Single bamboo spur and palasiding of whole 1st class bamboo
(Bholuka or Barua) 85mmto 100mm dia closely packed & driven ,
including fitting and fixing with half 2nd class bamboo (Jati or Bethua)
horizantally in three rows with the cane or tieing wire complete and
struts 1500 mm apart longitudinally and providing brush wood as per
drawing and technical specification .
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(A) Driven at least 900mm below and 1800 mm above the ground on
meter 607.78
average.
(B) Driven at least 900mm below and 900 mm above the ground on
meter 431.14
average
(C) Driven at least 900mm below and 1200 mm above the ground on
meter 521.78
average
(D) Driven at least 600mm below and 1200 mm above the ground on
meter 398.60
average
17.27 Bamboo spur 'A' type with whole bamboo 65mm t0 75mm dia, placed
230mm center to center driven 900mm below ground and 1200mm t0
1500mm above the ground tied with 2nd class bamboo(Jati or Bethua)
on either side at 450mm apart horizantally with galvanized wire etc.
complete as per drawing and technical specifications.

(A) 2nd class bamboo (Jati or Bethua) meter 441.60


(B) 1st class bamboo (Bholuka or Barua) 85mm to 100mm dia. meter 497.38
17.28 Providing 'A' type single spur with 1st class bamboo(Bholuka or
Barua) 85mm t0 100mm dia, driven closely placed 3m to 4m above the
ground and 1200mm to 1500mm below the ground and tied with cane
or coir string, half 2nd class bamboo(Jati or Bethua) horizontally on
both face placed not more than one meter apart including whole
bamboo struts inside one meter apart and 2nos. of purlin at top and RM 876.22
bottom fitted with vertical struts at 1500 mm apart and filling with
bryushwood or jungle wood inside the spur complete as per drawing
and technical specifications.

17.29 Providing close bamboo toe walling consisting of 65mm to 75mm


diameter bamboos of length ranging from 1.2m to 3.0m driven at least
150mm C/C and provided with three horizontal split bamboo runner meter 620.56
fixed with nails. All bamboos to be duly protected by coal tar painting

17.30 Double timber spur with two rows at 800mm C/C apart of 1st class
local wood piles with timber of Azar/Nahar/Nageswar/Zarul wood
150mm to 200mm dia driven 2000mm minimum below ground and
3600mm above ground average placed at 800mm belt, bracing etc. of
100mmx75mm size dia bolts and nuts etc. including coal tarring of meter 33,689.28
timber members and cost of necessary bamboo staging etc. as
directed by the Engineers as per drawing and technical specifications.

17.31 Supplying and filling up hollows of the timber spur to an average height
of 3600mm above the ground with jungle wood branches as directed
meter 53.46
by the Engineers and as per drawing and technical specifications.

17.32 Providing split bamboo digonally wooven lining over slope of bridges,
abutement and road embakement etc. secured to the ground at least
sqm 125.51
70cm long bamboo pegs and half bamboo horizontally at 100cm center
to center both ways.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.33 (a) Suuplying fitting and fixing whole Bholuka or Barua bamboo pegs
85mm to 100mm dia, closely placed all round the hollows of spur fitted
with necessary nail in the horizontal timber between 90 cm below
ground and 360cm above ground on average (timber works will be paid
for separately).
(a) For 360 cm above ground on average meter 922.71
(b) For 200 cm above ground on average meter 700.75
17.34 Earthwork in filling in the guide bund by head load up to lead of 60m
with approved quality all leads and lifts ramming and compacting with
rammer weighing not less than 10kg and falling from height of not less
than 90cm and sprinkling with water if necessary. earth is to collected
after removing the 1st 20cm of top soil and should be free from grass, cum 105.75
shrubs and other foreign matter and rate will be including payment of
fland compensation.

(a) Extra lead for each 30cm and part thereof beyond 60m up to a lead
cum 8.13
200m.
(b) Extra lift for each 1.50m or part thereof beyond the initial lift of 1.50m
cum 8.13
17.35 Labour for haulding up boat and refloating the same after repair

(a) Mar boat each 4,784.37


(b) Single boat each 2,377.66
17.36 Renewing rotton planks of boat with 25 mm to 38 mm thick timber
planks including supplying and fitting with necessary nail etc. including
coat tarring two coats applied hot.
(a) With Sal planks sq.m 3,919.76
(b) With Cham or Lorul planks sq.m 2,275.39
17.37 Making good carakcks of the joint boat with necessary jute mixed with
putty of dhuna and flat nails including coaltarring after taking out old metre 32.54
nails, rotten jute etc.
17.38 Supplying, fitting and fixing kori (for boat) of wood of required sizes.

(a) With Sal timber each 3,816.34


(b) With cham/sundi/nageswar/gamari timber each 1,967.44
17.39 Supplying sal wood helm for marboat 18cm dia 6.10m as per direction
including fixing in position and coal tarring complete as
directed.cham/nageswar wood helm for mar boat 13cm dia. 6.10m each 8,740.15
long as per direction including fixing in position and coal and coal
tarring as directed.
17.40 Supplying cham/nageswar wood helm for mar boat 13cm dia. 6.10m
long as per direction including fixing in position and coal and coal each 3,488.62
tarring as directed.
17.41 Renewing oars of wood plank.
(a) Of Sal wood each 1,606.02
(b) Of Cham wood each 852.98
17.42 Supplying fitting and fixing in position koniaghosa of required size of
salwood to fit exactly at boat and coal tarring etc. complete as directed.

(a) Sal wood each 431.14


APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

(b) Cham/Sundi/Gamari each 190.58


17.43 (a) Repariring or providing free board line 8cm by 5cm sal timber
metre 341.66
painted white with two coats of approved paint.
(b) Repairing or providing free board line 8cm by 5cm
cham/sundi/gamari timber painted with two coats of approved paint. metre 165.02

17.44 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 432.30
complete up to 6 tonne mar boat.
17.45 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 650.78
complete above 6 tonne mar boat.
17.46 Providing and launching Steel Truss of Structural steel BUG super
Structure including painting complete as per Section 1900 of MOST MT 1,11,971.82
specification.
17.47 Earth work by head load in filling embankment in layers not exceeding
20cm thick including breaking clods, dressing and sectioning,
cambering and ramming, within a lead up to 30 m and lift up to 1.5m
including payment of land conpensation for obtaining earth from private
land or govt. land as required (measurement will be on the bais of
profile or section measurement, 12.5% deduction being made on the
quantity thus arrived for shrinkage allowance.

(i) Sandy soil. cum 55.78


(II) Ordinary soil, Basti land, Low marshy land. cum 75.54
(III) Hard soil mixed with moorum and gravel cum 1.16
(a) Extra lead for each 30m and part thereof beyond initial lead of 30m.
cum 5.81
(b) Extra lift for each 1.50 m or part thereof beyond the initial lift of 1.50m
cum 5.81
17.48 Earth work in core of embankment by head load with soil of approved
quality with a lead up to 30 m and lift up to 1.5 m in layers not
exceeding 20 cm including breaking clods, dressing grading to required
shape and compacting to meet requiremenet of Table 300 - 2 cum 112.72
(including payment of land conpenssation for obtaining earth).

(a) Extra lead for each 30m and part thereof beyond initial lead of 30m.
cum 5.81
(b) Extra lift for each 1.50 m or part thereof beyond the initial lift of 1.50m
cum 5.81
17.49 Earth work in sub grade and shoulders by head load with selected soil
of approved quality with a lead of 30 m and lift up to 1.5 m spreading
grading to required shape and compacting to meet requirement of cum 126.67
Table 300 -2 (including payment of land compensation of obtaining
earth).
(a) Extra lead for each 30m and part thereof beyond initial lead of 30m.
cum 5.81
(b) Extra lift for each 1.50 m or part thereof beyond the initial lift of 1.50m
cum 5.81
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.50 Labour fror laying apron with man size boulders by hand packing the
syone with dry stone masonry template crosswalls to ensure regular
and orderly deposition of the full intended quality of stone in the apron
including labour for buildung these walls about one meter thick and to
the full height of the specific thockness of the apron at interval of 30 cum 496.22
meters all along the length of the apron with local carriage of stone
within 60 meters complete.

17.51 Stone masonry work. Uncoursed rubble masonry work in all retaining
wall, wing wall, abutement etc. in cement mortar 1;6 withoutside face
stone roughly hammer dressed and inside (earthen side ) undressed
as per drawing and technical sopecifications including racking out joints cum 3,687.34
and curing , supplying and carriage of stone as directed.

17.52 Labour for spreading metal gravel / granular material on the road
surface as directed including dressing and cambering the formation
and utilizing the loose earth in filling the depression as directed Cum 142.94
including carriage of gravel within 30m.

17.53 (a)Providing an construcyion of temporary island to accommodate pile


rig and other accessories including casting of pile cap, all complete in
each 76,506.85
depth of water up to 400 cm.

(b)Extra per meter depth beyond 400 cm depth metre 9,180.82


17.54 RCC Hollow Circular Guard Post
Providing of hume pipe delineator, 250 mm in diameter, 1250 mm high,
having 25mm skin thickness filled with earth for stability up to 5 cm
from top and remaining filled with 1:3:6 c.c.in spherical segment to
prevent percolation of water and emeded in c.c. (1:3:6) below ground Each 1,787.31
level up to a depth of 500mm, 75mm thick cc surrounding the pipe,
painted white as per approved drawing.

17.55 Drum Delineator


Providing of metal drum/empty bitumen drum delineator, 600 mm in
diameter, 800 mm high, filled with earth for stability up to 5 cm from top
and remaining filled with 1:3:6 c.c. to prevent percolation of water, Each 717.02
painted in circumferential strips of alternate black and white 120 mm
wide all as per IRC:SP:55-2001and drawing.

17.56 Paved Shoulder:-


Prviding brick soling in earthen shoulder with stone/best quality jhama
brick, sand packed and laid to true line and level and in panel after
preparing the subgrade including earthwork in excavation as directed
including all labour and materials and if necessary dewatering,
complete.
(a) Bricks on flat soling, sqm 302.15
(b) Bricks on edge soling, sqm 404.41
(c) Stone soling of thickness 150mm. sqm 274.26
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.57 Pre fabricated railing :-


Providing,fitting and erecting pre fabricated railing of TATA
STRUCTURA materials having size of 2.00x0.90M in panels made of
25x25x2.6/40x40x2.6 vertical bars and 40x40x2.6/32x32x2.6 horizontal
bars.The two end posts of each panel are founded with M-15 cement Rm 1,788.47
concrete up to a depth of 200mm with anti corrosive primer and paint
etc. complete as per approved drawing and technical specification as
directed..

17.58 Crash Barrier :-


Providing and erecting steel rails crash barrier in selected location with
vertical post of TATA STRUCTURA WRS of size (113.50X113.50
x4.800)mm & 1.50m1.25m/0.70m/0.60m height above the GL attached
to the gusset plate (330X330)X25mm with nut and bolts and embeded
in cement concrete in prop. 1:2:4 (450X450X750) mm as per approved
and technical specification , 3.70m center to center for intermediate
bay and 3.00m for end bay, 4 nos. horizantal steel rails of size
(113.50X113.50X4.80) mm of TATA STRUCTURA WRS to be fixed on
the vertical posts with a spacer channel section of size
(113.5X113.5X4.80)mm of TATA-STR-WRS including all fittings such
as Stainless Steel Hexagonal Head , SS washer & screw head , nylon
top hat washer and galvanized steel washer including transportation &
erection etc. complete as per approved drawing.

I Four rails System


(A) 1.50m heigh above ground level RM 10,218.35
(B) 1.25m heigh above ground level meter 10,142.81
II Single rail System
(A) 0.60m heigh above ground level RM 4,481.06
(B) 0.75m heigh above ground level meter 4,542.65
(C ) 0.75m heigh above ground level both side meter 8,565.84
17.59 Construction of PCC strips level footing (35cm X 15cm) in M-15 grade
concrete complete as per technical specification and drawing. RM 331.20

17.60 Providing 600mm drainage bay behind RE wall with compacted


granular material as per technical specification and drawing. cum 1,265.53

17.61 Greasing of Bearing with ULTRATACK AP3 grease including cleaeing


of bearings with steel brush, removal of dusts and dirt with necessary
each 1,492.14
scaffolding etc. complete as directed by the department.

17.62 Providing ,fitting,fixing 6mm thick permanent liner during cast in situ
pile boring to resist collapse of soil as per drawing and technical MT 74,708.00
specification
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)

MoRT&H
Ref. of
Unit without GST

17.63 Supplying,Fabrication,assembling, Erection, Launching of Steel Bow


string Girder:- Supplying of all types of structural steel conforming to Fe
490/Fe490 B of IS:2062,fabrication, assembling, erection/launching of
steel Bow string girders 36.00m and above span on sub structure
complete as per approved drawing including one coat of zinc chrome
primer to IS-104 and one coat of zinc chrome red oxide to IS:2074 and
painting as per relevant IS/IRS code on all members.(In case of ROB
detailed fabrication and erection drawings & launching methodology
(TAD)will be prepared and got approved by the contractor from Railway
and RDSO standard drawings shall be followed for construction of
superstructure).The rate includes fabrication of all the types of batten,
MT 1,09,613.00
bracings, ties, stiffners, packing, diaphragms, shop rivets/weldings,T&F
bolts ,dirfts,shop welds,templates, jigs, fixtures, back up supports,
accessories, transporting various components from fabrication shop to
site including loading, unloading, lift and taxes

17.64 Supplying,Fabrication,assembling, Erection, Launching of Steel Plate Girder:-MT


Supplying of all types of structural stee
94,908.00
17.65 Launching OF RCC/PSC GIRDER IN RIVER BED (FOR HEIGHT UP
TO 10M)
Launching of Pre cast RCC/PSC girders from casting Yard ,placing on
the truck trailer, transportation to the bridge location,lifting of girder by
suitable crane, over the bearing (Bearing to be placed true to line and MT 284.00
level over Pier cap pedestal placing the girder prior to placing
girder)(For Girder upto 40m effective span)

17.66 Launching OF RCC/PSC GIRDER OTHER THAN RIVER BED (FOR


HEIGHT UP TO 10M)
Launching of Pre cast RCC/PSC girders from casting Yard ,placing on
the truck trailer, transportation to the bridge location,lifting of girder by
suitable crane, placing the girder over the bearing (Bearing to be MT 213.00
placed true to line and level over Pier cap pedestal prior to placing
girder) (For Girder upto 40m effective span)

17.67 MS Liner for bored cast in situ concrete pile


Providing and installing 6mm MS liner for bored cast in situ concrete
pile including applying protective coating as per drawing and technical MT 77,868.00
specification and as directed by Engineer in charge.
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
Air compressor 210 cfm (with pneumatic chisel attachment for
P & M- 001 general purpose capacity in cfm 210 hour 663.00
cutting hard clay)
Air compressor 330 cfm (with pneumatic chisel attachment for
P & M- 002 general purpose capacity in cfm 330 hour 900.00
cutting hard clay)
Concrete batching and Mixing plant 30 cum capacity (63 KVA D.G set
P & M- 003 concrete mixing cum/hour 30 hour 1,670.00
to be attached seperately)
Concrete batching and Mixing plant 18 cum capacity (63 KVA D.G set
P & M- 004 concrete mixing cum/hour 18 hour 1,274.00
to be attached seperately)
Concrete batching and Mixing plant 45 cum capacity (125 KVA D.G
P & M- 005 concrete mixing cum/hour 45 hour 2,025.00
set to be attached seperately)
Concrete batching and Mixing plant 69 cum capacity (125 KVA D.G
P & M- 006 concrete mixing cum/hour 69 hour 3,127.00
set to be attached seperately)
Concrete batching and Mixing plant 101 cum capacity (150 KVA D.G
P & M- 007 concrete mixing cum/hour 101 hour 4,676.00
set to be attached seperately)
applying bitumen
P & M- 008 Bitumen pressure Distributor ( truck mounted ) ( 4 - 10 KL capacity) sqm/hour 1750 hour 1,274.00
tack coat
capacity in
P & M- 009 Bitumen Boiler boiling of bitumen 2 hour 843.00
tonne
P & M- 010 Bitumen Boiler boiling of bitumen capacity in Lts 400 hour 401.00
concrete laying &
P & M- 011 concrete slip form sensor paver finisher (3.5 meter) tonne/hour hour 1,899.00
paving
concrete laying &
P & M- 012 concrete slip form sensor paver finisher (5.5 meter) tonne/hour hour 2,489.00
paving
concrete laying &
P & M- 013 concrete slip form sensor paver finisher (6 meter) tonne/hour hour 2,592.00
paving
concrete laying &
P & M- 014 concrete slip form sensor paver finisher (9.5 meter) tonne/hour hour 3,181.00
paving
texturing for PQC
Texturing machine & concurring machine (for rigid pavement) for
P & M- 015 /concrete roads/rigid hour 957.00
7m in single row (concrete paver attach seperately)
pavements

P & M -016 Concrete pump 30 -45 cum (with 100 meter) Pumping of concrete cum/hour hour 719.00
P & M -017 concrete mixture 0.28 -0.4 cum capacity concrete mixing cum/hour 2.5 hour 410.00
P & M -018 concrete mixture 1 cum capacity concrete mixing cum/hour 1 cum hour 461.00
P & M -019 Crane upto 15 tonne capacity (hydra) lifting purpose tonne 30 hour 1,029.00
P & M -020 Crane 30 tonne capacity (hydra) lifting purpose tonne 30 hour 1,350.00
P & M -021 Crane 40 tonne capacity (hydra) lifting purpose tonne 40 hour 1,463.00
P & M -022 Crawler crane 50 tonne capacity lifting purpose tonne 50 hour 1,887.00
P & M -023 Crawler crane 80 tonne capacity lifting purpose tonne 80 hour 2,468.00
P & M -024 Crawler crane 100 MT capacity lifting purpose tonne 100 hour 2,842.00
P & M -025 Crawler crane 150MT capacity lifting purpose tonne 150 hour 3,947.00
P & M -026 Crawler crane 260 MT capacity lifting purpose tonne 260 hour 5,814.00
P & M -027 Crawler crane 50 T with grab 1 cum capacity lifting purpose tonne 2 hour 1,992.00
P & M -028 Crawler crane 30MT with grab 0.75 cum capacity lifting purpose tonne 1.5 hour 1,436.00
P & M -029 Hydralic telescopic truck crane 15 tonne lifting purpose tonne 15 hour 1,029.00
P & M -030 Hydralic telescopic truck crane 30 tonne lifting purpose tonne 30 hour 1,350.00
P & M -031 Hydralic telescopic truck crane 40 tonne lifting purpose tonne 40 hour 1,463.00
P & M -032 Hydralic telescopic truck crane 50 tonne lifting purpose tonne 50 hour 1,877.00
P & M -033 Hydralic telescopic truck crane 60 tonne lifting purpose tonne 60 hour 2,236.00
P & M -034 Hydralic telescopic truck crane 80 tonne lifting purpose tonne 80 hour 2,670.00
P & M -035 Tower crane 5 tonnes lifting purpose tonne 5 hour 2,060.00
P & M -036 Tower crane 6 tonnes lifting purpose tonne 6 hour 2,788.00
spreading/cutting/cle
P & M -037 Dozer D -80-A12 aring cum/hour 300/150/250 hour 2,797.00
spreading/cutting/cle
P & M -038 Dozer D -50-A15 aring cum/hour 200/120/150 2,103.00
spreading/cutting/cle
P & M -039 Emulsion pressure distributor with tractor sqm/hour
aring 1750 hour 880.00
Applying emulsion
P & M -040 Excavator cum loader (Back hoe) of 1 cum bucket cum/hour
tack coat 60/60 hour 1,520.00
Soil ordinary/soil
P & M -041 Front End loader 2.1 cum bucket capacity marshy/ soil cum/hour
unsuitable 60/60 hour 1,874.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
Soil ordinary/soil
P & M -042 Crawler mounted Excavator of 1 cum bucket marshy/ soil cum/hour
unsuitable 60/60 hour 2,248.00
Soil ordinary/soil
P & M -043 Generator 15 KVA marshy/ soil cum/hour
unsuitable 15 hour 652.00
Generation of
P & M -044 Generator 25 KVA
electric Energy KVA 25 hour 816.00
Generation of
P & M -045 Generator 40 KVA
electric Energy KVA 40 hour 887.00
Generation of
P & M -046 Generator 45 KVA
electric Energy KVA 45 hour 926.00
Generation of
P & M -047 Generator 63 KVA
electric Energy KVA 62.5 hour 1,189.00
Generation of
P & M -048 Generator 82.5 KVA
electric Energy KVA 82.5 hour 1,327.00
Generation of
P & M -049 Generator 100 KVA
electric Energy KVA 100 hour 1,464.00
Generation of
P & M -050 Generator 125 KVA
electric Energy KVA 125 hour 1,625.00
Generation of
P & M -051 Generator 160 KVA
electric Energy KVA 160 hour 2,053.00
Generation of
P & M -052 Generator 180 KVA
electric Energy KVA 180 hour 2,206.00
Generation of
P & M -053 Generator 200 KVA
electric Energy KVA 200 hour 2,388.00
Generation of
P & M -054 Generator 250 KVA
electric Energy KVA 250 hour 2,746.00
Batch Mix Plant -120mTPH capacity (160 KVA D.G set to be attached Generation of
P & M -055
separately) electric Energy MT/hour 120 hour 16,677.00
Hotmix (Drum)plant -100 TPH capacity (160 KVA D.G set to be
P & M -056 attached separately) DBM/BM/SDC/premix MT/hour 100 hour 14,777.00
Hotmix (Drum)plant -60 to 90 TPH capacity (160 KVA D.G set to be
P & M -057 attached separately) DBM/BM/SDC/premix MT/hour 60 hour 12,330.00
Hotmix (Drum)plant -40 to 60 TPH capacity (125 KVA D.G set to be
P & M -058 attached separately) DBM/BM/SDC/premix MT/hour 40 hour 10,091.00
blending asphalt
P & M -059 Batch Mix Plant 1500 TPH mixture MT/hour 1500 hour 24,963.00

P & M -060 Hydraulic chip spreader spreading GSB/WBM hour hour 269.00

P & M -061 Integrated stonne crusher 60 TPH (D.G set to be attached separately) Crushing of stone TPH 60 hour 1,796.00
P & M -062 Self propelled Kerb casting machine casting of kerb RM/ hour 5 hour 3,734.00
capacity in
P & M -063 Mastic cooker with attached 15 KVA D.G set. mastic wearing coat tonne 1 hour 879.00

P & M -064 Mechanical Broom hydraulic ( excluding prime mover/ tractor) surface cleaning sqm/hour 1250 hour 362.00

cleaning
P & M -065 Motor Grader 3.35 mm mtr blade /spreading/GSB/WBM cum/hour 200/200/50/50 hour 2,498.00
mixing and laying
P & M -066 Mobile slurry seal machine / equipment slurry seal sqm/hour 2700 hour 3,670.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (5.5-6 meter DBM/BM/SDBC/prem
P & M -067 width) ix tonne/hour 40 hour 3,005.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (7.3 meter DBM/BM/SDBC/prem
P & M -068 width) ix tonne/hour hour 3,445.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (9 meter DBM/BM/SDBC/prem
P & M -069 width) ix tonne/hour hour 4,072.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (12 meter DBM/BM/SDBC/prem
P & M -070 width) ix tonne/hour hour 4,860.00
P & M -071 Paver finisher mechanical 100 TPH paving surface hour hour 1,187.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
piling activity upto
P & M -072 Piling Rig (mannual) with bantonite pump (upto 500 mm dia boring) 1.2 m dia. RM/ hour 2 to 3 Rm 668.00
P & M -073 Power winch with assosories (Double Drum) pile hammering hour hour 3,452.00
rolling of asphalt
P & M -074 Pneumatic tyred road roller (VOLVO/HAMM) surface sqm/hour 25 hour 2,146.00

P & M -075 pad foot roller (11tonne) rolling & compacting sqm/hour hour 1,645.00
pneumatic sinking of
P & M -076 pneumatic sinking plant wells cum/hour 1.5 to 2 hour 3,455.00
P & M -077 pot hole repair machine repair of potholes cum/hour 4 hour 1,190.00
stressing of steel
P & M -078 single pretressing jack with pump & accessories (without D.G set) wires /stands hour hour 270.00
stressing of steel
P & M -079 Double prestressing jack with pump & accessories (without D.G set) wires /stands hour hour 289.00
P & M -080 Ripper ( attachment part in excavator) Scarifying cum/hour 60 hour 37.00
P & M -081 Rotavator ( attachment part in tractor) Scarifying cum/hour 25 hour 32.00
P & M -082 Road marking machine (manual) road making sqm/hour 100 hour 284.00
P & M -083 Road marking machine (self propelled , semi - automatic) road making sqm/hour 100 hour 517.00
soil compaction / BM
P & M -084 Smooth wheeled roller 8 tonne (static road roller) Compaction cum/hour 70/25 hour 897.00
rolling of asphalt
P & M -085 Tandem vibratory road roller (8 - 10 T) surface cum/hour 30 hour 1,505.00
transportation of
soil,GSB,WMM,hotmi
P & M -086 Tipper - 5 cum x etc. capacity in cum 5.5 hour 38.00
transportation of
soil,GSB,WMM,hotmi
P & M -087 Tipper - 5 cum x etc. capacity in cum 5.5 hour 1,144.00
transportation of
soil,GSB,WMM,hotmi
P & M -088 Tipper - 10 cum x etc. capacity in cum 10 hour 1,324.00

transportation of
P & M -089 Transit Mixer (concrete mixer ) 6/7 cum concrete mix to site capacity in cum 6\7 hour 1,605.00

Transportation of
P & M -090 Transit Mixture 4/4.5 cum concrete mix to site capacity in cum 4.5 hour 1,421.00

Transportation of
P & M -091 Transit Mixture 3 cum concrete mix to site capacity in cum 3 hour 1,190.00

Transportation of
P & M -092 Transit Mixture 3 cum concrete mix to site cum/hour tonne/km 20.00
P & M -093 Tractor with trailor pulling capacity in HP 50 hour 792.00
P & M -094 Truck 5.5 cum per 10 tonnes material transport Capacity /cum 5.5 hour 1,110.00
P & M -095 Truck 5.5 cum per 10 tonnes material transport Capacity /cum 5.5 tonne/km 6.00
Earth of
P & M -096 vibratory soil compactor soil/GSB/WBM cum/hour 100/60/60 hour 1,306.00
P & M -097 water - tanker (6 - 10 KL cap) truck mounted water transport capacity in KL 6 to 9 hour 984.00
Batch type cold mixing plant 100- 120 TPH capacity producing an
P & M -098 average output of 75 tonne per hour premix tonne/hour hour 3,277.00
P & M -099 Boat to carry atlist 20 persons Transportation 20 hour 494.00
shaping of irregular
P & M -100 cold milling machine @ 20 cum per hour surface cum/hour 20 hour 4,911.00
shaping of irregular
P & M -101 Milling machine (1.2 meter) surface cum/hour 24 hour 5,941.00
P & M -102 Crane 5-10 tonne capacity (Mechanical) lifting purpose tonne 10 hour 843.00
P & M -103 Crane 15 tonne capacity (Mechanical) lifting purpose tonne 15 hour 970.00
P & M -104 Crane 20 tonne capacity (Mechanical) lifting purpose tonne 20 hour 1,066.00
P & M -105 Epoxy injection gun injecting epoxy hour 164.00
cutting of concrete
P & M -106 joint cutting machine with 2-3 blades (for rigid pavement) pavement hour 227.00
P & M -107 jack for lifting 40 - 150 tonne lifting capacity. lifting purpose day 303.00

P & M -108 Hydraulic piling rig including double acting pile driving hammer. hour hours 9,009.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
P & M -109 Plate compactor compaction of soil hour 276.00
P & M -110 Truck trailor 30 tonne capacity carry materials tonne 30 hour 1,398.00
performing pile
vibrating pile driving hammer complete with power unit ,crane &
P & M -111 driving and grade
assecssories.
stabilization tonne hour 3,963.00
DBM/BM/SDBC/prem
P & M -112 Wet mix plant 100 TPH DG sets of 125 KVA attached seperately)
ix tonne/hour hour 2,717.00
DBM/BM/SDBC/prem
P & M -113 Wet mix plant 60-75 TPH DG sets of 63 KVA attached seperately)
ix tonne/hour hour 2,280.00
P & M -114 AR 2000 SUPER RECYCLER owning & operating cost hot recyling hour 2 to 3 hour 1,05,869.00
piling activity upto 2
P & M -115 Pilling Rig machine (upto 2000mm dia) with boring attachement
m dia. rm/hour 2 to 3 hour 4,843.00
PQC/concrete
P & M -116 paver with dowell bar inserter (7mtr wide) roads/rigid
pavements hour 4,162.00
P & M -117 Hydraulic self propelled chip spreader surface dressing sqm/hour 1500 hour 3,005.00
P & M -118 Grouting pump with agitator concrete grouting hour 550.00
APWD, SOR (NATIONAL HIGHWAY)
(B) LABOUR
Approved rate for SOR
Sl No. Description of Labour unit
2020-2021
L -01 Blacksmith (II nd clsass) day 380
L -02 Blacksmith (1st clsass) welder /plumber/electrician day 500.47
L -03 Blaster (stone cutter) day 315.42
L -04 Carpenter I class day 500.47
L -05 Chiseller (Head mazdoor) day 380.79
L -06 Driller (jumper) day 380.79
L -07 Driver day 380.79
L -08 Fitter day 402.55
L -09 Mali day 315.42
L -10 Mason (II nd class) day 315.42
L -11 Mason (I st class) day 500.47
L -12 Mate / supervisor day 500.47
L -13 Mazdoor day 271.97
L -14 Mazdoor/Dresser (semi- skilled) day 315.42
L -15 Mazdoor/Dresser /sinker ( skilled) day 380.79
L -16 Medical officer day 2200
L -17 operator (grouting) day 500.47
L -18 painter I class day 500.47
L -19 para medical personnel day 700
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-001 Stone boulder of size 150mm and below at crusher plant cum 1,643.99
M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken at site cum 1,783.99
M-003 Boulder with minimum size of 300 mm for pitching site cum 1,625.10
M-004 Coarse sand at mixing plant cum 1,042.80
M-005 Coarse sand at site cum 1,041.79
M-006 Fine sand at site cum 1,009.79
M-007 Moorum at site cum 784.37
M-008 Gravel / Quarry spall at site cum 1,506.21
M-009 Granular Material or hard murrum for GSB works at site cum 1,774.25
M-010 Granular Material or hard murrum for GSB works at Mixing plant cum 1,814.25
Fly ash conforming to IS: 3812 (Part II & I ) at HMP Plant / Batching
M-011 plant/Crushing plant cum 1,805.00
M-012 Filter media / Filter material as per Table 300-3 (MORT &H Specification) cum 2,062.51
M-013 Close graded Granular sub- base Material 53 mm to 9.5 mm cum 2,129.46
M-014 Close graded Granular sub- base Material 37.5mm to 9.5 mm cum 2,129.46
M-015 Close graded Granular sub- base Material 26.5 mm to 9.5 mm cum 2,129.46
M-016 Close graded Granular sub- base Material 9.5 mm to 4.75mm cum 2,155.02
M-017 Close graded Granular sub- base Material 9.5 mm to 2.36 mm cum 2,143.91
M-018 Close graded Granular sub- base Material 4.75 mm to 2.36 mm cum 2,106.13
M-019 Close graded Granular sub- base Material 4.75mm to 75 micron mm cum 2,177.24
M-020 Close graded Granular sub- base Material 2.36 mm cum 2,055.02
Stone crusher dust finer than 3mm with not more than 10 % passing 0.075
M-021 sieve. cum 1,472.88
M-022 Coare graded Granular sub- base Material 2.36 mm & below cum 1,839.54
M-023 Coare graded Granular sub- base Material 4.75mm to 75 micron mm cum 1,875.10
M-024 Coare graded Granular sub- base Material 4.75 mm to 2.36 mm cum 1,889.54
M-025 Coare graded Granular sub- base Material 9.5mm to 4.75mm cum 1,958.43
M-026 Coare graded Granular sub- base Material 26.5mm to 4.75mm cum 2,103.99
M-027 Coare graded Granular sub- base Material 26.5mm to 9.5mm cum 2,105.10
M-028 Coare graded Granular sub- base Material 37.5mm to 9.5mm cum 2,105.10
M-029 Coare graded Granular sub- base Material 53mm to 26.5 mm cum 2,088.43
M-030 Aggregates below 5.6 mm cum 1,851.77
M-031 Aggregates 22.4 mm to 2.36 mm cum 2,393.99
M-032 Aggregates 22.4 mm to 5.6 mm cum 2,360.66
M-033 Aggregates 45 mm to 2.8 mm Cum 2,365.10
M-034 Aggregates 45 mm to 22.4 mm Cum 2,377.32
M-035 Aggregates 53 mm to 2.8 mm Cum 2,395.10
M-036 Aggregates 53 mm to 22.4 mm Cum 2,334.66
M-037 Aggregates 63 mm to 2.8 mm Cum 2,360.66
M-038 Aggregates 63 mm to 45 mm Cum 2,350.66
M-039 Aggregates 90 mm to 45 mm Cum 2,319.54
M-040 Aggregates 10 mm to 5 mm Cum 2,389.77
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-041 Aggregates 11.2 mm to .09 mm Cum 2,406.43
M-042 Aggregates 13.2 mm to .09 mm Cum 2,373.10
M-043 Aggregates 13.2 mm to 5.6 mm Cum 2,438.66
M-044 Aggregates 13.2 mm to 10 mm Cum 2,423.10
M-045 Aggregates 20 mm to 10 mm Cum 2,447.66
M-046 Aggregates 25 mm to 10 mm Cum 2,438.21
M-047 Aggregates19 mm to 6 mm Cum 2,458.77
M-048 Aggregates 37.5 mm to 19 mm Cum 2,421.77
M-049 Aggregates 37.5 mm to 25 mm Cum 2,382.88
M-050 Aggregates 6 mm nominal size Cum 2,181.77
M-051 Aggregates 10 mm nominal size Cum 2,382.88
M-052 Aggregates 13.2/12.5mm nominal size Cum 2,422.88
M-053 Aggregates 20 mm nominal size Cum 2,451.77
M-054 Aggregates 25 mm nominal size Cum 2,440.66
M-055 Aggregates 40 mm nominal size Cum 2,380.66
M-056 GI Pipe 100 mm dia metre 528.67
M-057 Acrylic polymer bonding coat litre 401.25
M-058 Aluminium paint litre 160.00
M-059 Aluminium alloy plate 2mm thick Sqm 183.75
M-060 Aluminium alloy/galvonised steel tonne 43,786.25
Aluminium sheeting fixed with encapsulated lens type reflective sheeting
including 2 % towards lettering, cost of angle iron, cost of drilling holes,
M-061 nuts bolts etc and signs as applicable Sqm 953.75
M-062 Barbed wire kg 46.11
M-063 Bearing ( Cast steel rocker bearing assembly of 250 tone) MT 550.00
Bearing ( Elastomeric bearing assembly consisting of 7 internal layers of
elastomer bonded to 6 nos. internal reinforcing steel laminates by the
M-064 process of vulcanisation,) (19200 cum capacity) cum 575.00
M-065 Bearing ( Forged steel rollar bearing of 250 tonne) MT 150.00

Bearing ( pot type bearing assembly consisting of a metal piston supported


by a disc, PTFE pads providing sliding surfaces against stainless steel mating
together with cast steel assemblies / fabricated structural steel assemblies.
M-066 Duly painted with all comp (550 ton capacity) MT 150.00
M-067 Bearing ( PTFE sliding plate bearing assembly of 80 tonnes) MT 150.00
M-068 Bearing (Supply of sliding plate bearing of 80 tonne) MT 8.22
M-069 Bentonite KG 37.56
M-070 Binding wire KG 37,400.00
M-071 Bitumen (Cationic Emulsion)(CSS-1h) Tonne 43,745.00
M-072 Bitumen (Cationic Emulsion)(CSS-1) Tonne 42,586.00
M-073 Bitumen (Cationic Emulsion)(CSS-2) Tonne 37,200.00
M-074 Bitumen (Cationic Emulsion)(RS-1) Tonne 35,583.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-075 Bitumen (Cationic Emulsion)(RS-2) Tonne 40,800.00
M-076 Bitumen (Cationic Emulsion)(MS) Tonne 32,560.00
M-077 Bitumen (30-40 grade OR VG -40) 34,650.00
M-078 Bitumen (30-40 grade OR VG-30) Tonne 33,850.00
M-079 Bitumen (80-100 grade OR VG- 10) Tonne 36,650.00
M-080 Bitumen (CRMB-55) Tonne 44,903.54
M-081 Bitumen (Penetration at 25 deg C= 15+/-5) Tonne 60,689.00
M-082 Bitumen (Polymer modified graded) PMB Tonne 58,107.00
M-083 Polymer Modified Emulsion Grde CSS -015 confirming to IS : 8887 : 2004
Tonne 10.49
M-084 Brick each 40.63
M-085 C.I shoes for the pile kg 6,365.71
M-086 Cement tonne 42,372.00
M-087 Mild steel bars tonne 46,200.00
M-088 TMT reinforcement bar ( Fe -500) tonne 46,333.33
M-089 super Ductile (SD) TMT reinforcement bar (Fe-500D) tonne 48,333.33
M-090 super Ductile (SD) TMT reinforcement bar (Fe-600) tonne 48,333.33
M-091 TMT corrosion resistant structural steel (CRS) tonne 48,833.33
M-092 Coller for joints 300mm dia nos 692.00
M-093 Compressible fiber board ( 20 mm thick) Sqm 350.00
M-094 Connectors/staples each 30.00
M-095 Copper plate ( 12 m long x 250 mm wide) kg 110.00
M-096 Corrugated sheet, 3mm thick ." thrie" beam section railing kg 21.00
M-097 Credit for excavated rock found suitable for use cum 126.00
M-098 Curing compound liter 27.00
M-099 Earth cost or compensation for earth taken from private land cum 148.72
Elastomeric slab seal expansion joint assembly manufactured by using
chloroprene, elastomer for elastomeric slab unit conforming to clause
M-100 915.1 of IRC : 83 ( part ii) metre 32,500.00

M-101 Electric Detonators@ 1 detonators for 1/2 gelatin stick of 125 gms each 100 nos 455.54
M-102 Epoxy resin - hardner mix for prime coat kg 1,645.00
M-103 Epoxy compound with accessories for preparing epoxy mortar kg 945.66
M-104 Epoxy mortar kg 900.00
M-105 Epoxy mortar kg 600.00
M-106 Flag of red colour cloth 600x600 mm each 85.33
M-107 Flowering plants each 148.33
M-108 Galvanised MS flat clamp nos 850.00
Galvanised steel wire crates of hexagonal shaped mesh size 100 mm x 120
mm mechanically wooven with 2.7/3.7 ( I.D/O.D). Lacing wire to be knot
M-109 the crate as required Sqm 450.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21

M-110 Galvanised structural steel plate 200 mm wide , 6 mm thick , 24 m long kg 95.00
M-111 Gelatin 80% kg 60.00
M-112 G I Bolt 10 mm dia nos 71.20
M-113 Grass ( doob) kg 50.00
M-114 Grass ( fine) kg 75.00
M-115 HDPE pipes 75 mm dia metre 264.60
M-116 HDPE pipes 90 mm dia metre 353.00
M-117 Hedge plants each 115.00
M-118 Helical pipes 600 mm diameter metre 365.00
M-119 Hot applied thermoplastic compound liter 120.00
M-120 HTS strand tonne 68,000.00
M-121 Joint sealant compound kg 713.82

M-122 Jute netting, open weave , 2.5 cm square opening for seeding and mulching Sqm 70.00
M-123 LDO for steam curing litre 42.71
M-124 M.S Clamps nos 57.00
M-125 Masterplug ( CHOKSEY) each 23.24
M-126 M.S shoes @ 35 kg per pile of 15m kg 85.00
Moulder strip/box seal expansion joint including anchorage catering to a
horizontal movement beyond 70 mm and upto 140mm assembly
comprising of edge beam ,central beam ,2 modules chloropene
M-127 seal,anchorage elements ,support and meter 27,500.00

Modular strip /box seal expansion joint cataring to a horizontal movement


beyond 140mm and upto 210mm box/ box seal joint assembly containing 3
modules / cells and comprising of edge beams , two central beams ,
M-128 chloropene seal, anchorage elements, support and meter 55,500.00
M-129 Nipples 12mm nos 74.00
M-130 Nuts and bolts kg 89.40
M-131 paint litre 235.00
M-132 paint pavement marking paint litre 260.00
M-133 paving fabric (1.5mm thick) sqm 365.60
M-134 perforated geosynthetic pipe 150mm dia meter 250.00
M-135 perforated pipe of cement concrete, internal dia 100mm meter 166.00
M-136 pesticide kg 225.00
M-137 pipes 200mm dia, 2.5m long for drainage meter 623.33
M-138 plastic sheath,1.25mm thick for dowel bars sqm 55.13
M-139 plastic tubes 50 cm dia, 1.2 m high nos 120.00
M-140 polymer braids meter 35.00
M-141 pre moulded joint filler ,25 mm thick for expansion joint . sqm 1,185.00
M-142 pre coated stone chips of 13.2 mm nominal size cum 5,875.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-143 pre - moulded asphalt filler board sqm 1,350.00

M-144 pre - packed cement based polymer concrete of strength 45 Mpa at 28 days kg 97.62
M-145 primer kg 163.33
M-146 Quick setting compound kg 76.00
M-147 Random Rubble stone cum 1,762.50
M-148 Reflectorising glass beads kg 154.50
Reinforcement strips 60mm wide 5mm thick as per clause 3102. (copper
M-149 strips) meter 1,456.00
Reinforcement strips 60mm wide 5mm thick as per clause 3102.
M-150 (galvanised carbon steel strips) meter 329.00

Reinforcement strips 60 mm wide 5 mm thick as per clause 3102.( Glass


M-151 reinforced polymr / fibre reinforced polymer/polymeric strips) metre 875.00
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102.(
M-152 stainless steel strips) metre 875.00
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102.(
M-153 aluminium strips) metre 655.00
M-154 Rivets each 8.00
M-155 Sand bags ( cost of sand and empty bag) nos 63.67
M-156 Sapling 2m high 25 mm dia each 230.75
M-157 Scrap tyres of size 900 x20 nos 192.50
M-158 seeds kg 94.50
M-159 selected earth cum 531.70

M-160 Separation membrane of impermeable plastic sheeting 125 micron thick sqm 80.00
M-161 Sheathing duct metre 137.10
M-162 Shrubs each 32.00
Sludge/Farm yard manure @ .18 cum per 100 sqm at site of work for
M-163 turfing cum 192.50
Well decayed Farm yard manure @ .18 cum per 100 sqm at site of work
M-164 for turfing cum 242.50
M-165 Sodium vapour lamp ( 250 watts) each 10,880.00
M-166 Square rubble coursed stone cum 2,685.00
Steel circular hollow pole of standard specification for street lighting to
M-167 mount light at 5 m height above deck level each 9,000.00
Steel circular hollow pole of standard specification for street lighting to
M-168 mount light at 9 m height above road level each 11,000.00
M-169 steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 92.00
M-170 steel halmet and cushion block on top of pile head during driving kg 75.00
M-171 Steel pipe 25 mm external dia as pe IS : 1239 metre 284.20
M-172 Steel pipe 50 mm external dia as pe IS : 1239 metre 479.20
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-173 Steel wire rope 20 mm kg 190.00
M-174 Steel wire rope 40 mm kg 1,269.00
M-175 Strip seal expansion join metre 3,400.00
M-176 Structural steel tonne 50,000.00
M-177 Mild Steel plates tonne 46,000.00
M-178 Mild Steel angles tonne 44,000.00
M-179 Mild Steel channels tonne 44,000.00
M-180 G.I structural steel tonne 70,000.00
M-181 super plastisizer admixture IS marked as per 9103-1999 kg 186.00
Synthetic geogrids as per clause 3120.8 and approved design and
M-182 specification.(TGU-150) sqm 570.00
M-183 Trough and bond stone each 6.72
M-184 Tie rods 20 mm diameter nos 60.00
M-185 Tie size 300 x300 mm and 25 mm thick each 190.00
M-186 Timber cum 48,900.00
M-187 Traffic cones with 150mm reflective sleeve nos 490.00

M-188 Tube anchorage set complete with bearing plate ,permanent wedges etc. nos 2,074.35
M-189 Unstaked lime tonne 3,500.00
M-190 water kl 377.00
M-191 Anti stripping agent kg 773.33
M-192 Water based cement paint litre 403.00
M-193 welded steel wire fabric kg 250.00
M-194 wire mesh 50mm x 50mm size of 3mm wire kg 94.50
M-195 wooden ballies 2" dia for bracing each 470.00
M-196 wooden ballies 8" dia and 9mm long each 750.00
M-197 wooden packing cum 23,946.00
M-198 wooden staff for fastening of flag 25mm dia,one metre long each 80.00
M-199 Bamboo bholuka or barua 55mm to 100 mm dia and 6m long each 136.67
M-200 Bamboo jati or bethua 50mm to 100 mm dia and 6m long each 92.14
M-201 Wood local first class piles 25cm to 30cm metre 3,037.50
M-202 Wood local first class planks 25cm to 38 cm thick cum 35,455.40
M-203 Wood local first class small section cum 30,548.00
M-204 Wood local first class scantling upto 15cm x 15cm cum 38,312.00
M-205 Wood local first class heavy section above 15cm x 15cm cum 46,231.40
M-206 wood sal piles 25cm to 30 cm dia metre 23,600.00
M-207 wood sal planks 25cm to 38cm thick cum 22,250.00
M-208 wood sal scantling heavy section 15cm to 15cm cum 70,412.50
M-209 wood sal scantling upto 15 cm x15cm cum 70,412.50
M-210 conplast SP 430G8 (Masterplast PI -1 OR equivalent) litre 86.00
M-211 Conplast AEA (Air entraining admixture) litre 96.00
M-212 Conplast NC ( accelarating agent) Lit 120.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-213 PVC rain wrter pipe 100 mm dia RM 122.02
M-214 RBI grade 81 tonne 30,000.00
M-215 RENDEROC SP40 ( FOSROC)/ MASTER emaco S348 ( BASF) kg 25.00
M-216 RENDEROC S2 ( FOSROC) kg 35.00
M-217 Nitomortar S ( FOSROC) / master protect 1890 (BASF) litre 200.00
M-218 RENDEROC DS40 ( FOSROC)/ MASTER emaco S810 ( BASF) kg 20.00
M-219 Expocrete EC ( FOSROC)/ Wabocrete II ( BASF) litre 180.00
M-220 Nitoprime 25 ( FOSROC)/ master brace P 2525( BASF) litre 400.00
M-221 Nitozinc primer ( FOSROC) litre 1,200.00
M-222 Nitobond EP ( FOSROC)/ master BOND EP ( BASF) litre 800.00
M-223 Nitobond SBR( FOSROC)/ MASTER emacoSBR 2 ( BASF) litre 538.00
M-224 RENDEROC RG ( FOSROC)/ MASTER emacoS346 ( BASF) cum 75,913.00
M-225 Galvanised XP ( FOSROC) nos 1,030.12
M-226 Nitocote VF ( FOSROC) MASTERBRACE ADH 2200 (BASF) litre 1,275.00
M-227 Nitowrap 410 ( FOSROC)/ MASTERBRACE 4500 (BASF) ltr 1,125.00
M-228 Nitowrap 30 ( FOSROC)/ MASTERBRACE 3500 (BASF) ltr 1,355.00
M-229 Nitowrap EP(CF) ( FOSROC)/ MASTERBRACE FIBRES 230/200 (CF) sqm 2,750.00
M-230 Nitowrap 512 ( FOSROC)/ MASTERPROTECT 260 (BASF) litre 1,500.00
M-231 Nitowrap 40/Nitowrap ADH 2200 (BASF) litre 300.00
M-232 Nitowrap CPF( FOSROC)/ MASTERBRACE LAMINATES (BASF) RM 1,200.00
M-233 Cebex 100( FOSROC)/ MASTERFLOW 150 (BASF) kg 150.00
M-234 Conbextra EP 10 ( FOSROC)/masterinject 1315 (BASF) litre 800.00
M-235 Nitoseal UR63/ Masterseal 901 (BASF) kg 850.00
M-236 Nitofill WS60( FOSROC)/Master Roc MP 355 (BASF) kg 800.00
M-237 Polyurea WH200( FOSROC)/Masterseal878 (BASF) litre 437.00
M-238 Nitoprime 31 ( FOSROC) litre 500.00
M-239 Deckgaurd E2000 ( FOSROC)/ master protect 381( BASF) litre 550.00

M-240 Deckgaurd WB primer ( FOSROC)/ master protect 380 prime( BASF) litre 350.00
M-241 Nitocote EP50 ( FOSROC) litre 280.00
M-242 Nitocote EP110 ( FOSROC) litre 270.00
M-243 Nitocote EP100 ( FOSROC) litre 320.00
M-244 Deckgaurd PU silver grey ( FOSROC) litre 415.00
RENDEROC UW (FOSROC) cost is inclusive of material, transportation,
M-245 labour, taxes etc. Kg 52.00
M-246 conbextra EUW (FOSROC) litre 770.00
M-247 Lokfix P ( FOSROC) litre 1,800.00
M-248 Hydraproof extra ( FOSROC) litre 270.00
M-249 Recron 3s fibre Kg 96.00
M-250 RE 500 V3 of HILTI ml 9.60
M-251 HY 200R of HILTI ml 7.90
M-252 Aluminium backed flexible prismatic sheeting (AFP) sqft 950.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-253 Polypropylene fibre gm 0.61
M-254 Terrasil compound of Zytex industries Kg 1,450.88
M-255 Earth cost or compensation for earth taken from govt. land cum 17.43
M-256 HA/HAR Galvanized steel strip 60mm wide 5mm thick as per clause 3102. metre 435.79
M-257 HINCOL road bond MT 17,500.00
M-258 RCC pipe NP3 heavy duty non pressure pipe 750 mm dia 4,800.00
M-259 RCC pipe NP3 heavy duty non pressure pipe 900 mm dia 5,960.00
M-260 RCC pipe NP3 heavy duty non pressure pipe 1000 mm dia 6,900.00
M-261 RCC pipe NP3 heavy duty non pressure pipe 1200 mm dia metre 8,800.00
M-262 RCC pipe NP4 heavy duty non pressure pipe 900 mm dia 6,948.00
M-263 RCC pipe NP4 heavy duty non pressure pipe 1000 mm dia 8,455.50
M-264 RCC pipe NP4 heavy duty non pressure pipe 1200 mm dia metre 10,627.50
M-265 RCC pipe NP4 heavy duty non pressure pipe 1800 mm dia rm 18,600.00
M-266 Compression seal expansion joint rm 3,400.00
M-267 Asphalt reinforcement geogrid sqm 195.00
M-268 Glassgrid (50 KN/ M) to be used as asphalt reinforcement sqm 75.00

M-269 Glassgrid composite (50 KN/ M) to be used as asphalt reinforcement sqm 100.00
M-270 Triaxial geogrid ( TX 150) sqm 115.00
M-271 Triaxial geogrid ( TX 160) sqm 125.00
M-272 Triaxial geogrid ( TX 170) sqm 140.00

M-273 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 200.00

M-274 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 220.00

M-275 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 300.00

M-276 High strength flexible geogrids ( HSFG) ultimate strength 150KN/ m sqm 330.00
M-277 High strength flexible geogrids ( HSFG) ultimate strength 200 KN/m Sqm 350.00
M-278 High strength flexible geogrids ( HSFG) ultimate strength 250 KN/m Sqm 390.00
M-279 High strength flexible geogrids ( HSFG) ultimate strength 300 KN/m Sqm 420.00
M-280 High strength flexible geogrids ( HSFG) ultimate strength 350 KN/m Sqm 500.00
M-281 High strength flexible geogrids ( HSFG) ultimate strength 400 KN/m Sqm 550.00
M-282 Wooven Polypropylene Geotextile 150 gsm Sqm 60.00
M-283 Wooven Polypropylene Geotextile 220 gsm Sqm 65.00
M-284 Wooven Polypropylene Geotextile 250 gsm Sqm 75.00
M-285 Wooven Polypropylene Geotextile 400 gsm Sqm 130.00
Biaxial Geogrid, having tensile strength of 20 KN/m and aperture size of
M-286 39mm x 39 mm Sqm 100.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
Biaxial Geogrid, having tensile strength of 30 KN/m and aperture size of
M-287 39mm x 39 mm Sqm 125.00
Biaxial Geogrid, having tensile strength of 30 KN/m and aperture size of 65
M-288 mm x 65 mm Sqm 120.00
Biaxial Geogrid, having tensile strength of 40 KN/m and aperture size of 33
M-289 mm x 33 mm Sqm 140.00