CHAPTER-1
CARRIAGE OF MATERIALS
1.1 Loading and unloading by mechanical means (Placing tipper at
loading point, loading with front end loader, dumping, turning for return
trip, excluding time for haultage and return trip)
area.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
2.3 Clearing and Grubbing Road Land .(Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes, shrubs, saplings
and trees girth up to 300 mm, removal of stumps of trees cut earlier
and disposal of unserviceable materials and stacking of serviceable
201
MoRT&H
Ref. of
Unit without GST
I By Manual Means
A Bituminous courses cum 894.00
B Granular courses cum 670.00
II By Mechanical Means
A Bituminous course cum 470.00
2.6 Dismantling of Cement Concrete Pavement (Dismantling of cement
concrete pavement by mechanical means using pneumatic tools,
breaking to pieces not exceeding 0.02 cum in volume and stock piling
at designated locations and disposal of dismantled materials up to a cum 1,834.00
202
materials separately.)
2.8 Dismantling Kerb Stone (Dismantling kerb stone by manual means
and disposal of dismantled material with all lifts and up to a lead of metre 25.00
202
1000 metre)
2.9 Dismantling Kerb Stone channel (Dismantling kerb stone channel by
manual means and disposal of dismantled material with all lifts and up metre 37.00
202
MoRT&H
Ref. of
Unit without GST
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
3.1 Excavation in Soil by Manual Means. (a) (Excavation for roadway in
soil using manual means including loading in truck for carrying of cut
cum 244.00
earth to embankment site with all lifts and lead upto1000 metres.)
301
(b) (Excavation for roadway in soil using manual means using cut earth
cum 132.00
to embankment in the immediate vicinity.)
3.2 Excavation in ordinary rock by manual means (a) (Excavation in
ordinary rock using manual means including loading in a truck and
cum 318.00
carrying of excavated material to embankment site with in all lifts and
leads upto 1000 metres )
301
3.3 Excavation in Soil with Dozer with lead upto 100 metres
(Excavation for road way in soil by mechanical means including cutting
and pushing the earth to site of embankment upto a distance of 100
cum 117.00
metres (average lead 50 metres), including trimming bottom and side
slopes in accordance with requirements of lines,grades and cross
sections.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
3.4 Excavation in Ordinary Rock with Dozer with lead upto 100 metres
(Excavation for roadway in ordinary rock by deploying a dozer, 80 HP
including cutting and pushing the cut earth to site of embankment upto
a distance of 100 metres ( average lead 50 metres including trimming cum 198.00
301
sections,loading and disposal of cut road with in all lifts and leads upto
1000 metres)
sections,loading and disposal of cut road with in all lifts and leads upto
1000 metres)
3.10 Excavation in Marshy Soil (Excavation for roadway in marshy soil
with hydraulic excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with in all lifts and lead upto 1000
cum 112.00
metres, trimming of bottom and side slopes in accordance with
301
MoRT&H
Ref. of
Unit without GST
sqm 34.00
depth of 50 mm and disposal of scarified material within all lifts and
leads upto 1000 metres. )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
sqm 9.00
a depth of 50 mm and disposal of scarified material with in all lifts and
lead upto 1000 metres.)
3.16 Embankment Construction with Material Obtained from Borrow
Pits (Construction of embankment with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting to meet requirment of table
300-2 ( including compensation of earth.)( Including cost of testing of
materials at site and laboratory as directed by the deptt.)
305
3.21 Stripping, storing and re-laying top soil from borrow areas in
agriculture fields. (Stripping of top soil from borrow areas located in
agriculture fields, storing at a suitable place, spreading and re-laying
cum 70.00
after taking the borrow earth to maintain fertility of agricultural
field,finishing it to the reqd. levels and satisfaction of the farmer.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
3.22 Turfing with Sods (Furnishing and laying of the live sods of perennial
turf forming grass on embankment slope, verges or other locations
shown on the drawing or as directed by the engineer including sqm 99.00
307
3.23 Seeding and Mulching (Preparation of seed bed on previously laid top
soil, furnishing and placing of seeds, fertilizer, mulching material,
applying bituminous emulsion at the rate of 0.23 litres per sqm and sqm 359.00
laying and fixing jute netting, including watering)
embankment at site.)
roads)
3.30 Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture
content, trimming to the required line, grade, profile and rolling with 8- sqm 5.00
310.00
MoRT&H
Ref. of
Unit without GST
surface voids with stone spalls, blinding top layer with vibratory road
roller,complete as per cl. 313.)
3.32 Excavation in Hill Area in Soil by Mechanical Means (Excavation in
soil in hilly area by mechanical means including cutting and trimming of
side slopes
(a) Disposing of excavated earth with all lifts and lead upto 1000
301
cum 203.00
metres)
(b) Disposing of excavated earth on the barren valley side.) cum 86.00
3.33 Excavation in Hilly Area in Ordinary Rock by Mechanical Means
not Requiring Blasting. (Excavation in hilly area in ordinary rock not
requiring ballasting by mechanical means including cutting and cum 278.00
trimming of slopes
301
(a) Disposal of cut material with all lift and lead up to 1000m.)
(b) Disposal of cut material on the barren valley side. cum 136.00
3.34 Excavation in Hilly Areas in Hard Rock Requiring Blasting
(Excavation in hilly areas in hard rock requiring blasting, by mechanical
means including trimming of slopes cum 331.00
(a) disposal of cut material with all lifts and lead upto 1000 metres.)
301
(b) Disposal of cut material on the barren valley side. cum 190.00
3.36 Embankment Construction with Fly ash/Pond ash available from
coal or lignite burning Thermal Plants as waste material.
(Construction of embankment with fly ash conforming to table 1 of IRC:
SP: 58 - 2001 obtained from coal or lignite burning thermal power
cum 188.00
stations as waste materials,spread and compacted in layers of 200mm
thickness each at OMC,as specified in IRC:SP:58-2001 and as per
approved plans ( with an initial lead of 5 Km.)
CHAPTER-4
SUB-BASES, BASES (NON- BITUMINOUS) AND SHOULDERS
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
401
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
and compacting with road roller at OMC to achieve the desired density
to form a layer of improved sub grade ( with an initial lead of 5 Km.)
achieve at least 98% of the maximum dry density to form a layer of sub
base .( with an initial lead of 5 Km.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
4.5 Cement Treated Soil Sub Base/ Base (Providing, laying and
spreading soil on a prepared sub grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with
rotavator, grading with the motor grader and compacting with the road cum 889.00
403
interval in the existing thin bituminous wearing coarse including sqm 9.00
sweeping and disposal of excavated material within 1000 metres lead.)
grade in uniform layer on a prepared surface with motor grader and cum 1,695.00
compacting with power roller etc)
A By Manual Means
(I) Grading I
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,221.00
(b) Using Screening Type-A (13.2mm Agg.) cum 4,804.00
(ii) Grading- II
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,260.00
(b) Using Screening Type-A (13.2mm Agg.) cum 4,527.00
(c) Using Screening Type-B (11.2mm Agg.) cum 4,750.00
(iii) Grading- III
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,237.00
(b) Using Screening Type-B (11.2mm Agg.) cum 4,727.00
B By Mechanical Means:
(i) Grading- I
(a) Using Screening Crushable type such as Moorum or Gravel cum 4,051.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
4.13 Construction of Median and Island with Soil Taken from Roadway
Cutting (Construction of Median and Island above road level with
approved material deposited at site from roadway cutting and
cum 384.00
excavation for drain and foundation of other structures, spread, graded
407
4.14 Construction of Median and Island with Soil Taken from Borrow
Areas (Construction of median and Island above road level with
cum 454.00
approved material brought from borrow pits, spread, sloped and
407
MoRT&H
Ref. of
Unit without GST
CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1 Prime coat
502
(A) Prime coat (Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base including clearing of
road surface and spraying primer at the rate of 0.60 kg/sqm using
mechanical means.)( Including cost of testing of materials at site and
laboratory as directed by the deptt.)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom.( Including
cost of testing of materials at site and laboratory as directed by the
deptt.)
(I)With Bitumen emulsion CSS-1h
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
(iii) Mechanical method using polymer modified bitumen (PMB) and HMP
of appropriate capacity not less than 75 tonnes / hour . sqm 217.00
smooth wheeled roller 8-10 T capacity to yhe reqd. level and grade. (
including carriage up to initial lead of 5.0 km from quarry and carriage
of mixed materials up to 10.0 Km initial lead from mixing plant )(
Including cost of testing of materials at site and laboratory as directed
by the deptt.)
MoRT&H
Ref. of
Unit without GST
(ii) Case - II : Type B (Providing and laying of premix seal coat with HMP
of appropriate capacity not less than 75 tonnes/ hours using crushed
stone chipping 6.7 mm size and penetration bitumen of 60/70 or VG-30 sqm 51.00
grade.) (including carriage up to initial lead of 5.0 km from quarry )
(ii) Case - II : Type B (Providing and laying of premix seal coat with HMP
of appropriate capacity not less than 75 tonnes/ hours using crushed
stone chipping 6.7 mm size and penetration bitumen of 60/70 or VG-30 sqm 59.00
grade.) (including carriage up to initial lead of 5.0 km from quarry )
5.14 Mastic Asphalt (Providing and laying mastic asphalt wearing course
with paving grade bitumen meeting the requirements given in table 500-
29 (binder having penetration as (15+/- 5) at 25 deg. centrigrade),
prepared by using mastic cooker and laid to required level and slope
after cleaning the surface, including providing anti skid surface with
bitumen pre coated fine grained hard stone ships of 13.2mm nominal
size at the rate of .005cum per 10 sqm. and at an approximate spacing
515.00
MoRT&H
Ref. of
Unit without GST
5.15 Slurry Seal Providing and laying slurry seal consisting of a mixture of
fine aggregates conforming to specification of Table 500-33 of
MoRT&H specifiactionfor road & bridge works (4th revision,2001),
portland cement filler, bituminous emulsion as per specification and
water on a road surface including cleaning of surface, mixing of slurry
seal in a suitable mobile plant/ concrete mixer or using hand mixing as
per specification at Clause 516.2.1 of MoRT&H specifiactionfor road &
516
5.17 Fog Spray Providing and applying low viscosity bitumen emulsion (CSS-
1/CSS-1h) for sealing crack less than 3mm wide on incipient frepping
for dis integration in existing surfacing.
518
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
5.22 Recipe Cold Mix (Providing and laying of premix of crushed stone
aggregates and emulsion binder, mixed in a batch type cold mixing
plant, laid over prepared surface, by paver finisher, rolled with a
pneumatic tyred roller initially and finished with a smo
MoRT&H
Ref. of
Unit without GST
6.1 Dry Lean Cement Concrete Sub- base (Construction of dry lean
cement concrete Sub- base over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the size of coarse aggregate
not exceeding 25 mm, aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per table 600:1 , cement
concrete not to be less than 150kg/cum, optimum moisture content to
be determined during the trial length construction, concrete strength
not to be less than 10Mpa at 7 days, mixed in a batching plant, cum 4,738.00
601
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
CHAPTER-7
GEOSYNTHETICS, REINFORCED EARTH & SOIL WATER PROOFING
7.1 Sub-Surface Drain with Geotextiles
(A) For the purpose of sub-surface drainage, supply of high strength,
high flow, composite flat panel HDPE core with all accessories (end-
cap, side-out, end-out etc as per the drawing required for laying the
drainage line) having following properties: nominal panel height of
310mm (ASTM D2122), width >40mm (ASTM D2122), slot size (min)
2mmx25mm (ASTM D2412), compressive strength >200KPa (ASTM
D2412). Panel shall be wrapped with non-woven, spun-bound, needle- metre 1,088.82
punched PET geotextile having 140gsm weight (ASTM D5261), AOS of
150 microns (max) (ASTM D4751), & Permittivity of 3.29 (ASTM
D4491). Panel to be provided in rolls of 50 or 100m each.
MoRT&H
Ref. of
Unit without GST
7.5 Reinforced Earth Retaining Wall Providing and laying precast concrete facia wall of approved design and specified
3100
MoRT&H
Ref. of
Unit without GST
(D) Providing and Laying Knitted and PVC coated Polyester Uniaxial
Geogrid, Type-I(40 Kn/m Ultimate Tensile Strength) indigenously
manufactured from selected high tenacity polyester yarn with high
molecular weight (> 25000 g/mol), and low carboxyl end group
(<30mmol/kg) for reinforced soil wall and slope application with sqm 137.00
700
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
Providing & laying HDPE Geocell having density grater than 0.935
g/cm3 with a multitude rhombodial indentations, textured & perforated
with horizontal rows of maximum 10mm dia holes . Performations
within each row shall be 19mm on center. The quantity of perforations
shall remove +/- 17% of cell wall area having 200mm cell depth with
minimum sheet thickness of 1.20 mm & having yield strength of 18 sqm 496.57
kN/m as per specifications including cost of material,T&P, labour
scaffolding etc. to complete the job as per drawing & direction of
Engineer-In-Charge
NEOLOY GEOCELL
7.16 (a)Geo-cell Depth 75mm
Providing & laying NEOLOY Geocell ( made of Noval Pollymeric alloy)
having density grater than 1 g/cm3 with a multitude rhombodial
indentations, textured & perforated with horizontal rows of maximum
10mm dia holes . Resistance to UV Index isgreater than
1600minutes.Performations within each row shall be 19mm on center.
The quantity of perforations shall remove +/- 22% of cell wall area
having 75 mm cell depth with minimum sheet thickness of 1.20 mm & sqm 403.83
having yield strength greater than 23 kN/m as per specifications
including cost of material,T&P, labour scaffolding etc. to complete the
job as per drawing & direction of Engineer-In-Charge.The design life is
upto 75 years with less than 3% deformation.
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
7.18 Providing and fixing steel Rhombodial/high strength clip shaped Mesh
panels/Nets of 10 millimeter diameter of steel diameter wire rope of
size 300X300 millimeter,including top and bottom support rope,lacing
wire or rope required to connect the nets and all accessories such as
Uclamps, turn buckles,thimbles,including safety,all other ancillary sqm 4,950.00
works,material,machinary,labour etc complete as per technical
specifications and directed by Engineer-in -charge.
7.19 Providing and fixing steel steel wire grid/mesh double twisted
Hexagonal shaped wire mesh interlaced during manufacturing with 8
millimeter steel wire rope in longitudinal direction,top support,bottom
support rope,lacing wire,U clamps,thimbles,turn buckles with all other
accesorries including loading unloading of the material(mesh wire dia
2.7millimeter/3.7 millimeter heavily Zn+ PVC coated) including sqm 3,500.00
safety,all ancillary,labour,etc complete as per technical specifications
and as directed by Engineer In charge(The diameter of Zink coated
mesh wire is 2.7 millimeter over which 0.5 millimeter PVC coating shall
be provided.
MoRT&H
Ref. of
Unit without GST
7.22 Item : Supply , laying , fitting and fixing of double layered Geo textile,
fabricated to form a three dimensional mattresses after filling sand at
design slope, filled up with sand by pump, anchoring by cutting trench
at the upper and lower end of slope of depth 1.00m x 0.75 m placing
the mat by bending it into the trench, filling the trench by earth filled
cement bags, sides of mattresses in sloping direction stitched by
Polyester/Polypropylene thread with double locking chain stitch not less
than 3 stitches per 2.50 cm to achieve minimum stream strength sqm 1,539.49
including all handling and carriage charge complete as directed.
(Polyester/Polypropylene thread will be supplied by the department free
of cost) (Anchorage arrangement for holding the Geo Mat at both end
of the slope shall be measured and paid separately) - 650 GSM
GEOMATTRES
7.23 Supply & installation of 3D turf reinforcement mat ( Pyramat) made with
high strength polypropylene woven permeable fabric with the following
parameters . Minimum tensile strength 68 KN/m (MD) & 38 KN/m
(CD) ASTM D 6818, UV @ 70 % minimum, 1000 hrs having green sqm 740.35
coloured to be used in slope protection works.
Geo Bags
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
7.24 Supply and laying of of Geo Bags Type-B (Size 2.00m x 1.50m)( pillow
Type) made of composite layers of geo-textile as per specifications
below : Woven Geo-textile for the outer cover. The woven geo textile is
woven with UV resistant slit film tape fibre with MAVR values of the
following properties. Geo-textile used to manufacture geo-textile bags
should have high mechanical properties for enhanced durability along
with enhanced puncture, abrasion and U.V. resistance characteristics.
Geo-textile should be inert to biological degradation and resistant to
naturally encountered chemicals, alkalis, and acids. Weight (ISO-
9864/ASTMD 5261) ≥210 Gms/Sqm. Tensile strength ( ASTMD 4595)
= ≥35 kN/m Tensile Elongation ( ASTMD 4595)= ≥5% ≤30% Tensile
strength ( ASTMD 4632) = 1.5 Kn UV resistance( ASTMD 4355) =
70%/500 hrs Non woven Geo-textile for the inner layer It is needle
punched non woven geo-textile made of 100% polypropylene staple
fibers which are formed into a random network for dimensional stability.
l height of 6' in the back and tapering off into a slope in front which nos 815..35
ends in 1' vertical drop to meet the bottom layer measuring 8' from the
rear vertical face. 35 such chambers form 1 chain with waterproof
joining arrangements at its both ends that shall end in flaps to cover
the first cell of the connected chain. Stitching (as per ASTM D4884)
shall be along the cellular periphery only with not lesst than 300 denier
PET thread while ensuring the bends are curves and not rectangles ,
component, the cost of all mock ups at site, cost of all samples of the
individual components for testing in an approved laboratory, field tests
on the assembled working curtain wall with aluminium composi
MoRT&H
Ref. of
Unit without GST
Specification.
7.28 ASPHALT REINFORCEMENT WITH GLASSGRID -Providing Glass
Fibre Grid of strength 50 KN/m and aperture size 25mm X 25mm and
Sqm 89.82
specifications meeting Morth 5th edition table no. 700-17 to be used as
700
asphalt reinforcement.
7.29 ASPHALT REINFORCEMENT WITH Glassgrid composite -Providing
Glassgrid composite of strength 50 KN/m and aperture size 25mm X
25mm with woven geotextile chemically or mechanically bonded to the
Sqm 119.45
grid and specifications meeting Morth 5th edition table no. 700-17 to be
700
ration should have 0.8 (with a tolerance of - 0.15) and radial secant
stiffness at 0.5% strain should be 360 kn /m (with a tolerance of -75
kn/m).
7.31 B)Providing of Triaxial Geogrid(TX160), made from virgin high density
polyproylene, having apertures in triangle shape for better interlocking
and minimum junction efficiency 90%. The minimum radial stiffness
ration should have 0.8 (with a tolerance of - 0.15) and radial secant Sqm 171.74
700
MoRT&H
Ref. of
Unit without GST
stone laid with kerb laying machine, foundation concrete laid manually,
all complete as per clause 408.
MoRT&H
Ref. of
Unit without GST
8.5 Direction and place identification sign upto 0.9sqm size board.
Providing and erecting direction and place identification retro-
Reflectrorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide clause 801.3 fixed over aluminium sheeting,
2mm thick with area not exceeding 0.9sqm fixed on an angle iron of
25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x
6mm firmly fixed to the ground by means of properly design foundation sqm 10,000.00
801
with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below
ground level as per approved drawing and sign. ( All the Steel work
must be Tata/Sail/or any other approved brand)
8.6 'Direction and place identification sign more than 0.9sqm size
board.
Providing and erecting direction and place identification retro-
Reflectrorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide clause 801.3 fixed over aluminium sheeting,
2mm thick with area exceeding 0.9sqm fixed on an angle iron of
25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x sqm 11,000.00
801
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
8.17 G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2
metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm
x 40 mm x 6 mm placed every 3 metres center to center founded in
M15 grade cement concrete, 0.6 metre below ground level, every 15th
piost, last but one end post and corner post shall be strutted on both metre 259.00
807
sides and end post on one side only and provided with 9 horizontal
lines and 2 digonals interwoven with horizontal wiers, fixed with GI
staples, turn buckles etc complete as per clause 807.
8.18 G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8
metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm
x 50 mm x 6 mm placed every 3 metres center to center founded in
M15 grade cement concrete, 0.6 metre below ground level,every 15th
piost, last but one end post and corner post shall be strutted on both metre 436.00
807
sides and end post on one side only and provided with 12 horizontal
lines and 2 digonals interwoven with horizontal wiers, fixed with GI
staples, turn buckles etc complete as per clause 807.
8.21 Tubular Steel Railing on Precast RCC posts, 1.2 m high above
ground level (Providing, fencing and erecting 50 mm dia painted steel
pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8
metre 2,694.00
metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed
808
MoRT&H
Ref. of
Unit without GST
8.25 Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and
erecting a wire rope safety barrier with vertical posts of medium weight
RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long
0.85 m above ground and 0.65 m below ground level, split at the
bottom for better grip , embeded in M-15 grade cement concrete
450mmX450mmX450mm, 1.50m center to center with 4 horizantal
steel wier rope 40mm dia and anchored at terminal posts 15m apart.
Terminal posts to be embeded in M15 grade cement concrete metre 8,969.00
foundation 2400X450X900mm(Depth), strengthed by a strut of Rs
joists 100X75mm. 2m long at 450 inclination and a tie 100 X 8mm,
1.50m long at the bottom, all embeded in foundation concrete as per
approved design and drawing rate excluding excavation and cement
concrete.)
MoRT&H
Ref. of
Unit without GST
8.29 Cable Duct Across the Road (Providing and laying of a reinforced
cement concrete pipe duct, 300 mm dia, across the road (new
construction), extending from drain to drain in cuts and toe of slope to
toe of slope in fills, constructing head walls at both ends, providing a
minimum fill of granular material over top and sides of RCC pipe as per
IRC:98-1997, bedded on a 0.3 mm thick layer of gtranular material free
of rock pieces, outer to outer distance of pipe at least half dia of pipe
subject to minimum 450mm in case of double and triple row ducts, joint
to be made leak proof , invert level of duct to be above higher than
ground level to prevent entry of water and dirt, all as per IRC: 98-1997
and approved drawings.
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
8.48 Providing spring post of 750mm height, 80mm dia with round base of
200mm dia made of poly urethane with 3 white reflective bands made
each 1,500.00
of HIG retro-reflectorised sheeting and fixing to the ground as per
specifications of manufacturers
8.49 Tree reflector made of heigh intensity grade retro-reflectorised sheeting
fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with
necessary galvanized nail.
a)100mm dia/100mmx100mm. each 89.00
b)150mm dia/150mmx150mm. each 110.00
8.50 Providing Linear Delineator System with Diamond grade reflective
sheeting of size 80cmx10cm, fixing over thin gauge crimped aluminium
sheeting with single colour panels of Yellow/Red/White and fixing to the each 480.00
object as per specification of the manufacturer.
8.51 Providing reflective pavement marker with Micro prismatic lens in both
direction having thermoplastic body adhering to the specification and
guidelines of MoRT&H’s fixed to the road surface using the adhesives
and the procedures recommended by the manufacturers with three each 298.00
months replacement warranty and free maintenance.
8.52 Traffic cones: With rubber base and reflective of 7 inch sleeve, height= 750mm,
eachbottom square: 385mm and weight 4
700.00
8.53 Inter linking chain link for traffic cones. Rm 45.00
8.54 Providing metal tubular delineator (50mm dia and 1.25mm thick) with
15cm reflector made of heigh intensity grade retro reflectorised
sheeting around the pipe at top covered with wire mesh of 20cm length
with two nos of similar reflective bands and bottom fastener M.S.
angle including firmly fixing the delineator to the ground by means of
CC(M-15) foundation of size-(25cmx25cmx25cm), 25cm below ground
to the true line and level as directed by the deptt. With six months
replacement warranty and free maintenance.
MoRT&H
Ref. of
Unit without GST
8.64 Providing and fixing metal road studs for permanent marking comply
with standard EN1463 and BS 873(Part:IV) according to the CIL Each 600.00
requirements to ASTM D 4280 standard.
8.65 Providing and fixing Globemarker with dimensions120x60x16.5
MoRT&H
Ref. of
Unit without GST
8.72 Providing and fixing reflective inserts for road studs with dimensions
112.7x18.25 mm with 76 pieces of glass elements Each 550.00
8.73 Providing and fixing vertical marking with dia.104 mm 256 glass
Each 550.00
elements, distance between the two holes are 56 mm.
8.74 Providing and fixing vertical marking with dia.60 mm 80 glass
Each 300.00
elements, with central hole.
8.75 Providing and erecting Median Markers which shall be made of tough,
high impact resistant, injection-moulded, thermoplastic body with an
isosceles trapezoid structure of length, width and height not less than
15cm, 10cm and 10cm respectively and thickness shall not be less
than 1.8 mm. The palstic used for moulding the Median Marker shall
have a minimum notched izod impact strength value 600 J/m at room
temparature, when tested in accordance with ASTM D256 shall retain
70% of this value when sujected to accelerated weathering for 1000
hours as per ASTM G 155. The logo of the manufacturer shall be
embossed on either side of the body in the injection molding process.
The median marker shall have fluroscent yellow color retro-reflective
sheeting of size not les than 8.5cmX8.5cm and with fully reflective
each 720.00
microprismatic cube corners as its retro-reflective elements and meets
ASTM D 4956 type IX specification. The retro-reflective sheeting shall
be on both sides of the median marker and shall be edge protected wil
height of 6' in the back and tapering off into a slope in front which ends
in 1' vertical drop to meet the bottom layer measuring 8' from the rear
vertical face. 35 such chambers form 1 chain with waterproof joining
arrangements at its both ends that shall end in flaps to cover the first
cell of the connected chain
8.76 Providing and fixing reflectors for concrete barriers with dimensions
(Wallflex Top) 146x88 mm mounting with
a a)One- way reflective with 1x188 glass elements Each 120.00
b b) Two- way reflective with 2x188 glass elements. Each 150.00
8.77 Providing and fixing reflectors for concrete barriers with dimensions
(Wallflex Side) 128x110 mm mounting with
a a) One- way reflective with 1x346 glass elements. Each 120.00
b b) Two- way reflective with 2x346 glass elements Each 150.00
8.78 Providing and fixing signflash A630 solar flashing LED unit width 630
mm. integrated control unit and battery.(warning system for pedestrian Each 2,500.00
crossing)
8.79 Providing and fixing swaroline module100 6 LEDs per side one or two
Each 2,700.00
way with dimensions 100x105x19 mm.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
8.84 Providing fitting and fixing Solar Traffic Blinker of Diameter 300 mm
Each
of size 365x365x185mm
2,250.00 supported
8.85 Supply of Roll Up Sign for work zone to enhance night time safetyEachfor workers working on the project sit
750.00
8.86 Supply and installation of Reflective Delineator made of high impactEach
resistant plastic i.e.
1,300.00 ABS for outer p
8.87 Supply of Safety Jacket ade from flourescence orange/green/ yellow Each
colour good quality,
185.00polyester fabric
8.88 Supply and applying of AD lite Retro-Reflective paint is a Sqm 90.00
reliable solution to enhance nightime visibility for better road
safety. Using Glass Bead technology, AD lite Retro-Reflective
paint capture,intensifies and reflects light back to the source
making the road objects highly conspicuous. The paint can
easily be applied to varied surfaces like wood, stone, concrete,
plastics etc. , making the paint a single solution for almost all
kinds of ovjects and surfaces. Retro-reflective paint is a
modern tool to increase visibility and reduce accidents
8.89 Supply and installation of Flexible Median Marker made of Each 320.00
flexible thermoplastic body and Avery Dennison’s world class
Type XI Fluorescent Yellow Reflective Sheeting. Flexible
Median Marker helps to make the medians visible at night time
thereby making roads safer for the commuters. Together with
its flexible body, unique bounce-back quality and also it’s
moulded shank design ensures that there is no displacement
and disorientation thereby making the product more durable
and reducing the replacement cost
MoRT&H
Ref. of
Unit without GST
PIPE CULVERTS
9.1 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with
crushed stone aggregate 40 mm nominal size mechanically mixed,
cum 6,734.00
placed in foundation and compacted by vibration including curing for 14
408
days.)
9.2 Labour for laying Reinforced cement concrete pipe
NP4/NP3/prestressed concrete pipe for culverts on first class bedding
of granular material /cc M-15 in single row including fixing collar with
cement mortar 1:2,and cost of granular bedding but excluding
2900
)to the design level by adding fresh approved soil and compacting it
with appropriate equipment.)
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
10.4 Filling Pot- holes and Patch Repairs with open - graded Premix
surfacing, 20mm. (Removal of all failed material, trimming of
completed excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat of bitumen emulsion on the sides and
base of excavation as per clause 503, back filling the pot holes with hot
3004.2
and applying crusher dust in case crack are wider than 3mm.) metre 4.29
10.6(B) Filling of Pot Holes with Ready mix Material like HINCOL Road
Bond or Equivalent by removal of all failed materials trimming of
excavated materials to achieve firm vertical faces cleaning of surface
sqm 1,075.00
,application of tackcoat on sides and base of excavation as per
specification and backfilling with HINCOL road Bond or equivalent
complete as directed
10.7 Dusting (Applying crusher dust to areas of road where bleeding of
sqm 3.38
3004.3.4 3004.3.2 3004.4
MoRT&H
Ref. of
Unit without GST
CHAPTER-11
HORTICULTURE
11.1 Spreading of Sludge Farm Yard Manure or/and good Earth
(Spreading of sludge farm yard manure or/ and good earth in required
cum 24.00
thickness (cost of sludge, farm- yard manure or/and good earth to be
307
MoRT&H
Ref. of
Unit without GST
spreading of farm yard manure at a rate of 0.60 cum per 100 sqm
11.6 Maintenance of Lawns with Fine Grassing for the First Year
Maintenance of lawns with fine grassing for the first year including sqm 550.00
307
watering etc.
11.7 a) Planting Permanent Hedges including Digging of Trenches
(Planting permanent hedges including digging of trenches, 60 cm wide
and 45 cm deep, refilling the excavated earth mixed with farmyard
metre 1,032.00
manure, supplied at the rate of 4.65 cum per 100 metres and
307
fixing the tree guatrd and maintaining the plants for one year.
11.11 Supply at Site Well Decayed Farm Yard Manure (Supply at site of
work well decayed farm yard manure, from any available source,
cum
308.20
11.12 Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of
work/ store- deoiled neem cake duly packed in used gunny bags) quintal
MoRT&H
Ref. of
Unit without GST
11.14 Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre
1.25 metres, and height 1.2 metres, above ground and 0.20 metre
below ground bottom two course laid dry, and top tree courses in
cement mortar 1:6 (1cement 6 sand) and the intermediate coursees
being in dry honey comb masonry, as per design complete. (Half brick each 3,284.00
circular tree guard, in 2nd class brick, internal diametre 1.25 metres,
and height 1.2 meter.)
11.15 Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd
class bricks, laid dry lengthwise, including excavation, refilling,
metre 68.00
consolidation, with a hand packing and spreading nearly surplus earth
within a lead of 50 metres)
11.16 Making Tree Guard 53 cm dia and 1.3 m high as per design from
empty bitumen drum (Making tree guard 53 cm dia and 1.3 m high as
per design from empty bitumen drum, slit suitably to permit sun and
air, (supplied by the department at stock issue rate) including providing each 490.00
and fixing 2 nos MS sheet rings 50mmX0.5mm with rivets, complete in
all respects.
11.17 Making Tree Guard 53 cm dia and 2 metres high as per design
from empty bitumen drums (Making tree guard 53 cm dia and 2
metres high as per design from empty bitumen drums, slit suitably to
permit sun and air, ( supplied by the department at stock issue rate.)
each 980.00
including providing and fixing four legs 40 cm long of 30mmx 3mm MS
riveted to tree guard and providing and fixing 2 nos. MS sheet ring
50mm with rivets complete in alll respects.
11.18 Wrought Iron and Mild Steel Welded Work (Wrought iron and mild
steel welded work) (using angles, square bars, tees and channel
grills, grating frames, gates and tree guards of any size and design
etc. including cost of screens and welding rods or bolt and nuts quintal 8,871.00
complete fixed in position but without the cost of excavation and
concrete for mixing which will be paid separately.
11.19 Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60
cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6
mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm)
iron rings in two halves, bolted together with 8 mm dia and 30mm longeach tree guard 2,174.00
bolts including painting two coats with paint pf approved brand over a
coat of priming , complete in alll respects.
11.20 Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing
tree guard 0.60 metre square, 2.00 metre high fabricated with MS
angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire 3 mmeach tree guard 3,285.00
dia welded and fabricated as per design in two halves bolted together.
MoRT&H
Ref. of
Unit without GST
CHAPTER-12
FOUNDATIONS
12.1 Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification, including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with
304
approved material.
I Ordinary soil
A Manual Means
(I) Without dewatering
(i) upto 3 m depth cum 135.00
(ii) 3 m to 6 m depth cum 173.00
(iii) Above 6 m depth cum 231.00
(II) With dewatering
(i) upto 3 m depth cum 148.00
(ii) 3 m to 6 m depth cum 199.00
(iii) Above 6 m depth cum 278.00
B Mechanical Means
(I) Without dewatering
(i) Depth upto 3 m cum 63.00
(ii) Depth 3 m to 6 m cum 72.00
(iii) Depth above 6m cum 88.00
(II) With dewatering
(i) Depth upto 3 m cum 66.00
(ii) Depth 3 m to 6 m cum 77.00
(iii) Depth above 6m cum 96.00
II Ordinary rock (not requiring blasting)
A Manual Means
(I) Without dewatering
Depth upto 3 m cum 193.00
(ii)With dewatering
Depth upto 3 m cum 212.00
B Mechanical Means
(I) Without dewatering
Depth upto 3 m cum 80.00
(ii) With dewatering
Depth upto 3 m 86.00
III Hard rock ( requiring blasting )
A Manual Means
(I) Without dewatering cum 501.00
(ii) With dewatering cum 506.00
IV Hard rock ( blasting prohibited )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
A Mechanical Means
(I) Without dewatering cum 906.00
(ii) With dewatering cum 981.00
V Marshy soil
(i) upto 3 m depth
A Manual means
(I) Without dewatering cum 665.00
(ii) With dewatering cum 761.00
B Mechanical Means
(I) Without dewatering cum 190.00
(ii) With dewatering cum 221.00
VI Back Filling in Marshy Foundation Pits cum 541.00
12.2 Filling Annular Space Around Footing in Rock (Lean cement
concrete 1:3:6 nominal mix. Rate may be taken as per items 12.4.) cum 7,267.00
304
12.4 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in
foundation with crushed stone aggregate 40 mm nominal size
cum 7,267.00
2100
specifications
12.6 A Cement mortar1:3 (1cement :3 sand) cum 4,605.00
B Cement mortar1:2 (1cement :2 sand) cum 5,511.00
C Cement mortar1:4 (1cement :4 sand) cum 3,998.00
D Cement mortar1:6 (1cement :6 sand) cum 3,491.00
12.7 Stone masonry work in cement mortar 1:3 in foundation complete as
1400
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 10,494.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,165.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 11,319.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 10,990.00
(iii) RCC M30 Grade
Case I Using concrete mixer cum 11,365.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 11,039.00
(iv) RCC M35 Grade
Case I Using concrete mixer cum 11,579.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 11,251.00
B Well steining
(I) PCC M15 Grade cum 9,101.00
(ii) PCC M20 Grade cum 9,570.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 9,620.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9,317.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 10,999.00
(ii) Beyond 3m upto 10m depth metre 15,138.00
(iii) Beyond 10m upto 20m metre 19,993.00
(iv) Beyond 20m upto 30 m
a For sinking metre 37,499.00
b For sinking including kentledge metre 44,999.00
(v) Beyond 30m upto 40 m
a For sinking metre 89,093.00
b For sinking including kentledge metre 1,06,912.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 15,138.00
(ii) Beyond 3m upto 10m depth metre 24,444.00
(iii) Beyond 10 m upto 20 m
(a) For sinking metre 32,282.00
b For sinking including dewatering, if required., if required metre 33,897.00
(iv) Beyond 20m upto 30 m
a For sinking metre 60,554.00
b For sinking including kentledge metre 75,692.00
c For sinking including kentledge & dewatering, if required. metre 79,477.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,43,866.00
b For sinking including kentledge metre 1,72,640.00
c For sinking including kentledge & dewatering, if required. metre 1,81,272.00
C Soft rock ( 7m dia well )
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 13,691.00
(ii) Beyond 3m upto 10m depth metre 16,964.00
(iii) Beyond 10m upto 20m metre 22,405.00
(iv) Beyond 20m upto 30 m
a For sinking metre 42,027.00
b For sinking including kentledge metre 50,432.00
(v) Beyond 30m upto 40 m
a For sinking metre 99,851.00
b For sinking including kentledge metre 1,19,821.00
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 18,516.00
(ii) Beyond 3m upto 10m depth metre 25,270.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 33,374.00
b Adding for dewatering @ 5% of cost, if required. metre 35,043.00
(iv) Beyond 20m upto 30 m
a For sinking metre 62,602.00
b For sinking including kentledge metre 78,252.00
c For sinking including kentledge & dewatering, if required. metre 82,165.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,48,733.00
b For sinking including kentledge metre 1,78,479.00
c For sinking including kentledge & dewatering, if required. metre 1,87,403.00
C Soft rock ( 8m dia well )
(i) Depth in soft rock strata upto 3m metre 28,687.00
D Hard rock ( 8m dia well )
(i) Depth in hard rock strata upto 3 m metre 32,559.00
12.15 Sinking of 9 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 13,802.00
(ii) Beyond 3m upto 10m depth metre 18,632.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 16,805.00
(ii) Beyond 3m upto 10m depth metre 19,611.00
(iii) Beyond 10m upto 20m metre 25,900.00
(iv) Beyond 20m upto 30 m
a For sinking metre 48,583.00
b For sinking including kentledge metre 58,299.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,15,428.00
b Adding 20% of cost for Kentledge including supports, loading
metre 1,38,514.00
arrangement, and Labour etc.
B Clayey soil (10m dia. Well )
(i) Depth below bed level upto 3.0 M metre 21,066.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 39,242.00
(ii) Beyond 3m upto 10m depth metre 29,320.00
(iii) Beyond 10m upto 20m metre 38,722.00
(iv) Beyond 20m upto 30 m
a For sinking metre 72,633.00
b For sinking including kentledge metre 87,159.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,72,564.00
b For sinking including kentledge metre 2,07,077.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 35,111.00
(ii) Beyond 3m upto 10m depth metre 54,691.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 72,230.00
b For sinking including dewatering, if required metre 75,842.00
(iv) Beyond 20m upto 30 m
a For sinking metre 1,35,485.00
b For sinking including kentledge metre 1,69,356.00
c For sinking including kentledge & dewatering, if required. metre 1,77,824.00
(v) Beyond 30m upto 40 m
a For sinking metre 3,21,892.00
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 80,179.00
(ii) Beyond 3m upto 10m depth metre 89,117.00
(iii) Beyond 10m upto 20m metre 1,17,695.00
(iv) Beyond 20m upto 30 m
a For sinking metre 2,20,766.00
b For sinking including kentledge metre 2,64,919.00
(v) Beyond 30m upto 40 m
a For sinking metre 5,24,507.00
b For sinking including kentledge metre 6,29,408.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 86,628.00
(ii) Beyond 3m upto 10m depth metre 1,38,697.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 1,83,175.00
b For sinking including dewatering, if required metre 1,92,333.00
(iv) Beyond 20m upto 30 m
a For sinking metre 3,43,586.00
b For sinking including kentledge metre 4,29,483.00
c For sinking including kentledge & dewatering, if required. metre 4,50,957.00
(v) Beyond 30m upto 40 m
a For sinking metre 8,16,311.00
b For sinking including kentledge metre 9,79,574.00
c For sinking including kentledge & dewatering metre 10,28,552.00
C Soft rock (12m dia well )
(i) Depth of soft rock strata upto 3m metre 1,96,226.00
D Hard rock (12m dia well )
(i) Depth of hard rock strata upto 3 m metre 2,37,085.00
12.19 Sinking of Twin D Type well ( other than pneumatic method of sinking )
through all types of strata namely sandy soil, clayey soil and rock as
shown against each case, complete as per drawing and technical
1200
MoRT&H
Ref. of
Unit without GST
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 18,230.00
(ii) Beyond 3m upto 10m depth metre 19,625.00
(iii) Beyond 10m upto 20m metre 25,918.00
(iv) Beyond 20m upto 30 m
a For sinking metre 48,616.00
b For sinking including kentledge metre 58,340.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,15,508.00
b For sinking including kentledge metre 1,38,609.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 21,171.00
(ii) Beyond 3m upto 10m depth metre 29,602.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 39,094.00
b For sinking including dewatering, if required metre 41,049.00
(iv) Beyond 20m upto 30 m
a For sinking metre 73,331.00
b For sinking including kentledge metre 91,664.00
c For sinking including kentledge & dewatering, if required. metre 96,248.00
(v) Beyond 30m upto 40 m
a For sinking metre 1,74,226.00
b For sinking including kentledge metre 2,09,072.00
c For sinking including kentledge & dewatering, if required. metre 2,19,525.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 43,360.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 49,346.00
12.20 Pneumatic sinking of wells with equipment of approved design, drawing
and specifications worked by competent and trained personnel and
comprising of compression and decompression chambers, reducers,
two air locks separately for men and plant & materials
specifications
12.22 Providing steel liner 10 mm thick for curbs and 6mm thick for steining
of wells including fabricating and setting out as per detailed drawing
tonne 86,179.00
&
1200
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
12.23A
1700 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750
mm) metre 8,932.00
&
1100
excavated earth with all lifts and lead upto 1000 m. including providing
plasticiser (Masterplast PL-1/SPL-2 or equivalent), air entraining and
water reducing plasticiser ( asterplast PAE or equivalent) and metre 9,468.00
accelerating plasticiser (Masterplast ACPL or equivalent) conforming to
&
MoRT&H
Ref. of
Unit without GST
air entraining and water reducing plasticiser ( Masterplast PAE or metre 15,628.00
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999 (Pile diameter - 1200 mm)
12.35 Driven vertical steel piles complete as per drawing and &
Technical Specification (Section of the pile - H Section steel column metre 6,286.00
400 x 250 mm (ISHB Series) )
12.36 Driven vertical steel piles complete as per drawing and &
Technical Specification (Section of the pile - H Section steel column metre 7,105.00
450 x 250 mm (ISHB Series) )
12.37 Pile load test on single vertical pile in accordance with
Ton 363.00
1100
MoRT&H
Ref. of
Unit without GST
cum 7,029.00
CHAPTER-13
SUB-STRUCTURE
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
cum 9,699.00
13.2 Pointing with cement mortar (1:3 ) on brick work in substructure as per
Technical specifications
sqm 72.00
13.4 Stone masonry work in cement mortar 1:3 for substructure complete as
per drawing and Technical Specifications
MoRT&H
Ref. of
Unit without GST
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,668.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,297.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,984.00
c Height above 10m
Case I Using concrete Mixer cum 9,704.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,378.00
E RCC Grade M20
a Height upto 5m
Case I Using concrete Mixer cum 8,454.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,153.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8,761.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,449.00
c Height above 10m
Case I Using concrete Mixer cum 9,145.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,820.00
F RCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 8,972.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,670.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,266.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,954.00
c Height above 10m
Case I Using concrete Mixer cum 9,706.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,379.00
G RCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 9,002.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,702.00
b Height 5m to 10m
Case I Using concrete Mixer cum 9,256.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,947.00
c Height above 10m
Case I Using concrete Mixer cum 9,698.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 9,374.00
H RCC Grade M35
a Height upto 5m
Case I Using concrete Mixer cum 9,145.00
CaseII With Batching Plant, Transit Mixer and Concrete Pump cum 8,844.00
b Height 5m to 10m
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
13.9 Back filling behind abutment, wing wall and return wall complete as
per drawing and Technical specification
A Granular material cum 3,178.00
B Sandy material cum 1,967.00
13.10 Providing and laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRTH specifications to a thickness of not less than 600
mm with smaller size towards the soil and bigger size toeards the wall
and provided over the entire surfaces behind the abutement, wing wall cum 3,598.00
and return wall to the full height compacted to firm condition complete
as per drawing and technical specification.
13.11 Supplying, fitting and fixing in position true to line and level cast steel
rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003
of MoRTH specifications complete including all accessories as pertonne capacity 733.00
drawing and Technical Specifications.
13.12 Supplying, fitting and fixing in position true to line and level forged
steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause
2003 of MoRTH specifications complete including all accessories astonne capacity 767.00
per drawing and Technical Specifications.
13.13 Supplying, fitting and fixing in position true to line and level sliding
plate bearing with PTFE surface sliding on stainless steel complete
including all accessories as per drawing and Technical Specificationstonne capacity 206.00
and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of
MORT&H specification.
13.14 Supplying, fitting and fixing in position true to line and level elastomeric
bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of
cubic centimetre 0.64
MoRTH specifications complete including all accessories as per
drawing and Technical Specifications.
13.15 Supplying, fitting and fixing in position true to line and level sliding
plate bearing with stainless steel plate sliding on stainless steel plate
tonne capacity 200.00
with mild steel matrix complete including all accessories as per drawing
and Technical Specifications.
13.16 Supplying, fitting and fixing in position true to line and level POT-PTFE
bearing consisting of a metal piston supported by a disc or
unreinforced elastomer confined within a metal cylinder, sealing rings,
dust seals, PTFE surface sliding against stainlesssteel matting
surfaces, complete assembly to be of cast steel/fabricated structural
steel, meatal and elastomer elements to be as per IRC:83 part-I &IItonne capacity 200.00
respectively and parts conforming to BS:5400, section 9.1 & 9.2 and
clause 2006 of MORTH&S Specification complete as per drawing and
approved technical specification.
CHAPTER-14
SUPER-STRUCTURE
14.1 Furnishing and Placing Reinforced/Prestressed cement concrete
in super-structure as per drawing and Technical Specification'
including steel shuttering formwork.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
14.6 Construction of precast RCC railing of M30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolurence of vertical RCC
post not to exceed 1 in 500, centre to centre spacing between vertical
post not to exceed 2000 mm, leaving adequat space between vertical metre 2,076.00
posts for expansion, complete as per approved drawings and technical
specifications.
14.8 Providing, fitting and fixing mild steel railing complete as per drawing
metre 3,425.00
and Technical Specification
14.9 Drainage Spouts complete as per drawing and Technical specification
Each 7,737.00
14.10 PCC M15 Grade leveling course below approach slab complete as per
cum 7,214.00
drawing and Technical specification
14.11 Reinforced cement concrete approach slab including reinforcement
and formwork complete as per drawing and Technical specification
(a) (i) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500
cum 12,862.00
N/mm2
(b) (ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm
2
cum 12,871.00
(c) Other make ISI approved TMT reinforcement bar of Fe-415 N/mm2
cum 9,660.00
14.13 Precast - pretensioned Girders (Providing, precasting,
transportation and placing in position precast pretensioned concrete cum 25,326.00
girders as per drawing and technical specifications)
14.14 Providing and fixing Helical pipes in voided concrete slabs metre 694.00
14.15 Crash Barriers (The rate analysis for rigid crash barrier in reinforced
cement concrete, semi-rigid crash barrier with metal beam and flexible
crash barrier with wire ropes have been made and included in chapter-
8 on Traffic and Transportation.)
MoRT&H
Ref. of
Unit without GST
(iv) Providing and filling joint sealing compound as per drawings and
technical specifications with coarse sand and 6% bitumen by weight metre 25.00
14.19 Asphaltic Plug joint (Providing and laying of asphaltic plug joint to
provide for horizontal movement of 25 mm and vertical movement of 2
mm, depth of joint varying from 75 mm to 100 mm, width varying from
500 mm to 750 mm (in traffic direction), covered with a closure plate
200mmX 6mm of wiedable structural steel conforming to IS:2062,
asphaltic plug consist of polymer modified bitumen binder, carefully metre 2,109.00
selected singl;e size aggregate of 12.5mm nominal size and heat
resistant foam caulking/backer rod, all as per approved drawing and
specifications.)
MoRT&H
Ref. of
Unit without GST
14.22 Strip Seal Expansion Joint (Providing and laying of a strip seal
expansion joint catering to maximum horizontal movement upto 70
mm, complete as per approved drawings and standard specifications
to be installed by the manufacturer/supplier or their authorised metre 4,758.00
representative ensuring compliance to the manufacturer's instruction
for installation).
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
15.1 Providing and laying boulders apron on river bed for protection against
scour with stone boulders weighing not less than 40 kg each complete
2403
10% extra for laps and joints laid with stone boulders weighting not less
than 40Kg each.)
15.3 Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and
laying of apron with cement concrete blocks of size 0.5x0.5x0.5 m cast
in-situ and made with nominal mix of M-15 grade cement concrete with cum 7,652.00
2503
15.4 Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete
2504
MoRT&H
Ref. of
Unit without GST
15.13 Gabian Structure for Erosion Control, River Training Works and
Protection works (Providing and constructing gabain structures for
erosion control, river training works and protection works with wire
crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments
by cross netting, made from 4 mm galvanised steel wire@ 32Kgs per
10Sqm having minimum tensil strength of 300Mpa conforming to
cum 9,227.00
2503.3
CHAPTER-16
REPAIR AND REHABILITATION
16.1 Removal of existing cement concrete wearing coat including its
disposal complete as per Technical specification without causing any
detrimental effect to any part of the bridge structure and removal of sqm 211.00
2809
dismantled material with all lifts and lead upto 1000.(Thickness 75mm.)
MoRT&H
Ref. of
Unit without GST
16.3(A) Guniting concrete surface with cement mortar applied with compressor
after cleaning surface and spraying with epoxy complete as per sqm 1,622.00
2807
Technical specification
16.3(B) Guniting concrete surface with single component,fibre reinforced
shrinkage compensated,polymer modified structural grade repair
mortar like Fosroc Renderoc SP 40 or equivalent at a thickness of 25
mm. The repair mortar should have a compressive strength 45 sqm 1,821.00
N/mm²,flexture strength 7 N/mm² and tensile strength 2.5 N/mm² at 28
days.
16.4 Providing and inserting nipples with approved fixing compound after
drilling holes for grouting as per Technical Specifications including
subsequent cutting/removal and sealing of the hole as necessary of no 224.00
nipples after completion of grouting with Cement/Epoxy
Technical specification
16.8(B) Applying a high strength,high performance epoxy rasin based repair
mortar like Nitomortar S of Fosroc Chemicals or MasterProtect 1890 of
BASF or equivalent, a three component epoxy resin with a density not
greater than 2000 kg/m3 over leached, honey combed and spalled
concrete surface. The cured mortar shall achieve a compressive sqm 1,593.00
strength of 60 N/mm2, a flexural strength of 20 N/mm2 and a tensile
strength of 10 N/mm2 when tested at 7 days.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
density of gunite not less than 2000Kg/cum. , strength not less than
25Mpa and workmanship conforming to to clause no.2807.6
MoRT&H
Ref. of
Unit without GST
16.21 Repair of crash barrier (Repair of concrete crash barrier with cement
concrete of M-30 grade by cutting and trimming the damaged portion to
a regular shape, cleaning the area to be repaired thoroughly, applying metre 259.00
cement concrete after erection of proper f
16.22 Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring
metre 250.00
it to the original shape.)
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original
metre 288.00
shape)
16.24 Chipping of deteriorated concrete and removal of all loose & friable
materials and fully exposing rusted reinforcement followed by proper
cleaning and removing of rusts and other foreign materials using sand
blasting/ emery cloths/ wire brush etc. including formwork as directed sqm 258.00
and specified by the department complete
16.26 Providing and applying high strength epoxy concrete like Fosroc
Expocrete EC or equivalent as per maufracturer specification
specification.The epoxy concrete shall be paced at a minimum of
50mm thickness after proper surface preparation and priming the
substrate using Fosroc Nitoprime 25. The base, hardener and filler of
the Epoxy concrete shall be mixed thoroughly with using the heavy sqm 7,620.00
duty slow speed mixing machine and pour the course aggregate 6 mm
downgraded slowly and continue to mix 20 to 30 minutes until mix
thoroughly. The mixed material shall be poured in to the shuttering
surface, pack it with the help of steel trowel
MoRT&H
Ref. of
Unit without GST
B Providing and applying coating of the cleaned patches with two part of
polymer based bonding agent Nitobond SBR of Fosroc or
MasterEmaco SBR 2 of BASF or equivalent @ 0.22 Lit per Sqm prior
to application of polymer modified mortar with brush after totally
saturating the cleaned concrete surface with clean water for proper sqm 469.00
bonding of old and new concrete including formwork as specified and
directed by the department complete.
16.29 Plastering the surface with high rich polymer modified mortar 10mm
thick with cement sand mortar in prop. 1:4 mixed with 100% acrylic
polymer hydroproof extra of Fosroc Chemicals or MasterEmaco 131 of
BASF or equivalent @15% by weight of cement followed by proper sqm 665.00
curing as specified and directed by the department complete including
formwork.
16.30 Concreting of the structure with free flow nonshrink cementitious
microconcrete with Renderoc RG of Fosroc or equivalent after proper
mixing with cleanwater including formwork followed by proper curing for
28 days as per manufacturer's specifications complete and as directed cum 1,29,750.00
by the Department .
16.31 Providing and laying Zinc anode unit Galvanized XP of Fosroc make or
equivalent, fixed to the reinforcement steel by means of wire ties to
allow attachment in horizontal, vertical and overhead locations with a
spacing of one piece per 0.5m c/c and ensuring good electrical each 2,293.00
continuity as per specification of manufacturer including cost of
labour,copnsumables, tools and tackles and formwork.
MoRT&H
Ref. of
Unit without GST
16.33 Providing & fixing 16mm dia MS nozzles in a grid of 1m c/c up to the
half of the thickness of the concrete structure.A grout slurry of neat
cement & chloride free expanding grout Cebex 100 of Fosroc
Chemicals or Mastergrout CPG-1 of Choksey Chemicals or
MasterFlow 150 of BASF or equivalent @ 0.5% by weight of cement
water cement ratio 0.35 to 0.40 and viscosity not more than 1.02
centipoise with grouting pressure till the refusal of injection grout . The
grouting operation pressure shall be 2Kg/sq.cm.Cutting the exposed sqm 1,025.00
nozzle after the grouting with a good cutter to make the surface free
from the grouting pipes and to seal the gap with plugging compound
Masterplug of Choksey Chemicals as per the specification and the
direction of the department complete including formwork.
16.34 Providing & fixing PVC pipes in a grid of 0.5m c/c throughout the crack
of the concrete structure.A low viscous Epoxy grout with Conbextra
EP10 of Fosroc Chemicals or equivalent should be inserted throughout
the crack to fill the crack.Cutting the exposed nozzle after the grouting
with a good cutter to make the surface free from the grouting pipes and m 1,334.00
to seal the gap with the appeared crack with Epoxy putty of Choksey
Chemicals as per the specification and the direction of the department
complete including formwork.
MoRT&H
Ref. of
Unit without GST
16.40 Fabrication and fixing of steel pedestal support for bearing MT 33,124.00
16.41 Providing and fixing of Foundation bolts for steel pedestals. Each 1,006.20
16.42 Providing and fixing of Steel plates for placing of bearings MT 1,006.20
Non-destuctive testing with Ultrasonic Pulse Velocity Meter with data
storage facility for detection of cracks, voids and other imperfections in
16.43 Reinforced concrete structures and furnishing the findings thereof in Each 650.65
proper comprehensible format , complete as directed by the
department.
Non-destuctive testing with Profometer 5 Scanlog or equivalent
equipment with facility for built-in memory storage and statistical
analysis of data for detection of location and orientation of rebars in
16.44 Sqm 2,788.50
Reinforced concrete structures and furnishing the findings thereof in
proper comprehensible format , complete as directed by the
department.
16.46 Conducting PH tests on concrete stucture, as per stipulated procedures, for Each
determination the 114.40
PH (alkalinity) of the co
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
Pile intrigity test Integrity testing of all piles by using pile driving
analyser or equivalent as approved by Engineer-in-Charge and detailed
16.55 Each 2,080.00
in specification.Test to be carried out by an approved reputed
agency.Item to include all incidental work to execute the job.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
17.3 Making 150mm wide bamboo foot bridge with 100mm Bholuka or
Barua bamboo posts driven 120 cm to 180 cm underground 3 Nos. in
each row and rows being 3m apart bholuka or Barua bamboo dham
placed over the posts and tied with cane or wire , Bholuka or barua
bamboo struts in each row both up and down stream, jati bamboo long
gorhs closely packed and tied with dham. Single layer of mat placed R.M. 669.37
over 75mm thick brush wood and tied with bholuka or Barua bamboo
rail stand fixed in one side of the bridge etc. complete.
17.4 Supplying and driving sal piles 25cm to 30cm dia. Dressed to heart
wood including making length in every 30 cm interval, coal tarring two
(2) coats with best tar applied hot (Rate inclusive of the cost of the
required quantity of tar.)
(a) With pile Engine
(i) Portion of pile actually driven underground. meter 4,935.44
(ii) Portion of pile remaining above rground. meter 4,744.85
(b) Using labour
(i) Portion of pile actually driven underground. meter 4,848.28
(ii) Portion of pile remaining above rground. meter 4,665.83
17.5 Supplying and driving Azar/Nahar/Nageswar/Zarul piles 25cm to 30cm
dia. Dressed to heart wood including making length in every 30 cm
interval, coal tarring two (2) coats with best tar applied hot (Rate
inclusive of the cost of the required quantity of tar.)
MoRT&H
Ref. of
Unit without GST
MoRT&H
Ref. of
Unit without GST
17.17 Labour for fitting and fixing RSJ beam, old CI saddle etc. in position
including necessary scaffolding, and fixing ncessary bolts and nuts,
Quintal 514.81
painting two (2) coats complete (Tar-Steel paints to be supplied by the
contractor at his own costs)
17.18 Labour for making and fitting MS F.I. Straps and cleats etc. in position
including drilling holes and carrying the same from PWD godown. Quintal 1,528.16
17.19 Supplying fitting and fixing "U" shapeed flat iron strap making
0.5mX0.3m size from 150mmX12mm size MS flat including providing
10 bolts holes and fitting with 0.35m long 20mm dia MS bolts including Each 1,454.95
fitting tightly withbearing beam, pile and RSJ beams etc. as diected by
the Department.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
17.20 Labour for fitting woodwork including sizing , supplying and fixing with
new MS bolts, nuts, nails, spikes, and coal tarring coat applied hot (
Coal tar to be supplid by the contractor at his own costs) including
carrying from the PWD godown.
(a) Applying 2 (two) coats cu.m. 2,714.67
(b) Applying 1 (one) coats cu.m. 2,429.95
17.21 Labour for fitting and fixing 25cm to 30 cm dia log beam including
supplying and fixing necessary MS nuts and bolts etc. and coal tarring
coats appiled hot as dirceted (coal tar to be supplied by the contractor
at his own cost.)
(a) Applying 2 (two) coats meter 462.52
(b) Applying 1 (one) coats meter 321.90
17.22 Labour for taking out old woodworks of bridge and the refitting the
same including supplying and fixing necessary new MS bolts, nuts,
cum 2,736.75
spikes, nail as directed (Coal tar to be supplied by the contractor at his
own costs.)
17.23 Labour for taking out old log beam of bridge and refitting the same
including supplying and fixing necessary new MS bolts, nuts, spikes,
nail etc an d coaltering on coat applied hot as directed (Coal tar to be meter 269.61
supplied by the contractor at his own costs.)
17.24 Single bamboo spur and palasiding of whole 2nd class bamboo (Jati or
Bethua) 65mmto 75mm dia closely packed 7 driven , including fitting
and fixing with half bamboo kamis horizantally in three rows with the
cane or tieing wire complete and struts 1500 mm apart longitudinally
and providing brush wood as per drawing and technical specification
clause 1302.5 of MORT&H
(A) Driven at least 900mm below and 1800 mm above the ground on
meter 517.13
average.
(B) Driven at least 900mm below and 900 mm above the ground on
meter 431.14
average
17.25 Pile shoes : supplying fitting and fixing the pile shoes made of 6mm
thick mild steel plate with necessary welding joints, size of pile shoe will
be 78.54 cm(circumferential length of at top.) X50cm(Depth) X
5cm(circumferential length at bottom) and inside 25cm inside diameter
at top, including fitting and fixing 39Three) nos. M.S. plate of size of
6mmX50mm, length 45cm at top of the pile shoe with necessary
welding and drilling three nos of holes in each plate including fitting and Each 1,359.66
fixing the pile shoes at the pile end with necessary patent nails etc. ,
complete as directed by the Department .The pile shoe should be
camphered to fit the pile shoe properly withnecessary grooving for
placing the MS plates and pile shoe.
17.26 Single bamboo spur and palasiding of whole 1st class bamboo
(Bholuka or Barua) 85mmto 100mm dia closely packed & driven ,
including fitting and fixing with half 2nd class bamboo (Jati or Bethua)
horizantally in three rows with the cane or tieing wire complete and
struts 1500 mm apart longitudinally and providing brush wood as per
drawing and technical specification .
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
(A) Driven at least 900mm below and 1800 mm above the ground on
meter 607.78
average.
(B) Driven at least 900mm below and 900 mm above the ground on
meter 431.14
average
(C) Driven at least 900mm below and 1200 mm above the ground on
meter 521.78
average
(D) Driven at least 600mm below and 1200 mm above the ground on
meter 398.60
average
17.27 Bamboo spur 'A' type with whole bamboo 65mm t0 75mm dia, placed
230mm center to center driven 900mm below ground and 1200mm t0
1500mm above the ground tied with 2nd class bamboo(Jati or Bethua)
on either side at 450mm apart horizantally with galvanized wire etc.
complete as per drawing and technical specifications.
17.30 Double timber spur with two rows at 800mm C/C apart of 1st class
local wood piles with timber of Azar/Nahar/Nageswar/Zarul wood
150mm to 200mm dia driven 2000mm minimum below ground and
3600mm above ground average placed at 800mm belt, bracing etc. of
100mmx75mm size dia bolts and nuts etc. including coal tarring of meter 33,689.28
timber members and cost of necessary bamboo staging etc. as
directed by the Engineers as per drawing and technical specifications.
17.31 Supplying and filling up hollows of the timber spur to an average height
of 3600mm above the ground with jungle wood branches as directed
meter 53.46
by the Engineers and as per drawing and technical specifications.
17.32 Providing split bamboo digonally wooven lining over slope of bridges,
abutement and road embakement etc. secured to the ground at least
sqm 125.51
70cm long bamboo pegs and half bamboo horizontally at 100cm center
to center both ways.
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
17.33 (a) Suuplying fitting and fixing whole Bholuka or Barua bamboo pegs
85mm to 100mm dia, closely placed all round the hollows of spur fitted
with necessary nail in the horizontal timber between 90 cm below
ground and 360cm above ground on average (timber works will be paid
for separately).
(a) For 360 cm above ground on average meter 922.71
(b) For 200 cm above ground on average meter 700.75
17.34 Earthwork in filling in the guide bund by head load up to lead of 60m
with approved quality all leads and lifts ramming and compacting with
rammer weighing not less than 10kg and falling from height of not less
than 90cm and sprinkling with water if necessary. earth is to collected
after removing the 1st 20cm of top soil and should be free from grass, cum 105.75
shrubs and other foreign matter and rate will be including payment of
fland compensation.
(a) Extra lead for each 30cm and part thereof beyond 60m up to a lead
cum 8.13
200m.
(b) Extra lift for each 1.50m or part thereof beyond the initial lift of 1.50m
cum 8.13
17.35 Labour for haulding up boat and refloating the same after repair
MoRT&H
Ref. of
Unit without GST
17.44 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 432.30
complete up to 6 tonne mar boat.
17.45 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 650.78
complete above 6 tonne mar boat.
17.46 Providing and launching Steel Truss of Structural steel BUG super
Structure including painting complete as per Section 1900 of MOST MT 1,11,971.82
specification.
17.47 Earth work by head load in filling embankment in layers not exceeding
20cm thick including breaking clods, dressing and sectioning,
cambering and ramming, within a lead up to 30 m and lift up to 1.5m
including payment of land conpensation for obtaining earth from private
land or govt. land as required (measurement will be on the bais of
profile or section measurement, 12.5% deduction being made on the
quantity thus arrived for shrinkage allowance.
(a) Extra lead for each 30m and part thereof beyond initial lead of 30m.
cum 5.81
(b) Extra lift for each 1.50 m or part thereof beyond the initial lift of 1.50m
cum 5.81
17.49 Earth work in sub grade and shoulders by head load with selected soil
of approved quality with a lead of 30 m and lift up to 1.5 m spreading
grading to required shape and compacting to meet requirement of cum 126.67
Table 300 -2 (including payment of land compensation of obtaining
earth).
(a) Extra lead for each 30m and part thereof beyond initial lead of 30m.
cum 5.81
(b) Extra lift for each 1.50 m or part thereof beyond the initial lift of 1.50m
cum 5.81
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
17.50 Labour fror laying apron with man size boulders by hand packing the
syone with dry stone masonry template crosswalls to ensure regular
and orderly deposition of the full intended quality of stone in the apron
including labour for buildung these walls about one meter thick and to
the full height of the specific thockness of the apron at interval of 30 cum 496.22
meters all along the length of the apron with local carriage of stone
within 60 meters complete.
17.51 Stone masonry work. Uncoursed rubble masonry work in all retaining
wall, wing wall, abutement etc. in cement mortar 1;6 withoutside face
stone roughly hammer dressed and inside (earthen side ) undressed
as per drawing and technical sopecifications including racking out joints cum 3,687.34
and curing , supplying and carriage of stone as directed.
17.52 Labour for spreading metal gravel / granular material on the road
surface as directed including dressing and cambering the formation
and utilizing the loose earth in filling the depression as directed Cum 142.94
including carriage of gravel within 30m.
MoRT&H
Ref. of
Unit without GST
17.62 Providing ,fitting,fixing 6mm thick permanent liner during cast in situ
pile boring to resist collapse of soil as per drawing and technical MT 74,708.00
specification
APWD, SOR (NATIONAL HIGHWAY)
Item No. Descriptions Rate
(2020-21)
MoRT&H
Ref. of
Unit without GST
P & M -016 Concrete pump 30 -45 cum (with 100 meter) Pumping of concrete cum/hour hour 719.00
P & M -017 concrete mixture 0.28 -0.4 cum capacity concrete mixing cum/hour 2.5 hour 410.00
P & M -018 concrete mixture 1 cum capacity concrete mixing cum/hour 1 cum hour 461.00
P & M -019 Crane upto 15 tonne capacity (hydra) lifting purpose tonne 30 hour 1,029.00
P & M -020 Crane 30 tonne capacity (hydra) lifting purpose tonne 30 hour 1,350.00
P & M -021 Crane 40 tonne capacity (hydra) lifting purpose tonne 40 hour 1,463.00
P & M -022 Crawler crane 50 tonne capacity lifting purpose tonne 50 hour 1,887.00
P & M -023 Crawler crane 80 tonne capacity lifting purpose tonne 80 hour 2,468.00
P & M -024 Crawler crane 100 MT capacity lifting purpose tonne 100 hour 2,842.00
P & M -025 Crawler crane 150MT capacity lifting purpose tonne 150 hour 3,947.00
P & M -026 Crawler crane 260 MT capacity lifting purpose tonne 260 hour 5,814.00
P & M -027 Crawler crane 50 T with grab 1 cum capacity lifting purpose tonne 2 hour 1,992.00
P & M -028 Crawler crane 30MT with grab 0.75 cum capacity lifting purpose tonne 1.5 hour 1,436.00
P & M -029 Hydralic telescopic truck crane 15 tonne lifting purpose tonne 15 hour 1,029.00
P & M -030 Hydralic telescopic truck crane 30 tonne lifting purpose tonne 30 hour 1,350.00
P & M -031 Hydralic telescopic truck crane 40 tonne lifting purpose tonne 40 hour 1,463.00
P & M -032 Hydralic telescopic truck crane 50 tonne lifting purpose tonne 50 hour 1,877.00
P & M -033 Hydralic telescopic truck crane 60 tonne lifting purpose tonne 60 hour 2,236.00
P & M -034 Hydralic telescopic truck crane 80 tonne lifting purpose tonne 80 hour 2,670.00
P & M -035 Tower crane 5 tonnes lifting purpose tonne 5 hour 2,060.00
P & M -036 Tower crane 6 tonnes lifting purpose tonne 6 hour 2,788.00
spreading/cutting/cle
P & M -037 Dozer D -80-A12 aring cum/hour 300/150/250 hour 2,797.00
spreading/cutting/cle
P & M -038 Dozer D -50-A15 aring cum/hour 200/120/150 2,103.00
spreading/cutting/cle
P & M -039 Emulsion pressure distributor with tractor sqm/hour
aring 1750 hour 880.00
Applying emulsion
P & M -040 Excavator cum loader (Back hoe) of 1 cum bucket cum/hour
tack coat 60/60 hour 1,520.00
Soil ordinary/soil
P & M -041 Front End loader 2.1 cum bucket capacity marshy/ soil cum/hour
unsuitable 60/60 hour 1,874.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
Soil ordinary/soil
P & M -042 Crawler mounted Excavator of 1 cum bucket marshy/ soil cum/hour
unsuitable 60/60 hour 2,248.00
Soil ordinary/soil
P & M -043 Generator 15 KVA marshy/ soil cum/hour
unsuitable 15 hour 652.00
Generation of
P & M -044 Generator 25 KVA
electric Energy KVA 25 hour 816.00
Generation of
P & M -045 Generator 40 KVA
electric Energy KVA 40 hour 887.00
Generation of
P & M -046 Generator 45 KVA
electric Energy KVA 45 hour 926.00
Generation of
P & M -047 Generator 63 KVA
electric Energy KVA 62.5 hour 1,189.00
Generation of
P & M -048 Generator 82.5 KVA
electric Energy KVA 82.5 hour 1,327.00
Generation of
P & M -049 Generator 100 KVA
electric Energy KVA 100 hour 1,464.00
Generation of
P & M -050 Generator 125 KVA
electric Energy KVA 125 hour 1,625.00
Generation of
P & M -051 Generator 160 KVA
electric Energy KVA 160 hour 2,053.00
Generation of
P & M -052 Generator 180 KVA
electric Energy KVA 180 hour 2,206.00
Generation of
P & M -053 Generator 200 KVA
electric Energy KVA 200 hour 2,388.00
Generation of
P & M -054 Generator 250 KVA
electric Energy KVA 250 hour 2,746.00
Batch Mix Plant -120mTPH capacity (160 KVA D.G set to be attached Generation of
P & M -055
separately) electric Energy MT/hour 120 hour 16,677.00
Hotmix (Drum)plant -100 TPH capacity (160 KVA D.G set to be
P & M -056 attached separately) DBM/BM/SDC/premix MT/hour 100 hour 14,777.00
Hotmix (Drum)plant -60 to 90 TPH capacity (160 KVA D.G set to be
P & M -057 attached separately) DBM/BM/SDC/premix MT/hour 60 hour 12,330.00
Hotmix (Drum)plant -40 to 60 TPH capacity (125 KVA D.G set to be
P & M -058 attached separately) DBM/BM/SDC/premix MT/hour 40 hour 10,091.00
blending asphalt
P & M -059 Batch Mix Plant 1500 TPH mixture MT/hour 1500 hour 24,963.00
P & M -060 Hydraulic chip spreader spreading GSB/WBM hour hour 269.00
P & M -061 Integrated stonne crusher 60 TPH (D.G set to be attached separately) Crushing of stone TPH 60 hour 1,796.00
P & M -062 Self propelled Kerb casting machine casting of kerb RM/ hour 5 hour 3,734.00
capacity in
P & M -063 Mastic cooker with attached 15 KVA D.G set. mastic wearing coat tonne 1 hour 879.00
P & M -064 Mechanical Broom hydraulic ( excluding prime mover/ tractor) surface cleaning sqm/hour 1250 hour 362.00
cleaning
P & M -065 Motor Grader 3.35 mm mtr blade /spreading/GSB/WBM cum/hour 200/200/50/50 hour 2,498.00
mixing and laying
P & M -066 Mobile slurry seal machine / equipment slurry seal sqm/hour 2700 hour 3,670.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (5.5-6 meter DBM/BM/SDBC/prem
P & M -067 width) ix tonne/hour 40 hour 3,005.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (7.3 meter DBM/BM/SDBC/prem
P & M -068 width) ix tonne/hour hour 3,445.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (9 meter DBM/BM/SDBC/prem
P & M -069 width) ix tonne/hour hour 4,072.00
paving of
paver finisher hydrostatic with sensor control 100 TPH (12 meter DBM/BM/SDBC/prem
P & M -070 width) ix tonne/hour hour 4,860.00
P & M -071 Paver finisher mechanical 100 TPH paving surface hour hour 1,187.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
piling activity upto
P & M -072 Piling Rig (mannual) with bantonite pump (upto 500 mm dia boring) 1.2 m dia. RM/ hour 2 to 3 Rm 668.00
P & M -073 Power winch with assosories (Double Drum) pile hammering hour hour 3,452.00
rolling of asphalt
P & M -074 Pneumatic tyred road roller (VOLVO/HAMM) surface sqm/hour 25 hour 2,146.00
P & M -075 pad foot roller (11tonne) rolling & compacting sqm/hour hour 1,645.00
pneumatic sinking of
P & M -076 pneumatic sinking plant wells cum/hour 1.5 to 2 hour 3,455.00
P & M -077 pot hole repair machine repair of potholes cum/hour 4 hour 1,190.00
stressing of steel
P & M -078 single pretressing jack with pump & accessories (without D.G set) wires /stands hour hour 270.00
stressing of steel
P & M -079 Double prestressing jack with pump & accessories (without D.G set) wires /stands hour hour 289.00
P & M -080 Ripper ( attachment part in excavator) Scarifying cum/hour 60 hour 37.00
P & M -081 Rotavator ( attachment part in tractor) Scarifying cum/hour 25 hour 32.00
P & M -082 Road marking machine (manual) road making sqm/hour 100 hour 284.00
P & M -083 Road marking machine (self propelled , semi - automatic) road making sqm/hour 100 hour 517.00
soil compaction / BM
P & M -084 Smooth wheeled roller 8 tonne (static road roller) Compaction cum/hour 70/25 hour 897.00
rolling of asphalt
P & M -085 Tandem vibratory road roller (8 - 10 T) surface cum/hour 30 hour 1,505.00
transportation of
soil,GSB,WMM,hotmi
P & M -086 Tipper - 5 cum x etc. capacity in cum 5.5 hour 38.00
transportation of
soil,GSB,WMM,hotmi
P & M -087 Tipper - 5 cum x etc. capacity in cum 5.5 hour 1,144.00
transportation of
soil,GSB,WMM,hotmi
P & M -088 Tipper - 10 cum x etc. capacity in cum 10 hour 1,324.00
transportation of
P & M -089 Transit Mixer (concrete mixer ) 6/7 cum concrete mix to site capacity in cum 6\7 hour 1,605.00
Transportation of
P & M -090 Transit Mixture 4/4.5 cum concrete mix to site capacity in cum 4.5 hour 1,421.00
Transportation of
P & M -091 Transit Mixture 3 cum concrete mix to site capacity in cum 3 hour 1,190.00
Transportation of
P & M -092 Transit Mixture 3 cum concrete mix to site cum/hour tonne/km 20.00
P & M -093 Tractor with trailor pulling capacity in HP 50 hour 792.00
P & M -094 Truck 5.5 cum per 10 tonnes material transport Capacity /cum 5.5 hour 1,110.00
P & M -095 Truck 5.5 cum per 10 tonnes material transport Capacity /cum 5.5 tonne/km 6.00
Earth of
P & M -096 vibratory soil compactor soil/GSB/WBM cum/hour 100/60/60 hour 1,306.00
P & M -097 water - tanker (6 - 10 KL cap) truck mounted water transport capacity in KL 6 to 9 hour 984.00
Batch type cold mixing plant 100- 120 TPH capacity producing an
P & M -098 average output of 75 tonne per hour premix tonne/hour hour 3,277.00
P & M -099 Boat to carry atlist 20 persons Transportation 20 hour 494.00
shaping of irregular
P & M -100 cold milling machine @ 20 cum per hour surface cum/hour 20 hour 4,911.00
shaping of irregular
P & M -101 Milling machine (1.2 meter) surface cum/hour 24 hour 5,941.00
P & M -102 Crane 5-10 tonne capacity (Mechanical) lifting purpose tonne 10 hour 843.00
P & M -103 Crane 15 tonne capacity (Mechanical) lifting purpose tonne 15 hour 970.00
P & M -104 Crane 20 tonne capacity (Mechanical) lifting purpose tonne 20 hour 1,066.00
P & M -105 Epoxy injection gun injecting epoxy hour 164.00
cutting of concrete
P & M -106 joint cutting machine with 2-3 blades (for rigid pavement) pavement hour 227.00
P & M -107 jack for lifting 40 - 150 tonne lifting capacity. lifting purpose day 303.00
P & M -108 Hydraulic piling rig including double acting pile driving hammer. hour hours 9,009.00
APWD, SOR (NATIONAL HIGHWAY)
(A) USAGE RATES FOR PLANT AND MACHINERY
Unit of Approved
Sl No. Description of Machine Activity Unit Output usages rate for SOR
per 2020-2021
P & M -109 Plate compactor compaction of soil hour 276.00
P & M -110 Truck trailor 30 tonne capacity carry materials tonne 30 hour 1,398.00
performing pile
vibrating pile driving hammer complete with power unit ,crane &
P & M -111 driving and grade
assecssories.
stabilization tonne hour 3,963.00
DBM/BM/SDBC/prem
P & M -112 Wet mix plant 100 TPH DG sets of 125 KVA attached seperately)
ix tonne/hour hour 2,717.00
DBM/BM/SDBC/prem
P & M -113 Wet mix plant 60-75 TPH DG sets of 63 KVA attached seperately)
ix tonne/hour hour 2,280.00
P & M -114 AR 2000 SUPER RECYCLER owning & operating cost hot recyling hour 2 to 3 hour 1,05,869.00
piling activity upto 2
P & M -115 Pilling Rig machine (upto 2000mm dia) with boring attachement
m dia. rm/hour 2 to 3 hour 4,843.00
PQC/concrete
P & M -116 paver with dowell bar inserter (7mtr wide) roads/rigid
pavements hour 4,162.00
P & M -117 Hydraulic self propelled chip spreader surface dressing sqm/hour 1500 hour 3,005.00
P & M -118 Grouting pump with agitator concrete grouting hour 550.00
APWD, SOR (NATIONAL HIGHWAY)
(B) LABOUR
Approved rate for SOR
Sl No. Description of Labour unit
2020-2021
L -01 Blacksmith (II nd clsass) day 380
L -02 Blacksmith (1st clsass) welder /plumber/electrician day 500.47
L -03 Blaster (stone cutter) day 315.42
L -04 Carpenter I class day 500.47
L -05 Chiseller (Head mazdoor) day 380.79
L -06 Driller (jumper) day 380.79
L -07 Driver day 380.79
L -08 Fitter day 402.55
L -09 Mali day 315.42
L -10 Mason (II nd class) day 315.42
L -11 Mason (I st class) day 500.47
L -12 Mate / supervisor day 500.47
L -13 Mazdoor day 271.97
L -14 Mazdoor/Dresser (semi- skilled) day 315.42
L -15 Mazdoor/Dresser /sinker ( skilled) day 380.79
L -16 Medical officer day 2200
L -17 operator (grouting) day 500.47
L -18 painter I class day 500.47
L -19 para medical personnel day 700
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-001 Stone boulder of size 150mm and below at crusher plant cum 1,643.99
M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken at site cum 1,783.99
M-003 Boulder with minimum size of 300 mm for pitching site cum 1,625.10
M-004 Coarse sand at mixing plant cum 1,042.80
M-005 Coarse sand at site cum 1,041.79
M-006 Fine sand at site cum 1,009.79
M-007 Moorum at site cum 784.37
M-008 Gravel / Quarry spall at site cum 1,506.21
M-009 Granular Material or hard murrum for GSB works at site cum 1,774.25
M-010 Granular Material or hard murrum for GSB works at Mixing plant cum 1,814.25
Fly ash conforming to IS: 3812 (Part II & I ) at HMP Plant / Batching
M-011 plant/Crushing plant cum 1,805.00
M-012 Filter media / Filter material as per Table 300-3 (MORT &H Specification) cum 2,062.51
M-013 Close graded Granular sub- base Material 53 mm to 9.5 mm cum 2,129.46
M-014 Close graded Granular sub- base Material 37.5mm to 9.5 mm cum 2,129.46
M-015 Close graded Granular sub- base Material 26.5 mm to 9.5 mm cum 2,129.46
M-016 Close graded Granular sub- base Material 9.5 mm to 4.75mm cum 2,155.02
M-017 Close graded Granular sub- base Material 9.5 mm to 2.36 mm cum 2,143.91
M-018 Close graded Granular sub- base Material 4.75 mm to 2.36 mm cum 2,106.13
M-019 Close graded Granular sub- base Material 4.75mm to 75 micron mm cum 2,177.24
M-020 Close graded Granular sub- base Material 2.36 mm cum 2,055.02
Stone crusher dust finer than 3mm with not more than 10 % passing 0.075
M-021 sieve. cum 1,472.88
M-022 Coare graded Granular sub- base Material 2.36 mm & below cum 1,839.54
M-023 Coare graded Granular sub- base Material 4.75mm to 75 micron mm cum 1,875.10
M-024 Coare graded Granular sub- base Material 4.75 mm to 2.36 mm cum 1,889.54
M-025 Coare graded Granular sub- base Material 9.5mm to 4.75mm cum 1,958.43
M-026 Coare graded Granular sub- base Material 26.5mm to 4.75mm cum 2,103.99
M-027 Coare graded Granular sub- base Material 26.5mm to 9.5mm cum 2,105.10
M-028 Coare graded Granular sub- base Material 37.5mm to 9.5mm cum 2,105.10
M-029 Coare graded Granular sub- base Material 53mm to 26.5 mm cum 2,088.43
M-030 Aggregates below 5.6 mm cum 1,851.77
M-031 Aggregates 22.4 mm to 2.36 mm cum 2,393.99
M-032 Aggregates 22.4 mm to 5.6 mm cum 2,360.66
M-033 Aggregates 45 mm to 2.8 mm Cum 2,365.10
M-034 Aggregates 45 mm to 22.4 mm Cum 2,377.32
M-035 Aggregates 53 mm to 2.8 mm Cum 2,395.10
M-036 Aggregates 53 mm to 22.4 mm Cum 2,334.66
M-037 Aggregates 63 mm to 2.8 mm Cum 2,360.66
M-038 Aggregates 63 mm to 45 mm Cum 2,350.66
M-039 Aggregates 90 mm to 45 mm Cum 2,319.54
M-040 Aggregates 10 mm to 5 mm Cum 2,389.77
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-041 Aggregates 11.2 mm to .09 mm Cum 2,406.43
M-042 Aggregates 13.2 mm to .09 mm Cum 2,373.10
M-043 Aggregates 13.2 mm to 5.6 mm Cum 2,438.66
M-044 Aggregates 13.2 mm to 10 mm Cum 2,423.10
M-045 Aggregates 20 mm to 10 mm Cum 2,447.66
M-046 Aggregates 25 mm to 10 mm Cum 2,438.21
M-047 Aggregates19 mm to 6 mm Cum 2,458.77
M-048 Aggregates 37.5 mm to 19 mm Cum 2,421.77
M-049 Aggregates 37.5 mm to 25 mm Cum 2,382.88
M-050 Aggregates 6 mm nominal size Cum 2,181.77
M-051 Aggregates 10 mm nominal size Cum 2,382.88
M-052 Aggregates 13.2/12.5mm nominal size Cum 2,422.88
M-053 Aggregates 20 mm nominal size Cum 2,451.77
M-054 Aggregates 25 mm nominal size Cum 2,440.66
M-055 Aggregates 40 mm nominal size Cum 2,380.66
M-056 GI Pipe 100 mm dia metre 528.67
M-057 Acrylic polymer bonding coat litre 401.25
M-058 Aluminium paint litre 160.00
M-059 Aluminium alloy plate 2mm thick Sqm 183.75
M-060 Aluminium alloy/galvonised steel tonne 43,786.25
Aluminium sheeting fixed with encapsulated lens type reflective sheeting
including 2 % towards lettering, cost of angle iron, cost of drilling holes,
M-061 nuts bolts etc and signs as applicable Sqm 953.75
M-062 Barbed wire kg 46.11
M-063 Bearing ( Cast steel rocker bearing assembly of 250 tone) MT 550.00
Bearing ( Elastomeric bearing assembly consisting of 7 internal layers of
elastomer bonded to 6 nos. internal reinforcing steel laminates by the
M-064 process of vulcanisation,) (19200 cum capacity) cum 575.00
M-065 Bearing ( Forged steel rollar bearing of 250 tonne) MT 150.00
M-101 Electric Detonators@ 1 detonators for 1/2 gelatin stick of 125 gms each 100 nos 455.54
M-102 Epoxy resin - hardner mix for prime coat kg 1,645.00
M-103 Epoxy compound with accessories for preparing epoxy mortar kg 945.66
M-104 Epoxy mortar kg 900.00
M-105 Epoxy mortar kg 600.00
M-106 Flag of red colour cloth 600x600 mm each 85.33
M-107 Flowering plants each 148.33
M-108 Galvanised MS flat clamp nos 850.00
Galvanised steel wire crates of hexagonal shaped mesh size 100 mm x 120
mm mechanically wooven with 2.7/3.7 ( I.D/O.D). Lacing wire to be knot
M-109 the crate as required Sqm 450.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-110 Galvanised structural steel plate 200 mm wide , 6 mm thick , 24 m long kg 95.00
M-111 Gelatin 80% kg 60.00
M-112 G I Bolt 10 mm dia nos 71.20
M-113 Grass ( doob) kg 50.00
M-114 Grass ( fine) kg 75.00
M-115 HDPE pipes 75 mm dia metre 264.60
M-116 HDPE pipes 90 mm dia metre 353.00
M-117 Hedge plants each 115.00
M-118 Helical pipes 600 mm diameter metre 365.00
M-119 Hot applied thermoplastic compound liter 120.00
M-120 HTS strand tonne 68,000.00
M-121 Joint sealant compound kg 713.82
M-122 Jute netting, open weave , 2.5 cm square opening for seeding and mulching Sqm 70.00
M-123 LDO for steam curing litre 42.71
M-124 M.S Clamps nos 57.00
M-125 Masterplug ( CHOKSEY) each 23.24
M-126 M.S shoes @ 35 kg per pile of 15m kg 85.00
Moulder strip/box seal expansion joint including anchorage catering to a
horizontal movement beyond 70 mm and upto 140mm assembly
comprising of edge beam ,central beam ,2 modules chloropene
M-127 seal,anchorage elements ,support and meter 27,500.00
M-144 pre - packed cement based polymer concrete of strength 45 Mpa at 28 days kg 97.62
M-145 primer kg 163.33
M-146 Quick setting compound kg 76.00
M-147 Random Rubble stone cum 1,762.50
M-148 Reflectorising glass beads kg 154.50
Reinforcement strips 60mm wide 5mm thick as per clause 3102. (copper
M-149 strips) meter 1,456.00
Reinforcement strips 60mm wide 5mm thick as per clause 3102.
M-150 (galvanised carbon steel strips) meter 329.00
M-160 Separation membrane of impermeable plastic sheeting 125 micron thick sqm 80.00
M-161 Sheathing duct metre 137.10
M-162 Shrubs each 32.00
Sludge/Farm yard manure @ .18 cum per 100 sqm at site of work for
M-163 turfing cum 192.50
Well decayed Farm yard manure @ .18 cum per 100 sqm at site of work
M-164 for turfing cum 242.50
M-165 Sodium vapour lamp ( 250 watts) each 10,880.00
M-166 Square rubble coursed stone cum 2,685.00
Steel circular hollow pole of standard specification for street lighting to
M-167 mount light at 5 m height above deck level each 9,000.00
Steel circular hollow pole of standard specification for street lighting to
M-168 mount light at 9 m height above road level each 11,000.00
M-169 steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 92.00
M-170 steel halmet and cushion block on top of pile head during driving kg 75.00
M-171 Steel pipe 25 mm external dia as pe IS : 1239 metre 284.20
M-172 Steel pipe 50 mm external dia as pe IS : 1239 metre 479.20
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-173 Steel wire rope 20 mm kg 190.00
M-174 Steel wire rope 40 mm kg 1,269.00
M-175 Strip seal expansion join metre 3,400.00
M-176 Structural steel tonne 50,000.00
M-177 Mild Steel plates tonne 46,000.00
M-178 Mild Steel angles tonne 44,000.00
M-179 Mild Steel channels tonne 44,000.00
M-180 G.I structural steel tonne 70,000.00
M-181 super plastisizer admixture IS marked as per 9103-1999 kg 186.00
Synthetic geogrids as per clause 3120.8 and approved design and
M-182 specification.(TGU-150) sqm 570.00
M-183 Trough and bond stone each 6.72
M-184 Tie rods 20 mm diameter nos 60.00
M-185 Tie size 300 x300 mm and 25 mm thick each 190.00
M-186 Timber cum 48,900.00
M-187 Traffic cones with 150mm reflective sleeve nos 490.00
M-188 Tube anchorage set complete with bearing plate ,permanent wedges etc. nos 2,074.35
M-189 Unstaked lime tonne 3,500.00
M-190 water kl 377.00
M-191 Anti stripping agent kg 773.33
M-192 Water based cement paint litre 403.00
M-193 welded steel wire fabric kg 250.00
M-194 wire mesh 50mm x 50mm size of 3mm wire kg 94.50
M-195 wooden ballies 2" dia for bracing each 470.00
M-196 wooden ballies 8" dia and 9mm long each 750.00
M-197 wooden packing cum 23,946.00
M-198 wooden staff for fastening of flag 25mm dia,one metre long each 80.00
M-199 Bamboo bholuka or barua 55mm to 100 mm dia and 6m long each 136.67
M-200 Bamboo jati or bethua 50mm to 100 mm dia and 6m long each 92.14
M-201 Wood local first class piles 25cm to 30cm metre 3,037.50
M-202 Wood local first class planks 25cm to 38 cm thick cum 35,455.40
M-203 Wood local first class small section cum 30,548.00
M-204 Wood local first class scantling upto 15cm x 15cm cum 38,312.00
M-205 Wood local first class heavy section above 15cm x 15cm cum 46,231.40
M-206 wood sal piles 25cm to 30 cm dia metre 23,600.00
M-207 wood sal planks 25cm to 38cm thick cum 22,250.00
M-208 wood sal scantling heavy section 15cm to 15cm cum 70,412.50
M-209 wood sal scantling upto 15 cm x15cm cum 70,412.50
M-210 conplast SP 430G8 (Masterplast PI -1 OR equivalent) litre 86.00
M-211 Conplast AEA (Air entraining admixture) litre 96.00
M-212 Conplast NC ( accelarating agent) Lit 120.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-213 PVC rain wrter pipe 100 mm dia RM 122.02
M-214 RBI grade 81 tonne 30,000.00
M-215 RENDEROC SP40 ( FOSROC)/ MASTER emaco S348 ( BASF) kg 25.00
M-216 RENDEROC S2 ( FOSROC) kg 35.00
M-217 Nitomortar S ( FOSROC) / master protect 1890 (BASF) litre 200.00
M-218 RENDEROC DS40 ( FOSROC)/ MASTER emaco S810 ( BASF) kg 20.00
M-219 Expocrete EC ( FOSROC)/ Wabocrete II ( BASF) litre 180.00
M-220 Nitoprime 25 ( FOSROC)/ master brace P 2525( BASF) litre 400.00
M-221 Nitozinc primer ( FOSROC) litre 1,200.00
M-222 Nitobond EP ( FOSROC)/ master BOND EP ( BASF) litre 800.00
M-223 Nitobond SBR( FOSROC)/ MASTER emacoSBR 2 ( BASF) litre 538.00
M-224 RENDEROC RG ( FOSROC)/ MASTER emacoS346 ( BASF) cum 75,913.00
M-225 Galvanised XP ( FOSROC) nos 1,030.12
M-226 Nitocote VF ( FOSROC) MASTERBRACE ADH 2200 (BASF) litre 1,275.00
M-227 Nitowrap 410 ( FOSROC)/ MASTERBRACE 4500 (BASF) ltr 1,125.00
M-228 Nitowrap 30 ( FOSROC)/ MASTERBRACE 3500 (BASF) ltr 1,355.00
M-229 Nitowrap EP(CF) ( FOSROC)/ MASTERBRACE FIBRES 230/200 (CF) sqm 2,750.00
M-230 Nitowrap 512 ( FOSROC)/ MASTERPROTECT 260 (BASF) litre 1,500.00
M-231 Nitowrap 40/Nitowrap ADH 2200 (BASF) litre 300.00
M-232 Nitowrap CPF( FOSROC)/ MASTERBRACE LAMINATES (BASF) RM 1,200.00
M-233 Cebex 100( FOSROC)/ MASTERFLOW 150 (BASF) kg 150.00
M-234 Conbextra EP 10 ( FOSROC)/masterinject 1315 (BASF) litre 800.00
M-235 Nitoseal UR63/ Masterseal 901 (BASF) kg 850.00
M-236 Nitofill WS60( FOSROC)/Master Roc MP 355 (BASF) kg 800.00
M-237 Polyurea WH200( FOSROC)/Masterseal878 (BASF) litre 437.00
M-238 Nitoprime 31 ( FOSROC) litre 500.00
M-239 Deckgaurd E2000 ( FOSROC)/ master protect 381( BASF) litre 550.00
M-240 Deckgaurd WB primer ( FOSROC)/ master protect 380 prime( BASF) litre 350.00
M-241 Nitocote EP50 ( FOSROC) litre 280.00
M-242 Nitocote EP110 ( FOSROC) litre 270.00
M-243 Nitocote EP100 ( FOSROC) litre 320.00
M-244 Deckgaurd PU silver grey ( FOSROC) litre 415.00
RENDEROC UW (FOSROC) cost is inclusive of material, transportation,
M-245 labour, taxes etc. Kg 52.00
M-246 conbextra EUW (FOSROC) litre 770.00
M-247 Lokfix P ( FOSROC) litre 1,800.00
M-248 Hydraproof extra ( FOSROC) litre 270.00
M-249 Recron 3s fibre Kg 96.00
M-250 RE 500 V3 of HILTI ml 9.60
M-251 HY 200R of HILTI ml 7.90
M-252 Aluminium backed flexible prismatic sheeting (AFP) sqft 950.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
M-253 Polypropylene fibre gm 0.61
M-254 Terrasil compound of Zytex industries Kg 1,450.88
M-255 Earth cost or compensation for earth taken from govt. land cum 17.43
M-256 HA/HAR Galvanized steel strip 60mm wide 5mm thick as per clause 3102. metre 435.79
M-257 HINCOL road bond MT 17,500.00
M-258 RCC pipe NP3 heavy duty non pressure pipe 750 mm dia 4,800.00
M-259 RCC pipe NP3 heavy duty non pressure pipe 900 mm dia 5,960.00
M-260 RCC pipe NP3 heavy duty non pressure pipe 1000 mm dia 6,900.00
M-261 RCC pipe NP3 heavy duty non pressure pipe 1200 mm dia metre 8,800.00
M-262 RCC pipe NP4 heavy duty non pressure pipe 900 mm dia 6,948.00
M-263 RCC pipe NP4 heavy duty non pressure pipe 1000 mm dia 8,455.50
M-264 RCC pipe NP4 heavy duty non pressure pipe 1200 mm dia metre 10,627.50
M-265 RCC pipe NP4 heavy duty non pressure pipe 1800 mm dia rm 18,600.00
M-266 Compression seal expansion joint rm 3,400.00
M-267 Asphalt reinforcement geogrid sqm 195.00
M-268 Glassgrid (50 KN/ M) to be used as asphalt reinforcement sqm 75.00
M-269 Glassgrid composite (50 KN/ M) to be used as asphalt reinforcement sqm 100.00
M-270 Triaxial geogrid ( TX 150) sqm 115.00
M-271 Triaxial geogrid ( TX 160) sqm 125.00
M-272 Triaxial geogrid ( TX 170) sqm 140.00
M-273 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 200.00
M-274 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 220.00
M-275 High strength flexible geogrids ( HSFG) ultimate strength 100KN/ m sqm 300.00
M-276 High strength flexible geogrids ( HSFG) ultimate strength 150KN/ m sqm 330.00
M-277 High strength flexible geogrids ( HSFG) ultimate strength 200 KN/m Sqm 350.00
M-278 High strength flexible geogrids ( HSFG) ultimate strength 250 KN/m Sqm 390.00
M-279 High strength flexible geogrids ( HSFG) ultimate strength 300 KN/m Sqm 420.00
M-280 High strength flexible geogrids ( HSFG) ultimate strength 350 KN/m Sqm 500.00
M-281 High strength flexible geogrids ( HSFG) ultimate strength 400 KN/m Sqm 550.00
M-282 Wooven Polypropylene Geotextile 150 gsm Sqm 60.00
M-283 Wooven Polypropylene Geotextile 220 gsm Sqm 65.00
M-284 Wooven Polypropylene Geotextile 250 gsm Sqm 75.00
M-285 Wooven Polypropylene Geotextile 400 gsm Sqm 130.00
Biaxial Geogrid, having tensile strength of 20 KN/m and aperture size of
M-286 39mm x 39 mm Sqm 100.00
APWD, SOR (NATIONAL HIGHWAY)
(C) MATERIALS
Approved
Sl. No. Description Unit rate for SOR
20-21
Biaxial Geogrid, having tensile strength of 30 KN/m and aperture size of
M-287 39mm x 39 mm Sqm 125.00
Biaxial Geogrid, having tensile strength of 30 KN/m and aperture size of 65
M-288 mm x 65 mm Sqm 120.00
Biaxial Geogrid, having tensile strength of 40 KN/m and aperture size of 33
M-289 mm x 33 mm Sqm 140.00