DUBLIN CONSTRUCTION SERVICES

PROJECT TITLE: PROPOSED TWO-BEDROOM BUNGALOW RESIDENTIAL BUILDING


Project Location: BRGY. CAMAMAN-AN, CAGAYAN DE ORO CITY

BREAKDOWN OF EXPENDITURES % OF TOTAL AMOUNT


DIRECT COST:
Materials 53.1% 931,771.00
Labor/Manpower 19.3% 338,284.34
Equipment/Tools Expenses 4.1% 72,722.02
SUB-TOTAL (DIRECT COST) 0.76 1,342,777.36
INDIRECT COST:
Overhead, Contingency & Misc. 5.3% 93,796.19
Contractor's Profit 7.6% 134,277.74
Value Added Tax 10.6% 185,303.28
SUB-TOTAL (INDIRECT COST)
TOTAL PROJECT COST 100% 1,756,154.56

Prepared by:

Licensed Engineer/Registered Master Plumber/Master Electrician