Addendum 1
Employer: FSM National Government, Department of Transport, Communications and Infrastructure
Projects:
1)
Original:
21.1 Criteria, sub-criteria, and point system for the evaluation of the Full
(for FTP) Technical Proposals:
Points
(i) Specific experience of the Consultant (as a firm) relevant to the
Assignment: 10
(ii) Adequacy and quality of the proposed methodology (7), and work plan(8)
in responding to the Terms of Reference (TORs): 15
Replace with:
21.1 Criteria, sub-criteria, and point system for the evaluation of the Full
(for FTP) Technical Proposals:
Points
(i) Specific experience of the Consultant (as a firm) relevant to the
Assignment: 10
(ii) Adequacy and quality of the proposed methodology (7), and work plan(8)
in responding to the Terms of Reference (TORs): 15
*Should the Team Lead for Part 1 and 2 be different persons, the score shall be
the average between both scores
2)
Original:
* Note: For the Design-Build project of East and West Pou Circular, The Consultant shall include in its
pricing to support the preparation and issuance of Bid Documents for this job as follows:
1. Instructions to Bidders
2. Employer’s Requirements (Rigid Pavement Solution)
3. Contract Sum Analysis (Priced and Unpriced)
4. Supporting Information:
a. Topographic Survey (to be supplied by DTCI)
b. Geotechnical Survey (to be supplied by DTCI)
c. Environmental and Social Screening Report (to be supplied by DTCI)
d. Environmental and Social Safeguards Management Plan (to be prepared by the
Consultant in accordance with World Bank Guidelines)
The Client expects this project to be the first to be issued to bid of the Prioritized Road Listings
Replace with:
* Note: For the Design-Build project of East and West Pou Circular, The Consultant shall include in its
pricing to support the preparation and issuance of Bid Documents for this job as follows:
1. Instructions to Bidders
2. Employer’s Requirements (Rigid Pavement Solution)
3. Contract Sum Analysis (Priced and Unpriced)
4. Supporting Information:
a. Topographic Survey (to be supplied by DTCI)
b. Geotechnical Survey (to be supplied by DTCI)
c. Environmental and Social Screening Report (to be supplied by DTCI)
d. Environmental and Social Safeguards Management Plan (to be prepared by the
Consultant in accordance with World Bank Guidelines)
5. Supervision Services: Perform all applicable duties under the Contract as the “Engineer”
outlined under the FIDIC Conditions of Contract for Plant and Design-Build 2nd edition
(2017)
The Client expects this project to be the first to be issued to bid of the Prioritized Road Listings
GOVERNMENT OF THE
FEDERATED STATES OF MICRONESIA
Department of Transportation, Communications & Infrastructure
3)
Original :
(i) visit each contract site at intervals of no more than 3 months (unless agreed with the DTC&I
that a visit, or a visit to a particular site is not warranted);
(ii) delegate sufficient powers and authorities of the Engineer to the Resident Engineer (the
extent of delegation to the Resident Engineer shall be proposed in the consultant’s technical
proposal);
(iii) review all contractual correspondence and provide advice to the Resident Engineer where
necessary; and
(iv) Ensure that the contracts are correctly administered in accordance with the contracts.
Replace with :
(i) Perform all duties as defined by the “Engineer” under the Conditions of Contract
(ii) visit each contract site at intervals of no more than 3 months (unless agreed with the DTC&I
that a visit, or a visit to a particular site is not warranted);
(iii) delegate sufficient powers and authorities of the Engineer to the Resident Engineer (the
extent of delegation to the Resident Engineer shall be proposed in the consultant’s technical
proposal);
(iv) review all contractual correspondence and provide advice to the Resident Engineer where
necessary; and
GOVERNMENT OF THE
FEDERATED STATES OF MICRONESIA
Department of Transportation, Communications & Infrastructure
(v) Ensure that the contracts are correctly administered in accordance with the contracts.
4)
Original:
The services to be provided by the Consultant will be undertaken in a 2-stage approach as follows:
Replace with :
The services to be provided by the Consultant will be undertaken in a 2-stage approach as follows:
All other details remain as in the Bidding Documents inclusive of the Closing Date for this RFP as March