Sketch 1: Gas Distribution Lines in Pilot Plant Lab -1

Northern wall of the Pilot Plant Lab

Compressed nitrogen line Header lines OD = 16 mm, thickness 2 mm


Compressed hydrogen line Sub lines OD = 10 mm, thickness 1.5 mm
Line from nitrogen generator (OD = 10 mm, thickness 1.0 mm)

3.5 m 4.5 m 5m
8m

4m
Shelf Shelf CONTROL ROOM Shelf Shelf

Work Work Work Work


D Bench Bench Bench Bench D

Work Bench: Laboratory Work Bench, 2 m wide x 60 cm deep, 90 cm high Note: All Work Benches should have compressed air supply line, sink, cold water supply line and overhead shelf
Shelf: Laboratory Shelf, 2 m wide x 30 cm deep, 50-60 cm high
W: Window, 1 m wide, 2 m high, 1 m from floor
Sketch 2: Gas Distribution Lines in Pilot Plant Lab -2

Southern wall of the Pilot Plant Lab

Compressed nitrogen line Header lines OD = 16 mm, thickness 2 mm


Compressed hydrogen line Sub lines OD = 10 mm, thickness 1.5 mm

4.5 m 4.5 m 5m 4m 4m
8m
10 m 10 m
4m
Shelf
W Shelf
W Shelf
W Shelf
W
Shelf

Work Work Work Work Work


D Bench Bench Bench Bench Bench D

Work Bench: Laboratory Work Bench, 2 m wide x 60 cm deep, 90 cm high Note: All Work Benches should have compressed air supply line, sink, cold water supply line and overhead shelf
Shelf: Laboratory Shelf, 2 m wide x 30 cm deep, 50-60 cm high
W: Window, 1 m wide, 2 m high, 1 m from floor
Sketch 3: Fume Cupboards in Reaction Engineering Lab