The document compares the existing and proposed utility power requirements for equipment at a facility. The existing equipment draws a total of 1406KW/1757.5KVA while the proposed equipment is expected to draw 1645KW/2056.25KVA. Specifically, replacing older chillers and pumps with newer water cooled and air cooled chillers and pumps would increase the total power needs by over 200KW. During the summer, an additional 460KW load would be required on top of the existing 207KW York chiller load.
The document compares the existing and proposed utility power requirements for equipment at a facility. The existing equipment draws a total of 1406KW/1757.5KVA while the proposed equipment is expected to draw 1645KW/2056.25KVA. Specifically, replacing older chillers and pumps with newer water cooled and air cooled chillers and pumps would increase the total power needs by over 200KW. During the summer, an additional 460KW load would be required on top of the existing 207KW York chiller load.
The document compares the existing and proposed utility power requirements for equipment at a facility. The existing equipment draws a total of 1406KW/1757.5KVA while the proposed equipment is expected to draw 1645KW/2056.25KVA. Specifically, replacing older chillers and pumps with newer water cooled and air cooled chillers and pumps would increase the total power needs by over 200KW. During the summer, an additional 460KW load would be required on top of the existing 207KW York chiller load.