21.1 PURPOSE
The purpose of this document is to outline responsibilities and provide guidance on the use,
storage, maintenance, and disposal of wastes in the Project Sites to have a safe & green
Environment.
These guidelines describe the principal precautions required to be taken by all personnel
and apply to all company work sites.
The MR plans for conducting the review meeting. The review team consists of all in the top
management including staff with relevant information, and staff who have direct
responsibilities to discharge in fulfilling the EMS requirements. The management review
should take place minimum twice a year. MR will facilitate the meeting supported by the
Corporate HSE Advisor.
Main objectives
Procedure
Review should include the overall effectiveness of the EMS in meeting targets and objectives
of the system
The results of the review shall be used to determine modifications to the EMS required for
continuous improvement
Based on the company environmental audit program, internal and external audits are carried out
according to an appropriate time schedule. Generally, the internal audits are conducted at a higher
frequency.
Objectives
Ascertain whether company operations are in compliance with its policy and meet the
requirements of laws, regulations, permits and self-imposed standards
Assess the quality and effectiveness of the implementation of the Environmental
Management System [EMS].
Ascertain whether the environmental policies and procedures are clearly defined and
the roles and responsibilities of individual staff are assigned throughout the
organization
Recognize in a proper time the potential liabilities resulting from the company’s
environmental performance to place effective control measures to avoid or minimize
such liabilities
Identify gaps in the implementation of EMS with respect to ISO 14001 certification for
the top management review for taking necessary measures
Pre-Audit Requirements
The Minimum number of internal audit shall be once in six-month time preferably prior to a
Management Review.
The number of team members will vary depending on the scope, complexity, and size of the
facility to be audited and typically ranges from 2 to 5. The team members shall be
technically qualified, appropriately experienced, and trained in auditing to provide a
balanced and realistic appraisal.
Visit Program
Once the Project Site has provided the information package, the team reviews the
information, identifies the concern areas, and develops the visit program. The program
outlines the necessary steps; by whom and what sequence and the way in which these will
be accomplished. The visit program identifies the key employees to be interviewed, the
facilities to be inspected and the documents to be referred. Based on expertise and
experience, tasks will be allocated to specific audit team members.
Inspection of Facilities
The audit team visits the relevant operational sites and facilities including discharge
locations, the receiving environments. The team will cover, along with other matters, the
operational practice and procedures, the quality of effluent, the emission monitoring and
analysis, the facilities and the quality of waste disposal, housekeeping, performance of
equipment, etc.
The audit report provides a survey of observations of areas for improvement. The
recommendations will be grouped and ranked in order of priority. The audit team should
normally complete a draft audit report during their visit.
Audit Report
Following the site visit, the audit reports shall be prepared as soon as possible, taking into
account comments made during the debriefing meeting. The audit report will be sent to
Company management.
Page4of 5
Follow-Up
After the audit report is sent to the Project site, it is their responsibility to implement the
recommendations. Clearly, the value of the audit depends on active and purposeful follow-
up.
Implementation of Recommendations
Spill Prevention Program shall be prepared according to the site specific conditions,
depending on the nature and conditions of the project.
Transfer / filling of paints / chemicals / fuel / oil are restricted at work sites and shall
be done at designated areas only.
Separate area shall be identified for these types of activities, especially for
maintenance of equipments.
Under unavoidable circumstances, (equipment breakdowns etc.) proper precautions
such as pans shall be provided to prevent spillage.
Material Safety Data Sheets shall be available and displayed at the project site.