Professional Documents
Culture Documents
Form Maintenance Execution
Form Maintenance Execution
Form Maintenance Execution
CHECKSHEET
DIISI BERDASARKAN
BRAND DAN TYPE ALAT
INSPECTION CHECKSHEET NOMOR KODE
PERALATAN FPWP-MIF-01-04
Rev.00, Oktober 2022
PT. Waskita Beton Precast
Equipment Division
BATCHING PLANT (TWIN SHAFT)
AREA 1 : MIXER, SILO, CONVEYOR, CONTROL ROOM
CHECKING NUMBER 1 2 3 4 5 6 7 8 9 10
DIISI TGL, HM/KM, LOKASI SESUAI
PENGECEKAN KE-1, KE-2,...DST DATE 7-11-22 12-11-22 17-11-22
HM/KM SAAT AKAN DILAKUKAN INSPEKSI
HM/KM 4350 4400 4450
CHECKING NUMBER
NO COMPONENT ITEM CHECK
1 2 3 4 5 6 7 8 9 10
4 MAIN MOTOR & GEAR LH / MAIN MOTOR & GEAR RH V/V V/V V/V
7 ALLDESCRIPTION" SESUAIGROUP
MIXER SEALING & BEARING TABEL DIBAWAH V V V
8 BUTTERFLY VALVE V V V
*JIKA ADA ITEM PENGUKURAN (CTH.
9 TEMPERATUR,
LOAD CELL, VIBRATORRPM, DSB) MAKA DITULIS HASIL V 4 V
PENGUKURANNYA
10 MIXING BLADE, ARM & SHAFT V 4 V
11 *ITEMTILES
WEARING CHECK DGN TANDA "/" MENUNJUKKAN V V V
NAMA ITEM SAMA PADA POSISI YANG BERBEDA,
12 CENTRAL LUBRICATION GREASE PUMP V V V
GUNAKAN TANDA "/" SEBAGAI PEMISAH SESUAI
13 URUTAN
MANIFOLD, POSISI
PIPING KETERANGAN
& HOSE GREASE ITEM CHECK V V V
T
14 GATE MECHANISM, LIMIT/ PROXIMITY SWITCH V V V
15
START = WAKTU MULAI
FINISH
CONTROL = WAKTU
SYSTEM, SELESAI
MANUAL STATION
U LE V V V
17
18
INCLINE CONVEYOR GEAR TEMPERATURE
EN 84
V
83
V
85
V
C P
19 INCLINE CONVEYOR PULLEY & BELTS V V V
X BAD
SIGNATURE XXXX XXXX XXXX
GOOD AFTER BAD
1 LEAKING 5 WORN
SIGNATURE YYYY YYYY YYYY
2 BROKEN 6 CRACK
4 LOOSE
SIGNATURE ZZZZ ZZZZ ZZZZ
Beri tanda / angka pada kolom sesuai dengan Condition & Description
ACTION
NO PROBLEM DESCRIPTION REMARKS (COMMENT OPERATOR, AREA PROBLEM, ACTION) INSPECTION DATE
CONDITION DESCRIPTION
1 DISPLAY TIMBANGAN AGGREGATE KADANG MATI CLEANING SOCKET, BOARD MANUAL STATION KOTOR SEMUT 17-11-22
DIISI TEMUAN PROBLEM/MASALAH/KETIDAKNORMALAN PADA ALAT, DIISI KETERANGAN TINDAKAN YANG SUDAH DIISI TANGGAL
DIISI SESUAI KETENTUAN
DAPAT MENUNJUKKAN KETERANGAN DARI HASIL CHECKLIST DI ATAS DILAKUKAN (BAIK OPERATOR MAUPUN MEKANIK) PROBLEM
TABEL CONDITION &
ATAU TEMUAN DILUAR ITEM DI ATAS ATAU KETERANGAN PENDUKUNG LAIN YANG DITEMUKAN
DESCRIPTION, JIKA
BERKAITAN DENGAN PROBLEM TERSEBUT TIDAK ADA YG SESUAI
BISA YANG BERSIFAT LANGSUNG DIPERBAIKI (CLOSED) MAUPUN HARAP DIISI MANUAL
TIDAK (OPEN)
FORM PERIODICAL SERVICE
(PS) CHECKSHEET
FPWP-MIF-01-03A
DIISI NOMOR WO (WORK Rev.00, Oktober 2022
ORDER), TGL, HM/KM
PS III / PS IV
SESUAI PS I, PS II,...DST PS I (500) PS II (1000) PS I (500)
(2000 / 4000)
HM/KM SAAT AKAN
DILAKUKAN PS WO NUMBER WO001
DATE 20-11-22
PT. Waskita Beton Precast
Equipment Division HM/KM 4480
FEELER GAUGE
DIISI [ PLAN
KESIAPAN JUMLAH PARTS (SUKU CADANG) DAN/ ALAT
ACTUAL ] / / /
KERJA
DIGITAL DENGAN
VERNIER FORMAT "RENCANA / REALISASI"
CALIPER [ PLAN / ACTUAL ] / / /
PREPARATION
TOOLS FACILITIES
FOREMAN
MULTIMETER [ PLAN / ACTUAL ] 1/1 / / /
*KOLOM
MEGGER TESTERBLOK ABU-ABU TDK PERLU DIISI [ PLAN / ACTUAL ] /
T
MAIN GEAR OIL LEFT
U LE [1 BOTTLE ] 1/1 / / /
SAMPLE FOLLOW UP
EN [ PLAN / ACTUAL ]
START TIME
-/-
8:00
/ / /
C P
DIISI WAKTU DAN DURASI REALISASI PS [HH:MM]
START = WAKTU MULAI FINISH TIME 12:00
FINISH = WAKTU SELESAI SAMPAI GROUND TEST SUKSES
O M
X : Not Available
NAMA DAN TANDA TANGAN
PS TYPE REMARKS
S
PIC
NEXT PS PERLU DILAKUKAN PENGGANTIAN GEAR SCREW 3 KARENA PADA SAAT RESEAL DITEMUKAN TANDA KEAUSAN TIDAK NORMAL PADA GEAR. SCREW
SUDAH DILAKUKAN INSPECT DITEMUKAN KOTOR BEKUAN SEMEN, TELAH DILAKUKAN CLEANING DAN RUNNING PUTARAN NORMAL
PS I
GEAR LH TAMBAH OIL 0,2 LITER, CLEANING BREATHER/VENT
SETTING LIMIT SWITCH GATE
PS II
FOREMAN
PS I
PS III / PS IV
DIISI SEMUA CATATAN PENTING TEMUAN SAAT PS DILAKUKAN, DAPAT MENJELASKAN TINDAKAN YANG SUDAH DILAKUKAN ATAUPUN
SARAN UNTUK PS SELANJUTNYA
Halaman 1 / 4
FPWP-MIF-01-03B
NOMOR KODE
PERIODICAL SERVICE Rev.00, Oktober 2022
T
X = TDK DILAKUKAN ATAU KONDISI RUSAK CHECK, CLEAN, TIGHTEN
19
20
*HYDRAULIC
PNEUMATIC/
PUMP
= KONDISI RUSAK
*HYDRAULIC
U LE
DAN SUDAH DILAKUKAN
CYLINDER CHECK, CLEAN, TIGHTEN
5
5 V
TINDAKAN MENJADI BAIK
21
22
23
PNEUMATIC/ *HYDRAULIC CYLINDER HINGES
PNEUMATIC VALVE, SOLENOID
LIMIT/ MEMANG
PROXIMITYTIDAK ADA/TIDAK PERLU ADA
SWITCH
EN
NA = ITEM YANG DIMAKSUD TIDAK ADA/HILANG
(DIKOSONGI) = JIKA ITEM YANG DIMAKSUD
CHECK, REGREASE
CLEAN & CHECK FUNCTION
CLEAN, CHECK FUNCTION, ADJUST
5
5
5
V
V
C P
24 DISCHARGE DOOR, LEVER CHECK, CLEAN 5 V
*KOLOM BLOK ABU-ABU TDK PERLU DIISI
25 PEDESTAL BEARING CHECK, REGREASE 5 V
O M
M
26 MIXING BLADE CLEAN, CHECK WEAR, RETORQUE 30 V
27 MIXING ARM CLEAN, CHECK WEAR, RETORQUE 30 V
28 WEARING TILES CLEAN, CHECK WEAR 15 V
D A
(2000 / 4000)
30 *COUPLING BACKLASH MEASURE < 3 MM 5
31 TURNBUCKLE, JOIN HEAD CLEAN, CHECK WEAR, RETORQUE 5
32 BEARING BLOCK REGREASE 5
33 MIXING SHAFT CLEAN, CHECK WEAR 10
34 BLADE TO TROUGH WALL MEASURE GAP < 5 MM 15
PS III / PS IV
NO EVERY 2000 HOURS ACTIVITY DUR PS I (500) PS II (1000) PS I (500)
(2000 / 4000)
35 WEARING RING CLEAN, CHECK WEAR 10
36 *RETURN FILTER HYDRAULIC REPLACE 5
37 BELTS REPLACE 30
38 GREASE TANK CLEAN, REFILL 30
PS III / PS IV
NO EVERY 4000 HOURS ACTIVITY DUR PS I (500) PS II (1000) PS I (500)
(2000 / 4000)
39 MAIN MOTOR - RIGHT INSULATION TEST > 500 MΩ 15
40 * MAIN MOTOR - LEFT INSULATION TEST > 500 MΩ 15
41 MAIN MOTOR BEARING DE & NDE - RIGHT CHECK/ REPLACE 30
42 * MAIN MOTOR BEARING DE & NDE - LEFT CHECK/ REPLACE 30
43 MAIN GEAR REDUCER OIL - RIGHT FULL SYNTHETIC OIL REPLACE 15
44 MAIN GEAR REDUCER OIL - RIGHT FULL SYNTHETIC OIL REPLACE 15
45 BODY, FRAME CHECK CRACK 30
Halaman 2 / 4
FPWP-MIF-01-03B
PERIODICAL SERVICE Rev.00, Oktober 2022
T
17 CONTROL PANEL, AMMETER & POWER METER
U LE CLEAN, CHECK FUNCTION, TIGHTEN 10 V
EN CHECK
NA : Not Available
Halaman 3 / 4
FPWP-MIF-01-03B
PERIODICAL SERVICE Rev.00, Oktober 2022
AREA 3 ( CONVEYOR )
PT. Waskita Beton Precast BATCHING PLANT (TWIN SHAFT)
Equipment Division
T
17 HEAD PULLEY, LAGGING - BIN/ HORIZONTAL
U LE CHECK 5 V
CHECK
10
5
V
V
C P
21 BELT CONVEYOR - BIN/ HORIZONTAL CHECK, ADJUST TENSION 10 V
O M
NA : Not Available
Halaman 4 / 4
FORM BACKLOG
FORM BACKLOG FPWP-MIF-01-07
NAMA BULAN - TAHUN Rev.00, Oktober 2022
PLANT/BP/QUARRY/PROYEK PERIODE : Nov-22
PT Waskita Beton Precast Tbk
Equipment Division
PLANT : BOJONEGARA
PART RECOMENDATION
DATE OF DATE OF
NO NKP HM/KM PROBLEM DESCRIPTION ACTION PART STATUS MECHANIC
INSPECT PART NAME / SPEC QTY UNIT INSTAL
NUMBER
Mechanic A
1 17-11-22 BP 01 4450 Gear screw 3 rembes oli Reseal Shaft Seal 25070090 1 pcs x 20-Nov
Mechanic B
TANGGAL
TEMUAN
HM/KM TEMUAN RENCANA TINDAKAN DETAIL KEBUTUHAN SPAREPART
SAAT ADA PROBLEM/MASALAH/KETIDAKNOR PERBAIKAN YANG
TEMUAN MALAN PADA ALAT YANG BELUM DIPERLUKAN PART NAME = NAMA PART DAN SPESIFIKASI
DAPAT DISELESAIKAN LANGSUNG PART NUMBER = NOMOR PART
DAN MEMBUTUHKAN SPAREPART QTY = JUMLAH
MAUPUN JASA PERBAIKAN LEBIH UNIT = SATUAN (PCS/ASSY/UNIT/LTR/KG/...DLL)
LANJUT
T
U LE
STATUS TEMUAN
X = OPEN
EN
X = CLOSED
C P
TANGGAL TEMUAN
SELESAI
O M
DILAKUKAN
M
D A PERBAIKAN
STATUS :
FORM TECHNICAL REPORT (TR)
CENTANG SALAH SATU FPWP-MIF-01-06
- DILAKSANAKAN SENDIRI = TR Rev.00, Oktober 2022
TECHNICAL REPORT (TR) UNTUK INTERNAL WBP
- HANYA SBG INFO = TR UTK
Analysis Of Problem
LOCATION = LOKASI SPESIFIK ALAT (LINE/WS/SY/..DST)
KEBUTUHAN EKSTERNAL/CLAIM
REPORT NO = SESUAI FORMAT
GARANSI/CUSTOMER/..DLL
REPORT DATE = TANGGAL REPORT SELESAI DIBUAT
PT Waskita Beton Precast Tbk GROUP MODEL = KELOMPOK MODEL ALAT
WO NO. RELATED = NOMOR WO YANG BERHUBUNGAN DENGAN
Equipment Division V DILAKSANAKAN SENDIRI HANYA SEBAGAI INFORMASI
LOCATION REPORT NO. REPORT DATE UNIT OPERATIONAL/PROJECT GROUP MODEL WO NO. RELATED
COMPRESSOR ROOM 01/Z065/TR/00001/22 22-5-22 PLANT PALEMBANG GASING AIR COMPRESSOR SCREW WO001
(No./Planning Plant Code/TR/NIP Mech/Year) (dd-mm-yy)
UNIT/ CHASSIS NO. ENGINE MODEL COMPONENT SERIAL NO. ACTION DATE & TIME
1101806023 - BMDA220530 15-5-22 15:30
HM/KM ENGINE SERIAL NO. COMPONENT LIFETIME FINISH DATE & TIME
12765 HRS - 12765 HRS 22-5-22 10:00
FAILURE MODE **
Bent (Bengkok) Loosen (Kendor) Cracked (Retak) Leaking (Kebocoran) Shorted (Korsleting) V Worn Abnormal
(Keausan Abnormal)
T
ANALYSIS
U LE
( Uraikan detail kerusakan,data pendukung, Root Cause Analysis, LAMPIRKAN Foto & Gambar, Jika tidak mecukupi gunakan Continuation Sheet)
EN
1. CHECK LEVEL OLI -> VOLUME MASIH CUKUP TETAPI KONDISI TERDAPAT GELEMBUNG
2. CLEANING OIL COOLER -> PADA INLET DAN OUTLET OK, KISI-KISI MASIH KONDISI BAIK DAN TIDAK RUSAK ATAU TERTUTUP KOTORAN PADAT
3. COOLING FAN & THERMOSTAT BERFUNGSI NORMAL
4. OIL FILTER TIDAK BUNTU
C P
5. INSPECT PIPING & HOSE -> TIDAK ADA KEBOCORAN
6. CHECK TEMPERATURE MOTOR & SCREW -> NAIK DENGAN SANGAT CEPAT DARI 60-110 HINGGA SHUTDOWN DAN ERROR DENGAN SENDIRINYA
7. REMOVE AIR END, BONGKAR COVER BEARING -> DITEMUKAN BEARING KOTOR TERDAPAT OLI YANG TELAH MENJADI GEL DAN SEDIKIT KERAK
8. GANTI MAIN BEARING, INSTALL -> RUNNING TEST TEMP NORMAL, 83 AFTER FULL LOAD, 87 AFTER OPERASI 6 JAM DALAM KONDISIURAIKAN ANALISA MASALAH HINGGA PENYELESAIANNYA
PRODUKSI
DENGAN SELENGKAP MUNGKIN
O M
M
KEMUNGKINAN PENYEBAB :
1. ADANYA KESALAHAN DALAM PENGGANTIAN OLI, SPESIFIKASI MINERAL OIL TERCAMPUR DENGAN SYNTETIC OIL DAPAT DITULISKAN STEP BY STEP TINDAKAN YANG
2. TIDAK DILAKUKANNYA FLUSHING PADA SEMUA JALUR YANG DILALUI OLI DILAKUKAN SERTA HASIL SETIAP TINDAKANNYA
3. ATAS KONDISI TSB, 2 JENIS OLI TERSEBUT MENYEBABKAN REAKSI KIMIA YG MEMBENTUK GEL HINGGA KERAK
SERTA KEMUNGKINAN-KEMUNGKINAN PENYEBAB KERUSAKAN
D A
CAUSE **
Mis Assembly (Salah Pemasangan) Bad Material (Material Buruk) Mis Application (Kesalahan Aplikasi) Bad Infrastructire (Infrastruktur Buruk)
Poor Torque (Torsi Lemah) V Mis Maintenance (Salah Perawatan) Mis Operation (Kesalahan Operasi) Fatigue Fracture (Patah Lelah)
CENTANG PADA JENIS TINDAKAN PERBAIKAN YANG TELAH
DILAKUKAN
Bad Welding (Pengelasan Buruk) Mis Adjustment (Salah Penyetelan) Over Loaded (Kelebihan Beban) Out Of Adjustment (Kurang Penyetelan)
FINISH = PEKERJAAN DAPAT DISELESAIKAN
NOT FINISH = PEKERJAAN PENDING/BELUM SELESAI
Poor Durability (Daya Tahan Lemah) Substandard (Kualitas dibawah standar) Dirty Fuel (Bahan Bakar Kotor) OtherPENYELESAIAN
DUE TO = TANGGAL TARGET :………………………………..
CORRECTIVE ACTION **
V Repair (Perbaikan) Retorque (Pengencangan Replace Comp Assy Calibration (Kalibrasi) Warranty Claim Reinforce (Penambahan
Ulang) Material)
Adjust (Penyetelan) V Replace Part (Ganti Part) Rebuild (Membangun Out Site Repair (Perbaikan Site Modif (Modif Internal) Other :……………………..
Ulang) External)
Note :
NAMA, TANGGAL DAN TANDA TANGAN
** Diberi tanda V untuk option yang dipilih.
Page 1 of 2
PT Waskita Beton Precast Tbk REPORT NO.
Equipment Division TECHNICAL REPORT (TR)
01/Z065/TR/00001/22
CONTINUATION SHEET
(No./Planning Plant Code/TR/NIP Mech/Year)
NKP AC 001
COMPONENT NAME AIR END
ANALYSIS (Penjelasan Tambahan, Data Pendukung, Root Cause Analysis, dan Rekomendasi Preventive Action)
T
U LE
EN
C P
LEMBAR LANJUTAN DARI HALAMAN 1
O M
M
LANJUTAN URAIAN ANALISA
Page 2 of 2
FORM MECHANIC ORDER LIST
(MOL)
MECHANIC ORDER LIST ( MOL ) FPWP-DAN-02-06B
Rev.00, Oktober 2022
( DAFTAR PESANAN MEKANIK )
PT Waskita Beton Precast Tbk
Equipment Division
*Plant/BP/Project BOJONEGARA
No. MOL
(No. Urut/NIP Mech/Tahun)
01/00001/2022
NKP : WL 01
*HM/KM : 9076
*Coret, pilih salah satu
v
NOTE :
Suku Cadang / Part Ban / Tyre Gemuk / Grease
Jenis Part - Material /
Part - Material Type Bahan Habis Pakai /
Pelumas / Oli Bahan Lain / Others
Consumable Goods
No. COMP FIG NO. Item Part Number Uraian / Description / Specification QTY SATUAN
1 FUEL TANK - 10 16C0004 BREATHER CAP 1.00 PCS
T
NAMA KOMPONEN
U LE PART NUMBER SESUAI URAIAN NAMA PART, DESKRIPSI, SPESIFIKASI JUMLAH PART SATUAN
DARI PART YANG PART BOOK ALAT YANG JUMLAH PART
DIMAKSUD
EN TERKAIT DIBUTUHKAN
C P
FIG NO. DAN ITEM
PART SESUAI PART
O M
M
BOOK ALAT
TERKAIT (JIKA
ADA)
D A
S