W-18 (Rev1)
W-18 (Rev1)
1. Introduction 1
1.1 Project Objectives 1
1.2 Project Scope 1
1.3 Purpose of this Report 1
1.4 Related Reports 1
1.5 ADDC Supplied Information 1
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
6.6 Items for Further Investigation – only if this station is to maintain
future operation 10
7. Recommendations 11
Figure Index
Figure 1 Western Region PS 18 - Mirfa Truck Filling Station
Pumping Station DW-MRF-WPS1 2
Figure 2 Pump Building 4
Figure 3 Damaged Boundary Fence 5
Figure 4 Exposed Pump Cables 5
Figure 5 Grasses against Office Wall 6
Figure 6 Storage Tank Wall Cracking 6
Figure 7 Pump Room 7
Figure 8 Pump Floor layout 8
Figure 9 Station Supply Isolator 9
Figure 10 Interior showing exposed cable 9
Figure 11 Cables to Motor Isolator 10
Figure 12 Interior Showing Exposed Cable 10
Figure 13 General view – Pumps and Storage Tank Buildings 12
Appendices
A Pump Station Schematic
B Site Safety Assessment
C Civil and Infrastructure Assets
D Mechanical Assets
E Electrical Assets
F Pumps and Motors – Temperature, Noise, Vibration and Alignment
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
1. Introduction
This report should be read in conjunction with the “Assessment Overview Report” and the final “Condition
Assessment and Management Strategy Report”.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
2. Pump Station Overview
Figure 1 Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
NOTE: This pumping station has been out of pumping operation for approx. 2 years.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 2
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
3. Pump Station Assessments
Water Pumps;
Pump Room Overhead Cranes;
Pump Room, Switchboard and Control Room Air Conditioning; and
Pump Room Ventilation.
GHD’s condition assessment schedules for mechanical assets is attached as Appendix D
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 3
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
main switchboard and pump control panels;
power cabling;
room and exterior lighting; and
fire alarm systems.
GHD’s condition assessment schedules for electrical assets are attached as Appendix E
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 4
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
4. Civil and Infrastructure Assessment
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 5
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Pump No. 2 was taken out for repair some time ago but not returned for installation.
The control panel trips when the pumps are started (reason unknown).
The pump delivery pipe leaks.
Storage Tank
The storage tank is fair condition with some wall cracking at the foundation level (refer Figure 6), but is
not filled and is not used since the pump station was turned off.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 6
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
5. Mechanical Assets Assessment
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 7
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
6. Electrical Assets Assessment
Station layout
The station comprises a pump room and a connected office and amenity area. Both are equipped with
packaged air conditioning units but only those for the office/amenity area are working. It is entirely
possible that the office area has been kept going at the expense of the other area as it is being used as
sleeping accommodation.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 8
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
6.2 Motor Description and Condition
General Condition - Fair.
External:
General Condition - Motor winding insulation > 4 G at 500 V. Motor cable terminals were in
Electrical: poor condition, dirty and corroded.
Cable Layout
No cable trays are employed. Cables are loose laid from controllers to pumps.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 9
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Figure 11 Cables to Motor Isolator Figure 12 Interior Showing Exposed Cable
Control Room
Twin fluorescent fittings, not working and with cracked diffusers.
6.6 Items for Further Investigation – only if this station is to maintain future
operation
There are a number of serious shortcomings in the current state of the station. This list is restricted to
electrical matters.
Level control cables to/from the tank are run effectively unprotected over ground to the tank. These
must be properly protected and supported above ground. It is recommended that they be simply
replaced as a matter of course.
Tank level control inputs and control actions are to be recommissioned. It is expected that this action
will remove the “trip” fault in the control system
Power and status cables from control panels to motors and distribution boards to control panels are
loose laid on the station floor. These cables are to be mounted on protective cable trays.
Lighting to be fitted with lamps and diffusers and checked for insulation safety
Panel covers are to be restored to fully working condition. This work to include exterior distribution
board.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 10
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
7. Recommendations
General
1. A decision is needed as to whether to reinstate this pumping station to its full operational status or
decommission and secure the pump station.
Safety
Whether decommissioned or reinstated the following safety matters are to be attended to urgently:
2. Repair the insulation on the supply cables and secure the bare wires exposed in the power supply
exterior distribution board/ isolation box for the pump station.
3. Safety signs should be installed at the entrance to the station pump room). - Safety Shoes, Hard Hat,
Hearing Protection and Eye Protection).
4. The damaged site boundary fence should be either removed or reinstated with ‘fenders’ to prevent
further damage by trucks.
5. Mount the exposed power cables in the Pump Room on protective cable trays.
6. Permanent site lighting to be installed and temporary light (with flexible cord) removed
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 11
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
17. Pump room lighting is be reinstated - fitted with lamps and diffusers and checked for insulation
safety.
18. Panel covers are to be restored to fully working condition. This work will include the exterior
distribution board.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 12
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix A
Pump Station Schematic
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations A1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix B
Site Safety Assessment
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
SITE SAFETY ASSESSMENT
Pumping Station Name T anker Filling Station (TFS) Pump Station, Mirfa
Assessment Date 20 July 2009
Comments
It is recommended that proper safety signs should be installed at the entrance to the station (and pump room): Safety Shoes, Hard Hat, Hearing Protection,
Eye Protection.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations B1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix C
Civil and Infrastructure Assets
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Buildings & General Infrastructure
Pum ping Station Name Tanker Filling Station (TFS) Pum p S tation - Mirfa LE GEND - Asset Condition Assessment
Assessment D ate 20 July 2009 Description Life Remains Ratin g
Time: IN / OUT 9.00AM / 11.00A M "As New" 100% 1
GPS P osition (E ntry Gate) N 24° 5.353' E 53° 28.512' Good 75% 2
ADDC GIS Object No: 50 Fair 50% 3
Poor 25% 4
Inspection Personnel Failure Imminent 0% 5
John John (GH D) Failed / Derelict Un-useable 6
Roger Hawkins (Palmer Acoustics )
Padalchai P.
Comm ents
NOT E: 'NA' or 'Blank' = Not Applic able or Data Not Available.
- No separate c ontrol room - controls housed in t he pump room .
- O ffice housed in pump/c ontrol room, no dedicated office space available w ith necessary amenities and facilities.
- This pump station not in operation for last 1½ years.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Storage/ Transfer Water Tanks
Comments
NOTE: 'NA' or 'Blank' = Not Applicable or Data Not Available.
1) No water storing in the tank. Not in use for the last 1½ years.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C2
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Pipework & Valves (Suction Side)
Flexible Coupling
Flexible Coupling Diameter (mm) NA NA NA
Condition Rating (1 to 6) NA NA NA
Isolation Valve
ADDC GIS Object No: 9895 Not Assigned 9893
Isolation Valve Type gate NA gate
Isolation Valve Diameter (mm) 150 NA 150
Condition Rating (1 to 6) 3 NA 3
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C3
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Pipework & Valves (Delivery Side)
Delivery Header Pipework Pipe 1
Pipe Material steel
Pipe Diameter (mm) 200
Condition Rating (1 to 6) 3
Flexible Coupling
Flexible Coupling Diameter (mm) NA NA NA
Delivery Side
Condition Rating (1 to 6) NA NA NA
Non-Return Valve
ADDC GIS Object No: 9965 Not Assigned 9964
Isolation Valve Type spring/flap NA spring/flap
Isolation Valve Diameter (mm) 100 NA 100
Condition Rating (1 to 6) 3 NA 3
Isolation Valve
ADDC GIS Object No: 9896 Not Assigned 9894
Isolation Valve Type gate NA gate
Isolation Valve Diameter (mm) 100 NA 100
Condition Rating (1 to 6) 3 NA 3
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C4
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix D
Mechanical Assets
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Pump and Motor Data
Pump Data Pump 1 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6
ADDC GIS Object No: 82 Removed 81
Year of Installation
Purpose / Function
Brand
Type
Model No
Serial No
Impeller Design Size (mm) Pumps not operational
Speed (rpm)
Pumping Design Power (kW )
Pump Design Efficiency (%)
Duty Point Flow (l/s)
NPSHR (kPa)
Duty Point Pressure (kPa)
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Water Pumps
Overall Condition Pump 1 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6
Pump Body
Pump Shaft
Pump Shaft Coupling
Pump Base Pumps not opeaational
Springs / Anti Vib. Mat.
Pump Plinth
Pump Motor
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D2
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
PERFORMANCE ASSESSMENT - Water Pump Duty Point
Comments
NOTE: 'NA' or 'Blank' = Not Applicable or Data Not Available.
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D3
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
PERFORMANCE CURVES - Water Pumps
2 0.8
3
4 0.6
P- 02
5
0.4
6
7 0.2
8
0
0 0 0 1 1 1
Water Flow (l/s)
2 0.8
3
0.6
4
P- 03
5 0.4
6
7 0.2
8
0
0 0 0 1 1 1
Water Flow (l/s)
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D4
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Other Mechanical Equipment and Systems
Other
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D5
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix E
Electrical Assets
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Pump Motors
Motor Data Motor 1 Motor 2 Motor 3 Motor 4 Motor 5 Motor 6
ADDC GIS Object No: 82 Not Assigned 81
Year of Installation
Brand
Model No.
Serial No
Speed (rpm)
Average Voltage (V)
Pumps have been decomissionned and not working
Average Current (A)
Total Power (kW)
Overall Power Factor
Electrical Connection
Soft Start/ VSD
Hours Run (Hrs)
Cables/ Earthing Loose laid on floor. Loose laid on floor.
Unsatisfactory Unsatisfactory
Thermal Imaging
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
PERFORMANCE ASSESSMENT - Pump Motors
Performance Parameters Motor 1 Motor 2 Motor 3 Motor 4 Motor 5 Motor 6
R Y B R Y B R Y B R Y B R Y B R Y B
Voltage (V)
Current (A)
Power Factor
Average Voltage (V)
Average Current (A)
Overall Power Factor
Dielectric Absorption Insulation 400 @ Insulation 3600 @
(30sec / 60sec) >4G 1000 V >4G 1000 V
Polarisation Index (1min/10min) Not measured
Hours Run 1955
Power Measured (kW)
Total Power (kVAr)
Total Power (KVA)
RPM
Temperature ºC (Hot > 68ºC) 39.0
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E2
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Main Switchboard & Motor Control Panels
Main Switchboard LEGEND - Asset Condition Assessment
Year of Installation Description Life Remains Rating
Clear Labelling? No local metering "As New" 100% 1
Logical Layout? Good 75% 2
Main Isolator Fair 50% 3
Manufacturer Poor 25% 4
Type Failure Imminent 0% 5
Rating (A) Failed / Derelict Un-useable 6
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E3
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
CONDITION ASSESSMENT - Other Electrical Equipment and Systems
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E4
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
Appendix F
Pumps and Motors – Temperature, Noise,
Vibration and Alignment
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
TEMPERATURE, NOISE & VIBRATION - Pumps & Motors
Temperature Deg C
Pump Room 36.1
Control Room N/A
Outside (Ambient) 36.5
Vibration (mm/s) / Frequency (Hz) Pump-Motor 1 Pump-Motor 2 Pump-Motor 3 Pump-Motor 4 Pump-Motor 5 Pump-Motor 6
Vibration Limit = 2mm/sec V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz)
Point No 1 = Motor - Top Front Bearing N/A N/A N/A N/A
Point No 2 = Motor - Rear Foot N/A N/A N/A N/A
Point No 3 = Motor - Top of Motor N/A N/A N/A N/A
Pumps have been
Point No 4 = Pump - Top Front Bearing N/A N/A N/A N/A
decomissionned
Point No 5 = Pump - Top Rear Bearing N/A N/A and not working N/A N/A
Point No 6 = Pump - Rear Foot N/A N/A N/A N/A
Point No 7 = Pump - Inlet N/A N/A N/A N/A
Point No 8 = Pump - Outlet N/A N/A N/A N/A
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations F1
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1
ALIGNMENT - Pumps & Motors
Pump Shaft Alignment (mm) Pump-Motor 1 Pump-Motor 2 Pump-Motor 3 Pump-Motor 4 Pump-Motor 5 Pump-Motor 6
Angular Limit = 0.08mm/100m
mm mm mm mm mm mm
Linear Limit = 0.10mm
Angular Displacement - Horizontal 12.00 9.46
0.46 Pumps have been 0.48
Linear Displacement - Horizontal
decomissionned
Angular Displacement - Vertical 7.13 8.38
and not working
Linear Displacement - Vertical 0.24 0.48
Comments
NOTE: 'NA' or 'Blank' = Not Applicable or Data Not Available. LEGEND - Asset Condition Assessment
Pumps and motors in reasonable external condition "As New" 100% 1
Could not start pumps, no noise or vibration could be measured Good 75% 2
Pipework flexible connectors in good condition Fair 50% 3
Pump flexible couplings OK Poor 25% 4
Failure Imm inent 0% 5
Failed / Derelict Un-useable 6
76/10239/12054 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations F2
Western Region PS 18 - Mirfa Truck Filling Station Pumping Station DW-MRF-WPS1