Professional Documents
Culture Documents
Bridge Building Competition
Bridge Building Competition
DETAILED GUIDELINES:
1. Each team will be given the materials for the bridge construction. The materials are
as follows:
a. 100 Popsicle sticks
b. 1 yarn
c. 3 sheets of bond paper
2. The participants must provide the tools they would need for the bridge construction.
The tools are as follows:
a. Scissors and/or cutters
b. Pens
c. Rulers
3. The teams can build any type and configuration of truss bridges (e.g. Warren, Howe,
Curved-chord truss) with a horizontal driveway (see fig. 1).
4. Bridges shall be made using only the sticks provided. Yarns must be used for joint
connections only. (e.g. pencils and papers must not be used as part of the bridge.)
5. Teams are allowed to request for additional sticks and yarns during the Construction
phase
6. The bridge shall conform with the following dimensions:
a. Span: 50-52 cm
b. Width: 5-6 cm
c. Height: No restriction
Note: the actual length of the bridge must be greater than the span to allow
for its supports to rest on each end of the table (See fig. 2)