UPDATED :20.03.

2024
ZONE -6A St 2+200 to 2+320 No need for soil improvement only tunnel & Pump station no-04
ZONE -6B 2+200 TO 2660 MIP-JVC-CAL-GEO-000053-00-B-07.11.2023 Area=4403.816sq.m

2+660 TO 3+020 DRY & HV St 2+258.874 to 2+393.397


Dry Culvert st 2+025 to 2+098 & 2+186 to 2+260 &
Dry & HV Culvert MIP-JVC-CAL-GEO-000031-01-B Zone - 7
MIP-JVC-CAL-GEO-000018-01-B-17-6-2023 (Tunnel st 2+570 TO 2+704) Utility Culvert Room No.4 st 2+186 to 2+198 MIP-JVC-CAL-GEO-000062 -C0-C
ST 2+400 to 2+718 Designed area =1702.8 sq.m MIP-JVC-CAL-GEO-000044-01-B St 0+020 to 0+140 -Required soil improvement area = 3787.751sq.m
Design report approved 220/525CMC Dry Culvert st 2+098 to 2+186 incl. Utility Culvert Room No.4
Designed Area=4261 sq.m Progress = 41.9% MIP-JVC-CAL-GEO-000001-01-B
IR P O R T )
N E - 0 7 ( A
0/1168 CMC Progress area=714sq.m No need for soil improvement. Area=3605.636sq.m ZO 9 . 6 3
0 + 3 8
0+040 TO

0+391.62
AIR-Z07-16

0+360.00
EGRESS STAIR-22

0+320.00
AIR-Z07-14

0+280.00
AIR-Z07-12 AIR-Z07-15

0+240.00
AIR-Z07-10 AIR-Z07-13
D-Z06-19 D-Z06-18 D-Z06-17 D-Z06-16 D-Z06-15

0+200.00
D-Z06-38 AIR-Z07-08

D-
AIR-Z07-11
D-333 D-338 D-398 D-403

D-Z06-37 D-Z06-36 D-Z06-35 D-Z06-34 D-Z06-33 D-Z06-32 D-Z06-31 D-Z06-30 D-Z06-29 D-Z06-28 D-Z06-27 D-Z06-26 D-Z06-25 D-Z06-24 D-Z06-23 D-Z06-22 D-Z06-21 D-Z06-20 D-Z06-14 D-Z06-13 D-Z06-12 D-Z06-11 D-Z06-10 D-Z06-09 D-Z06-08 D-Z06-07 D-Z06-06 D-Z06-05 D-Z06-04 D-Z06-03 D-Z06-02

Z0
D-332 D-337 D-397 D-402

0+160.00
AIR-Z07-06 AIR-Z07-09
N=2707377.7172

PO.=4
Z=591.9448

E=561972.9300

6-
01 D-Z
-04

0.00
AIR-Z07-07

B
07
AIR-Z -05

0+12
AIR-Z07

06
-0
J-Z05-1
3+040.00

3+000.00

2+960.00

2+920.00

2+880.00

2+840.00

2+800.00

2+760.00

2+720.00

2+680.00

2+640.00

2+600.00

2+560.00

2+520.00

2+480.00

2+440.00

2+400.00

2+360.00

2+320.00

-0 2+280.00

2+240.00

2+200.00

2+160.00
1A
J-Z06-16 J-Z06-15 J-Z06-14 J-Z06-13 J-Z06-12 J-Z06-11 J-Z06-10 J-Z06-09 J-Z06-08 J-Z06-07 J-Z06-06 J-Z06-05 J-Z06-04 J-Z06-03 J-Z06-02 J-Z06-01 J-Z05-18 7 2 3
7-0 7-0

0+
00
-Z0
N=2707355.6172
PO.=5

-Z0
Z=600.8200

E=561972.9300

J-Z0

0
2+120.
AIR

80
3+020 5-16 J-Z0 AIR

1A

.00
5-15 B
B

1B 06

0.00
-0 -Z
06 W
B

W-Z06-30 W-Z06-16 J-Z


W-Z06-29 W-Z06-28 W-Z06-27 W-Z06-26 W-Z06-23 W-Z06-20

8
W-Z06-22 W-Z06-21 05- 1
A

2+0
E=562768.1960
W-Z06-38 W-Z06-37 W-Z06-36 W-Z06-25 W-Z06-24 W-Z06-19 -0
ZLT-TA-4

W-Z06-35 W-Z06-18 W-Z06-17


ZLT-TA-1

W-Z06-34 W-Z06-33 W-Z06-13


128 133 303 308 478 483 53 58 263 268
25 32 C-270 C-277

W-Z06-32 W-Z06-31 W-Z06-15 W-Z06-14 W-Z06-12 W-Z06-11 W-Z06-10 W-Z06-09 W-Z06-08 W-Z06-06 E=562787.8510
1

-Z
N=2707334.6170
W-Z06-07 W-Z06-05 W-Z06-03 W-Z06-02 4 07
A

24 31

W-Z06-04
129 134 304 309 479 484 52 57 262 267 C-269 C-276

N=2707333.2850

W
ZLT-TA-2 ZLT-TA-3

-Z

0+
R
AI
642 647

04
13
643 648

0.
-
0.0

00
ZONE -05

05
04
J-Z
2+
E=562767.2690
N=2707320.9480
E=562786.9250
N=2707319.6160

LIFT STATION 02 A

0+
2
Wet culvert N-

00

00
IO

0.

0.
CT 12

00
1+760 TO 2+200

00
E

2+
X
S 05 -
ER -Z
ST 2+545 to 2+660-01.08.2023 INT J

Design area =1380.4 sq.m 11


5- 00

MIP-JVC-CAL-GEO-000029-01-B
J-
Z0 960.
1+
Zone - 5 St 1+1+773 to 2+200

D
0
-1
05
J-Z

Wet Utility culvert 404/404CMC Tunnel St 2+320 to 2+540-16.04.2023 -09


MIP-JVC-CAL-GEO-000060-00-B-27.12.2023
ROOM 10 05
J-Z 920.0
0

ST 2+740 to +2+943 Progressed=100% Wet culvert + Tunnel portion only


1+

08
MIP-JVC-SHD-GEO-000079-00-B-02.01.2024
Progressed area=1376sq.m J-Z
05-

soil improvement required


MIP-JVC-CAL-GEO-000018-01-B-17-6-2023 MIP-JVC-CAL-GEO-000017-01-B 5-07

MIP-JVC-SHD-GEO-000043-00-B No need for soil improvement


J-Z0 .00
880
1+
0690/5650CMC
EGRESS STAIR-20
Design report approved Wet utility culvert St 2+576.716 to 2+739.852 Area = 9323 Sq.m EGRESS STAIR-19
(MODIFIED/RELOCATED)
J-Z0
5-06
Progressed =11.7%
(MODIFIED/RELOCATED)

Designed Area = 2706.9sq.m (Tunnel St 2+660 to 2+826) J-Z05-05


1+840.00
Total designed area= 21478sq.m
Grid size 2.0m X 2.0m MIP-JVC-CAL-GEO-000031-01-B J-Z05-04
T-373 T-372
T-441

T-424
T-440

T-425

Total progressed area=2564sq.m


MIP-JVC-SHD-GEO-000046-00-B
T-348 T-349

CMC 530/690 T-266

T-239
T-265

T-240

Designed area = 2062.447sq.m J-Z05-03


1+800.00

Progressed =76.8% 290/547CMC J-Z05-02

Progressed area = 2079 sq.m


T-5679 T-5678

T-5650 T-5651

Progressed =53% J-Z05-01


T-4008

T-4024
T-4009

T-4025

1+760.00

Progressed area = 1093 sq.m T-70

T-86
T-71

T-87

LEGEND : J-Z04-24

J-Z04-23
T-262

T-278

1+720.00
T-263

T-279

Tunnel-03 Total designed area=13899 sq.m J-Z04-22


T-460 T-461

Design & shop drawing approved


T-476 T-477

st 0+115 to 154 & 0+310 to 434 J-Z04-21


1+680.00 T-599 T-600

Revised- MIP-JVC-CAL-GEO-000025-03-B-18.10.2023
T-615 T-616

T-685 T-686

J-Z04-20 T-701 T-702

Required CMC Area =8663sq.m 2248/2528 CMC EGRESS STAIR-17 J-Z04-19 T-843 T-844

(MODIFIED/RELOCATED)
Progressed @ T-03 = 88.9% CMC completed
T-859 T-860

1+640.00

T-932 T-933

T-948 T-949

Designed area =6415.449 sq.m J-Z04-18

Not approved Design & shop drawing LIFT STATION 04


EGRESS STAIR-16
(MODIFIED/RELOCATED)
st 0+065 to 0+115
MIP-JVC-CAL-GEO-000016-02-B-24.09.2023
J-Z04-17
1+600.00
T-1065

T-1081
T-1066

T-1082

EGRESS STAIR-18 Zone - 4 ST1+260 to 1+760


Zone - 4A (1+260 to 1+380 ) -C35 CMC Grid size - 2m X 2m
ROOM-12A T-1241 T-1242

Required Soil Improvement arae=2281.54sq.m


Zone - 4B (1+380 to 1+760 to 1+773 ) C25 (C35- 17.05.2023)
T-1257 T-1258

J-Z04-16

St0+154 to 0+310m
1 2 3

E=562596.7850 E=562616.4850
N=2706891.7980 N=2706891.7980
A A
T-1364 T-1365

CMC Grid size-2.3mX2.3m


B T3-2508 T3-2517
B

T3-2509 T3-2518
0+154 to 210 T-1380 T-1381

J-Z04-15
0+210 to 0+310
1+560.00
E=562596.7850 T3-Z11-05 T3-Z11-03
N=2706878.7980
C C

T3-Z11-07

0+120.00

0+080.00

0+040.00

0+000.00
T3-Z11-02

0+160.00
T3-Z11-06 T3-Z11-04

0+200.00
T3-Z11-19 T3-Z11-17 T3-Z11-15 T3-Z11-13 T3-Z11-12 T3-Z11-10 T3-Z11-08
T3-Z11-21

0+240.00

T3-Z11-16 T3-Z11-14
0+280.00

MIP-JVC -CAL-GEO-000015-01-B-25.05.2023
T3-945 T3-930
ZLT-TA-1172 161
ZLT-TA-2
0+320.00
0+434.07

0+400.00

0+360.00

T3- T3-
T3-946 T3-931

ZLT-T3C-1
ZLT-T3B-1 ZLT-T3B-2
ZLT-T3A-1 ZLT-T3A-2
T3-
ZLT-TA-3
173
T3-
162
ZLT-TA-4 0+100 T3-1571

T3-1572
T3-1582

T3-1583 T3-1704 T3-1715


T3-Z11-01 0+000
2.5000

ZLT-T3C-4
ZLT-T3B-4
ZLT-T3B-3
ZLT-T3A-4 ZLT-T3A-3
T3-1705 T3-1716

J-Z04-14
T3-Z11-11
T3-574 T3-559

B A
T3-Z11-20 C T3-Z11-09
T3-770 T3-755 T3-575 T3-560

T3-Z11-18
T-1558 T-1559

No need for Soil improvement


T3-1131 T3-1116 T3-771 T3-756

T-1574 T-1575

T3-1132 T3-1117

T3-1995 T3-2008

MIP-JVC -CAL-GEO-000015-02-B-24.10.2023
T3-1996 T3-2009
T3-261 T3-249

T3-2140 T3-2153

T3-262 T3-250

T3-2141 T3-2154

Grid size1.9X1.9 T3-1469 T3-455

T3-300 T3-288

ST 0+310 TO 0+434
T3-1470 T3-456

Grid size1.7X1.7
T3-301 T3-289

J-Z04-13
1+520.00 T-1709 T-1710

EGRESS STAIR-15 T-1725 T-1726

MIP-JVC-SHD-GEO-000021-01-B-11.06.2023
Grid size 2X2
Grid size1.8X1.8

ROOM-12B
St 0+240 to 0+300
T-1786 T-1787

T-1802 T-1803

St 0+020to0+065 J-Z04-12

MIP-JVC-CAL-GEO-000016-02-B-24.09.2023 MIP-JVC-SHD-GEO-000021-04-B-18.11.2023
MIP-JVC-CAL-GEO-000020 St 0+154 to 0+210 No need for S.I area=1149sq.m J-Z04-11 T-1947 T-1948

4139/4344
T-1963 T-1964

1+480.00
T-2008 T-2009

Date of approved:27.04.2023 MIP-JVC-CAL-GEO-000020


T-2024 T-2025

J-Z04-10

Progressed = 95.28%
Soil replacement 1.8m depth soil replacement from Date of approved: 27.04.2023
excavation level 588.2m 3m depth soil replacement from
J-Z04-09
1+440.00
T-2186

T-2202
T-2187

T-2203

Total designed area =20769sq.m


J-Z04-08
T-2362 T-2363

Total progressed area=19963sq.m


Area= 2726.167sq.m excavation level 586.6m
T-2378 T-2379

Status:4 layer (Each layer 50cm thick) Area = 1360.670.m


J-Z04-07

ROOM-06
ZONE -04
T-2522 T-2523

1+400.00 T-2538 T-2539

CMC completed 2nd & 4th layer - two PLT conducted. St 0+280 to 0+340
T-2602 T-2603 R-67 R-68

R-74 R-75
T-2618 T-2619

J-Z04-06

Clay replacement Gravel filling MIP-JVC-CAL-GEO-000021-02-B-28.10.2023 T-2803

T-2821
T-2804

T-2822
J-Z04-05 T-2807

T-2825

1+360.00
T-2808

T-2826

T-2867 T-2868
1+260 to 1+760
MIP-JVC-SHD-GEO-000075-01-B-30.11.2023

A
T-2885 T-2886

T-2953

T-2971
T-2954

T-2972
LIFT STATION 05
including mech room-11, Egress no-12
J-Z04-04

Tunnel-02 Total design completed area= 14747 sq.m J-Z04-03

Required soil improvement = 3315.682sq.m


T-3183 T-3184

Design & Shop drawing approved (0+100 to 0+280)


T-3201 T-3202

1+320.00

T-3278 T-3279

T-3296 T-3297

MIP-JVC-CAL-GEO-000002 and ..5-B-25.12.2022 893/1051CMC Progress=84.96% EGRESS STAIR-13


Handed over
J-Z04-02

(MODIFIED/RELOCATED)
T-3476 T-3477

Progressed area =2866sq.m


T-3494 T-3495

MIP-JVC-SHD-GEO-000003-02-B-12.01.2023 LIFT STATION 03 fo


ns o
rm
m
er
Tree

T3614

T3632
T3615

T3633
J-Z04-01
1+280.00

Tra Ro

Tunnel area = 4349.05 sq.m ROOM-11


A
Tree
J-Z03-14
Zone - 3 (1+020 to 1+260)
Mechaniacal room no-11 =3073.57sq.m Design & Shop drawing approved.
-3

-4

6.8
TA2

TA2

MR-248 MR-234

ZLT-TA2-1ZLT-TA2-2
MR-247 MR-233
787 803

786 802
T-148 T-149
ZLT-TA2-3 ZLT-TA2-4

J-Z03-13
-2

-1
TA2

TA2

T-165 T-166

1+240.00

ST 0+100 to 0+200 Grid size -2mX2m (Tunnel)


MR-538 MR-531

T2-Z10-22 B MR-539 MR-532


B
0+432.00

MIP-JVC-CAL-GEO -000012-01-B-18.03.2023
T2-Z10-20
0+400.00

T2-Z10-21
T2-Z10-10

T2-Z10-06
T2-Z10-19

T2-Z10-14

T2-Z10-09

259 247
T2-Z10-11
T2-Z10-17

T2-Z10-12

T2-Z10-04

T2-Z10-02

T2-Z10-01
T2-Z10-05

T2-Z10-03
T2-Z10-15

T2-Z10-07
0+360.00

T2-Z10-08
T2-Z10-18

T2-Z10-13

1483 1493
T2-Z10-16

260 248
81 68

1484 1494
0+320.00

J-Z03-12
0+280.00

0+240.00

0+200.00

0+160.00

0+120.00

0+080.00

0+040.00

0+000.00

82 69

2177 2165

ZLT-TA-1 ZLT-TA-4 T332 T333


319 318 301 300

ZLT-TA-1 ZLT-TA-4
1999
2011 T349 T350
346 345 328 2-2 327 2-1

ST 0+200 to 0+322 Grid size- 1.9m X 1.9m (Tunnel)


-WA -WA
ZLT-TA-2 ZLT-TA-1 ZLT ZLT
-4
A4
-3

-W
A4

ZLT
-W

2012 2000 1419 1429


ZLT

ZLT-TA-2

MIP-JVC-CAL-GEO-000012-02-B-11.12.2023
1420 1430
-2
A4 4-1
-W -WA
ZLT ZLT

T420 T421

D-Z10-01 D-Z10-02 T437 T438

D-Z10-03 D-Z10-04 D-Z10-12 D-Z10-13 D-Z10-14 D-Z10-15 D-Z10-16 D-Z10-17 D-Z10-18 D-Z10-19
D-Z10-05 D-Z10-06 D-Z10-07 D-Z10-08 D-Z10-09 D-Z10-10 D-Z10-11

J-Z03-11

Grid size -1.7mx1.7m (Mechanical room no-11) ST 0+100 TO 0+280 ROOM No (27)
ROOM No (26) 1+200.00

MIP-JVC-SHD-GEO-000044-00-B-17.06.2023
EGRESS STAIR-12
2281/3131 CMC Completed
J-Z03-10 T-659 T-660

0+014 to 0+100 MIP-JVC-SHD-GEO-000018-03-B-20.12.2023


T-676 T-677

ZONE -03
T-765 T-766

Progressed @ T-02 = 72.8%


T-780 T-781

MIP-JVC-CAL-GEO- 000014-01-15.05.2023 J-Z03-09


1+160.00 Total designed area = 10079 sq.m
Progressed area = 11037.83 sq.m (No need for soil improvement) 2482/2592 Tunnel CMC Grid size: 2m X2m
St 0+340 to 0+404 Required S.I Area 2506.947 Area=1988.96 sq.m
J-Z03-08
T-996

T-1011
T-997

T-1012

1+020 TO 1+260
J-Z03-07

1+120.00
T-1118

T-1134
T-1119

T-1135 Progressed @ Z-03 = 95.7%


R02Z00-C021-JVC-CAL-GT-GT-000064-C0-O J-Z03-06
Progressed area = 9713 sq.m
Lift station -03 No need for soil improvement area=403.604sq.m
T-1328 T-1329

T-1345 T-1346

J-Z03-05
T-1492 T-1493

1+080.00
T-1510 T-1511

Kaar tunnel st 0+370 to 0+580 Area =9805.3sq.m


ZONE -08
T-1601 T-1602

Tunnel-01 EGRESS STAIR-10


T-1622 T-1623

J-Z03-04

MIP-JVC-CAL-GEO-000054-00-B-16.11.2023
0+040 to 0+300 Area=12126sq.m J-Z03-03
1+040.00
0582/2337CMC Progressed =24.9%
to 0 + 6 0 0
0+000
T-1964 T-1965

R02Z00-C021-JVC-CAL-GT-GT-000047-C1-O
T-1987 T-1988

EGRESS STAIR-09
T-1998 T-1999

T-2021 T-2022

J-Z03-02
Progressed area=2443 sq.m
0005/4157CMC Progressed=0.12%LIFT STATION 01 E=563018.6940
KAR-Z08-01

st 0+320 to 0+380 non soil improvement

0+040.00
N=2706325.3440
KAR-Z08-03

0+080.00
KAR-Z08-05

0+120.00
E=563031.6940
N=2706325.3440 J-Z03-01

Progressed area =15 sq.m KAR-Z08-07

0+160.00
9
1+000.00 KAR-Z08-0 KAR-Z08-02

0+200.00
EGRESS STAIR-08 KAR-Z08-04

Area= 2423sq.m R-Z08


-11 KAR-Z08-08
KAR-Z08-06

.00
PS60 PS61

PS68 PS69

KA

0
E=563018.6940

-10

0+24
N=2706307.3440

-Z08
-13 -Z08
KAR KAR

0.00
-12
-Z08
0+28
KAR-Z08-15 KAR
OPTIONAL SCOPE -
0+320.00

T1-Z09-12
T1-Z09-13 T1-Z09-11 T1-Z09-10 T1-Z09-01 KAR-Z08-17
0+360.00

T1-Z09-09 T1-Z09-08 T1-Z09-07 T1-Z09-06 T1-Z09-05 T1-Z09-02 KAR-Z08-19


0+280.00

OUT OF SCOPE - TO BE T1-Z09-04 T1-Z09-03


0+240.00

-14
0+320.00

KAR-Z08-21 KAR-Z08
0+400.00

SUBJECT TO RAM
0+200.00

23
KAR-Z08-
EGRESS STAIR-07
0+160.00

0+960.00
KAR-Z08-16
0+440.00
0+120.00

0+080.00

0+040.00

0+000.00
0.00

0+320
UNDERTAKEN BY OTHERS
0+480.00

8
CONFIRMATION INTERSECTION-1 KAR-Z08-25 KAR-Z08-1
0+520.00

KAR-Z08-20
o .2023
0+602.31
0+36

0+600.00

0+560.00

KAR-Z08-
22

+ 0 4 0 t 1 0
0.00

0 .
T-5852 T-5853

KAR-Z08-24
ST - 1 7
T-5869 T-5870

e l - B
T-506 T-507

D-Z09-01
n
KAR-Z08-26

043-01
0+40

D-Z09-02

Kaar Tun
T-528 T-529

D-Z09-03 D-Z09-04 D-Z09-05 J-Z02-21


D-Z09-06
00

D-Z09-07

0
D-Z09-08 D-Z09-09

0 0
0+440.

D-Z09-10

O -
0+480.00

E
0+560.00

-CAL-G
0+520.00
0+600.00
0+640.00

T-708 T-709

C ement
0+680.00

T-723 T-724 T-730 T-731

- J V
T-745 T-746

P
00

0+920.00
721.04

M I ro v
0+720.

ROOM No (29)

i l i m p
ROOM 03
for so
0+

EGRESS STAIR-05
No need
J-Z02-20
T-786 T-787

EGRESS STAIR-06
60sq.m
T-807 T-808

AL BAQEE FENCE J-Z02-19


0+880.00 A r ea : 11 3
T-1035 T-1036

(PROPOSAL)
T-1056 T-1057

J-Z02-18
T-1293 T-1294

T-1314 T-1315

EGRESS STAIR-04 Zone-02 st 0+500 to 1+020


T-1415 T-1416

T-1436 T-1437

0+840.00
J-Z02-17

J-Z02-16
Design report approved
ZONE -02
T-1673 T-1674

T-1693 T-1694

J-Z02-15
0+800.00
MIP-JVC-CAL-GEO-000026-C5-O
0+500 to 1+020 MIP-JVC-SHD-GEO-000040-05-B-12.12.2023
T-1949 T-1950

T-1969 T-1970

EGRESS STAIR-03 J-Z02-014

MIP-JVC-SHD-GEO-000078-00-B intersection
T-2130 T-2131

T-2149 T-2150

AL BAQEE FENCE J-Z02-13


(PROPOSAL)
T-2299 T-2300

Grid size
T-2318 T-2319

0+760.00

T-2519

T-2537
T-2520

T-2538
J-Z02-12
0+500 to 0+740 -2.00m X 2.00m
Zone-01 T-2735

T-2753
J-Z02-11
T-2736

T-2754
0+720.00 0+740 to 1+000 -1.85m X 1.85m
St 0+400 to 0+500 including Mech Room-01 T-2843

T-2861
T-2844

T-2862

J-Z02-10
Total designed area = 21536sq.m
R02Z00-C021-JVC-CAL-GT-GT-000041-03-B-24.02.24 J-Z02-09
5491/6068 CMC started -15.06.2023
0+680.00

MIP-JVC-SHD-GEO-000069-02-B-21.11.2023 T-3093

T-3111
T-3094

T-3112

Progressed =90.5%
J-Z02-08

Total designed area =6222sq.m Progress area = 19509sq.m


T-4658 T-4659

T-4676 T-4677

MEP-ROOM-31
DRY CULVERT D9-1
Grid size 2.2m X 2.2m T-4840

T-4858
J-Z02-07
T-4841

0+640.00
T-4859
MEP-ROOM-30

1247/1381 Tunnel portion CMC started -28.08.2023 J-Z02-06


T-4988

T-5006
T-4989

T-5007
D-D9-10 D-D9-09 D-D9-08 D-D9-07 D-D9-06
D-D9-22
D-D9-05 D-D9-04 D-D9-03 D-D9-02 D-D9-01
D-D9-21

Progressed =90% J-Z02-05 DRY CULVERT D9-1


MEP-ROOM-33

T-3451 T-3452

T-3468 T-3469

0+600.00

Progress area =5649 sq.m ST0+000 TO 0+191.109


D-D9-20

DRY CULVERT D9-2

T-3591 T-3592

T-3608 T-3609

J-Z02-04
No need for soil improvement
ME

D-D9-19
D-

P-
RO
D9

OM
-1

-32
1

Area: 2269.96sq.m
T-3796 T-3797
D-

T-3813 T-3814

0+560.00
D9

Zone-01
J-Z02-03
-1

D-D9-18
2
D

T-3962
T-3963
-D

T-3979
T-3980
9-

J-Z02-02

MIP-JVC-CAL-GEO-000051-01-B-30.12.23
13

MIP-JVC-CAL-GEO-000028-00-B-02.07.2023
D-D9-17
D

T-4096
T-4097
-D

T-4113
T-4114
9-

J-Z02
1

16
4

-01 9-

Wet utility culvert st 0+140 to 0+207 LIFT STATION 06


0+52
0.00
D-D9-15 D-
D
DRY CULVERT D9-2
J-Z0
EGRESS STAIR-02
Utility culvert room 21 69

96
68

95
1-17

ST0+000 TO 0+238.838
Required soil improvement
J-Z

450 449
0+4
01-
80.0
16
0 362

394
361

393
No need for soil improvement
Area=1402.09 sq.m 383/383CMC
485 484

Area: 1761.66sq.m
504 503

550 549 540


J-Z
539

588 587
01-
15
711 710

750 749

Progressed = 100% 823

859
822

858

0+
J-Z
882
44
0
881
01
-14

Zone-01
915 914

.00

progressed area=1402.09sq.m J- 1028 1027

Z0 1052 1051

1 -1
1097 1096

St 0+350 to 0+400
1117 1116

J-

Haram Tunnel st 0+233 to 0+300 W-Z01-15A


0+
40 1-
0. 12
0
Z0

MIP-JVC-CAL-GEO-000040-01-B-02.10.2023
0
1260 1259

4 W-Z01-15B
-1
1281 1280

1
Z0
D-Z01-03A D-Z01-03B

No need for soil improvement


J-

W
Z0

1375 1374

3
1-

1396 1395

-1
11

01

MIP-JVC-SHD-GEO-000071-01-B-12.10.2023
1440 1439

-Z
J- 360

1461 1460

W
Z0 .00
0+

Area =1707.423sq.m
1-

1-1
10

Z0
E=562869.4174
E=562884.5375

W-
N=2705704.6741
N=2705704.7933
J-Z

E=562870.0734
N=2705700.7507
E=562850.8414

-11
Total designed area = 1672.3sq.m
N=2705701.5684
01

Z0
1 02
W- 1-
-09

Z0
J-Z 320.0

1-10 D-
E=562887.1399
0+

N=2705695.7470

-Z0
01 0

1-09
W 01
J-Z

1-
-08

W-Z0 Z0
Grid size 2.2m X 2.2m
E=562853.2140

1-06
01-

8
D-
N=2705687.3773

W-Z01-07 W-Z01-0 J-Z0


W-Z01-06
07
0

W-Z01-05
80.0

W-Z01-04
W-Z01-03 -05
0+2

W-Z01-02 1
J-Z0
0+240.00

W-Z01-01 J-Z01-04
326/326 CMC started -19.08.2023
0+200.00

J-Z01-02 J-Z01-03
0+160.00

J-Z01-01
0+120.00
0+080.00

5J
--

Progressed =100%
0+040.00

1A
--
0+000.00

4A
5A
--
5B
--
5C
--
5D
--
5D
--
5E
--
5F
--
5G
--
5H
--
5I
--

Progress area =1672.3sq.m


4B
-- --

St 0+300 to 0+350
Zone-01 MIP-JVC-CAL-GEO-000052-00-B-18.11.2023
Wet culvert st 0+000 to 0+140 Soil improvement required area=1624sq.m
Haram tunnel st 0+100 to 0+233 0/334CMC
MIP-JVC-CAL-GEO-000050-01-B-07.11.2023
No need for soil improvement
Area=5947sq.m
ZONE -01
0+000 TO 0+500

SOIL IMPROVEMENT LAYOUT

You might also like