TECHNICAL QUERY / DEVIATION

REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 1 of 4

Project : Pembangunan Stasiun Pengumpul Lapangan Jati Contract No. : 4650015734


Asri

Issue date : 27-October-2023 Request Type : Engineering Site


Originator : Erick Ariestio Discipline : Piping
Request : MODIFIKASI OVER FLOW & DRAIN Priority : Urgent Routine
Purpose KONDENSAT METERING SP JATIASRI

Subject : MODIFIKASI OVER FLOW & DRAIN KONDENSAT METERING SP JATIASRI

Request Detail

Berdasarkan permintaan Pertamina EP untuk Modifikasi Over Flow & Drain Kondensat Metering SP Jatiasri
Latar belakang permintaan tersebut adalah sebagai berikut
1. Modifikasi overflow : LEL tinggi di area Tangki yang berasal dari line overflow tangki sebagai berikut
a. SETTLING TANK 2-13-T-01 A
b. SETTLING TANK 2-13-T-01 B
c. CRUDE OIL STORAGE TANK 2-13-T-02 A
d. CRUDE OIL STORAGE TANK 2-13-T-02 B
e. PRODUCED WATER STORAGE TANK 2-13-T-03
f. TEST TANK 2-13-T-04 A
g. TEST TANK 2-13-T-04 B

2. Modifikasi Drain Kondensat di Metering : Pembacaan sales gas di Custody Metering SP Jatiasri sering kali
terkendala akibat wet gas.

REFERENCE DOCUMENTS / ATTACHMENT LIST


1. Lampiran A
- Sketch Modification Over Flow
- Sketch Modification Drain Kondensat
- P&ID Tangki T-01 A/B, T-02 A/B, T-03 dan T-04 AB
- Update Drawing (Asbuilt) Isometrik line Over Flow

2. Lampiran B
Additional BOM & Cost Breakdown
TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 2 of 4

CHANGE FROM EXISTING DOCUMENTS

Possibilty to Impact : Cost Schedule None

PT. WKS – AI
Originator : Check by : Approved by :

Erick Ariestio Noor Wibowo Ayat Tohirin

Project Control Site Manager Project Manager

COMPANY RESPONSE
Accepted
Accepted with comment
Rejected
Date of receipt by Company Doc. Control : TQ to be revised in DEV

Response Pertamina EP :

Review By: Review By: Approve By:

Project Coordinator Asst. Man. SF Engineering Manager Project Zona 7


Project

For Company Internal Purpose


Change Order is Closed? Yes No Derogation
Request
Any Initial CO linked to this DEV Yes No
CO Document No
TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 3 of 4
TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 4 of 4

Lampiran A
TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 5 of 4

Sketch Modification Over Flow


TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 6 of 4

Sketch Modification Drain Kondensat


TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 7 of 4

P&ID Tangki T-01 A/B, T-02 A/B, T-03 dan T-04 AB


TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 8 of 4

Update Drawing (Asbuilt) Isometrik line Over Flow


TECHNICAL QUERY / DEVIATION
REQUEST (TQ/DR)`
Document Type : TQ System : Utility Discipline : Piping Date : 27-October-2023
Document Number : JAS-EPC-WKSAI-00-L0-TQ-021-R2 Page 9 of 4

Lampiran B

You might also like