Salient Features of MRTS
Salient Features of MRTS
S. Inter station
Station Level Chainage (Km)
No. Distance (Km)
1 Visalpur Elevated (-)1+382 -
2 Dholka Elevated 29+037 30.419
3 Vataman Elevated 47+404 18.367
4 Pipali Elevated 64+318 16.914
Navagam Airport
4A Elevated 66+845 2.527
Station*
5 Ambli Elevated 75+301 10.983
6 Kadipur Elevated 80+702 5.401
7 Dholera CBD At Grade 85+077 4.375
*Future Station
Planned Train Operation - In Year 2025: - The train operation with the
combination of 3 car and 6 car trains at 6 minutes peak period headway was
proposed for year 2025 with PHPDT (peak hour per direction traffic) capacity of
8930 passengers.
Total Cost of the project - Rs. 7228 Cr (including Rolling stock cost of Rs.
977 Cr) i.e., 83.08 Cr/km.