JECON ENGINEERS PVT LTD

JOB SAFETY ANALYSIS


Connected
JSA Code: JSA/CO/ JSA Equipment Erection permit
03 Description:

Job specific PPE Required (check ✓ if provided, mention NA if not applicable) (Other than mandatory PPE i.e. Safety Shoes, Helmet &
Safety Goggle, Gloves)
Acid-Alkali
Hand cotton Full Body SCBA proof Hand High Voltage Electrical Hand Gloves
Gloves Harness Gloves
(FBH)
Chemical
High temperature Online Chemical Splash Cut Resistance Hand Gloves
hand gloves Respirator Suit Goggles
Online Mention Job Specific PPE (By execution
Cartridge mask Dust Mask air Mask Face Shield team)

Applicable
Sr. No. Sub activity (✓)(NA) Hazards Control Measures to be taken
Personnel  Trained & experienced person to be deployed
 Toolbox talk conducted
 Cut Resistance gloves to be used.
Cut Injury  Check the route for suitable width and turning
radius Drains should have minimum 1 meter
distance so that wheel should not plunge inside
it.
 Inspect the area immediately around the load and
the route for clearance and tripping hazards.
Ensure route is clear and without any obstruction.
 Inspect Farana and ensure required documents
available as per our checklist. Form no.10
available
.Puc ,Rc, Physical Work Condition Sli
Trips & Fall Of Vehicle  Clear movable objects from the route
 Check for uneven terrain. Clean up spills that could
1 affect foot traction
Check the  Ensure hydra, farana & crane used for lifting of
intended route material only (Shifting activity strictly prohibited)
and point of  Crane load chart should be available in permit or JSA
placement
flagman with road clearance
 Rigging Plan should be made in the prescribed
format with due approvals as per the procedures.
Lacerations,  Examine object for snags, burrs, splinters, sharp
edges, nails. Remove objects prior to lift and/or
wear cut resistant gloves for hand protection
Slip of load from hands  Check object for greasy/slippery surfaces. Remove
grease prior to lifting. Wear gloves to improve grip.
 Size up the load before you lift. If load is too big
Crush Injury or awkward ,Divide load up, Ask for help
 Use mechanical assist device such as a hand
truck or trolley
 If load will block your vision, get help of signal
man.
Misjudgment due to blocked
 Ensure valid TPI certificate for all lifting
vision.
equipment’s and tools and tackles.
Non Compliance of rules
 Crane checklist should be available with
. permit .Crane inspection validity and checking
frequency should be available in checklist
 Use of certified lifting tools. Form no 10 for
farna/man/crane required.

 All employees will be clear of pinch point during


initial lift off of truck.
Evaluate the  Rigging will be inspected again to ensure load is
2 Load and level and secure.
suitability of Load failing on workers  Counter balance must be checked and verified
lifting vehicle and/or public. before starting activity.
 Crane load chart should be available in permit or JSA
 No one should access a scaffold if there is a red
tag or no tag. Works on scaffold must be
supervised at all times.
 All tools tie up with rope.
 Use Full Body harness (FBH) with proper
anchoring one by one. ensure FBH not anchoring
with Process line
 No equipment and tools will be stored on the
scaffold. All persons working on scaffold must be
trained on working at heights and use of
harnesses.
 All harness must be checked daily by a competent
person and inspected monthly and logged. NO workers
should alter the scaffolding
 Ensure that the scaffold is approved inspected by
authorised officer prior to use and tagged.
 Ensure Rope is safe to use .Use rope to liftgrating
and pipe.
 Don't throw clamps up and down.
 All rigging will be inspected prior to use. The unit
will be picked according to manufacturer's
Crane Overturning  Recommendations.
 Suitable gantry or overhead protection.
Power lines nearby  Lift area suitably barricaded. Suitable capacity
crane for the job.
 Crane set up correctly and away from other people
and structures.
 Certified persons slinging and operating the crane
only.
 Wind velocity and weather condition should be
monitored during the crane operation.
 Ensure no parts from crane enter the electrical
danger zone.

3 Performing the  Ensure temporary power board is fitted with


Lift Electric shock Residual Current Devices (RCD).
 Use guide rope
 If the load is shifting by Farana for short distance
Struck by object ensure tagline and banks man at both the
sides.
 Crane set up correctly and away from other people
and structures.

4 Lowering the
Load  Certified persons slinging and operating crane
Load Filing on workers and  Lift area suitably barricaded. Suitable capacity
/or public due to crane crane for the job.
overturning  All rigging will be inspected prior to use. The unit
will be picked according to manufacturer's
Electric Shock  recommendations.
 Avoid sudden raising and lowering of the boom
as it makes the crane prone to tipping over.
 Ensure no parts from crane enter the electrical
danger zone

Erection/fit up  Movement area at height should be checked.


5
of structure Fall of person hit by Sufficient space should be available.
(Heavy Lift) structure while erecting  Using of non-certified tools for lifting and erection of
aligning due to sudden structure.
jerk.  Avoid erection during night hours. Check the
illumination level. Provide additional lights.
Fall of structure due to  Use cut resistance hand gloves. Do haste to align the
failure of lifting appliance job.
and gears.  Use alignment rod to match the holes.
 Preparation of lifting plan.(for heavy lift). Take
Poor illumination. precaution as sub activity 3.

Pinch point.

Toppling of
crane/Hydra/Farana
6 Housekeeping  Remove the Unwanted Materials from workplace
at
workplace Fall of person or material Barricade the area properly
 Ensure that workplace is dry & non slippery, free from
spillage / leakage / obstacle
Material or person may fall  Ensure environmental condition is good - no rainfall
due to wet, slippery or oily or direct expose of gas or steam vent.
surface.
Additional Precaution to be taken:

Legends (*): Mandatory (hand written) to write at least 1 job specific and work condition hazard and their control measures. In case of no
job specific hazard, please write "No Job specific hazard identified". (**): In case, new sub activity found on job site, write it's job
specific and work condition hazard and their control measures. Else write NA.
Declaration: I/We hereby declare that, I/we have identified & understood all the possible hazards while performing the job (including job / site specific) and adequate
control measures have been mentioned (including job specific). Same have been explained to execution team members.

Review By

Approved by
JSA prepare