JAH-ENG-Z1-EW.20 Soil Improvement Design Preparation & Submission 7 13-Sep-23 A 20-Sep-23 A Soil Improvement Design Preparation & Submission
JAH-ENG-Z1-EW.25 Cross Section Shop Drawing Review & Approval 12 28-Dec-22 A 10-Jan-23 A Cross Section Shop Drawing Review & Approval
JAH-ENG-Z1-EW.30 Soil Improvement Design Review & Approval 11 10-Sep-23 A 23-Sep-23 A Soil Improvement Design Review & Approval
JAH-ENGZ1-WC-PW Plan and Profile Shop Drawing Prepration &Submission 13 18-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z1-WC-IR Plan and Profile Shop Drawing Review & Approval 14 14-Sep-24 30-Sep-24 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z1-WC-GD Plan and Profile Shop Drawing Review & Approval 285 01-Sep-22 A 30-Sep-24 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z1-WC-CW Plan and Profile Shop Drawing Review & Approval 14 19-Sep-24 06-Oct-24 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z1-WC-AW Plan and Profile Shop Drawing Review & Approval 14 19-Sep-24 06-Oct-24 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z1-WC-D. Plan and Profile Shop Drawing Review & Approval 14 05-Dec-24 21-Dec-24 Plan and Profile Shop Drawing Review & Approval
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 10-Oct-24 23-Oct-24 Review and approval power system shopdrawings
W-Z1-EC-CS.20 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval
W-Z1-EC-CS.25 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission
W-Z1-EC-CS.30 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval
W-Z1-01-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-01-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-01-EC-WCC Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-02 40 15-Feb-24 01-Apr-24 01-Apr-24, WET CULVERT-CIVIL-W-Z01-02
Actual Work
Remaining Work
1 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-02-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 03-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-02-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-02-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-02-EC-WCC Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-03 40 27-Feb-24 16-Apr-24 16-Apr-24, WET CULVERT-CIVIL-W-Z01-03
W-Z1-03-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 14-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-03-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-03-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 14-Mar-24 31-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-03-EC-WCC Reinforcement Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-04 40 10-Mar-24 28-Apr-24 28-Apr-24, WET CULVERT-CIVIL-W-Z01-04
W-Z1-04-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-04-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-04-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-04-EC-WCC Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-05 40 21-Mar-24 09-May-24 09-May-24, WET CULVERT-CIVIL-W-Z01-05
W-Z1-05-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-05-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-05-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-05-EC-WCC Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-06 40 16-Jan-24 03-Mar-24 03-Mar-24, WET CULVERT-CIVIL-W-Z01-06
W-Z1-06-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-06-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-06-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-06-EC-WCC Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-07 40 28-Jan-24 14-Mar-24 14-Mar-24, WET CULVERT-CIVIL-W-Z01-07
W-Z1-07-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-07-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-07-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-07-EC-WCC Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-08 40 08-Feb-24 26-Mar-24 26-Mar-24, WET CULVERT-CIVIL-W-Z01-08
W-Z1-08-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-08-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-08-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-08-EC-WCC Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-09 40 20-Feb-24 07-Apr-24 07-Apr-24, WET CULVERT-CIVIL-W-Z01-09
W-Z1-09-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-09-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-09-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-09-EC-WCC Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-10 40 03-Mar-24 22-Apr-24 22-Apr-24, WET CULVERT-CIVIL-W-Z01-10
W-Z1-10-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-10-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-10-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-10-EC-WCC Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-11 40 16-Jan-24 03-Mar-24 03-Mar-24, WET CULVERT-CIVIL-W-Z01-11
W-Z1-11-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
2 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-11-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-11-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-11-EC-WCC Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-12 40 28-Jan-24 14-Mar-24 14-Mar-24, WET CULVERT-CIVIL-W-Z01-12
W-Z1-12-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-12-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-12-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-12-EC-WCC Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-13 40 08-Feb-24 26-Mar-24 26-Mar-24, WET CULVERT-CIVIL-W-Z01-13
W-Z1-13-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-13-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-13-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-13-EC-WCC Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-14 40 20-Feb-24 07-Apr-24 07-Apr-24, WET CULVERT-CIVIL-W-Z01-14
W-Z1-14-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-14-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-14-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-14-EC-WCC Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-15 40 03-Mar-24 22-Apr-24 22-Apr-24, WET CULVERT-CIVIL-W-Z01-15
W-Z1-15-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z1-15-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval
W-Z1-15-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z1-15-EC-WCC Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval
W-Z1-EEP-ES.20 Earthing system Shop Drawings Review & Approval 30 12-Aug-24 15-Sep-24 Earthing system Shop Drawings Review & Approval
W-Z1-EEP-LS.20 Lighting system Shop Drawings Review & Approval 25 18-Aug-24 15-Sep-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 24-Aug-24 28-Sep-24 28-Sep-24, CABLE TRAY /CABLE ROUTING SYSTEM
W-Z1-EEP-CTCRS Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 24-Aug-24 28-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
W-Z1-EEP-CTCRS Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 24-Aug-24 28-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
W-Z1-EEP-SPS.20 Small Power system Shop Drawings Review & Approval 4 07-Jan-25 11-Jan-25 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 11 08-Oct-24 20-Oct-24 20-Oct-24, POWER DISTRIBUTION
W-Z1-EEP-PD.15 Generator Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 Generator Shop Drawings Preparation & Submission
W-Z1-EEP-PD.20 UPS Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 UPS Shop Drawings Preparation & Submission
W-Z1-EEP-PD.25 MDBs Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 MDBs Pannels Shop Drawings Preparation & Submission
W-Z1-EEP-PD.30 MCC Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 MCC Pannels Shop Drawings Preparation & Submission
W-Z1-EEP-PD.35 SMSB Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 SMSB Pannels Shop Drawings Preparation & Submission
W-Z1-EEP-PD.40 DB Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 DB Pannels Shop Drawings Preparation & Submission
W-Z1-EEP-PD.45 Isolators Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 Isolators Shop Drawings Preparation & Submission
W-Z1-EEP-PD.50 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
Actual Work
Remaining Work
3 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-EEP-PD.55 Generator Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 Generator Shop Drawings Review & Approval
W-Z1-EEP-PD.60 UPS Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 UPS Shop Drawings Review & Approval
W-Z1-EEP-PD.65 MDBs Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 MDBs Shop Drawings Review & Approval
W-Z1-EEP-PD.70 MCCB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 MCCB Shop Drawings Review & Approval
W-Z1-EEP-PD.75 SMSB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 SMSB Shop Drawings Review & Approval
W-Z1-EEP-PD.80 DB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 DB Shop Drawings Review & Approval
W-Z1-EEP-PD.85 Isolator Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 Isolator Shop Drawings Review & Approval
W-Z1-EEP-PD.90 LCP / ELC PannelsShop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 LCP / ELC PannelsShop Drawings Review & Approval
W-Z1-EEL-FAS.20 Fire Alarm system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Fire Alarm system Shop Drawings Review & Approval
ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 290 28-Jan-24 09-Jan-25 09-Jan-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
W-Z1-EEL-ICTS.15 ICT System Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 ICT System Shop Drawings Preparation & Submission
W-Z1-EEL-ICTS.20 ICT System Shop Drawings Review & Approval 4 06-Jan-25 09-Jan-25 ICT System Shop Drawings Review & Approval
W-Z1-EEL-ACS.20 Access Control system Shop Drawings Review & Approval 12 07-Jan-25 20-Jan-25 Access Control system Shop Drawings Review & Approval
RODDENT REPPELE
REPPELENT SYSTEM 18 29-Feb-24 21-Mar-24 21-Mar-24, RODDENT REPPELENT SYSTEM
W-Z1-EEL-RRS.15 Roddent Repplent system Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Roddent Repplent system Shop Drawings Preparation & Submission
W-Z1-EEL-RRS.20 Roddent Repplent system Shop Drawings Review & Approval 4 17-Mar-24 21-Mar-24 Roddent Repplent system Shop Drawings Review & Approval
W-Z1-EEL-SCADA Scada system Shop Drawings Review & Approval 12 28-Jan-25 10-Feb-25 Scada system Shop Drawings Review & Approval
W-Z1-EEL-RRBT.2 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 08-Feb-25 20-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
W-Z1-MSD-FF.20 Firefighting system Shop Drawings Review & Approval 12 13-Apr-24 25-Apr-24 Firefighting system Shop Drawings Review & Approval
W-Z1-MSD-HVAC. HVAC system Shop Drawings Review & Approval 12 19-Jan-25 01-Feb-25 HVAC system Shop Drawings Review & Approval
W-Z1-MSD-PB.20 Plumbing system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Plumbing system Shop Drawings Review & Approval
DC-CSD-CZW.20 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval
DC-CSD-CZW.25 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission
DC-CSD-CZW.30 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval
CIVIL/SEGMENT WISE
WIS 60 16-Jan-24 26-Mar-24 26-Mar-24, CIVIL/SEGMENT WISE
DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-01 40 16-Jan-24 03-Mar-24 03-Mar-24, DRY CULVERT-CIVIL-D-Z01-01
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
4 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-02 40 28-Jan-24 14-Mar-24 14-Mar-24, DRY CULVERT-CIVIL-D-Z01-02
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-03 40 08-Feb-24 26-Mar-24 26-Mar-24, DRY CULVERT-CIVIL-D-Z01-03
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
ELECTRICAL SHOP D
DRAWINGS 191 02-Dec-23 20-Jul-24 20-Jul-24, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 182 02-Dec-23 09-Jul-24 09-Jul-24, POWER SYSTEM
EARTHING SYSTEM 30 02-Dec-23 04-Jan-24 04-Jan-24, EARTHING SYSTEM
DC-ESD-PS-ES.1 Earthing system Shop Drawings Preparation & Submission 30 02-Dec-23 04-Jan-24 Earthing system Shop Drawings Preparation & Submission
DC-ESD-PS-ES.2 Earthing system Shop Drawings Review & Approval 30 02-Dec-23 04-Jan-24 Earthing system Shop Drawings Review & Approval
DC-ESD-PS-LS.2 Lighting system Shop Drawings Review & Approval 25 27-Apr-24 26-May-24 Lighting system Shop Drawings Review & Approval
DC-ESD-PS-CTC Cable Tray/ Cable Routing system Shop Drawings Review & Approval 25 06-May-24 04-Jun-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
SMALL POWER SY
SYSTEM 48 08-May-24 08-Jul-24 08-Jul-24, SMALL POWER SYSTEM
DC-ESD-PS-SPS. Small Power system Shop Drawings Preparation & Submission 23 08-May-24 04-Jun-24 Small Power system Shop Drawings Preparation & Submission
DC-ESD-PS-SPS. Small Power system Shop Drawings Review & Approval 25 04-Jun-24 08-Jul-24 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUT 25 05-Jun-24 09-Jul-24 09-Jul-24, POWER DISTRIBUTION
DC-ESD-PS-PD.1 Generator Shop Drawings Preparation & Submission 4 05-Jun-24 10-Jun-24 Generator Shop Drawings Preparation & Submission
DC-ESD-PS-PD.2 UPS Shop Drawings Preparation & Submission 4 05-Jun-24 10-Jun-24 UPS Shop Drawings Preparation & Submission
DC-ESD-PS-PD.2 MDBs Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 MDBs Pannels Shop Drawings Preparation & Submission
DC-ESD-PS-PD.3 MCC Pannels Shop Drawings Preparation & Submission 4 26-Jun-24 01-Jul-24 MCC Pannels Shop Drawings Preparation & Submission
DC-ESD-PS-PD.3 SMSB Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 SMSB Pannels Shop Drawings Preparation & Submission
DC-ESD-PS-PD.4 DB Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 DB Pannels Shop Drawings Preparation & Submission
DC-ESD-PS-PD.4 Isolators Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 Isolators Shop Drawings Preparation & Submission
DC-ESD-PS-PD.5 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
DC-ESD-PS-PD.5 Generator Shop Drawings Review & Approval 7 10-Jun-24 23-Jun-24 Generator Shop Drawings Review & Approval
DC-ESD-PS-PD.6 UPS Shop Drawings Review & Approval 7 10-Jun-24 23-Jun-24 UPS Shop Drawings Review & Approval
DC-ESD-PS-PD.6 MDBs Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 MDBs Shop Drawings Review & Approval
DC-ESD-PS-PD.7 MCCB Shop Drawings Review & Approval 7 01-Jul-24 09-Jul-24 MCCB Shop Drawings Review & Approval
DC-ESD-PS-PD.7 SMSB Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 SMSB Shop Drawings Review & Approval
DC-ESD-PS-PD.8 DB Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 DB Shop Drawings Review & Approval
DC-ESD-PS-PD.8 Isolator Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 Isolator Shop Drawings Review & Approval
DC-ESD-PS-PD.9 LCP / ELC PannelsShop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 LCP / ELC PannelsShop Drawings Review & Approval
Actual Work
Remaining Work
5 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DC-ESD-LCS-FA Fire Alarm system Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Fire Alarm system Shop Drawings Preparation & Submission
DC-ESD-LCS-FA Fire Alarm system Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Fire Alarm system Shop Drawings Review & Approval
ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 54 03-Jan-24 07-Mar-24 07-Mar-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
DC-ESD-LCS-ICT ICT System Shop Drawings Preparation & Submission 14 03-Jan-24 20-Jan-24 ICT System Shop Drawings Preparation & Submission
DC-ESD-LCS-ICT ICT System Shop Drawings Review & Approval 4 03-Mar-24 07-Mar-24 ICT System Shop Drawings Review & Approval
DC-ESD-LCS-AC Access Control system Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Access Control system Shop Drawings Review & Approval
RODDENT REPPELENT
REPPELE SYSTEM 27 05-Feb-24 07-Mar-24 07-Mar-24, RODDENT REPPELENT SYSTEM
DC-ESD-LCS-RR Roddent Repplent system Shop Drawings Preparation & Submission 14 05-Feb-24 21-Feb-24 Roddent Repplent system Shop Drawings Preparation & Submission
DC-ESD-LCS-RR Roddent Repplent system Shop Drawings Review & Approval 4 03-Mar-24 07-Mar-24 Roddent Repplent system Shop Drawings Review & Approval
DC-ESD-LCS-SC Scada system Shop Drawings Review & Approval 12 09-Mar-24 23-Mar-24 Scada system Shop Drawings Review & Approval
DC-ESD-LCS-RR Radio Re-Broad coasting system Shop Drawings Review & Approval 12 06-Jul-24 20-Jul-24 Radio Re-Broad coasting system Shop Drawings Review & Approval
DC-MSD-FF.20 Firefighting system Shop Drawings Review & Approval 12 12-May-24 26-May-24 Firefighting system Shop Drawings Review & Approval
DC-MSD-HVAC.2 HVAC system Shop Drawings Review & Approval 12 16-May-24 30-May-24 HVAC system Shop Drawings Review & Approval
DC-MSD-PB.20 Plumbing system Shop Drawings Review & Approval 12 12-May-24 26-May-24 Plumbing system Shop Drawings Review & Approval
JAH-ENG-Z1-R.20 Plan and Profile Shop Drawing Review & Approval 14 22-Feb-25 10-Mar-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z1-R.25 Road Cross Sections Shop Drawing Preparation & Submission 14 10-Mar-25 26-Mar-25 Road Cross Sections Shop Drawing Preparation & Submission
JAH-ENG-Z1-R.30 Road Cross Sections Shop Drawing Review & Approval 14 26-Mar-25 15-Apr-25 Road Cross Sections Shop Drawing Review & Approval
JAH-ENG-Z1-R.35 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 26-Mar-25 16-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission
JAH-ENG-Z1-R.40 Guiding Signs and Marking Shop Drawing Review & Approval 14 16-Apr-25 01-May-25 Guiding Signs and Marking Shop Drawing Review & Approval
JAH-Z1-EC.20 Plan and Profile Shop Drawings Review & Approval 12 13-Aug-24 26-Aug-24 Plan and Profile Shop Drawings Review & Approval
JAH-Z1-EC.25 Builder work Shop Drawings Preparation and submission 13 02-Sep-23 A 16-Sep-23 A Builder work Shop Drawings Preparation and submission
JAH-Z1-EC.30 Builder work Shop Drawings Review & Approval 5 16-Sep-23 A 20-Sep-23 A Builder work Shop Drawings Review & Approval
JAH-Z1-01-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-01-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-01-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
6 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z1-02-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z1-02-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-02-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-02-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-03-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-03-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-03-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-04-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-04-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-04-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-05-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-05-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-05-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-06-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-06-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-06-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-07-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-07-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-07-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-08-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-08-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-08-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-09-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-09-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-09-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-10-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-10-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-10-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
7 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z1-11-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-11-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-11-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-12-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-12-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-12-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-13-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-13-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-13-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-14-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 14-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-14-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-14-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-15-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-15-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-15-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-16-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-16-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-16-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-17-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z1-17-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z1-17-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z1-EEP-ES.20 Earthing system Shop Drawings Review & Approval 30 25-Jul-24 28-Aug-24 Earthing system Shop Drawings Review & Approval
JAH-Z1-EEP-LS.20 Lighting system Shop Drawings Review & Approval 25 29-Nov-22 A 27-Dec-22 A Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 06-Aug-24 09-Sep-24 09-Sep-24, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z1-EEP-CTCR Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 06-Aug-24 09-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z1-EEP-CTCR Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 06-Aug-24 09-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z1-EEP-SPS.2 Small Power system Shop Drawings Review & Approval 30 06-Aug-24 09-Sep-24 Small Power system Shop Drawings Review & Approval
Actual Work
Remaining Work
8 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION
DISTRIBUTIO 16 14-Sep-24 02-Oct-24 02-Oct-24, POWER DISTRIBUTION
JAH-Z1-EEP-PD.15 Generator Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 Generator Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.20 UPS Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 UPS Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.25 MDBs Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.30 MCC Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.35 SMSB Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.40 DB Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 DB Pannels Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.45 Isolators Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 Isolators Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.50 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 14-Sep-24 18-Sep-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z1-EEP-PD.55 Generator Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 Generator Shop Drawings Review & Approval
JAH-Z1-EEP-PD.60 UPS Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 UPS Shop Drawings Review & Approval
JAH-Z1-EEP-PD.65 MDBs Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 MDBs Shop Drawings Review & Approval
JAH-Z1-EEP-PD.70 MCCB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 MCCB Shop Drawings Review & Approval
JAH-Z1-EEP-PD.75 SMSB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 SMSB Shop Drawings Review & Approval
JAH-Z1-EEP-PD.80 DB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 DB Shop Drawings Review & Approval
JAH-Z1-EEP-PD.85 Isolator Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 Isolator Shop Drawings Review & Approval
JAH-Z1-EEP-PD.90 LCP / ELC PannelsShop Drawings Review & Approval 12 18-Sep-24 02-Oct-24 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z1-EEL-FAS.2 Fire Alarm system Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Fire Alarm system Shop Drawings Review & Approval
JAH-Z1-EEL-ICTS.2 ICT System Shop Drawings Review & Approval 4 14-Feb-24 19-Feb-24 ICT System Shop Drawings Review & Approval
JAH-Z1-EEL-ACS.2 Access Control system Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Access Control system Shop Drawings Review & Approval
JAH-Z1-EEL-PAS.2 Public Address system Shop Drawings Review & Approval 4 14-Feb-24 19-Feb-24 Public Address system Shop Drawings Review & Approval
JAH-Z1-EEL-SCAD Scada system Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Scada system Shop Drawings Review & Approval
JAH-Z1-EEL-RRBT Radio Re-Broad coasting system Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 54 14-Feb-24 20-Apr-24 20-Apr-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 44 14-Feb-24 04-Apr-24 04-Apr-24, FIRE FIGHTING
JAH-Z1-EM-FF.15 Firefighting system Shop Drawings Preparation & Submission 14 14-Feb-24 02-Mar-24 Firefighting system Shop Drawings Preparation & Submission
JAH-Z1-EM-FF.20 Firefighting system Shop Drawings Review & Approval 12 23-Mar-24 04-Apr-24 Firefighting system Shop Drawings Review & Approval
JAH-Z1-EM-HVAC.2 HVAC system Shop Drawings Review & Approval 12 27-Mar-24 13-Apr-24 HVAC system Shop Drawings Review & Approval
JAH-Z1-EM-PB.20 Plumbing system Shop Drawings Review & Approval 12 03-Apr-24 20-Apr-24 Plumbing system Shop Drawings Review & Approval
Actual Work
Remaining Work
9 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 1214 23-Aug-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1214 23-Aug-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 191 15-Dec-22 A 01-Aug-23 A 01-Aug-23 A, EARTH WORKS
JAH-ENG-Z2-EX.755 Cross Section Shop Drawing Preparation & Submission 11 15-Dec-22 A 27-Dec-22 A Cross Section Shop Drawing Preparation & Submission
JAH-ENG-Z2-EX.760 Cross Section Shop Drawing Review & Approval 4 28-Dec-22 A 01-Jan-23 A Cross Section Shop Drawing Review & Approval
JAH-ENG-Z2-SH.775 Shoring Design Preparation & Submission 6 23-Jan-23 A 29-Jan-23 A Shoring Design Preparation & Submission
JAH-ENG-Z2-SH.780 Shoring Design Review & Approval 7 30-Jan-23 A 06-Feb-23 A Shoring Design Review & Approval
JAH-ENG-Z2-SI.765 Soil Improvement Design Preparation & Submission 15 15-Jul-23 A 31-Jul-23 A Soil Improvement Design Preparation & Submission
JAH-ENG-Z2-SI.770 Soil Improvement Design Review & Approval 5 27-Jul-23 A 01-Aug-23 A Soil Improvement Design Review & Approval
JAH-Z2-EC.110 Plan and Profile Shop Drawings Review & Approval 3 26-Sep-23 A 28-Sep-23 A Plan and Profile Shop Drawings Review & Approval
JAH-Z2-EC.120 Builder work Shop Drawings Preparation and submission 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Preparation and submission
JAH-Z2-EC.130 Builder work Shop Drawings Review & Approval 4 30-Aug-23 A 03-Sep-23 A Builder work Shop Drawings Review & Approval
JAH-Z2-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 85 18-Mar-23 A 25-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Dec-23 25-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 02-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-02-EC-120 Reinforcement Shop Drawings Preparation and submission 8 17-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z2-02-EC-130 Reinforcement Shop Drawings Review & Approval 3 26-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z2-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 10-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-03-EC-120 Reinforcement Shop Drawings Preparation and submission 9 29-Aug-23 A 07-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z2-03-EC-130 Reinforcement Shop Drawings Review & Approval 10 07-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z2-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 16-Aug-23 A 23-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z2-04-EC-130 Reinforcement Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z2-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 13-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-05-EC-120 Reinforcement Shop Drawings Preparation and submission 10 10-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z2-05-EC-130 Reinforcement Shop Drawings Review & Approval 7 20-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z2-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-06-EC-120 Reinforcement Shop Drawings Preparation and submission 13 04-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Preparation and submission
Actual Work
Remaining Work
10 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z2-06-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z2-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 56 10-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-07-EC-120 Reinforcement Shop Drawings Preparation and submission 67 30-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-07-EC-130 Reinforcement Shop Drawings Review & Approval 55 11-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z2-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 05-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-08-EC-120 Reinforcement Shop Drawings Preparation and submission 63 30-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-08-EC-130 Reinforcement Shop Drawings Review & Approval 53 09-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z2-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 02-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-09-EC-120 Reinforcement Shop Drawings Preparation and submission 63 26-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-09-EC-130 Reinforcement Shop Drawings Review & Approval 55 04-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z2-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-10-EC-120 Reinforcement Shop Drawings Preparation and submission 66 21-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-10-EC-130 Reinforcement Shop Drawings Review & Approval 56 30-Mar-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z2-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Dec-23 24-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-11-EC-120 Reinforcement Shop Drawings Preparation and submission 10 12-Dec-23 24-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Dec-23 07-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Dec-23 08-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Jan-24 22-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jan-24 25-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jan-24 25-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Jan-24 08-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Jan-24 12-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Jan-24 12-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Feb-24 26-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
11 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z02-16 40 15-Feb-24 01-Apr-24 01-Apr-24, CIVIL-SEG-J-Z02-16
JAH-Z2-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 02-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z2-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Mar-24 18-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Mar-24 18-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-24 25-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-24 25-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-24 13-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Apr-24 13-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-May-24 30-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-May-24 30-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval
CIVIL-SEG-J-Z02-21 (INTERSECTION)
(I 40 29-Feb-24 18-Apr-24 18-Apr-24, CIVIL-SEG-J-Z02-21 (INTERSECTION)
JAH-Z2-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z2-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Mar-24 02-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z2-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Mar-24 02-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z2-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Apr-24 18-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z2-EEP-160 Earthing system Shop Drawings Review & Approval 30 20-Feb-25 27-Mar-25 Earthing system Shop Drawings Review & Approval
JAH-Z2-EEP-110 Lighting system Shop Drawings Review & Approval 25 26-Feb-25 27-Mar-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 23-Feb-25 03-Apr-25 03-Apr-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z2-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 23-Feb-25 03-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z2-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 23-Feb-25 03-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z2-EEP-130 Small Power system Shop Drawings Review & Approval 30 06-Mar-25 15-Apr-25 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 477 19-Mar-25 17-Oct-26 17-Oct-26, POWER DIS
JAH-Z2-EEP-170 Generator Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 Generator Shop Drawings Preparation & Submission
JAH-Z2-EEP-180 Generator Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 Generator Shop Drawings Review & Approval
Actual Work
Remaining Work
12 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z2-EEP-190 UPS Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 UPS Shop Drawings Preparation & Submission
JAH-Z2-EEP-200 UPS Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 UPS Shop Drawings Review & Approval
JAH-Z2-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 19-Mar-25 24-Mar-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z2-EEP-220 MDBs Shop Drawings Review & Approval 12 24-Mar-25 12-Apr-25 MDBs Shop Drawings Review & Approval
JAH-Z2-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 30-Sep-26 17-Oct-26 MCC Pannels Shop Draw
JAH-Z2-EEP-240 MCCB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 MCCB Shop Drawings Review & Approval
JAH-Z2-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z2-EEP-260 SMSB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 SMSB Shop Drawings Review & Approval
JAH-Z2-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z2-EEP-280 DB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 DB Shop Drawings Review & Approval
JAH-Z2-EEP-290 Isolators Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 Isolators Shop Drawings Preparation & Submission
JAH-Z2-EEP-300 Isolator Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 Isolator Shop Drawings Review & Approval
JAH-Z2-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z2-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z2-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 13-Jul-25 27-Jul-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z2-EEL-190 ICT System Shop Drawings Review & Approval 4 22-Jul-25 27-Jul-25 ICT System Shop Drawings Review & Approval
JAH-Z2-EEL-150 Access Control system Shop Drawings Review & Approval 12 23-Jul-25 06-Aug-25 Access Control system Shop Drawings Review & Approval
JAH-Z2-EEL-170 Public Address system Shop Drawings Review & Approval 4 02-Aug-25 06-Aug-25 Public Address system Shop Drawings Review & Approval
JAH-Z2-EEL-130 Scada system Shop Drawings Review & Approval 12 03-Aug-25 17-Aug-25 Scada system Shop Drawings Review & Approval
JAH-Z2-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 13-Aug-25 27-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 88 25-May-25 07-Sep-25 07-Sep-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 60 25-May-25 05-Aug-25 05-Aug-25, FIRE FIGHTING
JAH-Z2-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 25-May-25 12-Jun-25 Firefighting system Shop Drawings Preparation & Submission
JAH-Z2-EM-110 Firefighting system Shop Drawings Review & Approval 12 22-Jul-25 05-Aug-25 Firefighting system Shop Drawings Review & Approval
JAH-Z2-EM-130 HVAC system Shop Drawings Review & Approval 12 24-Aug-25 07-Sep-25 HVAC system Shop Drawings Review & Approval
JAH-Z2-EM-150 Plumbing system Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Plumbing system Shop Drawings Review & Approval
Actual Work
Remaining Work
13 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission
D-Z2-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval
D-Z2-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission
D-Z2-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval
D-Z2-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-02
CULVERT-CIVIL- 40 28-Jan-24 14-Mar-24 14-Mar-24, DRY CULVERT-CIVIL-D-Z02-02
D-Z2-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-03
CULVERT-CIVIL- 40 08-Feb-24 26-Mar-24 26-Mar-24, DRY CULVERT-CIVIL-D-Z02-03
D-Z2-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-04
CULVERT-CIVIL- 40 20-Feb-24 07-Apr-24 07-Apr-24, DRY CULVERT-CIVIL-D-Z02-04
D-Z2-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-05
CULVERT-CIVIL- 40 03-Mar-24 22-Apr-24 22-Apr-24, DRY CULVERT-CIVIL-D-Z02-05
D-Z2-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-06
CULVERT-CIVIL- 40 14-Mar-24 04-May-24 04-May-24, DRY CULVERT-CIVIL-D-Z02-06
D-Z2-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Apr-24 20-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Mar-24 20-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-07
CULVERT-CIVIL- 40 26-Mar-24 15-May-24 15-May-24, DRY CULVERT-CIVIL-D-Z02-07
D-Z2-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Apr-24 01-May-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Apr-24 01-May-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-May-24 15-May-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-08
CULVERT-CIVIL- 40 12-Jul-25 26-Aug-25 26-Aug-25, DRY CULVERT-CIVIL-D-Z02-08
D-Z2-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Jul-25 27-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Jul-25 12-Aug-25 Concrete Dimension Shop Drawings Review & Approval
D-Z2-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Jul-25 12-Aug-25 Reinforcement Shop Drawings Preparation and submission
D-Z2-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Aug-25 26-Aug-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-09
CULVERT-CIVIL- 40 30-Jun-25 14-Aug-25 14-Aug-25, DRY CULVERT-CIVIL-D-Z02-09
Actual Work
Remaining Work
14 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Jun-25 15-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jul-25 31-Jul-25 Concrete Dimension Shop Drawings Review & Approval
D-Z2-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jul-25 31-Jul-25 Reinforcement Shop Drawings Preparation and submission
D-Z2-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Jul-25 14-Aug-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-10
CULVERT-CIVIL- 40 18-Jun-25 03-Aug-25 03-Aug-25, DRY CULVERT-CIVIL-D-Z02-10
D-Z2-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Jun-25 03-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Jul-25 20-Jul-25 Concrete Dimension Shop Drawings Review & Approval
D-Z2-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Jul-25 20-Jul-25 Reinforcement Shop Drawings Preparation and submission
D-Z2-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jul-25 03-Aug-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-11
CULVERT-CIVIL- 40 14-Dec-24 29-Jan-25 29-Jan-25, DRY CULVERT-CIVIL-D-Z02-11
D-Z2-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Dec-24 30-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jan-25 15-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z2-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Dec-24 15-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z2-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jan-25 29-Jan-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-12
CULVERT-CIVIL- 40 25-Dec-24 10-Feb-25 10-Feb-25, DRY CULVERT-CIVIL-D-Z02-12
D-Z2-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 25-Dec-24 11-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z2-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Jan-25 27-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z2-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jan-25 10-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-13
CULVERT-CIVIL- 40 29-Jul-24 14-Sep-24 14-Sep-24, DRY CULVERT-CIVIL-D-Z02-13
D-Z2-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Aug-24 31-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-14
CULVERT-CIVIL- 40 17-Jul-24 02-Sep-24 02-Sep-24, DRY CULVERT-CIVIL-D-Z02-14
D-Z2-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Aug-24 19-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-15
CULVERT-CIVIL- 40 06-Jul-24 21-Aug-24 21-Aug-24, DRY CULVERT-CIVIL-D-Z02-15
D-Z2-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-16
CULVERT-CIVIL- 40 24-Jun-24 10-Aug-24 10-Aug-24, DRY CULVERT-CIVIL-D-Z02-16
D-Z2-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Jul-24 27-Jul-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-17
CULVERT-CIVIL- 40 08-Jun-24 29-Jul-24 29-Jul-24, DRY CULVERT-CIVIL-D-Z02-17
D-Z2-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Jun-24 15-Jul-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-18
CULVERT-CIVIL- 40 27-May-24 17-Jul-24 17-Jul-24, DRY CULVERT-CIVIL-D-Z02-18
D-Z2-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
15 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jun-24 03-Jul-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Jun-24 03-Jul-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-19
CULVERT-CIVIL- 40 15-May-24 06-Jul-24 06-Jul-24, DRY CULVERT-CIVIL-D-Z02-19
D-Z2-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jun-24 22-Jun-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jun-24 22-Jun-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-20
CULVERT-CIVIL- 40 04-May-24 24-Jun-24 24-Jun-24, DRY CULVERT-CIVIL-D-Z02-20
D-Z2-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-May-24 05-Jun-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-May-24 05-Jun-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-21
CULVERT-CIVIL- 40 22-Apr-24 08-Jun-24 08-Jun-24, DRY CULVERT-CIVIL-D-Z02-21
D-Z2-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Apr-24 08-May-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-May-24 25-May-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-May-24 25-May-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-May-24 08-Jun-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z02-22
CULVERT-CIVIL- 40 07-Apr-24 27-May-24 27-May-24, DRY CULVERT-CIVIL-D-Z02-22
D-Z2-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z2-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-24 13-May-24 Concrete Dimension Shop Drawings Review & Approval
D-Z2-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Apr-24 13-May-24 Reinforcement Shop Drawings Preparation and submission
D-Z2-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval
D-Z2-EEP-ES.160 Earthing system Shop Drawings Review & Approval 30 10-Mar-25 19-Apr-25 Earthing system Shop Drawings Review & Approval
D-Z2-EEP-LS.110 Lighting system Shop Drawings Review & Approval 25 28-Oct-25 26-Nov-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 38 22-Oct-25 06-Dec-25 06-Dec-25, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z2-EEP-CTCRS. Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 22-Oct-25 26-Nov-25 Cable Tray/ Cable Routing system Shop Drawings Preparatio
D-Z2-EEP-CTCRS. Cable Tray/ Cable Routing system Shop Drawings Review & Approval 25 06-Nov-25 06-Dec-25 Cable Tray/ Cable Routing system Shop Drawings Review &
D-Z2-EEP-SPS.130 Small Power system Shop Drawings Review & Approval 30 22-Oct-25 26-Nov-25 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 32 13-Nov-25 21-Dec-25 21-Dec-25, POWER DISTRIBUTION
D-Z2-EEP-PD.100 Generator Shop Drawings Preparation & Submission 4 13-Nov-25 18-Nov-25 Generator Shop Drawings Preparation & Submission
D-Z2-EEP-PD.110 UPS Shop Drawings Preparation & Submission 4 13-Nov-25 18-Nov-25 UPS Shop Drawings Preparation & Submission
D-Z2-EEP-PD.120 MDBs Pannels Shop Drawings Preparation & Submission 4 22-Nov-25 26-Nov-25 MDBs Pannels Shop Drawings Preparation & Submission
D-Z2-EEP-PD.130 MCC Pannels Shop Drawings Preparation & Submission 4 30-Nov-25 04-Dec-25 MCC Pannels Shop Drawings Preparation & Submission
D-Z2-EEP-PD.140 SMSB Pannels Shop Drawings Preparation & Submission 4 22-Nov-25 26-Nov-25 SMSB Pannels Shop Drawings Preparation & Submission
D-Z2-EEP-PD.150 DB Pannels Shop Drawings Preparation & Submission 4 08-Dec-25 13-Dec-25 DB Pannels Shop Drawings Preparation & Submission
D-Z2-EEP-PD.160 Isolators Shop Drawings Preparation & Submission 4 30-Nov-25 04-Dec-25 Isolators Shop Drawings Preparation & Submission
D-Z2-EEP-PD.170 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 08-Dec-25 13-Dec-25 LCP /ELC Pannels Shop Drawings Preparation & Submiss
Actual Work
Remaining Work
16 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-EEP-PD.180 Generator Shop Drawings Review & Approval 7 18-Nov-25 26-Nov-25 Generator Shop Drawings Review & Approval
D-Z2-EEP-PD.190 UPS Shop Drawings Review & Approval 7 18-Nov-25 26-Nov-25 UPS Shop Drawings Review & Approval
D-Z2-EEP-PD.200 MDBs Shop Drawings Review & Approval 7 26-Nov-25 04-Dec-25 MDBs Shop Drawings Review & Approval
D-Z2-EEP-PD.210 MCCB Shop Drawings Review & Approval 7 04-Dec-25 13-Dec-25 MCCB Shop Drawings Review & Approval
D-Z2-EEP-PD.220 SMSB Shop Drawings Review & Approval 7 26-Nov-25 04-Dec-25 SMSB Shop Drawings Review & Approval
D-Z2-EEP-PD.230 DB Shop Drawings Review & Approval 7 13-Dec-25 21-Dec-25 DB Shop Drawings Review & Approval
D-Z2-EEP-PD.240 Isolator Shop Drawings Review & Approval 7 04-Dec-25 13-Dec-25 Isolator Shop Drawings Review & Approval
D-Z2-EEP-PD.250 LCP / ELC PannelsShop Drawings Review & Approval 7 13-Dec-25 21-Dec-25 LCP / ELC PannelsShop Drawings Review & Approval
D-Z2-EEL-FAS.110 Fire Alarm system Shop Drawings Review & Approval 12 13-Mar-25 27-Mar-25 Fire Alarm system Shop Drawings Review & Approval
ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 63 13-Jan-25 27-Mar-25 27-Mar-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
D-Z2-EEL-ICTS.18 ICT System Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 ICT System Shop Drawings Preparation & Submission
D-Z2-EEL-ICTS.19 ICT System Shop Drawings Review & Approval 4 23-Mar-25 27-Mar-25 ICT System Shop Drawings Review & Approval
D-Z2-EEL-ACS.15 Access Control system Shop Drawings Review & Approval 12 24-Mar-25 12-Apr-25 Access Control system Shop Drawings Review & Approval
RODDENT REPPELE
REPPELENT SYSTEM 45 15-Feb-25 12-Apr-25 12-Apr-25, RODDENT REPPELENT SYSTEM
D-Z2-EEL-RRS.160 Roddent Repplent system Shop Drawings Preparation & Submission 14 15-Feb-25 02-Mar-25 Roddent Repplent system Shop Drawings Preparation & Submission
D-Z2-EEL-RRS.170 Roddent Repplent system Shop Drawings Review & Approval 4 07-Apr-25 12-Apr-25 Roddent Repplent system Shop Drawings Review & Approval
D-Z2-EEL-SCADA Scada system Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Scada system Shop Drawings Review & Approval
D-Z2-EEL-RRBT.2 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
D-Z2-EM-FF.110 Firefighting system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Firefighting system Shop Drawings Review & Approval
D-Z2-EM-HVAC.13 HVAC system Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 HVAC system Shop Drawings Review & Approval
D-Z2-EM-PB.150 Plumbing system Shop Drawings Review & Approval 12 15-Aug-24 29-Aug-24 Plumbing system Shop Drawings Review & Approval
JAH-ENG-Z2WC-PW Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z2WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 18-Mar-25 08-Apr-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z2WC-GD Plan and Profile Shop Drawing Prepration &Submission 293 23-Aug-22 A 22-Mar-25 Plan and Profile Shop Drawing Prepration &Submission
Actual Work
Remaining Work
17 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-Z2-WC-CW Plan and Profile Shop Drawing Review & Approval 14 05-Mar-25 22-Mar-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z2WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 17-Feb-25 05-Mar-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z2WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 21-Apr-25 07-May-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z2WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 11-Jun-25 26-Jun-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z2-DU-EN-PW Review and approval power system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power system shopdrawings
JAH-Z2-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power fire detection & alarm system shopdrawings
JAH-Z7-DU-EN-PW Review and approval power system shopdrawings 11 03-Jun-25 19-Jun-25 Review and approval power system shopdrawings
JAH-Z7-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power fire detection & alarm system shopdrawings
JAH-ENG-Z2-R.165 Plan and Profile Shop Drawing Review & Approval 14 29-Jul-25 13-Aug-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z2-R.170 Road Cross Sections Shop Drawing Preparation & Submission 14 14-Aug-25 30-Aug-25 Road Cross Sections Shop Drawing Preparation & Submission
JAH-ENG-Z2-R.175 Road Cross Sections Shop Drawing Review & Approval 14 15-Sep-25 02-Oct-25 Road Cross Sections Shop Drawing Review & Approval
JAH-ENG-Z2-R.180 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 30-Aug-25 15-Sep-25 Guiding Signs and Marking Shop Drawing Preparation & Submissio
JAH-ENG-Z2-R.185 Guiding Signs and Marking Shop Drawing Review & Approval 14 15-Sep-25 02-Oct-25 Guiding Signs and Marking Shop Drawing Review & Approval
JAH-ENG-Z3-EX.770 Cross Section Shop Drawing Review & Approval 4 28-Dec-22 A 01-Jan-23 A Cross Section Shop Drawing Review & Approval
JAH-ENG-Z3-SI.775 Soil Improvement Design Preparation & Submission 9 01-Jun-23 A 11-Jun-23 A Soil Improvement Design Preparation & Submission
JAH-ENG-Z3-SI.780 Soil Improvement Design Review & Approval 5 12-Jun-23 A 17-Jun-23 A Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 224 16-Feb-23 A 18-Mar-24 18-Mar-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 93 21-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 93 21-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z3-EC.100 Plan and Profile Shop Drawings Preparation & Submission 81 21-Feb-23 A 09-Dec-23 Plan and Profile Shop Drawings Preparation & Submission
JAH-Z3-EC.110 Plan and Profile Shop Drawings Review & Approval 75 26-Feb-23 A 07-Dec-23 Plan and Profile Shop Drawings Review & Approval
JAH-Z3-EC.120 Builder work Shop Drawings Preparation and submission 10 10-Aug-23 A 21-Aug-23 A Builder work Shop Drawings Preparation and submission
JAH-Z3-EC.130 Builder work Shop Drawings Review & Approval 13 21-Aug-23 A 04-Sep-23 A Builder work Shop Drawings Review & Approval
Actual Work
Remaining Work
18 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 13-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Feb-24 05-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z3-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Mar-24 18-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z3-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-02-EC-120 Reinforcement Shop Drawings Preparation and submission 10 17-Jul-23 A 27-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 10-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-03-EC-120 Reinforcement Shop Drawings Preparation and submission 9 13-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-03-EC-130 Reinforcement Shop Drawings Review & Approval 14 23-Jul-23 A 07-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-04-EC-120 Reinforcement Shop Drawings Preparation and submission 10 15-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-04-EC-130 Reinforcement Shop Drawings Review & Approval 14 25-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-05-EC-120 Reinforcement Shop Drawings Preparation and submission 10 17-Jul-23 A 27-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 02-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-06-EC-120 Reinforcement Shop Drawings Preparation and submission 9 07-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-06-EC-130 Reinforcement Shop Drawings Review & Approval 4 17-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 11-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-07-EC-120 Reinforcement Shop Drawings Preparation and submission 61 09-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z3-07-EC-130 Reinforcement Shop Drawings Review & Approval 52 18-Mar-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z3-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 14-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-08-EC-120 Reinforcement Shop Drawings Preparation and submission 9 07-Aug-23 A 16-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-08-EC-130 Reinforcement Shop Drawings Review & Approval 11 16-Aug-23 A 28-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 12-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-09-EC-120 Reinforcement Shop Drawings Preparation and submission 9 20-Jul-23 A 30-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-09-EC-130 Reinforcement Shop Drawings Review & Approval 10 30-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 11-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
Actual Work
Remaining Work
19 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-10-EC-120 Reinforcement Shop Drawings Preparation and submission 74 16-Feb-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission
JAH-Z3-10-EC-130 Reinforcement Shop Drawings Review & Approval 66 22-Feb-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z3-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-11-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Jul-23 A 01-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-11-EC-130 Reinforcement Shop Drawings Review & Approval 10 01-Aug-23 A 12-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-12-EC-120 Reinforcement Shop Drawings Preparation and submission 4 29-Aug-23 A 02-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-12-EC-130 Reinforcement Shop Drawings Review & Approval 13 02-Sep-23 A 16-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 02-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-13-EC-120 Reinforcement Shop Drawings Preparation and submission 7 02-Sep-23 A 09-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-13-EC-130 Reinforcement Shop Drawings Review & Approval 8 09-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 55 04-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z3-14-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Sep-23 A 11-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z3-14-EC-130 Reinforcement Shop Drawings Review & Approval 6 11-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z3-EEP-160 Earthing system Shop Drawings Review & Approval 30 15-Sep-24 20-Oct-24 Earthing system Shop Drawings Review & Approval
JAH-Z3-EEP-110 Lighting system Shop Drawings Review & Approval 25 21-Sep-24 20-Oct-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 115 30-Sep-24 10-Feb-25 10-Feb-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z3-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 4 30-Sep-24 03-Oct-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z3-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 7 03-Feb-25 10-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z3-EEP-130 Small Power system Shop Drawings Review & Approval 30 05-Oct-24 07-Nov-24 Small Power system Shop Drawings Review & Approval
JAH-Z3-EEP-180 Generator Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 Generator Shop Drawings Review & Approval
JAH-Z3-EEP-190 UPS Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 UPS Shop Drawings Preparation & Submission
JAH-Z3-EEP-200 UPS Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 UPS Shop Drawings Review & Approval
JAH-Z3-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z3-EEP-220 MDBs Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 MDBs Shop Drawings Review & Approval
JAH-Z3-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z3-EEP-240 MCCB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 MCCB Shop Drawings Review & Approval
JAH-Z3-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 SMSB Pannels Shop Drawings Preparation & Submission
Actual Work
Remaining Work
20 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-EEP-260 SMSB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 SMSB Shop Drawings Review & Approval
JAH-Z3-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 DB Pannels Shop Drawings Preparation & Submission
JAH-Z3-EEP-280 DB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 DB Shop Drawings Review & Approval
JAH-Z3-EEP-290 Isolators Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 Isolators Shop Drawings Preparation & Submission
JAH-Z3-EEP-300 Isolator Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 Isolator Shop Drawings Review & Approval
JAH-Z3-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z3-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 LCP / ELC PannelsShop Drawings Review & Approval
LOW CURRENT SYSTEM 170 06-Aug-24 22-Feb-25 22-Feb-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 65 06-Aug-24 22-Oct-24 22-Oct-24, FIRE ALARM SYSTEM
JAH-Z3-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Fire Alarm system Shop Drawings Preparation & Submission
JAH-Z3-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 09-Oct-24 22-Oct-24 Fire Alarm system Shop Drawings Review & Approval
JAH-Z3-EEL-190 ICT System Shop Drawings Review & Approval 4 29-Oct-24 02-Nov-24 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 47 08-Sep-24 02-Nov-24 02-Nov-24, ACCESS CONTROL SYSTEM
JAH-Z3-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 08-Sep-24 25-Sep-24 Access Control system Shop Drawings Preparation & Submission
JAH-Z3-EEL-150 Access Control system Shop Drawings Review & Approval 12 20-Oct-24 02-Nov-24 Access Control system Shop Drawings Review & Approval
JAH-Z3-EEL-170 Public Address system Shop Drawings Review & Approval 4 29-Oct-24 02-Nov-24 Public Address system Shop Drawings Review & Approval
JAH-Z3-EEL-130 Scada system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Scada system Shop Drawings Review & Approval
JAH-Z3-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 09-Feb-25 22-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z3-EM-110 Firefighting system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Firefighting system Shop Drawings Review & Approval
JAH-Z3-EM-130 HVAC system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 HVAC system Shop Drawings Review & Approval
JAH-Z3-EM-150 Plumbing system Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Plumbing system Shop Drawings Review & Approval
JAH-ENG-Z3WC-PW Plan and Profile Shop Drawing Prepration &Submission 30 12-Dec-24 15-Jan-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z3WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 17-Oct-24 03-Nov-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z3WC-GD Plan and Profile Shop Drawing Prepration &Submission 30 15-Oct-24 18-Nov-24 Plan and Profile Shop Drawing Prepration &Submission
Actual Work
Remaining Work
21 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-Z3WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 17-Oct-24 03-Nov-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z3WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 16-Nov-24 02-Dec-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z3WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 19-Feb-25 08-Mar-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z3-DU-EN-PWR Review and approval power system shopdrawings 11 23-Nov-24 05-Dec-24 Review and approval power system shopdrawings
JAH-ENG-Z3-R.195 Plan and Profile Shop Drawing Review & Approval 14 10-Feb-25 26-Feb-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z3-R.200 Road Cross Sections Shop Drawing Preparation & Submission 14 26-Feb-25 15-Mar-25 Road Cross Sections Shop Drawing Preparation & Submission
JAH-ENG-Z3-R.205 Road Cross Sections Shop Drawing Review & Approval 14 05-Apr-25 20-Apr-25 Road Cross Sections Shop Drawing Review & Approval
JAH-ENG-Z3-R.210 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 15-Mar-25 05-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission
JAH-ENG-Z3-R.215 Guiding Signs and Marking Shop Drawing Review & Approval 14 05-Apr-25 20-Apr-25 Guiding Signs and Marking Shop Drawing Review & Approval
JAH-ENG-Z4-EX.780 Cross Section Shop Drawing Review & Approval 5 01-Jan-23 A 05-Jan-23 A Cross Section Shop Drawing Review & Approval
JAH-ENG-Z4-SI.785 Soil Improvement Design Preparation & Submission 9 01-Jun-23 A 11-Jun-23 A Soil Improvement Design Preparation & Submission
JAH-ENG-Z4-SI.790 Soil Improvement Design Review & Approval 6 11-Jun-23 A 17-Jun-23 A Soil Improvement Design Review & Approval
JAH-Z4-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval
JAH-Z4-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission
JAH-Z4-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval
JAH-Z4-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 06-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-01-EC-120 Reinforcement Shop Drawings Preparation and submission 12 13-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z4-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-Aug-23 A 15-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-02-EC-120 Reinforcement Shop Drawings Preparation and submission 13 05-Sep-23 A 19-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z4-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 12-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-03-EC-120 Reinforcement Shop Drawings Preparation and submission 12 12-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Preparation and submission
Actual Work
Remaining Work
22 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Feb-24 06-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-24 06-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Sep-26 03-Oct-26 Concrete Dimension Shop
JAH-Z4-07-EC-120 Reinforcement Shop Drawings Preparation and submission 12 14-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z4-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Aug-23 A 21-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-08-EC-120 Reinforcement Shop Drawings Preparation and submission 12 13-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z4-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-09-EC-120 Reinforcement Shop Drawings Preparation and submission 13 29-Aug-23 A 12-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-09-EC-130 Reinforcement Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 07-Aug-23 A 21-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-10-EC-120 Reinforcement Shop Drawings Preparation and submission 11 31-Aug-23 A 12-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-10-EC-130 Reinforcement Shop Drawings Review & Approval 9 14-Sep-23 A 25-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 03-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-11-EC-120 Reinforcement Shop Drawings Preparation and submission 13 28-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-11-EC-130 Reinforcement Shop Drawings Review & Approval 9 11-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 03-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-12-EC-120 Reinforcement Shop Drawings Preparation and submission 13 27-Aug-23 A 10-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-12-EC-130 Reinforcement Shop Drawings Review & Approval 9 11-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
23 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z04-13 58 20-Jul-23 A 26-Sep-23 A 26-Sep-23 A, CIVIL-SEG-J-Z04-13
JAH-Z4-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 20-Jul-23 A 03-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z4-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 03-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-13-EC-120 Reinforcement Shop Drawings Preparation and submission 13 02-Sep-23 A 16-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-13-EC-130 Reinforcement Shop Drawings Review & Approval 9 16-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 1 23-Aug-23 A 23-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-14-EC-120 Reinforcement Shop Drawings Preparation and submission 12 10-Sep-23 A 24-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-14-EC-130 Reinforcement Shop Drawings Review & Approval 6 04-Dec-23 10-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z4-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 1 28-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-15-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-15-EC-130 Reinforcement Shop Drawings Review & Approval 7 25-Jul-23 A 01-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-16-EC-120 Reinforcement Shop Drawings Preparation and submission 13 26-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-16-EC-130 Reinforcement Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Dec-23 16-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-17-EC-120 Reinforcement Shop Drawings Preparation and submission 13 02-Jul-23 A 16-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-17-EC-130 Reinforcement Shop Drawings Review & Approval 8 17-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 16-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-18-EC-120 Reinforcement Shop Drawings Preparation and submission 13 04-Jul-23 A 18-Jul-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z4-18-EC-130 Reinforcement Shop Drawings Review & Approval 9 19-Jul-23 A 29-Jul-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z4-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-24 06-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-24 06-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-24 20-Feb-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
24 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-24 07-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z4-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Feb-24 24-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z4-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z4-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z4-EEP-160 Earthing system Shop Drawings Review & Approval 30 04-May-25 10-Jun-25 Earthing system Shop Drawings Review & Approval
JAH-Z4-EEP-110 Lighting system Shop Drawings Review & Approval 25 10-May-25 10-Jun-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 18-May-25 24-Jun-25 24-Jun-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z4-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 18-May-25 24-Jun-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z4-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 18-May-25 24-Jun-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z4-EEP-130 Small Power system Shop Drawings Review & Approval 30 22-May-25 29-Jun-25 Small Power system Shop Drawings Review & Approval
JAH-Z4-EEP-180 Generator Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 Generator Shop Drawings Review & Approval
JAH-Z4-EEP-190 UPS Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 UPS Shop Drawings Preparation & Submission
JAH-Z4-EEP-200 UPS Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 UPS Shop Drawings Review & Approval
JAH-Z4-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 30-Sep-26 17-Oct-26 MDBs Pannels Shop Dr
JAH-Z4-EEP-220 MDBs Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 MDBs Shop Drawings Review & Approval
JAH-Z4-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z4-EEP-240 MCCB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 MCCB Shop Drawings Review & Approval
JAH-Z4-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z4-EEP-260 SMSB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 SMSB Shop Drawings Review & Approval
JAH-Z4-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z4-EEP-280 DB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 DB Shop Drawings Review & Approval
JAH-Z4-EEP-290 Isolators Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 Isolators Shop Drawings Preparation & Submission
JAH-Z4-EEP-300 Isolator Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 Isolator Shop Drawings Review & Approval
JAH-Z4-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z4-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval
Actual Work
Remaining Work
25 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
FIRE ALARM SYSTEM 77 16-Mar-25 22-Jun-25 22-Jun-25, FIRE ALARM SYSTEM
JAH-Z4-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Fire Alarm system Shop Drawings Preparation & Submission
JAH-Z4-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 09-Jun-25 22-Jun-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z4-EEL-190 ICT System Shop Drawings Review & Approval 4 29-Jun-25 02-Jul-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 59 22-Apr-25 02-Jul-25 02-Jul-25, ACCESS CONTROL SYSTEM
JAH-Z4-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 22-Apr-25 08-May-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z4-EEL-150 Access Control system Shop Drawings Review & Approval 12 19-Jun-25 02-Jul-25 Access Control system Shop Drawings Review & Approval
JAH-Z4-EEL-170 Public Address system Shop Drawings Review & Approval 4 29-Jun-25 02-Jul-25 Public Address system Shop Drawings Review & Approval
JAH-Z4-EEL-130 Scada system Shop Drawings Review & Approval 12 19-Jun-25 02-Jul-25 Scada system Shop Drawings Review & Approval
JAH-Z4-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 30-Jun-25 13-Jul-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z4-EM-110 Firefighting system Shop Drawings Review & Approval 12 15-Jul-25 28-Jul-25 Firefighting system Shop Drawings Review & Approval
JAH-Z4-EM-130 HVAC system Shop Drawings Review & Approval 12 25-Jun-25 08-Jul-25 HVAC system Shop Drawings Review & Approval
JAH-Z4-EM-150 Plumbing system Shop Drawings Review & Approval 12 02-Jul-25 15-Jul-25 Plumbing system Shop Drawings Review & Approval
JAH-ENG-Z4WC-PW Plan and Profile Shop Drawing Prepration &Submission 7 19-Jun-25 28-Jun-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z4WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z4WC-GD Plan and Profile Shop Drawing Prepration &Submission 30 02-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z4WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z4WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z4WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 01-Nov-25 17-Nov-25 Plan and Profile Shop Drawing Prepration &Submission
Actual Work
Remaining Work
26 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-DU-EN-PWR Prepare and submit power system shopdrawings 20 21-Jun-25 14-Jul-25 Prepare and submit power system shopdrawings
JAH-Z4-DU-EN-PWR Review and approval power system shopdrawings 11 14-Jul-25 27-Jul-25 Review and approval power system shopdrawings
JAH-ENG-Z4-R.225 Plan and Profile Shop Drawing Review & Approval 14 22-Oct-25 08-Nov-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z4-R.230 Road Cross Sections Shop Drawing Preparation & Submission 14 08-Nov-25 24-Nov-25 Road Cross Sections Shop Drawing Preparation & Submissio
JAH-ENG-Z4-R.235 Road Cross Sections Shop Drawing Review & Approval 14 10-Dec-25 25-Dec-25 Road Cross Sections Shop Drawing Review & Approval
JAH-ENG-Z4-R.240 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 24-Nov-25 10-Dec-25 Guiding Signs and Marking Shop Drawing Preparation & S
JAH-ENG-Z4-R.245 Guiding Signs and Marking Shop Drawing Review & Approval 14 10-Dec-25 25-Dec-25 Guiding Signs and Marking Shop Drawing Review & Ap
JAH-ENG-Z5-EX.790 Cross Section Shop Drawing Review & Approval 14 13-Jan-24 28-Jan-24 Cross Section Shop Drawing Review & Approval
JAH-ENG-Z5-SH.805 Shoring Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Shoring Design Preparation & Submission
JAH-ENG-Z5-SH.810 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval
JAH-ENG-Z5-SI.795 Soil Improvement Design Preparation & Submission 14 11-Jan-24 28-Jan-24 Soil Improvement Design Preparation & Submission
JAH-ENG-Z5-SI.800 Soil Improvement Design Review & Approval 14 28-Jan-24 12-Feb-24 Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 321 02-Dec-23 18-Dec-24 18-Dec-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z5-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission
JAH-Z5-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval
JAH-Z5-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission
JAH-Z5-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval
JAH-Z5-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Feb-24 06-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-24 06-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Mar-24 14-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Mar-24 14-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
27 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z05-05 40 26-Mar-24 15-May-24 15-May-24, CIVIL-SEG-J-Z05-05
JAH-Z5-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z5-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Apr-24 01-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Apr-24 01-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-May-24 15-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-May-24 06-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-May-24 06-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jun-24 29-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jul-24 16-Jul-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Jul-24 03-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Aug-24 20-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Aug-24 20-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Aug-24 07-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
28 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z5-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Aug-24 08-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z5-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Sep-24 25-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Sep-24 25-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Sep-24 09-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Sep-24 13-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Oct-24 27-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Oct-24 30-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Oct-24 30-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Oct-24 13-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 17-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Nov-24 01-Dec-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Nov-24 04-Dec-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z5-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Nov-24 04-Dec-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z5-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Dec-24 18-Dec-24 Reinforcement Shop Drawings Review & Approval
JAH-Z5-EEP-160 Earthing system Shop Drawings Review & Approval 30 25-Jun-25 30-Jul-25 Earthing system Shop Drawings Review & Approval
JAH-Z5-EEP-110 Lighting system Shop Drawings Review & Approval 27 29-Jun-25 30-Jul-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 07-Jul-25 11-Aug-25 11-Aug-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z5-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 07-Jul-25 11-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submis
JAH-Z5-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 07-Jul-25 11-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z5-EEP-130 Small Power system Shop Drawings Review & Approval 30 09-Jul-25 13-Aug-25 Small Power system Shop Drawings Review & Approval
JAH-Z5-EEP-180 Generator Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 Generator Shop Drawings Review & Approval
JAH-Z5-EEP-190 UPS Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 UPS Shop Drawings Preparation & Submission
JAH-Z5-EEP-200 UPS Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 UPS Shop Drawings Review & Approval
JAH-Z5-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z5-EEP-220 MDBs Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 MDBs Shop Drawings Review & Approval
JAH-Z5-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 MCC Pannels Shop Drawings Preparation & Submission
Actual Work
Remaining Work
29 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z5-EEP-240 MCCB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 MCCB Shop Drawings Review & Approval
JAH-Z5-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z5-EEP-260 SMSB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 SMSB Shop Drawings Review & Approval
JAH-Z5-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z5-EEP-280 DB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 DB Shop Drawings Review & Approval
JAH-Z5-EEP-290 Isolators Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 Isolators Shop Drawings Preparation & Submission
JAH-Z5-EEP-300 Isolator Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 Isolator Shop Drawings Review & Approval
JAH-Z5-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z5-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 LCP / ELC PannelsShop Drawings Review & Approval
LOW CURRENT SYSTEM 104 17-Apr-25 20-Aug-25 20-Aug-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 95 17-Apr-25 10-Aug-25 10-Aug-25, FIRE ALARM SYSTEM
JAH-Z5-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 17-Apr-25 03-May-25 Fire Alarm system Shop Drawings Preparation & Submission
JAH-Z5-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z5-EEL-190 ICT System Shop Drawings Review & Approval 4 16-Aug-25 20-Aug-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 77 19-May-25 20-Aug-25 20-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z5-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-May-25 04-Jun-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z5-EEL-150 Access Control system Shop Drawings Review & Approval 12 06-Aug-25 20-Aug-25 Access Control system Shop Drawings Review & Approval
JAH-Z5-EEL-170 Public Address system Shop Drawings Review & Approval 4 16-Aug-25 20-Aug-25 Public Address system Shop Drawings Review & Approval
JAH-Z5-EEL-130 Scada system Shop Drawings Review & Approval 12 06-Aug-25 20-Aug-25 Scada system Shop Drawings Review & Approval
JAH-Z5-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z5-EM-110 Firefighting system Shop Drawings Review & Approval 12 05-Aug-25 19-Aug-25 Firefighting system Shop Drawings Review & Approval
JAH-Z5-EM-130 HVAC system Shop Drawings Review & Approval 12 10-Aug-25 24-Aug-25 HVAC system Shop Drawings Review & Approval
JAH-Z5-EM-150 Plumbing system Shop Drawings Review & Approval 12 12-Jul-25 26-Jul-25 Plumbing system Shop Drawings Review & Approval
JAH-ENG-Z5WC-PW Plan and Profile Shop Drawing Prepration &Submission 14 17-Jul-25 03-Aug-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z5WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 12-Jul-25 28-Jul-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z5WC-GD Plan and Profile Shop Drawing Prepration &Submission 14 20-Oct-25 05-Nov-25 Plan and Profile Shop Drawing Prepration &Submission
Actual Work
Remaining Work
30 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CHILLED WATER SUPPLY
SUPPL & RETURN NETWORK 28 16-Aug-25 17-Sep-25 17-Sep-25, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z5-WC-CW Plan and Profile Shop Drawing Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z5WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 16-Aug-25 01-Sep-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z5WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 16-Aug-25 01-Sep-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z5WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 20-Oct-25 05-Nov-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 24-Aug-25 06-Sep-25 Review and approval power system shopdrawings
JAH-Z7-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 27-Aug-25 09-Sep-25 Review and approval power fire detection & alarm system shopdrawin
JAH-ENG-Z5-R.255 Plan and Profile Shop Drawing Review & Approval 14 24-Dec-25 10-Jan-26 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z5-R.260 Road Cross Sections Shop Drawing Preparation & Submission 14 10-Jan-26 26-Jan-26 Road Cross Sections Shop Drawing Preparation & Su
JAH-ENG-Z5-R.265 Road Cross Sections Shop Drawing Review & Approval 14 11-Feb-26 28-Feb-26 Road Cross Sections Shop Drawing Review & Ap
JAH-ENG-Z5-R.270 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 26-Jan-26 11-Feb-26 Guiding Signs and Marking Shop Drawing Preparati
JAH-ENG-Z5-R.275 Guiding Signs and Marking Shop Drawing Review & Approval 14 11-Feb-26 28-Feb-26 Guiding Signs and Marking Shop Drawing Review
JAH-ENG-Z6-EX.800 Cross Section Shop Drawing Review & Approval 7 25-Oct-22 A 01-Nov-22 A Cross Section Shop Drawing Review & Approval
JAH-ENG-Z6-SH.815 Shoring Design Preparation & Submission 24 27-Apr-23 A 24-May-23 A Shoring Design Preparation & Submission
JAH-ENG-Z6-SH.820 Shoring Design Review & Approval 25 09-May-23 A 06-Jun-23 A Shoring Design Review & Approval
JAH-ENG-Z6-SI.805 Soil Improvement Design Preparation & Submission 129 04-Mar-23 A 07-Aug-23 A Soil Improvement Design Preparation & Submission
JAH-ENG-Z6-SI.810 Soil Improvement Design Review & Approval 129 18-Mar-23 A 21-Aug-23 A Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 626 01-Aug-22 A 17-Aug-24 17-Aug-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 437 01-Aug-22 A 31-Dec-23 31-Dec-23, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 437 01-Aug-22 A 31-Dec-23 31-Dec-23, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z6-EC.100 Plan and Profile Shop Drawings Preparation & Submission 326 01-Aug-22 A 22-Aug-23 A Plan and Profile Shop Drawings Preparation & Submission
JAH-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 19 14-Aug-22 A 04-Sep-22 A Plan and Profile Shop Drawings Review & Approval
JAH-Z6-EC.120 Builder work Shop Drawings Preparation and submission 14 02-Dec-23 17-Dec-23 Builder work Shop Drawings Preparation and submission
JAH-Z6-EC.130 Builder work Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 Builder work Shop Drawings Review & Approval
JAH-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
31 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-24 19-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-24 04-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Mar-24 25-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-24 19-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-24 04-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Mar-24 25-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Apr-24 02-May-24 Concrete Dimension Shop Drawings Review & Approval
Actual Work
Remaining Work
32 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Apr-24 02-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-May-24 16-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-May-24 06-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-May-24 06-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Jun-24 29-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Jul-24 16-Jul-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Jun-24 16-Jul-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jul-24 03-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval
JAH-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 30 09-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval
JAH-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 25 08-Mar-25 10-Apr-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 11-Mar-25 20-Apr-25 20-Apr-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 11-Mar-25 20-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 11-Mar-25 20-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 30 11-Mar-25 20-Apr-25 Small Power system Shop Drawings Review & Approval
JAH-Z6-EEP-180 Generator Shop Drawings Review & Approval 7 26-Apr-25 04-May-25 Generator Shop Drawings Review & Approval
JAH-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 4 29-Apr-25 04-May-25 UPS Shop Drawings Preparation & Submission
JAH-Z6-EEP-200 UPS Shop Drawings Review & Approval 7 04-May-25 12-May-25 UPS Shop Drawings Review & Approval
JAH-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 05-May-25 10-May-25 MDBs Pannels Shop Drawings Preparation & Submission
Actual Work
Remaining Work
33 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-EEP-220 MDBs Shop Drawings Review & Approval 7 10-May-25 18-May-25 MDBs Shop Drawings Review & Approval
JAH-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 13-May-25 18-May-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z6-EEP-240 MCCB Shop Drawings Review & Approval 7 18-May-25 26-May-25 MCCB Shop Drawings Review & Approval
JAH-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 21-May-25 26-May-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z6-EEP-260 SMSB Shop Drawings Review & Approval 7 26-May-25 03-Jun-25 SMSB Shop Drawings Review & Approval
JAH-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 27-May-25 01-Jun-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z6-EEP-280 DB Shop Drawings Review & Approval 7 01-Jun-25 12-Jun-25 DB Shop Drawings Review & Approval
JAH-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 4 02-Jun-25 10-Jun-25 Isolators Shop Drawings Preparation & Submission
JAH-Z6-EEP-300 Isolator Shop Drawings Review & Approval 7 10-Jun-25 18-Jun-25 Isolator Shop Drawings Review & Approval
JAH-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 11-Jun-25 16-Jun-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 16-Jun-25 24-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 06-Apr-25 20-Apr-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 26-Apr-25 30-Apr-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 68 06-Feb-25 30-Apr-25 30-Apr-25, ACCESS CONTROL SYSTEM
JAH-Z6-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 06-Feb-25 22-Feb-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Access Control system Shop Drawings Review & Approval
JAH-Z6-EEL-170 Public Address system Shop Drawings Review & Approval 4 26-Apr-25 30-Apr-25 Public Address system Shop Drawings Review & Approval
JAH-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Scada system Shop Drawings Review & Approval
JAH-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Firefighting system Shop Drawings Review & Approval
JAH-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 19-May-25 02-Jun-25 HVAC system Shop Drawings Review & Approval
JAH-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 26-May-25 12-Jun-25 Plumbing system Shop Drawings Review & Approval
W-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 170 05-Feb-23 A 28-Aug-23 A Plan and Profile Shop Drawings Review & Approval
W-Z6-EC.120 Builder work Shop Drawings Preparation and submission 86 20-Nov-23 A 20-Jan-24 Builder work Shop Drawings Preparation and submission
W-Z6-EC.130 Builder work Shop Drawings Review & Approval 86 14-Dec-22 A 07-Dec-23 Builder work Shop Drawings Review & Approval
Actual Work
Remaining Work
34 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL/SEGMENT WISE 1142 17-Jan-23 A 17-Oct-26 17-Oct-26, CIVIL/SEGM
WET CULVERT-CIVIL-W-Z06-01
CULVERT-CIVIL- 40 11-Mar-24 29-Apr-24 29-Apr-24, WET CULVERT-CIVIL-W-Z06-01
W-Z6-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Mar-24 27-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
W-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-02
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-02
W-Z6-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 7 10-May-23 A 17-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 8 17-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-03
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-03
W-Z6-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 30-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 7 11-May-23 A 18-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-04
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-04
W-Z6-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 29-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 16 01-May-23 A 18-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-05
CULVERT-CIVIL- 350 26-Apr-23 A 19-Jun-24 19-Jun-24, WET CULVERT-CIVIL-W-Z06-05
W-Z6-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 26-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 23 04-May-23 A 30-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-May-24 02-Jun-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jun-24 19-Jun-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-06
CULVERT-CIVIL- 360 26-Apr-23 A 01-Jul-24 01-Jul-24, WET CULVERT-CIVIL-W-Z06-06
W-Z6-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 26-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 04-May-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-May-24 13-Jun-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Jun-24 01-Jul-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-07
CULVERT-CIVIL- 26 21-Apr-23 A 24-May-23 A 24-May-23 A, WET CULVERT-CIVIL-W-Z06-07
W-Z6-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 21-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 30-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 6 11-May-23 A 17-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 7 17-May-23 A 24-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-08
CULVERT-CIVIL- 381 22-Apr-23 A 24-Jul-24 24-Jul-24, WET CULVERT-CIVIL-W-Z06-08
W-Z6-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 30-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Jun-24 11-Jul-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Jul-24 24-Jul-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-09
CULVERT-CIVIL- 78 05-Jun-23 A 06-Sep-23 A 06-Sep-23 A, WET CULVERT-CIVIL-W-Z06-09
W-Z6-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 21-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 29-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 7 05-Jun-23 A 12-Jun-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
35 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
WET CULVERT-CIVIL-W-Z06-10
CULVERT-CIVIL- 15 21-Apr-23 A 11-May-23 A 11-May-23 A, WET CULVERT-CIVIL-W-Z06-10
W-Z6-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 21-Apr-23 A 30-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 5 01-May-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 8 03-May-23 A 11-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-11
CULVERT-CIVIL- 15 22-Apr-23 A 11-May-23 A 11-May-23 A, WET CULVERT-CIVIL-W-Z06-11
W-Z6-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 30-Apr-23 A 10-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 9 02-May-23 A 11-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-12
CULVERT-CIVIL- 16 22-Apr-23 A 13-May-23 A 13-May-23 A, WET CULVERT-CIVIL-W-Z06-12
W-Z6-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 30-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 10 02-May-23 A 13-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-13
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-13
W-Z6-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 22-Apr-23 A 30-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 01-May-23 A 09-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 11 10-May-23 A 22-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 4 22-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-14
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-14
W-Z6-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 17 02-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-15
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-15
W-Z6-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 6 26-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 17 02-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-16
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-16
W-Z6-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 9 01-May-23 A 10-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 10 10-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-17
CULVERT-CIVIL- 1070 11-Apr-23 A 17-Oct-26 17-Oct-26, WET CULVE
W-Z6-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 4 12-Oct-26 17-Oct-26 Concrete Dimension Sho
W-Z6-17-EC-120 Reinforcement Shop Drawings Preparation and submission 8 01-May-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-17-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-18
CULVERT-CIVIL- 22 11-Apr-23 A 09-May-23 A 09-May-23 A, WET CULVERT-CIVIL-W-Z06-18
W-Z6-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 4 19-Apr-23 A 26-Apr-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-18-EC-120 Reinforcement Shop Drawings Preparation and submission 13 23-Apr-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-18-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-19
CULVERT-CIVIL- 22 11-Apr-23 A 09-May-23 A 09-May-23 A, WET CULVERT-CIVIL-W-Z06-19
Actual Work
Remaining Work
36 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 5 18-Apr-23 A 26-Apr-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-19-EC-120 Reinforcement Shop Drawings Preparation and submission 11 27-Apr-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-19-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-20
CULVERT-CIVIL- 22 12-Apr-23 A 10-May-23 A 10-May-23 A, WET CULVERT-CIVIL-W-Z06-20
W-Z6-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-20-EC-120 Reinforcement Shop Drawings Preparation and submission 5 04-May-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-20-EC-130 Reinforcement Shop Drawings Review & Approval 2 09-May-23 A 10-May-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-21
CULVERT-CIVIL- 260 11-Apr-23 A 15-Feb-24 15-Feb-24, WET CULVERT-CIVIL-W-Z06-21
W-Z6-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 11-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jan-24 03-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-22
CULVERT-CIVIL- 165 19-Jan-23 A 06-Aug-23 A 06-Aug-23 A, WET CULVERT-CIVIL-W-Z06-22
W-Z6-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-22-EC-120 Reinforcement Shop Drawings Preparation and submission 7 23-Jul-23 A 30-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-22-EC-130 Reinforcement Shop Drawings Review & Approval 6 31-Jul-23 A 06-Aug-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-23
CULVERT-CIVIL- 167 19-Jan-23 A 08-Aug-23 A 08-Aug-23 A, WET CULVERT-CIVIL-W-Z06-23
W-Z6-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-23-EC-120 Reinforcement Shop Drawings Preparation and submission 7 16-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-23-EC-130 Reinforcement Shop Drawings Review & Approval 14 24-Jul-23 A 08-Aug-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-24
CULVERT-CIVIL- 170 19-Jan-23 A 12-Aug-23 A 12-Aug-23 A, WET CULVERT-CIVIL-W-Z06-24
W-Z6-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-24-EC-120 Reinforcement Shop Drawings Preparation and submission 7 16-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-24-EC-130 Reinforcement Shop Drawings Review & Approval 18 23-Jul-23 A 12-Aug-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-25
CULVERT-CIVIL- 29 07-Aug-23 A 09-Sep-23 A 09-Sep-23 A, WET CULVERT-CIVIL-W-Z06-25
W-Z6-25-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 14-Aug-23 A 24-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 26-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-25-EC-120 Reinforcement Shop Drawings Preparation and submission 21 07-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-25-EC-130 Reinforcement Shop Drawings Review & Approval 9 30-Aug-23 A 09-Sep-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-26
CULVERT-CIVIL- 23 14-Aug-23 A 09-Sep-23 A 09-Sep-23 A, WET CULVERT-CIVIL-W-Z06-26
W-Z6-26-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 14-Aug-23 A 24-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 26-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-26-EC-120 Reinforcement Shop Drawings Preparation and submission 8 22-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-26-EC-130 Reinforcement Shop Drawings Review & Approval 9 30-Aug-23 A 09-Sep-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-27
CULVERT-CIVIL- 140 17-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-27
W-Z6-27-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 17-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-27-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-27-EC-120 Reinforcement Shop Drawings Preparation and submission 7 13-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-27-EC-130 Reinforcement Shop Drawings Review & Approval 11 20-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-28
CULVERT-CIVIL- 136 22-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-28
W-Z6-28-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 22-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
37 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-28-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-28-EC-120 Reinforcement Shop Drawings Preparation and submission 7 13-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-28-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-29
CULVERT-CIVIL- 40 01-Jan-24 15-Feb-24 15-Feb-24, WET CULVERT-CIVIL-W-Z06-29
W-Z6-29-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Jan-24 17-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-29-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z6-29-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jan-24 03-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-29-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-30
CULVERT-CIVIL- 40 13-Jan-24 27-Feb-24 27-Feb-24, WET CULVERT-CIVIL-W-Z06-30
W-Z6-30-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Jan-24 29-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-30-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-Jan-24 14-Feb-24 Concrete Dimension Shop Drawings Review & Approval
W-Z6-30-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Jan-24 14-Feb-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-30-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Feb-24 27-Feb-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-31
CULVERT-CIVIL- 138 19-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-31
W-Z6-31-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-31-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-31-EC-120 Reinforcement Shop Drawings Preparation and submission 6 14-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-31-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-32
CULVERT-CIVIL- 138 19-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-32
W-Z6-32-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-32-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-32-EC-120 Reinforcement Shop Drawings Preparation and submission 6 14-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-32-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-33
CULVERT-CIVIL- 155 18-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-33
W-Z6-33-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 18-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-33-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-33-EC-120 Reinforcement Shop Drawings Preparation and submission 7 04-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-33-EC-130 Reinforcement Shop Drawings Review & Approval 11 12-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-34
CULVERT-CIVIL- 155 18-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-34
W-Z6-34-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 18-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-34-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-34-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-34-EC-130 Reinforcement Shop Drawings Review & Approval 11 12-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-35
CULVERT-CIVIL- 25 03-Jul-23 A 31-Jul-23 A 31-Jul-23 A, WET CULVERT-CIVIL-W-Z06-35
W-Z6-35-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 03-Jul-23 A 12-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-35-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Jul-23 A 24-Jul-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-35-EC-120 Reinforcement Shop Drawings Preparation and submission 8 09-Jul-23 A 17-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-35-EC-130 Reinforcement Shop Drawings Review & Approval 6 25-Jul-23 A 31-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-36
CULVERT-CIVIL- 156 17-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-36
W-Z6-36-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 17-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-36-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 24-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval
W-Z6-36-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission
W-Z6-36-EC-130 Reinforcement Shop Drawings Review & Approval 7 17-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-37
CULVERT-CIVIL- 40 23-Mar-24 11-May-24 11-May-24, WET CULVERT-CIVIL-W-Z06-37
W-Z6-37-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-37-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Concrete Dimension Shop Drawings Review & Approval
Actual Work
Remaining Work
38 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-37-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Apr-24 28-Apr-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-37-EC-130 Reinforcement Shop Drawings Review & Approval 12 28-Apr-24 11-May-24 Reinforcement Shop Drawings Review & Approval
WET CULVERT-CIVIL-W-Z06-38
CULVERT-CIVIL- 40 03-Apr-24 22-May-24 22-May-24, WET CULVERT-CIVIL-W-Z06-38
W-Z6-38-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
W-Z6-38-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Apr-24 09-May-24 Concrete Dimension Shop Drawings Review & Approval
W-Z6-38-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Apr-24 09-May-24 Reinforcement Shop Drawings Preparation and submission
W-Z6-38-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-May-24 22-May-24 Reinforcement Shop Drawings Review & Approval
W-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 30 09-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval
W-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 25 25-Jun-24 23-Jul-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 29-Jun-24 01-Aug-24 01-Aug-24, CABLE TRAY /CABLE ROUTING SYSTEM
W-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 29-Jun-24 01-Aug-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
W-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 29-Jun-24 01-Aug-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
W-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 30 10-Jul-24 13-Aug-24 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 16 21-Jul-24 07-Aug-24 07-Aug-24, POWER DISTRIBUTION
W-Z6-EEP-170 Generator Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 Generator Shop Drawings Preparation & Submission
W-Z6-EEP-180 Generator Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 Generator Shop Drawings Review & Approval
W-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 UPS Shop Drawings Preparation & Submission
W-Z6-EEP-200 UPS Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 UPS Shop Drawings Review & Approval
W-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 MDBs Pannels Shop Drawings Preparation & Submission
W-Z6-EEP-220 MDBs Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 MDBs Shop Drawings Review & Approval
W-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 MCC Pannels Shop Drawings Preparation & Submission
W-Z6-EEP-240 MCCB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 MCCB Shop Drawings Review & Approval
W-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 SMSB Pannels Shop Drawings Preparation & Submission
W-Z6-EEP-260 SMSB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 SMSB Shop Drawings Review & Approval
W-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 DB Pannels Shop Drawings Preparation & Submission
W-Z6-EEP-280 DB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 DB Shop Drawings Review & Approval
W-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 Isolators Shop Drawings Preparation & Submission
W-Z6-EEP-300 Isolator Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 Isolator Shop Drawings Review & Approval
W-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 27-Jul-24 31-Jul-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
W-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 31-Jul-24 07-Aug-24 LCP / ELC PannelsShop Drawings Review & Approval
W-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 20-Jul-24 01-Aug-24 Fire Alarm system Shop Drawings Review & Approval
W-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 08-Aug-24 12-Aug-24 ICT System Shop Drawings Review & Approval
Actual Work
Remaining Work
39 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 10-Aug-24 22-Aug-24 Access Control system Shop Drawings Review & Approval
RODDENT REPPELENT
REPPELEN SYSTEM 27 13-Jul-24 12-Aug-24 12-Aug-24, RODDENT REPPELENT SYSTEM
W-Z6-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Roddent Repplent system Shop Drawings Preparation & Submission
W-Z6-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 08-Aug-24 12-Aug-24 Roddent Repplent system Shop Drawings Review & Approval
W-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 20-Aug-24 02-Sep-24 Scada system Shop Drawings Review & Approval
W-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 31-Aug-24 12-Sep-24 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 54 30-Jun-24 31-Aug-24 31-Aug-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 29 30-Jun-24 01-Aug-24 01-Aug-24, FIRE FIGHTING
W-Z6-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Firefighting system Shop Drawings Preparation & Submission
W-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 20-Jul-24 01-Aug-24 Firefighting system Shop Drawings Review & Approval
W-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 13-Aug-24 26-Aug-24 HVAC system Shop Drawings Review & Approval
W-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 18-Aug-24 31-Aug-24 Plumbing system Shop Drawings Review & Approval
D-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Plan and Profile Shop Drawings Review & Approval
D-Z6-EC.120 Builder work Shop Drawings Preparation and submission 14 02-Dec-23 17-Dec-23 Builder work Shop Drawings Preparation and submission
D-Z6-EC.130 Builder work Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 Builder work Shop Drawings Review & Approval
D-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-02
CULVERT-CIVIL-W 38 09-Mar-24 24-Apr-24 24-Apr-24, DRY CULVERT-CIVIL-W-Z06-02
D-Z6-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-03
CULVERT-CIVIL-W 40 11-Mar-24 29-Apr-24 29-Apr-24, DRY CULVERT-CIVIL-W-Z06-03
D-Z6-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Mar-24 27-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-04
CULVERT-CIVIL-W 40 16-Mar-24 04-May-24 04-May-24, DRY CULVERT-CIVIL-W-Z06-04
D-Z6-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Mar-24 01-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Apr-24 21-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Apr-24 21-Apr-24 Reinforcement Shop Drawings Preparation and submission
Actual Work
Remaining Work
40 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-05
CULVERT-CIVIL-W 40 20-Mar-24 08-May-24 08-May-24, DRY CULVERT-CIVIL-W-Z06-05
D-Z6-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-24 25-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-24 25-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Apr-24 08-May-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-06
CULVERT-CIVIL-W 40 31-Dec-23 15-Feb-24 15-Feb-24, DRY CULVERT-CIVIL-W-Z06-06
D-Z6-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-23 16-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-07
CULVERT-CIVIL-W 40 11-Jan-24 27-Feb-24 27-Feb-24, DRY CULVERT-CIVIL-W-Z06-07
D-Z6-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Jan-24 28-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Jan-24 13-Feb-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Feb-24 27-Feb-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-08
CULVERT-CIVIL-W 40 23-Jan-24 10-Mar-24 10-Mar-24, DRY CULVERT-CIVIL-W-Z06-08
D-Z6-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-24 08-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-24 25-Feb-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Feb-24 10-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-09
CULVERT-CIVIL-W 40 04-Feb-24 21-Mar-24 21-Mar-24, DRY CULVERT-CIVIL-W-Z06-09
D-Z6-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-10
CULVERT-CIVIL-W 40 15-Feb-24 02-Apr-24 02-Apr-24, DRY CULVERT-CIVIL-W-Z06-10
D-Z6-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 03-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 02-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-11
CULVERT-CIVIL-W 40 27-Feb-24 17-Apr-24 17-Apr-24, DRY CULVERT-CIVIL-W-Z06-11
D-Z6-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 14-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Mar-24 31-Mar-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Mar-24 17-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-12
CULVERT-CIVIL-W 40 10-Mar-24 29-Apr-24 29-Apr-24, DRY CULVERT-CIVIL-W-Z06-12
D-Z6-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-13
CULVERT-CIVIL-W 40 21-Mar-24 11-May-24 11-May-24, DRY CULVERT-CIVIL-W-Z06-13
D-Z6-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 11-May-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
41 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRY CULVERT-CIVIL-W-Z06-14
CULVERT-CIVIL-W 40 02-Apr-24 22-May-24 22-May-24, DRY CULVERT-CIVIL-W-Z06-14
D-Z6-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Apr-24 22-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Apr-24 08-May-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Apr-24 08-May-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-May-24 22-May-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-15
CULVERT-CIVIL-W 40 17-Apr-24 03-Jun-24 03-Jun-24, DRY CULVERT-CIVIL-W-Z06-15
D-Z6-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-16
CULVERT-CIVIL-W 40 06-Jul-24 21-Aug-24 21-Aug-24, DRY CULVERT-CIVIL-W-Z06-16
D-Z6-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-17
CULVERT-CIVIL-W 40 17-Jul-24 02-Sep-24 02-Sep-24, DRY CULVERT-CIVIL-W-Z06-17
D-Z6-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Aug-24 19-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-18
CULVERT-CIVIL-W 40 29-Jul-24 14-Sep-24 14-Sep-24, DRY CULVERT-CIVIL-W-Z06-18
D-Z6-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Aug-24 31-Aug-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-19
CULVERT-CIVIL-W 40 10-Aug-24 26-Sep-24 26-Sep-24, DRY CULVERT-CIVIL-W-Z06-19
D-Z6-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Aug-24 26-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Aug-24 11-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-20
CULVERT-CIVIL-W 40 21-Aug-24 08-Oct-24 08-Oct-24, DRY CULVERT-CIVIL-W-Z06-20
D-Z6-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Aug-24 07-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Sep-24 24-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Sep-24 24-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Sep-24 08-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-21
CULVERT-CIVIL-W 40 02-Sep-24 20-Oct-24 20-Oct-24, DRY CULVERT-CIVIL-W-Z06-21
D-Z6-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Sep-24 06-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Oct-24 20-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-22
CULVERT-CIVIL-W 40 03-Aug-24 18-Sep-24 18-Sep-24, DRY CULVERT-CIVIL-W-Z06-22
D-Z6-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Aug-24 04-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-23
CULVERT-CIVIL-W 40 14-Aug-24 01-Oct-24 01-Oct-24, DRY CULVERT-CIVIL-W-Z06-23
Actual Work
Remaining Work
42 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Aug-24 16-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-24
CULVERT-CIVIL-W 40 26-Aug-24 13-Oct-24 13-Oct-24, DRY CULVERT-CIVIL-W-Z06-24
D-Z6-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Sep-24 29-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-25
CULVERT-CIVIL-W 40 07-Sep-24 24-Oct-24 24-Oct-24, DRY CULVERT-CIVIL-W-Z06-25
D-Z6-25-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Sep-24 24-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Sep-24 10-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-25-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Sep-24 10-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-25-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Oct-24 24-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-26
CULVERT-CIVIL-W 40 18-Sep-24 05-Nov-24 05-Nov-24, DRY CULVERT-CIVIL-W-Z06-26
D-Z6-26-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Oct-24 22-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-26-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Oct-24 22-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-26-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Oct-24 05-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-27
CULVERT-CIVIL-W 40 01-Oct-24 17-Nov-24 17-Nov-24, DRY CULVERT-CIVIL-W-Z06-27
D-Z6-27-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-27-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-27-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Oct-24 03-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-27-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-28
CULVERT-CIVIL-W 40 13-Oct-24 28-Nov-24 28-Nov-24, DRY CULVERT-CIVIL-W-Z06-28
D-Z6-28-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Oct-24 29-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-28-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-Oct-24 14-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-28-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Oct-24 14-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-28-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Nov-24 28-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-29
CULVERT-CIVIL-W 40 07-Aug-24 24-Sep-24 24-Sep-24, DRY CULVERT-CIVIL-W-Z06-29
D-Z6-29-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Aug-24 24-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-29-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Aug-24 09-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-29-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Aug-24 09-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-29-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Sep-24 24-Sep-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-30
CULVERT-CIVIL-W 40 19-Aug-24 06-Oct-24 06-Oct-24, DRY CULVERT-CIVIL-W-Z06-30
D-Z6-30-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Aug-24 04-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-30-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-30-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Sep-24 21-Sep-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-30-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-31
CULVERT-CIVIL-W 40 31-Aug-24 17-Oct-24 17-Oct-24, DRY CULVERT-CIVIL-W-Z06-31
D-Z6-31-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-31-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-31-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Sep-24 03-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-31-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-32
CULVERT-CIVIL-W 40 11-Sep-24 29-Oct-24 29-Oct-24, DRY CULVERT-CIVIL-W-Z06-32
D-Z6-32-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
43 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-32-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Oct-24 15-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-32-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Sep-24 15-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-32-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Oct-24 29-Oct-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-33
CULVERT-CIVIL-W 40 24-Sep-24 10-Nov-24 10-Nov-24, DRY CULVERT-CIVIL-W-Z06-33
D-Z6-33-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Sep-24 10-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-33-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Oct-24 27-Oct-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-33-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Oct-24 27-Oct-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-33-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-34
CULVERT-CIVIL-W 40 06-Oct-24 21-Nov-24 21-Nov-24, DRY CULVERT-CIVIL-W-Z06-34
D-Z6-34-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-34-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-34-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Oct-24 07-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-34-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-35
CULVERT-CIVIL-W 40 17-Oct-24 03-Dec-24 03-Dec-24, DRY CULVERT-CIVIL-W-Z06-35
D-Z6-35-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-35-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Nov-24 19-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-35-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Nov-24 19-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-35-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-36
CULVERT-CIVIL-W 40 29-Oct-24 15-Dec-24 15-Dec-24, DRY CULVERT-CIVIL-W-Z06-36
D-Z6-36-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Oct-24 14-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-36-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Nov-24 01-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-36-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Nov-24 01-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-36-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Dec-24 15-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-37
CULVERT-CIVIL-W 40 06-Mar-24 24-Apr-24 24-Apr-24, DRY CULVERT-CIVIL-W-Z06-37
D-Z6-37-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Mar-24 23-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-37-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-37-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-37-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-W-Z06-38
CULVERT-CIVIL-W 40 18-Mar-24 06-May-24 06-May-24, DRY CULVERT-CIVIL-W-Z06-38
D-Z6-38-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z6-38-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Apr-24 23-Apr-24 Concrete Dimension Shop Drawings Review & Approval
D-Z6-38-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Apr-24 23-Apr-24 Reinforcement Shop Drawings Preparation and submission
D-Z6-38-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Apr-24 06-May-24 Reinforcement Shop Drawings Review & Approval
D-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 12 30-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval
D-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 12 24-Jun-24 07-Jul-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 22 22-Jun-24 16-Jul-24 16-Jul-24, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
D-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 13-Jul-24 16-Jul-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
D-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 4 24-Jul-24 28-Jul-24 Small Power system Shop Drawings Review & Approval
Actual Work
Remaining Work
44 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION
DISTRIBUTIO 31 12-Jun-24 22-Jul-24 22-Jul-24, POWER DISTRIBUTION
D-Z6-EEP-170 Generator Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 Generator Shop Drawings Preparation & Submission
D-Z6-EEP-180 Generator Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Generator Shop Drawings Review & Approval
D-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 UPS Shop Drawings Preparation & Submission
D-Z6-EEP-200 UPS Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 UPS Shop Drawings Review & Approval
D-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 MDBs Pannels Shop Drawings Preparation & Submission
D-Z6-EEP-220 MDBs Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 MDBs Shop Drawings Review & Approval
D-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 MCC Pannels Shop Drawings Preparation & Submission
D-Z6-EEP-240 MCCB Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 MCCB Shop Drawings Review & Approval
D-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 SMSB Pannels Shop Drawings Preparation & Submission
D-Z6-EEP-260 SMSB Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 SMSB Shop Drawings Review & Approval
D-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 DB Pannels Shop Drawings Preparation & Submission
D-Z6-EEP-280 DB Shop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 DB Shop Drawings Review & Approval
D-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Isolators Shop Drawings Preparation & Submission
D-Z6-EEP-300 Isolator Shop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 Isolator Shop Drawings Review & Approval
D-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 LCP /ELC Pannels Shop Drawings Preparation & Submission
D-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 LCP / ELC PannelsShop Drawings Review & Approval
D-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Fire Alarm system Shop Drawings Review & Approval
D-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 23-Jul-24 27-Jul-24 ICT System Shop Drawings Review & Approval
D-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Access Control system Shop Drawings Review & Approval
RODDENT REPPELENT
REPPELEN SYSTEM 190 21-May-24 04-Jan-25 04-Jan-25, RODDENT REPPELENT SYSTEM
D-Z6-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 21-May-24 06-Jun-24 Roddent Repplent system Shop Drawings Preparation & Submission
D-Z6-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 30-Dec-24 04-Jan-25 Roddent Repplent system Shop Drawings Review & Approval
D-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Scada system Shop Drawings Review & Approval
D-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 54 19-Feb-24 24-Apr-24 24-Apr-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 46 19-Feb-24 15-Apr-24 15-Apr-24, FIRE FIGHTING
D-Z6-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 19-Feb-24 06-Mar-24 Firefighting system Shop Drawings Preparation & Submission
D-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 30-Mar-24 15-Apr-24 Firefighting system Shop Drawings Review & Approval
D-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 03-Apr-24 20-Apr-24 HVAC system Shop Drawings Review & Approval
D-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Plumbing system Shop Drawings Review & Approval
Actual Work
Remaining Work
45 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POTABLE WATER NETWORK
NETW 28 12-Mar-24 16-Apr-24 16-Apr-24, POTABLE WATER NETWORK
JAH-ENG-Z6-WC-PW Plan and Profile Shop Drawing Review & Approval 14 28-Mar-24 16-Apr-24 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z6WC-PW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z6WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 06-Mar-24 23-Mar-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z6WC-GD Plan and Profile Shop Drawing Prepration &Submission 14 06-Mar-24 23-Mar-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z6WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z6WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-ENG-Z6WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 20-May-24 05-Jun-24 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 20-Mar-24 02-Apr-24 Review and approval power system shopdrawings
JAH-ENG-Z6-R.285 Plan and Profile Shop Drawing Review & Approval 14 02-Mar-25 18-Mar-25 Plan and Profile Shop Drawing Review & Approval
JAH-ENG-Z6-R.290 Road Cross Sections Shop Drawing Preparation & Submission 14 18-Mar-25 08-Apr-25 Road Cross Sections Shop Drawing Preparation & Submission
JAH-ENG-Z6-R.295 Road Cross Sections Shop Drawing Review & Approval 14 08-Apr-25 24-Apr-25 Road Cross Sections Shop Drawing Review & Approval
JAH-ENG-Z6-R.300 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 13-Apr-25 29-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission
JAH-ENG-Z6-R.305 Guiding Signs and Marking Shop Drawing Review & Approval 14 29-Apr-25 15-May-25 Guiding Signs and Marking Shop Drawing Review & Approval
AR-ENG-Z7-EX.810 Cross Section Shop Drawing Review & Approval 14 28-May-24 12-Jun-24 Cross Section Shop Drawing Review & Approval
AR-ENG-Z7-SH.825 Shoring Design Preparation & Submission 6 21-Sep-23 A 28-Sep-23 A Shoring Design Preparation & Submission
AR-ENG-Z7-SH.830 Shoring Design Review & Approval 14 02-Dec-23 17-Dec-23 Shoring Design Review & Approval
AR-ENG-Z7-SI.815 Soil Improvement Design Preparation & Submission 14 20-Jun-24 06-Jul-24 Soil Improvement Design Preparation & Submission
AR-ENG-Z7-SI.820 Soil Improvement Design Review & Approval 14 07-Jul-24 22-Jul-24 Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 394 10-Mar-24 30-Jun-25 30-Jun-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z7-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Plan and Profile Shop Drawings Preparation & Submission
JAH-Z7-EC.110 Plan and Profile Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Plan and Profile Shop Drawings Review & Approval
JAH-Z7-EC.120 Builder work Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Builder work Shop Drawings Preparation and submission
JAH-Z7-EC.130 Builder work Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Builder work Shop Drawings Review & Approval
Actual Work
Remaining Work
46 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z7-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Apr-24 15-May-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z7-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-May-24 30-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-May-24 30-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Jun-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Sep-24 06-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Oct-24 20-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Oct-24 23-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Oct-24 23-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Oct-24 06-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Oct-24 10-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Oct-24 10-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Nov-24 24-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Nov-24 27-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Nov-24 27-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 28-Nov-24 11-Dec-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Dec-24 15-Dec-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Nov-24 15-Dec-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Dec-24 29-Dec-24 Reinforcement Shop Drawings Review & Approval
JAH-Z7-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-24 01-Jan-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-24 01-Jan-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-25 15-Jan-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jan-25 19-Jan-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-25 02-Feb-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-25 05-Feb-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-25 05-Feb-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-25 19-Feb-25 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
47 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z7-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-25 23-Feb-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-25 23-Feb-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-25 12-Mar-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Mar-25 26-Mar-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-25 03-Apr-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Mar-25 03-Apr-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Apr-25 17-Apr-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-25 21-Apr-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-25 21-Apr-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Apr-25 05-May-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Apr-25 08-May-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Apr-25 08-May-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-May-25 22-May-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-May-25 26-May-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-May-25 26-May-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-May-25 16-Jun-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z7-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-May-25 16-Jun-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z7-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Jun-25 30-Jun-25 Reinforcement Shop Drawings Review & Approval
JAH-Z7-EEP-160 Earthing system Shop Drawings Review & Approval 12 21-Jul-25 03-Aug-25 Earthing system Shop Drawings Review & Approval
JAH-Z7-EEP-110 Lighting system Shop Drawings Review & Approval 12 21-Jul-25 03-Aug-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 38 02-Jul-25 14-Aug-25 14-Aug-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z7-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submissio
JAH-Z7-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z7-EEP-130 Small Power system Shop Drawings Review & Approval 4 04-Aug-25 07-Aug-25 Small Power system Shop Drawings Review & Approval
Actual Work
Remaining Work
48 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION 26 01-Jul-25 30-Jul-25 30-Jul-25, POWER DISTRIBUTION
JAH-Z7-EEP-170 Generator Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 Generator Shop Drawings Preparation & Submission
JAH-Z7-EEP-180 Generator Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 Generator Shop Drawings Review & Approval
JAH-Z7-EEP-190 UPS Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 UPS Shop Drawings Preparation & Submission
JAH-Z7-EEP-200 UPS Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 UPS Shop Drawings Review & Approval
JAH-Z7-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z7-EEP-220 MDBs Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 MDBs Shop Drawings Review & Approval
JAH-Z7-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z7-EEP-240 MCCB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 MCCB Shop Drawings Review & Approval
JAH-Z7-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z7-EEP-260 SMSB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 SMSB Shop Drawings Review & Approval
JAH-Z7-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z7-EEP-280 DB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 DB Shop Drawings Review & Approval
JAH-Z7-EEP-290 Isolators Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 Isolators Shop Drawings Preparation & Submission
JAH-Z7-EEP-300 Isolator Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 Isolator Shop Drawings Review & Approval
JAH-Z7-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z7-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z7-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 22-Jul-25 04-Aug-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z7-EEL-190 ICT System Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 50 18-Jun-25 14-Aug-25 14-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z7-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 18-Jun-25 05-Jul-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z7-EEL-150 Access Control system Shop Drawings Review & Approval 12 02-Aug-25 14-Aug-25 Access Control system Shop Drawings Review & Approval
JAH-Z7-EEL-170 Public Address system Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 Public Address system Shop Drawings Review & Approval
JAH-Z7-EEL-130 Scada system Shop Drawings Review & Approval 12 12-Aug-25 25-Aug-25 Scada system Shop Drawings Review & Approval
JAH-Z7-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 23-Aug-25 04-Sep-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z7-EM-110 Firefighting system Shop Drawings Review & Approval 12 13-Aug-25 26-Aug-25 Firefighting system Shop Drawings Review & Approval
JAH-Z7-EM-130 HVAC system Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 HVAC system Shop Drawings Review & Approval
JAH-Z7-EM-150 Plumbing system Shop Drawings Review & Approval 12 12-Nov-25 25-Nov-25 Plumbing system Shop Drawings Review & Approval
Actual Work
Remaining Work
49 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRAINAGE NET WORK 28 30-Nov-25 31-Dec-25 31-Dec-25, DRAINAGE NET WORK
AR-ENG-Z7-WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 30-Nov-25 16-Dec-25 Plan and Profile Shop Drawing Prepration &Submission
AR-ENG-Z7-WC-D.1 Plan and Profile Shop Drawing Review & Approval 14 16-Dec-25 31-Dec-25 Plan and Profile Shop Drawing Review & Approval
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 12-Nov-25 25-Nov-25 Review and approval power system shopdrawings
AR-ENG-Z7-R.315 Plan and Profile Shop Drawing Review & Approval 14 07-Dec-25 23-Dec-25 Plan and Profile Shop Drawing Review & Approval
AR-ENG-Z7-R.320 Road Cross Sections Shop Drawing Preparation & Submission 14 23-Dec-25 07-Jan-26 Road Cross Sections Shop Drawing Preparation & Subm
AR-ENG-Z7-R.325 Road Cross Sections Shop Drawing Review & Approval 14 08-Jan-26 24-Jan-26 Road Cross Sections Shop Drawing Review & Approv
AR-ENG-Z7-R.330 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 10-Jan-26 25-Jan-26 Guiding Signs and Marking Shop Drawing Preparation
AR-ENG-Z7-R.335 Guiding Signs and Marking Shop Drawing Review & Approval 14 26-Jan-26 10-Feb-26 Guiding Signs and Marking Shop Drawing Review &
KAAR-ENG-Z8-EX.82 Cross Section Shop Drawing Review & Approval 14 13-Dec-23 28-Dec-23 Cross Section Shop Drawing Review & Approval
KAAR-ENG-Z8-SH.83 Shoring Design Preparation & Submission 80 22-May-23 A 26-Aug-23 A Shoring Design Preparation & Submission
KAAR-ENG-Z8-SH.84 Shoring Design Review & Approval 80 05-Jun-23 A 09-Sep-23 A Shoring Design Review & Approval
KAAR-ENG-Z8-SI.825 Soil Improvement Design Preparation & Submission 73 06-May-23 A 10-Jan-24 Soil Improvement Design Preparation & Submission
KAAR-ENG-Z8-SI.830 Soil Improvement Design Review & Approval 63 15-May-23 A 10-Jan-24 Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 534 25-Dec-22 A 02-Mar-25 02-Mar-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 107 25-Dec-22 A 08-Jan-24 08-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 107 25-Dec-22 A 08-Jan-24 08-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z8-EC.100 Plan and Profile Shop Drawings Preparation & Submission 71 25-Dec-22 A 09-Dec-23 Plan and Profile Shop Drawings Preparation & Submission
JAH-Z8-EC.110 Plan and Profile Shop Drawings Review & Approval 57 07-Jan-23 A 25-Dec-23 Plan and Profile Shop Drawings Review & Approval
JAH-Z8-EC.120 Builder work Shop Drawings Preparation and submission 14 10-Dec-23 25-Dec-23 Builder work Shop Drawings Preparation and submission
JAH-Z8-EC.130 Builder work Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Builder work Shop Drawings Review & Approval
JAH-Z8-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Jan-24 10-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Jan-24 10-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Feb-24 02-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Feb-24 02-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Mar-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
50 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-KAR-Z08-04 40 04-Mar-24 22-Apr-24 22-Apr-24, CIVIL-SEG-KAR-Z08-04
JAH-Z8-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Mar-24 20-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z8-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Mar-24 06-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Mar-24 06-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Apr-24 14-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Apr-24 14-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-May-24 01-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-May-24 01-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Jun-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Jan-24 10-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Jan-24 10-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-09-EC-120 Reinforcement Shop Drawings Preparation and submission 7 05-Jun-23 A 12-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z8-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z8-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Feb-24 09-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-May-24 25-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-May-24 25-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-May-24 06-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-May-24 11-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-May-24 11-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Jun-24 29-Jun-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
51 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z8-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jun-24 03-Jul-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Jun-24 03-Jul-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jul-24 21-Jul-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Jul-24 03-Aug-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 20-Aug-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Aug-24 25-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Aug-24 11-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Sep-24 25-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Sep-24 30-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Oct-24 17-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Oct-24 30-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Oct-24 04-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Nov-24 21-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Nov-24 04-Dec-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
52 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Nov-24 09-Dec-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Nov-24 09-Dec-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Dec-24 22-Dec-24 Reinforcement Shop Drawings Review & Approval
JAH-Z8-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Dec-24 26-Dec-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Dec-24 26-Dec-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Dec-24 08-Jan-25 Reinforcement Shop Drawings Review & Approval
JAH-Z8-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Dec-24 13-Jan-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Dec-24 13-Jan-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Jan-25 26-Jan-25 Reinforcement Shop Drawings Review & Approval
JAH-Z8-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Jan-25 30-Jan-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-25-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Jan-25 30-Jan-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-25-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Jan-25 12-Feb-25 Reinforcement Shop Drawings Review & Approval
JAH-Z8-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Feb-25 17-Feb-25 Concrete Dimension Shop Drawings Review & Approval
JAH-Z8-26-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-25 17-Feb-25 Reinforcement Shop Drawings Preparation and submission
JAH-Z8-26-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Feb-25 02-Mar-25 Reinforcement Shop Drawings Review & Approval
JAH-Z8-EEP-160 Earthing system Shop Drawings Review & Approval 12 28-Oct-25 10-Nov-25 Earthing system Shop Drawings Review & Approval
JAH-Z8-EEP-110 Lighting system Shop Drawings Review & Approval 12 06-Jul-25 19-Jul-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 30 26-Jun-25 30-Jul-25 30-Jul-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z8-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 26-Jun-25 13-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submissio
JAH-Z8-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 27-Jul-25 30-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z8-EEP-130 Small Power system Shop Drawings Review & Approval 4 29-Jul-25 02-Aug-25 Small Power system Shop Drawings Review & Approval
JAH-Z8-EEP-180 Generator Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Generator Shop Drawings Review & Approval
JAH-Z8-EEP-190 UPS Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 UPS Shop Drawings Preparation & Submission
JAH-Z8-EEP-200 UPS Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 UPS Shop Drawings Review & Approval
JAH-Z8-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z8-EEP-220 MDBs Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 MDBs Shop Drawings Review & Approval
JAH-Z8-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z8-EEP-240 MCCB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 MCCB Shop Drawings Review & Approval
Actual Work
Remaining Work
53 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z8-EEP-260 SMSB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 SMSB Shop Drawings Review & Approval
JAH-Z8-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z8-EEP-280 DB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 DB Shop Drawings Review & Approval
JAH-Z8-EEP-290 Isolators Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 Isolators Shop Drawings Preparation & Submission
JAH-Z8-EEP-300 Isolator Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Isolator Shop Drawings Review & Approval
JAH-Z8-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z8-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 LCP / ELC PannelsShop Drawings Review & Approval
LOW CURRENT SYSTEM 113 16-Apr-25 30-Aug-25 30-Aug-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 86 16-Apr-25 29-Jul-25 29-Jul-25, FIRE ALARM SYSTEM
JAH-Z8-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 16-Apr-25 03-May-25 Fire Alarm system Shop Drawings Preparation & Submission
JAH-Z8-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 16-Jul-25 29-Jul-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z8-EEL-190 ICT System Shop Drawings Review & Approval 4 05-Aug-25 09-Aug-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 77 19-May-25 19-Aug-25 19-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z8-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-May-25 04-Jun-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z8-EEL-150 Access Control system Shop Drawings Review & Approval 12 06-Aug-25 19-Aug-25 Access Control system Shop Drawings Review & Approval
JAH-Z8-EEL-170 Public Address system Shop Drawings Review & Approval 4 26-Aug-25 30-Aug-25 Public Address system Shop Drawings Review & Approval
JAH-Z8-EEL-130 Scada system Shop Drawings Review & Approval 12 06-Aug-25 19-Aug-25 Scada system Shop Drawings Review & Approval
JAH-Z8-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 27-Jul-25 09-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z8-EM-110 Firefighting system Shop Drawings Review & Approval 12 07-Aug-25 20-Aug-25 Firefighting system Shop Drawings Review & Approval
JAH-Z8-EM-130 HVAC system Shop Drawings Review & Approval 12 02-Dec-25 15-Dec-25 HVAC system Shop Drawings Review & Approval
JAH-Z8-EM-150 Plumbing system Shop Drawings Review & Approval 12 07-Aug-25 20-Aug-25 Plumbing system Shop Drawings Review & Approval
KAAR-ENG-Z8-WC- Plan and Profile Shop Drawing Review & Approval 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Review & Approval
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings (MV) 11 21-Aug-25 03-Sep-25 Review and approval power system shopdrawings (MV)
KAAR-ENG-Z08-R.34 Plan and Profile Shop Drawing Review & Approval 14 11-Jan-26 27-Jan-26 Plan and Profile Shop Drawing Review & Approval
Actual Work
Remaining Work
54 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
KAAR-ENG-Z08-R.35 Road Cross Sections Shop Drawing Preparation & Submission 14 27-Jan-26 12-Feb-26 Road Cross Sections Shop Drawing Preparation & S
KAAR-ENG-Z08-R.35 Road Cross Sections Shop Drawing Review & Approval 14 12-Feb-26 28-Feb-26 Road Cross Sections Shop Drawing Review & Ap
KAAR-ENG-Z08-R.36 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 12-Feb-26 01-Mar-26 Guiding Signs and Marking Shop Drawing Prepar
KAAR-ENG-Z08-R.36 Guiding Signs and Marking Shop Drawing Review & Approval 14 01-Mar-26 16-Mar-26 Guiding Signs and Marking Shop Drawing Revi
T1-ENG-Z9-EX.830 Cross Section Shop Drawing Review & Approval 14 13-Jan-24 28-Jan-24 Cross Section Shop Drawing Review & Approval
T1-ENG-Z9-SI.835 Soil Improvement Design Preparation & Submission 55 20-May-23 A 08-Jan-24 Soil Improvement Design Preparation & Submission
T1-ENG-Z9-SI.840 Soil Improvement Design Review & Approval 62 20-May-23 A 16-Jan-24 Soil Improvement Design Review & Approval
CIVIL SHOP DRAWINGS 233 07-Jan-24 14-Oct-24 14-Oct-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 07-Jan-24 22-Feb-24 22-Feb-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 07-Jan-24 22-Feb-24 22-Feb-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z9-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 07-Jan-24 23-Jan-24 Plan and Profile Shop Drawings Preparation & Submission
JAH-Z9-EC.110 Plan and Profile Shop Drawings Review & Approval 12 25-Jan-24 08-Feb-24 Plan and Profile Shop Drawings Review & Approval
JAH-Z9-EC.120 Builder work Shop Drawings Preparation and submission 14 23-Jan-24 08-Feb-24 Builder work Shop Drawings Preparation and submission
JAH-Z9-EC.130 Builder work Shop Drawings Review & Approval 12 08-Feb-24 22-Feb-24 Builder work Shop Drawings Review & Approval
JAH-Z9-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Mar-24 26-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Apr-24 04-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-May-24 16-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 21-May-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 21-May-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-May-24 08-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-May-24 08-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
55 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z9-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-May-24 09-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z9-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jun-24 30-Jun-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jul-24 17-Jul-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Jul-24 04-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Aug-24 21-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Aug-24 03-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Aug-24 08-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Sep-24 21-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Sep-24 26-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Sep-24 09-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Sep-24 29-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Sep-24 12-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z9-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Sep-24 01-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z9-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Oct-24 14-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z9-EEP-160 Earthing system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Earthing system Shop Drawings Review & Approval
Actual Work
Remaining Work
56 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z9-EEP-110 Lighting system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 32 13-Apr-25 19-May-25 19-May-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z9-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 13-Apr-25 29-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z9-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 15-May-25 19-May-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z9-EEP-130 Small Power system Shop Drawings Review & Approval 4 15-May-25 19-May-25 Small Power system Shop Drawings Review & Approval
JAH-Z9-EEP-180 Generator Shop Drawings Review & Approval 12 06-May-25 19-May-25 Generator Shop Drawings Review & Approval
JAH-Z9-EEP-190 UPS Shop Drawings Preparation & Submission 14 28-Apr-25 14-May-25 UPS Shop Drawings Preparation & Submission
JAH-Z9-EEP-200 UPS Shop Drawings Review & Approval 12 14-May-25 27-May-25 UPS Shop Drawings Review & Approval
JAH-Z9-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 28-Apr-25 14-May-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z9-EEP-220 MDBs Shop Drawings Review & Approval 12 14-May-25 27-May-25 MDBs Shop Drawings Review & Approval
JAH-Z9-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z9-EEP-240 MCCB Shop Drawings Review & Approval 12 22-May-25 04-Jun-25 MCCB Shop Drawings Review & Approval
JAH-Z9-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z9-EEP-260 SMSB Shop Drawings Review & Approval 12 22-May-25 04-Jun-25 SMSB Shop Drawings Review & Approval
JAH-Z9-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z9-EEP-280 DB Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 DB Shop Drawings Review & Approval
JAH-Z9-EEP-290 Isolators Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 Isolators Shop Drawings Preparation & Submission
JAH-Z9-EEP-300 Isolator Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 Isolator Shop Drawings Review & Approval
JAH-Z9-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z9-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 28-May-25 14-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z9-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z9-EEL-190 ICT System Shop Drawings Review & Approval 4 17-May-25 20-May-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 50 19-Mar-25 20-May-25 20-May-25, ACCESS CONTROL SYSTEM
JAH-Z9-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-Mar-25 09-Apr-25 Access Control system Shop Drawings Preparation & Submission
JAH-Z9-EEL-150 Access Control system Shop Drawings Review & Approval 12 07-May-25 20-May-25 Access Control system Shop Drawings Review & Approval
JAH-Z9-EEL-170 Public Address system Shop Drawings Review & Approval 4 27-May-25 31-May-25 Public Address system Shop Drawings Review & Approval
JAH-Z9-EEL-130 Scada system Shop Drawings Review & Approval 12 18-May-25 31-May-25 Scada system Shop Drawings Review & Approval
JAH-Z9-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z9-EM-110 Firefighting system Shop Drawings Review & Approval 12 04-May-25 17-May-25 Firefighting system Shop Drawings Review & Approval
Actual Work
Remaining Work
57 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
HVAC 74 20-Mar-25 22-Jun-25 22-Jun-25, HVAC
JAH-Z9-EM-120 HVAC system Shop Drawings Preparation & Submission 14 20-Mar-25 10-Apr-25 HVAC system Shop Drawings Preparation & Submission
JAH-Z9-EM-130 HVAC system Shop Drawings Review & Approval 12 09-Jun-25 22-Jun-25 HVAC system Shop Drawings Review & Approval
JAH-Z9-EM-150 Plumbing system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Plumbing system Shop Drawings Review & Approval
D-Z9-EC.110 Plan and Profile Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Plan and Profile Shop Drawings Review & Approval
D-Z9-EC.120 Builder work Shop Drawings Preparation and submission 14 29-Aug-24 15-Sep-24 Builder work Shop Drawings Preparation and submission
D-Z9-EC.130 Builder work Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Builder work Shop Drawings Review & Approval
D-Z9-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Oct-24 02-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Oct-24 02-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Nov-24 14-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-02
CULVERT-CIVIL-D 40 12-Oct-24 26-Nov-24 26-Nov-24, DRY CULVERT-CIVIL-D-Z09-02
D-Z9-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Oct-24 13-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Nov-24 26-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-03
CULVERT-CIVIL-D 40 23-Oct-24 08-Dec-24 08-Dec-24, DRY CULVERT-CIVIL-D-Z09-03
D-Z9-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Oct-24 09-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Nov-24 25-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Nov-24 08-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-04
CULVERT-CIVIL-D 40 04-Nov-24 19-Dec-24 19-Dec-24, DRY CULVERT-CIVIL-D-Z09-04
D-Z9-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Nov-24 20-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Nov-24 07-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Dec-24 19-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-05
CULVERT-CIVIL-D 40 16-Nov-24 31-Dec-24 31-Dec-24, DRY CULVERT-CIVIL-D-Z09-05
D-Z9-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Nov-24 02-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Dec-24 18-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Dec-24 18-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Dec-24 31-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-06
CULVERT-CIVIL-D 40 05-Oct-24 19-Nov-24 19-Nov-24, DRY CULVERT-CIVIL-D-Z09-06
D-Z9-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Oct-24 06-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Nov-24 19-Nov-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-07
CULVERT-CIVIL-D 40 16-Oct-24 01-Dec-24 01-Dec-24, DRY CULVERT-CIVIL-D-Z09-07
D-Z9-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
Actual Work
Remaining Work
58 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z9-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 18-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 18-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Nov-24 01-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-08
CULVERT-CIVIL-D 40 28-Oct-24 12-Dec-24 12-Dec-24, DRY CULVERT-CIVIL-D-Z09-08
D-Z9-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Nov-24 30-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Nov-24 12-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-09
CULVERT-CIVIL-D 40 09-Nov-24 24-Dec-24 24-Dec-24, DRY CULVERT-CIVIL-D-Z09-09
D-Z9-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Nov-24 11-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Dec-24 24-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z09-10
CULVERT-CIVIL-D 40 20-Nov-24 05-Jan-25 05-Jan-25, DRY CULVERT-CIVIL-D-Z09-10
D-Z9-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z9-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z9-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Dec-24 23-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z9-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Dec-24 05-Jan-25 Reinforcement Shop Drawings Review & Approval
D-Z9-EEP-160 Earthing system Shop Drawings Review & Approval 12 18-Mar-25 06-Apr-25 Earthing system Shop Drawings Review & Approval
D-Z9-EEP-110 Lighting system Shop Drawings Review & Approval 12 25-Nov-24 09-Dec-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 18 02-Jan-24 23-Jan-24 23-Jan-24, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z9-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
D-Z9-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 18-Jan-24 23-Jan-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
D-Z9-EEP-130 Small Power system Shop Drawings Review & Approval 4 04-Feb-24 08-Feb-24 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 141 06-Nov-24 23-Apr-25 23-Apr-25, POWER DISTRIBUTION
D-Z9-EEP-170 Generator Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 Generator Shop Drawings Preparation & Submission
D-Z9-EEP-180 Generator Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Generator Shop Drawings Review & Approval
D-Z9-EEP-190 UPS Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 UPS Shop Drawings Preparation & Submission
D-Z9-EEP-200 UPS Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 UPS Shop Drawings Review & Approval
D-Z9-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 MDBs Pannels Shop Drawings Preparation & Submission
D-Z9-EEP-220 MDBs Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 MDBs Shop Drawings Review & Approval
D-Z9-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 MCC Pannels Shop Drawings Preparation & Submission
D-Z9-EEP-240 MCCB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 MCCB Shop Drawings Review & Approval
D-Z9-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 SMSB Pannels Shop Drawings Preparation & Submission
D-Z9-EEP-260 SMSB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 SMSB Shop Drawings Review & Approval
D-Z9-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 DB Pannels Shop Drawings Preparation & Submission
D-Z9-EEP-280 DB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 DB Shop Drawings Review & Approval
D-Z9-EEP-290 Isolators Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 Isolators Shop Drawings Preparation & Submission
Actual Work
Remaining Work
59 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z9-EEP-300 Isolator Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Isolator Shop Drawings Review & Approval
D-Z9-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 20-Mar-25 09-Apr-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
D-Z9-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 09-Apr-25 23-Apr-25 LCP / ELC PannelsShop Drawings Review & Approval
D-Z9-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 26-Nov-24 10-Dec-24 Fire Alarm system Shop Drawings Review & Approval
D-Z9-EEL-190 ICT System Shop Drawings Review & Approval 4 16-Dec-24 21-Dec-24 ICT System Shop Drawings Review & Approval
D-Z9-EEL-150 Access Control system Shop Drawings Review & Approval 12 26-Nov-24 10-Dec-24 Access Control system Shop Drawings Review & Approval
RODDENT REPPELENT
REPPELEN SYSTEM 36 30-Oct-24 10-Dec-24 10-Dec-24, RODDENT REPPELENT SYSTEM
D-Z9-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 30-Oct-24 16-Nov-24 Roddent Repplent system Shop Drawings Preparation & Submission
D-Z9-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 05-Dec-24 10-Dec-24 Roddent Repplent system Shop Drawings Review & Approval
D-Z9-EEL-130 Scada system Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Scada system Shop Drawings Review & Approval
D-Z9-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 17-Dec-24 31-Dec-24 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 79 03-Oct-24 02-Jan-25 02-Jan-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 75 03-Oct-24 29-Dec-24 29-Dec-24, FIRE FIGHTING
D-Z9-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 03-Oct-24 20-Oct-24 Firefighting system Shop Drawings Preparation & Submission
D-Z9-EM-110 Firefighting system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Firefighting system Shop Drawings Review & Approval
D-Z9-EM-130 HVAC system Shop Drawings Review & Approval 12 19-Dec-24 02-Jan-25 HVAC system Shop Drawings Review & Approval
D-Z9-EM-150 Plumbing system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Plumbing system Shop Drawings Review & Approval
T1-ENG-Z1-WC-D.18 Plan and Profile Shop Drawing Review & Approval 14 24-Apr-25 10-May-25 Plan and Profile Shop Drawing Review & Approval
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval power system shopdrawings
T1-ENG-Z9-R.375 Plan and Profile Review & Approval 14 25-May-25 14-Jun-25 Plan and Profile Review & Approval
T1-ENG-Z9-R.380 Road Cross Sections Preparation & Submission 14 14-Jun-25 30-Jun-25 Road Cross Sections Preparation & Submission
T1-ENG-Z9-R.385 Road Cross Sections Review & Approval 14 30-Jun-25 15-Jul-25 Road Cross Sections Review & Approval
T1-ENG-Z9-R.390 Guiding Signs and Marking Preparation & Submission 14 30-Jun-25 16-Jul-25 Guiding Signs and Marking Preparation & Submission
T1-ENG-Z9-R.395 Guiding Signs and Marking Review & Approval 14 16-Jul-25 31-Jul-25 Guiding Signs and Marking Review & Approval
Actual Work
Remaining Work
60 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 218 31-Oct-22 A 18-Jul-23 A 18-Jul-23 A, EARTH WORKS
T2-ENG-Z10-EX.835 Cross Section Shop Drawing Preparation & Submission 12 31-Oct-22 A 13-Nov-22 A Cross Section Shop Drawing Preparation & Submission
T2-ENG-Z10-EX.840 Cross Section Shop Drawing Review & Approval 5 15-Nov-22 A 20-Nov-22 A Cross Section Shop Drawing Review & Approval
T2-ENG-Z10-SH.855 Shoring Design Preparation & Submission 6 11-Jul-23 A 17-Jul-23 A Shoring Design Preparation & Submission
T2-ENG-Z10-SH.860 Shoring Design Review & Approval 6 12-Jul-23 A 18-Jul-23 A Shoring Design Review & Approval
T2-ENG-Z10-SI.845 Soil Improvement Design Preparation & Submission 103 12-Jan-23 A 15-May-23 A Soil Improvement Design Preparation & Submission
T2-ENG-Z10-SI.850 Soil Improvement Design Review & Approval 104 14-Jan-23 A 17-May-23 A Soil Improvement Design Review & Approval
JAH-Z10-EC.110 Plan and Profile Shop Drawings Review & Approval 18 16-Feb-23 A 08-Mar-23 A Plan and Profile Shop Drawings Review & Approval
JAH-Z10-EC.120 Builder work Shop Drawings Preparation and submission 14 01-Aug-23 A 16-Aug-23 A Builder work Shop Drawings Preparation and submission
JAH-Z10-EC.130 Builder work Shop Drawings Review & Approval 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Review & Approval
JAH-Z10-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Aug-24 22-Aug-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Aug-24 04-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Aug-24 09-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Sep-24 22-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 07-Sep-23 A 17-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Aug-23 A 31-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-03-EC-130 Reinforcement Shop Drawings Review & Approval 10 31-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 07-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-04-EC-120 Reinforcement Shop Drawings Preparation and submission 13 05-Jun-23 A 19-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-04-EC-130 Reinforcement Shop Drawings Review & Approval 11 20-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Jun-23 A 11-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-05-EC-120 Reinforcement Shop Drawings Preparation and submission 70 01-Jan-23 A 03-Oct-26 Reinforcement Shop Draw
JAH-Z10-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z10-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Mar-23 A 16-Mar-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-06-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-06-EC-130 Reinforcement Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
61 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-T2-Z10-07 80 03-Jan-23 A 11-Dec-23 11-Dec-23, CIVIL-SEG-T2-Z10-07
JAH-Z10-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 28-Aug-23 A 11-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z10-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 12-Sep-23 A 20-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-07-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-07-EC-130 Reinforcement Shop Drawings Review & Approval 62 03-Jan-23 A 11-Dec-23 Reinforcement Shop Drawings Review & Approval
JAH-Z10-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 16-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-08-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-08-EC-130 Reinforcement Shop Drawings Review & Approval 9 17-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 17-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-May-23 A 11-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-09-EC-130 Reinforcement Shop Drawings Review & Approval 5 11-Jun-23 A 15-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Jun-23 A 11-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-10-EC-120 Reinforcement Shop Drawings Preparation and submission 13 08-May-23 A 22-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-10-EC-130 Reinforcement Shop Drawings Review & Approval 4 23-May-23 A 27-May-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jun-23 A 14-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-11-EC-120 Reinforcement Shop Drawings Preparation and submission 13 14-May-23 A 28-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-11-EC-130 Reinforcement Shop Drawings Review & Approval 11 29-May-23 A 10-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-12-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-May-23 A 25-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-12-EC-130 Reinforcement Shop Drawings Review & Approval 7 27-May-23 A 03-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 01-Jun-23 A 12-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-13-EC-120 Reinforcement Shop Drawings Preparation and submission 13 14-May-23 A 28-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-13-EC-130 Reinforcement Shop Drawings Review & Approval 13 29-May-23 A 12-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 64 03-Jan-23 A 14-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-14-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-May-23 A 25-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-14-EC-130 Reinforcement Shop Drawings Review & Approval 10 27-May-23 A 06-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z10-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Dec-23 14-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-15-EC-120 Reinforcement Shop Drawings Preparation and submission 13 16-May-23 A 30-May-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z10-15-EC-130 Reinforcement Shop Drawings Review & Approval 9 31-May-23 A 10-Jun-23 A Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
62 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z10-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z10-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-24 06-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-24 06-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-24 20-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Feb-24 24-Feb-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Mar-24 30-Mar-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Mar-24 30-Mar-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Apr-24 20-Apr-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z10-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Mar-24 20-Apr-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z10-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval
JAH-Z10-EEP-160 Earthing system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Earthing system Shop Drawings Review & Approval
JAH-Z10-EEP-110 Lighting system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 32 21-Jan-25 26-Feb-25 26-Feb-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z10-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 21-Jan-25 06-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z10-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 23-Feb-25 26-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
Actual Work
Remaining Work
63 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z10-EEP-130 Small Power system Shop Drawings Review & Approval 4 23-Feb-25 26-Feb-25 Small Power system Shop Drawings Review & Approval
JAH-Z10-EEP-180 Generator Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 Generator Shop Drawings Review & Approval
JAH-Z10-EEP-190 UPS Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 UPS Shop Drawings Preparation & Submission
JAH-Z10-EEP-200 UPS Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 UPS Shop Drawings Review & Approval
JAH-Z10-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z10-EEP-220 MDBs Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 MDBs Shop Drawings Review & Approval
JAH-Z10-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z10-EEP-240 MCCB Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 MCCB Shop Drawings Review & Approval
JAH-Z10-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z10-EEP-260 SMSB Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 SMSB Shop Drawings Review & Approval
JAH-Z10-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 DB Pannels Shop Drawings Preparation & Submission
JAH-Z10-EEP-280 DB Shop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 DB Shop Drawings Review & Approval
JAH-Z10-EEP-290 Isolators Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 Isolators Shop Drawings Preparation & Submission
JAH-Z10-EEP-300 Isolator Shop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 Isolator Shop Drawings Review & Approval
JAH-Z10-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z10-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z10-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Fire Alarm system Shop Drawings Review & Approval
JAH-Z10-EEL-190 ICT System Shop Drawings Review & Approval 4 24-Feb-25 27-Feb-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 59 11-Dec-24 17-Feb-25 17-Feb-25, ACCESS CONTROL SYSTEM
JAH-Z10-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 Access Control system Shop Drawings Preparation & Submission
JAH-Z10-EEL-150 Access Control system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Access Control system Shop Drawings Review & Approval
JAH-Z10-EEL-170 Public Address system Shop Drawings Review & Approval 4 13-Feb-25 17-Feb-25 Public Address system Shop Drawings Review & Approval
JAH-Z10-EEL-130 Scada system Shop Drawings Review & Approval 12 15-Feb-25 27-Feb-25 Scada system Shop Drawings Review & Approval
JAH-Z10-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 15-Feb-25 27-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z10-EM-110 Firefighting system Shop Drawings Review & Approval 12 11-Feb-25 24-Feb-25 Firefighting system Shop Drawings Review & Approval
JAH-Z10-EM-130 HVAC system Shop Drawings Review & Approval 12 11-Feb-25 24-Feb-25 HVAC system Shop Drawings Review & Approval
JAH-Z10-EM-150 Plumbing system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Plumbing system Shop Drawings Review & Approval
Actual Work
Remaining Work
64 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRY CULVERT 198 31-Aug-24 24-Apr-25 24-Apr-25, DRY CULVERT
CIVIL SHOP DRAWINGS 193 31-Aug-24 19-Apr-25 19-Apr-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 31-Aug-24 16-Oct-24 16-Oct-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 40 31-Aug-24 16-Oct-24 16-Oct-24, CIVIL / STRUCTURAL-ZONE WISE
D-Z10-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Plan and Profile Shop Drawings Preparation & Submission
D-Z10-EC.110 Plan and Profile Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Plan and Profile Shop Drawings Review & Approval
D-Z10-EC.120 Builder work Shop Drawings Preparation and submission 14 16-Sep-24 03-Oct-24 Builder work Shop Drawings Preparation and submission
D-Z10-EC.130 Builder work Shop Drawings Review & Approval 12 03-Oct-24 16-Oct-24 Builder work Shop Drawings Review & Approval
D-Z10-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 18-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z10-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 18-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z10-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Nov-24 02-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-02
CULVERT-CIVIL-D 40 29-Oct-24 14-Dec-24 14-Dec-24, DRY CULVERT-CIVIL-D-Z10-02
D-Z10-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Concrete Dimension Shop Drawings Review & Approval
D-Z10-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Nov-24 30-Nov-24 Reinforcement Shop Drawings Preparation and submission
D-Z10-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Nov-24 14-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-03
CULVERT-CIVIL-D 40 10-Nov-24 25-Dec-24 25-Dec-24, DRY CULVERT-CIVIL-D-Z10-03
D-Z10-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z10-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Nov-24 11-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z10-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Dec-24 25-Dec-24 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-04
CULVERT-CIVIL-D 40 21-Nov-24 06-Jan-25 06-Jan-25, DRY CULVERT-CIVIL-D-Z10-04
D-Z10-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Concrete Dimension Shop Drawings Review & Approval
D-Z10-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Dec-24 23-Dec-24 Reinforcement Shop Drawings Preparation and submission
D-Z10-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Dec-24 06-Jan-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-05
CULVERT-CIVIL-D 40 03-Dec-24 18-Jan-25 18-Jan-25, DRY CULVERT-CIVIL-D-Z10-05
D-Z10-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Dec-24 18-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Dec-24 04-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Jan-25 18-Jan-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-06
CULVERT-CIVIL-D 40 15-Dec-24 29-Jan-25 29-Jan-25, DRY CULVERT-CIVIL-D-Z10-06
D-Z10-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Dec-24 30-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jan-25 15-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Dec-24 15-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jan-25 29-Jan-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-07
CULVERT-CIVIL-D 40 26-Dec-24 10-Feb-25 10-Feb-25, DRY CULVERT-CIVIL-D-Z10-07
D-Z10-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Dec-24 11-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Jan-25 27-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jan-25 10-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-08
CULVERT-CIVIL-D 40 07-Jan-25 22-Feb-25 22-Feb-25, DRY CULVERT-CIVIL-D-Z10-08
D-Z10-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Jan-25 22-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Jan-25 08-Feb-25 Concrete Dimension Shop Drawings Review & Approval
Actual Work
Remaining Work
65 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jan-25 08-Feb-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Feb-25 22-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-09
CULVERT-CIVIL-D 40 19-Jan-25 05-Mar-25 05-Mar-25, DRY CULVERT-CIVIL-D-Z10-09
D-Z10-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Jan-25 03-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-25 19-Feb-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-25 19-Feb-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-25 05-Mar-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-10
CULVERT-CIVIL-D 40 30-Jan-25 17-Mar-25 17-Mar-25, DRY CULVERT-CIVIL-D-Z10-10
D-Z10-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Jan-25 15-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Feb-25 03-Mar-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Feb-25 03-Mar-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Mar-25 17-Mar-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-11
CULVERT-CIVIL-D 40 11-Feb-25 29-Mar-25 29-Mar-25, DRY CULVERT-CIVIL-D-Z10-11
D-Z10-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Feb-25 26-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Mar-25 15-Mar-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Feb-25 15-Mar-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Mar-25 29-Mar-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-12
CULVERT-CIVIL-D 40 23-Feb-25 14-Apr-25 14-Apr-25, DRY CULVERT-CIVIL-D-Z10-12
D-Z10-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Feb-25 10-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Mar-25 26-Mar-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Mar-25 14-Apr-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-13
CULVERT-CIVIL-D 40 19-Dec-24 03-Feb-25 03-Feb-25, DRY CULVERT-CIVIL-D-Z10-13
D-Z10-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-24 04-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-25 20-Jan-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jan-25 20-Jan-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-25 03-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-14
CULVERT-CIVIL-D 40 31-Dec-24 15-Feb-25 15-Feb-25, DRY CULVERT-CIVIL-D-Z10-14
D-Z10-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-24 15-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-25 01-Feb-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Jan-25 01-Feb-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-25 15-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-15
CULVERT-CIVIL-D 40 12-Jan-25 26-Feb-25 26-Feb-25, DRY CULVERT-CIVIL-D-Z10-15
D-Z10-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Jan-25 12-Feb-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Jan-25 12-Feb-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Feb-25 26-Feb-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-16
CULVERT-CIVIL-D 40 23-Jan-25 10-Mar-25 10-Mar-25, DRY CULVERT-CIVIL-D-Z10-16
D-Z10-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-25 08-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-25 24-Feb-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-25 24-Feb-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-25 10-Mar-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-17
CULVERT-CIVIL-D 40 04-Feb-25 22-Mar-25 22-Mar-25, DRY CULVERT-CIVIL-D-Z10-17
D-Z10-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-25 19-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-25 08-Mar-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-25 08-Mar-25 Reinforcement Shop Drawings Preparation and submission
Actual Work
Remaining Work
66 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Mar-25 22-Mar-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-18
CULVERT-CIVIL-D 40 16-Feb-25 07-Apr-25 07-Apr-25, DRY CULVERT-CIVIL-D-Z10-18
D-Z10-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Feb-25 03-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-25 19-Mar-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-25 19-Mar-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-25 07-Apr-25 Reinforcement Shop Drawings Review & Approval
DRY CULVERT-CIVIL-D-Z10-19
CULVERT-CIVIL-D 40 27-Feb-25 19-Apr-25 19-Apr-25, DRY CULVERT-CIVIL-D-Z10-19
D-Z10-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-25 15-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission
D-Z10-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Concrete Dimension Shop Drawings Review & Approval
D-Z10-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Mar-25 05-Apr-25 Reinforcement Shop Drawings Preparation and submission
D-Z10-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Apr-25 19-Apr-25 Reinforcement Shop Drawings Review & Approval
D-Z10-EEP-160 Earthing system Shop Drawings Review & Approval 12 04-Mar-25 18-Mar-25 Earthing system Shop Drawings Review & Approval
D-Z10-EEP-110 Lighting system Shop Drawings Review & Approval 12 04-Mar-25 18-Mar-25 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 18 25-Feb-25 18-Mar-25 18-Mar-25, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z10-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 25-Feb-25 13-Mar-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
D-Z10-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 13-Mar-25 18-Mar-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
D-Z10-EEP-130 Small Power system Shop Drawings Review & Approval 4 09-Apr-25 14-Apr-25 Small Power system Shop Drawings Review & Approval
POWER DISTRIBUTION
DISTRIBUTIO 26 24-Feb-25 26-Mar-25 26-Mar-25, POWER DISTRIBUTION
D-Z10-EEP-170 Generator Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Generator Shop Drawings Preparation & Submission
D-Z10-EEP-180 Generator Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Generator Shop Drawings Review & Approval
D-Z10-EEP-190 UPS Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 UPS Shop Drawings Preparation & Submission
D-Z10-EEP-200 UPS Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 UPS Shop Drawings Review & Approval
D-Z10-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 MDBs Pannels Shop Drawings Preparation & Submission
D-Z10-EEP-220 MDBs Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 MDBs Shop Drawings Review & Approval
D-Z10-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 MCC Pannels Shop Drawings Preparation & Submission
D-Z10-EEP-240 MCCB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 MCCB Shop Drawings Review & Approval
D-Z10-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 SMSB Pannels Shop Drawings Preparation & Submission
D-Z10-EEP-260 SMSB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 SMSB Shop Drawings Review & Approval
D-Z10-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 DB Pannels Shop Drawings Preparation & Submission
D-Z10-EEP-280 DB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 DB Shop Drawings Review & Approval
D-Z10-EEP-290 Isolators Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Isolators Shop Drawings Preparation & Submission
D-Z10-EEP-300 Isolator Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Isolator Shop Drawings Review & Approval
D-Z10-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
D-Z10-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 LCP / ELC PannelsShop Drawings Review & Approval
D-Z10-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Fire Alarm system Shop Drawings Review & Approval
Actual Work
Remaining Work
67 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-EEL-180 ICT System Shop Drawings Preparation & Submission 14 01-Jan-25 18-Jan-25 ICT System Shop Drawings Preparation & Submission
D-Z10-EEL-190 ICT System Shop Drawings Review & Approval 4 06-Apr-25 10-Apr-25 ICT System Shop Drawings Review & Approval
D-Z10-EEL-150 Access Control system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Access Control system Shop Drawings Review & Approval
RODDENT REPPELENT
REPPELEN SYSTEM 54 03-Feb-25 10-Apr-25 10-Apr-25, RODDENT REPPELENT SYSTEM
D-Z10-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 03-Feb-25 18-Feb-25 Roddent Repplent system Shop Drawings Preparation & Submission
D-Z10-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 06-Apr-25 10-Apr-25 Roddent Repplent system Shop Drawings Review & Approval
D-Z10-EEL-130 Scada system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Scada system Shop Drawings Review & Approval
D-Z10-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
MECHANICAL SHOP DR
DRAWINGS 86 11-Jan-25 24-Apr-25 24-Apr-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 86 11-Jan-25 24-Apr-25 24-Apr-25, FIRE FIGHTING
D-Z10-EM-FF.100 Firefighting system Shop Drawings Preparation & Submission 14 11-Jan-25 26-Jan-25 Firefighting system Shop Drawings Preparation & Submission
D-Z10-EM-FF.110 Firefighting system Shop Drawings Review & Approval 12 10-Apr-25 24-Apr-25 Firefighting system Shop Drawings Review & Approval
D-Z10-EM-HVAC.13 HVAC system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 HVAC system Shop Drawings Review & Approval
D-Z10-EM-PB.150 Plumbing system Shop Drawings Review & Approval 12 27-Feb-25 13-Mar-25 Plumbing system Shop Drawings Review & Approval
T2-ENGZ10-WC-D.18 Plan and Profile Shop Drawing Prepration &Submission 14 30-Jan-25 16-Feb-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 16-Apr-25 29-Apr-25 Review and approval power system shopdrawings
T2-ENG-Z10-R.405 Plan and Profile Shop Drawing Review & Approval 14 14-Jan-25 30-Jan-25 Plan and Profile Shop Drawing Review & Approval
T2-ENG-Z10-R.410 Road Cross Sections Shop Drawing Preparation & Submission 14 30-Jan-25 16-Feb-25 Road Cross Sections Shop Drawing Preparation & Submission
T2-ENG-Z10-R.415 Road Cross Sections Shop Drawing Review & Approval 14 16-Feb-25 03-Mar-25 Road Cross Sections Shop Drawing Review & Approval
T2-ENG-Z10-R.420 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 16-Feb-25 04-Mar-25 Guiding Signs and Marking Shop Drawing Preparation & Submission
T2-ENG-Z10-R.425 Guiding Signs and Marking Shop Drawing Review & Approval 14 04-Mar-25 19-Mar-25 Guiding Signs and Marking Shop Drawing Review & Approval
T3-ENG-Z11-EX.850 Cross Section Shop Drawing Review & Approval 6 17-Oct-22 A 23-Oct-22 A Cross Section Shop Drawing Review & Approval
T3-ENG-Z11-SI.855 Soil Improvement Design Preparation & Submission 104 18-Jan-23 A 22-May-23 A Soil Improvement Design Preparation & Submission
T3-ENG-Z11-SI.860 Soil Improvement Design Review & Approval 100 01-Feb-23 A 31-May-23 A Soil Improvement Design Review & Approval
Actual Work
Remaining Work
68 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL/ ZONE WISE 92 06-Jun-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 92 06-Jun-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z11-EC.100 Plan and Profile Shop Drawings Preparation & Submission 85 06-Jun-23 A 16-Sep-23 A Plan and Profile Shop Drawings Preparation & Submission
JAH-Z11-EC.110 Plan and Profile Shop Drawings Review & Approval 83 17-Jun-23 A 25-Sep-23 A Plan and Profile Shop Drawings Review & Approval
JAH-Z11-EC.120 Builder work Shop Drawings Preparation and submission 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Preparation and submission
JAH-Z11-EC.130 Builder work Shop Drawings Review & Approval 6 31-Aug-23 A 06-Sep-23 A Builder work Shop Drawings Review & Approval
JAH-Z11-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Oct-24 19-Oct-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Oct-24 19-Oct-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Oct-24 02-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Oct-24 05-Nov-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Nov-24 19-Nov-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 05-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-05-EC-120 Reinforcement Shop Drawings Preparation and submission 6 29-Aug-23 A 04-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 384 28-Dec-22 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-06-EC-120 Reinforcement Shop Drawings Preparation and submission 7 26-Aug-23 A 02-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-06-EC-130 Reinforcement Shop Drawings Review & Approval 10 02-Sep-23 A 12-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 28-Aug-23 A 12-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-07-EC-120 Reinforcement Shop Drawings Preparation and submission 9 21-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-07-EC-130 Reinforcement Shop Drawings Review & Approval 11 30-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-08-EC-120 Reinforcement Shop Drawings Preparation and submission 6 12-Jun-23 A 18-Jun-23 A Reinforcement Shop Drawings Preparation and submission
Actual Work
Remaining Work
69 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z11-08-EC-130 Reinforcement Shop Drawings Review & Approval 8 18-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Aug-23 A 31-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-09-EC-120 Reinforcement Shop Drawings Preparation and submission 9 10-Aug-23 A 20-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 20-Aug-23 A 03-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Aug-23 A 31-Aug-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-10-EC-120 Reinforcement Shop Drawings Preparation and submission 10 14-Aug-23 A 24-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Aug-23 A 06-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 20-Aug-23 A 04-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-11-EC-120 Reinforcement Shop Drawings Preparation and submission 11 08-Aug-23 A 20-Aug-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-11-EC-130 Reinforcement Shop Drawings Review & Approval 14 20-Aug-23 A 04-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 61 27-Dec-22 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-12-EC-120 Reinforcement Shop Drawings Preparation and submission 5 01-Jun-23 A 06-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-12-EC-130 Reinforcement Shop Drawings Review & Approval 8 06-Jun-23 A 14-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 22 09-Aug-23 A 03-Sep-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-13-EC-120 Reinforcement Shop Drawings Preparation and submission 7 01-Sep-23 A 09-Sep-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-13-EC-130 Reinforcement Shop Drawings Review & Approval 9 09-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 04-Apr-23 A 12-Apr-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-14-EC-120 Reinforcement Shop Drawings Preparation and submission 5 01-Jun-23 A 06-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-14-EC-130 Reinforcement Shop Drawings Review & Approval 8 06-Jun-23 A 14-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-15-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-15-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Sep-26 03-Oct-26 Concrete Dimension Shop
JAH-Z11-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Sep-26 03-Oct-26 Reinforcement Shop Draw
JAH-Z11-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra
JAH-Z11-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-17-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-17-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval
Actual Work
Remaining Work
70 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-T3-Z11-18 18 01-Jun-23 A 21-Jun-23 A 21-Jun-23 A, CIVIL-SEG-T3-Z11-18
JAH-Z11-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 01-Jun-23 A 13-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission
JAH-Z11-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-18-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-18-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-19-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission
JAH-Z11-19-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval
JAH-Z11-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Aug-24 03-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Sep-24 16-Sep-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Concrete Dimension Shop Drawings Review & Approval
JAH-Z11-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Sep-24 21-Sep-24 Reinforcement Shop Drawings Preparation and submission
JAH-Z11-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Sep-24 05-Oct-24 Reinforcement Shop Drawings Review & Approval
JAH-Z11-EEP-160 Earthing system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Earthing system Shop Drawings Review & Approval
JAH-Z11-EEP-110 Lighting system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Lighting system Shop Drawings Review & Approval
CABLE TRAY /CABLE ROUTING SYSTEM 125 08-Dec-24 06-May-25 06-May-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z11-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 08-Dec-24 24-Dec-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission
JAH-Z11-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 03-May-25 06-May-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval
JAH-Z11-EEP-130 Small Power system Shop Drawings Review & Approval 4 09-Jan-25 13-Jan-25 Small Power system Shop Drawings Review & Approval
JAH-Z11-EEP-180 Generator Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Generator Shop Drawings Review & Approval
JAH-Z11-EEP-190 UPS Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 UPS Shop Drawings Preparation & Submission
JAH-Z11-EEP-200 UPS Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 UPS Shop Drawings Review & Approval
JAH-Z11-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 MDBs Pannels Shop Drawings Preparation & Submission
JAH-Z11-EEP-220 MDBs Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 MDBs Shop Drawings Review & Approval
JAH-Z11-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 MCC Pannels Shop Drawings Preparation & Submission
JAH-Z11-EEP-240 MCCB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 MCCB Shop Drawings Review & Approval
JAH-Z11-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 SMSB Pannels Shop Drawings Preparation & Submission
JAH-Z11-EEP-260 SMSB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 SMSB Shop Drawings Review & Approval
JAH-Z11-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 DB Pannels Shop Drawings Preparation & Submission
Actual Work
Remaining Work
71 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z11-EEP-280 DB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 DB Shop Drawings Review & Approval
JAH-Z11-EEP-290 Isolators Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Isolators Shop Drawings Preparation & Submission
JAH-Z11-EEP-300 Isolator Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Isolator Shop Drawings Review & Approval
JAH-Z11-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 LCP /ELC Pannels Shop Drawings Preparation & Submission
JAH-Z11-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 LCP / ELC PannelsShop Drawings Review & Approval
JAH-Z11-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 18-Dec-24 31-Dec-24 Fire Alarm system Shop Drawings Review & Approval
JAH-Z11-EEL-190 ICT System Shop Drawings Review & Approval 4 07-Jan-25 11-Jan-25 ICT System Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 50 14-Nov-24 11-Jan-25 11-Jan-25, ACCESS CONTROL SYSTEM
JAH-Z11-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 14-Nov-24 01-Dec-24 Access Control system Shop Drawings Preparation & Submission
JAH-Z11-EEL-150 Access Control system Shop Drawings Review & Approval 12 29-Dec-24 11-Jan-25 Access Control system Shop Drawings Review & Approval
JAH-Z11-EEL-170 Public Address system Shop Drawings Review & Approval 4 18-Jan-25 21-Jan-25 Public Address system Shop Drawings Review & Approval
JAH-Z11-EEL-130 Scada system Shop Drawings Review & Approval 12 08-Jan-25 21-Jan-25 Scada system Shop Drawings Review & Approval
JAH-Z11-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 19-Jan-25 01-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval
JAH-Z11-EM-110 Firefighting system Shop Drawings Review & Approval 12 16-Jan-25 29-Jan-25 Firefighting system Shop Drawings Review & Approval
JAH-Z11-EM-130 HVAC system Shop Drawings Review & Approval 12 23-Jan-25 05-Feb-25 HVAC system Shop Drawings Review & Approval
JAH-Z11-EM-150 Plumbing system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Plumbing system Shop Drawings Review & Approval
T3-ENGZ11-WC-D.19 Plan and Profile Shop Drawing Prepration &Submission 14 22-Mar-25 12-Apr-25 Plan and Profile Shop Drawing Prepration &Submission
JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 23-Jan-25 05-Feb-25 Review and approval power system shopdrawings
T3-ENG-Z11-R.435 Plan and Profile Shop Drawing Review & Approval 14 22-Jun-25 08-Jul-25 Plan and Profile Shop Drawing Review & Approval
T3-ENG-Z11-R.440 Road Cross Sections Shop Drawing Preparation & Submission 14 08-Jul-25 24-Jul-25 Road Cross Sections Shop Drawing Preparation & Submission
T3-ENG-Z11-R.445 Road Cross Sections Shop Drawing Review & Approval 14 24-Jul-25 09-Aug-25 Road Cross Sections Shop Drawing Review & Approval
T3-ENG-Z11-R.450 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 24-Jul-25 10-Aug-25 Guiding Signs and Marking Shop Drawing Preparation & Submission
Actual Work
Remaining Work
72 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
T3-ENG-Z11-R.455 Guiding Signs and Marking Shop Drawing Review & Approval 14 10-Aug-25 25-Aug-25 Guiding Signs and Marking Shop Drawing Review & Approval
ES.2-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 25-Jan-24 11-Feb-24 Foundation Shop Drawings Review & Approval
ES.2-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 Walls Shop Drawings Preparation & Submission
ES.2-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 26-Jun-24 13-Jul-24 Walls Shop Drawings Review & Approval
ES.2-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 29-Jul-24 13-Aug-24 Slab Shop Drawings Preparation & Submission
ES.2-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 13-Aug-24 29-Aug-24 Slab Shop Drawings Review & Approval
ES.2-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 24-Jul-24 10-Aug-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 16-Jul-24 18-Aug-24 18-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.2-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 HVAC Shop Drawings Preparation & Submission
ES.2-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 01-Aug-24 18-Aug-24 HVAC Shop Drawings Review & Approval
ES.2-EN-E-D..65 Cable Tray Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Cable Tray Shop Drawings Review & Approval
ES.2-EN-E-D..75 Power Cables Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Power Cables Shop Drawings Review & Approval
ES.2-EN-E-D..85 Lighting System Shop Drawings Review & Approval 12 15-Aug-24 29-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 33 27-Jul-24 03-Sep-24 03-Sep-24, ELECTRICAL INSTALLATIONS
ES.2-EN-E-D..90 Electrical Installations Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Electrical Installations Shop Drawings Preparation & Submission
ES.2-EN-E-D..95 Electrical Installations Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Electrical Installations Shop Drawings Review & Approval
ES.2-EN-E-D..105 Lightning Protection Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Lightning Protection Shop Drawings Review & Approval
ES.2-EN-EL-D..65 Fire Alarm Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 50 25-Jul-24 22-Sep-24 22-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.2-EN-EL-D..70 Telephone Shop Drawings Preparation & Submission 14 25-Jul-24 11-Aug-24 Telephone Shop Drawings Preparation & Submission
ES.2-EN-EL-D..75 Telephone Shop Drawings Review & Approval 12 08-Sep-24 22-Sep-24 Telephone Shop Drawings Review & Approval
ES.2-EN-EL-D..85 Public Address system Shop Drawings Review & Approval 12 12-Sep-24 28-Sep-24 Public Address system Shop Drawings Review & Approval
ES.2-EN-EL-D..95 Video Surveillance system Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
73 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.2-EN-EL-D..100 Access Control system Shop Drawings Preparation & Submission 14 12-Sep-24 30-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.2-EN-EL-D..105 Access Control system Shop Drawings Review & Approval 12 30-Sep-24 14-Oct-24 Access Control system Shop Drawings Review & Approval
ES.4-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 07-Jan-24 23-Jan-24 Foundation Shop Drawings Review & Approval
ES.4-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Walls Shop Drawings Preparation & Submission
ES.4-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 03-Jun-24 23-Jun-24 Walls Shop Drawings Review & Approval
ES.4-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Slab Shop Drawings Preparation & Submission
ES.4-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 27-Jul-24 12-Aug-24 Slab Shop Drawings Review & Approval
ES.4-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 06-Jul-24 22-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 27-Jun-24 30-Jul-24 30-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.4-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.4-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 14-Jul-24 30-Jul-24 HVAC Shop Drawings Review & Approval
ES.4-EN-E-D-CT.65 Cable Tray Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.4-EN-E-D-PC.75 Power Cables Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Power Cables Shop Drawings Review & Approval
ES.4-EN-E-D-LS.85 Lighting System Shop Drawings Review & Approval 12 28-Jul-24 11-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 33 08-Jul-24 15-Aug-24 15-Aug-24, ELECTRICAL INSTALLATIONS
ES.4-EN-E-D-EI.90 Electrical Installations Shop Drawings Preparation & Submission 14 08-Jul-24 24-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.4-EN-E-D-EI.95 Electrical Installations Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.4-EN-E-D-LPS.105 Lightning Protection Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.4-EN-EL-D-FD.65 Fire Alarm Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 50 07-Jul-24 03-Sep-24 03-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.4-EN-EL-D-CS.70 Telephone Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.4-EN-EL-D-CS.75 Telephone Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Telephone Shop Drawings Review & Approval
ES.4-EN-EL-D-VE.85 Public Address system Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Public Address system Shop Drawings Review & Approval
ES.4-EN-EL-D-VS.95 Video Surveillance system Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
74 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.4-EN-EL-D-AC.10 Access Control system Shop Drawings Preparation & Submission 14 25-Aug-24 10-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.4-EN-EL-D-AC.10 Access Control system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Access Control system Shop Drawings Review & Approval
ES.3-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 23-Apr-24 09-May-24 Foundation Shop Drawings Review & Approval
ES.3-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 03-Sep-24 19-Sep-24 Walls Shop Drawings Preparation & Submission
ES.3-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 19-Sep-24 06-Oct-24 Walls Shop Drawings Review & Approval
ES.3-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 26-Oct-24 10-Nov-24 Slab Shop Drawings Preparation & Submission
ES.3-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 10-Nov-24 26-Nov-24 Slab Shop Drawings Review & Approval
ES.3-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 15-Oct-24 31-Oct-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Oct-24 04-Nov-24 04-Nov-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.3-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Oct-24 19-Oct-24 HVAC Shop Drawings Preparation & Submission
ES.3-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 19-Oct-24 04-Nov-24 HVAC Shop Drawings Review & Approval
ES.3-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 17-Oct-24 31-Oct-24 Cable Tray Shop Drawings Review & Approval
ES.3-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Power Cables Shop Drawings Review & Approval
ES.3-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 05-Nov-24 19-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 20-Oct-24 24-Nov-24 24-Nov-24, ELECTRICAL INSTALLATIONS
ES.3-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 20-Oct-24 05-Nov-24 Electrical Installations Shop Drawings Preparation & Submission
ES.3-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Electrical Installations Shop Drawings Review & Approval
ES.3-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Lightning Protection Shop Drawings Review & Approval
ES.3-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 12-Oct-24 11-Dec-24 11-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.3-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Telephone Shop Drawings Preparation & Submission
ES.3-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Telephone Shop Drawings Review & Approval
ES.3-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 03-Dec-24 17-Dec-24 Public Address system Shop Drawings Review & Approval
ES.3-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 08-Dec-24 22-Dec-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
75 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.3-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 30-Nov-24 16-Dec-24 Access Control system Shop Drawings Preparation & Submission
ES.3-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 16-Dec-24 30-Dec-24 Access Control system Shop Drawings Review & Approval
ES.10-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.10-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Walls Shop Drawings Preparation & Submission
ES.10-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 21-May-24 06-Jun-24 Walls Shop Drawings Review & Approval
ES.10-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 09-Jul-24 24-Jul-24 Slab Shop Drawings Preparation & Submission
ES.10-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 25-Jul-24 10-Aug-24 Slab Shop Drawings Review & Approval
ES.10-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 19-Jun-24 06-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Jun-24 09-Jul-24 09-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.10-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.10-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Review & Approval
ES.10-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.10-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval
ES.10-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 24-Jun-24 29-Jul-24 29-Jul-24, ELECTRICAL INSTALLATIONS
ES.10-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.10-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.10-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.10-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 11-Jun-24 15-Aug-24 15-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.10-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.10-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Telephone Shop Drawings Review & Approval
ES.10-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Public Address system Shop Drawings Review & Approval
ES.10-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
76 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.10-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.10-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Access Control system Shop Drawings Review & Approval
ES.13-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Review & Approval
ES.13-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Walls Shop Drawings Preparation & Submission
ES.13-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 05-Jun-24 26-Jun-24 Walls Shop Drawings Review & Approval
ES.13-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 24-Jul-24 10-Aug-24 Slab Shop Drawings Preparation & Submission
ES.13-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 10-Aug-24 26-Aug-24 Slab Shop Drawings Review & Approval
ES.13-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 04-Jul-24 21-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jun-24 24-Jul-24 24-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.13-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jun-24 08-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.13-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 08-Jul-24 24-Jul-24 HVAC Shop Drawings Review & Approval
ES.13-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.13-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Power Cables Shop Drawings Review & Approval
ES.13-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Jul-24 13-Aug-24 13-Aug-24, ELECTRICAL INSTALLATIONS
ES.13-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Jul-24 25-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.13-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 30-Jul-24 13-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.13-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.13-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 02-Jul-24 31-Aug-24 31-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.13-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.13-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Telephone Shop Drawings Review & Approval
ES.13-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 22-Aug-24 05-Sep-24 Public Address system Shop Drawings Review & Approval
ES.13-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 27-Aug-24 10-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
77 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.13-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.13-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Access Control system Shop Drawings Review & Approval
ES.14-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 13-Jan-24 29-Jan-24 Foundation Shop Drawings Review & Approval
ES.14-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Walls Shop Drawings Preparation & Submission
ES.14-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-Jun-24 07-Jul-24 Walls Shop Drawings Review & Approval
ES.14-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Preparation & Submission
ES.14-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 20-Aug-24 05-Sep-24 Slab Shop Drawings Review & Approval
ES.14-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 15-Jul-24 31-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 03-Jul-24 04-Aug-24 04-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.14-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.14-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 HVAC Shop Drawings Review & Approval
ES.14-EN-E-D-CT.65 Cable Tray Shop Drawings Review & Approval 12 17-Jul-24 31-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.14-EN-E-D-PC.75 Power Cables Shop Drawings Review & Approval 12 23-Jul-24 06-Aug-24 Power Cables Shop Drawings Review & Approval
ES.14-EN-E-D-LS.85 Lighting System Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 180 18-Jan-24 24-Aug-24 24-Aug-24, ELECTRICAL INSTALLATIONS
ES.14-EN-E-D-EI.90 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
ES.14-EN-E-D-EI.95 Electrical Installations Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.14-EN-E-D-LPS.105 Lightning Protection Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Lightning Protection Shop Drawings Review & Approval
ES.14-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 13-Jul-24 10-Sep-24 10-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.14-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.14-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 27-Aug-24 10-Sep-24 Telephone Shop Drawings Review & Approval
ES.14-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Public Address system Shop Drawings Review & Approval
ES.14-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
78 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.14-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 31-Aug-24 15-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.14-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Access Control system Shop Drawings Review & Approval
ES.17-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.17-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Walls Shop Drawings Preparation & Submission
ES.17-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 21-May-24 06-Jun-24 Walls Shop Drawings Review & Approval
ES.17-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 Slab Shop Drawings Preparation & Submission
ES.17-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 20-Jul-24 04-Aug-24 Slab Shop Drawings Review & Approval
ES.17-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 19-Jun-24 06-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Jun-24 09-Jul-24 09-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.17-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.17-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Review & Approval
ES.17-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.17-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval
ES.17-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 24-Jun-24 29-Jul-24 29-Jul-24, ELECTRICAL INSTALLATIONS
ES.17-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.17-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.17-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.17-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 11-Jun-24 15-Aug-24 15-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.17-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.17-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Telephone Shop Drawings Review & Approval
ES.17-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Public Address system Shop Drawings Review & Approval
ES.17-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
79 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.17-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.17-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Access Control system Shop Drawings Review & Approval
ES.18-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.18-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission
ES.18-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval
ES.18-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 27-Jun-24 13-Jul-24 Slab Shop Drawings Preparation & Submission
ES.18-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 14-Jul-24 29-Jul-24 Slab Shop Drawings Review & Approval
ES.18-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.18-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.18-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval
ES.18-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.18-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval
ES.18-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.18-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.18-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.18-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.18-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.18-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.18-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval
ES.18-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval
ES.18-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
80 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.18-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.18-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval
ES.19-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 07-Feb-24 24-Feb-24 Foundation Shop Drawings Review & Approval
ES.19-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Walls Shop Drawings Preparation & Submission
ES.19-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 16-Jul-24 01-Aug-24 Walls Shop Drawings Review & Approval
ES.19-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Aug-24 03-Sep-24 Slab Shop Drawings Preparation & Submission
ES.19-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Sep-24 19-Sep-24 Slab Shop Drawings Review & Approval
ES.19-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 10-Aug-24 26-Aug-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 28-Jul-24 29-Aug-24 29-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.19-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 28-Jul-24 13-Aug-24 HVAC Shop Drawings Preparation & Submission
ES.19-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 13-Aug-24 29-Aug-24 HVAC Shop Drawings Review & Approval
ES.19-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Cable Tray Shop Drawings Review & Approval
ES.19-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 18-Aug-24 01-Sep-24 Power Cables Shop Drawings Review & Approval
ES.19-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 14-Aug-24 18-Sep-24 18-Sep-24, ELECTRICAL INSTALLATIONS
ES.19-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 14-Aug-24 31-Aug-24 Electrical Installations Shop Drawings Preparation & Submission
ES.19-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Electrical Installations Shop Drawings Review & Approval
ES.19-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Lightning Protection Shop Drawings Review & Approval
ES.19-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 06-Aug-24 07-Oct-24 07-Oct-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.19-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Telephone Shop Drawings Preparation & Submission
ES.19-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 22-Sep-24 07-Oct-24 Telephone Shop Drawings Review & Approval
ES.19-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Public Address system Shop Drawings Review & Approval
ES.19-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
81 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.19-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 25-Sep-24 12-Oct-24 Access Control system Shop Drawings Preparation & Submission
ES.19-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 12-Oct-24 26-Oct-24 Access Control system Shop Drawings Review & Approval
ES.20-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 01-Feb-24 18-Feb-24 Foundation Shop Drawings Review & Approval
ES.20-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Walls Shop Drawings Preparation & Submission
ES.20-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 11-Jul-24 28-Jul-24 Walls Shop Drawings Review & Approval
ES.20-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Aug-24 03-Sep-24 Slab Shop Drawings Preparation & Submission
ES.20-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Sep-24 19-Sep-24 Slab Shop Drawings Review & Approval
ES.20-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 05-Aug-24 21-Aug-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jul-24 25-Aug-24 25-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.20-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 HVAC Shop Drawings Preparation & Submission
ES.20-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 08-Aug-24 25-Aug-24 HVAC Shop Drawings Review & Approval
ES.20-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Cable Tray Shop Drawings Review & Approval
ES.20-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Power Cables Shop Drawings Review & Approval
ES.20-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 26-Aug-24 09-Sep-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Aug-24 14-Sep-24 14-Sep-24, ELECTRICAL INSTALLATIONS
ES.20-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Aug-24 26-Aug-24 Electrical Installations Shop Drawings Preparation & Submission
ES.20-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Electrical Installations Shop Drawings Review & Approval
ES.20-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Lightning Protection Shop Drawings Review & Approval
ES.20-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 01-Aug-24 02-Oct-24 02-Oct-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.20-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 01-Aug-24 18-Aug-24 Telephone Shop Drawings Preparation & Submission
ES.20-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 17-Sep-24 02-Oct-24 Telephone Shop Drawings Review & Approval
ES.20-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 24-Sep-24 08-Oct-24 Public Address system Shop Drawings Review & Approval
ES.20-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
82 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.20-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 19-Sep-24 07-Oct-24 Access Control system Shop Drawings Preparation & Submission
ES.20-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 07-Oct-24 21-Oct-24 Access Control system Shop Drawings Review & Approval
ES.22-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 04-Jan-24 20-Jan-24 Foundation Shop Drawings Review & Approval
ES.22-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 21-May-24 06-Jun-24 Walls Shop Drawings Preparation & Submission
ES.22-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 06-Jun-24 27-Jun-24 Walls Shop Drawings Review & Approval
ES.22-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Preparation & Submission
ES.22-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 23-Jul-24 07-Aug-24 Slab Shop Drawings Review & Approval
ES.22-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 06-Jul-24 22-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jun-24 25-Jul-24 25-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.22-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.22-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 09-Jul-24 25-Jul-24 HVAC Shop Drawings Review & Approval
ES.22-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 08-Jul-24 22-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.22-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Power Cables Shop Drawings Review & Approval
ES.22-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Jul-24 14-Aug-24 14-Aug-24, ELECTRICAL INSTALLATIONS
ES.22-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.22-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.22-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.22-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 02-Jul-24 01-Sep-24 01-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.22-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.22-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 18-Aug-24 01-Sep-24 Telephone Shop Drawings Review & Approval
ES.22-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 24-Aug-24 07-Sep-24 Public Address system Shop Drawings Review & Approval
ES.22-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
83 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.22-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.22-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Access Control system Shop Drawings Review & Approval
ES.9-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.9-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 07-May-24 23-May-24 Walls Shop Drawings Preparation & Submission
ES.9-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 23-May-24 09-Jun-24 Walls Shop Drawings Review & Approval
ES.9-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 25-Jul-24 10-Aug-24 Slab Shop Drawings Preparation & Submission
ES.9-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 11-Aug-24 26-Aug-24 Slab Shop Drawings Review & Approval
ES.9-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 04-Jun-24 11-Jul-24 11-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.9-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 04-Jun-24 25-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.9-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 25-Jun-24 11-Jul-24 HVAC Shop Drawings Review & Approval
ES.9-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 24-Jun-24 08-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.9-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 30-Jun-24 14-Jul-24 Power Cables Shop Drawings Review & Approval
ES.9-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 26-Jun-24 31-Jul-24 31-Jul-24, ELECTRICAL INSTALLATIONS
ES.9-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.9-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 17-Jul-24 31-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.9-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.9-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 13-Jun-24 18-Aug-24 18-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.9-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.9-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 04-Aug-24 18-Aug-24 Telephone Shop Drawings Review & Approval
ES.9-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Public Address system Shop Drawings Review & Approval
ES.9-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 14-Aug-24 28-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
84 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.9-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.9-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 22-Aug-24 05-Sep-24 Access Control system Shop Drawings Review & Approval
ES.5-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 04-Jan-24 20-Jan-24 Foundation Shop Drawings Review & Approval
ES.5-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 14-May-24 30-May-24 Walls Shop Drawings Preparation & Submission
ES.5-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 30-May-24 20-Jun-24 Walls Shop Drawings Review & Approval
ES.5-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Preparation & Submission
ES.5-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 23-Jul-24 07-Aug-24 Slab Shop Drawings Review & Approval
ES.5-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 29-Jun-24 15-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 11-Jun-24 18-Jul-24 18-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.5-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.5-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 02-Jul-24 18-Jul-24 HVAC Shop Drawings Review & Approval
ES.5-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.5-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Power Cables Shop Drawings Review & Approval
ES.5-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 03-Jul-24 07-Aug-24 07-Aug-24, ELECTRICAL INSTALLATIONS
ES.5-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 03-Jul-24 20-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.5-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.5-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.5-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 25-Jun-24 25-Aug-24 25-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.5-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.5-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Telephone Shop Drawings Review & Approval
ES.5-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Public Address system Shop Drawings Review & Approval
ES.5-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
85 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.5-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 13-Aug-24 29-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.5-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 29-Aug-24 12-Sep-24 Access Control system Shop Drawings Review & Approval
ES.12-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 16-Jan-24 01-Feb-24 Foundation Shop Drawings Review & Approval
ES.12-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Walls Shop Drawings Preparation & Submission
ES.12-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Walls Shop Drawings Review & Approval
ES.12-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Slab Shop Drawings Preparation & Submission
ES.12-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 12-Aug-24 28-Aug-24 Slab Shop Drawings Review & Approval
ES.12-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 06-Jul-24 07-Aug-24 07-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.12-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 HVAC Shop Drawings Preparation & Submission
ES.12-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jul-24 07-Aug-24 HVAC Shop Drawings Review & Approval
ES.12-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Cable Tray Shop Drawings Review & Approval
ES.12-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Power Cables Shop Drawings Review & Approval
ES.12-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 08-Aug-24 22-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jul-24 27-Aug-24 27-Aug-24, ELECTRICAL INSTALLATIONS
ES.12-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Electrical Installations Shop Drawings Preparation & Submission
ES.12-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Electrical Installations Shop Drawings Review & Approval
ES.12-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Lightning Protection Shop Drawings Review & Approval
ES.12-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 15-Jul-24 14-Sep-24 14-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.12-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 15-Jul-24 31-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.12-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Telephone Shop Drawings Review & Approval
ES.12-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Public Address system Shop Drawings Review & Approval
ES.12-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
86 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.12-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Access Control system Shop Drawings Preparation & Submission
ES.12-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Access Control system Shop Drawings Review & Approval
ES.156-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.156-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission
ES.156-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval
ES.156-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 22-Jun-24 07-Jul-24 Slab Shop Drawings Preparation & Submission
ES.156-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Review & Approval
ES.156-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.156-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.156-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval
ES.156-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.156-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval
ES.156-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.156-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.156-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.156-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.156-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.156-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.156-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval
ES.156-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval
ES.156-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
87 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.156-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.156-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval
ES.16-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
ES.16-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission
ES.16-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval
ES.16-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Jun-24 04-Jul-24 Slab Shop Drawings Preparation & Submission
ES.16-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Jul-24 21-Jul-24 Slab Shop Drawings Review & Approval
ES.16-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval
DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.16-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission
ES.16-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval
ES.16-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval
ES.16-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval
ES.16-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.16-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
ES.16-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval
ES.16-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval
ES.16-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.16-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission
ES.16-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval
ES.16-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval
ES.16-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval
Actual Work
Remaining Work
88 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.16-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission
ES.16-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval
JAH-ENG-VR01-SI.87 Soil Improvement Design Review & Approval 14 24-Jan-24 08-Feb-24 Soil Improvement Design Review & Approval
VTR-1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Mar-24 26-Mar-24 Foundation Shop Drawings Review & Approval
VTR-1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Jul-24 01-Aug-24 Walls Shop Drawings Preparation & Submission
VTR-1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 03-Aug-24 18-Aug-24 Walls Shop Drawings Review & Approval
VTR-1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Slab Shop Drawings Preparation & Submission
VTR-1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 05-Sep-24 21-Sep-24 Slab Shop Drawings Review & Approval
VTR-1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 16-Feb-25 04-Mar-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 184 22-Jul-24 22-Feb-25 22-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 22-Jul-24 06-Aug-24 HVAC Shop Drawings Preparation & Submission
VTR-1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 05-Feb-25 22-Feb-25 HVAC Shop Drawings Review & Approval
VTR-1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 29-Jan-25 15-Feb-25 Plumbing System Shop Drawings Review & Approval
VTR-1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 15-Jan-25 28-Jan-25 Cable Tray Shop Drawings Review & Approval
VTR-1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 18-Jan-25 30-Jan-25 Power Cables Shop Drawings Review & Approval
VTR-1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 13-Jan-25 26-Jan-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 26 09-Jan-25 08-Feb-25 08-Feb-25, ELECTRICAL INSTALLATIONS
VTR-1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 09-Jan-25 25-Jan-25 Electrical Installations Shop Drawings Preparation & Submission
VTR-1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Jan-25 08-Feb-25 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 111 08-Sep-24 16-Jan-25 16-Jan-25, LIGHTNING PROTECTION SYSTEM
VTR-1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 08-Sep-24 25-Sep-24 Lightning Protection Drawings Preparation & Submission
VTR-1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 04-Jan-25 16-Jan-25 Lightning Protection Shop Drawings Review & Approval
VTR-1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 04-Jan-25 16-Jan-25 Earthing System Drawings Review & Approval
Actual Work
Remaining Work
89 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR-1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 95 28-Oct-24 16-Feb-25 16-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 28-Oct-24 13-Nov-24 Telephone Shop Drawings Preparation & Submission
VTR-1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Telephone Shop Drawings Review & Approval
VTR-1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Public Address system Shop Drawings Review & Approval
VTR-1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 54 16-Dec-24 16-Feb-25 16-Feb-25, ACCESS CONTROL SYSTEM
VTR-1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 16-Dec-24 31-Dec-24 Access Control system Shop Drawings Preparation & Submission
VTR-1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 40 01-Jan-25 16-Feb-25 16-Feb-25, RADIO RE-BROADCASTING SYSTEM
VTR-1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-Jan-25 16-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR-1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR-1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval power system shopdrawings
MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval medium voltage shopdrawings
MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval transformer shopdrawings
MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval RMU shopdrawings
MEP-VR01-ENG-PW Review and approval MVSG shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval MVSG shopdrawings
MEP-VR01-ENG-PW Review and approval Battery room shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval Battery room shopdrawings
VECHICULAR ROOM 06 (IN ZONE 04) 348 02-Dec-23 19-Jan-25 19-Jan-25, VECHICULAR ROOM 06 (IN ZONE 04)
ENGINEERING 348 02-Dec-23 19-Jan-25 19-Jan-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 348 02-Dec-23 19-Jan-25 19-Jan-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-VR06-SI.88 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission
JAH-ENG-VR06-SI.89 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
VTR.6-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Feb-24 05-Mar-24 Foundation Shop Drawings Review & Approval
VTR.6-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission
Actual Work
Remaining Work
90 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR.6-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Feb-24 20-Feb-24 Walls Shop Drawings Review & Approval
VTR.6-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Slab Shop Drawings Preparation & Submission
VTR.6-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 01-Jul-24 17-Jul-24 Slab Shop Drawings Review & Approval
VTR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 16-Sep-24 02-Oct-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 48 24-Sep-24 18-Nov-24 18-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR.6-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 24-Sep-24 10-Oct-24 HVAC Shop Drawings Preparation & Submission
VTR.6-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 03-Nov-24 18-Nov-24 HVAC Shop Drawings Review & Approval
VTR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 27-Oct-24 11-Nov-24 Plumbing System Shop Drawings Review & Approval
VTR.6-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 28-Aug-24 10-Sep-24 Cable Tray Shop Drawings Review & Approval
VTR.6-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 28-Aug-24 10-Sep-24 Power Cables Shop Drawings Review & Approval
VTR.6-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 29-Apr-24 12-May-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 109 29-Apr-24 07-Sep-24 07-Sep-24, ELECTRICAL INSTALLATIONS
VTR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Electrical Installations Shop Drawings Preparation & Submission
VTR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 88 15-May-24 29-Aug-24 29-Aug-24, LIGHTNING PROTECTION SYSTEM
VTR.6-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 15-May-24 30-May-24 Lightning Protection Drawings Preparation & Submission
VTR.6-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 17-Aug-24 29-Aug-24 Lightning Protection Shop Drawings Review & Approval
VTR.6-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 17-Aug-24 29-Aug-24 Earthing System Drawings Review & Approval
VTR.6-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 63 07-Jul-24 18-Sep-24 18-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR.6-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Telephone Shop Drawings Preparation & Submission
VTR.6-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Telephone Shop Drawings Review & Approval
VTR.6-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Public Address system Shop Drawings Review & Approval
VTR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 25-Aug-24 25-Sep-24 25-Sep-24, ACCESS CONTROL SYSTEM
VTR.6-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 25-Aug-24 10-Sep-24 Access Control system Shop Drawings Preparation & Submission
VTR.6-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 10-Sep-24 12-Oct-24 12-Oct-24, RADIO RE-BROADCASTING SYSTEM
Actual Work
Remaining Work
91 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 28-Sep-24 12-Oct-24 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR.6-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Oct-24 27-Oct-24 SCADA system Shop Drawings Review & Approval
DU-P-PLV.110 Review and approval power system shopdrawings 11 26-Dec-24 08-Jan-25 Review and approval power system shopdrawings
DU-P-PMV.110 Review and approval medium voltage shopdrawings 11 28-Dec-24 09-Jan-25 Review and approval medium voltage shopdrawings
DU-P-PT.110 Review and approval transformer shopdrawings 11 04-Jan-25 18-Jan-25 Review and approval transformer shopdrawings
DU-P-PRMU.110 Review and approval RMU shopdrawings 11 06-Jan-25 19-Jan-25 Review and approval RMU shopdrawings
VECHICULAR ROOM 10 (IN ZONE 05) 420 02-Dec-23 17-Apr-25 17-Apr-25, VECHICULAR ROOM 10 (IN ZONE 05)
ENGINEERING 420 02-Dec-23 17-Apr-25 17-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 420 02-Dec-23 17-Apr-25 17-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-VR10-SI.89 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission
JAH-ENG-VR10-SI.90 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
VTR.10-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 13-Apr-24 28-Apr-24 Foundation Shop Drawings Review & Approval
VTR.10-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission
VTR.10-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 Walls Shop Drawings Review & Approval
VTR.10-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Slab Shop Drawings Preparation & Submission
VTR.10-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Slab Shop Drawings Review & Approval
VTR.10-ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 16-Nov-24 02-Dec-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 237 24-Mar-24 04-Jan-25 04-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR.10-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 HVAC Shop Drawings Preparation & Submission
VTR.10-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 18-Dec-24 04-Jan-25 HVAC Shop Drawings Review & Approval
VTR.10-ENG-MC-PI. Plumbing System Shop Drawings Review & Approval 14 29-Apr-24 14-May-24 Plumbing System Shop Drawings Review & Approval
VTR.10-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Cable Tray Shop Drawings Review & Approval
VTR.10-ENG-EL-PC. Power Cables Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Power Cables Shop Drawings Review & Approval
Actual Work
Remaining Work
92 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 132 20-Jun-24 24-Nov-24 24-Nov-24, LIGHTING SYSTEM
VTR.10-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Lighting System Shop Drawings Preparation & Submission
VTR.10-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 119 07-Jul-24 24-Nov-24 24-Nov-24, ELECTRICAL INSTALLATIONS
VTR.10-ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
VTR.10-ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 23-Jul-24 17-Nov-24 17-Nov-24, LIGHTNING PROTECTION SYSTEM
VTR.10-ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Lightning Protection Drawings Preparation & Submission
VTR.10-ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Lightning Protection Shop Drawings Review & Approval
VTR.10-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Earthing System Drawings Review & Approval
VTR.10-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 93 10-Sep-24 28-Dec-24 28-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR.10-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Telephone Shop Drawings Preparation & Submission
VTR.10-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Telephone Shop Drawings Review & Approval
VTR.10-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Public Address system Shop Drawings Review & Approval
VTR.10-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 51 30-Oct-24 28-Dec-24 28-Dec-24, ACCESS CONTROL SYSTEM
VTR.10-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 30-Oct-24 14-Nov-24 Access Control system Shop Drawings Preparation & Submission
VTR.10-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 37 14-Nov-24 28-Dec-24 28-Dec-24, RADIO RE-BROADCASTING SYSTEM
VTR.10-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 14-Nov-24 01-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR.10-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR.10-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 17-Dec-24 31-Dec-24 SCADA system Shop Drawings Review & Approval
SD-DU-P-PLV.5 Prepare and submit power system shopdrawings 20 29-Dec-24 20-Jan-25 Prepare and submit power system shopdrawings
SD-DU-P-PMV.5 Prepare and submit medium voltage shopdrawings 20 21-Jan-25 12-Feb-25 Prepare and submit medium voltage shopdrawings
SD-DU-P-PT.105 Review and approval transformer shopdrawings 11 03-Apr-25 16-Apr-25 Review and approval transformer shopdrawings
SD-DU-P-PRMU.105 Review and approval RMU shopdrawings 11 05-Apr-25 17-Apr-25 Review and approval RMU shopdrawings
VECHICULAR ROOM 3C (IN ZONE 08) 335 22-Jun-25 27-Jul-26 27-Jul-26, VECHICULAR ROOM
Actual Work
Remaining Work
93 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 335 22-Jun-25 27-Jul-26 27-Jul-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 335 22-Jun-25 27-Jul-26 27-Jul-26, SHOP DRAWING SU
STRUCTURE 179 22-Jun-25 17-Jan-26 17-Jan-26, STRUCTURE
VR-3C-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 22-Jun-25 07-Jul-25 Foundation Shop Drawings Preparation & Submission
VR-3C-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 07-Jul-25 23-Jul-25 Foundation Shop Drawings Review & Approval
VR-3C-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 11-Nov-25 27-Nov-25 Walls Shop Drawings Preparation & Submission
VR-3C-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 27-Nov-25 14-Dec-25 Walls Shop Drawings Review & Approval
VR-3C-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 15-Dec-25 31-Dec-25 Slab Shop Drawings Preparation & Submission
VR-3C-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 31-Dec-25 17-Jan-26 Slab Shop Drawings Review & Approval
VR-3C-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 08-Jan-26 25-Jan-26 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 18-Feb-26 28-Mar-26 28-Mar-26, VENTILATION SYSTEM/AIR CO
VR-3C-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 18-Feb-26 07-Mar-26 HVAC Shop Drawings Preparation & Submission
VR-3C-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 07-Mar-26 28-Mar-26 HVAC Shop Drawings Review & Approval
VR-3C-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 02-Feb-26 18-Feb-26 Plumbing System Shop Drawings Review & Appro
VR-3C-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Cable Tray Shop Drawings Review & Approval
VR-3C-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Power Cables Shop Drawings Review & Approval
VR-3C-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Lighting System Shop Drawings Review & Appro
ELECTRICAL INSTALLATIONS
INSTALLAT 26 26-Jan-26 25-Feb-26 25-Feb-26, ELECTRICAL INSTALLATIONS
VR-3C-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Electrical Installations Shop Drawings Preparation &
VR-3C-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Electrical Installations Shop Drawings Review & A
LIGHTNING PROTECTION
PROTECTIO SYSTEM 46 03-Jan-26 25-Feb-26 25-Feb-26, LIGHTNING PROTECTION SYSTE
VR-3C-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Jan-26 19-Jan-26 Lightning Protection Drawings Preparation & Submiss
VR-3C-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Lightning Protection Shop Drawings Review & Ap
VR-3C-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 04-Feb-26 18-Feb-26 Earthing System Drawings Review & Approval
VR-3C-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 26 26-Jan-26 25-Feb-26 25-Feb-26, COMMUNICATION SYSTEM/ EME
VR-3C-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Telephone Shop Drawings Preparation & Submissio
VR-3C-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Telephone Shop Drawings Review & Approval
VR-3C-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Public Address system Shop Drawings Review & A
Actual Work
Remaining Work
94 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VR-3C-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 Video Surveillance system Shop Drawings Preparation &
VR-3C-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Video Surveillance system Shop Drawings Review
ACCESS CONTROL SY
SYSTEM 54 04-Jan-26 08-Mar-26 08-Mar-26, ACCESS CONTROL SYSTEM
VR-3C-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Jan-26 20-Jan-26 Access Control system Shop Drawings Preparation &
VR-3C-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 Access Control system Shop Drawings Review &
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 40 20-Jan-26 08-Mar-26 08-Mar-26, RADIO RE-BROADCASTING SYS
VR-3C-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jan-26 05-Feb-26 Radio Re Broadcasting system Shop Drawings Prepa
VR-3C-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 Radio Re Broadcasting system Shop Drawings Re
VR-3C-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 SCADA system Shop Drawings Review & Appr
DU-P-LV.205 Review and approval power system shopdrawings 11 04-Jul-26 16-Jul-26 Review and approval power system
DU-P-MV.205 Review and approval medium voltage shopdrawings 11 04-Jul-26 18-Jul-26 Review and approval medium volta
DU-P-T.205 Review and approval transformer shopdrawings 11 12-Jul-26 25-Jul-26 Review and approval transformer s
DU-P-RMU.205 Review and approval RMU shopdrawings 11 13-Jul-26 27-Jul-26 Review and approval RMU shopd
VECHICULAR ROOM 3A (IN ZONE 09) 452 10-Dec-23 03-Jun-25 03-Jun-25, VECHICULAR ROOM 3A (IN ZONE 09)
ENGINEERING 452 10-Dec-23 03-Jun-25 03-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 452 10-Dec-23 03-Jun-25 03-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 10-Dec-23 10-Jan-24 10-Jan-24, EARTH WORKS
T1-ENG-VR3A-SI.875 Soil Improvement Design Preparation & Submission 14 10-Dec-23 26-Dec-23 Soil Improvement Design Preparation & Submission
T1-ENG-VR3A-SI.880 Soil Improvement Design Review & Approval 14 26-Dec-23 10-Jan-24 Soil Improvement Design Review & Approval
VTR-3A-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 09-May-24 26-May-24 Foundation Shop Drawings Review & Approval
VTR-3A-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 04-Apr-24 23-Apr-24 Walls Shop Drawings Preparation & Submission
VTR-3A-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 30-Sep-24 16-Oct-24 Walls Shop Drawings Review & Approval
VTR-3A-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Slab Shop Drawings Preparation & Submission
VTR-3A-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 09-May-24 26-May-24 Slab Shop Drawings Review & Approval
VTR-3A-ENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 26-Dec-24 12-Jan-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 30 03-Feb-25 10-Mar-25 10-Mar-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-3A-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 03-Feb-25 19-Feb-25 HVAC Shop Drawings Preparation & Submission
VTR-3A-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 22-Feb-25 10-Mar-25 HVAC Shop Drawings Review & Approval
VTR-3A-ENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 08-Mar-25 24-Mar-25 Plumbing System Shop Drawings Review & Approval
Actual Work
Remaining Work
95 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CABLE TRAYS 68 16-Oct-24 04-Jan-25 04-Jan-25, CABLE TRAYS
VTR-3A-ENG-EL-CT. Cable Tray Shop Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Cable Tray Shop Drawings Preparation & Submission
VTR-3A-ENG-EL-CT. Cable Tray Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Cable Tray Shop Drawings Review & Approval
VTR-3A-ENG-EL-PC Power Cables Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Power Cables Shop Drawings Review & Approval
VTR-3A-ENG-EL-LS. Lighting System Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 26 04-Dec-24 04-Jan-25 04-Jan-25, ELECTRICAL INSTALLATIONS
VTR-3A-ENG-EL-EI. Electrical Installations Shop Drawings Preparation & Submission 14 04-Dec-24 21-Dec-24 Electrical Installations Shop Drawings Preparation & Submission
VTR-3A-ENG-EL-EI. Electrical Installations Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 87 16-Sep-24 28-Dec-24 28-Dec-24, LIGHTNING PROTECTION SYSTEM
VTR-3A-ENG-EL-LP. Lightning Protection Drawings Preparation & Submission 14 16-Sep-24 03-Oct-24 Lightning Protection Drawings Preparation & Submission
VTR-3A-ENG-EL-LP. Lightning Protection Shop Drawings Review & Approval 12 14-Dec-24 28-Dec-24 Lightning Protection Shop Drawings Review & Approval
VTR-3A-ENG-EL-ES. Earthing System Drawings Review & Approval 12 14-Dec-24 28-Dec-24 Earthing System Drawings Review & Approval
VTR-3A-ENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 15-Jan-25 28-Jan-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 05-Nov-24 08-Feb-25 08-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-3A-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 05-Nov-24 21-Nov-24 Telephone Shop Drawings Preparation & Submission
VTR-3A-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Telephone Shop Drawings Review & Approval
VTR-3A-ENG-ELL-P Public Address system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Public Address system Shop Drawings Review & Approval
VTR-3A-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 24-Dec-24 08-Feb-25 08-Feb-25, ACCESS CONTROL SYSTEM
VTR-3A-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 24-Dec-24 09-Jan-25 Access Control system Shop Drawings Preparation & Submission
VTR-3A-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 09-Jan-25 08-Feb-25 08-Feb-25, RADIO RE-BROADCASTING SYSTEM
VTR-3A-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 09-Jan-25 25-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR-3A-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR-3A-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.305 Review and approval power system shopdrawings 11 05-May-25 19-May-25 Review and approval power system shopdrawings
DU-P-MV.305 Review and approval medium voltage shopdrawings 11 06-May-25 19-May-25 Review and approval medium voltage shopdrawings
Actual Work
Remaining Work
96 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-T.300 Prepare and submit transformer shopdrawings 20 13-Apr-25 06-May-25 Prepare and submit transformer shopdrawings
DU-P-T.305 Review and approval transformer shopdrawings 11 06-May-25 19-May-25 Review and approval transformer shopdrawings
DU-P-RMU.305 Review and approval RMU shopdrawings 11 08-May-25 21-May-25 Review and approval RMU shopdrawings
DU-P-MRMU.305 Review and approval MRMU shopdrawings 11 11-May-25 24-May-25 Review and approval MRMU shopdrawings
DU-P-MVSG.305 Review and approval MVSG shopdrawings 11 14-May-25 27-May-25 Review and approval MVSG shopdrawings
DU-P-BARM.305 Review and approval Battery room shopdrawings 11 21-May-25 03-Jun-25 Review and approval Battery room shopdrawings
VECHICULAR ROOM 3B (IN ZONE 09) 354 01-Sep-24 29-Oct-25 29-Oct-25, VECHICULAR ROOM 3B (IN ZONE 09)
ENGINEERING 354 01-Sep-24 29-Oct-25 29-Oct-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 354 01-Sep-24 29-Oct-25 29-Oct-25, SHOP DRAWING SUBMITTAL AND APPROVA
STRUCTURE 181 01-Sep-24 07-Apr-25 07-Apr-25, STRUCTURE
VTR-3B-ENG-CV-ST.1 Foundation Shop Drawings Preparation & Submission 14 01-Sep-24 17-Sep-24 Foundation Shop Drawings Preparation & Submission
VTR-3B-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 21-Oct-24 06-Nov-24 Foundation Shop Drawings Review & Approval
VTR-3B-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 17-Sep-24 05-Oct-24 Walls Shop Drawings Preparation & Submission
VTR-3B-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 17-Mar-25 07-Apr-25 Walls Shop Drawings Review & Approval
VTR-3B-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Slab Shop Drawings Preparation & Submission
VTR-3B-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 21-Oct-24 06-Nov-24 Slab Shop Drawings Review & Approval
VTR-3B-ENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 10-Jun-25 26-Jun-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 70 29-May-25 23-Aug-25 23-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WORK
VTR-3B-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 29-May-25 18-Jun-25 HVAC Shop Drawings Preparation & Submission
VTR-3B-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 06-Aug-25 23-Aug-25 HVAC Shop Drawings Review & Approval
VTR-3B-ENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 05-Jul-25 21-Jul-25 Plumbing System Shop Drawings Review & Approval
VTR-3B-ENG-EL-CT. Cable Tray Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Cable Tray Shop Drawings Review & Approval
VTR-3B-ENG-EL-PC. Power Cables Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Power Cables Shop Drawings Review & Approval
VTR-3B-ENG-EL-LS. Lighting System Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 130 09-Jan-25 18-Jun-25 18-Jun-25, ELECTRICAL INSTALLATIONS
VTR-3B-ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 09-Jan-25 26-Jan-25 Electrical Installations Shop Drawings Preparation & Submission
VTR-3B-ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 116 26-Jan-25 18-Jun-25 18-Jun-25, TRANSFORMERS INSTALLATION
VTR-3B-ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 26-Jan-25 11-Feb-25 Transformers Installation Shop Drawings Preparation & Submission
Actual Work
Remaining Work
97 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR-3B-ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 11-Feb-25 11-Jun-25 11-Jun-25, LIGHTNING PROTECTION SYSTEM
VTR-3B-ENG-EL-LP. Lightning Protection Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Lightning Protection Drawings Preparation & Submission
VTR-3B-ENG-EL-LP. Lightning Protection Shop Drawings Review & Approval 12 25-May-25 11-Jun-25 Lightning Protection Shop Drawings Review & Approval
VTR-3B-ENG-EL-ES. Earthing System Drawings Review & Approval 12 25-May-25 11-Jun-25 Earthing System Drawings Review & Approval
VTR-3B-ENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 18-Jun-25 02-Jul-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 06-Apr-25 13-Jul-25 13-Jul-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-3B-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 06-Apr-25 21-Apr-25 Telephone Shop Drawings Preparation & Submission
VTR-3B-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Telephone Shop Drawings Review & Approval
VTR-3B-ENG-ELL-P Public Address system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Public Address system Shop Drawings Review & Approval
VTR-3B-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 24-May-25 13-Jul-25 13-Jul-25, ACCESS CONTROL SYSTEM
VTR-3B-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 24-May-25 12-Jun-25 Access Control system Shop Drawings Preparation & Submission
VTR-3B-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 12-Jun-25 13-Jul-25 13-Jul-25, RADIO RE-BROADCASTING SYSTEM
VTR-3B-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR-3B-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR-3B-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.405 Review and approval power system shopdrawings 11 15-Oct-25 28-Oct-25 Review and approval power system shopdrawings
DU-P-MV.405 Review and approval medium voltage shopdrawings 11 16-Oct-25 29-Oct-25 Review and approval medium voltage shopdrawings
VECHICULAR ROOM 11 (IN ZONE 10) 601 01-May-23 A 20-Apr-25 20-Apr-25, VECHICULAR ROOM 11 (IN ZONE 10)
ENGINEERING 601 01-May-23 A 20-Apr-25 20-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 601 01-May-23 A 20-Apr-25 20-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 13 01-May-23 A 15-May-23 A 15-May-23 A, EARTH WORKS
T2-ENG-VR11-SI.925 Soil Improvement Design Preparation & Submission 9 01-May-23 A 10-May-23 A Soil Improvement Design Preparation & Submission
T3-ENG-VR11-SI.930 Soil Improvement Design Review & Approval 5 10-May-23 A 15-May-23 A Soil Improvement Design Review & Approval
VR.11-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 29-Feb-24 17-Mar-24 Foundation Shop Drawings Review & Approval
VR.11-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 24-Apr-24 11-May-24 Walls Shop Drawings Preparation & Submission
VR.11-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 11-May-24 27-May-24 Walls Shop Drawings Review & Approval
VR.11-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Slab Shop Drawings Preparation & Submission
Actual Work
Remaining Work
98 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VR.11-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 11-Sep-24 29-Sep-24 Slab Shop Drawings Review & Approval
VR.11-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 04-Nov-24 20-Nov-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 19-Oct-24 20-Nov-24 20-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VR.11-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 19-Oct-24 04-Nov-24 HVAC Shop Drawings Preparation & Submission
VR.11-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 04-Nov-24 20-Nov-24 HVAC Shop Drawings Review & Approval
VR.11-ENG-MC-PI.11 Plumbing System Shop Drawings Review & Approval 14 28-Nov-24 15-Dec-24 Plumbing System Shop Drawings Review & Approval
VR.11-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Cable Tray Shop Drawings Review & Approval
VR.11-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Power Cables Shop Drawings Review & Approval
VR.11-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 26 21-Oct-24 20-Nov-24 20-Nov-24, ELECTRICAL INSTALLATIONS
VR.11-ENG-EL-EI.110 Electrical Installations Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Electrical Installations Shop Drawings Preparation & Submission
VR.11-ENG-EL-EI.115 Electrical Installations Shop Drawings Review & Approval 12 06-Nov-24 20-Nov-24 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 15-Jul-24 05-Nov-24 05-Nov-24, LIGHTNING PROTECTION SYSTEM
VR.11-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 15-Jul-24 31-Jul-24 Lightning Protection Drawings Preparation & Submission
VR.11-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Lightning Protection Shop Drawings Review & Approval
VR.11-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Earthing System Drawings Review & Approval
VR.11-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 12-Nov-24 26-Nov-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 02-Sep-24 07-Dec-24 07-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VR.11-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Telephone Shop Drawings Preparation & Submission
VR.11-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Telephone Shop Drawings Review & Approval
VR.11-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Public Address system Shop Drawings Review & Approval
VR.11-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 21-Oct-24 07-Dec-24 07-Dec-24, ACCESS CONTROL SYSTEM
VR.11-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Access Control system Shop Drawings Preparation & Submission
VR.11-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Nov-24 07-Dec-24 07-Dec-24, RADIO RE-BROADCASTING SYSTEM
VR.11-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VR.11-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval
Actual Work
Remaining Work
99 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
SCADA SYSTEM 26 06-Nov-24 07-Dec-24 07-Dec-24, SCADA SYSTEM
VR.11-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 SCADA system Shop Drawings Preparation & Submission
VR.11-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.505 Review and approval power system shopdrawings 11 10-Mar-25 23-Mar-25 Review and approval power system shopdrawings
DU-P-MV.505 Review and approval medium voltage shopdrawings 11 11-Mar-25 24-Mar-25 Review and approval medium voltage shopdrawings
DU-P-T.505 Review and approval transformer shopdrawings 11 18-Mar-25 05-Apr-25 Review and approval transformer shopdrawings
DU-P-RMU.505 Review and approval RMU shopdrawings 11 20-Mar-25 07-Apr-25 Review and approval RMU shopdrawings
DU-P-MRMU.505 Review and approval MRMU shopdrawings 11 23-Mar-25 09-Apr-25 Review and approval MRMU shopdrawings
DU-P-MVSG.505 Review and approval MVSG shopdrawings 11 26-Mar-25 13-Apr-25 Review and approval MVSG shopdrawings
DU-P-BARM.505 Review and approval Battery room shopdrawings 11 07-Apr-25 20-Apr-25 Review and approval Battery room shopdrawings
T3-ENG-VR12A-SI.94 Soil Improvement Design Review & Approval 5 01-May-23 A 06-May-23 A Soil Improvement Design Review & Approval
VTR-12AENG-CV-ST. Foundation Shop Drawings Review & Approval 14 05-Aug-24 21-Aug-24 Foundation Shop Drawings Review & Approval
VTR-12AENG-CV-ST. Walls Shop Drawings Preparation & Submission 14 29-Jan-24 13-Feb-24 Walls Shop Drawings Preparation & Submission
VTR-12AENG-CV-ST. Walls Shop Drawings Review & Approval 14 25-Sep-24 12-Oct-24 Walls Shop Drawings Review & Approval
VTR-12AENG-CV-ST. Slab Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Slab Shop Drawings Preparation & Submission
VTR-12AENG-CV-ST. Slab Shop Drawings Review & Approval 14 29-Feb-24 17-Mar-24 Slab Shop Drawings Review & Approval
VTR-12AENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 02-Nov-24 18-Nov-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 67 28-Oct-24 14-Jan-25 14-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-12AENG-MC-H HVAC Shop Drawings Preparation & Submission 14 28-Oct-24 12-Nov-24 HVAC Shop Drawings Preparation & Submission
VTR-12AENG-MC-H HVAC Shop Drawings Review & Approval 14 29-Dec-24 14-Jan-25 HVAC Shop Drawings Review & Approval
VTR-12AENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 28-Nov-24 15-Dec-24 Plumbing System Shop Drawings Review & Approval
Actual Work
Remaining Work
100 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL 193 17-Apr-24 04-Dec-24 04-Dec-24, ELECTRICAL
CABLE TRAYS 172 17-Apr-24 10-Nov-24 10-Nov-24, CABLE TRAYS
VTR-12AENG-EL-CT Cable Tray Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Cable Tray Shop Drawings Preparation & Submission
VTR-12AENG-EL-CT Cable Tray Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Cable Tray Shop Drawings Review & Approval
VTR-12AENG-EL-PC Power Cables Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Power Cables Shop Drawings Review & Approval
VTR-12AENG-EL-LS Lighting System Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 130 05-Jun-24 10-Nov-24 10-Nov-24, ELECTRICAL INSTALLATIONS
VTR-12AENG-EL-EI. Electrical Installations Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 Electrical Installations Shop Drawings Preparation & Submission
VTR-12AENG-EL-EI. Electrical Installations Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 126 26-Jun-24 20-Nov-24 20-Nov-24, TRANSFORMERS INSTALLATION
VTR-12AENG-EL-TI. Transformers Installation Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Transformers Installation Shop Drawings Preparation & Submission
VTR-12AENG-EL-TI. Transformers Installation Shop Drawings Review & Approval 12 06-Nov-24 20-Nov-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 13-Jul-24 03-Nov-24 03-Nov-24, LIGHTNING PROTECTION SYSTEM
VTR-12AENG-EL-LP Lightning Protection Drawings Preparation & Submission 14 13-Jul-24 28-Jul-24 Lightning Protection Drawings Preparation & Submission
VTR-12AENG-EL-LP Lightning Protection Shop Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Lightning Protection Shop Drawings Review & Approval
VTR-12AENG-EL-ES Earthing System Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Earthing System Drawings Review & Approval
VTR-12AENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 29-Aug-24 24-Nov-24 24-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-12AENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 29-Aug-24 15-Sep-24 Telephone Shop Drawings Preparation & Submission
VTR-12AENG-ELL-P Telephone Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Telephone Shop Drawings Review & Approval
VTR-12AENG-ELL-P Public Address system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Public Address system Shop Drawings Review & Approval
VTR-12AENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 19-Oct-24 04-Dec-24 04-Dec-24, ACCESS CONTROL SYSTEM
VTR-12AENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 19-Oct-24 04-Nov-24 Access Control system Shop Drawings Preparation & Submission
VTR-12AENG-ELL-A Access Control system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 04-Nov-24 04-Dec-24 04-Dec-24, RADIO RE-BROADCASTING SYSTEM
VTR-12AENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 04-Nov-24 20-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VTR-12AENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval
VTR-12AENG-ELL-S SCADA system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.605 Review and approval power system shopdrawings 11 08-Mar-25 20-Mar-25 Review and approval power system shopdrawings
Actual Work
Remaining Work
101 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VECHICULAR ROOM 12B
12 (IN ZONE 11) 534 01-Mar-23 A 01-Dec-24 01-Dec-24, VECHICULAR ROOM 12B (IN ZONE 11)
ENGINEERING 534 01-Mar-23 A 01-Dec-24 01-Dec-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 534 01-Mar-23 A 01-Dec-24 01-Dec-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 24 01-Mar-23 A 28-Mar-23 A 28-Mar-23 A, EARTH WORKS
T3-ENG-VR12B-SI.945 Soil Improvement Design Preparation & Submission 8 01-Mar-23 A 09-Mar-23 A Soil Improvement Design Preparation & Submission
T3-ENG-VR12B-SI.950 Soil Improvement Design Review & Approval 20 06-Mar-23 A 28-Mar-23 A Soil Improvement Design Review & Approval
VR.12-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval
VR.12-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission
VR.12-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 18-Mar-24 03-Apr-24 Walls Shop Drawings Review & Approval
VR.12-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission
VR.12-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval
VR.12-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 03-Jul-24 20-Jul-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 70 25-Jun-24 15-Sep-24 15-Sep-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VR.12-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 HVAC Shop Drawings Preparation & Submission
VR.12-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 29-Aug-24 15-Sep-24 HVAC Shop Drawings Review & Approval
VR.12-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 28-Jul-24 13-Aug-24 Plumbing System Shop Drawings Review & Approval
VR.12-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Cable Tray Shop Drawings Review & Approval
VR.12-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval
VR.12-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 121 13-Feb-24 11-Jul-24 11-Jul-24, ELECTRICAL INSTALLATIONS
VR.12-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
VR.12-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 107 29-Feb-24 11-Jul-24 11-Jul-24, TRANSFORMERS INSTALLATION
VR.12-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Transformers Installation Shop Drawings Preparation & Submission
VR.12-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 88 17-Mar-24 04-Jul-24 04-Jul-24, LIGHTNING PROTECTION SYSTEM
VR.12-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 17-Mar-24 01-Apr-24 Lightning Protection Drawings Preparation & Submission
VR.12-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Lightning Protection Shop Drawings Review & Approval
VR.12-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Earthing System Drawings Review & Approval
VR.12-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Fire Alarm Shop Drawings Review & Approval
Actual Work
Remaining Work
102 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 64 07-May-24 25-Jul-24 25-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VR.12-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 07-May-24 23-May-24 Telephone Shop Drawings Preparation & Submission
VR.12-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Telephone Shop Drawings Review & Approval
VR.12-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Public Address system Shop Drawings Review & Approval
VR.12-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 30-Jun-24 05-Aug-24 05-Aug-24, ACCESS CONTROL SYSTEM
VR.12-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Access Control system Shop Drawings Preparation & Submission
VR.12-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 16-Jul-24 15-Aug-24 15-Aug-24, RADIO RE-BROADCASTING SYSTEM
VR.12-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
VR.12-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval
VR.12-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.705 Review and approval power system shopdrawings 11 07-Nov-24 20-Nov-24 Review and approval power system shopdrawings
DU-P-MV.705 Review and approval medium voltage shopdrawings 11 09-Nov-24 21-Nov-24 Review and approval medium voltage shopdrawings
DU-P-T.705 Review and approval transformer shopdrawings 11 16-Nov-24 28-Nov-24 Review and approval transformer shopdrawings
DU-P-RMU.705 Review and approval RMU shopdrawings 11 18-Nov-24 01-Dec-24 Review and approval RMU shopdrawings
JAH-ENG-UR19-SI.93 Soil Improvement Design Review & Approval 14 26-Jul-25 11-Aug-25 Soil Improvement Design Review & Approval
UCR.19ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 29-Mar-25 19-Apr-25 Foundation Shop Drawings Review & Approval
UCR.19ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Walls Shop Drawings Preparation & Submission
UCR.19ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 20-Aug-25 04-Sep-25 Walls Shop Drawings Review & Approval
UCR.19ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 12-Mar-25 29-Mar-25 Slab Shop Drawings Preparation & Submission
UCR.19ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 29-Mar-25 19-Apr-25 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
103 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.19ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 09-Aug-25 25-Aug-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 21-Jul-25 07-Sep-25 07-Sep-25, VENTILATION SYSTEM/AIR CONDITIONING WOR
UCR.19ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 21-Jul-25 05-Aug-25 HVAC Shop Drawings Preparation & Submission
UCR.19ENG-MC-HC HVAC Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 HVAC Shop Drawings Review & Approval
UCR.19ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Plumbing System Shop Drawings Review & Approval
UCR.19ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 23-Jul-25 05-Aug-25 Cable Tray Shop Drawings Review & Approval
UCR.19ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 12-Aug-25 26-Aug-25 Power Cables Shop Drawings Review & Approval
UCR.19ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 151 15-Feb-25 17-Aug-25 17-Aug-25, ELECTRICAL INSTALLATIONS
UCR.19ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 15-Feb-25 02-Mar-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.19ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 137 02-Mar-25 17-Aug-25 17-Aug-25, TRANSFORMERS INSTALLATION
UCR.19ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.19ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 115 18-Mar-25 07-Aug-25 07-Aug-25, LIGHTNING PROTECTION SYSTEM
UCR.19ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 Lightning Protection Drawings Preparation & Submission
UCR.19ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Lightning Protection Shop Drawings Review & Approval
UCR.19ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Earthing System Drawings Review & Approval
UCR.19ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 11-May-25 06-Aug-25 06-Aug-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHO
UCR.19ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Telephone Shop Drawings Preparation & Submission
UCR.19ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Telephone Shop Drawings Review & Approval
UCR.19ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Public Address system Shop Drawings Review & Approval
UCR.19ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 02-Jul-25 06-Aug-25 06-Aug-25, ACCESS CONTROL SYSTEM
UCR.19ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Access Control system Shop Drawings Preparation & Submission
UCR.19ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 19-Jul-25 17-Aug-25 17-Aug-25, RADIO RE-BROADCASTING SYSTEM
UCR.19ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 19-Jul-25 03-Aug-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.19ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Radio Re Broadcasting system Shop Drawings Review & Approval
Actual Work
Remaining Work
104 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.19ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 19-Jul-25 03-Aug-25 SCADA system Shop Drawings Preparation & Submission
UCR.19ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 26-Nov-25 09-Dec-25 Review and approval power system shopdrawings
JAH-ENG-UR21-SI.94 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval
UCR.21ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval
UCR.21ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission
UCR.21ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Mar-24 03-Apr-24 Walls Shop Drawings Review & Approval
UCR.21ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission
UCR.21ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval
UCR.21ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 18-May-24 03-Jun-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 28-Apr-24 04-Jul-24 04-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.21ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 28-Apr-24 14-May-24 HVAC Shop Drawings Preparation & Submission
UCR.21ENG-MC-HC HVAC Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 HVAC Shop Drawings Review & Approval
UCR.21ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-May-24 20-Jun-24 Plumbing System Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 26-Sep-24 09-Oct-24 Review and approval power system shopdrawings
MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 28-Sep-24 10-Oct-24 Review and approval medium voltage shopdrawings
MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 05-Oct-24 17-Oct-24 Review and approval transformer shopdrawings
MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 07-Oct-24 20-Oct-24 Review and approval RMU shopdrawings
MEP-VR01-ENG-PW Review and approval MVSG shopdrawings 11 09-Oct-24 22-Oct-24 Review and approval MVSG shopdrawings
Actual Work
Remaining Work
105 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MEP-VR01-ENG-PW Review and approval Battery room shopdrawings 11 16-Oct-24 29-Oct-24 Review and approval Battery room shopdrawings
UCR.21ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 21-May-24 04-Jun-24 Cable Tray Shop Drawings Review & Approval
UCR.21ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 21-May-24 04-Jun-24 Power Cables Shop Drawings Review & Approval
UCR.21ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 12-May-24 26-May-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 130 23-Dec-23 26-May-24 26-May-24, ELECTRICAL INSTALLATIONS
UCR.21ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Dec-23 08-Jan-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.21ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 12-May-24 26-May-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 116 08-Jan-24 26-May-24 26-May-24, TRANSFORMERS INSTALLATION
UCR.21ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 08-Jan-24 24-Jan-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.21ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 12-May-24 26-May-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 24-Jan-24 19-May-24 19-May-24, LIGHTNING PROTECTION SYSTEM
UCR.21ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 24-Jan-24 10-Feb-24 Lightning Protection Drawings Preparation & Submission
UCR.21ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 05-May-24 19-May-24 Lightning Protection Shop Drawings Review & Approval
UCR.21ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 05-May-24 19-May-24 Earthing System Drawings Review & Approval
UCR.21ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 26-May-24 09-Jun-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 13-Mar-24 24-Jun-24 24-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.21ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Mar-24 28-Mar-24 Telephone Shop Drawings Preparation & Submission
UCR.21ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Telephone Shop Drawings Review & Approval
UCR.21ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Public Address system Shop Drawings Review & Approval
UCR.21ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 04-May-24 24-Jun-24 24-Jun-24, ACCESS CONTROL SYSTEM
UCR.21ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Access Control system Shop Drawings Preparation & Submission
UCR.21ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-May-24 24-Jun-24 24-Jun-24, RADIO RE-BROADCASTING SYSTEM
UCR.21ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.21ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.21ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 SCADA system Shop Drawings Review & Approval
Actual Work
Remaining Work
106 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-UR22-SI.95 Soil Improvement Design Preparation & Submission 14 20-Jan-24 05-Feb-24 Soil Improvement Design Preparation & Submission
JAH-ENG-UR22-SI.95 Soil Improvement Design Review & Approval 14 05-Feb-24 20-Feb-24 Soil Improvement Design Review & Approval
UCR.22ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval
UCR.22ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission
UCR.22ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Apr-24 24-Apr-24 Walls Shop Drawings Review & Approval
UCR.22ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission
UCR.22ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval
UCR.22ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 06-Jun-24 27-Jun-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 170 17-Dec-23 10-Jul-24 10-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.22ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission
UCR.22ENG-MC-HC HVAC Shop Drawings Review & Approval 14 24-Jun-24 10-Jul-24 HVAC Shop Drawings Review & Approval
UCR.22ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval
UCR.22ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Cable Tray Shop Drawings Review & Approval
UCR.22ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Power Cables Shop Drawings Review & Approval
UCR.22ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 23-May-24 05-Jun-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 120 23-Jan-24 19-Jun-24 19-Jun-24, ELECTRICAL INSTALLATIONS
UCR.22ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jan-24 08-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.22ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 106 08-Feb-24 19-Jun-24 19-Jun-24, TRANSFORMERS INSTALLATION
UCR.22ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.22ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 85 25-Feb-24 05-Jun-24 05-Jun-24, LIGHTNING PROTECTION SYSTEM
UCR.22ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 25-Feb-24 12-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.22ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 23-May-24 05-Jun-24 Lightning Protection Shop Drawings Review & Approval
UCR.22ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 23-May-24 05-Jun-24 Earthing System Drawings Review & Approval
UCR.22ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 17-Apr-24 25-Jul-24 25-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.22ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 17-Apr-24 02-May-24 Telephone Shop Drawings Preparation & Submission
UCR.22ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Telephone Shop Drawings Review & Approval
Actual Work
Remaining Work
107 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.22ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 04-May-24 19-May-24 Public Address system Shop Drawings Preparation & Submission
UCR.22ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Public Address system Shop Drawings Review & Approval
UCR.22ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 04-Jun-24 25-Jul-24 25-Jul-24, ACCESS CONTROL SYSTEM
UCR.22ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Jun-24 25-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.22ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-Jun-24 25-Jul-24 25-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.22ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.22ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.22ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.905 Review and approval power system shopdrawings 11 16-Oct-24 29-Oct-24 Review and approval power system shopdrawings
JAH-ENG-UR18-SI.96 Soil Improvement Design Review & Approval 14 22-Sep-25 09-Oct-25 Soil Improvement Design Review & Approval
UCR.18ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Foundation Shop Drawings Review & Approval
UCR.18ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 21-Jul-25 05-Aug-25 Walls Shop Drawings Preparation & Submission
UCR.18ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 08-Nov-25 24-Nov-25 Walls Shop Drawings Review & Approval
UCR.18ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 05-Aug-25 21-Aug-25 Slab Shop Drawings Preparation & Submission
UCR.18ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Slab Shop Drawings Review & Approval
UCR.18ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 11-Dec-25 28-Dec-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 30 06-Dec-25 10-Jan-26 10-Jan-26, VENTILATION SYSTEM/AIR CONDITIO
UCR.18ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 06-Dec-25 22-Dec-25 HVAC Shop Drawings Preparation & Submission
UCR.18ENG-MC-HC HVAC Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 HVAC Shop Drawings Review & Approval
UCR.18ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 07-Jan-26 24-Jan-26 Plumbing System Shop Drawings Review & Approva
UCR.18ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Cable Tray Shop Drawings Review & Approval
UCR.18ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Power Cables Shop Drawings Review & Approval
Actual Work
Remaining Work
108 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 126 15-Jul-25 10-Dec-25 10-Dec-25, LIGHTING SYSTEM
UCR.18ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 15-Jul-25 31-Jul-25 Lighting System Shop Drawings Preparation & Submission
UCR.18ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 120 31-Jul-25 20-Dec-25 20-Dec-25, ELECTRICAL INSTALLATIONS
UCR.18ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 31-Jul-25 17-Aug-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.18ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Electrical Installations Shop Drawings Review & Approva
TRANSFORMERS INSTALLATION
INSTA 106 17-Aug-25 20-Dec-25 20-Dec-25, TRANSFORMERS INSTALLATION
UCR.18ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 17-Aug-25 01-Sep-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.18ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Transformers Installation Shop Drawings Review & Appro
LIGHTNING PROTECTION
PROTECTIO SYSTEM 85 02-Sep-25 10-Dec-25 10-Dec-25, LIGHTNING PROTECTION SYSTEM
UCR.18ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 02-Sep-25 17-Sep-25 Lightning Protection Drawings Preparation & Submission
UCR.18ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Lightning Protection Shop Drawings Review & Approval
UCR.18ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Earthing System Drawings Review & Approval
UCR.18ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 31-Dec-25 14-Jan-26 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 21-Oct-25 25-Jan-26 25-Jan-26, COMMUNICATION SYSTEM/ EMERG
UCR.18ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 21-Oct-25 06-Nov-25 Telephone Shop Drawings Preparation & Submission
UCR.18ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Telephone Shop Drawings Review & Approval
UCR.18ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Public Address system Shop Drawings Review & App
UCR.18ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Video Surveillance system Shop Drawings Review &
ACCESS CONTROL SY
SYSTEM 40 09-Dec-25 25-Jan-26 25-Jan-26, ACCESS CONTROL SYSTEM
UCR.18ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 09-Dec-25 25-Dec-25 Access Control system Shop Drawings Preparation & Sub
UCR.18ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Access Control system Shop Drawings Review & Ap
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-Dec-25 25-Jan-26 25-Jan-26, RADIO RE-BROADCASTING SYSTEM
UCR.18ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-Dec-25 11-Jan-26 Radio Re Broadcasting system Shop Drawings Preparat
UCR.18ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Radio Re Broadcasting system Shop Drawings Review
UCR.18ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 21-Apr-26 04-May-26 Review and approval power system shopdr
JAH-ENG-UR30-SI.97 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
Actual Work
Remaining Work
109 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-30ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval
UCR-30ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission
UCR-30ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 07-Apr-24 27-Apr-24 Walls Shop Drawings Review & Approval
UCR-30ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission
UCR-30ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval
UCR-30ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 20-Apr-24 08-Jun-24 08-Jun-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-30ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 20-Apr-24 06-May-24 HVAC Shop Drawings Preparation & Submission
UCR-30ENG-MC-HC HVAC Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 HVAC Shop Drawings Review & Approval
UCR-30ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 Plumbing System Shop Drawings Review & Approval
UCR-30ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 13-Jun-24 02-Jul-24 Cable Tray Shop Drawings Review & Approval
UCR-30ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 13-Jun-24 02-Jul-24 Power Cables Shop Drawings Review & Approval
UCR-30ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 07-May-24 21-May-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 97 05-Feb-24 30-May-24 30-May-24, ELECTRICAL INSTALLATIONS
UCR-30ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 05-Feb-24 20-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR-30ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 16-May-24 30-May-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 83 20-Feb-24 30-May-24 30-May-24, TRANSFORMERS INSTALLATION
UCR-30ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Transformers Installation Shop Drawings Preparation & Submission
UCR-30ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 16-May-24 30-May-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 55 07-Mar-24 14-May-24 14-May-24, LIGHTNING PROTECTION SYSTEM
UCR-30ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR-30ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 30-Apr-24 14-May-24 Lightning Protection Shop Drawings Review & Approval
UCR-30ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 30-Apr-24 14-May-24 Earthing System Drawings Review & Approval
UCR-30ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 29-Apr-24 06-Aug-24 06-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-30ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 29-Apr-24 15-May-24 Telephone Shop Drawings Preparation & Submission
UCR-30ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Telephone Shop Drawings Review & Approval
UCR-30ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Public Address system Shop Drawings Review & Approval
Actual Work
Remaining Work
110 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-30ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 22-Jun-24 06-Aug-24 06-Aug-24, ACCESS CONTROL SYSTEM
UCR-30ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Access Control system Shop Drawings Preparation & Submission
UCR-30ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Jul-24 06-Aug-24 06-Aug-24, RADIO RE-BROADCASTING SYSTEM
UCR-30ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Jul-24 23-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-30ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR-30ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 SCADA system Shop Drawings Review & Approval
36330 Review and approval power system shopdrawings 11 01-Oct-24 14-Oct-24 Review and approval power system shopdrawings
JAH-ENG-UR31-SI.98 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
UCR-31ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 27-May-25 16-Jun-25 Foundation Shop Drawings Review & Approval
UCR-31ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 26-Apr-25 11-May-25 Walls Shop Drawings Preparation & Submission
UCR-31ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Aug-25 03-Sep-25 Walls Shop Drawings Review & Approval
UCR-31ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 12-May-25 27-May-25 Slab Shop Drawings Preparation & Submission
UCR-31ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 27-May-25 16-Jun-25 Slab Shop Drawings Review & Approval
UCR-31ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-Nov-25 08-Dec-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 37 22-Nov-25 04-Jan-26 04-Jan-26, VENTILATION SYSTEM/AIR CONDITIO
UCR-31ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 22-Nov-25 08-Dec-25 HVAC Shop Drawings Preparation & Submission
UCR-31ENG-MC-HC HVAC Shop Drawings Review & Approval 14 18-Dec-25 04-Jan-26 HVAC Shop Drawings Review & Approval
UCR-31ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Plumbing System Shop Drawings Review & Approval
UCR-31ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Cable Tray Shop Drawings Review & Approval
UCR-31ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Power Cables Shop Drawings Review & Approval
UCR-31ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 135 31-May-25 09-Nov-25 09-Nov-25, ELECTRICAL INSTALLATIONS
Actual Work
Remaining Work
111 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-31ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 31-May-25 19-Jun-25 Electrical Installations Shop Drawings Preparation & Submission
UCR-31ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 121 19-Jun-25 09-Nov-25 09-Nov-25, TRANSFORMERS INSTALLATION
UCR-31ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 19-Jun-25 06-Jul-25 Transformers Installation Shop Drawings Preparation & Submission
UCR-31ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 101 06-Jul-25 02-Nov-25 02-Nov-25, LIGHTNING PROTECTION SYSTEM
UCR-31ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 06-Jul-25 22-Jul-25 Lightning Protection Drawings Preparation & Submission
UCR-31ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 20-Oct-25 02-Nov-25 Lightning Protection Shop Drawings Review & Approval
UCR-31ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Oct-25 02-Nov-25 Earthing System Drawings Review & Approval
UCR-31ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Nov-25 17-Nov-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 24-Aug-25 27-Nov-25 27-Nov-25, COMMUNICATION SYSTEM/ EMERGENCY
UCR-31ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 24-Aug-25 09-Sep-25 Telephone Shop Drawings Preparation & Submission
UCR-31ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Telephone Shop Drawings Review & Approval
UCR-31ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Public Address system Shop Drawings Review & Approval
UCR-31ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Video Surveillance system Shop Drawings Review & Appro
ACCESS CONTROL SY
SYSTEM 40 12-Oct-25 27-Nov-25 27-Nov-25, ACCESS CONTROL SYSTEM
UCR-31ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 12-Oct-25 28-Oct-25 Access Control system Shop Drawings Preparation & Submissio
UCR-31ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 28-Oct-25 27-Nov-25 27-Nov-25, RADIO RE-BROADCASTING SYSTEM
UCR-31ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 28-Oct-25 13-Nov-25 Radio Re Broadcasting system Shop Drawings Preparation &
UCR-31ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Radio Re Broadcasting system Shop Drawings Review & Ap
UCR-31ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 SCADA system Shop Drawings Review & Approval
36530 Review and approval power system shopdrawings 11 14-Apr-26 27-Apr-26 Review and approval power system shopdra
JAH-ENG-UR32-SI.99 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
UCR-32ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Jan-25 27-Jan-25 Foundation Shop Drawings Review & Approval
UCR-32ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Walls Shop Drawings Preparation & Submission
UCR-32ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 05-Apr-25 21-Apr-25 Walls Shop Drawings Review & Approval
Actual Work
Remaining Work
112 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-32ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-Dec-24 11-Jan-25 Slab Shop Drawings Preparation & Submission
UCR-32ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Jan-25 27-Jan-25 Slab Shop Drawings Review & Approval
UCR-32ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 08-Mar-25 30-Apr-25 30-Apr-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-32ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 08-Mar-25 24-Mar-25 HVAC Shop Drawings Preparation & Submission
UCR-32ENG-MC-HC HVAC Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 HVAC Shop Drawings Review & Approval
UCR-32ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 Plumbing System Shop Drawings Review & Approval
UCR-32ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Cable Tray Shop Drawings Review & Approval
UCR-32ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Power Cables Shop Drawings Review & Approval
UCR-32ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 139 06-Nov-24 22-Apr-25 22-Apr-25, ELECTRICAL INSTALLATIONS
UCR-32ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Electrical Installations Shop Drawings Preparation & Submission
UCR-32ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 125 23-Nov-24 22-Apr-25 22-Apr-25, TRANSFORMERS INSTALLATION
UCR-32ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Transformers Installation Shop Drawings Preparation & Submission
UCR-32ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 121 09-Dec-24 04-May-25 04-May-25, LIGHTNING PROTECTION SYSTEM
UCR-32ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Lightning Protection Drawings Preparation & Submission
UCR-32ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 20-Apr-25 04-May-25 Lightning Protection Shop Drawings Review & Approval
UCR-32ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Apr-25 04-May-25 Earthing System Drawings Review & Approval
UCR-32ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 27-Jan-25 06-May-25 06-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-32ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 27-Jan-25 12-Feb-25 Telephone Shop Drawings Preparation & Submission
UCR-32ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Telephone Shop Drawings Review & Approval
UCR-32ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Public Address system Shop Drawings Review & Approval
UCR-32ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 16-Mar-25 06-May-25 06-May-25, ACCESS CONTROL SYSTEM
UCR-32ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Access Control system Shop Drawings Preparation & Submission
Actual Work
Remaining Work
113 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-32ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Apr-25 06-May-25 06-May-25, RADIO RE-BROADCASTING SYSTEM
UCR-32ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Apr-25 22-Apr-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-32ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR-32ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.955 Review and approval power system shopdrawings 11 21-Aug-25 03-Sep-25 Review and approval power system shopdrawings
JAH-ENG-UR33-SI.10 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
UCR-33ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 10-Jun-24 01-Jul-24 Foundation Shop Drawings Review & Approval
UCR-33ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 08-May-24 25-May-24 Walls Shop Drawings Preparation & Submission
UCR-33ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 02-Sep-24 18-Sep-24 Walls Shop Drawings Review & Approval
UCR-33ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Slab Shop Drawings Preparation & Submission
UCR-33ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 10-Jun-24 01-Jul-24 Slab Shop Drawings Review & Approval
UCR-33ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 30-Oct-24 16-Nov-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 28-Sep-24 30-Nov-24 30-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-33ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 28-Sep-24 14-Oct-24 HVAC Shop Drawings Preparation & Submission
UCR-33ENG-MC-HC HVAC Shop Drawings Review & Approval 14 13-Nov-24 30-Nov-24 HVAC Shop Drawings Review & Approval
UCR-33ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-Oct-24 16-Nov-24 Plumbing System Shop Drawings Review & Approval
UCR-33ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Cable Tray Shop Drawings Review & Approval
UCR-33ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Power Cables Shop Drawings Review & Approval
UCR-33ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 244 18-Jan-24 07-Nov-24 07-Nov-24, ELECTRICAL INSTALLATIONS
UCR-33ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR-33ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 230 04-Feb-24 07-Nov-24 07-Nov-24, TRANSFORMERS INSTALLATION
Actual Work
Remaining Work
114 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-33ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR-33ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 210 20-Feb-24 31-Oct-24 31-Oct-24, LIGHTNING PROTECTION SYSTEM
UCR-33ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR-33ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 17-Oct-24 31-Oct-24 Lightning Protection Shop Drawings Review & Approval
UCR-33ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Earthing System Drawings Review & Approval
UCR-33ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 18-Aug-24 21-Nov-24 21-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-33ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Aug-24 02-Sep-24 Telephone Shop Drawings Preparation & Submission
UCR-33ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Telephone Shop Drawings Review & Approval
UCR-33ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Public Address system Shop Drawings Review & Approval
UCR-33ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 06-Oct-24 21-Nov-24 21-Nov-24, ACCESS CONTROL SYSTEM
UCR-33ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Access Control system Shop Drawings Preparation & Submission
UCR-33ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 22-Oct-24 21-Nov-24 21-Nov-24, RADIO RE-BROADCASTING SYSTEM
UCR-33ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 22-Oct-24 07-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-33ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR-33ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.1011 Review and approval power system shopdrawings 11 05-Mar-25 18-Mar-25 Review and approval power system shopdrawings
DU-P-MV.1011 Review and approval medium voltage shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval medium voltage shopdrawings
DU-P-T.1011 Review and approval transformer shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval transformer shopdrawings
DU-P-RMU.1011 Review and approval RMU shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval RMU shopdrawings
Actual Work
Remaining Work
115 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-UR15-SI.10 Soil Improvement Design Review & Approval 14 26-Apr-25 11-May-25 Soil Improvement Design Review & Approval
UCR.15ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 20-Mar-25 09-Apr-25 Foundation Shop Drawings Review & Approval
UCR.15ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 16-Feb-25 04-Mar-25 Walls Shop Drawings Preparation & Submission
UCR.15ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 14-Jun-25 30-Jun-25 Walls Shop Drawings Review & Approval
UCR.15ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 04-Mar-25 20-Mar-25 Slab Shop Drawings Preparation & Submission
UCR.15ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 20-Mar-25 09-Apr-25 Slab Shop Drawings Review & Approval
UCR.15ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 14-Jun-25 02-Aug-25 02-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.15ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 14-Jun-25 30-Jun-25 HVAC Shop Drawings Preparation & Submission
UCR.15ENG-MC-HC HVAC Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 HVAC Shop Drawings Review & Approval
UCR.15ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 Plumbing System Shop Drawings Review & Approval
UCR.15ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Cable Tray Shop Drawings Review & Approval
UCR.15ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Power Cables Shop Drawings Review & Approval
UCR.15ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 144 29-Jan-25 24-Jul-25 24-Jul-25, ELECTRICAL INSTALLATIONS
UCR.15ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 29-Jan-25 15-Feb-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.15ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 130 15-Feb-25 24-Jul-25 24-Jul-25, TRANSFORMERS INSTALLATION
UCR.15ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 15-Feb-25 03-Mar-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.15ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 108 03-Mar-25 15-Jul-25 15-Jul-25, LIGHTNING PROTECTION SYSTEM
UCR.15ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 03-Mar-25 19-Mar-25 Lightning Protection Drawings Preparation & Submission
UCR.15ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Lightning Protection Shop Drawings Review & Approval
UCR.15ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Earthing System Drawings Review & Approval
UCR.15ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 26-Apr-25 02-Aug-25 02-Aug-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHO
UCR.15ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Apr-25 11-May-25 Telephone Shop Drawings Preparation & Submission
UCR.15ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Telephone Shop Drawings Review & Approval
Actual Work
Remaining Work
116 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.15ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Public Address system Shop Drawings Review & Approval
UCR.15ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 16-Jun-25 02-Aug-25 02-Aug-25, ACCESS CONTROL SYSTEM
UCR.15ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 16-Jun-25 02-Jul-25 Access Control system Shop Drawings Preparation & Submission
UCR.15ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 02-Jul-25 02-Aug-25 02-Aug-25, RADIO RE-BROADCASTING SYSTEM
UCR.15ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.15ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.15ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 20-Nov-25 03-Dec-25 Review and approval power system shopdrawings
JAH-ENG-UR16-SI.10 Soil Improvement Design Review & Approval 14 26-Apr-25 11-May-25 Soil Improvement Design Review & Approval
UCR.16ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Mar-25 26-Mar-25 Foundation Shop Drawings Review & Approval
UCR.16ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 06-Feb-25 23-Feb-25 Walls Shop Drawings Preparation & Submission
UCR.16ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 29-May-25 18-Jun-25 Walls Shop Drawings Review & Approval
UCR.16ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 23-Feb-25 11-Mar-25 Slab Shop Drawings Preparation & Submission
UCR.16ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Mar-25 26-Mar-25 Slab Shop Drawings Review & Approval
UCR.16ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 15-Jul-25 31-Jul-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 65 12-Jun-25 27-Aug-25 27-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WOR
UCR.16ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 HVAC Shop Drawings Preparation & Submission
UCR.16ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Aug-25 27-Aug-25 HVAC Shop Drawings Review & Approval
UCR.16ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 15-Jul-25 31-Jul-25 Plumbing System Shop Drawings Review & Approval
UCR.16ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Cable Tray Shop Drawings Review & Approval
UCR.16ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Power Cables Shop Drawings Review & Approval
Actual Work
Remaining Work
117 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.16ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 12-Jan-25 28-Jan-25 Lighting System Shop Drawings Preparation & Submission
UCR.16ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 144 28-Jan-25 23-Jul-25 23-Jul-25, ELECTRICAL INSTALLATIONS
UCR.16ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 28-Jan-25 13-Feb-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.16ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 130 13-Feb-25 23-Jul-25 23-Jul-25, TRANSFORMERS INSTALLATION
UCR.16ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 13-Feb-25 02-Mar-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.16ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 110 02-Mar-25 16-Jul-25 16-Jul-25, LIGHTNING PROTECTION SYSTEM
UCR.16ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Lightning Protection Drawings Preparation & Submission
UCR.16ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 02-Jul-25 16-Jul-25 Lightning Protection Shop Drawings Review & Approval
UCR.16ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 02-Jul-25 16-Jul-25 Earthing System Drawings Review & Approval
UCR.16ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 24-Apr-25 31-Jul-25 31-Jul-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHON
UCR.16ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 24-Apr-25 10-May-25 Telephone Shop Drawings Preparation & Submission
UCR.16ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Telephone Shop Drawings Review & Approval
UCR.16ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Public Address system Shop Drawings Review & Approval
UCR.16ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 15-Jun-25 31-Jul-25 31-Jul-25, ACCESS CONTROL SYSTEM
UCR.16ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 15-Jun-25 01-Jul-25 Access Control system Shop Drawings Preparation & Submission
UCR.16ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 01-Jul-25 31-Jul-25 31-Jul-25, RADIO RE-BROADCASTING SYSTEM
UCR.16ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-Jul-25 17-Jul-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.16ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.16ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.1205 Review and approval power system shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval power system shopdrawings
DU-P-MV.1205 Review and approval medium voltage shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval medium voltage shopdrawings
DU-P-T.1205 Review and approval transformer shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval transformer shopdrawings
Actual Work
Remaining Work
118 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-RMU.1205 Review and approval RMU shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval RMU shopdrawings
JAH-ENG-UR13-SI.10 Soil Improvement Design Review & Approval 14 24-Dec-25 08-Jan-26 Soil Improvement Design Review & Approval
UCR.13ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Nov-25 08-Dec-25 Foundation Shop Drawings Review & Approval
UCR.13ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 21-Oct-25 06-Nov-25 Walls Shop Drawings Preparation & Submission
UCR.13ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 09-Feb-26 25-Feb-26 Walls Shop Drawings Review & Approval
UCR.13ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Nov-25 23-Nov-25 Slab Shop Drawings Preparation & Submission
UCR.13ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Nov-25 08-Dec-25 Slab Shop Drawings Review & Approval
UCR.13ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 15-Jul-24 31-Jul-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 09-Jul-24 27-Aug-24 27-Aug-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.13ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 HVAC Shop Drawings Preparation & Submission
UCR.13ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Aug-24 27-Aug-24 HVAC Shop Drawings Review & Approval
UCR.13ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 11-Aug-24 27-Aug-24 Plumbing System Shop Drawings Review & Approval
UCR.13ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval
UCR.13ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval
UCR.13ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.13ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.13ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.13ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.13ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 664 20-Feb-24 28-Apr-26 28-Apr-26, LIGHTNING PROTECTION S
UCR.13ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.13ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 14-Apr-26 28-Apr-26 Lightning Protection Shop Drawings Review
UCR.13ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 14-Apr-26 28-Apr-26 Earthing System Drawings Review & Appro
Actual Work
Remaining Work
119 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.13ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.13ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
UCR.13ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval
UCR.13ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval
UCR.13ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.13ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.13ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.13ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.13ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.13ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 19-Dec-24 01-Jan-25 Review and approval power system shopdrawings
MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 21-Dec-24 02-Jan-25 Review and approval medium voltage shopdrawings
MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 28-Dec-24 09-Jan-25 Review and approval transformer shopdrawings
MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 30-Dec-24 12-Jan-25 Review and approval RMU shopdrawings
JAH-ENG-UR14-SI.10 Soil Improvement Design Review & Approval 14 14-Jan-26 29-Jan-26 Soil Improvement Design Review & Approval
UCR.14ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 14-Dec-25 29-Dec-25 Foundation Shop Drawings Review & Approval
UCR.14ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 11-Nov-25 27-Nov-25 Walls Shop Drawings Preparation & Submission
UCR.14ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 28-Feb-26 16-Mar-26 Walls Shop Drawings Review & Approval
UCR.14ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 27-Nov-25 14-Dec-25 Slab Shop Drawings Preparation & Submission
UCR.14ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 14-Dec-25 29-Dec-25 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
120 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.14ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.14ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission
UCR.14ENG-MC-HC HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval
UCR.14ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval
UCR.14ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval
UCR.14ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval
UCR.14ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Lighting System Shop Drawings Review & Appr
ELECTRICAL INSTALLATIONS
INSTALLAT 69 18-Jan-24 08-Apr-24 08-Apr-24, ELECTRICAL INSTALLATIONS
UCR.14ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.14ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 55 04-Feb-24 08-Apr-24 08-Apr-24, TRANSFORMERS INSTALLATION
UCR.14ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.14ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 629 20-Feb-24 14-Mar-26 14-Mar-26, LIGHTNING PROTECTION SYST
UCR.14ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.14ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Lightning Protection Shop Drawings Review & A
UCR.14ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Earthing System Drawings Review & Approval
UCR.14ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.14ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
UCR.14ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval
UCR.14ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Public Address system Shop Drawings Review & Approval
UCR.14ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.14ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.14ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.14ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.14ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
Actual Work
Remaining Work
121 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.14ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 SCADA system Shop Drawings Preparation & Submission
UCR.14ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings
MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 23-Jun-24 06-Jul-24 Review and approval medium voltage shopdrawings
MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 14-Jul-24 27-Jul-24 Review and approval transformer shopdrawings
MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 01-Aug-24 14-Aug-24 Review and approval RMU shopdrawings
JAH-ENG-UR11-SI.10 Soil Improvement Design Review & Approval 14 24-Jan-26 09-Feb-26 Soil Improvement Design Review & Approval
UCR.11ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Foundation Shop Drawings Review & Approval
UCR.11ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Walls Shop Drawings Preparation & Submission
UCR.11ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Mar-26 25-Mar-26 Walls Shop Drawings Review & Approval
UCR.11ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 07-Dec-25 23-Dec-25 Slab Shop Drawings Preparation & Submission
UCR.11ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Slab Shop Drawings Review & Approval
UCR.11ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.11ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission
UCR.11ENG-MC-HC HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval
UCR.11ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval
UCR.11ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval
UCR.11ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval
UCR.11ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Lighting System Shop Drawings Review & Approva
Actual Work
Remaining Work
122 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.11ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.11ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.11ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.11ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 600 20-Feb-24 08-Feb-26 08-Feb-26, LIGHTNING PROTECTION SYSTEM
UCR.11ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.11ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Lightning Protection Shop Drawings Review & Appr
UCR.11ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Earthing System Drawings Review & Approval
UCR.11ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.11ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
UCR.11ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval
UCR.11ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval
UCR.11ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.11ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.11ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.11ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.11ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.11ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval
DU-P-LV.1505 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings
JAH-ENG-UR12-SI.10 Soil Improvement Design Review & Approval 14 27-Jan-26 12-Feb-26 Soil Improvement Design Review & Approval
UCR.12ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Foundation Shop Drawings Review & Approval
UCR.12ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Walls Shop Drawings Preparation & Submission
Actual Work
Remaining Work
123 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.12ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 26-Feb-26 15-Mar-26 Walls Shop Drawings Review & Approval
UCR.12ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 07-Dec-25 23-Dec-25 Slab Shop Drawings Preparation & Submission
UCR.12ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Slab Shop Drawings Review & Approval
UCR.12ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 20-Jan-26 05-Feb-26 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 18-Dec-25 19-Feb-26 19-Feb-26, VENTILATION SYSTEM/AIR COND
UCR.12ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 HVAC Shop Drawings Preparation & Submission
UCR.12ENG-MC-HC HVAC Shop Drawings Review & Approval 14 03-Feb-26 19-Feb-26 HVAC Shop Drawings Review & Approval
UCR.12ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 20-Jan-26 05-Feb-26 Plumbing System Shop Drawings Review & Approv
UCR.12ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 03-Jan-26 17-Jan-26 Cable Tray Shop Drawings Review & Approval
UCR.12ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 03-Jan-26 17-Jan-26 Power Cables Shop Drawings Review & Approval
UCR.12ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 160 24-Jul-25 28-Jan-26 28-Jan-26, ELECTRICAL INSTALLATIONS
UCR.12ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jul-25 10-Aug-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.12ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Electrical Installations Shop Drawings Review & App
TRANSFORMERS INSTALLATION
INSTA 146 10-Aug-25 28-Jan-26 28-Jan-26, TRANSFORMERS INSTALLATION
UCR.12ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 10-Aug-25 26-Aug-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.12ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Transformers Installation Shop Drawings Review & A
LIGHTNING PROTECTION
PROTECTIO SYSTEM 140 26-Aug-25 07-Feb-26 07-Feb-26, LIGHTNING PROTECTION SYSTEM
UCR.12ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 26-Aug-25 11-Sep-25 Lightning Protection Drawings Preparation & Submission
UCR.12ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 24-Jan-26 07-Feb-26 Lightning Protection Shop Drawings Review & Appr
UCR.12ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Jan-26 07-Feb-26 Earthing System Drawings Review & Approval
UCR.12ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 14-Oct-25 18-Jan-26 18-Jan-26, COMMUNICATION SYSTEM/ EMERGE
UCR.12ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 14-Oct-25 30-Oct-25 Telephone Shop Drawings Preparation & Submission
UCR.12ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Telephone Shop Drawings Review & Approval
UCR.12ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Public Address system Shop Drawings Review & App
UCR.12ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Video Surveillance system Shop Drawings Review & A
ACCESS CONTROL SY
SYSTEM 49 02-Dec-25 28-Jan-26 28-Jan-26, ACCESS CONTROL SYSTEM
Actual Work
Remaining Work
124 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.12ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 02-Dec-25 18-Dec-25 Access Control system Shop Drawings Preparation & Sub
UCR.12ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Access Control system Shop Drawings Review & Ap
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 18-Dec-25 18-Jan-26 18-Jan-26, RADIO RE-BROADCASTING SYSTEM
UCR.12ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 Radio Re Broadcasting system Shop Drawings Preparatio
UCR.12ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Radio Re Broadcasting system Shop Drawings Review
UCR.12ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 SCADA system Shop Drawings Review & Approval
MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 02-Jun-26 16-Jun-26 Review and approval power system sh
JAH-ENG-UR1-SI.119 Soil Improvement Design Review & Approval 14 13-Jan-24 28-Jan-24 Soil Improvement Design Review & Approval
UCR.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Foundation Shop Drawings Review & Approval
UCR.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Walls Shop Drawings Preparation & Submission
UCR.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 17-Jul-24 03-Aug-24 Walls Shop Drawings Review & Approval
UCR.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Apr-24 25-Apr-24 Slab Shop Drawings Preparation & Submission
UCR.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Slab Shop Drawings Review & Approval
UCR.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 09-Feb-25 25-Feb-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 51 29-Dec-24 26-Feb-25 26-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 29-Dec-24 14-Jan-25 HVAC Shop Drawings Preparation & Submission
UCR.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 10-Feb-25 26-Feb-25 HVAC Shop Drawings Review & Approval
UCR.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-Jan-25 16-Feb-25 Plumbing System Shop Drawings Review & Approval
UCR.1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 09-Mar-25 22-Mar-25 Cable Tray Shop Drawings Review & Approval
UCR.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 09-Mar-25 22-Mar-25 Power Cables Shop Drawings Review & Approval
UCR.1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 138 06-Oct-24 16-Mar-25 16-Mar-25, ELECTRICAL INSTALLATIONS
UCR.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 02-Mar-25 16-Mar-25 Electrical Installations Shop Drawings Review & Approval
Actual Work
Remaining Work
125 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
TRANSFORMERS INSTALLATION
INSTA 124 22-Oct-24 16-Mar-25 16-Mar-25, TRANSFORMERS INSTALLATION
UCR.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 22-Oct-24 07-Nov-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 02-Mar-25 16-Mar-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 07-Nov-24 03-Mar-25 03-Mar-25, LIGHTNING PROTECTION SYSTEM
UCR.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 07-Nov-24 24-Nov-24 Lightning Protection Drawings Preparation & Submission
UCR.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Lightning Protection Shop Drawings Review & Approval
UCR.1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Earthing System Drawings Review & Approval
UCR.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 26-Dec-24 05-Apr-25 05-Apr-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Dec-24 12-Jan-25 Telephone Shop Drawings Preparation & Submission
UCR.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Telephone Shop Drawings Review & Approval
UCR.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Public Address system Shop Drawings Review & Approval
UCR.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 13-Feb-25 05-Apr-25 05-Apr-25, ACCESS CONTROL SYSTEM
UCR.1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 13-Feb-25 01-Mar-25 Access Control system Shop Drawings Preparation & Submission
UCR.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 02-Mar-25 05-Apr-25 05-Apr-25, RADIO RE-BROADCASTING SYSTEM
UCR.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 02-Mar-25 17-Mar-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.1720 Review and approval power system shopdrawings 11 10-Jun-25 23-Jun-25 Review and approval power system shopdrawings
JAH-ENG-UR02-SI.11 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval
UCR.2-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 17-Feb-24 03-Mar-24 Foundation Shop Drawings Review & Approval
UCR.2-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 15-Jan-24 31-Jan-24 Walls Shop Drawings Preparation & Submission
UCR.2-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 08-May-24 25-May-24 Walls Shop Drawings Review & Approval
UCR.2-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 31-Jan-24 17-Feb-24 Slab Shop Drawings Preparation & Submission
UCR.2-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 17-Feb-24 03-Mar-24 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
126 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MECHANICAL 79 11-Jul-24 12-Oct-24 12-Oct-24, MECHANICAL
FIRE FIGHTING SYSTEM 56 11-Jul-24 14-Sep-24 14-Sep-24, FIRE FIGHTING SYSTEM
UCR.2-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 11-Jul-24 28-Jul-24 Fire Fighting Shop Drawings Preparation & Submission
UCR.2-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 28-Aug-24 14-Sep-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 65 28-Jul-24 12-Oct-24 12-Oct-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.2-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 28-Jul-24 12-Aug-24 HVAC Shop Drawings Preparation & Submission
UCR.2-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 25-Sep-24 12-Oct-24 HVAC Shop Drawings Review & Approval
UCR.2-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 28-Aug-24 14-Sep-24 Plumbing System Shop Drawings Review & Approval
UCR.2-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Cable Tray Shop Drawings Review & Approval
UCR.2-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Power Cables Shop Drawings Review & Approval
UCR.2-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 154 02-Mar-24 05-Sep-24 05-Sep-24, ELECTRICAL INSTALLATIONS
UCR.2-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 02-Mar-24 18-Mar-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.2-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 140 18-Mar-24 05-Sep-24 05-Sep-24, TRANSFORMERS INSTALLATION
UCR.2-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.2-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 126 03-Apr-24 05-Sep-24 05-Sep-24, LIGHTNING PROTECTION SYSTEM
UCR.2-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Lightning Protection Drawings Preparation & Submission
UCR.2-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Lightning Protection Shop Drawings Review & Approval
UCR.2-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Earthing System Drawings Review & Approval
UCR.2-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 96 26-May-24 19-Sep-24 19-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.2-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Telephone Shop Drawings Preparation & Submission
UCR.2-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Telephone Shop Drawings Review & Approval
UCR.2-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Public Address system Shop Drawings Review & Approval
UCR.2-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 55 18-Jul-24 19-Sep-24 19-Sep-24, ACCESS CONTROL SYSTEM
UCR.2-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 18-Jul-24 03-Aug-24 Access Control system Shop Drawings Preparation & Submission
UCR.2-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 04-Aug-24 02-Sep-24 02-Sep-24, RADIO RE-BROADCASTING SYSTEM
Actual Work
Remaining Work
127 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.2-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 04-Aug-24 19-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.2-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.2-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 03-May-25 17-May-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.1920 Review and approval power system shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval power system shopdrawings
DU-P-MV.1920 Review and approval medium voltage shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval medium voltage shopdrawings
DU-P-T.1920 Review and approval transformer shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval transformer shopdrawings
DU-P-RMU.1920 Review and approval RMU shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval RMU shopdrawings
JAH-ENG-UR03-SI.11 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
UCR.3-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 08-Oct-24 24-Oct-24 Foundation Shop Drawings Review & Approval
UCR.3-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 04-Sep-24 21-Sep-24 Walls Shop Drawings Preparation & Submission
UCR.3-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 26-Dec-24 12-Jan-25 Walls Shop Drawings Review & Approval
UCR.3-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 21-Sep-24 08-Oct-24 Slab Shop Drawings Preparation & Submission
UCR.3-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 08-Oct-24 24-Oct-24 Slab Shop Drawings Review & Approval
UCR.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 07-May-25 24-May-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 18-Mar-25 11-May-25 11-May-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.3-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 HVAC Shop Drawings Preparation & Submission
UCR.3-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 24-Apr-25 11-May-25 HVAC Shop Drawings Review & Approval
UCR.3-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Apr-25 11-May-25 Plumbing System Shop Drawings Review & Approval
UCR.3-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Cable Tray Shop Drawings Review & Approval
UCR.3-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Power Cables Shop Drawings Review & Approval
Actual Work
Remaining Work
128 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 153 31-Oct-24 03-May-25 03-May-25, LIGHTING SYSTEM
UCR.3-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 31-Oct-24 17-Nov-24 Lighting System Shop Drawings Preparation & Submission
UCR.3-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 139 17-Nov-24 03-May-25 03-May-25, ELECTRICAL INSTALLATIONS
UCR.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 17-Nov-24 03-Dec-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 140 03-Dec-24 20-May-25 20-May-25, TRANSFORMERS INSTALLATION
UCR.3-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 03-Dec-24 18-Dec-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.3-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 06-May-25 20-May-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 111 19-Dec-24 03-May-25 03-May-25, LIGHTNING PROTECTION SYSTEM
UCR.3-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 19-Dec-24 04-Jan-25 Lightning Protection Drawings Preparation & Submission
UCR.3-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Lightning Protection Shop Drawings Review & Approval
UCR.3-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 12-Apr-25 26-Apr-25 Earthing System Drawings Review & Approval
UCR.3-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-May-25 17-May-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 05-Feb-25 17-May-25 17-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.3-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 05-Feb-25 22-Feb-25 Telephone Shop Drawings Preparation & Submission
UCR.3-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 03-May-25 17-May-25 Telephone Shop Drawings Review & Approval
UCR.3-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Public Address system Shop Drawings Review & Approval
UCR.3-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 26-Mar-25 17-May-25 17-May-25, ACCESS CONTROL SYSTEM
UCR.3-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 26-Mar-25 16-Apr-25 Access Control system Shop Drawings Preparation & Submission
UCR.3-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 16-Apr-25 17-May-25 17-May-25, RADIO RE-BROADCASTING SYSTEM
UCR.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 16-Apr-25 03-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.3-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 20-May-25 03-Jun-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.2105 Review and approval power system shopdrawings 11 31-Aug-25 14-Sep-25 Review and approval power system shopdrawings
JAH-ENG-UR04-SI.11 Soil Improvement Design Review & Approval 14 30-Sep-26 17-Oct-26 Soil Improvement Design
Actual Work
Remaining Work
129 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.4-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 17-Apr-24 04-May-24 Foundation Shop Drawings Review & Approval
UCR.4-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Walls Shop Drawings Preparation & Submission
UCR.4-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 10-Jul-24 27-Jul-24 Walls Shop Drawings Review & Approval
UCR.4-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 28-Mar-24 17-Apr-24 Slab Shop Drawings Preparation & Submission
UCR.4-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 17-Apr-24 04-May-24 Slab Shop Drawings Review & Approval
UCR.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 01-Oct-24 19-Nov-24 19-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.4-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 HVAC Shop Drawings Preparation & Submission
UCR.4-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 HVAC Shop Drawings Review & Approval
UCR.4-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 Plumbing System Shop Drawings Review & Approval
UCR.4-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Cable Tray Shop Drawings Review & Approval
UCR.4-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Power Cables Shop Drawings Review & Approval
UCR.4-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 139 27-May-24 11-Nov-24 11-Nov-24, ELECTRICAL INSTALLATIONS
UCR.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 125 12-Jun-24 11-Nov-24 11-Nov-24, TRANSFORMERS INSTALLATION
UCR.4-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.4-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 105 03-Jul-24 04-Nov-24 04-Nov-24, LIGHTNING PROTECTION SYSTEM
UCR.4-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 Lightning Protection Drawings Preparation & Submission
UCR.4-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Lightning Protection Shop Drawings Review & Approval
UCR.4-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Earthing System Drawings Review & Approval
UCR.4-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 20-Aug-24 25-Nov-24 25-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.4-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Telephone Shop Drawings Preparation & Submission
UCR.4-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Telephone Shop Drawings Review & Approval
UCR.4-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Public Address system Shop Drawings Review & Approval
Actual Work
Remaining Work
130 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.4-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 09-Oct-24 25-Nov-24 25-Nov-24, ACCESS CONTROL SYSTEM
UCR.4-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 09-Oct-24 26-Oct-24 Access Control system Shop Drawings Preparation & Submission
UCR.4-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 26-Oct-24 25-Nov-24 25-Nov-24, RADIO RE-BROADCASTING SYSTEM
UCR.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 26-Oct-24 11-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.4-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.2305 Review and approval power system shopdrawings 11 09-Mar-25 22-Mar-25 Review and approval power system shopdrawings
JAH-ENG-UR05-SI.11 Soil Improvement Design Review & Approval 14 15-Nov-25 01-Dec-25 Soil Improvement Design Review & Approval
UCR.5-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 07-Oct-25 23-Oct-25 Foundation Shop Drawings Review & Approval
UCR.5-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 03-Sep-25 20-Sep-25 Walls Shop Drawings Preparation & Submission
UCR.5-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Dec-25 04-Jan-26 Walls Shop Drawings Review & Approval
UCR.5-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Sep-25 07-Oct-25 Slab Shop Drawings Preparation & Submission
UCR.5-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 07-Oct-25 23-Oct-25 Slab Shop Drawings Review & Approval
UCR.5-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 23-Nov-25 24-Jan-26 24-Jan-26, VENTILATION SYSTEM/AIR CONDITI
UCR.5-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 23-Nov-25 08-Dec-25 HVAC Shop Drawings Preparation & Submission
UCR.5-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 07-Jan-26 24-Jan-26 HVAC Shop Drawings Review & Approval
UCR.5-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Plumbing System Shop Drawings Review & Approval
UCR.5-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Cable Tray Shop Drawings Review & Approval
UCR.5-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Power Cables Shop Drawings Review & Approval
UCR.5-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 162 26-Jun-25 01-Jan-26 01-Jan-26, ELECTRICAL INSTALLATIONS
Actual Work
Remaining Work
131 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.5-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jun-25 13-Jul-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.5-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Electrical Installations Shop Drawings Review & Approv
TRANSFORMERS INSTALLATION
INSTA 260 13-Jul-25 17-May-26 17-May-26, TRANSFORMERS INSTAL
UCR.5-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 13-Jul-25 28-Jul-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.5-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 03-May-26 17-May-26 Transformers Installation Shop Drawings
LIGHTNING PROTECTION
PROTECTIO SYSTEM 128 29-Jul-25 25-Dec-25 25-Dec-25, LIGHTNING PROTECTION SYSTEM
UCR.5-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 29-Jul-25 13-Aug-25 Lightning Protection Drawings Preparation & Submission
UCR.5-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 13-Dec-25 25-Dec-25 Lightning Protection Shop Drawings Review & Approval
UCR.5-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 13-Dec-25 25-Dec-25 Earthing System Drawings Review & Approval
UCR.5-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 15-Sep-25 21-Dec-25 21-Dec-25, COMMUNICATION SYSTEM/ EMERGEN
UCR.5-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 15-Sep-25 02-Oct-25 Telephone Shop Drawings Preparation & Submission
UCR.5-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Telephone Shop Drawings Review & Approval
UCR.5-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Dec-25 30-Dec-25 Public Address system Shop Drawings Review & Appro
UCR.5-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Video Surveillance system Shop Drawings Review & App
ACCESS CONTROL SY
SYSTEM 40 04-Nov-25 21-Dec-25 21-Dec-25, ACCESS CONTROL SYSTEM
UCR.5-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Access Control system Shop Drawings Preparation & Submis
UCR.5-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Access Control system Shop Drawings Review & Approv
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Nov-25 21-Dec-25 21-Dec-25, RADIO RE-BROADCASTING SYSTEM
UCR.5-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Radio Re Broadcasting system Shop Drawings Preparation &
UCR.5-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Radio Re Broadcasting system Shop Drawings Review &
UCR.5-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.2505 Review and approval power system shopdrawings 11 04-May-26 17-May-26 Review and approval power system shopd
DU-P-MV.2505 Review and approval medium voltage shopdrawings 11 04-May-26 17-May-26 Review and approval medium voltage shop
DU-P-T.2505 Review and approval transformer shopdrawings 11 04-May-26 17-May-26 Review and approval transformer shopdra
DU-P-RMU.2505 Review and approval RMU shopdrawings 11 04-May-26 17-May-26 Review and approval RMU shopdrawings
Actual Work
Remaining Work
132 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 240 02-Dec-23 15-Sep-24 15-Sep-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Jan-24 03-Feb-24 03-Feb-24, EARTH WORKS
JAH-ENG-UR06-SI.11 Soil Improvement Design Preparation & Submission 14 02-Jan-24 18-Jan-24 Soil Improvement Design Preparation & Submission
JAH-ENG-UR06-SI.11 Soil Improvement Design Review & Approval 14 18-Jan-24 03-Feb-24 Soil Improvement Design Review & Approval
UCR.6-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Foundation Shop Drawings Review & Approval
UCR.6-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Walls Shop Drawings Preparation & Submission
UCR.6-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 17-Jul-24 03-Aug-24 Walls Shop Drawings Review & Approval
UCR.6-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Apr-24 25-Apr-24 Slab Shop Drawings Preparation & Submission
UCR.6-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Slab Shop Drawings Review & Approval
UCR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.6-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission
UCR.6-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval
UCR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval
UCR.6-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval
UCR.6-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval
UCR.6-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.6-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.6-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 171 20-Feb-24 15-Sep-24 15-Sep-24, LIGHTNING PROTECTION SYSTEM
UCR.6-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.6-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Lightning Protection Shop Drawings Review & Approval
UCR.6-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Earthing System Drawings Review & Approval
UCR.6-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.6-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
Actual Work
Remaining Work
133 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.6-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval
UCR.6-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Public Address system Shop Drawings Review & Approval
UCR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.6-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.6-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.6-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval
DU-P-LV.2655 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings
JAH-ENG-UR07-SI.11 Soil Improvement Design Review & Approval 14 30-Sep-26 17-Oct-26 Soil Improvement Design
UCR.7-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 03-Feb-24 18-Feb-24 Foundation Shop Drawings Review & Approval
UCR.7-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 01-Jan-24 17-Jan-24 Walls Shop Drawings Preparation & Submission
UCR.7-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 03-Apr-24 23-Apr-24 Walls Shop Drawings Review & Approval
UCR.7-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 17-Jan-24 03-Feb-24 Slab Shop Drawings Preparation & Submission
UCR.7-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 03-Feb-24 18-Feb-24 Slab Shop Drawings Review & Approval
UCR.7-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 30-Apr-24 07-Jul-24 07-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.7-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 HVAC Shop Drawings Preparation & Submission
UCR.7-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 20-Jun-24 07-Jul-24 HVAC Shop Drawings Review & Approval
UCR.7-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 02-Jun-24 23-Jun-24 Plumbing System Shop Drawings Review & Approval
UCR.7-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval
Actual Work
Remaining Work
134 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.7-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission
UCR.7-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval
UCR.7-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 29-May-24 12-Jun-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 139 18-Jan-24 07-Jul-24 07-Jul-24, ELECTRICAL INSTALLATIONS
UCR.7-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.7-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 23-Jun-24 07-Jul-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 125 04-Feb-24 07-Jul-24 07-Jul-24, TRANSFORMERS INSTALLATION
UCR.7-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.7-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 23-Jun-24 07-Jul-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 144 20-Feb-24 14-Aug-24 14-Aug-24, LIGHTNING PROTECTION SYSTEM
UCR.7-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.7-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Lightning Protection Shop Drawings Review & Approval
UCR.7-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Earthing System Drawings Review & Approval
UCR.7-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.7-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
UCR.7-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval
UCR.7-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval
UCR.7-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.7-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.7-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.7-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.7-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.7-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 23-Apr-24 06-May-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.2855 Review and approval power system shopdrawings 11 12-Oct-24 24-Oct-24 Review and approval power system shopdrawings
DU-P-MV.2855 Review and approval medium voltage shopdrawings 11 12-Oct-24 26-Oct-24 Review and approval medium voltage shopdrawings
Actual Work
Remaining Work
135 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-T.2855 Review and approval transformer shopdrawings 11 20-Oct-24 02-Nov-24 Review and approval transformer shopdrawings
DU-P-RMU.2855 Review and approval RMU shopdrawings 11 21-Oct-24 04-Nov-24 Review and approval RMU shopdrawings
JAH-ENG-UR08-SI.11 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval
UCR.8-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 05-Feb-24 20-Feb-24 Foundation Shop Drawings Review & Approval
UCR.8-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 03-Jan-24 20-Jan-24 Walls Shop Drawings Preparation & Submission
UCR.8-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 27-Apr-24 13-May-24 Walls Shop Drawings Review & Approval
UCR.8-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Jan-24 05-Feb-24 Slab Shop Drawings Preparation & Submission
UCR.8-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 05-Feb-24 20-Feb-24 Slab Shop Drawings Review & Approval
UCR.8-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.8-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission
UCR.8-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval
UCR.8-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval
UCR.8-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Cable Tray Shop Drawings Review & Approval
UCR.8-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Power Cables Shop Drawings Review & Approval
UCR.8-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 135 25-Jan-24 09-Jul-24 09-Jul-24, ELECTRICAL INSTALLATIONS
UCR.8-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 25-Jan-24 10-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.8-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 121 11-Feb-24 09-Jul-24 09-Jul-24, TRANSFORMERS INSTALLATION
UCR.8-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 11-Feb-24 26-Feb-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.8-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 26-Feb-24 30-Jun-24 30-Jun-24, LIGHTNING PROTECTION SYSTEM
UCR.8-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 26-Feb-24 13-Mar-24 Lightning Protection Drawings Preparation & Submission
UCR.8-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Lightning Protection Shop Drawings Review & Approval
UCR.8-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Earthing System Drawings Review & Approval
Actual Work
Remaining Work
136 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOW CURRENT 95 30-Mar-24 27-Jul-24 27-Jul-24, LOW CURRENT
FIRE DETECTION AND ALARM SYSTEM 86 30-Mar-24 17-Jul-24 17-Jul-24, FIRE DETECTION AND ALARM SYSTEM
UCR.8-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 30-Mar-24 18-Apr-24 Fire Alarm Shop Drawings Preparation & Submission
UCR.8-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 18-Apr-24 27-Jul-24 27-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.8-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Apr-24 05-May-24 Telephone Shop Drawings Preparation & Submission
UCR.8-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Telephone Shop Drawings Review & Approval
UCR.8-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Public Address system Shop Drawings Review & Approval
UCR.8-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 06-Jun-24 27-Jul-24 27-Jul-24, ACCESS CONTROL SYSTEM
UCR.8-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 06-Jun-24 27-Jun-24 Access Control system Shop Drawings Preparation & Submission
UCR.8-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 27-Jun-24 27-Jul-24 27-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.8-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.8-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.8-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 SCADA system Shop Drawings Review & Approval
DU-P-LV.3005 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings
JAH-ENG-UR09-SI.11 Soil Improvement Design Review & Approval 14 26-Dec-23 10-Jan-24 Soil Improvement Design Review & Approval
UCR.9-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Foundation Shop Drawings Review & Approval
UCR.9-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Walls Shop Drawings Preparation & Submission
UCR.9-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 10-Sep-24 28-Sep-24 Walls Shop Drawings Review & Approval
UCR.9-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Slab Shop Drawings Preparation & Submission
UCR.9-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Slab Shop Drawings Review & Approval
UCR.9-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 06-Nov-24 24-Dec-24 24-Dec-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.9-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 HVAC Shop Drawings Preparation & Submission
UCR.9-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 HVAC Shop Drawings Review & Approval
Actual Work
Remaining Work
137 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.9-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 Plumbing System Shop Drawings Review & Approval
UCR.9-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Cable Tray Shop Drawings Review & Approval
UCR.9-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Power Cables Shop Drawings Review & Approval
UCR.9-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 107 12-Aug-24 16-Dec-24 16-Dec-24, ELECTRICAL INSTALLATIONS
UCR.9-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 12-Aug-24 28-Aug-24 Electrical Installations Shop Drawings Preparation & Submission
UCR.9-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 94 28-Aug-24 16-Dec-24 16-Dec-24, TRANSFORMERS INSTALLATION
UCR.9-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 28-Aug-24 14-Sep-24 Transformers Installation Shop Drawings Preparation & Submission
UCR.9-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 48 14-Sep-24 10-Nov-24 10-Nov-24, LIGHTNING PROTECTION SYSTEM
UCR.9-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Lightning Protection Drawings Preparation & Submission
UCR.9-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lightning Protection Shop Drawings Review & Approval
UCR.9-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Earthing System Drawings Review & Approval
UCR.9-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 03-Nov-24 05-Feb-25 05-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.9-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 03-Nov-24 18-Nov-24 Telephone Shop Drawings Preparation & Submission
UCR.9-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Telephone Shop Drawings Review & Approval
UCR.9-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Public Address system Shop Drawings Review & Approval
UCR.9-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 21-Dec-24 05-Feb-25 05-Feb-25, ACCESS CONTROL SYSTEM
UCR.9-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Access Control system Shop Drawings Preparation & Submission
UCR.9-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Jan-25 05-Feb-25 05-Feb-25, RADIO RE-BROADCASTING SYSTEM
UCR.9-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Jan-25 22-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR.9-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR.9-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 SCADA system Shop Drawings Review & Approval
Actual Work
Remaining Work
138 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-LV.3205 Review and approval power system shopdrawings 11 17-Apr-25 30-Apr-25 Review and approval power system shopdrawings
T1-ENG-UR17-SI.1105 Soil Improvement Design Review & Approval 14 11-Sep-25 28-Sep-25 Soil Improvement Design Review & Approval
UCR.17ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Aug-25 26-Aug-25 Foundation Shop Drawings Review & Approval
UCR.17ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 Walls Shop Drawings Preparation & Submission
UCR.17ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 29-Oct-25 13-Nov-25 Walls Shop Drawings Review & Approval
UCR.17ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 26-Jul-25 11-Aug-25 Slab Shop Drawings Preparation & Submission
UCR.17ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Aug-25 26-Aug-25 Slab Shop Drawings Review & Approval
UCR.17ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 03-Dec-25 21-Jan-26 21-Jan-26, VENTILATION SYSTEM/AIR CONDITI
UCR.17ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 03-Dec-25 20-Dec-25 HVAC Shop Drawings Preparation & Submission
UCR.17ENG-MC-HC HVAC Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 HVAC Shop Drawings Review & Approval
UCR.17ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 Plumbing System Shop Drawings Review & Approval
UCR.17ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Cable Tray Shop Drawings Review & Approval
UCR.17ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 18-Nov-25 02-Dec-25 Power Cables Shop Drawings Review & Approval
UCR.17ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 117 14-Aug-25 30-Dec-25 30-Dec-25, ELECTRICAL INSTALLATIONS
UCR.17ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 14-Aug-25 31-Aug-25 Electrical Installations Shop Drawings Preparation & Submission
UCR.17ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 16-Dec-25 30-Dec-25 Electrical Installations Shop Drawings Review & Approv
TRANSFORMERS INSTALLATION
INSTA 103 31-Aug-25 30-Dec-25 30-Dec-25, TRANSFORMERS INSTALLATION
UCR.17ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 31-Aug-25 15-Sep-25 Transformers Installation Shop Drawings Preparation & Submission
UCR.17ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 16-Dec-25 30-Dec-25 Transformers Installation Shop Drawings Review & App
LIGHTNING PROTECTION
PROTECTIO SYSTEM 58 16-Sep-25 23-Nov-25 23-Nov-25, LIGHTNING PROTECTION SYSTEM
UCR.17ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 16-Sep-25 02-Oct-25 Lightning Protection Drawings Preparation & Submission
UCR.17ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Lightning Protection Shop Drawings Review & Approval
UCR.17ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Earthing System Drawings Review & Approval
Actual Work
Remaining Work
139 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.17ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 04-Nov-25 08-Feb-26 08-Feb-26, COMMUNICATION SYSTEM/ EMER
UCR.17ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Telephone Shop Drawings Preparation & Submission
UCR.17ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Telephone Shop Drawings Review & Approval
UCR.17ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Public Address system Shop Drawings Review & Ap
UCR.17ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Video Surveillance system Shop Drawings Review &
ACCESS CONTROL SY
SYSTEM 40 23-Dec-25 08-Feb-26 08-Feb-26, ACCESS CONTROL SYSTEM
UCR.17ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 23-Dec-25 08-Jan-26 Access Control system Shop Drawings Preparation & S
UCR.17ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Access Control system Shop Drawings Review & A
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Jan-26 08-Feb-26 08-Feb-26, RADIO RE-BROADCASTING SYSTE
UCR.17ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Jan-26 25-Jan-26 Radio Re Broadcasting system Shop Drawings Prepara
UCR.17ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Radio Re Broadcasting system Shop Drawings Revie
UCR.17ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 SCADA system Shop Drawings Review & Approva
DU-P-LV.3305 Review and approval power system shopdrawings 11 16-May-26 01-Jun-26 Review and approval power system shop
DU-P-MV.3305 Review and approval medium voltage shopdrawings 11 16-May-26 01-Jun-26 Review and approval medium voltage sh
DU-P-T.3305 Review and approval transformer shopdrawings 11 16-May-26 01-Jun-26 Review and approval transformer shopdr
DU-P-RMU.3305 Review and approval RMU shopdrawings 11 16-May-26 01-Jun-26 Review and approval RMU shopdrawing
T1-ENG-UR29-SI.1095 Soil Improvement Design Review & Approval 14 11-Feb-24 26-Feb-24 Soil Improvement Design Review & Approval
UCR-29ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-May-24 26-May-24 Foundation Shop Drawings Review & Approval
UCR-29ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 04-Apr-24 24-Apr-24 Walls Shop Drawings Preparation & Submission
UCR-29ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 01-Aug-24 18-Aug-24 Walls Shop Drawings Review & Approval
UCR-29ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 24-Apr-24 11-May-24 Slab Shop Drawings Preparation & Submission
UCR-29ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-May-24 26-May-24 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
140 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-29ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 04-Jul-24 21-Aug-24 21-Aug-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-29ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 04-Jul-24 21-Jul-24 HVAC Shop Drawings Preparation & Submission
UCR-29ENG-MC-HC HVAC Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 HVAC Shop Drawings Review & Approval
UCR-29ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 Plumbing System Shop Drawings Review & Approval
UCR-29ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Cable Tray Shop Drawings Review & Approval
UCR-29ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Power Cables Shop Drawings Review & Approval
UCR-29ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 139 14-Feb-24 03-Aug-24 03-Aug-24, ELECTRICAL INSTALLATIONS
UCR-29ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 14-Feb-24 02-Mar-24 Electrical Installations Shop Drawings Preparation & Submission
UCR-29ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 125 02-Mar-24 03-Aug-24 03-Aug-24, TRANSFORMERS INSTALLATION
UCR-29ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 02-Mar-24 17-Mar-24 Transformers Installation Shop Drawings Preparation & Submission
UCR-29ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 105 18-Mar-24 27-Jul-24 27-Jul-24, LIGHTNING PROTECTION SYSTEM
UCR-29ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 18-Mar-24 02-Apr-24 Lightning Protection Drawings Preparation & Submission
UCR-29ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Lightning Protection Shop Drawings Review & Approval
UCR-29ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Earthing System Drawings Review & Approval
UCR-29ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 08-May-24 17-Aug-24 17-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-29ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 08-May-24 25-May-24 Telephone Shop Drawings Preparation & Submission
UCR-29ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Telephone Shop Drawings Review & Approval
UCR-29ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Public Address system Shop Drawings Review & Approval
UCR-29ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 01-Jul-24 17-Aug-24 17-Aug-24, ACCESS CONTROL SYSTEM
UCR-29ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Access Control system Shop Drawings Preparation & Submission
UCR-29ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 17-Jul-24 17-Aug-24 17-Aug-24, RADIO RE-BROADCASTING SYSTEM
UCR-29ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-29ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval
Actual Work
Remaining Work
141 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-29ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 SCADA system Shop Drawings Preparation & Submission
UCR-29ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 SCADA system Shop Drawings Review & Approval
37660 Review and approval power system shopdrawings 11 10-Dec-24 23-Dec-24 Review and approval power system shopdrawings
T2-ENG-UR26-SI.1085 Soil Improvement Design Review & Approval 14 17-Mar-24 01-Apr-24 Soil Improvement Design Review & Approval
UCR-26ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 13-Mar-25 03-Apr-25 Foundation Shop Drawings Review & Approval
UCR-26ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 10-Feb-25 25-Feb-25 Walls Shop Drawings Preparation & Submission
UCR-26ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 09-Jun-25 25-Jun-25 Walls Shop Drawings Review & Approval
UCR-26ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-Feb-25 13-Mar-25 Slab Shop Drawings Preparation & Submission
UCR-26ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 13-Mar-25 03-Apr-25 Slab Shop Drawings Review & Approval
UCR-26ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 06-May-25 26-Jun-25 26-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-26ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 HVAC Shop Drawings Preparation & Submission
UCR-26ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 HVAC Shop Drawings Review & Approval
UCR-26ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 Plumbing System Shop Drawings Review & Approval
UCR-26ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Cable Tray Shop Drawings Review & Approval
UCR-26ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Power Cables Shop Drawings Review & Approval
UCR-26ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 21-Jun-25 03-Jul-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 172 25-Dec-24 21-Jul-25 21-Jul-25, ELECTRICAL INSTALLATIONS
UCR-26ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 25-Dec-24 09-Jan-25 Electrical Installations Shop Drawings Preparation & Submission
UCR-26ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 07-Jul-25 21-Jul-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 158 11-Jan-25 21-Jul-25 21-Jul-25, TRANSFORMERS INSTALLATION
UCR-26ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 11-Jan-25 26-Jan-25 Transformers Installation Shop Drawings Preparation & Submission
UCR-26ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 07-Jul-25 21-Jul-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 161 26-Jan-25 10-Aug-25 10-Aug-25, LIGHTNING PROTECTION SYSTEM
UCR-26ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 26-Jan-25 11-Feb-25 Lightning Protection Drawings Preparation & Submission
UCR-26ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Lightning Protection Shop Drawings Review & Approval
Actual Work
Remaining Work
142 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EARTHING SYSTEM 109 11-Feb-25 26-Jun-25 26-Jun-25, EARTHING SYSTEM
UCR-26ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Earthing System Shop Drawings Preparation & Submission
UCR-26ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Earthing System Drawings Review & Approval
UCR-26ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 16-Mar-25 26-Jun-25 26-Jun-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-26ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Telephone Shop Drawings Preparation & Submission
UCR-26ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Telephone Shop Drawings Review & Approval
UCR-26ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Public Address system Shop Drawings Review & Approval
UCR-26ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 08-May-25 26-Jun-25 26-Jun-25, ACCESS CONTROL SYSTEM
UCR-26ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 08-May-25 25-May-25 Access Control system Shop Drawings Preparation & Submission
UCR-26ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-May-25 26-Jun-25 26-Jun-25, RADIO RE-BROADCASTING SYSTEM
UCR-26ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-May-25 14-Jun-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-26ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR-26ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 SCADA system Shop Drawings Review & Approval
DU-P-LV.4005 Review and approval power system shopdrawings 11 15-Oct-25 28-Oct-25 Review and approval power system shopdrawings
T2-ENG-UR27-SI.1075 Soil Improvement Design Review & Approval 14 24-Jan-24 08-Feb-24 Soil Improvement Design Review & Approval
UCR-27ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 02-Dec-24 18-Dec-24 Foundation Shop Drawings Review & Approval
UCR-27ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 31-Oct-24 16-Nov-24 Walls Shop Drawings Preparation & Submission
UCR-27ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 19-Feb-25 08-Mar-25 Walls Shop Drawings Review & Approval
UCR-27ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 16-Nov-24 02-Dec-24 Slab Shop Drawings Preparation & Submission
UCR-27ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 02-Dec-24 18-Dec-24 Slab Shop Drawings Review & Approval
UCR-27ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-Feb-25 09-Mar-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 20-Jan-25 23-Mar-25 23-Mar-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-27ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 20-Jan-25 05-Feb-25 HVAC Shop Drawings Preparation & Submission
Actual Work
Remaining Work
143 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-27ENG-MC-HC HVAC Shop Drawings Review & Approval 14 08-Mar-25 23-Mar-25 HVAC Shop Drawings Review & Approval
UCR-27ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 22-Feb-25 09-Mar-25 Plumbing System Shop Drawings Review & Approval
UCR-27ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Mar-25 10-Apr-25 Cable Tray Shop Drawings Review & Approval
UCR-27ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Mar-25 10-Apr-25 Power Cables Shop Drawings Review & Approval
UCR-27ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 151 14-Sep-24 09-Mar-25 09-Mar-25, ELECTRICAL INSTALLATIONS
UCR-27ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 14-Sep-24 30-Sep-24 Electrical Installations Shop Drawings Preparation & Submission
UCR-27ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INSTA 137 01-Oct-24 09-Mar-25 09-Mar-25, TRANSFORMERS INSTALLATION
UCR-27ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 01-Oct-24 16-Oct-24 Transformers Installation Shop Drawings Preparation & Submission
UCR-27ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 157 16-Oct-24 22-Apr-25 22-Apr-25, LIGHTNING PROTECTION SYSTEM
UCR-27ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Lightning Protection Drawings Preparation & Submission
UCR-27ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Lightning Protection Shop Drawings Review & Approval
UCR-27ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Earthing System Drawings Review & Approval
UCR-27ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 04-Dec-24 09-Mar-25 09-Mar-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-27ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 04-Dec-24 21-Dec-24 Telephone Shop Drawings Preparation & Submission
UCR-27ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Telephone Shop Drawings Review & Approval
UCR-27ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Public Address system Shop Drawings Review & Approval
UCR-27ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 40 22-Jan-25 09-Mar-25 09-Mar-25, ACCESS CONTROL SYSTEM
UCR-27ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 22-Jan-25 08-Feb-25 Access Control system Shop Drawings Preparation & Submission
UCR-27ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Feb-25 09-Mar-25 09-Mar-25, RADIO RE-BROADCASTING SYSTEM
UCR-27ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Feb-25 24-Feb-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
UCR-27ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Radio Re Broadcasting system Shop Drawings Review & Approval
UCR-27ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 SCADA system Shop Drawings Review & Approval
Actual Work
Remaining Work
144 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER 31 11-Jun-25 17-Jul-25 17-Jul-25, POWER
POWER LV 31 11-Jun-25 17-Jul-25 17-Jul-25, POWER LV
DU-P-LV.5000 Prepare and submit power system shopdrawings 20 11-Jun-25 05-Jul-25 Prepare and submit power system shopdrawings
DU-P-LV.5005 Review and approval power system shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval power system shopdrawings
DU-P-MV.5005 Review and approval medium voltage shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval medium voltage shopdrawings
DU-P-T.5005 Review and approval transformer shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval transformer shopdrawings
DU-P-RMU.5005 Review and approval RMU shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval RMU shopdrawings
LS2-EN-SD-EW.105 Soil Improvement Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Soil Improvement Design Preparation & Submission
LS2-EN-SD-EW.110 Shoring Design Review & Approval 14 02-Jan-24 18-Jan-24 Shoring Design Review & Approval
LS2-EN-SD-EW.115 Soil Improvement Design Review & Approval 14 18-Jan-24 03-Feb-24 Soil Improvement Design Review & Approval
LS2-EN-SD-STR.105 Foundation Shop Drawings Review & Approval 14 19-Feb-24 06-Mar-24 Foundation Shop Drawings Review & Approval
LS2-EN-SD-STR.110 Walls Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Walls Shop Drawings Preparation & Submission
LS2-EN-SD-STR.115 Walls Shop Drawings Review & Approval 14 25-Mar-24 14-Apr-24 Walls Shop Drawings Review & Approval
LS2-EN-SD-STR.120 Slab Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Slab Shop Drawings Preparation & Submission
LS2-EN-SD-STR.125 Slab Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Review & Approval
LS2-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Review & Approval 14 15-Feb-26 03-Mar-26 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 73 19-Jan-26 19-Apr-26 19-Apr-26, VENTILATION SYSTEM/AIR
LS2-EN-SD-M-VEN.1 HVAC Shop Drawings Preparation & Submission 14 19-Jan-26 04-Feb-26 HVAC Shop Drawings Preparation & Submission
LS2-EN-SD-M-VEN.1 HVAC Shop Drawings Review & Approval 14 02-Apr-26 19-Apr-26 HVAC Shop Drawings Review & Approval
LS2-EN-SD-M-PS.105 Plumbing System Shop Drawings Review & Approval 14 21-Feb-26 09-Mar-26 Plumbing System Shop Drawings Review & App
LS2-EN-SD-E-CT.105 Cable Tray Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Cable Tray Shop Drawings Review & App
LS2-EN-SD-E-PC.105 Power Cables Shop Drawings Review & Approval 12 28-Mar-26 11-Apr-26 Power Cables Shop Drawings Review & App
LS2-EN-SD-E-LS.105 Lighting System Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Lighting System Shop Drawings Review &
Actual Work
Remaining Work
145 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 26 29-Jan-26 01-Mar-26 01-Mar-26, ELECTRICAL INSTALLATIONS
LS2-EN-SD-E-EI.100 Electrical Installations Shop Drawings Preparation & Submission 14 29-Jan-26 15-Feb-26 Electrical Installations Shop Drawings Preparation &
LS2-EN-SD-E-EI.105 Electrical Installations Shop Drawings Review & Approval 12 15-Feb-26 01-Mar-26 Electrical Installations Shop Drawings Review & A
LIGHTNING PROTECTION
PROTECTIO SYSTEM 624 23-Apr-24 11-May-26 11-May-26, LIGHTNING PROTECTION
LS2-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Lightning Protection Drawings Preparation & Submission
LS2-EN-SD-E-LPS.10 Lightning Protection Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Lightning Protection Shop Drawings Revie
LS2-EN-SD-E-ES.105 Earthing System Drawings Review & Approval 12 27-Apr-26 11-May-26 Earthing System Drawings Review & App
LS2-EN-SD-LC-FD.1 Fire Alarm Shop Drawings Review & Approval 12 06-Apr-26 19-Apr-26 Fire Alarm Shop Drawings Review & Appro
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 11-Jun-24 08-Sep-24 08-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS2-EN-SD-LC-CS.1 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission
LS2-EN-SD-LC-CS.1 Telephone Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Telephone Shop Drawings Review & Approval
LS2-EN-SD-LC-VE.1 Public Address system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Public Address system Shop Drawings Review & Approval
LS2-EN-SD-LC-VS.1 Video Surveillance system Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 04-Aug-24 08-Sep-24 08-Sep-24, ACCESS CONTROL SYSTEM
LS2-EN-SD-LC-ACS Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission
LS2-EN-SD-LC-ACS Access Control system Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Aug-24 18-Sep-24 18-Sep-24, RADIO RE-BROADCASTING SYSTEM
LS2-EN-SD-LC-RRB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
LS2-EN-SD-LC-RRB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Radio Re Broadcasting system Shop Drawings Review & Approval
LS2-EN-SD-LC-SS.1 SCADA system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 SCADA system Shop Drawings Review & Approval
lIFTING STATION 03 (IN ZONE 10) 261 17-Dec-23 26-Oct-24 26-Oct-24, lIFTING STATION 03 (IN ZONE 10)
ENGINEERING 261 17-Dec-23 26-Oct-24 26-Oct-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 261 17-Dec-23 26-Oct-24 26-Oct-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 92 17-Dec-23 02-Apr-24 02-Apr-24, EARTH WORKS
LS3-EN-SD-EW.10 Shoring Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Shoring Design Preparation & Submission
LS3-EN-SD-EW.15 Soil Improvement Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Soil Improvement Design Preparation & Submission
LS3-EN-SD-EW.20 Soil Improvement Design Review & Approval 14 17-Mar-24 02-Apr-24 Soil Improvement Design Review & Approval
LS3-EN-SD-EW.25 Shoring Design Review & Approval 14 18-Jan-24 04-Feb-24 Shoring Design Review & Approval
LS3-EN-SD-STR.15 Foundation Shop Drawings Review & Approval 14 05-Mar-24 21-Mar-24 Foundation Shop Drawings Review & Approval
LS3-EN-SD-STR.20 Walls Shop Drawings Preparation & Submission 14 14-Apr-24 30-Apr-24 Walls Shop Drawings Preparation & Submission
LS3-EN-SD-STR.25 Walls Shop Drawings Review & Approval 14 30-Apr-24 16-May-24 Walls Shop Drawings Review & Approval
LS3-EN-SD-STR.30 Slab Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Preparation & Submission
LS3-EN-SD-STR.35 Slab Shop Drawings Review & Approval 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
146 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LS3-EN-SD-ME-FFS. Fire Fighting Shop Drawings Review & Approval 14 26-Sep-24 13-Oct-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 07-Sep-24 26-Oct-24 26-Oct-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
LS3-EN-SD-ME-VS.1 HVAC Shop Drawings Preparation & Submission 14 07-Sep-24 22-Sep-24 HVAC Shop Drawings Preparation & Submission
LS3-EN-SD-ME-VS.1 HVAC Shop Drawings Review & Approval 14 09-Oct-24 26-Oct-24 HVAC Shop Drawings Review & Approval
LS3-EN-SD-ME-PS.1 Plumbing System Shop Drawings Review & Approval 14 09-Oct-24 26-Oct-24 Plumbing System Shop Drawings Review & Approval
LS3-EN-SD-E-CT.15 Cable Tray Shop Drawings Review & Approval 12 14-May-24 28-May-24 Cable Tray Shop Drawings Review & Approval
LS3-EN-SD-E-PC.15 Power Cables Shop Drawings Review & Approval 12 14-May-24 28-May-24 Power Cables Shop Drawings Review & Approval
LS3-EN-SD-E-LS.15 Lighting System Shop Drawings Review & Approval 12 14-May-24 28-May-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 103 04-Feb-24 06-Jun-24 06-Jun-24, ELECTRICAL INSTALLATIONS
LS3-EN-SD-E-EI.10 Electrical Installations Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Electrical Installations Shop Drawings Preparation & Submission
LS3-EN-SD-E-EI.15 Electrical Installations Shop Drawings Review & Approval 12 23-May-24 06-Jun-24 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 81 20-Feb-24 28-May-24 28-May-24, LIGHTNING PROTECTION SYSTEM
LS3-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission
LS3-EN-SD-E-LPS.15 Lightning Protection Shop Drawings Review & Approval 12 14-May-24 28-May-24 Lightning Protection Shop Drawings Review & Approval
LS3-EN-SD-E-ES.15 Earthing System Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Earthing System Drawings Review & Approval
LS3-EN-SD-E-LC-FD Fire Alarm Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 68 13-Apr-24 04-Jul-24 04-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS3-EN-SD-E-LC-CS Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission
LS3-EN-SD-E-LC-CS Telephone Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Telephone Shop Drawings Review & Approval
LS3-EN-SD-E-LC-VE Public Address system Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Public Address system Shop Drawings Review & Approval
LS3-EN-SD-E-LC-VS Video Surveillance system Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
LS3-EN-SD-E-LC-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission
LS3-EN-SD-E-LC-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
LS3-EN-SD-E-LC-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
LS3-EN-SD-E-LC-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval
LS3-EN-SD-E-LC-SS SCADA system Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 SCADA system Shop Drawings Review & Approval
lIFTING STATION 04 (IN ZONE 11) 283 02-Jan-24 07-Dec-24 07-Dec-24, lIFTING STATION 04 (IN ZONE 11)
Actual Work
Remaining Work
147 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 283 02-Jan-24 07-Dec-24 07-Dec-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 283 02-Jan-24 07-Dec-24 07-Dec-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 78 02-Jan-24 02-Apr-24 02-Apr-24, EARTH WORKS
LS4-EN-SD-EW.10 Shoring Design Preparation & Submission 14 02-Jan-24 18-Jan-24 Shoring Design Preparation & Submission
LS4-EN-SD-EW.15 Soil Improvement Design Preparation & Submission 14 29-Feb-24 17-Mar-24 Soil Improvement Design Preparation & Submission
LS4-EN-SD-EW.20 Shoring Design Review & Approval 14 18-Jan-24 04-Feb-24 Shoring Design Review & Approval
LS4-EN-SD-EW.25 Soil Improvement Design Review & Approval 14 17-Mar-24 02-Apr-24 Soil Improvement Design Review & Approval
LS4-EN-SD-STR.15 Foundation Shop Drawings Review & Approval 14 13-Apr-24 29-Apr-24 Foundation Shop Drawings Review & Approval
LS4-EN-SD-STR.20 Walls Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Walls Shop Drawings Preparation & Submission
LS4-EN-SD-STR.25 Walls Shop Drawings Review & Approval 14 04-May-24 20-May-24 Walls Shop Drawings Review & Approval
LS4-EN-SD-STR.30 Slab Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Preparation & Submission
LS4-EN-SD-STR.35 Slab Shop Drawings Review & Approval 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Review & Approval
LS4-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Review & Approval 14 11-Nov-24 27-Nov-24 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 50 09-Oct-24 07-Dec-24 07-Dec-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
LS4-EN-SD-M-VS.10 HVAC Shop Drawings Preparation & Submission 14 09-Oct-24 26-Oct-24 HVAC Shop Drawings Preparation & Submission
LS4-EN-SD-M-VS.15 HVAC Shop Drawings Review & Approval 14 20-Nov-24 07-Dec-24 HVAC Shop Drawings Review & Approval
LS4-EN-SD-M-PS.15 Plumbing System Shop Drawings Review & Approval 14 11-Nov-24 27-Nov-24 Plumbing System Shop Drawings Review & Approval
LS4-EN-SD-E-CT.15 Cable Tray Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Cable Tray Shop Drawings Review & Approval
LS4-EN-SD-E-PC.15 Power Cables Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Power Cables Shop Drawings Review & Approval
LS4-EN-SD-E-LS.15 Lighting System Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 140 27-Apr-24 13-Oct-24 13-Oct-24, ELECTRICAL INSTALLATIONS
LS4-EN-SD-E-EI10 Electrical Installations Shop Drawings Preparation & Submission 14 27-Apr-24 13-May-24 Electrical Installations Shop Drawings Preparation & Submission
LS4-EN-SD-E-EI15 Electrical Installations Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 118 13-May-24 03-Oct-24 03-Oct-24, LIGHTNING PROTECTION SYSTEM
LS4-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 13-May-24 29-May-24 Lightning Protection Drawings Preparation & Submission
LS4-EN-SD-E-LPS.15 Lightning Protection Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Lightning Protection Shop Drawings Review & Approval
LS4-EN-SD-E-ES.15 Earthing System Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Earthing System Drawings Review & Approval
LS4-EN-SD-E-LCFD Fire Alarm Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 72 13-Aug-24 06-Nov-24 06-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS4-EN-SD-E-LCCS Telephone Shop Drawings Preparation & Submission 14 13-Aug-24 28-Aug-24 Telephone Shop Drawings Preparation & Submission
Actual Work
Remaining Work
148 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LS4-EN-SD-E-LCCS Telephone Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Telephone Shop Drawings Review & Approval
LS4-EN-SD-E-LCVE Public Address system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Public Address system Shop Drawings Review & Approval
LS4-EN-SD-E-LCVS Video Surveillance system Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 01-Oct-24 06-Nov-24 06-Nov-24, ACCESS CONTROL SYSTEM
LS4-EN-SD-E-LCAC Access Control system Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 Access Control system Shop Drawings Preparation & Submission
LS4-EN-SD-E-LCAC Access Control system Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 17-Oct-24 17-Nov-24 17-Nov-24, RADIO RE-BROADCASTING SYSTEM
LS4-EN-SD-E-LCRR Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
LS4-EN-SD-E-LCRR Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval
LS4-EN-SD-E-LCSS SCADA system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 SCADA system Shop Drawings Review & Approval
lIFTING STATION 05 (IN ZONE 04) 446 18-Jan-24 09-Jul-25 09-Jul-25, lIFTING STATION 05 (IN ZONE 04)
ENGINEERING 446 18-Jan-24 09-Jul-25 09-Jul-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 446 18-Jan-24 09-Jul-25 09-Jul-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 18-Jan-24 20-Feb-24 20-Feb-24, EARTH WORKS
JAH-ENG-SH-LS05.97 Shoring Design Preparation & Submission 14 18-Jan-24 04-Feb-24 Shoring Design Preparation & Submission
JAH-ENG-SH-LS05.98 Shoring Design Review & Approval 14 04-Feb-24 20-Feb-24 Shoring Design Review & Approval
PMP.3-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 25-Jan-25 09-Feb-25 Foundation Shop Drawings Review & Approval
PMP.3-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 01-Mar-25 16-Mar-25 Walls Shop Drawings Preparation & Submission
PMP.3-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 16-Mar-25 06-Apr-25 Walls Shop Drawings Review & Approval
PMP.3-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 03-Jun-25 23-Jun-25 Slab Shop Drawings Preparation & Submission
PMP.3-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 23-Jun-25 09-Jul-25 Slab Shop Drawings Review & Approval
PMP.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 23-Apr-25 14-Jun-25 14-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
PMP.3-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 23-Apr-25 10-May-25 HVAC Shop Drawings Preparation & Submission
PMP.3-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 HVAC Shop Drawings Review & Approval
PMP.3-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 Plumbing System Shop Drawings Review & Approval
PMP.3-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 03-Apr-25 17-Apr-25 Cable Tray Shop Drawings Review & Approval
PMP.3-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 03-Apr-25 17-Apr-25 Power Cables Shop Drawings Review & Approval
PMP.3-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Lighting System Shop Drawings Review & Approval
Actual Work
Remaining Work
149 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 26 23-Mar-25 27-Apr-25 27-Apr-25, ELECTRICAL INSTALLATIONS
PMP.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Mar-25 13-Apr-25 Electrical Installations Shop Drawings Preparation & Submission
PMP.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 101 04-Jan-25 06-May-25 06-May-25, LIGHTNING PROTECTION SYSTEM
PMP.3-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 04-Jan-25 19-Jan-25 Lightning Protection Drawings Preparation & Submission
PMP.3-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Lightning Protection Shop Drawings Review & Approval
PMP.3-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 22-Apr-25 06-May-25 Earthing System Drawings Review & Approval
PMP.3-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-May-25 21-May-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 20-Feb-25 21-May-25 21-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
PMP.3-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 20-Feb-25 09-Mar-25 Telephone Shop Drawings Preparation & Submission
PMP.3-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-May-25 21-May-25 Telephone Shop Drawings Review & Approval
PMP.3-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 Public Address system Shop Drawings Review & Approval
PMP.3-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 07-May-25 21-May-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 15-Apr-25 21-May-25 21-May-25, ACCESS CONTROL SYSTEM
PMP.3-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 15-Apr-25 01-May-25 Access Control system Shop Drawings Preparation & Submission
PMP.3-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 07-May-25 21-May-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 01-May-25 01-Jun-25 01-Jun-25, RADIO RE-BROADCASTING SYSTEM
PMP.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-May-25 18-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
PMP.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval
PMP.3-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 SCADA system Shop Drawings Review & Approval
lIFTING STATION 01 (IN ZONE 03) 418 04-Feb-24 23-Jun-25 23-Jun-25, lIFTING STATION 01 (IN ZONE 03)
ENGINEERING 418 04-Feb-24 23-Jun-25 23-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 418 04-Feb-24 23-Jun-25 23-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 78 04-Feb-24 08-May-24 08-May-24, EARTH WORKS
JAH-ENG-SH-LS06.98 Shoring Design Preparation & Submission 14 04-Feb-24 20-Feb-24 Shoring Design Preparation & Submission
JAH-ENG-SH-LS06.99 Shoring Design Review & Approval 14 20-Feb-24 07-Mar-24 Shoring Design Review & Approval
JAH-ENG-SI-LS06.100 Soil Improvement Design Review & Approval 14 22-Apr-24 08-May-24 Soil Improvement Design Review & Approval
JAH-ENG-SI-LS06.995 Soil Improvement Design Preparation & Submission 14 02-Apr-24 22-Apr-24 Soil Improvement Design Preparation & Submission
PMP.4-ENG-CV-ST.140 Foundation Shop Drawings Review & Approval 14 20-Mar-24 06-Apr-24 Foundation Shop Drawings Review & Approval
PMP.4-ENG-CV-ST.150 Walls Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Walls Shop Drawings Preparation & Submission
PMP.4-ENG-CV-ST.160 Walls Shop Drawings Review & Approval 14 02-Jun-24 23-Jun-24 Walls Shop Drawings Review & Approval
PMP.4-ENG-CV-ST.170 Slab Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Slab Shop Drawings Preparation & Submission
PMP.4-ENG-CV-ST.180 Slab Shop Drawings Review & Approval 14 05-Sep-24 22-Sep-24 Slab Shop Drawings Review & Approval
Actual Work
Remaining Work
150 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PMP.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 03-May-25 23-Jun-25 23-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
PMP.4-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 03-May-25 19-May-25 HVAC Shop Drawings Preparation & Submission
PMP.4-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 HVAC Shop Drawings Review & Approval
PMP.4-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 Plumbing System Shop Drawings Review & Approval
PMP.4-ENG-EL-CT.12 Cable Tray Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Cable Tray Shop Drawings Review & Approval
PMP.4-ENG-EL-PC.12 Power Cables Shop Drawings Review & Approval 12 06-May-25 20-May-25 Power Cables Shop Drawings Review & Approval
PMP.4-ENG-EL-LS.12 Lighting System Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLAT 26 15-Apr-25 15-May-25 15-May-25, ELECTRICAL INSTALLATIONS
PMP.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 15-Apr-25 01-May-25 Electrical Installations Shop Drawings Preparation & Submission
PMP.4-ENG-EL-EI.12 Electrical Installations Shop Drawings Review & Approval 12 01-May-25 15-May-25 Electrical Installations Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTIO SYSTEM 86 12-Jan-25 27-Apr-25 27-Apr-25, LIGHTNING PROTECTION SYSTEM
PMP.4-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 12-Jan-25 28-Jan-25 Lightning Protection Drawings Preparation & Submission
PMP.4-ENG-EL-LP.12 Lightning Protection Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Lightning Protection Shop Drawings Review & Approval
PMP.4-ENG-EL-ES.12 Earthing System Drawings Review & Approval 12 01-May-25 15-May-25 Earthing System Drawings Review & Approval
PMP.4-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-May-25 31-May-25 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 02-Mar-25 31-May-25 31-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
PMP.4-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Telephone Shop Drawings Preparation & Submission
PMP.4-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-May-25 31-May-25 Telephone Shop Drawings Review & Approval
PMP.4-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Public Address system Shop Drawings Review & Approval
PMP.4-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-May-25 31-May-25 Video Surveillance system Shop Drawings Review & Approval
ACCESS CONTROL SY
SYSTEM 31 24-Apr-25 31-May-25 31-May-25, ACCESS CONTROL SYSTEM
PMP.4-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 24-Apr-25 11-May-25 Access Control system Shop Drawings Preparation & Submission
PMP.4-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-May-25 31-May-25 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 11-May-25 12-Jun-25 12-Jun-25, RADIO RE-BROADCASTING SYSTEM
PMP.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission
PMP.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval
PMP.4-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 SCADA system Shop Drawings Review & Approval
Actual Work
Remaining Work
151 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
IRRIGATION & FIRE FIG
FIGHTING PUMP STATION SOUTH STATION 357 02-Dec-23 29-Jan-25 29-Jan-25, IRRIGATION & FIRE FIGHTING PUMP STATION SOUTH STATION
SOUTH STATION 357 02-Dec-23 29-Jan-25 29-Jan-25, SOUTH STATION
ENGINEERING 357 02-Dec-23 29-Jan-25 29-Jan-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMIT AND APPROVAL 357 02-Dec-23 29-Jan-25 29-Jan-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
IRS-ENG-SH-LS02.94 Shoring Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Shoring Design Preparation & Submission
IRS-ENG-SH-LS02.95 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval
IRS-ENG-SI-LS02.955 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission
IRS-ENG-SI-LS02.960 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
IRS.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval
IRS.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 31-Mar-24 20-Apr-24 Walls Shop Drawings Preparation & Submission
IRS.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 20-Apr-24 06-May-24 Walls Shop Drawings Review & Approval
IRS.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 22-Jul-24 07-Aug-24 Slab Shop Drawings Preparation & Submission
IRS.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 07-Aug-24 24-Aug-24 Slab Shop Drawings Review & Approval
IRS.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-24 02-Jan-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM CONDITIONING WORKS 30 11-Dec-24 15-Jan-25 15-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
IRS.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 HVAC Shop Drawings Preparation & Submission
IRS.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 30-Dec-24 15-Jan-25 HVAC Shop Drawings Review & Approval
IRS.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 13-Jan-25 29-Jan-25 Plumbing System Shop Drawings Review & Approval
IRS.1-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Cable Tray Shop Drawings Review & Approval
IRS.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Power Cables Shop Drawings Review & Approval
IRS.1-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLA 150 12-May-24 10-Nov-24 10-Nov-24, ELECTRICAL INSTALLATIONS
IRS.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 12-May-24 28-May-24 Electrical Installations Shop Drawings Preparation & Submission
IRS.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INST 136 28-May-24 10-Nov-24 10-Nov-24, TRANSFORMERS INSTALLATION
IRS.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 28-May-24 13-Jun-24 Transformers Installation Shop Drawings Preparation & Submission
IRS.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTI SYSTEM 40 13-Jun-24 04-Aug-24 04-Aug-24, LIGHTNING PROTECTION SYSTEM
IRS.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Lightning Protection Drawings Preparation & Submission
IRS.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Lightning Protection Shop Drawings Review & Approval
IRS.1-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Earthing System Drawings Review & Approval
Actual Work
Remaining Work
152 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
FIRE DETECTION AND ALARM SYSTEM 86 02-Sep-24 12-Dec-24 12-Dec-24, FIRE DETECTION AND ALARM SYSTEM
IRS.1-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Fire Alarm Shop Drawings Preparation & Submission
IRS.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SY EMERGENCY TELEPHONE 73 18-Sep-24 12-Dec-24 12-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
IRS.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Sep-24 06-Oct-24 Telephone Shop Drawings Preparation & Submission
IRS.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Telephone Shop Drawings Review & Approval
IRS.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Public Address system Shop Drawings Review & Approval
VIDEO SURVEILLANCE
SURVEILLANC 45 22-Oct-24 12-Dec-24 12-Dec-24, VIDEO SURVEILLANCE
IRS.1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 22-Oct-24 06-Nov-24 Video Surveillance system Shop Drawings Preparation & Submission
IRS.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Video Surveillance system Shop Drawings Review & Approval
IRS.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 23-Nov-24 23-Dec-24 23-Dec-24, RADIO RE-BROADCASTING SYSTEM
IRS.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
IRS.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval
IRS.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 SCADA system Shop Drawings Review & Approval
IRN-ENG-SH-LS02.9 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval
IRN-ENG-SI-LS02.95 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission
IRN-ENG-SI-LS02.96 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval
IRN.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Foundation Shop Drawings Review & Approval
IRN.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission
IRN.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 05-May-24 21-May-24 Walls Shop Drawings Review & Approval
IRN.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Slab Shop Drawings Preparation & Submission
IRN.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Slab Shop Drawings Review & Approval
IRN.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 02-Jan-25 19-Jan-25 Fire Fighting Shop Drawings Review & Approval
VENTILATION SYSTEM/AIR
SYSTEM CONDITIONING WORKS 30 28-Dec-24 01-Feb-25 01-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
IRN.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 HVAC Shop Drawings Preparation & Submission
IRN.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 15-Jan-25 01-Feb-25 HVAC Shop Drawings Review & Approval
IRN.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 29-Jan-25 15-Feb-25 Plumbing System Shop Drawings Review & Approval
Actual Work
Remaining Work
153 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
IRN.1-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Cable Tray Shop Drawings Preparation & Submission
IRN.1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Cable Tray Shop Drawings Review & Approval
IRN.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Power Cables Shop Drawings Review & Approval
IRN.1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Lighting System Shop Drawings Review & Approval
ELECTRICAL INSTALLATIONS
INSTALLA 138 11-Jun-24 25-Nov-24 25-Nov-24, ELECTRICAL INSTALLATIONS
IRN.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Electrical Installations Shop Drawings Preparation & Submission
IRN.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 12-Nov-24 25-Nov-24 Electrical Installations Shop Drawings Review & Approval
TRANSFORMERS INSTALLATION
INST 229 02-Jul-24 27-Mar-25 27-Mar-25, TRANSFORMERS INSTALLATION
IRN.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Transformers Installation Shop Drawings Preparation & Submission
IRN.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 15-Mar-25 27-Mar-25 Transformers Installation Shop Drawings Review & Approval
LIGHTNING PROTECTION
PROTECTI SYSTEM 40 18-Jul-24 03-Sep-24 03-Sep-24, LIGHTNING PROTECTION SYSTEM
IRN.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Lightning Protection Drawings Preparation & Submission
IRN.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Lightning Protection Shop Drawings Review & Approval
IRN.1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Earthing System Drawings Review & Approval
IRN.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Fire Alarm Shop Drawings Review & Approval
COMMUNICATION SYSTEM/
SY EMERGENCY TELEPHONE 73 05-Oct-24 29-Dec-24 29-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
IRN.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Telephone Shop Drawings Preparation & Submission
IRN.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Telephone Shop Drawings Review & Approval
IRN.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 Public Address system Shop Drawings Review & Approval
VIDEO SURVEILLANCE
SURVEILLANC 45 06-Nov-24 29-Dec-24 29-Dec-24, VIDEO SURVEILLANCE
IRN.1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Video Surveillance system Shop Drawings Preparation & Submission
IRN.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Video Surveillance system Shop Drawings Review & Approval
IRN.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Access Control system Shop Drawings Review & Approval
RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 09-Dec-24 08-Jan-25 08-Jan-25, RADIO RE-BROADCASTING SYSTEM
IRN.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission
IRN.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 Radio Re Broadcasting system Shop Drawings Review & Approval
IRN.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 SCADA system Shop Drawings Review & Approval
PEDESTRIAN BRIDGES
BRIDGE 733 26-Feb-24 28-Jul-26 28-Jul-26, PEDESTRIAN BRIDG
BRIDGE NO.01 626 25-May-24 17-Jun-26 17-Jun-26, BRIDGE NO.01
ENGINEERING 626 25-May-24 17-Jun-26 17-Jun-26, ENGINEERING
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTURAL/ME 78 25-May-24 28-Aug-24 28-Aug-24, CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
PB1-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Earthworks Shop Drawings Preparation & Submission
PB1-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 10-Jun-24 29-Jun-24 Earthworks Shop Drawings Review & Approval
Actual Work
Remaining Work
154 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB1-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 29-Jun-24 15-Jul-24 Bridge Structural Shop Drawings Submission
PB1-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Bridge Structural Shop Drawings Review & Approval
PB1-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Bridge Drainage Shop Drawings Preparation & Submission
PB1-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 14-Aug-24 28-Aug-24 Bridge Drainage Shop Drawings Review & Approval
PB1-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 06-Sep-25 18-Sep-25 Architectural Shop Drawings Review & Approval
PB1-EN-DU-ELEV.105 Review and approval elevators shopdrawings 11 08-May-25 21-May-25 Review and approval elevators shopdrawings
LV (Elevator Panel to LV p
panel) 51 21-May-25 23-Jul-25 23-Jul-25, LV (Elevator Panel to LV panel)
PB1-EN-DU-LV.100 Prepare and submit LV elevator shopdrawings 20 21-May-25 17-Jun-25 Prepare and submit LV elevator shopdrawings
PB1-EN-DU-LV.105 Review and approval LV elevator shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval LV elevator shopdrawings
PB1-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval Lighting system shopdrawings
PB1-EN-ELEV.105 Elevator Structural Shop Drawings Review & Approval 12 08-Oct-24 21-Oct-24 Elevator Structural Shop Drawings Review & Approval
PB1-EN-ELEV.110 Elevator Drainage Shop Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Elevator Drainage Shop Drawings Preparation & Submission
PB1-EN-ELEV.115 Elevator Drainage Shop Drawings Review & Approval 12 01-Oct-24 15-Oct-24 Elevator Drainage Shop Drawings Review & Approval
PB1-EN-ELEV.120 Elevator Shop Drawings Preparation & Submission 14 24-Jun-25 10-Jul-25 Elevator Shop Drawings Preparation & Submission
PB1-EN-ELEV.125 Elevator Shop Drawings Review & Approval 12 10-Jul-25 23-Jul-25 Elevator Shop Drawings Review & Approval
PB1-EN-RD.105 Plan and Profile Review & Approval 14 15-Feb-26 02-Mar-26 Plan and Profile Review & Approval
PB1-EN-RD.110 Road Cross Sections Preparation & Submission 14 03-Mar-26 18-Mar-26 Road Cross Sections Preparation & Submission
PB1-EN-RD.115 Road Cross Sections Review & Approval 14 18-Mar-26 08-Apr-26 Road Cross Sections Review & Approval
PB1-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 13-May-26 01-Jun-26 Guiding Signs and Marking Preparation
PB1-EN-RD.125 Guiding Signs and Marking Review & Approval 14 02-Jun-26 17-Jun-26 Guiding Signs and Marking Review &
PB2-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 09-Jun-24 27-Jun-24 Earthworks Shop Drawings Review & Approval
PB2-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 27-Jun-24 14-Jul-24 Bridge Structural Shop Drawings Submission
PB2-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Bridge Structural Shop Drawings Review & Approval
PB2-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 28-Jul-24 13-Aug-24 Bridge Drainage Shop Drawings Preparation & Submission
PB2-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Bridge Drainage Shop Drawings Review & Approval
PB2-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 12-Sep-24 26-Sep-24 Architectural Shop Drawings Review & Approval
PB2-EN-ELE.105 Elevator Structural Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Structural Shop Drawings Review & Approval
Actual Work
Remaining Work
155 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB2-EN-ELE.110 Elevator Drainage Shop Drawings Preparation & Submission 14 07-Oct-25 23-Oct-25 Elevator Drainage Shop Drawings Preparation & Submission
PB2-EN-ELE.115 Elevator Drainage Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Drainage Shop Drawings Review & Approval
PB2-EN-ELE.120 Elevator Shop Drawings Preparation & Submission 14 23-Oct-25 09-Nov-25 Elevator Shop Drawings Preparation & Submission
PB2-EN-ELE.125 Elevator Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Shop Drawings Review & Approval
PB2-EN-DU-ELEV.105 Review and approval elevators shopdrawings 11 01-Apr-26 14-Apr-26 Review and approval elevators shopdrawings
LV (Elevator Panel to LV p
panel) 31 23-Apr-26 02-Jun-26 02-Jun-26, LV (Elevator Panel to LV pan
PB2-EN-DU-LV.100 Prepare and submit LV elevator shopdrawings 20 23-Apr-26 17-May-26 Prepare and submit LV elevator shopdraw
PB2-EN-DU-LV.105 Review and approval LV elevator shopdrawings 11 17-May-26 02-Jun-26 Review and approval LV elevator shopd
PB2-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 25-May-26 10-Jun-26 Review and approval Lighting system s
PB-EN-B2-R.105 Plan and Profile Review & Approval 14 13-May-26 02-Jun-26 Plan and Profile Review & Approval
PB-EN-B2-R.110 Road Cross Sections Preparation & Submission 14 02-Jun-26 18-Jun-26 Road Cross Sections Preparation & Su
PB-EN-B2-R.115 Road Cross Sections Review & Approval 14 18-Jun-26 05-Jul-26 Road Cross Sections Review & App
PB-EN-B2-R.120 Guiding Signs and Marking Preparation & Submission 14 25-Jun-26 12-Jul-26 Guiding Signs and Marking Prepara
PB-EN-B2-R.125 Guiding Signs and Marking Review & Approval 14 12-Jul-26 28-Jul-26 Guiding Signs and Marking Revie
PB3-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Earthworks Shop Drawings Review & Approval
PB3-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 14-Oct-24 29-Oct-24 Bridge Structural Shop Drawings Submission
PB3-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Bridge Structural Shop Drawings Review & Approval
PB3-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 12-Nov-24 28-Nov-24 Bridge Drainage Shop Drawings Preparation & Submission
PB3-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Bridge Drainage Shop Drawings Review & Approval
PB3-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 23-Aug-25 06-Sep-25 Architectural Shop Drawings Review & Approval
PB3-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 15-Apr-26 28-Apr-26 Review and approval Lighting system shopd
PB3-EN-RD.105 Plan and Profile Review & Approval 14 31-Mar-26 15-Apr-26 Plan and Profile Review & Approval
PB3-EN-RD.110 Road Cross Sections Preparation & Submission 14 15-Apr-26 02-May-26 Road Cross Sections Preparation & Submis
PB3-EN-RD.115 Road Cross Sections Review & Approval 14 06-May-26 23-May-26 Road Cross Sections Review & Approva
PB3-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 02-May-26 18-May-26 Guiding Signs and Marking Preparation &
PB3-EN-RD.125 Guiding Signs and Marking Review & Approval 14 18-May-26 07-Jun-26 Guiding Signs and Marking Review &
Actual Work
Remaining Work
156 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB4-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 26-Feb-24 13-Mar-24 Earthworks Shop Drawings Preparation & Submission
PB4-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 13-Mar-24 27-Mar-24 Earthworks Shop Drawings Review & Approval
PB4-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 27-Mar-24 16-Apr-24 Bridge Structural Shop Drawings Submission
PB4-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 16-Apr-24 30-Apr-24 Bridge Structural Shop Drawings Review & Approval
PB4-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 Bridge Drainage Shop Drawings Preparation & Submission
PB4-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 16-May-24 30-May-24 Bridge Drainage Shop Drawings Review & Approval
PB4-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 05-May-25 19-May-25 Architectural Shop Drawings Review & Approval
PB4-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 20-Jan-26 02-Feb-26 Review and approval Lighting system shopdrawings
PB4-EN-RD.105 Plan and Profile Review & Approval 14 05-Jan-26 21-Jan-26 Plan and Profile Review & Approval
PB4-EN-RD.110 Road Cross Sections Preparation & Submission 14 21-Jan-26 07-Feb-26 Road Cross Sections Preparation & Submission
PB4-EN-RD.115 Road Cross Sections Review & Approval 14 10-Feb-26 26-Feb-26 Road Cross Sections Review & Approval
PB4-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 07-Feb-26 23-Feb-26 Guiding Signs and Marking Preparation & Submiss
PB4-EN-RD.125 Guiding Signs and Marking Review & Approval 14 23-Feb-26 11-Mar-26 Guiding Signs and Marking Review & Approval
EXTERNAL SURROUNDING
SURROUN UTILITIES 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, EXTERNAL SURROUN
ENGINEERING 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBM AND APPROVAL 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, SHOP DRAWING SUBM
WET UTILITIES 1025 14-Aug-22 A 01-Feb-26 01-Feb-26, WET UTILITIES
WET UTILITIES PART 01(ZONE
01(Z 06) 131 20-Feb-24 30-Jul-24 30-Jul-24, WET UTILITIES PART 01(ZONE 06)
POTABLE WATER NETWORK
NETW 90 13-Apr-24 30-Jul-24 30-Jul-24, POTABLE WATER NETWORK
EX-ENG-WU-PW-P01 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-PW-P01 Plan and Profile Shop Drawing Review & Approval 14 14-Jul-24 30-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P01.1 Plan and Profile Shop Drawing Review & Approval 14 08-Jul-24 24-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P01 Plan and Profile Shop Drawing Review & Approval 14 03-Jul-24 20-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P01 Plan and Profile Shop Drawing Review & Approval 14 25-Jun-24 11-Jul-24 Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 28 30-May-24 07-Jul-24 07-Jul-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P01 Plan and Profile Shop Drawing Prepration &Submission 14 30-May-24 20-Jun-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P01 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SW-P01 Plan and Profile Shop Drawing Review & Approval 14 07-May-24 23-May-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SE-P01. Plan and Profile Shop Drawing Review & Approval 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Review & Approval
Actual Work
Remaining Work
157 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EX-ENG-WU-PW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 24-Mar-24 13-Apr-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-PW-P02 Plan and Profile Shop Drawing Review & Approval 14 25-May-24 09-Jun-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P02.2 Plan and Profile Shop Drawing Review & Approval 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P02 Plan and Profile Shop Drawing Review & Approval 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P02 Plan and Profile Shop Drawing Review & Approval 14 04-May-24 20-May-24 Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 42 15-May-24 07-Jul-24 07-Jul-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P02 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-AW-P02 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SW-P02 Plan and Profile Shop Drawing Review & Approval 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SE-P02. Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-PW-P03 Plan and Profile Shop Drawing Review & Approval 14 17-Jan-26 01-Feb-26 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P03.2 Plan and Profile Shop Drawing Review & Approval 14 28-Dec-25 13-Jan-26 Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 519 29-Apr-24 10-Jan-26 10-Jan-26, CHILLED WATER SUPPLY & RETURN N
EX-ENG-WU-CW-P03 Plan and Profile Shop Drawing Prepration &Submission 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P03 Plan and Profile Shop Drawing Review & Approval 14 24-Dec-25 10-Jan-26 Plan and Profile Shop Drawing Review & Approval
STORM NET WORK 588 04-Feb-24 08-Jan-26 08-Jan-26, STORM NET WORK
EX-ENG-WU-SW-P03 Plan and Profile Shop Drawing Prepration &Submission 14 04-Feb-24 20-Feb-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SW-P03 Plan and Profile Shop Drawing Review & Approval 14 23-Dec-25 08-Jan-26 Plan and Profile Shop Drawing Review & Approval
SEWER NET WORK 572 18-Jan-24 04-Dec-25 04-Dec-25, SEWER NET WORK
EX-ENG-WU-SE-P03. Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SE-P03. Plan and Profile Shop Drawing Review & Approval 14 18-Nov-25 04-Dec-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-PW-P04 Plan and Profile Shop Drawing Review & Approval 14 21-Aug-25 07-Sep-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P04.1 Plan and Profile Shop Drawing Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P04 Plan and Profile Shop Drawing Review & Approval 14 26-Jun-25 13-Jul-25 Plan and Profile Shop Drawing Review & Approval
Actual Work
Remaining Work
158 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
AUTOMATIC WASTE COLLECTION
COL NETWORK 340 15-May-24 29-Jun-25 29-Jun-25, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P04 Plan and Profile Shop Drawing Prepration &Submission 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-AW-P04 Plan and Profile Shop Drawing Review & Approval 14 12-Jun-25 29-Jun-25 Plan and Profile Shop Drawing Review & Approval
STORM NET WORK 437 18-Jan-24 29-Jun-25 29-Jun-25, STORM NET WORK
EX-ENG-WU-SW-P04 Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SW-P04 Plan and Profile Shop Drawing Review & Approval 14 12-Jun-25 29-Jun-25 Plan and Profile Shop Drawing Review & Approval
SEWER NET WORK 386 02-Jan-24 10-Apr-25 10-Apr-25, SEWER NET WORK
EX-ENG-WU-SE-P04. Plan and Profile Shop Drawing Prepration &Submission 14 02-Jan-24 18-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SE-P04. Plan and Profile Shop Drawing Review & Approval 14 20-Mar-25 10-Apr-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-PW-P05 Plan and Profile Shop Drawing Review & Approval 14 06-Oct-25 21-Oct-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P05.1 Plan and Profile Shop Drawing Review & Approval 14 05-Oct-25 20-Oct-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P05 Plan and Profile Shop Drawing Review & Approval 14 01-Dec-25 16-Dec-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P05 Plan and Profile Shop Drawing Review & Approval 14 03-Dec-25 18-Dec-25 Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 515 13-Apr-24 18-Dec-25 18-Dec-25, CHILLED WATER SUPPLY & RETURN NE
EX-ENG-WU-CW-P05 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P05 Plan and Profile Shop Drawing Review & Approval 14 03-Dec-25 18-Dec-25 Plan and Profile Shop Drawing Review & Approval
STORM NET WORK 589 02-Jan-24 08-Dec-25 08-Dec-25, STORM NET WORK
EX-ENG-WU-SW-P05 Plan and Profile Shop Drawing Prepration &Submission 14 02-Jan-24 18-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SW-P05 Plan and Profile Shop Drawing Review & Approval 14 23-Nov-25 08-Dec-25 Plan and Profile Shop Drawing Review & Approval
SEWER NET WORK 555 17-Dec-23 13-Oct-25 13-Oct-25, SEWER NET WORK
EX-ENG-WU-SE-P05. Plan and Profile Shop Drawing Prepration &Submission 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SE-P05. Plan and Profile Shop Drawing Review & Approval 14 28-Sep-25 13-Oct-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-PW-P06 Plan and Profile Shop Drawing Review & Approval 14 26-Jun-25 12-Jul-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P06.1 Plan and Profile Shop Drawing Review & Approval 14 21-Jun-25 06-Jul-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P06 Plan and Profile Shop Drawing Review & Approval 14 15-Jun-25 30-Jun-25 Plan and Profile Shop Drawing Review & Approval
STORM NET WORK 458 17-Dec-23 21-Jun-25 21-Jun-25, STORM NET WORK
EX-ENG-WU-SW-P06 Plan and Profile Shop Drawing Prepration &Submission 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SW-P06 Plan and Profile Shop Drawing Review & Approval 14 02-Jun-25 21-Jun-25 Plan and Profile Shop Drawing Review & Approval
SEWER NET WORK 449 02-Dec-23 21-May-25 21-May-25, SEWER NET WORK
EX-ENG-WU-SE-P06. Plan and Profile Shop Drawing Prepration &Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-SE-P06. Plan and Profile Shop Drawing Review & Approval 14 06-May-25 21-May-25 Plan and Profile Shop Drawing Review & Approval
Actual Work
Remaining Work
159 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EX-ENG-WU-PW-P07 Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-PW-P07 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P07.1 Plan and Profile Shop Drawing Review & Approval 14 02-Apr-24 21-Apr-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P07 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P07 Plan and Profile Shop Drawing Review & Approval 289 17-Aug-22 A 19-Mar-24 Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 34 27-Jan-24 06-Mar-24 06-Mar-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P07 Plan and Profile Shop Drawing Prepration &Submission 14 27-Jan-24 12-Feb-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P07 Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 06-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-AW-P07 Plan and Profile Shop Drawing Review & Approval 14 28-Feb-24 16-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SW-P07 Plan and Profile Shop Drawing Review & Approval 8 20-Oct-22 A 29-Oct-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SE-P07. Plan and Profile Shop Drawing Review & Approval 5 03-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-PW-P08 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P08.1 Plan and Profile Shop Drawing Review & Approval 14 18-Mar-25 07-Apr-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P08 Plan and Profile Shop Drawing Review & Approval 289 18-Aug-22 A 04-Mar-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P08 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 310 10-Jan-24 15-Jan-25 15-Jan-25, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P08 Plan and Profile Shop Drawing Prepration &Submission 14 10-Jan-24 27-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P08 Plan and Profile Shop Drawing Review & Approval 14 31-Dec-24 15-Jan-25 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-AW-P08 Plan and Profile Shop Drawing Review & Approval 14 12-Feb-24 28-Feb-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SW-P08 Plan and Profile Shop Drawing Review & Approval 8 20-Oct-22 A 29-Oct-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SE-P08. Plan and Profile Shop Drawing Review & Approval 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Review & Approval
Actual Work
Remaining Work
160 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POTABLE WATER NETWORK
NETW 17 25-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK
EX-ENG-WU-PW-P09 Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-PW-P09 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-IR-P09.1 Plan and Profile Shop Drawing Review & Approval 14 02-Apr-24 21-Apr-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GD-P09 Plan and Profile Shop Drawing Review & Approval 289 21-Aug-22 A 06-Apr-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-GC-P09 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval
CHILLED WATER SUPPLY & RETURN NETWORK 62 25-Dec-23 06-Mar-24 06-Mar-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P09 Plan and Profile Shop Drawing Prepration &Submission 14 25-Dec-23 10-Jan-24 Plan and Profile Shop Drawing Prepration &Submission
EX-ENG-WU-CW-P09 Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 06-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-AW-P09 Plan and Profile Shop Drawing Review & Approval 14 28-Feb-24 16-Mar-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SW-P09 Plan and Profile Shop Drawing Review & Approval 14 11-Feb-24 26-Feb-24 Plan and Profile Shop Drawing Review & Approval
EX-ENG-WU-SE-P09. Plan and Profile Shop Drawing Review & Approval 5 03-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Review & Approval
DU-BZ1-Z1-PMV.29 review and approval shopdrawing for MV Proposed cable 11 28-Aug-25 10-Sep-25 review and approval shopdrawing for MV Proposed cable
MV UNIT SUB-STATION
SUB-STATIO 73 16-Jun-25 08-Sep-25 08-Sep-25, MV UNIT SUB-STATION
DU-BZ1-Z1-PMV.30 prepare and submit shopdrawing for MV unit sub- station 20 16-Jun-25 09-Jul-25 prepare and submit shopdrawing for MV unit sub- station
DU-BZ1-Z1-PMV.30 review and approval shopdrawing for MV unit sub- station 11 26-Aug-25 08-Sep-25 review and approval shopdrawing for MV unit sub- station
DU-BZ1-Z1-PLV.225 review and approval shopdrawing for LV unit sub- station 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for LV unit sub- station
DU-BZ1-Z1-PLS.225 review and approval shopdrawing for lighting system 11 25-Aug-25 07-Sep-25 review and approval shopdrawing for lighting system
DU-BZ1-Z1-LC-TN review and approval shopdrawing for telecom network proposed 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for telecom network proposed
DU-BZ1-Z1-LC-ELV review and approval shopdrawing for ELV Network 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for ELV Network
Actual Work
Remaining Work
161 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ1-Z1-LC-ELV prepare and submit shopdrawing for ICT Network 20 12-Jun-25 06-Jul-25 prepare and submit shopdrawing for ICT Network
DU-BZ1-Z1-LC-ELV review and approval shopdrawing for ICT Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for ICT Network
DU-BZ1-Z1-LC-ELV review and approval shopdrawing for Security Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for Security Network
DU-BZ1-Z1-LC-ELV review and approval shopdrawing for SCADA Network 11 20-Aug-25 03-Sep-25 review and approval shopdrawing for SCADA Network
DU-BZ1-AIP-PMV. review and approval shopdrawing for MV cable relocation 11 23-Aug-25 04-Sep-25 review and approval shopdrawing for MV cable relocation
MV CABLES PROPOS
PROPOSED INSTALLATION 31 05-Aug-25 10-Sep-25 10-Sep-25, MV CABLES PROPOSED INSTALLATION
DU-BZ1-AIP-PMV. prepare and submit shopdrawing for MV Proposed cable 20 05-Aug-25 28-Aug-25 prepare and submit shopdrawing for MV Proposed cable
DU-BZ1-AIP-PMV. review and approval shopdrawing for MV Proposed cable 11 28-Aug-25 10-Sep-25 review and approval shopdrawing for MV Proposed cable
MV UNIT SUB-STATION
SUB-STATIO 31 03-Aug-25 08-Sep-25 08-Sep-25, MV UNIT SUB-STATION
DU-BZ1-AIP-PMV. prepare and submit shopdrawing for MV unit sub- station 20 03-Aug-25 26-Aug-25 prepare and submit shopdrawing for MV unit sub- station
DU-BZ1-AIP-PMV. review and approval shopdrawing for MV unit sub- station 11 26-Aug-25 08-Sep-25 review and approval shopdrawing for MV unit sub- station
DU-BZ1-AIP-PLV.28 review and approval shopdrawing for LV unit sub- station 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for LV unit sub- station
DU-BZ1-AIP-PLS.28 review and approval shopdrawing for lighting system 11 25-Aug-25 07-Sep-25 review and approval shopdrawing for lighting system
DU-BZ1-AIP-LC.28 review and approval shopdrawing for ELV Network 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for ELV Network
DU-BZ1-AIP-LC.29 review and approval shopdrawing for ICT Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for ICT Network
DU-BZ1-AIP-LC.30 review and approval shopdrawing for Security Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for Security Network
DU-BZ1-AIP-LC.31 review and approval shopdrawing for SCADA Network 11 20-Aug-25 03-Sep-25 review and approval shopdrawing for SCADA Network
DU-BZ2-PMV.345 review and approval shopdrawing for MV Proposed cable 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for MV
LV (Unit Sub-station to L
LV panel) 51 22-Feb-26 27-Apr-26 27-Apr-26, LV (Unit Sub-station to LV pane
DU-BZ2-PLV.340 prepare and submit shopdrawing for LV unit sub- station 20 22-Feb-26 17-Mar-26 prepare and submit shopdrawing for LV unit sub
DU-BZ2-PLV.345 review and approval shopdrawing for LV unit sub- station 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for LV u
Actual Work
Remaining Work
162 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ2-PLS.340 prepare and submit shopdrawing for lighting system 20 17-Mar-26 14-Apr-26 prepare and submit shopdrawing for lighting s
DU-BZ2-PLS.345 review and approval shopdrawing for lighting system 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for lightin
DU-BZ2-LC-TN.345 review and approval shopdrawing for telecom network proposed 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for teleco
DU-BZ2-LC-ELVN.3 review and approval shopdrawing for ELV Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for ELV N
DU-BZ2-LC-ELVN.3 review and approval shopdrawing for ICT Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for ICT N
DU-BZ2-LC-ELVN.3 review and approval shopdrawing for Security Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for Secur
DU-BZ2-LC-ELVN.3 review and approval shopdrawing for SCADA Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for SCAD
DU-BZ3-PMV.375 review and approval shopdrawing for MV Proposed cable 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for MV Proposed cable
DU-BZ3-PMV.385 review and approval shopdrawing for MV unit sub- station 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for MV unit sub- statio
LV (Unit Sub-station to L
LV panel) 51 20-Oct-25 18-Dec-25 18-Dec-25, LV (Unit Sub-station to LV panel)
DU-BZ3-PLV.380 prepare and submit shopdrawing for LV unit sub- station 20 20-Oct-25 12-Nov-25 prepare and submit shopdrawing for LV unit sub- station
DU-BZ3-PLV.385 review and approval shopdrawing for LV unit sub- station 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for LV unit sub- station
DU-BZ3-PLS.395 review and approval shopdrawing for lighting system 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for lighting system
DU-BZ3-LC-TN.395 review and approval shopdrawing for telecom network proposed 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for telecom network pro
DU-BZ3-LC-ELVN.3 review and approval shopdrawing for ELV Network 11 02-Dec-25 16-Dec-25 review and approval shopdrawing for ELV Network
DU-BZ3-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 31-Jan-26 12-Feb-26 review and approval shopdrawing for ICT Network
DU-BZ3-LC-ELVN.4 review and approval shopdrawing for Security Network 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for Security Network
Actual Work
Remaining Work
163 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ3-LC-ELVN.4 prepare and submit shopdrawing for SCADA Network 20 07-Jan-26 31-Jan-26 prepare and submit shopdrawing for SCADA Networ
DU-BZ3-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 31-Jan-26 12-Feb-26 review and approval shopdrawing for SCADA Netw
DU-BZ4-PMV.405 review and approval shopdrawing for MV Proposed cable 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for MV Propos
DU-BZ4-PMV.415 review and approval shopdrawing for MV unit sub- station 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for MV unit sub
LV (Unit Sub-station to L
LV panel) 56 17-Dec-25 19-Feb-26 19-Feb-26, LV (Unit Sub-station to LV panel)
DU-BZ4-PLV.410 prepare and submit shopdrawing for LV unit sub- station 20 17-Dec-25 10-Jan-26 prepare and submit shopdrawing for LV unit sub- statio
DU-BZ4-PLV.415 review and approval shopdrawing for LV unit sub- station 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for LV unit sub-
DU-BZ4-PLS.415 review and approval shopdrawing for lighting system 11 02-Feb-26 15-Feb-26 review and approval shopdrawing for lighting syste
DU-BZ4-LC-TN.415 review and approval shopdrawing for telecom network proposed 11 04-Feb-26 17-Feb-26 review and approval shopdrawing for telecom netw
DU-BZ4-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 04-Feb-26 17-Feb-26 review and approval shopdrawing for ELV Network
DU-BZ4-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for ICT Network
DU-BZ4-LC-ELVN.4 review and approval shopdrawing for Security Network 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for Security Netw
DU-BZ4-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 31-Mar-26 13-Apr-26 review and approval shopdrawing for SCAD
DU-BZ5-PMV.445 review and approval shopdrawing for MV Proposed cable 11 22-Apr-24 05-May-24 review and approval shopdrawing for MV Proposed cable
LV (Unit Sub-station to L
LV panel) 51 25-Jan-26 29-Mar-26 29-Mar-26, LV (Unit Sub-station to LV panel)
DU-BZ5-PLV.440 prepare and submit shopdrawing for LV unit sub- station 20 25-Jan-26 16-Feb-26 prepare and submit shopdrawing for LV unit sub- s
DU-BZ5-PLV.445 review and approval shopdrawing for LV unit sub- station 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for LV unit
DU-BZ5-PLS.445 review and approval shopdrawing for lighting system 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for lighting s
Actual Work
Remaining Work
164 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ5-LC-TN.445 review and approval shopdrawing for telecom network proposed 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for telecom n
DU-BZ5-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 10-Mar-26 28-Mar-26 review and approval shopdrawing for ELV Net
DU-BZ5-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 13-May-26 30-May-26 review and approval shopdrawing for IC
DU-BZ5-LC-ELVN.4 review and approval shopdrawing for Security Network 11 03-Mar-26 16-Mar-26 review and approval shopdrawing for Security N
DU-BZ5-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 12-Mar-26 30-Mar-26 review and approval shopdrawing for SCADA
DU-BZ6-PMV.475 review and approval shopdrawing for MV Proposed cable 11 07-Dec-25 20-Dec-25 review and approval shopdrawing for MV Proposed cabl
DU-BZ6-PMV.485 review and approval shopdrawing for MV unit sub- station 11 25-Jun-24 08-Jul-24 review and approval shopdrawing for MV unit sub- station
LV (Unit Sub-station to L
LV panel) 54 18-Oct-25 20-Dec-25 20-Dec-25, LV (Unit Sub-station to LV panel)
DU-BZ6-PLV.480 prepare and submit shopdrawing for LV unit sub- station 20 18-Oct-25 10-Nov-25 prepare and submit shopdrawing for LV unit sub- station
DU-BZ6-PLV.485 review and approval shopdrawing for LV unit sub- station 11 07-Dec-25 20-Dec-25 review and approval shopdrawing for LV unit sub- station
DU-BZ6-PLS.485 review and approval shopdrawing for lighting system 11 03-Dec-25 16-Dec-25 review and approval shopdrawing for lighting system
DU-BZ6-LC-TN.485 review and approval shopdrawing for telecom network proposed 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for telecom network pro
DU-BZ6-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 09-Dec-25 22-Dec-25 review and approval shopdrawing for ELV Network
DU-BZ6-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for ICT Network
DU-BZ6-LC-ELVN.5 review and approval shopdrawing for Security Network 11 04-Dec-25 17-Dec-25 review and approval shopdrawing for Security Network
DU-BZ6-LC-ELVN.5 review and approval shopdrawing for SCADA Network 11 30-Nov-25 13-Dec-25 review and approval shopdrawing for SCADA Network
Actual Work
Remaining Work
165 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ7-PLV.515 review and approval shopdrawing for LV unit sub- station 11 21-Apr-26 04-May-26 review and approval shopdrawing for LV
DU-BZ7-PLS.515 review and approval shopdrawing for lighting system 11 21-Apr-26 04-May-26 review and approval shopdrawing for light
DU-BZ7-LC-TN.515 review and approval shopdrawing for telecom network proposed 11 21-Apr-26 04-May-26 review and approval shopdrawing for telec
DU-BZ7-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 19-Apr-26 02-May-26 review and approval shopdrawing for ELV
DU-BZ7-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 21-Jun-26 04-Jul-26 review and approval shopdrawing fo
DU-BZ7-LC-ELVN.5 review and approval shopdrawing for Security Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for Secu
DU-BZ8-PLV.535 review and approval shopdrawing for LV unit sub- station 11 13-Apr-26 26-Apr-26 review and approval shopdrawing for LV u
DU-BZ8-PLS.535 review and approval shopdrawing for lighting system 11 09-Apr-26 22-Apr-26 review and approval shopdrawing for lightin
DU-BZ8-LC-TN.535 review and approval shopdrawing for telecom network proposed 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for teleco
DU-BZ8-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for ELV N
DU-BZ8-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for ICT N
DU-BZ8-LC-ELVN.5 review and approval shopdrawing for Security Network 11 09-Apr-26 22-Apr-26 review and approval shopdrawing for Securi
DU-BZ9-PMV.555 review and approval shopdrawing for MV Proposed cable 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for MV Proposed cable
LV (Unit Sub-station to L
LV panel) 89 06-Aug-25 18-Nov-25 18-Nov-25, LV (Unit Sub-station to LV panel)
DU-BZ9-PLV.550 prepare and submit shopdrawing for LV unit sub- station 20 06-Aug-25 30-Aug-25 prepare and submit shopdrawing for LV unit sub- station
DU-BZ9-PLV.555 review and approval shopdrawing for LV unit sub- station 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for LV unit sub- station
Actual Work
Remaining Work
166 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOW CURRENTS 71 30-Aug-25 22-Nov-25 22-Nov-25, LOW CURRENTS
ELV NETWORK 71 30-Aug-25 22-Nov-25 22-Nov-25, ELV NETWORK
ELV NETWORK 69 30-Aug-25 18-Nov-25 18-Nov-25, ELV NETWORK
DU-BZ9-LC-ELVN.5 prepare and submit shopdrawing for ELV Network 20 30-Aug-25 22-Sep-25 prepare and submit shopdrawing for ELV Network
DU-BZ9-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for ELV Network
DU-BZ9-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 09-Nov-25 22-Nov-25 review and approval shopdrawing for ICT Network
DU-BZ9-LC-ELVN.5 review and approval shopdrawing for Security Network 11 09-Nov-25 22-Nov-25 review and approval shopdrawing for Security Network
DU-SB1-PMV.575 review and approval shopdrawing for MV Proposed cable 11 10-Feb-24 22-Feb-24 review and approval shopdrawing for MV Proposed cable
DU-SB2-PMV.575 review and approval shopdrawing for MV cable relocation 11 01-Apr-24 17-Apr-24 review and approval shopdrawing for MV cable relocation
MV CABLES PROPOSED
PROPOSE INSTALLATION 31 15-Aug-24 21-Sep-24 21-Sep-24, MV CABLES PROPOSED INSTALLATION
DU-SB2-PMV.580 prepare and submit shopdrawing for MV Proposed cable 20 15-Aug-24 08-Sep-24 prepare and submit shopdrawing for MV Proposed cable
DU-SB2-PMV.585 review and approval shopdrawing for MV Proposed cable 11 08-Sep-24 21-Sep-24 review and approval shopdrawing for MV Proposed cable
DU-SB2-PLS.585 review and approval shopdrawing for lighting system 11 14-Nov-24 28-Nov-24 review and approval shopdrawing for lighting system
DU-SB2-LC-TN.585 review and approval shopdrawing for telecome divertion 11 08-Sep-24 21-Sep-24 review and approval shopdrawing for telecome divertion
DU-SB2-LC-TN.595 review and approval shopdrawing for telecom network canceled 11 03-Oct-24 16-Oct-24 review and approval shopdrawing for telecom network canceled
TELECOME NETWORK (Proposed Duct bank) 31 19-Sep-24 27-Oct-24 27-Oct-24, TELECOME NETWORK (Proposed Duct bank)
DU-SB2-LC-TN.600 prepare and submit shopdrawing for telecom network proposed 20 19-Sep-24 14-Oct-24 prepare and submit shopdrawing for telecom network proposed
DU-SB2-LC-TN.605 review and approval shopdrawing for telecom network proposed 11 14-Oct-24 27-Oct-24 review and approval shopdrawing for telecom network proposed
DU-SB2-LC-ELVN.6 review and approval shopdrawing for ELV Network 11 25-Dec-24 07-Jan-25 review and approval shopdrawing for ELV Network
DU-SB3-PMV.605 review and approval shopdrawing for MV cable relocation 11 13-Apr-24 25-Apr-24 review and approval shopdrawing for MV cable relocation
Actual Work
Remaining Work
167 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 03-Jun-24 14-Jul-24 14-Jul-24, MV CABLES RELOCATION / DIVERTING
DU-SB4-PMV.600 prepare and submit shopdrawing for MV cable relocation 20 03-Jun-24 01-Jul-24 prepare and submit shopdrawing for MV cable relocation
DU-SB4-PMV.605 review and approval shopdrawing for MV cable relocation 11 01-Jul-24 14-Jul-24 review and approval shopdrawing for MV cable relocation
DU-SB5-PMV.605 review and approval shopdrawing for MV cable relocation 11 14-Sep-24 28-Sep-24 review and approval shopdrawing for MV cable relocation
DU-SB5-LC-TN.605 review and approval shopdrawing for telecome divertion 11 28-Nov-24 11-Dec-24 review and approval shopdrawing for telecome divertion
DU-D10-PHV.605 review and approval shopdrawing for HV cable relocation 11 19-Feb-24 03-Mar-24 review and approval shopdrawing for HV cable relocation
DU-D10-PMV.605 review and approval shopdrawing for MV Proposed cable 11 12-Jun-24 30-Jun-24 review and approval shopdrawing for MV Proposed cable
DU-D10-PMV.615 review and approval shopdrawing for MV unit sub- station 11 22-Aug-24 04-Sep-24 review and approval shopdrawing for MV unit sub- station
LV (Unit Sub-station to L
LV panel) 31 25-Sep-24 31-Oct-24 31-Oct-24, LV (Unit Sub-station to LV panel)
DU-D10-PLV.610 prepare and submit shopdrawing for LV unit sub- station 20 25-Sep-24 17-Oct-24 prepare and submit shopdrawing for LV unit sub- station
DU-D10-PLV.615 review and approval shopdrawing for LV unit sub- station 11 17-Oct-24 31-Oct-24 review and approval shopdrawing for LV unit sub- station
DU-D10-PLS.615 review and approval shopdrawing for lighting system 11 08-Dec-24 22-Dec-24 review and approval shopdrawing for lighting system
DU-D10-LC-TN.615 review and approval shopdrawing for telecom network proposed 11 24-Apr-24 07-May-24 review and approval shopdrawing for telecom network proposed
DU-D10-LC-ELVN.6 review and approval shopdrawing for ELV Network 11 10-Jul-24 23-Jul-24 review and approval shopdrawing for ELV Network
DU-D10-LC-ELVN.6 review and approval shopdrawing for ICT Network 11 07-Sep-24 21-Sep-24 review and approval shopdrawing for ICT Network
DU-D10-LC-ELVN.6 review and approval shopdrawing for Security Network 11 05-Oct-24 17-Oct-24 review and approval shopdrawing for Security Network
DU-D10-LC-ELVN.6 review and approval shopdrawing for SCADA Network 11 28-Dec-24 09-Jan-25 review and approval shopdrawing for SCADA Network
Actual Work
Remaining Work
168 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER 169 02-Dec-23 23-Jun-24 23-Jun-24, POWER
MV 117 02-Dec-23 18-Apr-24 18-Apr-24, MV
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 02-Dec-23 07-Jan-24 07-Jan-24, MV CABLES RELOCATION / DIVERTING
DU-D9-PMV.640 prepare and submit shopdrawing for MV cable relocation 20 02-Dec-23 24-Dec-23 prepare and submit shopdrawing for MV cable relocation
DU-D9-PMV.645 review and approval shopdrawing for MV cable relocation 11 24-Dec-23 07-Jan-24 review and approval shopdrawing for MV cable relocation
MV CABLES PROPOSED
PROPOSE INSTALLATION 97 24-Dec-23 18-Apr-24 18-Apr-24, MV CABLES PROPOSED INSTALLATION
DU-D9-PMV.650 prepare and submit shopdrawing for MV Proposed cable 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for MV Proposed cable
DU-D9-PMV.655 review and approval shopdrawing for MV Proposed cable 11 02-Apr-24 18-Apr-24 review and approval shopdrawing for MV Proposed cable
DU-D9-PMV.665 review and approval shopdrawing for MV unit sub- station 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for MV unit sub- station
LV (Unit Sub-station to L
LV panel) 31 12-Mar-24 21-Apr-24 21-Apr-24, LV (Unit Sub-station to LV panel)
DU-D9-PLV.660 prepare and submit shopdrawing for LV unit sub- station 20 12-Mar-24 03-Apr-24 prepare and submit shopdrawing for LV unit sub- station
DU-D9-PLV.665 review and approval shopdrawing for LV unit sub- station 11 03-Apr-24 21-Apr-24 review and approval shopdrawing for LV unit sub- station
DU-D9-PLL.665 review and approval shopdrawing for lighting system 11 05-Jun-24 23-Jun-24 review and approval shopdrawing for lighting system
DU-D9-LC-TN.665 review and approval shopdrawing for telecom network proposed 11 23-Jul-24 06-Aug-24 review and approval shopdrawing for telecom network proposed
DU-D9-LC-ELVN.66 review and approval shopdrawing for ELV Network 11 11-Jun-24 29-Jun-24 review and approval shopdrawing for ELV Network
DU-D9-LC-ELVN.67 review and approval shopdrawing for ICT Network 11 13-Aug-24 27-Aug-24 review and approval shopdrawing for ICT Network
DU-D9-LC-ELVN.68 review and approval shopdrawing for Security Network 11 09-Sep-24 22-Sep-24 review and approval shopdrawing for Security Network
DU-D9-LC-ELVN.69 review and approval shopdrawing for SCADA Network 11 05-Dec-24 18-Dec-24 review and approval shopdrawing for SCADA Network
CROWD CORRIDOR NO.01 BESIDE ZONE 10 122 08-Dec-25 04-May-26 04-May-26, CROWD CORRIDOR NO.01
POWER 71 08-Dec-25 01-Mar-26 01-Mar-26, POWER
MV 71 08-Dec-25 01-Mar-26 01-Mar-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 71 08-Dec-25 01-Mar-26 01-Mar-26, MV CABLES PROPOSED INSTALL
DU-CC01BZ10-PMV prepare and submit shopdrawing for MV Proposed cable 20 08-Dec-25 31-Dec-25 prepare and submit shopdrawing for MV Proposed cable
DU-CC01BZ10-PMV review and approval shopdrawing for MV Proposed cable 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for MV Propo
LV (Unit Sub-station to L
LV panel) 51 31-Dec-25 01-Mar-26 01-Mar-26, LV (Unit Sub-station to LV panel)
DU-CC01BZ10-PLV.6 prepare and submit shopdrawing for LV unit sub- station 20 31-Dec-25 24-Jan-26 prepare and submit shopdrawing for LV unit sub- stati
DU-CC01BZ10-PLV.6 review and approval shopdrawing for LV unit sub- station 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for LV unit sub
DU-CC01BZ10-LCEN review and approval shopdrawing for ELV Network 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for ELV Netwo
Actual Work
Remaining Work
169 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-CC01BZ10-LCEN review and approval shopdrawing for ICT Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for ICT
DU-CC01BZ10-LCEN review and approval shopdrawing for Security Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for Secu
CROWD CORRIDOR NO.02 BESIDE ZONE 11 111 17-Sep-25 26-Jan-26 26-Jan-26, CROWD CORRIDOR NO.02 BESIDE Z
POWER 109 17-Sep-25 24-Jan-26 24-Jan-26, POWER
MV 109 17-Sep-25 24-Jan-26 24-Jan-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 109 17-Sep-25 24-Jan-26 24-Jan-26, MV CABLES PROPOSED INSTALLATI
DU-CC02BZ11-PMV prepare and submit shopdrawing for MV Proposed cable 20 17-Sep-25 12-Oct-25 prepare and submit shopdrawing for MV Proposed cable
DU-CC02BZ11-PMV review and approval shopdrawing for MV Proposed cable 11 11-Jan-26 24-Jan-26 review and approval shopdrawing for MV Proposed
LV (Unit Sub-station to L
LV panel) 89 12-Oct-25 24-Jan-26 24-Jan-26, LV (Unit Sub-station to LV panel)
DU-CC02BZ11-PLV.6 prepare and submit shopdrawing for LV unit sub- station 20 12-Oct-25 04-Nov-25 prepare and submit shopdrawing for LV unit sub- station
DU-CC02BZ11-PLV.6 review and approval shopdrawing for LV unit sub- station 11 11-Jan-26 24-Jan-26 review and approval shopdrawing for LV unit sub- st
DU-CC02BZ11-LCEN review and approval shopdrawing for ELV Network 11 10-Jan-26 24-Jan-26 review and approval shopdrawing for ELV Network
DU-CC02BZ11-LCEN review and approval shopdrawing for ICT Network 11 13-Jan-26 26-Jan-26 review and approval shopdrawing for ICT Network
DU-CC02BZ11-LCEN review and approval shopdrawing for Security Network 11 13-Jan-26 26-Jan-26 review and approval shopdrawing for Security Netwo
CROWD CORRIDOR NO.03 BETWEEN SUPERBLOCK 2&3 129 02-Dec-23 02-May-24 02-May-24, CROWD CORRIDOR NO.03 BETWEEN SUPERBLOCK 2&3
POWER 129 02-Dec-23 02-May-24 02-May-24, POWER
LV (Unit Sub-station to L
LV panel) 129 02-Dec-23 02-May-24 02-May-24, LV (Unit Sub-station to LV panel)
DU-CC03BSB2&3-P.7 prepare and submit shopdrawing for LV unit sub- station 20 02-Dec-23 24-Dec-23 prepare and submit shopdrawing for LV unit sub- station
DU-CC03BSB2&3-P.7 review and approval shopdrawing for LV unit sub- station 11 20-Apr-24 02-May-24 review and approval shopdrawing for LV unit sub- station
DU-CC3BSB2&3-LC review and approval shopdrawing for ELV Network 11 16-Jan-24 29-Jan-24 review and approval shopdrawing for ELV Network
DU-CC3BSB2&3-LC review and approval shopdrawing for Security Network 11 16-Mar-24 28-Mar-24 review and approval shopdrawing for Security Network
CROWD CORRIDOR NO.04 IN SUPERBLOCK 1 102 24-Dec-23 24-Apr-24 24-Apr-24, CROWD CORRIDOR NO.04 IN SUPERBLOCK 1
POWER 31 24-Dec-23 29-Jan-24 29-Jan-24, POWER
LV (Unit Sub-station to L
LV panel) 31 24-Dec-23 29-Jan-24 29-Jan-24, LV (Unit Sub-station to LV panel)
DU-CC04INSB1-PLV. prepare and submit shopdrawing for LV unit sub- station 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for LV unit sub- station
DU-CC04INSB1-PLV. review and approval shopdrawing for LV unit sub- station 11 16-Jan-24 29-Jan-24 review and approval shopdrawing for LV unit sub- station
DU-CC04INSB1-LC. review and approval shopdrawing for ELV Network 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for ELV Network
DU-CC04INSB1-LC. review and approval shopdrawing for Security Network 11 08-Apr-24 24-Apr-24 review and approval shopdrawing for Security Network
CROWD CORRIDOR NO.04 IN SUPERBLOCK 2 102 16-Jan-24 18-May-24 18-May-24, CROWD CORRIDOR NO.04 IN SUPERBLOCK 2
POWER 31 16-Jan-24 21-Feb-24 21-Feb-24, POWER
Actual Work
Remaining Work
170 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LV (Unit Sub-station to L
LV panel) 31 16-Jan-24 21-Feb-24 21-Feb-24, LV (Unit Sub-station to LV panel)
DU-CC04INSB2-PLV. prepare and submit shopdrawing for LV unit sub- station 20 16-Jan-24 08-Feb-24 prepare and submit shopdrawing for LV unit sub- station
DU-CC04INSB2-PLV. review and approval shopdrawing for LV unit sub- station 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for LV unit sub- station
DU-CC04INSB2-LC. review and approval shopdrawing for ELV Network 11 03-Mar-24 16-Mar-24 review and approval shopdrawing for ELV Network
DU-CC04INSB2-LC. review and approval shopdrawing for Security Network 11 05-May-24 18-May-24 review and approval shopdrawing for Security Network
EMR-ENG-GE.105 Typical Sections Review & Approval 14 08-Sep-25 25-Sep-25 Typical Sections Review & Approval
EMR-ENG-HBR.495 Plan and Profile Review & Approval 14 15-Apr-26 02-May-26 Plan and Profile Review & Approval
EMR-ENG-HBR.500 Road Cross Sections Preparation & Submission 14 02-May-26 18-May-26 Road Cross Sections Preparation & Subm
EMR-ENG-HBR.505 Road Cross Sections Review & Approval 14 18-May-26 07-Jun-26 Road Cross Sections Review & Approv
EMR-ENG-HBR.510 Guiding Signs and Marking Preparation & Submission 14 13-Aug-26 30-Aug-26 Guiding Signs and Marking P
EMR-ENG-HBR.515 Guiding Signs and Marking Review & Approval 14 30-Aug-26 15-Sep-26 Guiding Signs and Marking
HARAM RAMP NOURTH 01 169 12-Oct-25 02-May-26 02-May-26, HARAM RAMP NOURTH 0
EMR-ENG-JH-R-N1.100 Plan and Profile Preparation & Submission 14 12-Oct-25 27-Oct-25 Plan and Profile Preparation & Submission
EMR-ENG-JH-R-N1.105 Plan and Profile Review & Approval 14 21-Jan-26 07-Feb-26 Plan and Profile Review & Approval
EMR-ENG-JH-R-N1.110 Road Cross Sections Preparation & Submission 14 07-Feb-26 23-Feb-26 Road Cross Sections Preparation & Submission
EMR-ENG-JH-R-N1.115 Road Cross Sections Review & Approval 14 23-Feb-26 11-Mar-26 Road Cross Sections Review & Approval
EMR-ENG-JH-R-N1.120 Guiding Signs and Marking Preparation & Submission 14 30-Mar-26 15-Apr-26 Guiding Signs and Marking Preparation & Su
EMR-ENG-JH-R-N1.125 Guiding Signs and Marking Review & Approval 14 15-Apr-26 02-May-26 Guiding Signs and Marking Review & App
HARAM RAMP NOURTH 02 147 28-Oct-25 22-Apr-26 22-Apr-26, HARAM RAMP NOURTH 02
EMR-ENG-JH-R-N2.100 Plan and Profile Preparation & Submission 14 28-Oct-25 12-Nov-25 Plan and Profile Preparation & Submission
EMR-ENG-JH-R-N2.105 Plan and Profile Review & Approval 14 31-Jan-26 16-Feb-26 Plan and Profile Review & Approval
EMR-ENG-JH-R-N2.110 Road Cross Sections Preparation & Submission 14 16-Feb-26 04-Mar-26 Road Cross Sections Preparation & Submission
EMR-ENG-JH-R-N2.115 Road Cross Sections Review & Approval 14 04-Mar-26 25-Mar-26 Road Cross Sections Review & Approval
EMR-ENG-JH-R-N2.120 Guiding Signs and Marking Preparation & Submission 14 16-Mar-26 06-Apr-26 Guiding Signs and Marking Preparation & Sub
EMR-ENG-JH-R-N2.125 Guiding Signs and Marking Review & Approval 14 06-Apr-26 22-Apr-26 Guiding Signs and Marking Review & Appr
EMR-ENG-JH-R-S1.105 Plan and Profile Review & Approval 14 30-Dec-25 15-Jan-26 Plan and Profile Review & Approval
EMR-ENG-JH-R-S1.110 Road Cross Sections Preparation & Submission 14 15-Jan-26 01-Feb-26 Road Cross Sections Preparation & Submission
EMR-ENG-JH-R-S1.115 Road Cross Sections Review & Approval 14 01-Feb-26 16-Feb-26 Road Cross Sections Review & Approval
EMR-ENG-JH-R-S1.120 Guiding Signs and Marking Preparation & Submission 14 12-Feb-26 01-Mar-26 Guiding Signs and Marking Preparation & Submis
EMR-ENG-JH-R-S1.125 Guiding Signs and Marking Review & Approval 14 01-Mar-26 16-Mar-26 Guiding Signs and Marking Review & Approval
HARAM RAMP SOUTH 02 105 12-Nov-25 15-Mar-26 15-Mar-26, HARAM RAMP SOUTH 02
EMR-ENG-JH-R-S2.100 Plan and Profile Preparation & Submission 14 12-Nov-25 29-Nov-25 Plan and Profile Preparation & Submission
Actual Work
Remaining Work
171 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EMR-ENG-JH-R-S2.105 Plan and Profile Review & Approval 14 30-Dec-25 15-Jan-26 Plan and Profile Review & Approval
EMR-ENG-JH-R-S2.110 Road Cross Sections Preparation & Submission 14 15-Jan-26 01-Feb-26 Road Cross Sections Preparation & Submission
EMR-ENG-JH-R-S2.115 Road Cross Sections Review & Approval 14 01-Feb-26 16-Feb-26 Road Cross Sections Review & Approval
EMR-ENG-JH-R-S2.120 Guiding Signs and Marking Preparation & Submission 14 11-Feb-26 28-Feb-26 Guiding Signs and Marking Preparation & Submis
EMR-ENG-JH-R-S2.125 Guiding Signs and Marking Review & Approval 14 28-Feb-26 15-Mar-26 Guiding Signs and Marking Review & Approval
EMR-ENG-AR.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval
EMR-ENG-AR.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi
EMR-ENG-AR.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval
EMR-ENG-AR.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &
EMR-ENG-AR.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &
AIRPORT ROAD RAMP 01 142 15-Dec-25 07-Jun-26 07-Jun-26, AIRPORT ROAD RAMP 0
EMR-ENG-AR-R1.100 Plan and Profile Preparation & Submission 14 15-Dec-25 31-Dec-25 Plan and Profile Preparation & Submission
EMR-ENG-AR-R1.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval
EMR-ENG-AR-R1.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi
EMR-ENG-AR-R1.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval
EMR-ENG-AR-R1.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &
EMR-ENG-AR-R1.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &
AIRPORT ROAD RAMP 02 128 31-Dec-25 07-Jun-26 07-Jun-26, AIRPORT ROAD RAMP 0
EMR-ENG-AR-R2.100 Plan and Profile Preparation & Submission 14 31-Dec-25 17-Jan-26 Plan and Profile Preparation & Submission
EMR-ENG-AR-R2.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval
EMR-ENG-AR-R2.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi
EMR-ENG-AR-R2.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval
EMR-ENG-AR-R2.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &
EMR-ENG-AR-R2.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &
AIRPORT ROAD Grade 01 112 17-Jan-26 04-Jun-26 04-Jun-26, AIRPORT ROAD Grade 01
EMR-ENG-AR-G1.100 Plan and Profile Preparation & Submission 14 17-Jan-26 02-Feb-26 Plan and Profile Preparation & Submission
EMR-ENG-AR-G1.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval
EMR-ENG-AR-G1.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi
EMR-ENG-AR-G1.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval
EMR-ENG-AR-G1.120 Guiding Signs and Marking Preparation & Submission 14 30-Apr-26 16-May-26 Guiding Signs and Marking Preparation &
EMR-ENG-AR-G1.125 Guiding Signs and Marking Review & Approval 14 17-May-26 04-Jun-26 Guiding Signs and Marking Review & A
EMR-ENG-KAAR.105 Plan and Profile Review & Approval 14 24-May-26 13-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR.110 Road Cross Sections Preparation & Submission 14 13-Jun-26 29-Jun-26 Road Cross Sections Preparation & S
EMR-ENG-KAAR.115 Road Cross Sections Review & Approval 14 29-Jun-26 15-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR.120 Guiding Signs and Marking Preparation & Submission 14 13-Jul-26 29-Jul-26 Guiding Signs and Marking Prepa
EMR-ENG-KAAR.125 Guiding Signs and Marking Review & Approval 14 29-Jul-26 15-Aug-26 Guiding Signs and Marking Rev
EMR-ENG-KAAR-R1.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-R1.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
Actual Work
Remaining Work
172 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EMR-ENG-KAAR-R1.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-R1.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-R1.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re
EMR-ENG-KAAR-R2.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-R2.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
EMR-ENG-KAAR-R2.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-R2.120 Guiding Signs and Marking Preparation & Submission 14 18-Jul-26 03-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-R2.125 Guiding Signs and Marking Review & Approval 14 03-Aug-26 19-Aug-26 Guiding Signs and Marking Re
EMR-ENG-KAAR-G1.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-G1.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
EMR-ENG-KAAR-G1.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-G1.120 Guiding Signs and Marking Preparation & Submission 14 26-Jul-26 11-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-G1.125 Guiding Signs and Marking Review & Approval 14 11-Aug-26 27-Aug-26 Guiding Signs and Marking Re
EMR-ENG-KAAR-G2.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-G2.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
EMR-ENG-KAAR-G2.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-G2.120 Guiding Signs and Marking Preparation & Submission 14 22-Jul-26 08-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-G2.125 Guiding Signs and Marking Review & Approval 14 08-Aug-26 24-Aug-26 Guiding Signs and Marking Re
EMR-ENG-KAAR-G3.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-G3.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
EMR-ENG-KAAR-G3.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-G3.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-G3.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re
EMR-ENG-KAAR-G4.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval
EMR-ENG-KAAR-G4.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &
EMR-ENG-KAAR-G4.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap
EMR-ENG-KAAR-G4.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep
EMR-ENG-KAAR-G4.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re
ER-ENG-GS.115 Shop Drawings Review & Approval 14 11-Apr-26 27-Apr-26 Shop Drawings Review & Approval
LOCAL ROADS AND PAVINGS 998 10-Jan-23 A 20-Apr-26 20-Apr-26, LOCAL ROADS AND PAVING
ENGINEERING 998 10-Jan-23 A 20-Apr-26 20-Apr-26, ENGINEERING
NORTH 977 04-Feb-23 A 20-Apr-26 20-Apr-26, NORTH
Actual Work
Remaining Work
173 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOCAL ROAD NO. 01 888 09-Mar-23 A 03-Feb-26 03-Feb-26, LOCAL ROAD NO. 01
LR-ENG-N-R1.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R1.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval
LR-ENG-N-R1.110 Road Cross Sections Preparation & Submission 14 17-Dec-25 03-Jan-26 Road Cross Sections Preparation & Submission
LR-ENG-N-R1.115 Road Cross Sections Review & Approval 14 05-Jan-26 20-Jan-26 Road Cross Sections Review & Approval
LR-ENG-N-R1.120 Guiding Signs and Marking Preparation & Submission 14 03-Jan-26 19-Jan-26 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R1.125 Guiding Signs and Marking Review & Approval 14 19-Jan-26 03-Feb-26 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 03 888 09-Mar-23 A 03-Feb-26 03-Feb-26, LOCAL ROAD NO. 03
LR-ENG-N-R3.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R3.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval
LR-ENG-N-R3.110 Road Cross Sections Preparation & Submission 14 17-Dec-25 03-Jan-26 Road Cross Sections Preparation & Submission
LR-ENG-N-R3.115 Road Cross Sections Review & Approval 14 05-Jan-26 20-Jan-26 Road Cross Sections Review & Approval
LR-ENG-N-R3.120 Guiding Signs and Marking Preparation & Submission 14 03-Jan-26 19-Jan-26 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R3.125 Guiding Signs and Marking Review & Approval 14 19-Jan-26 03-Feb-26 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 05 669 09-Mar-23 A 19-May-25 19-May-25, LOCAL ROAD NO. 05
LR-ENG-N-R5.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R5.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval
LR-ENG-N-R5.110 Road Cross Sections Preparation & Submission 14 27-Mar-25 17-Apr-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R5.115 Road Cross Sections Review & Approval 14 20-Apr-25 05-May-25 Road Cross Sections Review & Approval
LR-ENG-N-R5.120 Guiding Signs and Marking Preparation & Submission 14 17-Apr-25 04-May-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R5.125 Guiding Signs and Marking Review & Approval 14 04-May-25 19-May-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 07 669 09-Mar-23 A 19-May-25 19-May-25, LOCAL ROAD NO. 07
LR-ENG-N-R7.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R7.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval
LR-ENG-N-R7.110 Road Cross Sections Preparation & Submission 14 27-Mar-25 17-Apr-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R7.115 Road Cross Sections Review & Approval 14 20-Apr-25 05-May-25 Road Cross Sections Review & Approval
LR-ENG-N-R7.120 Guiding Signs and Marking Preparation & Submission 14 17-Apr-25 04-May-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R7.125 Guiding Signs and Marking Review & Approval 14 04-May-25 19-May-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 09 769 18-Jun-23 A 23-Dec-25 23-Dec-25, LOCAL ROAD NO. 09
LR-ENG-N-R9.100 Plan and Profile Preparation & Submission 5 18-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R9.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval
LR-ENG-N-R9.110 Road Cross Sections Preparation & Submission 14 05-Nov-25 22-Nov-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R9.115 Road Cross Sections Review & Approval 14 24-Nov-25 09-Dec-25 Road Cross Sections Review & Approval
LR-ENG-N-R9.120 Guiding Signs and Marking Preparation & Submission 14 22-Nov-25 08-Dec-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R9.125 Guiding Signs and Marking Review & Approval 14 08-Dec-25 23-Dec-25 Guiding Signs and Marking Review & Approval
LR-ENG-N-R25.105 Plan and Profile Review & Approval 14 04-Dec-25 21-Dec-25 Plan and Profile Review & Approval
LR-ENG-N-R25.110 Road Cross Sections Preparation & Submission 14 21-Dec-25 06-Jan-26 Road Cross Sections Preparation & Submission
LR-ENG-N-R25.115 Road Cross Sections Review & Approval 14 08-Jan-26 24-Jan-26 Road Cross Sections Review & Approval
LR-ENG-N-R25.120 Guiding Signs and Marking Preparation & Submission 14 06-Jan-26 22-Jan-26 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R25.125 Guiding Signs and Marking Review & Approval 14 22-Jan-26 07-Feb-26 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 26 868 04-Feb-23 A 09-Dec-25 09-Dec-25, LOCAL ROAD NO. 26
LR-ENG-N-R26.100 Plan and Profile Preparation & Submission 6 04-Feb-23 A 09-Feb-23 A Plan and Profile Preparation & Submission
Actual Work
Remaining Work
174 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-N-R26.105 Plan and Profile Review & Approval 4 09-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval
LR-ENG-N-R26.110 Road Cross Sections Preparation & Submission 14 21-Oct-25 06-Nov-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R26.115 Road Cross Sections Review & Approval 14 09-Nov-25 25-Nov-25 Road Cross Sections Review & Approval
LR-ENG-N-R26.120 Guiding Signs and Marking Preparation & Submission 14 06-Nov-25 23-Nov-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R26.125 Guiding Signs and Marking Review & Approval 14 23-Nov-25 09-Dec-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 29 876 06-Feb-23 A 20-Dec-25 20-Dec-25, LOCAL ROAD NO. 29
LR-ENG-N-R29.100 Plan and Profile Preparation & Submission 5 06-Feb-23 A 11-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R29.105 Plan and Profile Review & Approval 3 11-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval
LR-ENG-N-R29.110 Road Cross Sections Preparation & Submission 14 02-Nov-25 18-Nov-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R29.115 Road Cross Sections Review & Approval 14 20-Nov-25 06-Dec-25 Road Cross Sections Review & Approval
LR-ENG-N-R29.120 Guiding Signs and Marking Preparation & Submission 14 18-Nov-25 04-Dec-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R29.125 Guiding Signs and Marking Review & Approval 14 04-Dec-25 20-Dec-25 Guiding Signs and Marking Review & Approval
LR-ENG-N-R31.105 Plan and Profile Review & Approval 14 01-Oct-25 18-Oct-25 Plan and Profile Review & Approval
LR-ENG-N-R31.110 Road Cross Sections Preparation & Submission 14 18-Oct-25 03-Nov-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R31.115 Road Cross Sections Review & Approval 14 05-Nov-25 22-Nov-25 Road Cross Sections Review & Approval
LR-ENG-N-R31.120 Guiding Signs and Marking Preparation & Submission 14 03-Nov-25 19-Nov-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R31.125 Guiding Signs and Marking Review & Approval 14 19-Nov-25 06-Dec-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 32 495 04-Feb-23 A 18-Sep-24 18-Sep-24, LOCAL ROAD NO. 32
LR-ENG-N-R32.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-N-R32.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval
LR-ENG-N-R32.110 Road Cross Sections Preparation & Submission 14 01-Aug-24 17-Aug-24 Road Cross Sections Preparation & Submission
LR-ENG-N-R32.115 Road Cross Sections Review & Approval 14 19-Aug-24 04-Sep-24 Road Cross Sections Review & Approval
LR-ENG-N-R32.120 Guiding Signs and Marking Preparation & Submission 14 17-Aug-24 02-Sep-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R32.125 Guiding Signs and Marking Review & Approval 14 02-Sep-24 18-Sep-24 Guiding Signs and Marking Review & Approval
LR-ENG-N-R33.105 Plan and Profile Review & Approval 14 14-Jul-24 29-Jul-24 Plan and Profile Review & Approval
LR-ENG-N-R33.110 Road Cross Sections Preparation & Submission 14 30-Jul-24 14-Aug-24 Road Cross Sections Preparation & Submission
LR-ENG-N-R33.115 Road Cross Sections Review & Approval 14 17-Aug-24 02-Sep-24 Road Cross Sections Review & Approval
LR-ENG-N-R33.120 Guiding Signs and Marking Preparation & Submission 14 14-Aug-24 31-Aug-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R33.125 Guiding Signs and Marking Review & Approval 14 31-Aug-24 16-Sep-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 34 178 11-Aug-25 08-Mar-26 08-Mar-26, LOCAL ROAD NO. 34
LR-ENG-N-R34.100 Plan and Profile Preparation & Submission 14 11-Aug-25 26-Aug-25 Plan and Profile Preparation & Submission
LR-ENG-N-R34.105 Plan and Profile Review & Approval 14 01-Jan-26 18-Jan-26 Plan and Profile Review & Approval
LR-ENG-N-R34.110 Road Cross Sections Preparation & Submission 14 18-Jan-26 03-Feb-26 Road Cross Sections Preparation & Submission
LR-ENG-N-R34.115 Road Cross Sections Review & Approval 14 05-Feb-26 22-Feb-26 Road Cross Sections Review & Approval
LR-ENG-N-R34.120 Guiding Signs and Marking Preparation & Submission 14 03-Feb-26 19-Feb-26 Guiding Signs and Marking Preparation & Submiss
LR-ENG-N-R34.125 Guiding Signs and Marking Review & Approval 14 19-Feb-26 08-Mar-26 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 36 138 26-Aug-25 04-Feb-26 04-Feb-26, LOCAL ROAD NO. 36
LR-ENG-N-R36.100 Plan and Profile Preparation & Submission 14 26-Aug-25 11-Sep-25 Plan and Profile Preparation & Submission
LR-ENG-N-R36.105 Plan and Profile Review & Approval 14 02-Dec-25 18-Dec-25 Plan and Profile Review & Approval
LR-ENG-N-R36.110 Road Cross Sections Preparation & Submission 14 18-Dec-25 04-Jan-26 Road Cross Sections Preparation & Submission
Actual Work
Remaining Work
175 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-N-R36.115 Road Cross Sections Review & Approval 14 06-Jan-26 21-Jan-26 Road Cross Sections Review & Approval
LR-ENG-N-R36.120 Guiding Signs and Marking Preparation & Submission 14 04-Jan-26 20-Jan-26 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R36.125 Guiding Signs and Marking Review & Approval 14 20-Jan-26 04-Feb-26 Guiding Signs and Marking Review & Approval
LR-ENG-N-R45.105 Plan and Profile Review & Approval 14 29-Sep-25 15-Oct-25 Plan and Profile Review & Approval
LR-ENG-N-R45.110 Road Cross Sections Preparation & Submission 14 15-Oct-25 01-Nov-25 Road Cross Sections Preparation & Submission
LR-ENG-N-R45.115 Road Cross Sections Review & Approval 14 01-Nov-25 17-Nov-25 Road Cross Sections Review & Approval
LR-ENG-N-R45.120 Guiding Signs and Marking Preparation & Submission 14 01-Nov-25 17-Nov-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-N-R45.125 Guiding Signs and Marking Review & Approval 14 17-Nov-25 03-Dec-25 Guiding Signs and Marking Review & Approval
LR-ENG-N-RAR-A.105 Plan and Profile Review & Approval 14 02-Feb-26 18-Feb-26 Plan and Profile Review & Approval
LR-ENG-N-RAR-A.110 Road Cross Sections Preparation & Submission 14 18-Feb-26 07-Mar-26 Road Cross Sections Preparation & Submission
LR-ENG-N-RAR-A.115 Road Cross Sections Review & Approval 14 07-Mar-26 28-Mar-26 Road Cross Sections Review & Approval
LR-ENG-N-RAR-A.120 Guiding Signs and Marking Preparation & Submission 14 12-Mar-26 02-Apr-26 Guiding Signs and Marking Preparation & Sub
LR-ENG-N-RAR-A.125 Guiding Signs and Marking Review & Approval 14 02-Apr-26 19-Apr-26 Guiding Signs and Marking Review & Appro
LR-ENG-N-RAR-B.105 Plan and Profile Review & Approval 14 02-Feb-26 18-Feb-26 Plan and Profile Review & Approval
LR-ENG-N-RAR-B.110 Road Cross Sections Preparation & Submission 14 18-Feb-26 07-Mar-26 Road Cross Sections Preparation & Submission
LR-ENG-N-RAR-B.115 Road Cross Sections Review & Approval 14 07-Mar-26 28-Mar-26 Road Cross Sections Review & Approval
LR-ENG-N-RAR-B.120 Guiding Signs and Marking Preparation & Submission 14 12-Mar-26 02-Apr-26 Guiding Signs and Marking Preparation & Sub
LR-ENG-N-RAR-B.125 Guiding Signs and Marking Review & Approval 14 02-Apr-26 19-Apr-26 Guiding Signs and Marking Review & Appro
EXISTING ROAD (NEAR HARAM RAMP NORTH - 01) 101 18-Dec-25 20-Apr-26 20-Apr-26, EXISTING ROAD (NEAR HA
LR-ENG-EX-N1.100 Plan and Profile Preparation & Submission 14 18-Dec-25 03-Jan-26 Plan and Profile Preparation & Submission
LR-ENG-EX-N1.105 Plan and Profile Review & Approval 14 09-Feb-26 25-Feb-26 Plan and Profile Review & Approval
LR-ENG-EX-N1.110 Road Cross Sections Preparation & Submission 14 25-Feb-26 14-Mar-26 Road Cross Sections Preparation & Submission
LR-ENG-EX-N1.115 Road Cross Sections Review & Approval 14 16-Mar-26 06-Apr-26 Road Cross Sections Review & Approval
LR-ENG-EX-N1.120 Guiding Signs and Marking Preparation & Submission 14 14-Mar-26 04-Apr-26 Guiding Signs and Marking Preparation & Sub
LR-ENG-EX-N1.125 Guiding Signs and Marking Review & Approval 14 04-Apr-26 20-Apr-26 Guiding Signs and Marking Review & Appro
EXISTING ROAD (NEAR HARAM RAMP NORTH - 02) 80 03-Jan-26 12-Apr-26 12-Apr-26, EXISTING ROAD (NEAR HAR
LR-ENG-EX-N2.100 Plan and Profile Preparation & Submission 14 03-Jan-26 19-Jan-26 Plan and Profile Preparation & Submission
LR-ENG-EX-N2.105 Plan and Profile Review & Approval 14 01-Feb-26 17-Feb-26 Plan and Profile Review & Approval
LR-ENG-EX-N2.110 Road Cross Sections Preparation & Submission 14 17-Feb-26 05-Mar-26 Road Cross Sections Preparation & Submission
LR-ENG-EX-N2.115 Road Cross Sections Review & Approval 14 08-Mar-26 29-Mar-26 Road Cross Sections Review & Approval
LR-ENG-EX-N2.120 Guiding Signs and Marking Preparation & Submission 14 05-Mar-26 26-Mar-26 Guiding Signs and Marking Preparation & Subm
LR-ENG-EX-N2.125 Guiding Signs and Marking Review & Approval 14 26-Mar-26 12-Apr-26 Guiding Signs and Marking Review & Appro
LR-ENG-AR-G.105 Plan and Profile Review & Approval 14 04-Feb-26 21-Feb-26 Plan and Profile Review & Approval
LR-ENG-AR-G.110 Road Cross Sections Preparation & Submission 14 21-Feb-26 09-Mar-26 Road Cross Sections Preparation & Submission
LR-ENG-AR-G.115 Road Cross Sections Review & Approval 14 09-Mar-26 30-Mar-26 Road Cross Sections Review & Approval
LR-ENG-AR-G.120 Guiding Signs and Marking Preparation & Submission 14 09-Mar-26 30-Mar-26 Guiding Signs and Marking Preparation & Sub
Actual Work
Remaining Work
176 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-AR-G.125 Guiding Signs and Marking Review & Approval 14 30-Mar-26 15-Apr-26 Guiding Signs and Marking Review & Appro
LR-ENG-S-R11.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval
LR-ENG-S-R11.110 Road Cross Sections Preparation & Submission 14 21-Oct-24 06-Nov-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R11.115 Road Cross Sections Review & Approval 14 06-Nov-24 21-Nov-24 Road Cross Sections Review & Approval
LR-ENG-S-R11.120 Guiding Signs and Marking Preparation & Submission 14 06-Nov-24 23-Nov-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R11.125 Guiding Signs and Marking Review & Approval 14 23-Nov-24 08-Dec-24 Guiding Signs and Marking Review & Approval
LR-ENG-S-R10.105 Plan and Profile Review & Approval 14 20-Aug-24 05-Sep-24 Plan and Profile Review & Approval
LR-ENG-S-R10.110 Road Cross Sections Preparation & Submission 14 05-Sep-24 22-Sep-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R10.115 Road Cross Sections Review & Approval 14 25-Sep-24 10-Oct-24 Road Cross Sections Review & Approval
LR-ENG-S-R10.120 Guiding Signs and Marking Preparation & Submission 14 22-Sep-24 09-Oct-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R10.125 Guiding Signs and Marking Review & Approval 14 09-Oct-24 24-Oct-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 12 394 24-Aug-23 A 05-Dec-24 05-Dec-24, LOCAL ROAD NO. 12
LR-ENG-S-R12.100 Plan and Profile Preparation & Submission 7 24-Aug-23 A 31-Aug-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R12.105 Plan and Profile Review & Approval 4 31-Aug-23 A 04-Sep-23 A Plan and Profile Review & Approval
LR-ENG-S-R12.110 Road Cross Sections Preparation & Submission 14 16-Oct-24 02-Nov-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R12.115 Road Cross Sections Review & Approval 14 02-Nov-24 17-Nov-24 Road Cross Sections Review & Approval
LR-ENG-S-R12.120 Guiding Signs and Marking Preparation & Submission 14 04-Nov-24 20-Nov-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R12.125 Guiding Signs and Marking Review & Approval 14 20-Nov-24 05-Dec-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 13 462 18-Jun-23 A 21-Dec-24 21-Dec-24, LOCAL ROAD NO. 13
LR-ENG-S-R13.100 Plan and Profile Preparation & Submission 5 18-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R13.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval
LR-ENG-S-R13.110 Road Cross Sections Preparation & Submission 14 03-Nov-24 19-Nov-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R13.115 Road Cross Sections Review & Approval 14 19-Nov-24 04-Dec-24 Road Cross Sections Review & Approval
LR-ENG-S-R13.120 Guiding Signs and Marking Preparation & Submission 14 19-Nov-24 05-Dec-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R13.125 Guiding Signs and Marking Review & Approval 14 05-Dec-24 21-Dec-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 14 506 04-Feb-23 A 02-Oct-24 02-Oct-24, LOCAL ROAD NO. 14
LR-ENG-S-R14.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R14.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval
LR-ENG-S-R14.110 Road Cross Sections Preparation & Submission 14 14-Aug-24 31-Aug-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R14.115 Road Cross Sections Review & Approval 14 02-Sep-24 17-Sep-24 Road Cross Sections Review & Approval
LR-ENG-S-R14.120 Guiding Signs and Marking Preparation & Submission 14 31-Aug-24 16-Sep-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R14.125 Guiding Signs and Marking Review & Approval 14 16-Sep-24 02-Oct-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 15 551 10-Jan-23 A 30-Oct-24 30-Oct-24, LOCAL ROAD NO. 15
LR-ENG-S-R15.100 Plan and Profile Preparation & Submission 16 10-Jan-23 A 28-Jan-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R15.105 Plan and Profile Review & Approval 13 18-Jan-23 A 01-Feb-23 A Plan and Profile Review & Approval
LR-ENG-S-R15.110 Road Cross Sections Preparation & Submission 14 11-Sep-24 29-Sep-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R15.115 Road Cross Sections Review & Approval 14 01-Oct-24 16-Oct-24 Road Cross Sections Review & Approval
LR-ENG-S-R15.120 Guiding Signs and Marking Preparation & Submission 14 29-Sep-24 15-Oct-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R15.125 Guiding Signs and Marking Review & Approval 14 15-Oct-24 30-Oct-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 16 508 11-Feb-23 A 12-Oct-24 12-Oct-24, LOCAL ROAD NO. 16
Actual Work
Remaining Work
177 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R16.100 Plan and Profile Preparation & Submission 2 15-Feb-23 A 16-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R16.105 Plan and Profile Review & Approval 5 11-Feb-23 A 15-Feb-23 A Plan and Profile Review & Approval
LR-ENG-S-R16.110 Road Cross Sections Preparation & Submission 14 24-Aug-24 09-Sep-24 Road Cross Sections Preparation & Submission
LR-ENG-S-R16.115 Road Cross Sections Review & Approval 14 11-Sep-24 28-Sep-24 Road Cross Sections Review & Approval
LR-ENG-S-R16.120 Guiding Signs and Marking Preparation & Submission 14 09-Sep-24 26-Sep-24 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R16.125 Guiding Signs and Marking Review & Approval 14 26-Sep-24 12-Oct-24 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 17 722 15-Jun-23 A 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 17
LR-ENG-S-R17.100 Plan and Profile Preparation & Submission 7 15-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R17.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval
LR-ENG-S-R17.110 Road Cross Sections Preparation & Submission 14 08-Sep-25 25-Sep-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R17.115 Road Cross Sections Review & Approval 14 28-Sep-25 13-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R17.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R17.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 18 115 01-May-25 16-Sep-25 16-Sep-25, LOCAL ROAD NO. 18
LR-ENG-S-R18.100 Plan and Profile Preparation & Submission 14 01-May-25 18-May-25 Plan and Profile Preparation & Submission
LR-ENG-S-R18.105 Plan and Profile Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Review & Approval
LR-ENG-S-R18.110 Road Cross Sections Preparation & Submission 14 30-Jul-25 16-Aug-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R18.115 Road Cross Sections Review & Approval 14 18-Aug-25 02-Sep-25 Road Cross Sections Review & Approval
LR-ENG-S-R18.120 Guiding Signs and Marking Preparation & Submission 14 16-Aug-25 01-Sep-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R18.125 Guiding Signs and Marking Review & Approval 14 01-Sep-25 16-Sep-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 20 143 18-May-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 20
LR-ENG-S-R20.100 Plan and Profile Preparation & Submission 14 18-May-25 03-Jun-25 Plan and Profile Preparation & Submission
LR-ENG-S-R20.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R20.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R20.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R20.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R20.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 21 129 03-Jun-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 21
LR-ENG-S-R21.100 Plan and Profile Preparation & Submission 14 03-Jun-25 23-Jun-25 Plan and Profile Preparation & Submission
LR-ENG-S-R21.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R21.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R21.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R21.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R21.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 22 107 23-Jun-25 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 22
LR-ENG-S-R22.100 Plan and Profile Preparation & Submission 14 23-Jun-25 09-Jul-25 Plan and Profile Preparation & Submission
LR-ENG-S-R22.105 Plan and Profile Review & Approval 14 20-Aug-25 06-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R22.110 Road Cross Sections Preparation & Submission 14 06-Sep-25 22-Sep-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R22.115 Road Cross Sections Review & Approval 14 22-Sep-25 08-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R22.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R22.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval
LR-ENG-S-R23.105 Plan and Profile Review & Approval 14 26-Jul-25 11-Aug-25 Plan and Profile Review & Approval
Actual Work
Remaining Work
178 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R23.110 Road Cross Sections Preparation & Submission 14 11-Aug-25 27-Aug-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R23.115 Road Cross Sections Review & Approval 14 30-Aug-25 14-Sep-25 Road Cross Sections Review & Approval
LR-ENG-S-R23.120 Guiding Signs and Marking Preparation & Submission 14 27-Aug-25 13-Sep-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R23.125 Guiding Signs and Marking Review & Approval 14 13-Sep-25 29-Sep-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 24 829 10-Jan-23 A 29-Sep-25 29-Sep-25, LOCAL ROAD NO. 24
LR-ENG-S-R24.100 Plan and Profile Preparation & Submission 23 10-Jan-23 A 05-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R24.105 Plan and Profile Review & Approval 17 18-Jan-23 A 06-Feb-23 A Plan and Profile Review & Approval
LR-ENG-S-R24.110 Road Cross Sections Preparation & Submission 14 11-Aug-25 27-Aug-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R24.115 Road Cross Sections Review & Approval 14 30-Aug-25 14-Sep-25 Road Cross Sections Review & Approval
LR-ENG-S-R24.120 Guiding Signs and Marking Preparation & Submission 14 27-Aug-25 13-Sep-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R24.125 Guiding Signs and Marking Review & Approval 14 13-Sep-25 29-Sep-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 38 772 04-Feb-23 A 17-Aug-25 17-Aug-25, LOCAL ROAD NO. 38
LR-ENG-S-R38.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission
LR-ENG-S-R38.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval
LR-ENG-S-R38.110 Road Cross Sections Preparation & Submission 14 28-Jun-25 14-Jul-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R38.115 Road Cross Sections Review & Approval 14 14-Jul-25 29-Jul-25 Road Cross Sections Review & Approval
LR-ENG-S-R38.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-25 02-Aug-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R38.125 Guiding Signs and Marking Review & Approval 14 02-Aug-25 17-Aug-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 41 284 21-Nov-24 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 41
LR-ENG-S-R41.100 Plan and Profile Preparation & Submission 14 21-Nov-24 07-Dec-24 Plan and Profile Preparation & Submission
LR-ENG-S-R41.105 Plan and Profile Review & Approval 14 23-Aug-25 08-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R41.110 Road Cross Sections Preparation & Submission 14 08-Sep-25 25-Sep-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R41.115 Road Cross Sections Review & Approval 14 28-Sep-25 13-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R41.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R41.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 42 319 07-Dec-24 23-Dec-25 23-Dec-25, LOCAL ROAD NO. 42
LR-ENG-S-R42.100 Plan and Profile Preparation & Submission 14 07-Dec-24 23-Dec-24 Plan and Profile Preparation & Submission
LR-ENG-S-R42.105 Plan and Profile Review & Approval 14 27-Aug-25 13-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R42.110 Road Cross Sections Preparation & Submission 14 13-Sep-25 30-Sep-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R42.115 Road Cross Sections Review & Approval 14 30-Sep-25 15-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R42.120 Guiding Signs and Marking Preparation & Submission 14 20-Nov-25 07-Dec-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R42.125 Guiding Signs and Marking Review & Approval 14 07-Dec-25 23-Dec-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 43 260 23-Dec-24 01-Nov-25 01-Nov-25, LOCAL ROAD NO. 43
LR-ENG-S-R43.100 Plan and Profile Preparation & Submission 14 23-Dec-24 08-Jan-25 Plan and Profile Preparation & Submission
LR-ENG-S-R43.105 Plan and Profile Review & Approval 14 27-Aug-25 13-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R43.110 Road Cross Sections Preparation & Submission 14 13-Sep-25 30-Sep-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R43.115 Road Cross Sections Review & Approval 14 02-Oct-25 18-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R43.120 Guiding Signs and Marking Preparation & Submission 14 30-Sep-25 16-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R43.125 Guiding Signs and Marking Review & Approval 14 16-Oct-25 01-Nov-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 44 248 08-Jan-25 03-Nov-25 03-Nov-25, LOCAL ROAD NO. 44
LR-ENG-S-R44.100 Plan and Profile Preparation & Submission 14 08-Jan-25 25-Jan-25 Plan and Profile Preparation & Submission
LR-ENG-S-R44.105 Plan and Profile Review & Approval 14 30-Aug-25 15-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R44.110 Road Cross Sections Preparation & Submission 14 15-Sep-25 02-Oct-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R44.115 Road Cross Sections Review & Approval 14 05-Oct-25 20-Oct-25 Road Cross Sections Review & Approval
Actual Work
Remaining Work
179 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R44.120 Guiding Signs and Marking Preparation & Submission 14 02-Oct-25 19-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R44.125 Guiding Signs and Marking Review & Approval 14 19-Oct-25 03-Nov-25 Guiding Signs and Marking Review & Approval
LOCAL ROAD NO. 48 236 25-Jan-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 48
LR-ENG-S-R48.100 Plan and Profile Preparation & Submission 14 25-Jan-25 10-Feb-25 Plan and Profile Preparation & Submission
LR-ENG-S-R48.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-R48.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R48.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-R48.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R48.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval
LR-ENG-S-R49.105 Plan and Profile Review & Approval 14 26-Feb-25 15-Mar-25 Plan and Profile Review & Approval
LR-ENG-S-R49.110 Road Cross Sections Preparation & Submission 14 15-Mar-25 05-Apr-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R49.115 Road Cross Sections Review & Approval 14 07-Apr-25 22-Apr-25 Road Cross Sections Review & Approval
LR-ENG-S-R49.120 Guiding Signs and Marking Preparation & Submission 14 05-Apr-25 21-Apr-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R49.125 Guiding Signs and Marking Review & Approval 14 21-Apr-25 06-May-25 Guiding Signs and Marking Review & Approval
LR-ENG-S-R54.105 Plan and Profile Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Review & Approval
LR-ENG-S-R54.110 Road Cross Sections Preparation & Submission 14 30-Jul-25 16-Aug-25 Road Cross Sections Preparation & Submission
LR-ENG-S-R54.115 Road Cross Sections Review & Approval 14 18-Aug-25 02-Sep-25 Road Cross Sections Review & Approval
LR-ENG-S-R54.120 Guiding Signs and Marking Preparation & Submission 14 16-Aug-25 01-Sep-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-R54.125 Guiding Signs and Marking Review & Approval 14 01-Sep-25 16-Sep-25 Guiding Signs and Marking Review & Approval
LR-ENG-S-AR.105 Plan and Profile Review & Approval 14 08-Sep-25 25-Sep-25 Plan and Profile Review & Approval
LR-ENG-S-AR.110 Road Cross Sections Preparation & Submission 14 25-Sep-25 12-Oct-25 Road Cross Sections Preparation & Submission
LR-ENG-S-AR.115 Road Cross Sections Review & Approval 14 12-Oct-25 27-Oct-25 Road Cross Sections Review & Approval
LR-ENG-S-AR.120 Guiding Signs and Marking Preparation & Submission 14 18-Oct-25 03-Nov-25 Guiding Signs and Marking Preparation & Submission
LR-ENG-S-AR.125 Guiding Signs and Marking Review & Approval 14 03-Nov-25 18-Nov-25 Guiding Signs and Marking Review & Approval
Actual Work
Remaining Work
180 of 180
Critical Remaining Work
Milestone