MONTRING SCHEDULE FORRUA AL MADINAH MAIN

INFRASTRUCTURE PACKAGEC -REV0 C-40


Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MONTRING SCHEDULE
SCHEDU FORRUA AL MADINAH MAIN INFRASTRUCTURE PACKAGEC -REV0 C-40 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, MONTRING

TUNNEL AND CULVERT


CULVE CONSTRUCTION 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, TUNNEL AN
JADAT AL HARAM TUNNEL
TUNN AND CULVERT 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, JADAT AL H
ZONE 1 - FROM STA. 0+000
0+ ~ 0+510 776 24-Aug-22 A 01-May-25 01-May-25, ZONE 1 - FROM STA. 0+000 ~ 0+510
ENGINEERING 776 24-Aug-22 A 01-May-25 01-May-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 776 24-Aug-22 A 01-May-25 01-May-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 235 15-Dec-22 A 23-Sep-23 A 23-Sep-23 A, EARTH WORKS
JAH-ENG-Z1-EW.15 Cross Section Shop Drawing Preparation & Submission 11 15-Dec-22 A 27-Dec-22 A Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z1-EW.20 Soil Improvement Design Preparation & Submission 7 13-Sep-23 A 20-Sep-23 A Soil Improvement Design Preparation & Submission

JAH-ENG-Z1-EW.25 Cross Section Shop Drawing Review & Approval 12 28-Dec-22 A 10-Jan-23 A Cross Section Shop Drawing Review & Approval

JAH-ENG-Z1-EW.30 Soil Improvement Design Review & Approval 11 10-Sep-23 A 23-Sep-23 A Soil Improvement Design Review & Approval

WET UTILITIES 667 24-Aug-22 A 21-Dec-24 21-Dec-24, WET UTILITIES


POTABLE WATER NETWORK
NETW 23 18-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK
JAH-ENG-Z1-WC-PW Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval

JAH-ENGZ1-WC-PW Plan and Profile Shop Drawing Prepration &Submission 13 18-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 28-Aug-24 30-Sep-24 30-Sep-24, IRRIGATION NETWORK


JAH-ENG-Z1-WC-IR Plan and Profile Shop Drawing Prepration &Submission 14 28-Aug-24 14-Sep-24 Plan and Profile Shop Drawing Prepration &Submission

JAH-ENG-Z1-WC-IR Plan and Profile Shop Drawing Review & Approval 14 14-Sep-24 30-Sep-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 293 24-Aug-22 A 30-Sep-24 30-Sep-24, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z1-WC-GD Plan and Profile Shop Drawing Prepration &Submission 293 24-Aug-22 A 30-Sep-24 Plan and Profile Shop Drawing Prepration &Submission

JAH-ENG-Z1-WC-GD Plan and Profile Shop Drawing Review & Approval 285 01-Sep-22 A 30-Sep-24 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY


SUPPL & RETURN NETWORK 28 03-Sep-24 06-Oct-24 06-Oct-24, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z1-WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 03-Sep-24 19-Sep-24 Plan and Profile Shop Drawing Prepration &Submission

JAH-ENG-Z1-WC-CW Plan and Profile Shop Drawing Review & Approval 14 19-Sep-24 06-Oct-24 Plan and Profile Shop Drawing Review & Approval

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 03-Sep-24 06-Oct-24 06-Oct-24, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z1-WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 03-Sep-24 19-Sep-24 Plan and Profile Shop Drawing Prepration &Submission

JAH-ENG-Z1-WC-AW Plan and Profile Shop Drawing Review & Approval 14 19-Sep-24 06-Oct-24 Plan and Profile Shop Drawing Review & Approval

DRAINAGE NET WORK 28 19-Nov-24 21-Dec-24 21-Dec-24, DRAINAGE NET WORK


JAH-ENG-Z1-WC-D. Plan and Profile Shop Drawing Prepration &Submission 14 19-Nov-24 05-Dec-24 Plan and Profile Shop Drawing Prepration &Submission

JAH-ENG-Z1-WC-D. Plan and Profile Shop Drawing Review & Approval 14 05-Dec-24 21-Dec-24 Plan and Profile Shop Drawing Review & Approval

DRY UTILITIES 31 16-Sep-24 23-Oct-24 23-Oct-24, DRY UTILITIES


POWER 31 16-Sep-24 23-Oct-24 23-Oct-24, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 16-Sep-24 10-Oct-24 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 10-Oct-24 23-Oct-24 Review and approval power system shopdrawings

CULVERT SHOP DRAWINGS


DRAWIN 376 02-Dec-23 20-Feb-25 20-Feb-25, CULVERT SHOP DRAWINGS
WET CULVERT 376 02-Dec-23 20-Feb-25 20-Feb-25, WET CULVERT
CIVIL SHOP DRAWINGS
DRAWING 135 02-Dec-23 09-May-24 09-May-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
W-Z1-EC-CS.15 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

W-Z1-EC-CS.20 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval

W-Z1-EC-CS.25 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission

W-Z1-EC-CS.30 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 95 16-Jan-24 09-May-24 09-May-24, CIVIL/SEGMENT WISE


WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-01 40 04-Feb-24 20-Mar-24 20-Mar-24, WET CULVERT-CIVIL-W-Z01-01
W-Z1-01-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-01-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-01-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-01-EC-WCC Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-02 40 15-Feb-24 01-Apr-24 01-Apr-24, WET CULVERT-CIVIL-W-Z01-02

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
1 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-02-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 03-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-02-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-02-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-02-EC-WCC Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-03 40 27-Feb-24 16-Apr-24 16-Apr-24, WET CULVERT-CIVIL-W-Z01-03
W-Z1-03-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 14-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-03-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-03-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 14-Mar-24 31-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-03-EC-WCC Reinforcement Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-04 40 10-Mar-24 28-Apr-24 28-Apr-24, WET CULVERT-CIVIL-W-Z01-04
W-Z1-04-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-04-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-04-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-04-EC-WCC Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-05 40 21-Mar-24 09-May-24 09-May-24, WET CULVERT-CIVIL-W-Z01-05
W-Z1-05-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-05-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-05-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-05-EC-WCC Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-06 40 16-Jan-24 03-Mar-24 03-Mar-24, WET CULVERT-CIVIL-W-Z01-06
W-Z1-06-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-06-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-06-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-06-EC-WCC Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-07 40 28-Jan-24 14-Mar-24 14-Mar-24, WET CULVERT-CIVIL-W-Z01-07
W-Z1-07-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-07-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-07-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-07-EC-WCC Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-08 40 08-Feb-24 26-Mar-24 26-Mar-24, WET CULVERT-CIVIL-W-Z01-08
W-Z1-08-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-08-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-08-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-08-EC-WCC Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-09 40 20-Feb-24 07-Apr-24 07-Apr-24, WET CULVERT-CIVIL-W-Z01-09
W-Z1-09-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-09-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-09-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-09-EC-WCC Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-10 40 03-Mar-24 22-Apr-24 22-Apr-24, WET CULVERT-CIVIL-W-Z01-10
W-Z1-10-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-10-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-10-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-10-EC-WCC Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-11 40 16-Jan-24 03-Mar-24 03-Mar-24, WET CULVERT-CIVIL-W-Z01-11
W-Z1-11-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
2 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-11-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-11-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-11-EC-WCC Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-12 40 28-Jan-24 14-Mar-24 14-Mar-24, WET CULVERT-CIVIL-W-Z01-12
W-Z1-12-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-12-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-12-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-12-EC-WCC Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-13 40 08-Feb-24 26-Mar-24 26-Mar-24, WET CULVERT-CIVIL-W-Z01-13
W-Z1-13-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-13-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-13-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-13-EC-WCC Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-14 40 20-Feb-24 07-Apr-24 07-Apr-24, WET CULVERT-CIVIL-W-Z01-14
W-Z1-14-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-14-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-14-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-14-EC-WCC Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL
CULVERT-CIVIL-W-Z01-15 40 03-Mar-24 22-Apr-24 22-Apr-24, WET CULVERT-CIVIL-W-Z01-15
W-Z1-15-EC-WCC Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z1-15-EC-WCC Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval

W-Z1-15-EC-WCC Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z1-15-EC-WCC Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DR 340 11-Jan-24 20-Feb-25 20-Feb-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 148 22-Jul-24 11-Jan-25 11-Jan-25, POWER SYSTEM
EARTHING SYSTEM 48 22-Jul-24 15-Sep-24 15-Sep-24, EARTHING SYSTEM
W-Z1-EEP-ES.15 Earthing system Shop Drawings Preparation & Submission 30 22-Jul-24 26-Aug-24 Earthing system Shop Drawings Preparation & Submission

W-Z1-EEP-ES.20 Earthing system Shop Drawings Review & Approval 30 12-Aug-24 15-Sep-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 48 22-Jul-24 15-Sep-24 15-Sep-24, LIGHTING SYSTEM


W-Z1-EEP-LS.15 Lighting system Shop Drawings Preparation & Submission 23 22-Jul-24 18-Aug-24 Lighting system Shop Drawings Preparation & Submission

W-Z1-EEP-LS.20 Lighting system Shop Drawings Review & Approval 25 18-Aug-24 15-Sep-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 24-Aug-24 28-Sep-24 28-Sep-24, CABLE TRAY /CABLE ROUTING SYSTEM
W-Z1-EEP-CTCRS Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 24-Aug-24 28-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

W-Z1-EEP-CTCRS Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 24-Aug-24 28-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYS


SYSTEM 108 07-Sep-24 11-Jan-25 11-Jan-25, SMALL POWER SYSTEM
W-Z1-EEP-SPS.15 Small Power system Shop Drawings Preparation & Submission 30 07-Sep-24 12-Oct-24 Small Power system Shop Drawings Preparation & Submission

W-Z1-EEP-SPS.20 Small Power system Shop Drawings Review & Approval 4 07-Jan-25 11-Jan-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 11 08-Oct-24 20-Oct-24 20-Oct-24, POWER DISTRIBUTION
W-Z1-EEP-PD.15 Generator Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 Generator Shop Drawings Preparation & Submission

W-Z1-EEP-PD.20 UPS Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 UPS Shop Drawings Preparation & Submission

W-Z1-EEP-PD.25 MDBs Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 MDBs Pannels Shop Drawings Preparation & Submission

W-Z1-EEP-PD.30 MCC Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 MCC Pannels Shop Drawings Preparation & Submission

W-Z1-EEP-PD.35 SMSB Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 SMSB Pannels Shop Drawings Preparation & Submission

W-Z1-EEP-PD.40 DB Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 DB Pannels Shop Drawings Preparation & Submission

W-Z1-EEP-PD.45 Isolators Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 Isolators Shop Drawings Preparation & Submission

W-Z1-EEP-PD.50 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 08-Oct-24 13-Oct-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
3 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z1-EEP-PD.55 Generator Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 Generator Shop Drawings Review & Approval

W-Z1-EEP-PD.60 UPS Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 UPS Shop Drawings Review & Approval

W-Z1-EEP-PD.65 MDBs Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 MDBs Shop Drawings Review & Approval

W-Z1-EEP-PD.70 MCCB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 MCCB Shop Drawings Review & Approval

W-Z1-EEP-PD.75 SMSB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 SMSB Shop Drawings Review & Approval

W-Z1-EEP-PD.80 DB Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 DB Shop Drawings Review & Approval

W-Z1-EEP-PD.85 Isolator Shop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 Isolator Shop Drawings Review & Approval

W-Z1-EEP-PD.90 LCP / ELC PannelsShop Drawings Review & Approval 7 13-Oct-24 20-Oct-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYST 340 11-Jan-24 20-Feb-25 20-Feb-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM
SYSTE 295 11-Jan-24 30-Dec-24 30-Dec-24, FIRE ALARM SYSTEM
W-Z1-EEL-FAS.15 Fire Alarm system Shop Drawings Preparation & Submission 14 11-Jan-24 28-Jan-24 Fire Alarm system Shop Drawings Preparation & Submission

W-Z1-EEL-FAS.20 Fire Alarm system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 290 28-Jan-24 09-Jan-25 09-Jan-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
W-Z1-EEL-ICTS.15 ICT System Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 ICT System Shop Drawings Preparation & Submission

W-Z1-EEL-ICTS.20 ICT System Shop Drawings Review & Approval 4 06-Jan-25 09-Jan-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


S 285 13-Feb-24 20-Jan-25 20-Jan-25, ACCESS CONTROL SYSTEM
W-Z1-EEL-ACS.15 Access Control system Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Access Control system Shop Drawings Preparation & Submission

W-Z1-EEL-ACS.20 Access Control system Shop Drawings Review & Approval 12 07-Jan-25 20-Jan-25 Access Control system Shop Drawings Review & Approval

RODDENT REPPELE
REPPELENT SYSTEM 18 29-Feb-24 21-Mar-24 21-Mar-24, RODDENT REPPELENT SYSTEM
W-Z1-EEL-RRS.15 Roddent Repplent system Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Roddent Repplent system Shop Drawings Preparation & Submission

W-Z1-EEL-RRS.20 Roddent Repplent system Shop Drawings Review & Approval 4 17-Mar-24 21-Mar-24 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 31 06-Jan-25 10-Feb-25 10-Feb-25, SCADA SYSTEM


W-Z1-EEL-SCADA Scada system Shop Drawings Preparation & Submission 14 06-Jan-25 22-Jan-25 Scada system Shop Drawings Preparation & Submission

W-Z1-EEL-SCADA Scada system Shop Drawings Review & Approval 12 28-Jan-25 10-Feb-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 22-Jan-25 20-Feb-25 20-Feb-25, RADIO RE- BROADCOASTING/ TETRA
W-Z1-EEL-RRBT.1 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 22-Jan-25 08-Feb-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

W-Z1-EEL-RRBT.2 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 08-Feb-25 20-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


D 274 17-Mar-24 08-Feb-25 08-Feb-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 32 17-Mar-24 25-Apr-24 25-Apr-24, FIRE FIGHTING
W-Z1-MSD-FF.15 Firefighting system Shop Drawings Preparation & Submission 14 17-Mar-24 02-Apr-24 Firefighting system Shop Drawings Preparation & Submission

W-Z1-MSD-FF.20 Firefighting system Shop Drawings Review & Approval 12 13-Apr-24 25-Apr-24 Firefighting system Shop Drawings Review & Approval

HVAC 254 02-Apr-24 01-Feb-25 01-Feb-25, HVAC


W-Z1-MSD-HVAC. HVAC system Shop Drawings Preparation & Submission 14 02-Apr-24 22-Apr-24 HVAC system Shop Drawings Preparation & Submission

W-Z1-MSD-HVAC. HVAC system Shop Drawings Review & Approval 12 19-Jan-25 01-Feb-25 HVAC system Shop Drawings Review & Approval

PLUMBING 246 22-Apr-24 08-Feb-25 08-Feb-25, PLUMBING


W-Z1-MSD-PB.15 Plumbing system Shop Drawings Preparation & Submission 14 22-Apr-24 07-May-24 Plumbing system Shop Drawings Preparation & Submission

W-Z1-MSD-PB.20 Plumbing system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Plumbing system Shop Drawings Review & Approval

DRY CULVERT 191 02-Dec-23 20-Jul-24 20-Jul-24, DRY CULVERT


DRY CULVERT 191 02-Dec-23 20-Jul-24 20-Jul-24, DRY CULVERT
CIVIL SHOP DRAWING
DRAWINGS 99 02-Dec-23 26-Mar-24 26-Mar-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURA WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
DC-CSD-CZW.15 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

DC-CSD-CZW.20 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval

DC-CSD-CZW.25 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission

DC-CSD-CZW.30 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE
WIS 60 16-Jan-24 26-Mar-24 26-Mar-24, CIVIL/SEGMENT WISE
DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-01 40 16-Jan-24 03-Mar-24 03-Mar-24, DRY CULVERT-CIVIL-D-Z01-01
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
4 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-02 40 28-Jan-24 14-Mar-24 14-Mar-24, DRY CULVERT-CIVIL-D-Z01-02
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL
CULVERT-CIVIL-D-Z01-03 40 08-Feb-24 26-Mar-24 26-Mar-24, DRY CULVERT-CIVIL-D-Z01-03
DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

DC-CSD-CSW-Z0 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

DC-CSD-CSW-Z0 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP D
DRAWINGS 191 02-Dec-23 20-Jul-24 20-Jul-24, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 182 02-Dec-23 09-Jul-24 09-Jul-24, POWER SYSTEM
EARTHING SYSTEM 30 02-Dec-23 04-Jan-24 04-Jan-24, EARTHING SYSTEM
DC-ESD-PS-ES.1 Earthing system Shop Drawings Preparation & Submission 30 02-Dec-23 04-Jan-24 Earthing system Shop Drawings Preparation & Submission

DC-ESD-PS-ES.2 Earthing system Shop Drawings Review & Approval 30 02-Dec-23 04-Jan-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 63 10-Mar-24 26-May-24 26-May-24, LIGHTING SYSTEM


DC-ESD-PS-LS.1 Lighting system Shop Drawings Preparation & Submission 23 10-Mar-24 06-Apr-24 Lighting system Shop Drawings Preparation & Submission

DC-ESD-PS-LS.2 Lighting system Shop Drawings Review & Approval 25 27-Apr-24 26-May-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE


/CABL ROUTING SYSTEM 48 06-Apr-24 04-Jun-24 04-Jun-24, CABLE TRAY /CABLE ROUTING SYSTEM
DC-ESD-PS-CTC Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 23 06-Apr-24 06-May-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

DC-ESD-PS-CTC Cable Tray/ Cable Routing system Shop Drawings Review & Approval 25 06-May-24 04-Jun-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SY
SYSTEM 48 08-May-24 08-Jul-24 08-Jul-24, SMALL POWER SYSTEM
DC-ESD-PS-SPS. Small Power system Shop Drawings Preparation & Submission 23 08-May-24 04-Jun-24 Small Power system Shop Drawings Preparation & Submission

DC-ESD-PS-SPS. Small Power system Shop Drawings Review & Approval 25 04-Jun-24 08-Jul-24 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUT 25 05-Jun-24 09-Jul-24 09-Jul-24, POWER DISTRIBUTION
DC-ESD-PS-PD.1 Generator Shop Drawings Preparation & Submission 4 05-Jun-24 10-Jun-24 Generator Shop Drawings Preparation & Submission

DC-ESD-PS-PD.2 UPS Shop Drawings Preparation & Submission 4 05-Jun-24 10-Jun-24 UPS Shop Drawings Preparation & Submission

DC-ESD-PS-PD.2 MDBs Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 MDBs Pannels Shop Drawings Preparation & Submission

DC-ESD-PS-PD.3 MCC Pannels Shop Drawings Preparation & Submission 4 26-Jun-24 01-Jul-24 MCC Pannels Shop Drawings Preparation & Submission

DC-ESD-PS-PD.3 SMSB Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 SMSB Pannels Shop Drawings Preparation & Submission

DC-ESD-PS-PD.4 DB Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 DB Pannels Shop Drawings Preparation & Submission

DC-ESD-PS-PD.4 Isolators Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 Isolators Shop Drawings Preparation & Submission

DC-ESD-PS-PD.5 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 13-Jun-24 23-Jun-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

DC-ESD-PS-PD.5 Generator Shop Drawings Review & Approval 7 10-Jun-24 23-Jun-24 Generator Shop Drawings Review & Approval

DC-ESD-PS-PD.6 UPS Shop Drawings Review & Approval 7 10-Jun-24 23-Jun-24 UPS Shop Drawings Review & Approval

DC-ESD-PS-PD.6 MDBs Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 MDBs Shop Drawings Review & Approval

DC-ESD-PS-PD.7 MCCB Shop Drawings Review & Approval 7 01-Jul-24 09-Jul-24 MCCB Shop Drawings Review & Approval

DC-ESD-PS-PD.7 SMSB Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 SMSB Shop Drawings Review & Approval

DC-ESD-PS-PD.8 DB Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 DB Shop Drawings Review & Approval

DC-ESD-PS-PD.8 Isolator Shop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 Isolator Shop Drawings Review & Approval

DC-ESD-PS-PD.9 LCP / ELC PannelsShop Drawings Review & Approval 7 23-Jun-24 01-Jul-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYS 176 19-Dec-23 20-Jul-24 20-Jul-24, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM
SYSTE 68 19-Dec-23 07-Mar-24 07-Mar-24, FIRE ALARM SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
5 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DC-ESD-LCS-FA Fire Alarm system Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Fire Alarm system Shop Drawings Preparation & Submission

DC-ESD-LCS-FA Fire Alarm system Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 54 03-Jan-24 07-Mar-24 07-Mar-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
DC-ESD-LCS-ICT ICT System Shop Drawings Preparation & Submission 14 03-Jan-24 20-Jan-24 ICT System Shop Drawings Preparation & Submission

DC-ESD-LCS-ICT ICT System Shop Drawings Review & Approval 4 03-Mar-24 07-Mar-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM 40 20-Jan-24 07-Mar-24 07-Mar-24, ACCESS CONTROL SYSTEM


DC-ESD-LCS-AC Access Control system Shop Drawings Preparation & Submission 14 20-Jan-24 05-Feb-24 Access Control system Shop Drawings Preparation & Submission

DC-ESD-LCS-AC Access Control system Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Access Control system Shop Drawings Review & Approval

RODDENT REPPELENT
REPPELE SYSTEM 27 05-Feb-24 07-Mar-24 07-Mar-24, RODDENT REPPELENT SYSTEM
DC-ESD-LCS-RR Roddent Repplent system Shop Drawings Preparation & Submission 14 05-Feb-24 21-Feb-24 Roddent Repplent system Shop Drawings Preparation & Submission

DC-ESD-LCS-RR Roddent Repplent system Shop Drawings Review & Approval 4 03-Mar-24 07-Mar-24 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 26 21-Feb-24 23-Mar-24 23-Mar-24, SCADA SYSTEM


DC-ESD-LCS-SC Scada system Shop Drawings Preparation & Submission 14 21-Feb-24 09-Mar-24 Scada system Shop Drawings Preparation & Submission

DC-ESD-LCS-SC Scada system Shop Drawings Review & Approval 12 09-Mar-24 23-Mar-24 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADC TETRA 95 23-Mar-24 20-Jul-24 20-Jul-24, RADIO RE- BROADCOASTING/ TETRA
DC-ESD-LCS-RR Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 23-Mar-24 08-Apr-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

DC-ESD-LCS-RR Radio Re-Broad coasting system Shop Drawings Review & Approval 12 06-Jul-24 20-Jul-24 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


D 58 20-Mar-24 30-May-24 30-May-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 54 20-Mar-24 26-May-24 26-May-24, FIRE FIGHTING
DC-MSD-FF.15 Firefighting system Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Firefighting system Shop Drawings Preparation & Submission

DC-MSD-FF.20 Firefighting system Shop Drawings Review & Approval 12 12-May-24 26-May-24 Firefighting system Shop Drawings Review & Approval

HVAC 44 06-Apr-24 30-May-24 30-May-24, HVAC


DC-MSD-HVAC.1 HVAC system Shop Drawings Preparation & Submission 14 06-Apr-24 25-Apr-24 HVAC system Shop Drawings Preparation & Submission

DC-MSD-HVAC.2 HVAC system Shop Drawings Review & Approval 12 16-May-24 30-May-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 25-Apr-24 26-May-24 26-May-24, PLUMBING


DC-MSD-PB.15 Plumbing system Shop Drawings Preparation & Submission 14 25-Apr-24 12-May-24 Plumbing system Shop Drawings Preparation & Submission

DC-MSD-PB.20 Plumbing system Shop Drawings Review & Approval 12 12-May-24 26-May-24 Plumbing system Shop Drawings Review & Approval

ROADS 70 05-Feb-25 01-May-25 01-May-25, ROADS


JAH-ENG-Z1-R.15 Plan and Profile Shop Drawing Preparation & Submission 14 05-Feb-25 22-Feb-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z1-R.20 Plan and Profile Shop Drawing Review & Approval 14 22-Feb-25 10-Mar-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z1-R.25 Road Cross Sections Shop Drawing Preparation & Submission 14 10-Mar-25 26-Mar-25 Road Cross Sections Shop Drawing Preparation & Submission

JAH-ENG-Z1-R.30 Road Cross Sections Shop Drawing Review & Approval 14 26-Mar-25 15-Apr-25 Road Cross Sections Shop Drawing Review & Approval

JAH-ENG-Z1-R.35 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 26-Mar-25 16-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission

JAH-ENG-Z1-R.40 Guiding Signs and Marking Shop Drawing Review & Approval 14 16-Apr-25 01-May-25 Guiding Signs and Marking Shop Drawing Review & Approval

TUNNEL SHOP DRAWINGS


DRAWING 566 26-Nov-22 A 02-Oct-24 02-Oct-24, TUNNEL SHOP DRAWINGS
CIVIL SHOP DRAWINGS 301 02-Sep-23 A 26-Aug-24 26-Aug-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 301 02-Sep-23 A 26-Aug-24 26-Aug-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 301 02-Sep-23 A 26-Aug-24 26-Aug-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z1-EC.15 Plan and Profile Shop Drawings Preparation & Submission 14 28-Jul-24 12-Aug-24 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z1-EC.20 Plan and Profile Shop Drawings Review & Approval 12 13-Aug-24 26-Aug-24 Plan and Profile Shop Drawings Review & Approval

JAH-Z1-EC.25 Builder work Shop Drawings Preparation and submission 13 02-Sep-23 A 16-Sep-23 A Builder work Shop Drawings Preparation and submission

JAH-Z1-EC.30 Builder work Shop Drawings Review & Approval 5 16-Sep-23 A 20-Sep-23 A Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 52 27-Feb-24 30-Apr-24 30-Apr-24, CIVIL/SEGMENT WISE


CIVIL-SEG-J-Z01-01 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-01
JAH-Z1-01-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-01-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-01-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-01-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-02 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-02

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
6 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z1-02-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-02-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-02-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-02-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-03 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-03


JAH-Z1-03-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-03-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-03-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-03-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-04 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-04


JAH-Z1-04-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-04-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-04-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-04-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-05 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-05


JAH-Z1-05-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-05-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-05-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-05-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-06 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-06


JAH-Z1-06-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-06-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-06-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-06-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-07 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-07


JAH-Z1-07-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-07-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-07-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-07-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-08 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-08


JAH-Z1-08-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-08-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-08-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-08-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-09 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-09


JAH-Z1-09-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-09-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-09-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-09-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-10 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-10


JAH-Z1-10-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-10-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-10-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-10-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-11 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-11


JAH-Z1-11-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
7 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z1-11-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-11-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-11-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-12 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-12


JAH-Z1-12-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-12-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-12-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-12-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-13 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-13


JAH-Z1-13-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-13-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-13-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-13-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-14 52 27-Feb-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-14


JAH-Z1-14-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 14-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-14-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 14-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-14-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-14-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-15 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-15


JAH-Z1-15-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-15-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-15-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-15-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-16 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-16


JAH-Z1-16-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-16-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-16-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-16-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z01-17 40 12-Mar-24 30-Apr-24 30-Apr-24, CIVIL-SEG-J-Z01-17


JAH-Z1-17-EC.15 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z1-17-EC.20 Concrete Dimension Shop Drawings Review & Approval 12 31-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z1-17-EC.25 Reinforcement Shop Drawings Preparation and submission 14 28-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z1-17-EC.30 Reinforcement Shop Drawings Review & Approval 12 17-Apr-24 30-Apr-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 566 26-Nov-22 A 02-Oct-24 02-Oct-24, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 566 26-Nov-22 A 02-Oct-24 02-Oct-24, POWER SYSTEM
EARTHING SYSTEM 226 02-Dec-23 28-Aug-24 28-Aug-24, EARTHING SYSTEM
JAH-Z1-EEP-ES.15 Earthing system Shop Drawings Preparation & Submission 30 02-Dec-23 04-Jan-24 Earthing system Shop Drawings Preparation & Submission

JAH-Z1-EEP-ES.20 Earthing system Shop Drawings Review & Approval 30 25-Jul-24 28-Aug-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 28 26-Nov-22 A 27-Dec-22 A 27-Dec-22 A, LIGHTING SYSTEM


JAH-Z1-EEP-LS.15 Lighting system Shop Drawings Preparation & Submission 23 26-Nov-22 A 21-Dec-22 A Lighting system Shop Drawings Preparation & Submission

JAH-Z1-EEP-LS.20 Lighting system Shop Drawings Review & Approval 25 29-Nov-22 A 27-Dec-22 A Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 06-Aug-24 09-Sep-24 09-Sep-24, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z1-EEP-CTCR Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 06-Aug-24 09-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z1-EEP-CTCR Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 06-Aug-24 09-Sep-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 30 06-Aug-24 09-Sep-24 09-Sep-24, SMALL POWER SYSTEM
JAH-Z1-EEP-SPS.1 Small Power system Shop Drawings Preparation & Submission 30 06-Aug-24 09-Sep-24 Small Power system Shop Drawings Preparation & Submission

JAH-Z1-EEP-SPS.2 Small Power system Shop Drawings Review & Approval 30 06-Aug-24 09-Sep-24 Small Power system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
8 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION
DISTRIBUTIO 16 14-Sep-24 02-Oct-24 02-Oct-24, POWER DISTRIBUTION
JAH-Z1-EEP-PD.15 Generator Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 Generator Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.20 UPS Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 UPS Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.25 MDBs Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.30 MCC Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.35 SMSB Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.40 DB Pannels Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 DB Pannels Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.45 Isolators Shop Drawings Preparation & Submission 4 19-Sep-24 25-Sep-24 Isolators Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.50 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 14-Sep-24 18-Sep-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z1-EEP-PD.55 Generator Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 Generator Shop Drawings Review & Approval

JAH-Z1-EEP-PD.60 UPS Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 UPS Shop Drawings Review & Approval

JAH-Z1-EEP-PD.65 MDBs Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 MDBs Shop Drawings Review & Approval

JAH-Z1-EEP-PD.70 MCCB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 MCCB Shop Drawings Review & Approval

JAH-Z1-EEP-PD.75 SMSB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 SMSB Shop Drawings Review & Approval

JAH-Z1-EEP-PD.80 DB Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 DB Shop Drawings Review & Approval

JAH-Z1-EEP-PD.85 Isolator Shop Drawings Review & Approval 7 25-Sep-24 02-Oct-24 Isolator Shop Drawings Review & Approval

JAH-Z1-EEP-PD.90 LCP / ELC PannelsShop Drawings Review & Approval 12 18-Sep-24 02-Oct-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 95 02-Dec-23 21-Mar-24 21-Mar-24, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 68 02-Dec-23 19-Feb-24 19-Feb-24, FIRE ALARM SYSTEM
JAH-Z1-EEL-FAS.1 Fire Alarm system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z1-EEL-FAS.2 Fire Alarm system Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 54 17-Dec-23 19-Feb-24 19-Feb-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
JAH-Z1-EEL-ICTS. ICT System Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 ICT System Shop Drawings Preparation & Submission

JAH-Z1-EEL-ICTS.2 ICT System Shop Drawings Review & Approval 4 14-Feb-24 19-Feb-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 40 02-Jan-24 19-Feb-24 19-Feb-24, ACCESS CONTROL SYSTEM
JAH-Z1-EEL-ACS.1 Access Control system Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Access Control system Shop Drawings Preparation & Submission

JAH-Z1-EEL-ACS.2 Access Control system Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SY 27 18-Jan-24 19-Feb-24 19-Feb-24, PUBLIC ADDRESS SYSTEM
JAH-Z1-EEL-PAS.1 Public Address system Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Public Address system Shop Drawings Preparation & Submission

JAH-Z1-EEL-PAS.2 Public Address system Shop Drawings Review & Approval 4 14-Feb-24 19-Feb-24 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 26 04-Feb-24 05-Mar-24 05-Mar-24, SCADA SYSTEM


JAH-Z1-EEL-SCAD Scada system Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Scada system Shop Drawings Preparation & Submission

JAH-Z1-EEL-SCAD Scada system Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 20-Feb-24 21-Mar-24 21-Mar-24, RADIO RE- BROADCOASTING/ TETRA
JAH-Z1-EEL-RRBT Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z1-EEL-RRBT Radio Re-Broad coasting system Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 54 14-Feb-24 20-Apr-24 20-Apr-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 44 14-Feb-24 04-Apr-24 04-Apr-24, FIRE FIGHTING
JAH-Z1-EM-FF.15 Firefighting system Shop Drawings Preparation & Submission 14 14-Feb-24 02-Mar-24 Firefighting system Shop Drawings Preparation & Submission

JAH-Z1-EM-FF.20 Firefighting system Shop Drawings Review & Approval 12 23-Mar-24 04-Apr-24 Firefighting system Shop Drawings Review & Approval

HVAC 34 02-Mar-24 13-Apr-24 13-Apr-24, HVAC


JAH-Z1-EM-HVAC.1 HVAC system Shop Drawings Preparation & Submission 14 02-Mar-24 18-Mar-24 HVAC system Shop Drawings Preparation & Submission

JAH-Z1-EM-HVAC.2 HVAC system Shop Drawings Review & Approval 12 27-Mar-24 13-Apr-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 18-Mar-24 20-Apr-24 20-Apr-24, PLUMBING


JAH-Z1-EM-PB.15 Plumbing system Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Plumbing system Shop Drawings Preparation & Submission

JAH-Z1-EM-PB.20 Plumbing system Shop Drawings Review & Approval 12 03-Apr-24 20-Apr-24 Plumbing system Shop Drawings Review & Approval

ZONE 2 - FROM STA. 0+510


0+ ~ 0+994 1214 23-Aug-22 A 17-Oct-26 17-Oct-26, ZONE 2 - FR

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
9 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 1214 23-Aug-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1214 23-Aug-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 191 15-Dec-22 A 01-Aug-23 A 01-Aug-23 A, EARTH WORKS
JAH-ENG-Z2-EX.755 Cross Section Shop Drawing Preparation & Submission 11 15-Dec-22 A 27-Dec-22 A Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z2-EX.760 Cross Section Shop Drawing Review & Approval 4 28-Dec-22 A 01-Jan-23 A Cross Section Shop Drawing Review & Approval

JAH-ENG-Z2-SH.775 Shoring Design Preparation & Submission 6 23-Jan-23 A 29-Jan-23 A Shoring Design Preparation & Submission

JAH-ENG-Z2-SH.780 Shoring Design Review & Approval 7 30-Jan-23 A 06-Feb-23 A Shoring Design Review & Approval

JAH-ENG-Z2-SI.765 Soil Improvement Design Preparation & Submission 15 15-Jul-23 A 31-Jul-23 A Soil Improvement Design Preparation & Submission

JAH-ENG-Z2-SI.770 Soil Improvement Design Review & Approval 5 27-Jul-23 A 01-Aug-23 A Soil Improvement Design Review & Approval

TUNNEL SHOP DRAWINGS


DRAWING 986 09-Mar-23 A 17-Oct-26 17-Oct-26, TUNNEL SH
CIVIL SHOP DRAWINGS 275 09-Mar-23 A 13-Jun-24 13-Jun-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 36 17-Aug-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 36 17-Aug-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z2-EC.100 Plan and Profile Shop Drawings Preparation & Submission 8 17-Sep-23 A 26-Sep-23 A Plan and Profile Shop Drawings Preparation & Submission

JAH-Z2-EC.110 Plan and Profile Shop Drawings Review & Approval 3 26-Sep-23 A 28-Sep-23 A Plan and Profile Shop Drawings Review & Approval

JAH-Z2-EC.120 Builder work Shop Drawings Preparation and submission 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Preparation and submission

JAH-Z2-EC.130 Builder work Shop Drawings Review & Approval 4 30-Aug-23 A 03-Sep-23 A Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 275 09-Mar-23 A 13-Jun-24 13-Jun-24, CIVIL/SEGMENT WISE


CIVIL-SEG-J-Z02-01 130 09-Mar-23 A 08-Jan-24 08-Jan-24, CIVIL-SEG-J-Z02-01
JAH-Z2-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 94 09-Mar-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 85 18-Mar-23 A 25-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Dec-23 25-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-02 56 25-Jul-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL-SEG-J-Z02-02


JAH-Z2-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 25-Jul-23 A 02-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 02-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-02-EC-120 Reinforcement Shop Drawings Preparation and submission 8 17-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z2-02-EC-130 Reinforcement Shop Drawings Review & Approval 3 26-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-03 18 29-Aug-23 A 18-Sep-23 A 18-Sep-23 A, CIVIL-SEG-J-Z02-03


JAH-Z2-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 02-Sep-23 A 10-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 10-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-03-EC-120 Reinforcement Shop Drawings Preparation and submission 9 29-Aug-23 A 07-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z2-03-EC-130 Reinforcement Shop Drawings Review & Approval 10 07-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-04 44 08-Aug-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL-SEG-J-Z02-04


JAH-Z2-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 08-Aug-23 A 16-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 16-Aug-23 A 23-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z2-04-EC-130 Reinforcement Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-05 23 02-Sep-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL-SEG-J-Z02-05


JAH-Z2-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 02-Sep-23 A 13-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 13-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-05-EC-120 Reinforcement Shop Drawings Preparation and submission 10 10-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z2-05-EC-130 Reinforcement Shop Drawings Review & Approval 7 20-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-06 21 02-Sep-23 A 26-Sep-23 A 26-Sep-23 A, CIVIL-SEG-J-Z02-06


JAH-Z2-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 02-Sep-23 A 13-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-06-EC-120 Reinforcement Shop Drawings Preparation and submission 13 04-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Preparation and submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
10 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z2-06-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-07 67 30-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z02-07


JAH-Z2-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 67 01-Apr-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 56 10-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-07-EC-120 Reinforcement Shop Drawings Preparation and submission 67 30-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-07-EC-130 Reinforcement Shop Drawings Review & Approval 55 11-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-08 70 25-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z02-08


JAH-Z2-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 70 25-Mar-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 05-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-08-EC-120 Reinforcement Shop Drawings Preparation and submission 63 30-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-08-EC-130 Reinforcement Shop Drawings Review & Approval 53 09-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-09 67 25-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z02-09


JAH-Z2-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 67 25-Mar-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 02-Apr-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-09-EC-120 Reinforcement Shop Drawings Preparation and submission 63 26-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-09-EC-130 Reinforcement Shop Drawings Review & Approval 55 04-Apr-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-10 74 21-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z02-10


JAH-Z2-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 02-Sep-23 A 13-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-10-EC-120 Reinforcement Shop Drawings Preparation and submission 66 21-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-10-EC-130 Reinforcement Shop Drawings Review & Approval 56 30-Mar-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-11 32 02-Dec-23 07-Jan-24 07-Jan-24, CIVIL-SEG-J-Z02-11


JAH-Z2-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 02-Dec-23 10-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Dec-23 24-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-11-EC-120 Reinforcement Shop Drawings Preparation and submission 10 12-Dec-23 24-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Dec-23 07-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-12 40 07-Dec-23 22-Jan-24 22-Jan-24, CIVIL-SEG-J-Z02-12


JAH-Z2-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Dec-23 23-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Dec-23 08-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Jan-24 22-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-13 40 25-Dec-23 08-Feb-24 08-Feb-24, CIVIL-SEG-J-Z02-13


JAH-Z2-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 25-Dec-23 09-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jan-24 25-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jan-24 25-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Jan-24 08-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-14 40 11-Jan-24 26-Feb-24 26-Feb-24, CIVIL-SEG-J-Z02-14


JAH-Z2-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Jan-24 27-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Jan-24 12-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Jan-24 12-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Feb-24 26-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-15 40 29-Jan-24 14-Mar-24 14-Mar-24, CIVIL-SEG-J-Z02-15


JAH-Z2-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
11 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z02-16 40 15-Feb-24 01-Apr-24 01-Apr-24, CIVIL-SEG-J-Z02-16
JAH-Z2-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 02-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Mar-24 18-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Mar-24 18-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-17 40 04-Mar-24 22-Apr-24 22-Apr-24, CIVIL-SEG-J-Z02-17


JAH-Z2-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-18 40 21-Mar-24 09-May-24 09-May-24, CIVIL-SEG-J-Z02-18


JAH-Z2-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 06-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-24 25-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-24 25-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-19 40 08-Apr-24 27-May-24 27-May-24, CIVIL-SEG-J-Z02-19


JAH-Z2-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-24 13-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Apr-24 13-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-20 40 29-Apr-24 13-Jun-24 13-Jun-24, CIVIL-SEG-J-Z02-20


JAH-Z2-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-May-24 30-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-May-24 30-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z02-21 (INTERSECTION)
(I 40 29-Feb-24 18-Apr-24 18-Apr-24, CIVIL-SEG-J-Z02-21 (INTERSECTION)
JAH-Z2-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z2-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Mar-24 02-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z2-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Mar-24 02-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z2-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Apr-24 18-Apr-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 521 27-Jan-25 17-Oct-26 17-Oct-26, ELECTRICA
POWER SYSTEM 521 27-Jan-25 17-Oct-26 17-Oct-26, POWER SYS
EARTHING SYSTEM 51 27-Jan-25 27-Mar-25 27-Mar-25, EARTHING SYSTEM
JAH-Z2-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 27-Jan-25 03-Mar-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z2-EEP-160 Earthing system Shop Drawings Review & Approval 30 20-Feb-25 27-Mar-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 51 27-Jan-25 27-Mar-25 27-Mar-25, LIGHTING SYSTEM


JAH-Z2-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 27-Jan-25 23-Feb-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z2-EEP-110 Lighting system Shop Drawings Review & Approval 25 26-Feb-25 27-Mar-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 23-Feb-25 03-Apr-25 03-Apr-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z2-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 23-Feb-25 03-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z2-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 23-Feb-25 03-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 30 06-Mar-25 15-Apr-25 15-Apr-25, SMALL POWER SYSTEM
JAH-Z2-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 06-Mar-25 15-Apr-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z2-EEP-130 Small Power system Shop Drawings Review & Approval 30 06-Mar-25 15-Apr-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 477 19-Mar-25 17-Oct-26 17-Oct-26, POWER DIS
JAH-Z2-EEP-170 Generator Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 Generator Shop Drawings Preparation & Submission

JAH-Z2-EEP-180 Generator Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 Generator Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
12 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z2-EEP-190 UPS Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 UPS Shop Drawings Preparation & Submission

JAH-Z2-EEP-200 UPS Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 UPS Shop Drawings Review & Approval

JAH-Z2-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 19-Mar-25 24-Mar-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z2-EEP-220 MDBs Shop Drawings Review & Approval 12 24-Mar-25 12-Apr-25 MDBs Shop Drawings Review & Approval

JAH-Z2-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 30-Sep-26 17-Oct-26 MCC Pannels Shop Draw

JAH-Z2-EEP-240 MCCB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 MCCB Shop Drawings Review & Approval

JAH-Z2-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z2-EEP-260 SMSB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 SMSB Shop Drawings Review & Approval

JAH-Z2-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z2-EEP-280 DB Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 DB Shop Drawings Review & Approval

JAH-Z2-EEP-290 Isolators Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 Isolators Shop Drawings Preparation & Submission

JAH-Z2-EEP-300 Isolator Shop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 Isolator Shop Drawings Review & Approval

JAH-Z2-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 25-Mar-25 03-Apr-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z2-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 03-Apr-25 12-Apr-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 95 05-May-25 27-Aug-25 27-Aug-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 68 05-May-25 27-Jul-25 27-Jul-25, FIRE ALARM SYSTEM
JAH-Z2-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 05-May-25 21-May-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z2-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 13-Jul-25 27-Jul-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 54 21-May-25 27-Jul-25 27-Jul-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE,
JAH-Z2-EEL-180 ICT System Shop Drawings Preparation & Submission 14 21-May-25 10-Jun-25 ICT System Shop Drawings Preparation & Submission

JAH-Z2-EEL-190 ICT System Shop Drawings Review & Approval 4 22-Jul-25 27-Jul-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 50 10-Jun-25 06-Aug-25 06-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z2-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 10-Jun-25 26-Jun-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z2-EEL-150 Access Control system Shop Drawings Review & Approval 12 23-Jul-25 06-Aug-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SY 36 26-Jun-25 06-Aug-25 06-Aug-25, PUBLIC ADDRESS SYSTEM
JAH-Z2-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 26-Jun-25 12-Jul-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z2-EEL-170 Public Address system Shop Drawings Review & Approval 4 02-Aug-25 06-Aug-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 31 13-Jul-25 17-Aug-25 17-Aug-25, SCADA SYSTEM


JAH-Z2-EEL-120 Scada system Shop Drawings Preparation & Submission 14 13-Jul-25 28-Jul-25 Scada system Shop Drawings Preparation & Submission

JAH-Z2-EEL-130 Scada system Shop Drawings Review & Approval 12 03-Aug-25 17-Aug-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 28-Jul-25 27-Aug-25 27-Aug-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z2-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 28-Jul-25 13-Aug-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submiss

JAH-Z2-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 13-Aug-25 27-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 88 25-May-25 07-Sep-25 07-Sep-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 60 25-May-25 05-Aug-25 05-Aug-25, FIRE FIGHTING
JAH-Z2-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 25-May-25 12-Jun-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z2-EM-110 Firefighting system Shop Drawings Review & Approval 12 22-Jul-25 05-Aug-25 Firefighting system Shop Drawings Review & Approval

HVAC 74 14-Jun-25 07-Sep-25 07-Sep-25, HVAC


JAH-Z2-EM-120 HVAC system Shop Drawings Preparation & Submission 14 14-Jun-25 29-Jun-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z2-EM-130 HVAC system Shop Drawings Review & Approval 12 24-Aug-25 07-Sep-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 29-Jun-25 29-Jul-25 29-Jul-25, PLUMBING


JAH-Z2-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 29-Jun-25 15-Jul-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z2-EM-150 Plumbing system Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Plumbing system Shop Drawings Review & Approval

CULVERT SHOP DRAWINGS


DRAWIN 628 02-Dec-23 21-Dec-25 21-Dec-25, CULVERT SHOP DRAWINGS
DRY CULVERT 628 02-Dec-23 21-Dec-25 21-Dec-25, DRY CULVERT
CIVIL SHOP DRAWINGS
DRAWING 529 02-Dec-23 26-Aug-25 26-Aug-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
13 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

D-Z2-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval

D-Z2-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission

D-Z2-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 489 16-Jan-24 26-Aug-25 26-Aug-25, CIVIL/SEGMENT WISE


DRY CULVERT-CIVIL-D-Z02-01
CULVERT-CIVIL- 40 16-Jan-24 03-Mar-24 03-Mar-24, DRY CULVERT-CIVIL-D-Z02-01
D-Z2-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-02
CULVERT-CIVIL- 40 28-Jan-24 14-Mar-24 14-Mar-24, DRY CULVERT-CIVIL-D-Z02-02
D-Z2-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Feb-24 29-Feb-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Feb-24 29-Feb-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Feb-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-03
CULVERT-CIVIL- 40 08-Feb-24 26-Mar-24 26-Mar-24, DRY CULVERT-CIVIL-D-Z02-03
D-Z2-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-04
CULVERT-CIVIL- 40 20-Feb-24 07-Apr-24 07-Apr-24, DRY CULVERT-CIVIL-D-Z02-04
D-Z2-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-05
CULVERT-CIVIL- 40 03-Mar-24 22-Apr-24 22-Apr-24, DRY CULVERT-CIVIL-D-Z02-05
D-Z2-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Mar-24 04-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Mar-24 04-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-06
CULVERT-CIVIL- 40 14-Mar-24 04-May-24 04-May-24, DRY CULVERT-CIVIL-D-Z02-06
D-Z2-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Apr-24 20-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Mar-24 20-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-07
CULVERT-CIVIL- 40 26-Mar-24 15-May-24 15-May-24, DRY CULVERT-CIVIL-D-Z02-07
D-Z2-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Apr-24 01-May-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Apr-24 01-May-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-May-24 15-May-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-08
CULVERT-CIVIL- 40 12-Jul-25 26-Aug-25 26-Aug-25, DRY CULVERT-CIVIL-D-Z02-08
D-Z2-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Jul-25 27-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Jul-25 12-Aug-25 Concrete Dimension Shop Drawings Review & Approval

D-Z2-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Jul-25 12-Aug-25 Reinforcement Shop Drawings Preparation and submission

D-Z2-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Aug-25 26-Aug-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-09
CULVERT-CIVIL- 40 30-Jun-25 14-Aug-25 14-Aug-25, DRY CULVERT-CIVIL-D-Z02-09

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
14 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Jun-25 15-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jul-25 31-Jul-25 Concrete Dimension Shop Drawings Review & Approval

D-Z2-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jul-25 31-Jul-25 Reinforcement Shop Drawings Preparation and submission

D-Z2-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Jul-25 14-Aug-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-10
CULVERT-CIVIL- 40 18-Jun-25 03-Aug-25 03-Aug-25, DRY CULVERT-CIVIL-D-Z02-10
D-Z2-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Jun-25 03-Jul-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Jul-25 20-Jul-25 Concrete Dimension Shop Drawings Review & Approval

D-Z2-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Jul-25 20-Jul-25 Reinforcement Shop Drawings Preparation and submission

D-Z2-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jul-25 03-Aug-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-11
CULVERT-CIVIL- 40 14-Dec-24 29-Jan-25 29-Jan-25, DRY CULVERT-CIVIL-D-Z02-11
D-Z2-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Dec-24 30-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jan-25 15-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z2-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Dec-24 15-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z2-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jan-25 29-Jan-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-12
CULVERT-CIVIL- 40 25-Dec-24 10-Feb-25 10-Feb-25, DRY CULVERT-CIVIL-D-Z02-12
D-Z2-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 25-Dec-24 11-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z2-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Jan-25 27-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z2-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jan-25 10-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-13
CULVERT-CIVIL- 40 29-Jul-24 14-Sep-24 14-Sep-24, DRY CULVERT-CIVIL-D-Z02-13
D-Z2-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Aug-24 31-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-14
CULVERT-CIVIL- 40 17-Jul-24 02-Sep-24 02-Sep-24, DRY CULVERT-CIVIL-D-Z02-14
D-Z2-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Aug-24 19-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-15
CULVERT-CIVIL- 40 06-Jul-24 21-Aug-24 21-Aug-24, DRY CULVERT-CIVIL-D-Z02-15
D-Z2-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-16
CULVERT-CIVIL- 40 24-Jun-24 10-Aug-24 10-Aug-24, DRY CULVERT-CIVIL-D-Z02-16
D-Z2-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Jul-24 27-Jul-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-17
CULVERT-CIVIL- 40 08-Jun-24 29-Jul-24 29-Jul-24, DRY CULVERT-CIVIL-D-Z02-17
D-Z2-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Jun-24 15-Jul-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-18
CULVERT-CIVIL- 40 27-May-24 17-Jul-24 17-Jul-24, DRY CULVERT-CIVIL-D-Z02-18
D-Z2-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
15 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jun-24 03-Jul-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Jun-24 03-Jul-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-19
CULVERT-CIVIL- 40 15-May-24 06-Jul-24 06-Jul-24, DRY CULVERT-CIVIL-D-Z02-19
D-Z2-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jun-24 22-Jun-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jun-24 22-Jun-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-20
CULVERT-CIVIL- 40 04-May-24 24-Jun-24 24-Jun-24, DRY CULVERT-CIVIL-D-Z02-20
D-Z2-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-May-24 05-Jun-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-May-24 05-Jun-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-21
CULVERT-CIVIL- 40 22-Apr-24 08-Jun-24 08-Jun-24, DRY CULVERT-CIVIL-D-Z02-21
D-Z2-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Apr-24 08-May-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-May-24 25-May-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-May-24 25-May-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-May-24 08-Jun-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z02-22
CULVERT-CIVIL- 40 07-Apr-24 27-May-24 27-May-24, DRY CULVERT-CIVIL-D-Z02-22
D-Z2-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z2-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-24 13-May-24 Concrete Dimension Shop Drawings Review & Approval

D-Z2-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Apr-24 13-May-24 Reinforcement Shop Drawings Preparation and submission

D-Z2-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DR 299 28-Dec-24 21-Dec-25 21-Dec-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 237 10-Mar-25 21-Dec-25 21-Dec-25, POWER SYSTEM
EARTHING SYSTEM 30 10-Mar-25 19-Apr-25 19-Apr-25, EARTHING SYSTEM
D-Z2-EEP-ES.150 Earthing system Shop Drawings Preparation & Submission 30 10-Mar-25 19-Apr-25 Earthing system Shop Drawings Preparation & Submission

D-Z2-EEP-ES.160 Earthing system Shop Drawings Review & Approval 30 10-Mar-25 19-Apr-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 53 25-Sep-25 26-Nov-25 26-Nov-25, LIGHTING SYSTEM


D-Z2-EEP-LS.100 Lighting system Shop Drawings Preparation & Submission 23 25-Sep-25 22-Oct-25 Lighting system Shop Drawings Preparation & Submission

D-Z2-EEP-LS.110 Lighting system Shop Drawings Review & Approval 25 28-Oct-25 26-Nov-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 38 22-Oct-25 06-Dec-25 06-Dec-25, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z2-EEP-CTCRS. Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 22-Oct-25 26-Nov-25 Cable Tray/ Cable Routing system Shop Drawings Preparatio

D-Z2-EEP-CTCRS. Cable Tray/ Cable Routing system Shop Drawings Review & Approval 25 06-Nov-25 06-Dec-25 Cable Tray/ Cable Routing system Shop Drawings Review &

SMALL POWER SYS


SYSTEM 30 22-Oct-25 26-Nov-25 26-Nov-25, SMALL POWER SYSTEM
D-Z2-EEP-SPS.120 Small Power system Shop Drawings Preparation & Submission 30 22-Oct-25 26-Nov-25 Small Power system Shop Drawings Preparation & Submissi

D-Z2-EEP-SPS.130 Small Power system Shop Drawings Review & Approval 30 22-Oct-25 26-Nov-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 32 13-Nov-25 21-Dec-25 21-Dec-25, POWER DISTRIBUTION
D-Z2-EEP-PD.100 Generator Shop Drawings Preparation & Submission 4 13-Nov-25 18-Nov-25 Generator Shop Drawings Preparation & Submission

D-Z2-EEP-PD.110 UPS Shop Drawings Preparation & Submission 4 13-Nov-25 18-Nov-25 UPS Shop Drawings Preparation & Submission

D-Z2-EEP-PD.120 MDBs Pannels Shop Drawings Preparation & Submission 4 22-Nov-25 26-Nov-25 MDBs Pannels Shop Drawings Preparation & Submission

D-Z2-EEP-PD.130 MCC Pannels Shop Drawings Preparation & Submission 4 30-Nov-25 04-Dec-25 MCC Pannels Shop Drawings Preparation & Submission

D-Z2-EEP-PD.140 SMSB Pannels Shop Drawings Preparation & Submission 4 22-Nov-25 26-Nov-25 SMSB Pannels Shop Drawings Preparation & Submission

D-Z2-EEP-PD.150 DB Pannels Shop Drawings Preparation & Submission 4 08-Dec-25 13-Dec-25 DB Pannels Shop Drawings Preparation & Submission

D-Z2-EEP-PD.160 Isolators Shop Drawings Preparation & Submission 4 30-Nov-25 04-Dec-25 Isolators Shop Drawings Preparation & Submission

D-Z2-EEP-PD.170 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 08-Dec-25 13-Dec-25 LCP /ELC Pannels Shop Drawings Preparation & Submiss

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
16 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z2-EEP-PD.180 Generator Shop Drawings Review & Approval 7 18-Nov-25 26-Nov-25 Generator Shop Drawings Review & Approval

D-Z2-EEP-PD.190 UPS Shop Drawings Review & Approval 7 18-Nov-25 26-Nov-25 UPS Shop Drawings Review & Approval

D-Z2-EEP-PD.200 MDBs Shop Drawings Review & Approval 7 26-Nov-25 04-Dec-25 MDBs Shop Drawings Review & Approval

D-Z2-EEP-PD.210 MCCB Shop Drawings Review & Approval 7 04-Dec-25 13-Dec-25 MCCB Shop Drawings Review & Approval

D-Z2-EEP-PD.220 SMSB Shop Drawings Review & Approval 7 26-Nov-25 04-Dec-25 SMSB Shop Drawings Review & Approval

D-Z2-EEP-PD.230 DB Shop Drawings Review & Approval 7 13-Dec-25 21-Dec-25 DB Shop Drawings Review & Approval

D-Z2-EEP-PD.240 Isolator Shop Drawings Review & Approval 7 04-Dec-25 13-Dec-25 Isolator Shop Drawings Review & Approval

D-Z2-EEP-PD.250 LCP / ELC PannelsShop Drawings Review & Approval 7 13-Dec-25 21-Dec-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYST 95 28-Dec-24 22-Apr-25 22-Apr-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM
SYSTE 77 28-Dec-24 27-Mar-25 27-Mar-25, FIRE ALARM SYSTEM
D-Z2-EEL-FAS.100 Fire Alarm system Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 Fire Alarm system Shop Drawings Preparation & Submission

D-Z2-EEL-FAS.110 Fire Alarm system Shop Drawings Review & Approval 12 13-Mar-25 27-Mar-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA) 63 13-Jan-25 27-Mar-25 27-Mar-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
D-Z2-EEL-ICTS.18 ICT System Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 ICT System Shop Drawings Preparation & Submission

D-Z2-EEL-ICTS.19 ICT System Shop Drawings Review & Approval 4 23-Mar-25 27-Mar-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


S 59 29-Jan-25 12-Apr-25 12-Apr-25, ACCESS CONTROL SYSTEM
D-Z2-EEL-ACS.14 Access Control system Shop Drawings Preparation & Submission 14 29-Jan-25 15-Feb-25 Access Control system Shop Drawings Preparation & Submission

D-Z2-EEL-ACS.15 Access Control system Shop Drawings Review & Approval 12 24-Mar-25 12-Apr-25 Access Control system Shop Drawings Review & Approval

RODDENT REPPELE
REPPELENT SYSTEM 45 15-Feb-25 12-Apr-25 12-Apr-25, RODDENT REPPELENT SYSTEM
D-Z2-EEL-RRS.160 Roddent Repplent system Shop Drawings Preparation & Submission 14 15-Feb-25 02-Mar-25 Roddent Repplent system Shop Drawings Preparation & Submission

D-Z2-EEL-RRS.170 Roddent Repplent system Shop Drawings Review & Approval 4 07-Apr-25 12-Apr-25 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 40 03-Mar-25 22-Apr-25 22-Apr-25, SCADA SYSTEM


D-Z2-EEL-SCADA Scada system Shop Drawings Preparation & Submission 14 03-Mar-25 18-Mar-25 Scada system Shop Drawings Preparation & Submission

D-Z2-EEL-SCADA Scada system Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 18-Mar-25 22-Apr-25 22-Apr-25, RADIO RE- BROADCOASTING/ TETRA
D-Z2-EEL-RRBT.2 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

D-Z2-EEL-RRBT.2 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


D 79 27-Jun-24 29-Sep-24 29-Sep-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 58 27-Jun-24 03-Sep-24 03-Sep-24, FIRE FIGHTING
D-Z2-EM-FF.100 Firefighting system Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 Firefighting system Shop Drawings Preparation & Submission

D-Z2-EM-FF.110 Firefighting system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Firefighting system Shop Drawings Review & Approval

HVAC 65 14-Jul-24 29-Sep-24 29-Sep-24, HVAC


D-Z2-EM-HVAC.12 HVAC system Shop Drawings Preparation & Submission 14 14-Jul-24 30-Jul-24 HVAC system Shop Drawings Preparation & Submission

D-Z2-EM-HVAC.13 HVAC system Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 30-Jul-24 29-Aug-24 29-Aug-24, PLUMBING


D-Z2-EM-PB.140 Plumbing system Shop Drawings Preparation & Submission 14 30-Jul-24 15-Aug-24 Plumbing system Shop Drawings Preparation & Submission

D-Z2-EM-PB.150 Plumbing system Shop Drawings Review & Approval 12 15-Aug-24 29-Aug-24 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 829 23-Aug-22 A 13-Jul-25 13-Jul-25, WET UTILITIES


POTABLE WATER NETWORK
NETW 17 25-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK
JAH-ENG-Z2-WC-PW Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-PW Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 18-Mar-25 24-Apr-25 24-Apr-25, IRRIGATION NETWORK


JAH-ENG-Z2-WC-IR Plan and Profile Shop Drawing Review & Approval 14 08-Apr-25 24-Apr-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 18-Mar-25 08-Apr-25 Plan and Profile Shop Drawing Prepration &Submission

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 293 23-Aug-22 A 22-Mar-25 22-Mar-25, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z2-WC-GD Plan and Profile Shop Drawing Review & Approval 289 27-Aug-22 A 22-Mar-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-GD Plan and Profile Shop Drawing Prepration &Submission 293 23-Aug-22 A 22-Mar-25 Plan and Profile Shop Drawing Prepration &Submission

CHILLED WATER SUPPLY


SUPPL & RETURN NETWORK 28 17-Feb-25 22-Mar-25 22-Mar-25, CHILLED WATER SUPPLY & RETURN NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
17 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-Z2-WC-CW Plan and Profile Shop Drawing Review & Approval 14 05-Mar-25 22-Mar-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 17-Feb-25 05-Mar-25 Plan and Profile Shop Drawing Prepration &Submission

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 21-Apr-25 24-May-25 24-May-25, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z2-WC-AW Plan and Profile Shop Drawing Review & Approval 14 07-May-25 24-May-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 21-Apr-25 07-May-25 Plan and Profile Shop Drawing Prepration &Submission

DRAINAGE NET WORK 28 11-Jun-25 13-Jul-25 13-Jul-25, DRAINAGE NET WORK


JAH-ENG-Z2-WC-D. Plan and Profile Shop Drawing Review & Approval 14 26-Jun-25 13-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 11-Jun-25 26-Jun-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 96 19-Feb-25 19-Jun-25 19-Jun-25, DRY UTILITIES


ZONE 2 31 19-Feb-25 27-Mar-25 27-Mar-25, ZONE 2
POWER 31 19-Feb-25 27-Mar-25 27-Mar-25, POWER
JAH-Z2-DU-EN-PW Prepare and submit power system shopdrawings 20 19-Feb-25 15-Mar-25 Prepare and submit power system shopdrawings

JAH-Z2-DU-EN-PW Review and approval power system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power system shopdrawings

LOW CURRENT 31 19-Feb-25 27-Mar-25 27-Mar-25, LOW CURRENT


Traffic Management System
S 31 19-Feb-25 27-Mar-25 27-Mar-25, Traffic Management System
JAH-Z2-DU-EN-TM Prepare and submit fire detection & alarm system shopdrawings 20 19-Feb-25 15-Mar-25 Prepare and submit fire detection & alarm system shopdrawings

JAH-Z2-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power fire detection & alarm system shopdrawings

D9-1/D9-2 96 19-Feb-25 19-Jun-25 19-Jun-25, D9-1/D9-2


POWER 31 11-May-25 19-Jun-25 19-Jun-25, POWER
JAH-Z7-DU-EN-PW Prepare and submit power system shopdrawings 20 11-May-25 03-Jun-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PW Review and approval power system shopdrawings 11 03-Jun-25 19-Jun-25 Review and approval power system shopdrawings

LOW CURRENT 31 19-Feb-25 27-Mar-25 27-Mar-25, LOW CURRENT


Traffic Management System
S 31 19-Feb-25 27-Mar-25 27-Mar-25, Traffic Management System
JAH-Z7-DU-EN-TM Prepare and submit fire detection & alarm system shopdrawings 20 19-Feb-25 15-Mar-25 Prepare and submit fire detection & alarm system shopdrawings

JAH-Z7-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 15-Mar-25 27-Mar-25 Review and approval power fire detection & alarm system shopdrawings

ROADS 70 13-Jul-25 02-Oct-25 02-Oct-25, ROADS


JAH-ENG-Z2-R.160 Plan and Profile Shop Drawing Preparation & Submission 14 13-Jul-25 29-Jul-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z2-R.165 Plan and Profile Shop Drawing Review & Approval 14 29-Jul-25 13-Aug-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z2-R.170 Road Cross Sections Shop Drawing Preparation & Submission 14 14-Aug-25 30-Aug-25 Road Cross Sections Shop Drawing Preparation & Submission

JAH-ENG-Z2-R.175 Road Cross Sections Shop Drawing Review & Approval 14 15-Sep-25 02-Oct-25 Road Cross Sections Shop Drawing Review & Approval

JAH-ENG-Z2-R.180 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 30-Aug-25 15-Sep-25 Guiding Signs and Marking Shop Drawing Preparation & Submissio

JAH-ENG-Z2-R.185 Guiding Signs and Marking Shop Drawing Review & Approval 14 15-Sep-25 02-Oct-25 Guiding Signs and Marking Shop Drawing Review & Approval

ZONE 3 - FROM STA. 0+994


0+ ~ 1+274 712 20-Dec-22 A 20-Apr-25 20-Apr-25, ZONE 3 - FROM STA. 0+994 ~ 1+274
ENGINEERING 712 20-Dec-22 A 20-Apr-25 20-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 712 20-Dec-22 A 20-Apr-25 20-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 151 20-Dec-22 A 17-Jun-23 A 17-Jun-23 A, EARTH WORKS
JAH-ENG-Z3-EX.765 Cross Section Shop Drawing Preparation & Submission 7 20-Dec-22 A 27-Dec-22 A Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z3-EX.770 Cross Section Shop Drawing Review & Approval 4 28-Dec-22 A 01-Jan-23 A Cross Section Shop Drawing Review & Approval

JAH-ENG-Z3-SI.775 Soil Improvement Design Preparation & Submission 9 01-Jun-23 A 11-Jun-23 A Soil Improvement Design Preparation & Submission

JAH-ENG-Z3-SI.780 Soil Improvement Design Review & Approval 5 12-Jun-23 A 17-Jun-23 A Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 224 16-Feb-23 A 18-Mar-24 18-Mar-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 93 21-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 93 21-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z3-EC.100 Plan and Profile Shop Drawings Preparation & Submission 81 21-Feb-23 A 09-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z3-EC.110 Plan and Profile Shop Drawings Review & Approval 75 26-Feb-23 A 07-Dec-23 Plan and Profile Shop Drawings Review & Approval

JAH-Z3-EC.120 Builder work Shop Drawings Preparation and submission 10 10-Aug-23 A 21-Aug-23 A Builder work Shop Drawings Preparation and submission

JAH-Z3-EC.130 Builder work Shop Drawings Review & Approval 13 21-Aug-23 A 04-Sep-23 A Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 224 16-Feb-23 A 18-Mar-24 18-Mar-24, CIVIL/SEGMENT WISE


CIVIL-SEG-J-Z03-01 224 01-Jul-23 A 18-Mar-24 18-Mar-24, CIVIL-SEG-J-Z03-01
JAH-Z3-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 12 01-Jul-23 A 13-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
18 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 13-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Feb-24 05-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z3-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Mar-24 18-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-02 35 28-Jun-23 A 09-Aug-23 A 09-Aug-23 A, CIVIL-SEG-J-Z03-02


JAH-Z3-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 28-Jun-23 A 05-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-02-EC-120 Reinforcement Shop Drawings Preparation and submission 10 17-Jul-23 A 27-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-03 33 01-Jul-23 A 07-Aug-23 A 07-Aug-23 A, CIVIL-SEG-J-Z03-03


JAH-Z3-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 01-Jul-23 A 10-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 10-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-03-EC-120 Reinforcement Shop Drawings Preparation and submission 9 13-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-03-EC-130 Reinforcement Shop Drawings Review & Approval 14 23-Jul-23 A 07-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-04 35 01-Jul-23 A 09-Aug-23 A 09-Aug-23 A, CIVIL-SEG-J-Z03-04


JAH-Z3-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 01-Jul-23 A 05-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-04-EC-120 Reinforcement Shop Drawings Preparation and submission 10 15-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-04-EC-130 Reinforcement Shop Drawings Review & Approval 14 25-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-05 35 01-Jul-23 A 09-Aug-23 A 09-Aug-23 A, CIVIL-SEG-J-Z03-05


JAH-Z3-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 01-Jul-23 A 05-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 05-Jul-23 A 17-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-05-EC-120 Reinforcement Shop Drawings Preparation and submission 10 17-Jul-23 A 27-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-06 23 26-Aug-23 A 20-Sep-23 A 20-Sep-23 A, CIVIL-SEG-J-Z03-06


JAH-Z3-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 26-Aug-23 A 02-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 02-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-06-EC-120 Reinforcement Shop Drawings Preparation and submission 9 07-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-06-EC-130 Reinforcement Shop Drawings Review & Approval 4 17-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-07 74 09-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-07


JAH-Z3-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 02-Sep-23 A 11-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 11-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-07-EC-120 Reinforcement Shop Drawings Preparation and submission 61 09-Mar-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z3-07-EC-130 Reinforcement Shop Drawings Review & Approval 52 18-Mar-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-08 96 05-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-08


JAH-Z3-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 63 05-Mar-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 14-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-08-EC-120 Reinforcement Shop Drawings Preparation and submission 9 07-Aug-23 A 16-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-08-EC-130 Reinforcement Shop Drawings Review & Approval 11 16-Aug-23 A 28-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-09 111 02-Mar-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-09


JAH-Z3-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 64 02-Mar-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 12-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-09-EC-120 Reinforcement Shop Drawings Preparation and submission 9 20-Jul-23 A 30-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-09-EC-130 Reinforcement Shop Drawings Review & Approval 10 30-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-10 74 16-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-10


JAH-Z3-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 64 28-Feb-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 54 11-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
19 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-10-EC-120 Reinforcement Shop Drawings Preparation and submission 74 16-Feb-23 A 09-Dec-23 Reinforcement Shop Drawings Preparation and submission

JAH-Z3-10-EC-130 Reinforcement Shop Drawings Review & Approval 66 22-Feb-23 A 07-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-11 16 25-Jul-23 A 12-Aug-23 A 12-Aug-23 A, CIVIL-SEG-J-Z03-11


JAH-Z3-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 25-Jul-23 A 01-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-11-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Jul-23 A 01-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-11-EC-130 Reinforcement Shop Drawings Review & Approval 10 01-Aug-23 A 12-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-12 48 23-Jul-23 A 16-Sep-23 A 16-Sep-23 A, CIVIL-SEG-J-Z03-12


JAH-Z3-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 23-Jul-23 A 01-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-12-EC-120 Reinforcement Shop Drawings Preparation and submission 4 29-Aug-23 A 02-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-12-EC-130 Reinforcement Shop Drawings Review & Approval 13 02-Sep-23 A 16-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-13 74 21-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-13


JAH-Z3-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 67 21-Feb-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 57 02-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-13-EC-120 Reinforcement Shop Drawings Preparation and submission 7 02-Sep-23 A 09-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-13-EC-130 Reinforcement Shop Drawings Review & Approval 8 09-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z03-14 74 23-Feb-23 A 09-Dec-23 09-Dec-23, CIVIL-SEG-J-Z03-14


JAH-Z3-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 63 23-Feb-23 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z3-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 55 04-Mar-23 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z3-14-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Sep-23 A 11-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z3-14-EC-130 Reinforcement Shop Drawings Review & Approval 6 11-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 170 06-Aug-24 22-Feb-25 22-Feb-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 145 25-Aug-24 10-Feb-25 10-Feb-25, POWER SYSTEM
EARTHING SYSTEM 48 25-Aug-24 20-Oct-24 20-Oct-24, EARTHING SYSTEM
JAH-Z3-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 25-Aug-24 30-Sep-24 Earthing system Shop Drawings Preparation & Submission

JAH-Z3-EEP-160 Earthing system Shop Drawings Review & Approval 30 15-Sep-24 20-Oct-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 48 25-Aug-24 20-Oct-24 20-Oct-24, LIGHTING SYSTEM


JAH-Z3-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 25-Aug-24 21-Sep-24 Lighting system Shop Drawings Preparation & Submission

JAH-Z3-EEP-110 Lighting system Shop Drawings Review & Approval 25 21-Sep-24 20-Oct-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 115 30-Sep-24 10-Feb-25 10-Feb-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z3-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 4 30-Sep-24 03-Oct-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z3-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 7 03-Feb-25 10-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 30 05-Oct-24 07-Nov-24 07-Nov-24, SMALL POWER SYSTEM
JAH-Z3-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 05-Oct-24 07-Nov-24 Small Power system Shop Drawings Preparation & Submission

JAH-Z3-EEP-130 Small Power system Shop Drawings Review & Approval 30 05-Oct-24 07-Nov-24 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 11 27-Oct-24 07-Nov-24 07-Nov-24, POWER DISTRIBUTION


JAH-Z3-EEP-170 Generator Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 Generator Shop Drawings Preparation & Submission

JAH-Z3-EEP-180 Generator Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 Generator Shop Drawings Review & Approval

JAH-Z3-EEP-190 UPS Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 UPS Shop Drawings Preparation & Submission

JAH-Z3-EEP-200 UPS Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 UPS Shop Drawings Review & Approval

JAH-Z3-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z3-EEP-220 MDBs Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 MDBs Shop Drawings Review & Approval

JAH-Z3-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z3-EEP-240 MCCB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 MCCB Shop Drawings Review & Approval

JAH-Z3-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 SMSB Pannels Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
20 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z3-EEP-260 SMSB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 SMSB Shop Drawings Review & Approval

JAH-Z3-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 DB Pannels Shop Drawings Preparation & Submission

JAH-Z3-EEP-280 DB Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 DB Shop Drawings Review & Approval

JAH-Z3-EEP-290 Isolators Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 Isolators Shop Drawings Preparation & Submission

JAH-Z3-EEP-300 Isolator Shop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 Isolator Shop Drawings Review & Approval

JAH-Z3-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 27-Oct-24 31-Oct-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z3-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 31-Oct-24 07-Nov-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 170 06-Aug-24 22-Feb-25 22-Feb-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 65 06-Aug-24 22-Oct-24 22-Oct-24, FIRE ALARM SYSTEM
JAH-Z3-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z3-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 09-Oct-24 22-Oct-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 61 22-Aug-24 02-Nov-24 02-Nov-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
JAH-Z3-EEL-180 ICT System Shop Drawings Preparation & Submission 14 22-Aug-24 08-Sep-24 ICT System Shop Drawings Preparation & Submission

JAH-Z3-EEL-190 ICT System Shop Drawings Review & Approval 4 29-Oct-24 02-Nov-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 47 08-Sep-24 02-Nov-24 02-Nov-24, ACCESS CONTROL SYSTEM
JAH-Z3-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 08-Sep-24 25-Sep-24 Access Control system Shop Drawings Preparation & Submission

JAH-Z3-EEL-150 Access Control system Shop Drawings Review & Approval 12 20-Oct-24 02-Nov-24 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 33 25-Sep-24 02-Nov-24 02-Nov-24, PUBLIC ADDRESS SYSTEM
JAH-Z3-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 25-Sep-24 12-Oct-24 Public Address system Shop Drawings Preparation & Submission

JAH-Z3-EEL-170 Public Address system Shop Drawings Review & Approval 4 29-Oct-24 02-Nov-24 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 28 12-Oct-24 12-Nov-24 12-Nov-24, SCADA SYSTEM


JAH-Z3-EEL-120 Scada system Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Scada system Shop Drawings Preparation & Submission

JAH-Z3-EEL-130 Scada system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 101 28-Oct-24 22-Feb-25 22-Feb-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z3-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 28-Oct-24 12-Nov-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z3-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 09-Feb-25 22-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 54 15-Sep-24 17-Nov-24 17-Nov-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 50 15-Sep-24 12-Nov-24 12-Nov-24, FIRE FIGHTING
JAH-Z3-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 15-Sep-24 02-Oct-24 Firefighting system Shop Drawings Preparation & Submission

JAH-Z3-EM-110 Firefighting system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Firefighting system Shop Drawings Review & Approval

HVAC 36 02-Oct-24 12-Nov-24 12-Nov-24, HVAC


JAH-Z3-EM-120 HVAC system Shop Drawings Preparation & Submission 14 02-Oct-24 19-Oct-24 HVAC system Shop Drawings Preparation & Submission

JAH-Z3-EM-130 HVAC system Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 19-Oct-24 17-Nov-24 17-Nov-24, PLUMBING


JAH-Z3-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 19-Oct-24 04-Nov-24 Plumbing system Shop Drawings Preparation & Submission

JAH-Z3-EM-150 Plumbing system Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 137 15-Oct-24 23-Mar-25 23-Mar-25, WET UTILITIES


POTABLE WATER NETWORK
NETW 60 12-Dec-24 19-Feb-25 19-Feb-25, POTABLE WATER NETWORK
JAH-ENG-Z3-WC-PW Plan and Profile Shop Drawing Review & Approval 30 16-Jan-25 19-Feb-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3WC-PW Plan and Profile Shop Drawing Prepration &Submission 30 12-Dec-24 15-Jan-25 Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 17-Oct-24 18-Nov-24 18-Nov-24, IRRIGATION NETWORK


JAH-ENG-Z3-WC-IR Plan and Profile Shop Drawing Review & Approval 14 03-Nov-24 18-Nov-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 17-Oct-24 03-Nov-24 Plan and Profile Shop Drawing Prepration &Submission

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 30 15-Oct-24 18-Nov-24 18-Nov-24, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z3-WC-GD Plan and Profile Shop Drawing Review & Approval 30 15-Oct-24 18-Nov-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3WC-GD Plan and Profile Shop Drawing Prepration &Submission 30 15-Oct-24 18-Nov-24 Plan and Profile Shop Drawing Prepration &Submission

CHILLED WATER SUPPLY


SUPPL & RETURN NETWORK 28 17-Oct-24 18-Nov-24 18-Nov-24, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z3-WC-CW Plan and Profile Shop Drawing Review & Approval 14 03-Nov-24 18-Nov-24 Plan and Profile Shop Drawing Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
21 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-Z3WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 17-Oct-24 03-Nov-24 Plan and Profile Shop Drawing Prepration &Submission

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 16-Nov-24 17-Dec-24 17-Dec-24, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z3-WC-AW Plan and Profile Shop Drawing Review & Approval 14 02-Dec-24 17-Dec-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 16-Nov-24 02-Dec-24 Plan and Profile Shop Drawing Prepration &Submission

DRAINAGE NET WORK 28 19-Feb-25 23-Mar-25 23-Mar-25, DRAINAGE NET WORK


JAH-ENG-Z3-WC-D. Plan and Profile Shop Drawing Review & Approval 14 08-Mar-25 23-Mar-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 19-Feb-25 08-Mar-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 31 30-Oct-24 05-Dec-24 05-Dec-24, DRY UTILITIES


POWER 31 30-Oct-24 05-Dec-24 05-Dec-24, POWER
JAH-Z3-DU-EN-PWR Prepare and submit power system shopdrawings 20 30-Oct-24 23-Nov-24 Prepare and submit power system shopdrawings

JAH-Z3-DU-EN-PWR Review and approval power system shopdrawings 11 23-Nov-24 05-Dec-24 Review and approval power system shopdrawings

ROADS 70 25-Jan-25 20-Apr-25 20-Apr-25, ROADS


JAH-ENG-Z3-R.190 Plan and Profile Shop Drawing Preparation & Submission 14 25-Jan-25 10-Feb-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z3-R.195 Plan and Profile Shop Drawing Review & Approval 14 10-Feb-25 26-Feb-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z3-R.200 Road Cross Sections Shop Drawing Preparation & Submission 14 26-Feb-25 15-Mar-25 Road Cross Sections Shop Drawing Preparation & Submission

JAH-ENG-Z3-R.205 Road Cross Sections Shop Drawing Review & Approval 14 05-Apr-25 20-Apr-25 Road Cross Sections Shop Drawing Review & Approval

JAH-ENG-Z3-R.210 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 15-Mar-25 05-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission

JAH-ENG-Z3-R.215 Guiding Signs and Marking Shop Drawing Review & Approval 14 05-Apr-25 20-Apr-25 Guiding Signs and Marking Shop Drawing Review & Approval

ZONE 4 - FROM STA. 1+274~


1+ 1+754 1165 21-Dec-22 A 17-Oct-26 17-Oct-26, ZONE 4 - FR
ENGINEERING 1165 21-Dec-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1165 21-Dec-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 150 21-Dec-22 A 17-Jun-23 A 17-Jun-23 A, EARTH WORKS
JAH-ENG-Z4-EX.775 Cross Section Shop Drawing Preparation & Submission 10 21-Dec-22 A 01-Jan-23 A Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z4-EX.780 Cross Section Shop Drawing Review & Approval 5 01-Jan-23 A 05-Jan-23 A Cross Section Shop Drawing Review & Approval

JAH-ENG-Z4-SI.785 Soil Improvement Design Preparation & Submission 9 01-Jun-23 A 11-Jun-23 A Soil Improvement Design Preparation & Submission

JAH-ENG-Z4-SI.790 Soil Improvement Design Review & Approval 6 11-Jun-23 A 17-Jun-23 A Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 1007 01-Jul-23 A 17-Oct-26 17-Oct-26, CIVIL SHOP


CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z4-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z4-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval

JAH-Z4-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission

JAH-Z4-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 1007 01-Jul-23 A 17-Oct-26 17-Oct-26, CIVIL/SEGM


CIVIL-SEG-J-Z04-01 989 22-Jul-23 A 17-Oct-26 17-Oct-26, CIVIL-SEG-
JAH-Z4-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 22-Jul-23 A 05-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 06-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-01-EC-120 Reinforcement Shop Drawings Preparation and submission 12 13-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-J-Z04-02 989 22-Jul-23 A 17-Oct-26 17-Oct-26, CIVIL-SEG-


JAH-Z4-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 22-Jul-23 A 05-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-Aug-23 A 15-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-02-EC-120 Reinforcement Shop Drawings Preparation and submission 13 05-Sep-23 A 19-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-J-Z04-03 205 28-Aug-23 A 28-Apr-24 28-Apr-24, CIVIL-SEG-J-Z04-03


JAH-Z4-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 28-Aug-23 A 11-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 12-Sep-23 A 25-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-03-EC-120 Reinforcement Shop Drawings Preparation and submission 12 12-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Preparation and submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
22 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-04 40 20-Feb-24 07-Apr-24 07-Apr-24, CIVIL-SEG-J-Z04-04


JAH-Z4-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-05 40 03-Feb-24 20-Mar-24 20-Mar-24, CIVIL-SEG-J-Z04-05


JAH-Z4-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Feb-24 06-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-24 06-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-06 40 16-Jan-24 03-Mar-24 03-Mar-24, CIVIL-SEG-J-Z04-06


JAH-Z4-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-07 951 04-Sep-23 A 17-Oct-26 17-Oct-26, CIVIL-SEG-


JAH-Z4-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 04-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Sep-26 03-Oct-26 Concrete Dimension Shop

JAH-Z4-07-EC-120 Reinforcement Shop Drawings Preparation and submission 12 14-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-J-Z04-08 987 24-Jul-23 A 17-Oct-26 17-Oct-26, CIVIL-SEG-


JAH-Z4-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 24-Jul-23 A 07-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Aug-23 A 21-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-08-EC-120 Reinforcement Shop Drawings Preparation and submission 12 13-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-J-Z04-09 53 25-Jul-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL-SEG-J-Z04-09


JAH-Z4-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 25-Jul-23 A 08-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-09-EC-120 Reinforcement Shop Drawings Preparation and submission 13 29-Aug-23 A 12-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-09-EC-130 Reinforcement Shop Drawings Review & Approval 10 13-Sep-23 A 25-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-10 55 23-Jul-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL-SEG-J-Z04-10


JAH-Z4-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 23-Jul-23 A 06-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 07-Aug-23 A 21-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-10-EC-120 Reinforcement Shop Drawings Preparation and submission 11 31-Aug-23 A 12-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-10-EC-130 Reinforcement Shop Drawings Review & Approval 9 14-Sep-23 A 25-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-11 54 20-Jul-23 A 20-Sep-23 A 20-Sep-23 A, CIVIL-SEG-J-Z04-11


JAH-Z4-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 12 20-Jul-23 A 02-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 03-Aug-23 A 10-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-11-EC-120 Reinforcement Shop Drawings Preparation and submission 13 28-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-11-EC-130 Reinforcement Shop Drawings Review & Approval 9 11-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-12 54 20-Jul-23 A 20-Sep-23 A 20-Sep-23 A, CIVIL-SEG-J-Z04-12


JAH-Z4-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 20-Jul-23 A 03-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 03-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-12-EC-120 Reinforcement Shop Drawings Preparation and submission 13 27-Aug-23 A 10-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-12-EC-130 Reinforcement Shop Drawings Review & Approval 9 11-Sep-23 A 20-Sep-23 A Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
23 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z04-13 58 20-Jul-23 A 26-Sep-23 A 26-Sep-23 A, CIVIL-SEG-J-Z04-13
JAH-Z4-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 20-Jul-23 A 03-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 03-Aug-23 A 12-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-13-EC-120 Reinforcement Shop Drawings Preparation and submission 13 02-Sep-23 A 16-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-13-EC-130 Reinforcement Shop Drawings Review & Approval 9 16-Sep-23 A 26-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-14 105 09-Aug-23 A 10-Dec-23 10-Dec-23, CIVIL-SEG-J-Z04-14


JAH-Z4-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 09-Aug-23 A 23-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 1 23-Aug-23 A 23-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-14-EC-120 Reinforcement Shop Drawings Preparation and submission 12 10-Sep-23 A 24-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-14-EC-130 Reinforcement Shop Drawings Review & Approval 6 04-Dec-23 10-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-15 42 11-Jul-23 A 28-Aug-23 A 28-Aug-23 A, CIVIL-SEG-J-Z04-15


JAH-Z4-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 14-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 1 28-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-15-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-15-EC-130 Reinforcement Shop Drawings Review & Approval 7 25-Jul-23 A 01-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-16 21 25-Jul-23 A 17-Aug-23 A 17-Aug-23 A, CIVIL-SEG-J-Z04-16


JAH-Z4-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 25-Jul-23 A 08-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-16-EC-120 Reinforcement Shop Drawings Preparation and submission 13 26-Jul-23 A 09-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-16-EC-130 Reinforcement Shop Drawings Review & Approval 8 09-Aug-23 A 17-Aug-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-17 143 02-Jul-23 A 16-Dec-23 16-Dec-23, CIVIL-SEG-J-Z04-17


JAH-Z4-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 13-Jul-23 A 27-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Dec-23 16-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-17-EC-120 Reinforcement Shop Drawings Preparation and submission 13 02-Jul-23 A 16-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-17-EC-130 Reinforcement Shop Drawings Review & Approval 8 17-Jul-23 A 25-Jul-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-18 25 01-Jul-23 A 29-Jul-23 A 29-Jul-23 A, CIVIL-SEG-J-Z04-18


JAH-Z4-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 01-Jul-23 A 15-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 16-Jul-23 A 25-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-18-EC-120 Reinforcement Shop Drawings Preparation and submission 13 04-Jul-23 A 18-Jul-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z4-18-EC-130 Reinforcement Shop Drawings Review & Approval 9 19-Jul-23 A 29-Jul-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-19 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL-SEG-J-Z04-19


JAH-Z4-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-20 40 19-Dec-23 03-Feb-24 03-Feb-24, CIVIL-SEG-J-Z04-20


JAH-Z4-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-21 40 06-Jan-24 20-Feb-24 20-Feb-24, CIVIL-SEG-J-Z04-21


JAH-Z4-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jan-24 21-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-24 06-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-24 06-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-24 20-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-22 40 23-Jan-24 09-Mar-24 09-Mar-24, CIVIL-SEG-J-Z04-22

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
24 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-24 07-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Feb-24 24-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-23 40 10-Feb-24 26-Mar-24 26-Mar-24, CIVIL-SEG-J-Z04-23


JAH-Z4-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z04-24 40 19-Dec-23 03-Feb-24 03-Feb-24, CIVIL-SEG-J-Z04-24


JAH-Z4-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z4-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z4-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z4-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 481 16-Mar-25 17-Oct-26 17-Oct-26, ELECTRICA
POWER SYSTEM 461 13-Apr-25 17-Oct-26 17-Oct-26, POWER SYS
EARTHING SYSTEM 48 13-Apr-25 10-Jun-25 10-Jun-25, EARTHING SYSTEM
JAH-Z4-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 13-Apr-25 18-May-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z4-EEP-160 Earthing system Shop Drawings Review & Approval 30 04-May-25 10-Jun-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 48 13-Apr-25 10-Jun-25 10-Jun-25, LIGHTING SYSTEM


JAH-Z4-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 13-Apr-25 10-May-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z4-EEP-110 Lighting system Shop Drawings Review & Approval 25 10-May-25 10-Jun-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 18-May-25 24-Jun-25 24-Jun-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z4-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 18-May-25 24-Jun-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z4-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 18-May-25 24-Jun-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 30 22-May-25 29-Jun-25 29-Jun-25, SMALL POWER SYSTEM
JAH-Z4-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 22-May-25 29-Jun-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z4-EEP-130 Small Power system Shop Drawings Review & Approval 30 22-May-25 29-Jun-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 408 17-Jun-25 17-Oct-26 17-Oct-26, POWER DIS


JAH-Z4-EEP-170 Generator Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 Generator Shop Drawings Preparation & Submission

JAH-Z4-EEP-180 Generator Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 Generator Shop Drawings Review & Approval

JAH-Z4-EEP-190 UPS Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 UPS Shop Drawings Preparation & Submission

JAH-Z4-EEP-200 UPS Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 UPS Shop Drawings Review & Approval

JAH-Z4-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 30-Sep-26 17-Oct-26 MDBs Pannels Shop Dr

JAH-Z4-EEP-220 MDBs Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 MDBs Shop Drawings Review & Approval

JAH-Z4-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z4-EEP-240 MCCB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 MCCB Shop Drawings Review & Approval

JAH-Z4-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z4-EEP-260 SMSB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 SMSB Shop Drawings Review & Approval

JAH-Z4-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z4-EEP-280 DB Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 DB Shop Drawings Review & Approval

JAH-Z4-EEP-290 Isolators Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 Isolators Shop Drawings Preparation & Submission

JAH-Z4-EEP-300 Isolator Shop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 Isolator Shop Drawings Review & Approval

JAH-Z4-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 17-Jun-25 22-Jun-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z4-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 22-Jun-25 29-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 16-Mar-25 13-Jul-25 13-Jul-25, LOW CURRENT SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
25 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
FIRE ALARM SYSTEM 77 16-Mar-25 22-Jun-25 22-Jun-25, FIRE ALARM SYSTEM
JAH-Z4-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z4-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 09-Jun-25 22-Jun-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 72 06-Apr-25 02-Jul-25 02-Jul-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP
JAH-Z4-EEL-180 ICT System Shop Drawings Preparation & Submission 14 06-Apr-25 22-Apr-25 ICT System Shop Drawings Preparation & Submission

JAH-Z4-EEL-190 ICT System Shop Drawings Review & Approval 4 29-Jun-25 02-Jul-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 59 22-Apr-25 02-Jul-25 02-Jul-25, ACCESS CONTROL SYSTEM
JAH-Z4-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 22-Apr-25 08-May-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z4-EEL-150 Access Control system Shop Drawings Review & Approval 12 19-Jun-25 02-Jul-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 45 08-May-25 02-Jul-25 02-Jul-25, PUBLIC ADDRESS SYSTEM
JAH-Z4-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 08-May-25 25-May-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z4-EEL-170 Public Address system Shop Drawings Review & Approval 4 29-Jun-25 02-Jul-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 31 25-May-25 02-Jul-25 02-Jul-25, SCADA SYSTEM


JAH-Z4-EEL-120 Scada system Shop Drawings Preparation & Submission 14 25-May-25 14-Jun-25 Scada system Shop Drawings Preparation & Submission

JAH-Z4-EEL-130 Scada system Shop Drawings Review & Approval 12 19-Jun-25 02-Jul-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 14-Jun-25 13-Jul-25 13-Jul-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z4-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 14-Jun-25 30-Jun-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z4-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 30-Jun-25 13-Jul-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 65 11-May-25 28-Jul-25 28-Jul-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 65 11-May-25 28-Jul-25 28-Jul-25, FIRE FIGHTING
JAH-Z4-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z4-EM-110 Firefighting system Shop Drawings Review & Approval 12 15-Jul-25 28-Jul-25 Firefighting system Shop Drawings Review & Approval

HVAC 34 27-May-25 08-Jul-25 08-Jul-25, HVAC


JAH-Z4-EM-120 HVAC system Shop Drawings Preparation & Submission 14 27-May-25 16-Jun-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z4-EM-130 HVAC system Shop Drawings Review & Approval 12 25-Jun-25 08-Jul-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 16-Jun-25 15-Jul-25 15-Jul-25, PLUMBING


JAH-Z4-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 16-Jun-25 02-Jul-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z4-EM-150 Plumbing system Shop Drawings Review & Approval 12 02-Jul-25 15-Jul-25 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 154 02-Jun-25 02-Dec-25 02-Dec-25, WET UTILITIES


POTABLE WATER NETWORK
NETW 18 19-Jun-25 09-Jul-25 09-Jul-25, POTABLE WATER NETWORK
JAH-ENG-Z4-WC-PW Plan and Profile Shop Drawing Review & Approval 11 28-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-PW Plan and Profile Shop Drawing Prepration &Submission 7 19-Jun-25 28-Jun-25 Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 04-Jun-25 09-Jul-25 09-Jul-25, IRRIGATION NETWORK


JAH-ENG-Z4-WC-IR Plan and Profile Shop Drawing Review & Approval 14 24-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 30 02-Jun-25 09-Jul-25 09-Jul-25, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z4-WC-GD Plan and Profile Shop Drawing Review & Approval 30 02-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-GD Plan and Profile Shop Drawing Prepration &Submission 30 02-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Prepration &Submission

CHILLED WATER SUPPLY


SUPPL & RETURN NETWORK 28 04-Jun-25 09-Jul-25 09-Jul-25, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z4-WC-CW Plan and Profile Shop Drawing Review & Approval 14 24-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 04-Jun-25 09-Jul-25 09-Jul-25, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z4-WC-AW Plan and Profile Shop Drawing Review & Approval 14 24-Jun-25 09-Jul-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 04-Jun-25 24-Jun-25 Plan and Profile Shop Drawing Prepration &Submission

DRAINAGE NET WORK 28 01-Nov-25 02-Dec-25 02-Dec-25, DRAINAGE NET WORK


JAH-ENG-Z4-WC-D. Plan and Profile Shop Drawing Review & Approval 14 17-Nov-25 02-Dec-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 01-Nov-25 17-Nov-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 31 21-Jun-25 27-Jul-25 27-Jul-25, DRY UTILITIES


POWER 31 21-Jun-25 27-Jul-25 27-Jul-25, POWER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
26 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z4-DU-EN-PWR Prepare and submit power system shopdrawings 20 21-Jun-25 14-Jul-25 Prepare and submit power system shopdrawings

JAH-Z4-DU-EN-PWR Review and approval power system shopdrawings 11 14-Jul-25 27-Jul-25 Review and approval power system shopdrawings

ROADS 70 06-Oct-25 25-Dec-25 25-Dec-25, ROADS


JAH-ENG-Z4-R.220 Plan and Profile Shop Drawing Preparation & Submission 14 06-Oct-25 22-Oct-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z4-R.225 Plan and Profile Shop Drawing Review & Approval 14 22-Oct-25 08-Nov-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z4-R.230 Road Cross Sections Shop Drawing Preparation & Submission 14 08-Nov-25 24-Nov-25 Road Cross Sections Shop Drawing Preparation & Submissio

JAH-ENG-Z4-R.235 Road Cross Sections Shop Drawing Review & Approval 14 10-Dec-25 25-Dec-25 Road Cross Sections Shop Drawing Review & Approval

JAH-ENG-Z4-R.240 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 24-Nov-25 10-Dec-25 Guiding Signs and Marking Shop Drawing Preparation & S

JAH-ENG-Z4-R.245 Guiding Signs and Marking Shop Drawing Review & Approval 14 10-Dec-25 25-Dec-25 Guiding Signs and Marking Shop Drawing Review & Ap

ZONE 5 - FROM STA. 1+754


1+ ~ 2+157 763 07-May-23 A 28-Feb-26 28-Feb-26, ZONE 5 - FROM STA. 1+754 ~ 2+15
ENGINEERING 763 07-May-23 A 28-Feb-26 28-Feb-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 763 07-May-23 A 28-Feb-26 28-Feb-26, SHOP DRAWING SUBMITTAL AN
EARTH WORKS 140 07-May-23 A 12-Feb-24 12-Feb-24, EARTH WORKS
JAH-ENG-Z5-EX.785 Cross Section Shop Drawing Preparation & Submission 73 07-May-23 A 13-Jan-24 Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z5-EX.790 Cross Section Shop Drawing Review & Approval 14 13-Jan-24 28-Jan-24 Cross Section Shop Drawing Review & Approval

JAH-ENG-Z5-SH.805 Shoring Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Shoring Design Preparation & Submission

JAH-ENG-Z5-SH.810 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval

JAH-ENG-Z5-SI.795 Soil Improvement Design Preparation & Submission 14 11-Jan-24 28-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-Z5-SI.800 Soil Improvement Design Review & Approval 14 28-Jan-24 12-Feb-24 Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 321 02-Dec-23 18-Dec-24 18-Dec-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z5-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z5-EC.110 Plan and Profile Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Plan and Profile Shop Drawings Review & Approval

JAH-Z5-EC.120 Builder work Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Builder work Shop Drawings Preparation and submission

JAH-Z5-EC.130 Builder work Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 281 16-Jan-24 18-Dec-24 18-Dec-24, CIVIL/SEGMENT WISE


CIVIL-SEG-J-Z05-01 40 16-Jan-24 03-Mar-24 03-Mar-24, CIVIL-SEG-J-Z05-01
JAH-Z5-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Feb-24 18-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-24 18-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Feb-24 03-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-02 40 03-Feb-24 20-Mar-24 20-Mar-24, CIVIL-SEG-J-Z05-02


JAH-Z5-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Feb-24 06-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-24 06-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Mar-24 20-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-03 40 20-Feb-24 07-Apr-24 07-Apr-24, CIVIL-SEG-J-Z05-03


JAH-Z5-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Mar-24 24-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Mar-24 24-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-04 40 09-Mar-24 28-Apr-24 28-Apr-24, CIVIL-SEG-J-Z05-04


JAH-Z5-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Mar-24 14-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Mar-24 14-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
27 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-J-Z05-05 40 26-Mar-24 15-May-24 15-May-24, CIVIL-SEG-J-Z05-05
JAH-Z5-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Apr-24 01-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Apr-24 01-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-May-24 15-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-06 40 18-Apr-24 03-Jun-24 03-Jun-24, CIVIL-SEG-J-Z05-06


JAH-Z5-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Apr-24 04-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-07 40 06-May-24 25-Jun-24 25-Jun-24, CIVIL-SEG-J-Z05-07


JAH-Z5-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-May-24 21-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-May-24 06-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-May-24 06-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-08 40 23-May-24 13-Jul-24 13-Jul-24, CIVIL-SEG-J-Z05-08


JAH-Z5-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-May-24 08-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jun-24 29-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-09 40 10-Jun-24 30-Jul-24 30-Jul-24, CIVIL-SEG-J-Z05-09


JAH-Z5-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Jun-24 30-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jul-24 16-Jul-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-10 40 02-Jul-24 17-Aug-24 17-Aug-24, CIVIL-SEG-J-Z05-10


JAH-Z5-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Jul-24 17-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Jul-24 03-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-11 40 20-Jul-24 03-Sep-24 03-Sep-24, CIVIL-SEG-J-Z05-11


JAH-Z5-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Jul-24 04-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Aug-24 20-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Aug-24 20-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-12 40 18-Apr-24 03-Jun-24 03-Jun-24, CIVIL-SEG-J-Z05-12


JAH-Z5-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Apr-24 04-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-13 40 06-Aug-24 21-Sep-24 21-Sep-24, CIVIL-SEG-J-Z05-13


JAH-Z5-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Aug-24 21-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Aug-24 07-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-14 40 24-Aug-24 09-Oct-24 09-Oct-24, CIVIL-SEG-J-Z05-14

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
28 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z5-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Aug-24 08-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Sep-24 25-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Sep-24 25-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Sep-24 09-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-15 40 10-Sep-24 27-Oct-24 27-Oct-24, CIVIL-SEG-J-Z05-15


JAH-Z5-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Sep-24 26-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Sep-24 13-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Oct-24 27-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-16 40 29-Sep-24 13-Nov-24 13-Nov-24, CIVIL-SEG-J-Z05-16


JAH-Z5-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Sep-24 14-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Oct-24 30-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Oct-24 30-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Oct-24 13-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-17 40 16-Oct-24 01-Dec-24 01-Dec-24, CIVIL-SEG-J-Z05-17


JAH-Z5-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Oct-24 31-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 17-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Nov-24 01-Dec-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z05-18 40 03-Nov-24 18-Dec-24 18-Dec-24, CIVIL-SEG-J-Z05-18


JAH-Z5-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Nov-24 18-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z5-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Nov-24 04-Dec-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z5-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Nov-24 04-Dec-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z5-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Dec-24 18-Dec-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 104 17-Apr-25 20-Aug-25 20-Aug-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 62 29-May-25 13-Aug-25 13-Aug-25, POWER SYSTEM
EARTHING SYSTEM 50 29-May-25 30-Jul-25 30-Jul-25, EARTHING SYSTEM
JAH-Z5-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 29-May-25 07-Jul-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z5-EEP-160 Earthing system Shop Drawings Review & Approval 30 25-Jun-25 30-Jul-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 50 29-May-25 30-Jul-25 30-Jul-25, LIGHTING SYSTEM


JAH-Z5-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 29-May-25 29-Jun-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z5-EEP-110 Lighting system Shop Drawings Review & Approval 27 29-Jun-25 30-Jul-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 07-Jul-25 11-Aug-25 11-Aug-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z5-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 07-Jul-25 11-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submis

JAH-Z5-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 07-Jul-25 11-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 30 09-Jul-25 13-Aug-25 13-Aug-25, SMALL POWER SYSTEM
JAH-Z5-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 09-Jul-25 13-Aug-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z5-EEP-130 Small Power system Shop Drawings Review & Approval 30 09-Jul-25 13-Aug-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 11 23-Jul-25 05-Aug-25 05-Aug-25, POWER DISTRIBUTION


JAH-Z5-EEP-170 Generator Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 Generator Shop Drawings Preparation & Submission

JAH-Z5-EEP-180 Generator Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 Generator Shop Drawings Review & Approval

JAH-Z5-EEP-190 UPS Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 UPS Shop Drawings Preparation & Submission

JAH-Z5-EEP-200 UPS Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 UPS Shop Drawings Review & Approval

JAH-Z5-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z5-EEP-220 MDBs Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 MDBs Shop Drawings Review & Approval

JAH-Z5-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 MCC Pannels Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
29 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z5-EEP-240 MCCB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 MCCB Shop Drawings Review & Approval

JAH-Z5-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z5-EEP-260 SMSB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 SMSB Shop Drawings Review & Approval

JAH-Z5-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z5-EEP-280 DB Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 DB Shop Drawings Review & Approval

JAH-Z5-EEP-290 Isolators Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 Isolators Shop Drawings Preparation & Submission

JAH-Z5-EEP-300 Isolator Shop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 Isolator Shop Drawings Review & Approval

JAH-Z5-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 23-Jul-25 28-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z5-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 28-Jul-25 05-Aug-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 104 17-Apr-25 20-Aug-25 20-Aug-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 95 17-Apr-25 10-Aug-25 10-Aug-25, FIRE ALARM SYSTEM
JAH-Z5-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 17-Apr-25 03-May-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z5-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 90 04-May-25 20-Aug-25 20-Aug-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHON
JAH-Z5-EEL-180 ICT System Shop Drawings Preparation & Submission 14 04-May-25 19-May-25 ICT System Shop Drawings Preparation & Submission

JAH-Z5-EEL-190 ICT System Shop Drawings Review & Approval 4 16-Aug-25 20-Aug-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 77 19-May-25 20-Aug-25 20-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z5-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-May-25 04-Jun-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z5-EEL-150 Access Control system Shop Drawings Review & Approval 12 06-Aug-25 20-Aug-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 63 04-Jun-25 20-Aug-25 20-Aug-25, PUBLIC ADDRESS SYSTEM
JAH-Z5-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 04-Jun-25 24-Jun-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z5-EEL-170 Public Address system Shop Drawings Review & Approval 4 16-Aug-25 20-Aug-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 49 24-Jun-25 20-Aug-25 20-Aug-25, SCADA SYSTEM


JAH-Z5-EEL-120 Scada system Shop Drawings Preparation & Submission 14 24-Jun-25 10-Jul-25 Scada system Shop Drawings Preparation & Submission

JAH-Z5-EEL-130 Scada system Shop Drawings Review & Approval 12 06-Aug-25 20-Aug-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 10-Jul-25 10-Aug-25 10-Aug-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z5-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 10-Jul-25 27-Jul-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submissio

JAH-Z5-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 79 20-May-25 24-Aug-25 24-Aug-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 75 20-May-25 19-Aug-25 19-Aug-25, FIRE FIGHTING
JAH-Z5-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 20-May-25 09-Jun-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z5-EM-110 Firefighting system Shop Drawings Review & Approval 12 05-Aug-25 19-Aug-25 Firefighting system Shop Drawings Review & Approval

HVAC 65 09-Jun-25 24-Aug-25 24-Aug-25, HVAC


JAH-Z5-EM-120 HVAC system Shop Drawings Preparation & Submission 14 09-Jun-25 25-Jun-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z5-EM-130 HVAC system Shop Drawings Review & Approval 12 10-Aug-25 24-Aug-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 25-Jun-25 26-Jul-25 26-Jul-25, PLUMBING


JAH-Z5-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 25-Jun-25 12-Jul-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z5-EM-150 Plumbing system Shop Drawings Review & Approval 12 12-Jul-25 26-Jul-25 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 113 12-Jul-25 22-Nov-25 22-Nov-25, WET UTILITIES


POTABLE WATER NETWORK
NETW 28 17-Jul-25 19-Aug-25 19-Aug-25, POTABLE WATER NETWORK
JAH-ENG-Z5-WC-PW Plan and Profile Shop Drawing Review & Approval 14 03-Aug-25 19-Aug-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-PW Plan and Profile Shop Drawing Prepration &Submission 14 17-Jul-25 03-Aug-25 Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 12-Jul-25 13-Aug-25 13-Aug-25, IRRIGATION NETWORK


JAH-ENG-Z5-WC-IR Plan and Profile Shop Drawing Review & Approval 14 28-Jul-25 13-Aug-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 12-Jul-25 28-Jul-25 Plan and Profile Shop Drawing Prepration &Submission

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 28 20-Oct-25 22-Nov-25 22-Nov-25, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z5-WC-GD Plan and Profile Shop Drawing Review & Approval 14 05-Nov-25 22-Nov-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-GD Plan and Profile Shop Drawing Prepration &Submission 14 20-Oct-25 05-Nov-25 Plan and Profile Shop Drawing Prepration &Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
30 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CHILLED WATER SUPPLY
SUPPL & RETURN NETWORK 28 16-Aug-25 17-Sep-25 17-Sep-25, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z5-WC-CW Plan and Profile Shop Drawing Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 16-Aug-25 01-Sep-25 Plan and Profile Shop Drawing Prepration &Submission

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 16-Aug-25 17-Sep-25 17-Sep-25, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z5-WC-AW Plan and Profile Shop Drawing Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 16-Aug-25 01-Sep-25 Plan and Profile Shop Drawing Prepration &Submission

DRAINAGE NET WORK 28 20-Oct-25 22-Nov-25 22-Nov-25, DRAINAGE NET WORK


JAH-ENG-Z5-WC-D. Plan and Profile Shop Drawing Review & Approval 14 05-Nov-25 22-Nov-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 20-Oct-25 05-Nov-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 34 31-Jul-25 09-Sep-25 09-Sep-25, DRY UTILITIES


POWER 31 31-Jul-25 06-Sep-25 06-Sep-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 31-Jul-25 24-Aug-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 24-Aug-25 06-Sep-25 Review and approval power system shopdrawings

LOW CURRENT 31 04-Aug-25 09-Sep-25 09-Sep-25, LOW CURRENT


Traffic Management System
Sy 31 04-Aug-25 09-Sep-25 09-Sep-25, Traffic Management System
JAH-Z7-DU-EN-TM Prepare and submit fire detection & alarm system shopdrawings 20 04-Aug-25 27-Aug-25 Prepare and submit fire detection & alarm system shopdrawings

JAH-Z7-DU-EN-TM Review and approval power fire detection & alarm system shopdrawings 11 27-Aug-25 09-Sep-25 Review and approval power fire detection & alarm system shopdrawin

ROADS 70 08-Dec-25 28-Feb-26 28-Feb-26, ROADS


JAH-ENG-Z5-R.250 Plan and Profile Shop Drawing Preparation & Submission 14 08-Dec-25 24-Dec-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z5-R.255 Plan and Profile Shop Drawing Review & Approval 14 24-Dec-25 10-Jan-26 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z5-R.260 Road Cross Sections Shop Drawing Preparation & Submission 14 10-Jan-26 26-Jan-26 Road Cross Sections Shop Drawing Preparation & Su

JAH-ENG-Z5-R.265 Road Cross Sections Shop Drawing Review & Approval 14 11-Feb-26 28-Feb-26 Road Cross Sections Shop Drawing Review & Ap

JAH-ENG-Z5-R.270 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 26-Jan-26 11-Feb-26 Guiding Signs and Marking Shop Drawing Preparati

JAH-ENG-Z5-R.275 Guiding Signs and Marking Shop Drawing Review & Approval 14 11-Feb-26 28-Feb-26 Guiding Signs and Marking Shop Drawing Review

ZONE 6 - FROM STA. 2+157


2+ ~ 3+029 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, ZONE 6 - FR
ENGINEERING 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1287 01-Aug-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 257 19-Oct-22 A 21-Aug-23 A 21-Aug-23 A, EARTH WORKS
JAH-ENG-Z6-EX.795 Cross Section Shop Drawing Preparation & Submission 5 19-Oct-22 A 24-Oct-22 A Cross Section Shop Drawing Preparation & Submission

JAH-ENG-Z6-EX.800 Cross Section Shop Drawing Review & Approval 7 25-Oct-22 A 01-Nov-22 A Cross Section Shop Drawing Review & Approval

JAH-ENG-Z6-SH.815 Shoring Design Preparation & Submission 24 27-Apr-23 A 24-May-23 A Shoring Design Preparation & Submission

JAH-ENG-Z6-SH.820 Shoring Design Review & Approval 25 09-May-23 A 06-Jun-23 A Shoring Design Review & Approval

JAH-ENG-Z6-SI.805 Soil Improvement Design Preparation & Submission 129 04-Mar-23 A 07-Aug-23 A Soil Improvement Design Preparation & Submission

JAH-ENG-Z6-SI.810 Soil Improvement Design Review & Approval 129 18-Mar-23 A 21-Aug-23 A Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 626 01-Aug-22 A 17-Aug-24 17-Aug-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 437 01-Aug-22 A 31-Dec-23 31-Dec-23, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 437 01-Aug-22 A 31-Dec-23 31-Dec-23, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z6-EC.100 Plan and Profile Shop Drawings Preparation & Submission 326 01-Aug-22 A 22-Aug-23 A Plan and Profile Shop Drawings Preparation & Submission

JAH-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 19 14-Aug-22 A 04-Sep-22 A Plan and Profile Shop Drawings Review & Approval

JAH-Z6-EC.120 Builder work Shop Drawings Preparation and submission 14 02-Dec-23 17-Dec-23 Builder work Shop Drawings Preparation and submission

JAH-Z6-EC.130 Builder work Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 190 31-Dec-23 17-Aug-24 17-Aug-24, CIVIL/SEGMENT WISE


CIVIL-SEG-J-Z06-01 40 31-Dec-23 15-Feb-24 15-Feb-24, CIVIL-SEG-J-Z06-01
JAH-Z6-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-23 16-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-02 40 17-Jan-24 04-Mar-24 04-Mar-24, CIVIL-SEG-J-Z06-02


JAH-Z6-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jan-24 03-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
31 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-24 19-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-24 04-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-03 40 04-Feb-24 21-Mar-24 21-Mar-24, CIVIL-SEG-J-Z06-03


JAH-Z6-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-04 40 21-Feb-24 08-Apr-24 08-Apr-24, CIVIL-SEG-J-Z06-04


JAH-Z6-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Feb-24 09-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Mar-24 25-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-05 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL-SEG-J-Z06-05


JAH-Z6-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-06 40 31-Dec-23 15-Feb-24 15-Feb-24, CIVIL-SEG-J-Z06-06


JAH-Z6-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-23 16-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-07 40 17-Jan-24 04-Mar-24 04-Mar-24, CIVIL-SEG-J-Z06-07


JAH-Z6-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jan-24 03-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-24 19-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-24 19-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-24 04-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-08 40 04-Feb-24 21-Mar-24 21-Mar-24, CIVIL-SEG-J-Z06-08


JAH-Z6-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-09 40 21-Feb-24 08-Apr-24 08-Apr-24, CIVIL-SEG-J-Z06-09


JAH-Z6-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Feb-24 09-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Mar-24 25-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-10 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL-SEG-J-Z06-10


JAH-Z6-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-11 40 27-Mar-24 16-May-24 16-May-24, CIVIL-SEG-J-Z06-11


JAH-Z6-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Apr-24 02-May-24 Concrete Dimension Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
32 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Apr-24 02-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-May-24 16-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-12 40 17-Apr-24 03-Jun-24 03-Jun-24, CIVIL-SEG-J-Z06-12


JAH-Z6-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-13 40 05-May-24 25-Jun-24 25-Jun-24, CIVIL-SEG-J-Z06-13


JAH-Z6-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-May-24 06-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-May-24 06-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-14 40 22-May-24 13-Jul-24 13-Jul-24, CIVIL-SEG-J-Z06-14


JAH-Z6-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-May-24 08-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Jun-24 29-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Jun-24 29-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-15 40 09-Jun-24 30-Jul-24 30-Jul-24, CIVIL-SEG-J-Z06-15


JAH-Z6-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Jun-24 30-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Jul-24 16-Jul-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Jun-24 16-Jul-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-J-Z06-16 40 01-Jul-24 17-Aug-24 17-Aug-24, CIVIL-SEG-J-Z06-16


JAH-Z6-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jul-24 03-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 188 09-Nov-24 24-Jun-25 24-Jun-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 188 09-Nov-24 24-Jun-25 24-Jun-25, POWER SYSTEM
EARTHING SYSTEM 30 09-Nov-24 14-Dec-24 14-Dec-24, EARTHING SYSTEM
JAH-Z6-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 09-Nov-24 14-Dec-24 Earthing system Shop Drawings Preparation & Submission

JAH-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 30 09-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 48 09-Feb-25 10-Apr-25 10-Apr-25, LIGHTING SYSTEM


JAH-Z6-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 09-Feb-25 08-Mar-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 25 08-Mar-25 10-Apr-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 11-Mar-25 20-Apr-25 20-Apr-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 11-Mar-25 20-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 11-Mar-25 20-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 30 11-Mar-25 20-Apr-25 20-Apr-25, SMALL POWER SYSTEM
JAH-Z6-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 11-Mar-25 20-Apr-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 30 11-Mar-25 20-Apr-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 52 21-Apr-25 24-Jun-25 24-Jun-25, POWER DISTRIBUTION


JAH-Z6-EEP-170 Generator Shop Drawings Preparation & Submission 4 21-Apr-25 26-Apr-25 Generator Shop Drawings Preparation & Submission

JAH-Z6-EEP-180 Generator Shop Drawings Review & Approval 7 26-Apr-25 04-May-25 Generator Shop Drawings Review & Approval

JAH-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 4 29-Apr-25 04-May-25 UPS Shop Drawings Preparation & Submission

JAH-Z6-EEP-200 UPS Shop Drawings Review & Approval 7 04-May-25 12-May-25 UPS Shop Drawings Review & Approval

JAH-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 05-May-25 10-May-25 MDBs Pannels Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
33 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z6-EEP-220 MDBs Shop Drawings Review & Approval 7 10-May-25 18-May-25 MDBs Shop Drawings Review & Approval

JAH-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 13-May-25 18-May-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z6-EEP-240 MCCB Shop Drawings Review & Approval 7 18-May-25 26-May-25 MCCB Shop Drawings Review & Approval

JAH-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 21-May-25 26-May-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z6-EEP-260 SMSB Shop Drawings Review & Approval 7 26-May-25 03-Jun-25 SMSB Shop Drawings Review & Approval

JAH-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 27-May-25 01-Jun-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z6-EEP-280 DB Shop Drawings Review & Approval 7 01-Jun-25 12-Jun-25 DB Shop Drawings Review & Approval

JAH-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 4 02-Jun-25 10-Jun-25 Isolators Shop Drawings Preparation & Submission

JAH-Z6-EEP-300 Isolator Shop Drawings Review & Approval 7 10-Jun-25 18-Jun-25 Isolator Shop Drawings Review & Approval

JAH-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 11-Jun-25 16-Jun-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 16-Jun-25 24-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 05-Jan-25 30-Apr-25 30-Apr-25, LOW CURRENT SYSTEM


FIRE ALARM SYSTEM 86 05-Jan-25 20-Apr-25 20-Apr-25, FIRE ALARM SYSTEM
JAH-Z6-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 05-Jan-25 21-Jan-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 06-Apr-25 20-Apr-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 81 21-Jan-25 30-Apr-25 30-Apr-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA
JAH-Z6-EEL-180 ICT System Shop Drawings Preparation & Submission 14 21-Jan-25 05-Feb-25 ICT System Shop Drawings Preparation & Submission

JAH-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 26-Apr-25 30-Apr-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 68 06-Feb-25 30-Apr-25 30-Apr-25, ACCESS CONTROL SYSTEM
JAH-Z6-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 06-Feb-25 22-Feb-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 54 22-Feb-25 30-Apr-25 30-Apr-25, PUBLIC ADDRESS SYSTEM
JAH-Z6-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 22-Feb-25 10-Mar-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z6-EEL-170 Public Address system Shop Drawings Review & Approval 4 26-Apr-25 30-Apr-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 40 10-Mar-25 30-Apr-25 30-Apr-25, SCADA SYSTEM


JAH-Z6-EEL-120 Scada system Shop Drawings Preparation & Submission 14 10-Mar-25 26-Mar-25 Scada system Shop Drawings Preparation & Submission

JAH-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 26-Mar-25 30-Apr-25 30-Apr-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z6-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 26-Mar-25 16-Apr-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 60 26-Mar-25 12-Jun-25 12-Jun-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 26 26-Mar-25 30-Apr-25 30-Apr-25, FIRE FIGHTING
JAH-Z6-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 26-Mar-25 16-Apr-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 16-Apr-25 30-Apr-25 Firefighting system Shop Drawings Review & Approval

HVAC 34 23-Apr-25 02-Jun-25 02-Jun-25, HVAC


JAH-Z6-EM-120 HVAC system Shop Drawings Preparation & Submission 14 23-Apr-25 10-May-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 19-May-25 02-Jun-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 10-May-25 12-Jun-25 12-Jun-25, PLUMBING


JAH-Z6-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 10-May-25 26-May-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 26-May-25 12-Jun-25 Plumbing system Shop Drawings Review & Approval

WET CULVERT 1142 14-Dec-22 A 17-Oct-26 17-Oct-26, WET CULVE


CIVIL SHOP DRAWINGS 1142 14-Dec-22 A 17-Oct-26 17-Oct-26, CIVIL SHOP
CIVIL/ ZONE WISE 250 14-Dec-22 A 20-Jan-24 20-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 250 14-Dec-22 A 20-Jan-24 20-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
W-Z6-EC.100 Plan and Profile Shop Drawings Preparation & Submission 61 31-Jan-23 A 11-Apr-23 A Plan and Profile Shop Drawings Preparation & Submission

W-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 170 05-Feb-23 A 28-Aug-23 A Plan and Profile Shop Drawings Review & Approval

W-Z6-EC.120 Builder work Shop Drawings Preparation and submission 86 20-Nov-23 A 20-Jan-24 Builder work Shop Drawings Preparation and submission

W-Z6-EC.130 Builder work Shop Drawings Review & Approval 86 14-Dec-22 A 07-Dec-23 Builder work Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
34 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL/SEGMENT WISE 1142 17-Jan-23 A 17-Oct-26 17-Oct-26, CIVIL/SEGM
WET CULVERT-CIVIL-W-Z06-01
CULVERT-CIVIL- 40 11-Mar-24 29-Apr-24 29-Apr-24, WET CULVERT-CIVIL-W-Z06-01
W-Z6-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Mar-24 27-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

W-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-02
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-02
W-Z6-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 7 10-May-23 A 17-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 8 17-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-03
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-03
W-Z6-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 30-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 7 11-May-23 A 18-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-04
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-04
W-Z6-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 29-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 16 01-May-23 A 18-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 7 18-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-05
CULVERT-CIVIL- 350 26-Apr-23 A 19-Jun-24 19-Jun-24, WET CULVERT-CIVIL-W-Z06-05
W-Z6-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 26-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 23 04-May-23 A 30-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-May-24 02-Jun-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jun-24 19-Jun-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-06
CULVERT-CIVIL- 360 26-Apr-23 A 01-Jul-24 01-Jul-24, WET CULVERT-CIVIL-W-Z06-06
W-Z6-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 26-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 04-May-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-May-24 13-Jun-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Jun-24 01-Jul-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-07
CULVERT-CIVIL- 26 21-Apr-23 A 24-May-23 A 24-May-23 A, WET CULVERT-CIVIL-W-Z06-07
W-Z6-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 21-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 30-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 6 11-May-23 A 17-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 7 17-May-23 A 24-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-08
CULVERT-CIVIL- 381 22-Apr-23 A 24-Jul-24 24-Jul-24, WET CULVERT-CIVIL-W-Z06-08
W-Z6-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 30-Apr-23 A 11-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Jun-24 11-Jul-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Jul-24 24-Jul-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-09
CULVERT-CIVIL- 78 05-Jun-23 A 06-Sep-23 A 06-Sep-23 A, WET CULVERT-CIVIL-W-Z06-09
W-Z6-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 21-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 29-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 7 05-Jun-23 A 12-Jun-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
35 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
WET CULVERT-CIVIL-W-Z06-10
CULVERT-CIVIL- 15 21-Apr-23 A 11-May-23 A 11-May-23 A, WET CULVERT-CIVIL-W-Z06-10
W-Z6-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 21-Apr-23 A 30-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 5 01-May-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 8 03-May-23 A 11-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-11
CULVERT-CIVIL- 15 22-Apr-23 A 11-May-23 A 11-May-23 A, WET CULVERT-CIVIL-W-Z06-11
W-Z6-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 30-Apr-23 A 10-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 9 02-May-23 A 11-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-12
CULVERT-CIVIL- 16 22-Apr-23 A 13-May-23 A 13-May-23 A, WET CULVERT-CIVIL-W-Z06-12
W-Z6-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 22-Apr-23 A 29-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 6 30-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 10 02-May-23 A 13-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-13
CULVERT-CIVIL- 27 22-Apr-23 A 25-May-23 A 25-May-23 A, WET CULVERT-CIVIL-W-Z06-13
W-Z6-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 22-Apr-23 A 30-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 01-May-23 A 09-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 11 10-May-23 A 22-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 4 22-May-23 A 25-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-14
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-14
W-Z6-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 7 25-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 17 02-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-15
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-15
W-Z6-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 6 26-Apr-23 A 02-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 17 02-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-16
CULVERT-CIVIL- 31 12-Apr-23 A 21-May-23 A 21-May-23 A, WET CULVERT-CIVIL-W-Z06-16
W-Z6-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 19-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 9 01-May-23 A 10-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 10 10-May-23 A 21-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-17
CULVERT-CIVIL- 1070 11-Apr-23 A 17-Oct-26 17-Oct-26, WET CULVE
W-Z6-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 4 12-Oct-26 17-Oct-26 Concrete Dimension Sho

W-Z6-17-EC-120 Reinforcement Shop Drawings Preparation and submission 8 01-May-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-17-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-18
CULVERT-CIVIL- 22 11-Apr-23 A 09-May-23 A 09-May-23 A, WET CULVERT-CIVIL-W-Z06-18
W-Z6-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 4 19-Apr-23 A 26-Apr-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-18-EC-120 Reinforcement Shop Drawings Preparation and submission 13 23-Apr-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-18-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-19
CULVERT-CIVIL- 22 11-Apr-23 A 09-May-23 A 09-May-23 A, WET CULVERT-CIVIL-W-Z06-19

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
36 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 11-Apr-23 A 18-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 5 18-Apr-23 A 26-Apr-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-19-EC-120 Reinforcement Shop Drawings Preparation and submission 11 27-Apr-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-19-EC-130 Reinforcement Shop Drawings Review & Approval 1 09-May-23 A 09-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-20
CULVERT-CIVIL- 22 12-Apr-23 A 10-May-23 A 10-May-23 A, WET CULVERT-CIVIL-W-Z06-20
W-Z6-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 12-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-20-EC-120 Reinforcement Shop Drawings Preparation and submission 5 04-May-23 A 09-May-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-20-EC-130 Reinforcement Shop Drawings Review & Approval 2 09-May-23 A 10-May-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-21
CULVERT-CIVIL- 260 11-Apr-23 A 15-Feb-24 15-Feb-24, WET CULVERT-CIVIL-W-Z06-21
W-Z6-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 11-Apr-23 A 19-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jan-24 03-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-22
CULVERT-CIVIL- 165 19-Jan-23 A 06-Aug-23 A 06-Aug-23 A, WET CULVERT-CIVIL-W-Z06-22
W-Z6-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-22-EC-120 Reinforcement Shop Drawings Preparation and submission 7 23-Jul-23 A 30-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-22-EC-130 Reinforcement Shop Drawings Review & Approval 6 31-Jul-23 A 06-Aug-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-23
CULVERT-CIVIL- 167 19-Jan-23 A 08-Aug-23 A 08-Aug-23 A, WET CULVERT-CIVIL-W-Z06-23
W-Z6-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-23-EC-120 Reinforcement Shop Drawings Preparation and submission 7 16-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-23-EC-130 Reinforcement Shop Drawings Review & Approval 14 24-Jul-23 A 08-Aug-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-24
CULVERT-CIVIL- 170 19-Jan-23 A 12-Aug-23 A 12-Aug-23 A, WET CULVERT-CIVIL-W-Z06-24
W-Z6-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-24-EC-120 Reinforcement Shop Drawings Preparation and submission 7 16-Jul-23 A 23-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-24-EC-130 Reinforcement Shop Drawings Review & Approval 18 23-Jul-23 A 12-Aug-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-25
CULVERT-CIVIL- 29 07-Aug-23 A 09-Sep-23 A 09-Sep-23 A, WET CULVERT-CIVIL-W-Z06-25
W-Z6-25-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 14-Aug-23 A 24-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 26-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-25-EC-120 Reinforcement Shop Drawings Preparation and submission 21 07-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-25-EC-130 Reinforcement Shop Drawings Review & Approval 9 30-Aug-23 A 09-Sep-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-26
CULVERT-CIVIL- 23 14-Aug-23 A 09-Sep-23 A 09-Sep-23 A, WET CULVERT-CIVIL-W-Z06-26
W-Z6-26-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 14-Aug-23 A 24-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 11 26-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-26-EC-120 Reinforcement Shop Drawings Preparation and submission 8 22-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-26-EC-130 Reinforcement Shop Drawings Review & Approval 9 30-Aug-23 A 09-Sep-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-27
CULVERT-CIVIL- 140 17-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-27
W-Z6-27-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 17-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-27-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-27-EC-120 Reinforcement Shop Drawings Preparation and submission 7 13-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-27-EC-130 Reinforcement Shop Drawings Review & Approval 11 20-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-28
CULVERT-CIVIL- 136 22-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-28
W-Z6-28-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 5 22-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
37 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-28-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-28-EC-120 Reinforcement Shop Drawings Preparation and submission 7 13-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-28-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-29
CULVERT-CIVIL- 40 01-Jan-24 15-Feb-24 15-Feb-24, WET CULVERT-CIVIL-W-Z06-29
W-Z6-29-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Jan-24 17-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-29-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z6-29-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Jan-24 03-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-29-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-30
CULVERT-CIVIL- 40 13-Jan-24 27-Feb-24 27-Feb-24, WET CULVERT-CIVIL-W-Z06-30
W-Z6-30-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Jan-24 29-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-30-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-Jan-24 14-Feb-24 Concrete Dimension Shop Drawings Review & Approval

W-Z6-30-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Jan-24 14-Feb-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-30-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Feb-24 27-Feb-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-31
CULVERT-CIVIL- 138 19-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-31
W-Z6-31-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-31-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 28-Jan-23 A 05-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-31-EC-120 Reinforcement Shop Drawings Preparation and submission 6 14-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-31-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-32
CULVERT-CIVIL- 138 19-Jan-23 A 05-Jul-23 A 05-Jul-23 A, WET CULVERT-CIVIL-W-Z06-32
W-Z6-32-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 19-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-32-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-32-EC-120 Reinforcement Shop Drawings Preparation and submission 6 14-Jun-23 A 20-Jun-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-32-EC-130 Reinforcement Shop Drawings Review & Approval 10 21-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-33
CULVERT-CIVIL- 155 18-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-33
W-Z6-33-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 18-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-33-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-33-EC-120 Reinforcement Shop Drawings Preparation and submission 7 04-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-33-EC-130 Reinforcement Shop Drawings Review & Approval 11 12-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-34
CULVERT-CIVIL- 155 18-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-34
W-Z6-34-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 18-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-34-EC-110 Concrete Dimension Shop Drawings Review & Approval 7 28-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-34-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-34-EC-130 Reinforcement Shop Drawings Review & Approval 11 12-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-35
CULVERT-CIVIL- 25 03-Jul-23 A 31-Jul-23 A 31-Jul-23 A, WET CULVERT-CIVIL-W-Z06-35
W-Z6-35-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 03-Jul-23 A 12-Jul-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-35-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 13-Jul-23 A 24-Jul-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-35-EC-120 Reinforcement Shop Drawings Preparation and submission 8 09-Jul-23 A 17-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-35-EC-130 Reinforcement Shop Drawings Review & Approval 6 25-Jul-23 A 31-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-36
CULVERT-CIVIL- 156 17-Jan-23 A 24-Jul-23 A 24-Jul-23 A, WET CULVERT-CIVIL-W-Z06-36
W-Z6-36-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 17-Jan-23 A 26-Jan-23 A Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-36-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 24-Jan-23 A 04-Feb-23 A Concrete Dimension Shop Drawings Review & Approval

W-Z6-36-EC-120 Reinforcement Shop Drawings Preparation and submission 9 02-Jul-23 A 11-Jul-23 A Reinforcement Shop Drawings Preparation and submission

W-Z6-36-EC-130 Reinforcement Shop Drawings Review & Approval 7 17-Jul-23 A 24-Jul-23 A Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-37
CULVERT-CIVIL- 40 23-Mar-24 11-May-24 11-May-24, WET CULVERT-CIVIL-W-Z06-37
W-Z6-37-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-37-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Apr-24 28-Apr-24 Concrete Dimension Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
38 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-37-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Apr-24 28-Apr-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-37-EC-130 Reinforcement Shop Drawings Review & Approval 12 28-Apr-24 11-May-24 Reinforcement Shop Drawings Review & Approval

WET CULVERT-CIVIL-W-Z06-38
CULVERT-CIVIL- 40 03-Apr-24 22-May-24 22-May-24, WET CULVERT-CIVIL-W-Z06-38
W-Z6-38-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

W-Z6-38-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Apr-24 09-May-24 Concrete Dimension Shop Drawings Review & Approval

W-Z6-38-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Apr-24 09-May-24 Reinforcement Shop Drawings Preparation and submission

W-Z6-38-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-May-24 22-May-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 173 20-May-24 14-Dec-24 14-Dec-24, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 169 25-May-24 14-Dec-24 14-Dec-24, POWER SYSTEM
EARTHING SYSTEM 169 25-May-24 14-Dec-24 14-Dec-24, EARTHING SYSTEM
W-Z6-EEP-150 Earthing system Shop Drawings Preparation & Submission 30 25-May-24 03-Jul-24 Earthing system Shop Drawings Preparation & Submission

W-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 30 09-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 48 25-May-24 23-Jul-24 23-Jul-24, LIGHTING SYSTEM


W-Z6-EEP-100 Lighting system Shop Drawings Preparation & Submission 23 25-May-24 25-Jun-24 Lighting system Shop Drawings Preparation & Submission

W-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 25 25-Jun-24 23-Jul-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 29-Jun-24 01-Aug-24 01-Aug-24, CABLE TRAY /CABLE ROUTING SYSTEM
W-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 30 29-Jun-24 01-Aug-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

W-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 30 29-Jun-24 01-Aug-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 30 10-Jul-24 13-Aug-24 13-Aug-24, SMALL POWER SYSTEM
W-Z6-EEP-120 Small Power system Shop Drawings Preparation & Submission 30 10-Jul-24 13-Aug-24 Small Power system Shop Drawings Preparation & Submission

W-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 30 10-Jul-24 13-Aug-24 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 16 21-Jul-24 07-Aug-24 07-Aug-24, POWER DISTRIBUTION
W-Z6-EEP-170 Generator Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 Generator Shop Drawings Preparation & Submission

W-Z6-EEP-180 Generator Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 Generator Shop Drawings Review & Approval

W-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 UPS Shop Drawings Preparation & Submission

W-Z6-EEP-200 UPS Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 UPS Shop Drawings Review & Approval

W-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 MDBs Pannels Shop Drawings Preparation & Submission

W-Z6-EEP-220 MDBs Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 MDBs Shop Drawings Review & Approval

W-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 MCC Pannels Shop Drawings Preparation & Submission

W-Z6-EEP-240 MCCB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 MCCB Shop Drawings Review & Approval

W-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 SMSB Pannels Shop Drawings Preparation & Submission

W-Z6-EEP-260 SMSB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 SMSB Shop Drawings Review & Approval

W-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 DB Pannels Shop Drawings Preparation & Submission

W-Z6-EEP-280 DB Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 DB Shop Drawings Review & Approval

W-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 4 21-Jul-24 25-Jul-24 Isolators Shop Drawings Preparation & Submission

W-Z6-EEP-300 Isolator Shop Drawings Review & Approval 7 25-Jul-24 01-Aug-24 Isolator Shop Drawings Review & Approval

W-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 4 27-Jul-24 31-Jul-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

W-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 7 31-Jul-24 07-Aug-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 95 20-May-24 12-Sep-24 12-Sep-24, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 59 20-May-24 01-Aug-24 01-Aug-24, FIRE ALARM SYSTEM
W-Z6-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Fire Alarm system Shop Drawings Preparation & Submission

W-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 20-Jul-24 01-Aug-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 54 05-Jun-24 12-Aug-24 12-Aug-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
W-Z6-EEL-180 ICT System Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 ICT System Shop Drawings Preparation & Submission

W-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 08-Aug-24 12-Aug-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 50 26-Jun-24 22-Aug-24 22-Aug-24, ACCESS CONTROL SYSTEM
W-Z6-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Access Control system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
39 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
W-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 10-Aug-24 22-Aug-24 Access Control system Shop Drawings Review & Approval

RODDENT REPPELENT
REPPELEN SYSTEM 27 13-Jul-24 12-Aug-24 12-Aug-24, RODDENT REPPELENT SYSTEM
W-Z6-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Roddent Repplent system Shop Drawings Preparation & Submission

W-Z6-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 08-Aug-24 12-Aug-24 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 31 29-Jul-24 02-Sep-24 02-Sep-24, SCADA SYSTEM


W-Z6-EEL-120 Scada system Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Scada system Shop Drawings Preparation & Submission

W-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 20-Aug-24 02-Sep-24 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 14-Aug-24 12-Sep-24 12-Sep-24, RADIO RE- BROADCOASTING/ TETRA
W-Z6-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 14-Aug-24 31-Aug-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

W-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 31-Aug-24 12-Sep-24 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 54 30-Jun-24 31-Aug-24 31-Aug-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 29 30-Jun-24 01-Aug-24 01-Aug-24, FIRE FIGHTING
W-Z6-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Firefighting system Shop Drawings Preparation & Submission

W-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 20-Jul-24 01-Aug-24 Firefighting system Shop Drawings Review & Approval

HVAC 36 16-Jul-24 26-Aug-24 26-Aug-24, HVAC


W-Z6-EM-120 HVAC system Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 HVAC system Shop Drawings Preparation & Submission

W-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 13-Aug-24 26-Aug-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 01-Aug-24 31-Aug-24 31-Aug-24, PLUMBING


W-Z6-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 01-Aug-24 18-Aug-24 Plumbing system Shop Drawings Preparation & Submission

W-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 18-Aug-24 31-Aug-24 Plumbing system Shop Drawings Review & Approval

DRY CULVERT 335 02-Dec-23 04-Jan-25 04-Jan-25, DRY CULVERT


CIVIL SHOP DRAWINGS 317 02-Dec-23 15-Dec-24 15-Dec-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 122 02-Dec-23 24-Apr-24 24-Apr-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 122 02-Dec-23 24-Apr-24 24-Apr-24, CIVIL / STRUCTURAL-ZONE WISE
D-Z6-EC.100 Plan and Profile Shop Drawings Preparation & Submission 10 06-Dec-23 17-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

D-Z6-EC.110 Plan and Profile Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Plan and Profile Shop Drawings Review & Approval

D-Z6-EC.120 Builder work Shop Drawings Preparation and submission 14 02-Dec-23 17-Dec-23 Builder work Shop Drawings Preparation and submission

D-Z6-EC.130 Builder work Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 292 31-Dec-23 15-Dec-24 15-Dec-24, CIVIL/SEGMENT WISE


DRY CULVERT-CIVIL-W-Z06-01
CULVERT-CIVIL-W 38 09-Mar-24 24-Apr-24 24-Apr-24, DRY CULVERT-CIVIL-W-Z06-01
D-Z6-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-02
CULVERT-CIVIL-W 38 09-Mar-24 24-Apr-24 24-Apr-24, DRY CULVERT-CIVIL-W-Z06-02
D-Z6-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-03
CULVERT-CIVIL-W 40 11-Mar-24 29-Apr-24 29-Apr-24, DRY CULVERT-CIVIL-W-Z06-03
D-Z6-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Mar-24 27-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-04
CULVERT-CIVIL-W 40 16-Mar-24 04-May-24 04-May-24, DRY CULVERT-CIVIL-W-Z06-04
D-Z6-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Mar-24 01-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Apr-24 21-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Apr-24 21-Apr-24 Reinforcement Shop Drawings Preparation and submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
40 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-05
CULVERT-CIVIL-W 40 20-Mar-24 08-May-24 08-May-24, DRY CULVERT-CIVIL-W-Z06-05
D-Z6-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-24 25-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-24 25-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Apr-24 08-May-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-06
CULVERT-CIVIL-W 40 31-Dec-23 15-Feb-24 15-Feb-24, DRY CULVERT-CIVIL-W-Z06-06
D-Z6-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-23 16-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Jan-24 01-Feb-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-24 15-Feb-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-07
CULVERT-CIVIL-W 40 11-Jan-24 27-Feb-24 27-Feb-24, DRY CULVERT-CIVIL-W-Z06-07
D-Z6-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Jan-24 28-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Jan-24 13-Feb-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Jan-24 13-Feb-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Feb-24 27-Feb-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-08
CULVERT-CIVIL-W 40 23-Jan-24 10-Mar-24 10-Mar-24, DRY CULVERT-CIVIL-W-Z06-08
D-Z6-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-24 08-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-24 25-Feb-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Feb-24 10-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-09
CULVERT-CIVIL-W 40 04-Feb-24 21-Mar-24 21-Mar-24, DRY CULVERT-CIVIL-W-Z06-09
D-Z6-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-24 07-Mar-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Feb-24 07-Mar-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-10
CULVERT-CIVIL-W 40 15-Feb-24 02-Apr-24 02-Apr-24, DRY CULVERT-CIVIL-W-Z06-10
D-Z6-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 03-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 02-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-11
CULVERT-CIVIL-W 40 27-Feb-24 17-Apr-24 17-Apr-24, DRY CULVERT-CIVIL-W-Z06-11
D-Z6-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 14-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Mar-24 31-Mar-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Mar-24 17-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-12
CULVERT-CIVIL-W 40 10-Mar-24 29-Apr-24 29-Apr-24, DRY CULVERT-CIVIL-W-Z06-12
D-Z6-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-13
CULVERT-CIVIL-W 40 21-Mar-24 11-May-24 11-May-24, DRY CULVERT-CIVIL-W-Z06-13
D-Z6-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 11-May-24 Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
41 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRY CULVERT-CIVIL-W-Z06-14
CULVERT-CIVIL-W 40 02-Apr-24 22-May-24 22-May-24, DRY CULVERT-CIVIL-W-Z06-14
D-Z6-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Apr-24 22-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Apr-24 08-May-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Apr-24 08-May-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-May-24 22-May-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-15
CULVERT-CIVIL-W 40 17-Apr-24 03-Jun-24 03-Jun-24, DRY CULVERT-CIVIL-W-Z06-15
D-Z6-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-May-24 20-May-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-May-24 20-May-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-16
CULVERT-CIVIL-W 40 06-Jul-24 21-Aug-24 21-Aug-24, DRY CULVERT-CIVIL-W-Z06-16
D-Z6-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-17
CULVERT-CIVIL-W 40 17-Jul-24 02-Sep-24 02-Sep-24, DRY CULVERT-CIVIL-W-Z06-17
D-Z6-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Aug-24 19-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-18
CULVERT-CIVIL-W 40 29-Jul-24 14-Sep-24 14-Sep-24, DRY CULVERT-CIVIL-W-Z06-18
D-Z6-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Aug-24 31-Aug-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-19
CULVERT-CIVIL-W 40 10-Aug-24 26-Sep-24 26-Sep-24, DRY CULVERT-CIVIL-W-Z06-19
D-Z6-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Aug-24 26-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Aug-24 11-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-20
CULVERT-CIVIL-W 40 21-Aug-24 08-Oct-24 08-Oct-24, DRY CULVERT-CIVIL-W-Z06-20
D-Z6-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Aug-24 07-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Sep-24 24-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Sep-24 24-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Sep-24 08-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-21
CULVERT-CIVIL-W 40 02-Sep-24 20-Oct-24 20-Oct-24, DRY CULVERT-CIVIL-W-Z06-21
D-Z6-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Sep-24 06-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Oct-24 20-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-22
CULVERT-CIVIL-W 40 03-Aug-24 18-Sep-24 18-Sep-24, DRY CULVERT-CIVIL-W-Z06-22
D-Z6-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Aug-24 04-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-23
CULVERT-CIVIL-W 40 14-Aug-24 01-Oct-24 01-Oct-24, DRY CULVERT-CIVIL-W-Z06-23

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
42 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Aug-24 31-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Aug-24 16-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-24
CULVERT-CIVIL-W 40 26-Aug-24 13-Oct-24 13-Oct-24, DRY CULVERT-CIVIL-W-Z06-24
D-Z6-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Sep-24 29-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-25
CULVERT-CIVIL-W 40 07-Sep-24 24-Oct-24 24-Oct-24, DRY CULVERT-CIVIL-W-Z06-25
D-Z6-25-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Sep-24 24-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Sep-24 10-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-25-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Sep-24 10-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-25-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Oct-24 24-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-26
CULVERT-CIVIL-W 40 18-Sep-24 05-Nov-24 05-Nov-24, DRY CULVERT-CIVIL-W-Z06-26
D-Z6-26-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Oct-24 22-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-26-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Oct-24 22-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-26-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Oct-24 05-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-27
CULVERT-CIVIL-W 40 01-Oct-24 17-Nov-24 17-Nov-24, DRY CULVERT-CIVIL-W-Z06-27
D-Z6-27-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-27-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-27-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Oct-24 03-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-27-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-28
CULVERT-CIVIL-W 40 13-Oct-24 28-Nov-24 28-Nov-24, DRY CULVERT-CIVIL-W-Z06-28
D-Z6-28-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Oct-24 29-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-28-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-Oct-24 14-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-28-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Oct-24 14-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-28-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-Nov-24 28-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-29
CULVERT-CIVIL-W 40 07-Aug-24 24-Sep-24 24-Sep-24, DRY CULVERT-CIVIL-W-Z06-29
D-Z6-29-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Aug-24 24-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-29-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Aug-24 09-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-29-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Aug-24 09-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-29-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Sep-24 24-Sep-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-30
CULVERT-CIVIL-W 40 19-Aug-24 06-Oct-24 06-Oct-24, DRY CULVERT-CIVIL-W-Z06-30
D-Z6-30-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Aug-24 04-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-30-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-30-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Sep-24 21-Sep-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-30-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-31
CULVERT-CIVIL-W 40 31-Aug-24 17-Oct-24 17-Oct-24, DRY CULVERT-CIVIL-W-Z06-31
D-Z6-31-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-31-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-31-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Sep-24 03-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-31-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-32
CULVERT-CIVIL-W 40 11-Sep-24 29-Oct-24 29-Oct-24, DRY CULVERT-CIVIL-W-Z06-32
D-Z6-32-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
43 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z6-32-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Oct-24 15-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-32-EC-120 Reinforcement Shop Drawings Preparation and submission 14 29-Sep-24 15-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-32-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Oct-24 29-Oct-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-33
CULVERT-CIVIL-W 40 24-Sep-24 10-Nov-24 10-Nov-24, DRY CULVERT-CIVIL-W-Z06-33
D-Z6-33-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Sep-24 10-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-33-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Oct-24 27-Oct-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-33-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Oct-24 27-Oct-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-33-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-34
CULVERT-CIVIL-W 40 06-Oct-24 21-Nov-24 21-Nov-24, DRY CULVERT-CIVIL-W-Z06-34
D-Z6-34-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-34-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-34-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Oct-24 07-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-34-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-35
CULVERT-CIVIL-W 40 17-Oct-24 03-Dec-24 03-Dec-24, DRY CULVERT-CIVIL-W-Z06-35
D-Z6-35-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-35-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Nov-24 19-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-35-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Nov-24 19-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-35-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-36
CULVERT-CIVIL-W 40 29-Oct-24 15-Dec-24 15-Dec-24, DRY CULVERT-CIVIL-W-Z06-36
D-Z6-36-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Oct-24 14-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-36-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Nov-24 01-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-36-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Nov-24 01-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-36-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Dec-24 15-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-37
CULVERT-CIVIL-W 40 06-Mar-24 24-Apr-24 24-Apr-24, DRY CULVERT-CIVIL-W-Z06-37
D-Z6-37-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Mar-24 23-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-37-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-37-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Mar-24 08-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-37-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-W-Z06-38
CULVERT-CIVIL-W 40 18-Mar-24 06-May-24 06-May-24, DRY CULVERT-CIVIL-W-Z06-38
D-Z6-38-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z6-38-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Apr-24 23-Apr-24 Concrete Dimension Shop Drawings Review & Approval

D-Z6-38-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Apr-24 23-Apr-24 Reinforcement Shop Drawings Preparation and submission

D-Z6-38-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Apr-24 06-May-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 232 30-Mar-24 04-Jan-25 04-Jan-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 177 15-May-24 14-Dec-24 14-Dec-24, POWER SYSTEM
EARTHING SYSTEM 177 15-May-24 14-Dec-24 14-Dec-24, EARTHING SYSTEM
D-Z6-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Earthing system Shop Drawings Preparation & Submission

D-Z6-EEP-160 Earthing system Shop Drawings Review & Approval 12 30-Nov-24 14-Dec-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 28 01-Jun-24 07-Jul-24 07-Jul-24, LIGHTING SYSTEM


D-Z6-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 Lighting system Shop Drawings Preparation & Submission

D-Z6-EEP-110 Lighting system Shop Drawings Review & Approval 12 24-Jun-24 07-Jul-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 22 22-Jun-24 16-Jul-24 16-Jul-24, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z6-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

D-Z6-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 13-Jul-24 16-Jul-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 18 08-Jul-24 28-Jul-24 28-Jul-24, SMALL POWER SYSTEM
D-Z6-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 08-Jul-24 24-Jul-24 Small Power system Shop Drawings Preparation & Submission

D-Z6-EEP-130 Small Power system Shop Drawings Review & Approval 4 24-Jul-24 28-Jul-24 Small Power system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
44 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION
DISTRIBUTIO 31 12-Jun-24 22-Jul-24 22-Jul-24, POWER DISTRIBUTION
D-Z6-EEP-170 Generator Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 Generator Shop Drawings Preparation & Submission

D-Z6-EEP-180 Generator Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Generator Shop Drawings Review & Approval

D-Z6-EEP-190 UPS Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 UPS Shop Drawings Preparation & Submission

D-Z6-EEP-200 UPS Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 UPS Shop Drawings Review & Approval

D-Z6-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 MDBs Pannels Shop Drawings Preparation & Submission

D-Z6-EEP-220 MDBs Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 MDBs Shop Drawings Review & Approval

D-Z6-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 MCC Pannels Shop Drawings Preparation & Submission

D-Z6-EEP-240 MCCB Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 MCCB Shop Drawings Review & Approval

D-Z6-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 SMSB Pannels Shop Drawings Preparation & Submission

D-Z6-EEP-260 SMSB Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 SMSB Shop Drawings Review & Approval

D-Z6-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 DB Pannels Shop Drawings Preparation & Submission

D-Z6-EEP-280 DB Shop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 DB Shop Drawings Review & Approval

D-Z6-EEP-290 Isolators Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Isolators Shop Drawings Preparation & Submission

D-Z6-EEP-300 Isolator Shop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 Isolator Shop Drawings Review & Approval

D-Z6-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 LCP /ELC Pannels Shop Drawings Preparation & Submission

D-Z6-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 09-Jul-24 22-Jul-24 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 232 30-Mar-24 04-Jan-25 04-Jan-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 86 30-Mar-24 16-Jul-24 16-Jul-24, FIRE ALARM SYSTEM
D-Z6-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 30-Mar-24 18-Apr-24 Fire Alarm system Shop Drawings Preparation & Submission

D-Z6-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 81 18-Apr-24 27-Jul-24 27-Jul-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
D-Z6-EEL-180 ICT System Shop Drawings Preparation & Submission 14 18-Apr-24 05-May-24 ICT System Shop Drawings Preparation & Submission

D-Z6-EEL-190 ICT System Shop Drawings Review & Approval 4 23-Jul-24 27-Jul-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 68 05-May-24 27-Jul-24 27-Jul-24, ACCESS CONTROL SYSTEM
D-Z6-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Access Control system Shop Drawings Preparation & Submission

D-Z6-EEL-150 Access Control system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Access Control system Shop Drawings Review & Approval

RODDENT REPPELENT
REPPELEN SYSTEM 190 21-May-24 04-Jan-25 04-Jan-25, RODDENT REPPELENT SYSTEM
D-Z6-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 21-May-24 06-Jun-24 Roddent Repplent system Shop Drawings Preparation & Submission

D-Z6-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 30-Dec-24 04-Jan-25 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 40 06-Jun-24 27-Jul-24 27-Jul-24, SCADA SYSTEM


D-Z6-EEL-120 Scada system Shop Drawings Preparation & Submission 14 06-Jun-24 27-Jun-24 Scada system Shop Drawings Preparation & Submission

D-Z6-EEL-130 Scada system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 27-Jun-24 27-Jul-24 27-Jul-24, RADIO RE- BROADCOASTING/ TETRA
D-Z6-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

D-Z6-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 54 19-Feb-24 24-Apr-24 24-Apr-24, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 46 19-Feb-24 15-Apr-24 15-Apr-24, FIRE FIGHTING
D-Z6-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 19-Feb-24 06-Mar-24 Firefighting system Shop Drawings Preparation & Submission

D-Z6-EM-110 Firefighting system Shop Drawings Review & Approval 12 30-Mar-24 15-Apr-24 Firefighting system Shop Drawings Review & Approval

HVAC 36 06-Mar-24 20-Apr-24 20-Apr-24, HVAC


D-Z6-EM-120 HVAC system Shop Drawings Preparation & Submission 14 06-Mar-24 23-Mar-24 HVAC system Shop Drawings Preparation & Submission

D-Z6-EM-130 HVAC system Shop Drawings Review & Approval 12 03-Apr-24 20-Apr-24 HVAC system Shop Drawings Review & Approval

PLUMBING 26 23-Mar-24 24-Apr-24 24-Apr-24, PLUMBING


D-Z6-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 23-Mar-24 08-Apr-24 Plumbing system Shop Drawings Preparation & Submission

D-Z6-EM-150 Plumbing system Shop Drawings Review & Approval 12 08-Apr-24 24-Apr-24 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 89 06-Mar-24 25-Jun-24 25-Jun-24, WET UTILITIES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
45 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POTABLE WATER NETWORK
NETW 28 12-Mar-24 16-Apr-24 16-Apr-24, POTABLE WATER NETWORK
JAH-ENG-Z6-WC-PW Plan and Profile Shop Drawing Review & Approval 14 28-Mar-24 16-Apr-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-PW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

IRRIGATION NETWORK 28 06-Mar-24 07-Apr-24 07-Apr-24, IRRIGATION NETWORK


JAH-ENG-Z6-WC-IR Plan and Profile Shop Drawing Review & Approval 14 23-Mar-24 07-Apr-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-IR. Plan and Profile Shop Drawing Prepration &Submission 14 06-Mar-24 23-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

GREY WATER DISTRIBUTION


DISTRIBU SYSTEM 28 06-Mar-24 07-Apr-24 07-Apr-24, GREY WATER DISTRIBUTION SYSTEM
JAH-ENG-Z6-WC-GD Plan and Profile Shop Drawing Review & Approval 14 23-Mar-24 07-Apr-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-GD Plan and Profile Shop Drawing Prepration &Submission 14 06-Mar-24 23-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

CHILLED WATER SUPPLY


SUPPL & RETURN NETWORK 28 12-Mar-24 16-Apr-24 16-Apr-24, CHILLED WATER SUPPLY & RETURN NETWORK
JAH-ENG-Z6-WC-CW Plan and Profile Shop Drawing Review & Approval 14 28-Mar-24 16-Apr-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-CW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

AUTOMATIC WASTE COLLECTION


CO NETWORK 28 12-Mar-24 16-Apr-24 16-Apr-24, AUTOMATIC WASTE COLLECTION NETWORK
JAH-ENG-Z6-WC-AW Plan and Profile Shop Drawing Review & Approval 14 28-Mar-24 16-Apr-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-AW Plan and Profile Shop Drawing Prepration &Submission 14 12-Mar-24 28-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

DRAINAGE NET WORK 28 20-May-24 25-Jun-24 25-Jun-24, DRAINAGE NET WORK


JAH-ENG-Z6-WC-D. Plan and Profile Shop Drawing Review & Approval 14 05-Jun-24 25-Jun-24 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 20-May-24 05-Jun-24 Plan and Profile Shop Drawing Prepration &Submission

DRU UTILITIES 31 26-Feb-24 02-Apr-24 02-Apr-24, DRU UTILITIES


POWER 31 26-Feb-24 02-Apr-24 02-Apr-24, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 26-Feb-24 20-Mar-24 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 20-Mar-24 02-Apr-24 Review and approval power system shopdrawings

ROADS 74 13-Feb-25 15-May-25 15-May-25, ROADS


JAH-ENG-Z6-R.280 Plan and Profile Shop Drawing Preparation & Submission 14 13-Feb-25 02-Mar-25 Plan and Profile Shop Drawing Preparation & Submission

JAH-ENG-Z6-R.285 Plan and Profile Shop Drawing Review & Approval 14 02-Mar-25 18-Mar-25 Plan and Profile Shop Drawing Review & Approval

JAH-ENG-Z6-R.290 Road Cross Sections Shop Drawing Preparation & Submission 14 18-Mar-25 08-Apr-25 Road Cross Sections Shop Drawing Preparation & Submission

JAH-ENG-Z6-R.295 Road Cross Sections Shop Drawing Review & Approval 14 08-Apr-25 24-Apr-25 Road Cross Sections Shop Drawing Review & Approval

JAH-ENG-Z6-R.300 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 13-Apr-25 29-Apr-25 Guiding Signs and Marking Shop Drawing Preparation & Submission

JAH-ENG-Z6-R.305 Guiding Signs and Marking Shop Drawing Review & Approval 14 29-Apr-25 15-May-25 Guiding Signs and Marking Shop Drawing Review & Approval

AIRPORT ROAD TUNNEL


TUNNE 734 23-May-23 A 10-Feb-26 10-Feb-26, AIRPORT ROAD TUNNEL
ZONE 7 - FROM STA. 0+040
0+ ~ 0+360 734 23-May-23 A 10-Feb-26 10-Feb-26, ZONE 7 - FROM STA. 0+040 ~ 0+360
ENGINEERING 734 23-May-23 A 10-Feb-26 10-Feb-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 734 23-May-23 A 10-Feb-26 10-Feb-26, SHOP DRAWING SUBMITTAL AND
EARTH WORKS 256 23-May-23 A 22-Jul-24 22-Jul-24, EARTH WORKS
AR-ENG-Z7-EX.805 Cross Section Shop Drawing Preparation & Submission 62 23-May-23 A 27-May-24 Cross Section Shop Drawing Preparation & Submission

AR-ENG-Z7-EX.810 Cross Section Shop Drawing Review & Approval 14 28-May-24 12-Jun-24 Cross Section Shop Drawing Review & Approval

AR-ENG-Z7-SH.825 Shoring Design Preparation & Submission 6 21-Sep-23 A 28-Sep-23 A Shoring Design Preparation & Submission

AR-ENG-Z7-SH.830 Shoring Design Review & Approval 14 02-Dec-23 17-Dec-23 Shoring Design Review & Approval

AR-ENG-Z7-SI.815 Soil Improvement Design Preparation & Submission 14 20-Jun-24 06-Jul-24 Soil Improvement Design Preparation & Submission

AR-ENG-Z7-SI.820 Soil Improvement Design Review & Approval 14 07-Jul-24 22-Jul-24 Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 394 10-Mar-24 30-Jun-25 30-Jun-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 10-Mar-24 29-Apr-24 29-Apr-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z7-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 10-Mar-24 26-Mar-24 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z7-EC.110 Plan and Profile Shop Drawings Review & Approval 12 28-Mar-24 15-Apr-24 Plan and Profile Shop Drawings Review & Approval

JAH-Z7-EC.120 Builder work Shop Drawings Preparation and submission 14 26-Mar-24 15-Apr-24 Builder work Shop Drawings Preparation and submission

JAH-Z7-EC.130 Builder work Shop Drawings Review & Approval 12 15-Apr-24 29-Apr-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 355 29-Apr-24 30-Jun-25 30-Jun-25, CIVIL/SEGMENT WISE


CIVIL-SEG-AIR-Z07-01 40 29-Apr-24 13-Jun-24 13-Jun-24, CIVIL-SEG-AIR-Z07-01

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
46 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z7-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Apr-24 15-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-May-24 30-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-May-24 30-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Jun-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-02 40 03-Sep-24 20-Oct-24 20-Oct-24, CIVIL-SEG-AIR-Z07-02


JAH-Z7-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Sep-24 19-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Sep-24 06-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Sep-24 06-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Oct-24 20-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-03 40 21-Sep-24 06-Nov-24 06-Nov-24, CIVIL-SEG-AIR-Z07-03


JAH-Z7-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Sep-24 08-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Oct-24 23-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Oct-24 23-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Oct-24 06-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-04 40 09-Oct-24 24-Nov-24 24-Nov-24, CIVIL-SEG-AIR-Z07-04


JAH-Z7-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Oct-24 26-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Oct-24 10-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Oct-24 10-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Nov-24 24-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-05 40 27-Oct-24 11-Dec-24 11-Dec-24, CIVIL-SEG-AIR-Z07-05


JAH-Z7-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Oct-24 12-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Nov-24 27-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Nov-24 27-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 28-Nov-24 11-Dec-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-06 40 13-Nov-24 29-Dec-24 29-Dec-24, CIVIL-SEG-AIR-Z07-06


JAH-Z7-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Nov-24 30-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Dec-24 15-Dec-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Nov-24 15-Dec-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Dec-24 29-Dec-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-07 40 01-Dec-24 15-Jan-25 15-Jan-25, CIVIL-SEG-AIR-Z07-07


JAH-Z7-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Dec-24 17-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-24 01-Jan-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-24 01-Jan-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-25 15-Jan-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-08 40 18-Dec-24 02-Feb-25 02-Feb-25, CIVIL-SEG-AIR-Z07-08


JAH-Z7-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Dec-24 04-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jan-25 19-Jan-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-25 02-Feb-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-09 40 05-Jan-25 19-Feb-25 19-Feb-25, CIVIL-SEG-AIR-Z07-09


JAH-Z7-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-Jan-25 21-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-25 05-Feb-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-25 05-Feb-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-25 19-Feb-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-10 40 22-Jan-25 09-Mar-25 09-Mar-25, CIVIL-SEG-AIR-Z07-10


JAH-Z7-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Jan-25 08-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
47 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z7-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-25 23-Feb-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-25 23-Feb-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-11 40 09-Feb-25 26-Mar-25 26-Mar-25, CIVIL-SEG-AIR-Z07-11


JAH-Z7-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Feb-25 25-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-25 12-Mar-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Mar-25 26-Mar-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-12 40 26-Feb-25 17-Apr-25 17-Apr-25, CIVIL-SEG-AIR-Z07-12


JAH-Z7-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Feb-25 15-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-25 03-Apr-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Mar-25 03-Apr-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Apr-25 17-Apr-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-13 40 16-Mar-25 05-May-25 05-May-25, CIVIL-SEG-AIR-Z07-13


JAH-Z7-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 08-Apr-25 21-Apr-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Apr-25 21-Apr-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Apr-25 05-May-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-14 40 07-Apr-25 22-May-25 22-May-25, CIVIL-SEG-AIR-Z07-14


JAH-Z7-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Apr-25 23-Apr-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 26-Apr-25 08-May-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Apr-25 08-May-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-May-25 22-May-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-15 40 24-Apr-25 12-Jun-25 12-Jun-25, CIVIL-SEG-AIR-Z07-15


JAH-Z7-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Apr-25 11-May-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-May-25 26-May-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-May-25 26-May-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-AIR-Z07-16 40 12-May-25 30-Jun-25 30-Jun-25, CIVIL-SEG-AIR-Z07-16


JAH-Z7-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z7-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 31-May-25 16-Jun-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z7-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-May-25 16-Jun-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z7-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Jun-25 30-Jun-25 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 95 13-May-25 04-Sep-25 04-Sep-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 66 27-May-25 14-Aug-25 14-Aug-25, POWER SYSTEM
EARTHING SYSTEM 56 27-May-25 03-Aug-25 03-Aug-25, EARTHING SYSTEM
JAH-Z7-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 27-May-25 16-Jun-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z7-EEP-160 Earthing system Shop Drawings Review & Approval 12 21-Jul-25 03-Aug-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 42 16-Jun-25 03-Aug-25 03-Aug-25, LIGHTING SYSTEM


JAH-Z7-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 16-Jun-25 02-Jul-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z7-EEP-110 Lighting system Shop Drawings Review & Approval 12 21-Jul-25 03-Aug-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 38 02-Jul-25 14-Aug-25 14-Aug-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z7-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submissio

JAH-Z7-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 18 19-Jul-25 07-Aug-25 07-Aug-25, SMALL POWER SYSTEM
JAH-Z7-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 19-Jul-25 03-Aug-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z7-EEP-130 Small Power system Shop Drawings Review & Approval 4 04-Aug-25 07-Aug-25 Small Power system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
48 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER DISTRIBUTION 26 01-Jul-25 30-Jul-25 30-Jul-25, POWER DISTRIBUTION
JAH-Z7-EEP-170 Generator Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 Generator Shop Drawings Preparation & Submission

JAH-Z7-EEP-180 Generator Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 Generator Shop Drawings Review & Approval

JAH-Z7-EEP-190 UPS Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 UPS Shop Drawings Preparation & Submission

JAH-Z7-EEP-200 UPS Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 UPS Shop Drawings Review & Approval

JAH-Z7-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z7-EEP-220 MDBs Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 MDBs Shop Drawings Review & Approval

JAH-Z7-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z7-EEP-240 MCCB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 MCCB Shop Drawings Review & Approval

JAH-Z7-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z7-EEP-260 SMSB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 SMSB Shop Drawings Review & Approval

JAH-Z7-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z7-EEP-280 DB Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 DB Shop Drawings Review & Approval

JAH-Z7-EEP-290 Isolators Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 Isolators Shop Drawings Preparation & Submission

JAH-Z7-EEP-300 Isolator Shop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 Isolator Shop Drawings Review & Approval

JAH-Z7-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 01-Jul-25 16-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z7-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 17-Jul-25 30-Jul-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 13-May-25 04-Sep-25 04-Sep-25, LOW CURRENT SYSTEM


FIRE ALARM SYSTEM 68 13-May-25 04-Aug-25 04-Aug-25, FIRE ALARM SYSTEM
JAH-Z7-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 13-May-25 29-May-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z7-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 22-Jul-25 04-Aug-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 63 29-May-25 14-Aug-25 14-Aug-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHON
JAH-Z7-EEL-180 ICT System Shop Drawings Preparation & Submission 14 29-May-25 18-Jun-25 ICT System Shop Drawings Preparation & Submission

JAH-Z7-EEL-190 ICT System Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 50 18-Jun-25 14-Aug-25 14-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z7-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 18-Jun-25 05-Jul-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z7-EEL-150 Access Control system Shop Drawings Review & Approval 12 02-Aug-25 14-Aug-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 36 05-Jul-25 14-Aug-25 14-Aug-25, PUBLIC ADDRESS SYSTEM
JAH-Z7-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 05-Jul-25 21-Jul-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z7-EEL-170 Public Address system Shop Drawings Review & Approval 4 11-Aug-25 14-Aug-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 31 21-Jul-25 25-Aug-25 25-Aug-25, SCADA SYSTEM


JAH-Z7-EEL-120 Scada system Shop Drawings Preparation & Submission 14 21-Jul-25 06-Aug-25 Scada system Shop Drawings Preparation & Submission

JAH-Z7-EEL-130 Scada system Shop Drawings Review & Approval 12 12-Aug-25 25-Aug-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 06-Aug-25 04-Sep-25 04-Sep-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z7-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 06-Aug-25 21-Aug-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submis

JAH-Z7-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 23-Aug-25 04-Sep-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 133 23-Jun-25 25-Nov-25 25-Nov-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 56 23-Jun-25 26-Aug-25 26-Aug-25, FIRE FIGHTING
JAH-Z7-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 23-Jun-25 09-Jul-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z7-EM-110 Firefighting system Shop Drawings Review & Approval 12 13-Aug-25 26-Aug-25 Firefighting system Shop Drawings Review & Approval

HVAC 26 09-Jul-25 07-Aug-25 07-Aug-25, HVAC


JAH-Z7-EM-120 HVAC system Shop Drawings Preparation & Submission 14 09-Jul-25 24-Jul-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z7-EM-130 HVAC system Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 27-Oct-25 25-Nov-25 25-Nov-25, PLUMBING


JAH-Z7-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 27-Oct-25 11-Nov-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z7-EM-150 Plumbing system Shop Drawings Review & Approval 12 12-Nov-25 25-Nov-25 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 28 30-Nov-25 31-Dec-25 31-Dec-25, WET UTILITIES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
49 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRAINAGE NET WORK 28 30-Nov-25 31-Dec-25 31-Dec-25, DRAINAGE NET WORK
AR-ENG-Z7-WC-D.1 Plan and Profile Shop Drawing Prepration &Submission 14 30-Nov-25 16-Dec-25 Plan and Profile Shop Drawing Prepration &Submission

AR-ENG-Z7-WC-D.1 Plan and Profile Shop Drawing Review & Approval 14 16-Dec-25 31-Dec-25 Plan and Profile Shop Drawing Review & Approval

DRY UTILITIES 31 20-Oct-25 25-Nov-25 25-Nov-25, DRY UTILITIES


POWER 31 20-Oct-25 25-Nov-25 25-Nov-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 20-Oct-25 12-Nov-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 12-Nov-25 25-Nov-25 Review and approval power system shopdrawings

ROADS 71 20-Nov-25 10-Feb-26 10-Feb-26, ROADS


AR-ENG-Z7-R.310 Plan and Profile Shop Drawing Preparation & Submission 14 20-Nov-25 07-Dec-25 Plan and Profile Shop Drawing Preparation & Submission

AR-ENG-Z7-R.315 Plan and Profile Shop Drawing Review & Approval 14 07-Dec-25 23-Dec-25 Plan and Profile Shop Drawing Review & Approval

AR-ENG-Z7-R.320 Road Cross Sections Shop Drawing Preparation & Submission 14 23-Dec-25 07-Jan-26 Road Cross Sections Shop Drawing Preparation & Subm

AR-ENG-Z7-R.325 Road Cross Sections Shop Drawing Review & Approval 14 08-Jan-26 24-Jan-26 Road Cross Sections Shop Drawing Review & Approv

AR-ENG-Z7-R.330 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 10-Jan-26 25-Jan-26 Guiding Signs and Marking Shop Drawing Preparation

AR-ENG-Z7-R.335 Guiding Signs and Marking Shop Drawing Review & Approval 14 26-Jan-26 10-Feb-26 Guiding Signs and Marking Shop Drawing Review &

KAAR TUNNEL (KING ABDULAZIZ


AB ROAD TUNNEL EAST) 863 25-Dec-22 A 16-Mar-26 16-Mar-26, KAAR TUNNEL (KING ABDULA
ZONE 8 - FROM STA. 0+040.13
0+ ~ 0+553 863 25-Dec-22 A 16-Mar-26 16-Mar-26, ZONE 8 - FROM STA. 0+040.13 ~
ENGINEERING 863 25-Dec-22 A 16-Mar-26 16-Mar-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 863 25-Dec-22 A 16-Mar-26 16-Mar-26, SHOP DRAWING SUBMITTAL A
EARTH WORKS 186 06-May-23 A 10-Jan-24 10-Jan-24, EARTH WORKS
KAAR-ENG-Z8-EX.81 Cross Section Shop Drawing Preparation & Submission 63 21-May-23 A 12-Dec-23 Cross Section Shop Drawing Preparation & Submission

KAAR-ENG-Z8-EX.82 Cross Section Shop Drawing Review & Approval 14 13-Dec-23 28-Dec-23 Cross Section Shop Drawing Review & Approval

KAAR-ENG-Z8-SH.83 Shoring Design Preparation & Submission 80 22-May-23 A 26-Aug-23 A Shoring Design Preparation & Submission

KAAR-ENG-Z8-SH.84 Shoring Design Review & Approval 80 05-Jun-23 A 09-Sep-23 A Shoring Design Review & Approval

KAAR-ENG-Z8-SI.825 Soil Improvement Design Preparation & Submission 73 06-May-23 A 10-Jan-24 Soil Improvement Design Preparation & Submission

KAAR-ENG-Z8-SI.830 Soil Improvement Design Review & Approval 63 15-May-23 A 10-Jan-24 Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 534 25-Dec-22 A 02-Mar-25 02-Mar-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 107 25-Dec-22 A 08-Jan-24 08-Jan-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 107 25-Dec-22 A 08-Jan-24 08-Jan-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z8-EC.100 Plan and Profile Shop Drawings Preparation & Submission 71 25-Dec-22 A 09-Dec-23 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z8-EC.110 Plan and Profile Shop Drawings Review & Approval 57 07-Jan-23 A 25-Dec-23 Plan and Profile Shop Drawings Review & Approval

JAH-Z8-EC.120 Builder work Shop Drawings Preparation and submission 14 10-Dec-23 25-Dec-23 Builder work Shop Drawings Preparation and submission

JAH-Z8-EC.130 Builder work Shop Drawings Review & Approval 12 25-Dec-23 08-Jan-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 534 05-Jun-23 A 02-Mar-25 02-Mar-25, CIVIL/SEGMENT WISE


CIVIL-SEG-KAR-Z08-01 40 08-Jan-24 24-Feb-24 24-Feb-24, CIVIL-SEG-KAR-Z08-01
JAH-Z8-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Jan-24 24-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Jan-24 10-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Jan-24 10-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-02 40 29-Jan-24 14-Mar-24 14-Mar-24, CIVIL-SEG-KAR-Z08-02


JAH-Z8-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Jan-24 14-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Feb-24 02-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Feb-24 02-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Mar-24 14-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-03 40 15-Feb-24 01-Apr-24 01-Apr-24, CIVIL-SEG-KAR-Z08-03


JAH-Z8-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Feb-24 03-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-24 19-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-24 19-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-24 01-Apr-24 Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
50 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-KAR-Z08-04 40 04-Mar-24 22-Apr-24 22-Apr-24, CIVIL-SEG-KAR-Z08-04
JAH-Z8-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Mar-24 20-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Mar-24 06-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Mar-24 06-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Apr-24 22-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-05 40 21-Mar-24 09-May-24 09-May-24, CIVIL-SEG-KAR-Z08-05


JAH-Z8-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Apr-24 27-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Apr-24 09-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-06 40 08-Apr-24 27-May-24 27-May-24, CIVIL-SEG-KAR-Z08-06


JAH-Z8-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Apr-24 28-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Apr-24 14-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Apr-24 14-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 14-May-24 27-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-07 40 29-Apr-24 13-Jun-24 13-Jun-24, CIVIL-SEG-KAR-Z08-07


JAH-Z8-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Apr-24 15-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-May-24 01-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-May-24 01-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Jun-24 13-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-08 40 08-Jan-24 24-Feb-24 24-Feb-24, CIVIL-SEG-KAR-Z08-08


JAH-Z8-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 08-Jan-24 24-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Jan-24 10-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Jan-24 10-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-09 19 05-Jun-23 A 26-Jun-23 A 26-Jun-23 A, CIVIL-SEG-KAR-Z08-09


JAH-Z8-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 7 05-Jun-23 A 12-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-09-EC-120 Reinforcement Shop Drawings Preparation and submission 7 05-Jun-23 A 12-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z8-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 12-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-10 40 05-Feb-24 21-Mar-24 21-Mar-24, CIVIL-SEG-KAR-Z08-10


JAH-Z8-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-Feb-24 21-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Feb-24 09-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Mar-24 21-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-11 40 22-Apr-24 06-Jun-24 06-Jun-24, CIVIL-SEG-KAR-Z08-11


JAH-Z8-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Apr-24 08-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-May-24 25-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-May-24 25-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-May-24 06-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-12 40 09-May-24 29-Jun-24 29-Jun-24, CIVIL-SEG-KAR-Z08-12


JAH-Z8-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-May-24 26-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-May-24 11-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-May-24 11-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Jun-24 29-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-13 40 27-May-24 16-Jul-24 16-Jul-24, CIVIL-SEG-KAR-Z08-13

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
51 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Jun-24 03-Jul-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Jun-24 03-Jul-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Jul-24 16-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-14 40 13-Jun-24 03-Aug-24 03-Aug-24, CIVIL-SEG-KAR-Z08-14


JAH-Z8-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jul-24 21-Jul-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Jul-24 03-Aug-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-15 40 06-Jul-24 20-Aug-24 20-Aug-24, CIVIL-SEG-KAR-Z08-15


JAH-Z8-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jul-24 07-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Aug-24 20-Aug-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-16 40 23-Jul-24 07-Sep-24 07-Sep-24, CIVIL-SEG-KAR-Z08-16


JAH-Z8-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Aug-24 25-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-17 40 10-Aug-24 25-Sep-24 25-Sep-24, CIVIL-SEG-KAR-Z08-17


JAH-Z8-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Aug-24 26-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Aug-24 11-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Sep-24 25-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-18 40 27-Aug-24 13-Oct-24 13-Oct-24, CIVIL-SEG-KAR-Z08-18


JAH-Z8-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Aug-24 12-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 12-Sep-24 30-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-19 40 14-Sep-24 30-Oct-24 30-Oct-24, CIVIL-SEG-KAR-Z08-19


JAH-Z8-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Oct-24 17-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Oct-24 30-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-20 40 02-Oct-24 17-Nov-24 17-Nov-24, CIVIL-SEG-KAR-Z08-20


JAH-Z8-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Oct-24 19-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Oct-24 04-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Nov-24 17-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-21 40 20-Oct-24 04-Dec-24 04-Dec-24, CIVIL-SEG-KAR-Z08-21


JAH-Z8-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Oct-24 05-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Nov-24 21-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Nov-24 04-Dec-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-22 40 06-Nov-24 22-Dec-24 22-Dec-24, CIVIL-SEG-KAR-Z08-22


JAH-Z8-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
52 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Nov-24 09-Dec-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 23-Nov-24 09-Dec-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Dec-24 22-Dec-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-23 40 24-Nov-24 08-Jan-25 08-Jan-25, CIVIL-SEG-KAR-Z08-23


JAH-Z8-23-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Nov-24 10-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-23-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Dec-24 26-Dec-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-23-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Dec-24 26-Dec-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-23-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Dec-24 08-Jan-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-24 40 11-Dec-24 26-Jan-25 26-Jan-25, CIVIL-SEG-KAR-Z08-24


JAH-Z8-24-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-24-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Dec-24 13-Jan-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-24-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Dec-24 13-Jan-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-24-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Jan-25 26-Jan-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-25 40 29-Dec-24 12-Feb-25 12-Feb-25, CIVIL-SEG-KAR-Z08-25


JAH-Z8-25-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Dec-24 14-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-25-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Jan-25 30-Jan-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-25-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Jan-25 30-Jan-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-25-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Jan-25 12-Feb-25 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-KAR-Z08-26 40 15-Jan-25 02-Mar-25 02-Mar-25, CIVIL-SEG-KAR-Z08-26


JAH-Z8-26-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Jan-25 01-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z8-26-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Feb-25 17-Feb-25 Concrete Dimension Shop Drawings Review & Approval

JAH-Z8-26-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Feb-25 17-Feb-25 Reinforcement Shop Drawings Preparation and submission

JAH-Z8-26-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Feb-25 02-Mar-25 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 174 16-Apr-25 10-Nov-25 10-Nov-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 145 21-May-25 10-Nov-25 10-Nov-25, POWER SYSTEM
EARTHING SYSTEM 145 21-May-25 10-Nov-25 10-Nov-25, EARTHING SYSTEM
JAH-Z8-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 21-May-25 10-Jun-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z8-EEP-160 Earthing system Shop Drawings Review & Approval 12 28-Oct-25 10-Nov-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 34 10-Jun-25 19-Jul-25 19-Jul-25, LIGHTING SYSTEM


JAH-Z8-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 10-Jun-25 26-Jun-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z8-EEP-110 Lighting system Shop Drawings Review & Approval 12 06-Jul-25 19-Jul-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 30 26-Jun-25 30-Jul-25 30-Jul-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z8-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 26-Jun-25 13-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submissio

JAH-Z8-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 27-Jul-25 30-Jul-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 18 13-Jul-25 02-Aug-25 02-Aug-25, SMALL POWER SYSTEM
JAH-Z8-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 13-Jul-25 29-Jul-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z8-EEP-130 Small Power system Shop Drawings Review & Approval 4 29-Jul-25 02-Aug-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 26 09-Jul-25 07-Aug-25 07-Aug-25, POWER DISTRIBUTION


JAH-Z8-EEP-170 Generator Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 Generator Shop Drawings Preparation & Submission

JAH-Z8-EEP-180 Generator Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Generator Shop Drawings Review & Approval

JAH-Z8-EEP-190 UPS Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 UPS Shop Drawings Preparation & Submission

JAH-Z8-EEP-200 UPS Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 UPS Shop Drawings Review & Approval

JAH-Z8-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z8-EEP-220 MDBs Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 MDBs Shop Drawings Review & Approval

JAH-Z8-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z8-EEP-240 MCCB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 MCCB Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
53 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z8-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z8-EEP-260 SMSB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 SMSB Shop Drawings Review & Approval

JAH-Z8-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z8-EEP-280 DB Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 DB Shop Drawings Review & Approval

JAH-Z8-EEP-290 Isolators Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 Isolators Shop Drawings Preparation & Submission

JAH-Z8-EEP-300 Isolator Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Isolator Shop Drawings Review & Approval

JAH-Z8-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z8-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 113 16-Apr-25 30-Aug-25 30-Aug-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 86 16-Apr-25 29-Jul-25 29-Jul-25, FIRE ALARM SYSTEM
JAH-Z8-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 16-Apr-25 03-May-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z8-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 16-Jul-25 29-Jul-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 81 03-May-25 09-Aug-25 09-Aug-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHON
JAH-Z8-EEL-180 ICT System Shop Drawings Preparation & Submission 14 03-May-25 19-May-25 ICT System Shop Drawings Preparation & Submission

JAH-Z8-EEL-190 ICT System Shop Drawings Review & Approval 4 05-Aug-25 09-Aug-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 77 19-May-25 19-Aug-25 19-Aug-25, ACCESS CONTROL SYSTEM
JAH-Z8-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-May-25 04-Jun-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z8-EEL-150 Access Control system Shop Drawings Review & Approval 12 06-Aug-25 19-Aug-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 72 04-Jun-25 30-Aug-25 30-Aug-25, PUBLIC ADDRESS SYSTEM
JAH-Z8-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 04-Jun-25 24-Jun-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z8-EEL-170 Public Address system Shop Drawings Review & Approval 4 26-Aug-25 30-Aug-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 49 24-Jun-25 19-Aug-25 19-Aug-25, SCADA SYSTEM


JAH-Z8-EEL-120 Scada system Shop Drawings Preparation & Submission 14 24-Jun-25 10-Jul-25 Scada system Shop Drawings Preparation & Submission

JAH-Z8-EEL-130 Scada system Shop Drawings Review & Approval 12 06-Aug-25 19-Aug-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 10-Jul-25 09-Aug-25 09-Aug-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z8-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 10-Jul-25 27-Jul-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submissio

JAH-Z8-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 27-Jul-25 09-Aug-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 153 19-Jun-25 15-Dec-25 15-Dec-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 54 19-Jun-25 20-Aug-25 20-Aug-25, FIRE FIGHTING
JAH-Z8-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 19-Jun-25 06-Jul-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z8-EM-110 Firefighting system Shop Drawings Review & Approval 12 07-Aug-25 20-Aug-25 Firefighting system Shop Drawings Review & Approval

HVAC 139 06-Jul-25 15-Dec-25 15-Dec-25, HVAC


JAH-Z8-EM-120 HVAC system Shop Drawings Preparation & Submission 14 06-Jul-25 22-Jul-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z8-EM-130 HVAC system Shop Drawings Review & Approval 12 02-Dec-25 15-Dec-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 22-Jul-25 20-Aug-25 20-Aug-25, PLUMBING


JAH-Z8-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 22-Jul-25 07-Aug-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z8-EM-150 Plumbing system Shop Drawings Review & Approval 12 07-Aug-25 20-Aug-25 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 28 02-Dec-23 02-Jan-24 02-Jan-24, WET UTILITIES


DRAINAGE NET WORK 28 02-Dec-23 02-Jan-24 02-Jan-24, DRAINAGE NET WORK
KAAR-ENG-Z8-WC- Plan and Profile Shop Drawing Prepration &Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

KAAR-ENG-Z8-WC- Plan and Profile Shop Drawing Review & Approval 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Review & Approval

DRY UTILITIES 31 29-Jul-25 03-Sep-25 03-Sep-25, DRY UTILITIES


POWER 31 29-Jul-25 03-Sep-25 03-Sep-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings (MV) 20 29-Jul-25 21-Aug-25 Prepare and submit power system shopdrawings (MV)

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings (MV) 11 21-Aug-25 03-Sep-25 Review and approval power system shopdrawings (MV)

ROADS 70 25-Dec-25 16-Mar-26 16-Mar-26, ROADS


KAAR-ENG-Z08-R.34 Plan and Profile Shop Drawing Preparation & Submission 14 25-Dec-25 11-Jan-26 Plan and Profile Shop Drawing Preparation & Submissi

KAAR-ENG-Z08-R.34 Plan and Profile Shop Drawing Review & Approval 14 11-Jan-26 27-Jan-26 Plan and Profile Shop Drawing Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
54 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
KAAR-ENG-Z08-R.35 Road Cross Sections Shop Drawing Preparation & Submission 14 27-Jan-26 12-Feb-26 Road Cross Sections Shop Drawing Preparation & S

KAAR-ENG-Z08-R.35 Road Cross Sections Shop Drawing Review & Approval 14 12-Feb-26 28-Feb-26 Road Cross Sections Shop Drawing Review & Ap

KAAR-ENG-Z08-R.36 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 12-Feb-26 01-Mar-26 Guiding Signs and Marking Shop Drawing Prepar

KAAR-ENG-Z08-R.36 Guiding Signs and Marking Shop Drawing Review & Approval 14 01-Mar-26 16-Mar-26 Guiding Signs and Marking Shop Drawing Revi

KAAR TUNNEL (KING ABDULAZIZ


AB ROAD TUNNEL WEST) 569 20-May-23 A 31-Jul-25 31-Jul-25, KAAR TUNNEL (KING ABDULAZIZ ROAD TUNNEL WE
ZONE 9 - STA. 0+040~ 0
0+301 569 20-May-23 A 31-Jul-25 31-Jul-25, ZONE 9 - STA. 0+040~ 0+301
ENGINEERING 569 20-May-23 A 31-Jul-25 31-Jul-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 569 20-May-23 A 31-Jul-25 31-Jul-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 112 20-May-23 A 28-Jan-24 28-Jan-24, EARTH WORKS
T1-ENG-Z9-EX.825 Cross Section Shop Drawing Preparation & Submission 62 20-May-23 A 13-Jan-24 Cross Section Shop Drawing Preparation & Submission

T1-ENG-Z9-EX.830 Cross Section Shop Drawing Review & Approval 14 13-Jan-24 28-Jan-24 Cross Section Shop Drawing Review & Approval

T1-ENG-Z9-SI.835 Soil Improvement Design Preparation & Submission 55 20-May-23 A 08-Jan-24 Soil Improvement Design Preparation & Submission

T1-ENG-Z9-SI.840 Soil Improvement Design Review & Approval 62 20-May-23 A 16-Jan-24 Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 233 07-Jan-24 14-Oct-24 14-Oct-24, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 07-Jan-24 22-Feb-24 22-Feb-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 40 07-Jan-24 22-Feb-24 22-Feb-24, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z9-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 07-Jan-24 23-Jan-24 Plan and Profile Shop Drawings Preparation & Submission

JAH-Z9-EC.110 Plan and Profile Shop Drawings Review & Approval 12 25-Jan-24 08-Feb-24 Plan and Profile Shop Drawings Review & Approval

JAH-Z9-EC.120 Builder work Shop Drawings Preparation and submission 14 23-Jan-24 08-Feb-24 Builder work Shop Drawings Preparation and submission

JAH-Z9-EC.130 Builder work Shop Drawings Review & Approval 12 08-Feb-24 22-Feb-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 194 22-Feb-24 14-Oct-24 14-Oct-24, CIVIL/SEGMENT WISE


CIVIL-SEG-T1-Z09-01 40 22-Feb-24 08-Apr-24 08-Apr-24, CIVIL-SEG-T1-Z09-01
JAH-Z9-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Feb-24 10-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Mar-24 26-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Mar-24 08-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-02 40 11-Mar-24 29-Apr-24 29-Apr-24, CIVIL-SEG-T1-Z09-02


JAH-Z9-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Mar-24 27-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Mar-24 16-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 16-Apr-24 29-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-03 40 28-Mar-24 16-May-24 16-May-24, CIVIL-SEG-T1-Z09-03


JAH-Z9-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Mar-24 17-Apr-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Apr-24 04-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-May-24 16-May-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-04 40 18-Apr-24 03-Jun-24 03-Jun-24, CIVIL-SEG-T1-Z09-04


JAH-Z9-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 18-Apr-24 05-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-May-24 21-May-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-May-24 21-May-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-May-24 03-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-05 40 06-May-24 25-Jun-24 25-Jun-24, CIVIL-SEG-T1-Z09-05


JAH-Z9-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-May-24 22-May-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-May-24 08-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-May-24 08-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Jun-24 25-Jun-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-06 40 23-May-24 13-Jul-24 13-Jul-24, CIVIL-SEG-T1-Z09-06

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
55 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z9-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-May-24 09-Jun-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Jun-24 30-Jun-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Jun-24 13-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-07 40 10-Jun-24 30-Jul-24 30-Jul-24, CIVIL-SEG-T1-Z09-07


JAH-Z9-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 01-Jul-24 17-Jul-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 17-Jul-24 30-Jul-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-08 40 02-Jul-24 17-Aug-24 17-Aug-24, CIVIL-SEG-T1-Z09-08


JAH-Z9-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Jul-24 04-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Aug-24 17-Aug-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-09 40 20-Jul-24 03-Sep-24 03-Sep-24, CIVIL-SEG-T1-Z09-09


JAH-Z9-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Jul-24 05-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 05-Aug-24 21-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Aug-24 03-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-10 40 06-Aug-24 21-Sep-24 21-Sep-24, CIVIL-SEG-T1-Z09-10


JAH-Z9-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Aug-24 08-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Sep-24 21-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-11 40 24-Aug-24 09-Oct-24 09-Oct-24, CIVIL-SEG-T1-Z09-11


JAH-Z9-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 24-Aug-24 09-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Sep-24 26-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Sep-24 09-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-12 40 26-Aug-24 12-Oct-24 12-Oct-24, CIVIL-SEG-T1-Z09-12


JAH-Z9-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 14-Sep-24 29-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Sep-24 29-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 29-Sep-24 12-Oct-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T1-Z09-13 40 28-Aug-24 14-Oct-24 14-Oct-24, CIVIL-SEG-T1-Z09-13


JAH-Z9-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Aug-24 14-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z9-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z9-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 14-Sep-24 01-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z9-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Oct-24 14-Oct-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 95 15-Feb-25 14-Jun-25 14-Jun-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 79 06-Mar-25 14-Jun-25 14-Jun-25, POWER SYSTEM
EARTHING SYSTEM 52 06-Mar-25 10-May-25 10-May-25, EARTHING SYSTEM
JAH-Z9-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 06-Mar-25 23-Mar-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z9-EEP-160 Earthing system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 38 23-Mar-25 10-May-25 10-May-25, LIGHTING SYSTEM


JAH-Z9-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 23-Mar-25 13-Apr-25 Lighting system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
56 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z9-EEP-110 Lighting system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 32 13-Apr-25 19-May-25 19-May-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z9-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 13-Apr-25 29-Apr-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z9-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 15-May-25 19-May-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 18 29-Apr-25 19-May-25 19-May-25, SMALL POWER SYSTEM
JAH-Z9-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 29-Apr-25 15-May-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z9-EEP-130 Small Power system Shop Drawings Review & Approval 4 15-May-25 19-May-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 45 20-Apr-25 14-Jun-25 14-Jun-25, POWER DISTRIBUTION


JAH-Z9-EEP-170 Generator Shop Drawings Preparation & Submission 14 20-Apr-25 06-May-25 Generator Shop Drawings Preparation & Submission

JAH-Z9-EEP-180 Generator Shop Drawings Review & Approval 12 06-May-25 19-May-25 Generator Shop Drawings Review & Approval

JAH-Z9-EEP-190 UPS Shop Drawings Preparation & Submission 14 28-Apr-25 14-May-25 UPS Shop Drawings Preparation & Submission

JAH-Z9-EEP-200 UPS Shop Drawings Review & Approval 12 14-May-25 27-May-25 UPS Shop Drawings Review & Approval

JAH-Z9-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 28-Apr-25 14-May-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z9-EEP-220 MDBs Shop Drawings Review & Approval 12 14-May-25 27-May-25 MDBs Shop Drawings Review & Approval

JAH-Z9-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z9-EEP-240 MCCB Shop Drawings Review & Approval 12 22-May-25 04-Jun-25 MCCB Shop Drawings Review & Approval

JAH-Z9-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z9-EEP-260 SMSB Shop Drawings Review & Approval 12 22-May-25 04-Jun-25 SMSB Shop Drawings Review & Approval

JAH-Z9-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z9-EEP-280 DB Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 DB Shop Drawings Review & Approval

JAH-Z9-EEP-290 Isolators Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 Isolators Shop Drawings Preparation & Submission

JAH-Z9-EEP-300 Isolator Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 Isolator Shop Drawings Review & Approval

JAH-Z9-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z9-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 28-May-25 14-Jun-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 15-Feb-25 14-Jun-25 14-Jun-25, LOW CURRENT SYSTEM


FIRE ALARM SYSTEM 68 15-Feb-25 10-May-25 10-May-25, FIRE ALARM SYSTEM
JAH-Z9-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 15-Feb-25 03-Mar-25 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z9-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 63 03-Mar-25 20-May-25 20-May-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DA
JAH-Z9-EEL-180 ICT System Shop Drawings Preparation & Submission 14 03-Mar-25 19-Mar-25 ICT System Shop Drawings Preparation & Submission

JAH-Z9-EEL-190 ICT System Shop Drawings Review & Approval 4 17-May-25 20-May-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 50 19-Mar-25 20-May-25 20-May-25, ACCESS CONTROL SYSTEM
JAH-Z9-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 19-Mar-25 09-Apr-25 Access Control system Shop Drawings Preparation & Submission

JAH-Z9-EEL-150 Access Control system Shop Drawings Review & Approval 12 07-May-25 20-May-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 45 09-Apr-25 31-May-25 31-May-25, PUBLIC ADDRESS SYSTEM
JAH-Z9-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 09-Apr-25 26-Apr-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z9-EEL-170 Public Address system Shop Drawings Review & Approval 4 27-May-25 31-May-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 31 26-Apr-25 31-May-25 31-May-25, SCADA SYSTEM


JAH-Z9-EEL-120 Scada system Shop Drawings Preparation & Submission 14 26-Apr-25 12-May-25 Scada system Shop Drawings Preparation & Submission

JAH-Z9-EEL-130 Scada system Shop Drawings Review & Approval 12 18-May-25 31-May-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 12-May-25 14-Jun-25 14-Jun-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z9-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 12-May-25 28-May-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z9-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 28-May-25 14-Jun-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 88 04-Mar-25 22-Jun-25 22-Jun-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 60 04-Mar-25 17-May-25 17-May-25, FIRE FIGHTING
JAH-Z9-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 04-Mar-25 20-Mar-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z9-EM-110 Firefighting system Shop Drawings Review & Approval 12 04-May-25 17-May-25 Firefighting system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
57 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
HVAC 74 20-Mar-25 22-Jun-25 22-Jun-25, HVAC
JAH-Z9-EM-120 HVAC system Shop Drawings Preparation & Submission 14 20-Mar-25 10-Apr-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z9-EM-130 HVAC system Shop Drawings Review & Approval 12 09-Jun-25 22-Jun-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 10-Apr-25 10-May-25 10-May-25, PLUMBING


JAH-Z9-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 10-Apr-25 27-Apr-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z9-EM-150 Plumbing system Shop Drawings Review & Approval 12 27-Apr-25 10-May-25 Plumbing system Shop Drawings Review & Approval

DRY CULVERT 428 02-Dec-23 27-Apr-25 27-Apr-25, DRY CULVERT


CIVIL SHOP DRAWINGS 123 13-Aug-24 05-Jan-25 05-Jan-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 13-Aug-24 30-Sep-24 30-Sep-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 40 13-Aug-24 30-Sep-24 30-Sep-24, CIVIL / STRUCTURAL-ZONE WISE
D-Z9-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 13-Aug-24 29-Aug-24 Plan and Profile Shop Drawings Preparation & Submission

D-Z9-EC.110 Plan and Profile Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Plan and Profile Shop Drawings Review & Approval

D-Z9-EC.120 Builder work Shop Drawings Preparation and submission 14 29-Aug-24 15-Sep-24 Builder work Shop Drawings Preparation and submission

D-Z9-EC.130 Builder work Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 84 30-Sep-24 05-Jan-25 05-Jan-25, CIVIL/SEGMENT WISE


DRY CULVERT-CIVIL-D-Z09-01
CULVERT-CIVIL-D 40 30-Sep-24 14-Nov-24 14-Nov-24, DRY CULVERT-CIVIL-D-Z09-01
D-Z9-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Sep-24 16-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Oct-24 02-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Oct-24 02-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Nov-24 14-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-02
CULVERT-CIVIL-D 40 12-Oct-24 26-Nov-24 26-Nov-24, DRY CULVERT-CIVIL-D-Z09-02
D-Z9-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 30-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 28-Oct-24 13-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 13-Nov-24 26-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-03
CULVERT-CIVIL-D 40 23-Oct-24 08-Dec-24 08-Dec-24, DRY CULVERT-CIVIL-D-Z09-03
D-Z9-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Oct-24 09-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 09-Nov-24 25-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 25-Nov-24 08-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-04
CULVERT-CIVIL-D 40 04-Nov-24 19-Dec-24 19-Dec-24, DRY CULVERT-CIVIL-D-Z09-04
D-Z9-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Nov-24 20-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 20-Nov-24 07-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 07-Dec-24 19-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-05
CULVERT-CIVIL-D 40 16-Nov-24 31-Dec-24 31-Dec-24, DRY CULVERT-CIVIL-D-Z09-05
D-Z9-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Nov-24 02-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Dec-24 18-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Dec-24 18-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Dec-24 31-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-06
CULVERT-CIVIL-D 40 05-Oct-24 19-Nov-24 19-Nov-24, DRY CULVERT-CIVIL-D-Z09-06
D-Z9-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Oct-24 06-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Nov-24 19-Nov-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-07
CULVERT-CIVIL-D 40 16-Oct-24 01-Dec-24 01-Dec-24, DRY CULVERT-CIVIL-D-Z09-07
D-Z9-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
58 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z9-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 18-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 18-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Nov-24 01-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-08
CULVERT-CIVIL-D 40 28-Oct-24 12-Dec-24 12-Dec-24, DRY CULVERT-CIVIL-D-Z09-08
D-Z9-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 28-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Nov-24 30-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Nov-24 12-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-09
CULVERT-CIVIL-D 40 09-Nov-24 24-Dec-24 24-Dec-24, DRY CULVERT-CIVIL-D-Z09-09
D-Z9-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 09-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Nov-24 11-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Dec-24 24-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z09-10
CULVERT-CIVIL-D 40 20-Nov-24 05-Jan-25 05-Jan-25, DRY CULVERT-CIVIL-D-Z09-10
D-Z9-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 20-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z9-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z9-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Dec-24 23-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z9-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Dec-24 05-Jan-25 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 428 02-Dec-23 27-Apr-25 27-Apr-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 425 02-Dec-23 23-Apr-25 23-Apr-25, POWER SYSTEM
EARTHING SYSTEM 410 02-Dec-23 06-Apr-25 06-Apr-25, EARTHING SYSTEM
D-Z9-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Earthing system Shop Drawings Preparation & Submission

D-Z9-EEP-160 Earthing system Shop Drawings Review & Approval 12 18-Mar-25 06-Apr-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 299 17-Dec-23 09-Dec-24 09-Dec-24, LIGHTING SYSTEM


D-Z9-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Lighting system Shop Drawings Preparation & Submission

D-Z9-EEP-110 Lighting system Shop Drawings Review & Approval 12 25-Nov-24 09-Dec-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 18 02-Jan-24 23-Jan-24 23-Jan-24, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z9-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

D-Z9-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 18-Jan-24 23-Jan-24 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 18 18-Jan-24 08-Feb-24 08-Feb-24, SMALL POWER SYSTEM
D-Z9-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Small Power system Shop Drawings Preparation & Submission

D-Z9-EEP-130 Small Power system Shop Drawings Review & Approval 4 04-Feb-24 08-Feb-24 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 141 06-Nov-24 23-Apr-25 23-Apr-25, POWER DISTRIBUTION
D-Z9-EEP-170 Generator Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 Generator Shop Drawings Preparation & Submission

D-Z9-EEP-180 Generator Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Generator Shop Drawings Review & Approval

D-Z9-EEP-190 UPS Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 UPS Shop Drawings Preparation & Submission

D-Z9-EEP-200 UPS Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 UPS Shop Drawings Review & Approval

D-Z9-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 MDBs Pannels Shop Drawings Preparation & Submission

D-Z9-EEP-220 MDBs Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 MDBs Shop Drawings Review & Approval

D-Z9-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 MCC Pannels Shop Drawings Preparation & Submission

D-Z9-EEP-240 MCCB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 MCCB Shop Drawings Review & Approval

D-Z9-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 SMSB Pannels Shop Drawings Preparation & Submission

D-Z9-EEP-260 SMSB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 SMSB Shop Drawings Review & Approval

D-Z9-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 DB Pannels Shop Drawings Preparation & Submission

D-Z9-EEP-280 DB Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 DB Shop Drawings Review & Approval

D-Z9-EEP-290 Isolators Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 Isolators Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
59 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z9-EEP-300 Isolator Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Isolator Shop Drawings Review & Approval

D-Z9-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 20-Mar-25 09-Apr-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

D-Z9-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 09-Apr-25 23-Apr-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 191 10-Sep-24 27-Apr-25 27-Apr-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 77 10-Sep-24 10-Dec-24 10-Dec-24, FIRE ALARM SYSTEM
D-Z9-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Fire Alarm system Shop Drawings Preparation & Submission

D-Z9-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 26-Nov-24 10-Dec-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 72 28-Sep-24 21-Dec-24 21-Dec-24, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
D-Z9-EEL-180 ICT System Shop Drawings Preparation & Submission 14 28-Sep-24 14-Oct-24 ICT System Shop Drawings Preparation & Submission

D-Z9-EEL-190 ICT System Shop Drawings Review & Approval 4 16-Dec-24 21-Dec-24 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 50 14-Oct-24 10-Dec-24 10-Dec-24, ACCESS CONTROL SYSTEM
D-Z9-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 14-Oct-24 30-Oct-24 Access Control system Shop Drawings Preparation & Submission

D-Z9-EEL-150 Access Control system Shop Drawings Review & Approval 12 26-Nov-24 10-Dec-24 Access Control system Shop Drawings Review & Approval

RODDENT REPPELENT
REPPELEN SYSTEM 36 30-Oct-24 10-Dec-24 10-Dec-24, RODDENT REPPELENT SYSTEM
D-Z9-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 30-Oct-24 16-Nov-24 Roddent Repplent system Shop Drawings Preparation & Submission

D-Z9-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 05-Dec-24 10-Dec-24 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 136 16-Nov-24 27-Apr-25 27-Apr-25, SCADA SYSTEM


D-Z9-EEL-120 Scada system Shop Drawings Preparation & Submission 14 16-Nov-24 01-Dec-24 Scada system Shop Drawings Preparation & Submission

D-Z9-EEL-130 Scada system Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 02-Dec-24 31-Dec-24 31-Dec-24, RADIO RE- BROADCOASTING/ TETRA
D-Z9-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 02-Dec-24 17-Dec-24 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

D-Z9-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 17-Dec-24 31-Dec-24 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 79 03-Oct-24 02-Jan-25 02-Jan-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 75 03-Oct-24 29-Dec-24 29-Dec-24, FIRE FIGHTING
D-Z9-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 03-Oct-24 20-Oct-24 Firefighting system Shop Drawings Preparation & Submission

D-Z9-EM-110 Firefighting system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Firefighting system Shop Drawings Review & Approval

HVAC 65 20-Oct-24 02-Jan-25 02-Jan-25, HVAC


D-Z9-EM-120 HVAC system Shop Drawings Preparation & Submission 14 20-Oct-24 04-Nov-24 HVAC system Shop Drawings Preparation & Submission

D-Z9-EM-130 HVAC system Shop Drawings Review & Approval 12 19-Dec-24 02-Jan-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 05-Nov-24 04-Dec-24 04-Dec-24, PLUMBING


D-Z9-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 05-Nov-24 20-Nov-24 Plumbing system Shop Drawings Preparation & Submission

D-Z9-EM-150 Plumbing system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 28 08-Apr-25 10-May-25 10-May-25, WET UTILITIES


DRAINAGE NET WORK 28 08-Apr-25 10-May-25 10-May-25, DRAINAGE NET WORK
T1-ENG-Z1-WC-D.18 Plan and Profile Shop Drawing Prepration &Submission 14 08-Apr-25 24-Apr-25 Plan and Profile Shop Drawing Prepration &Submission

T1-ENG-Z1-WC-D.18 Plan and Profile Shop Drawing Review & Approval 14 24-Apr-25 10-May-25 Plan and Profile Shop Drawing Review & Approval

DRY UTILITIES 31 10-Dec-24 15-Jan-25 15-Jan-25, DRY UTILITIES


POWER 31 10-Dec-24 15-Jan-25 15-Jan-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 10-Dec-24 02-Jan-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval power system shopdrawings

ROADS 70 08-May-25 31-Jul-25 31-Jul-25, ROADS


T1-ENG-Z9-R.370 Plan and Profile Preparation & Submission 14 08-May-25 25-May-25 Plan and Profile Preparation & Submission

T1-ENG-Z9-R.375 Plan and Profile Review & Approval 14 25-May-25 14-Jun-25 Plan and Profile Review & Approval

T1-ENG-Z9-R.380 Road Cross Sections Preparation & Submission 14 14-Jun-25 30-Jun-25 Road Cross Sections Preparation & Submission

T1-ENG-Z9-R.385 Road Cross Sections Review & Approval 14 30-Jun-25 15-Jul-25 Road Cross Sections Review & Approval

T1-ENG-Z9-R.390 Guiding Signs and Marking Preparation & Submission 14 30-Jun-25 16-Jul-25 Guiding Signs and Marking Preparation & Submission

T1-ENG-Z9-R.395 Guiding Signs and Marking Review & Approval 14 16-Jul-25 31-Jul-25 Guiding Signs and Marking Review & Approval

TUNNEL 2 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, TUNNEL 2


ZONE 10 - FROM STA. 0
0+020 ~ 0+402 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, ZONE 10 - F

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
60 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1209 31-Oct-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 218 31-Oct-22 A 18-Jul-23 A 18-Jul-23 A, EARTH WORKS
T2-ENG-Z10-EX.835 Cross Section Shop Drawing Preparation & Submission 12 31-Oct-22 A 13-Nov-22 A Cross Section Shop Drawing Preparation & Submission

T2-ENG-Z10-EX.840 Cross Section Shop Drawing Review & Approval 5 15-Nov-22 A 20-Nov-22 A Cross Section Shop Drawing Review & Approval

T2-ENG-Z10-SH.855 Shoring Design Preparation & Submission 6 11-Jul-23 A 17-Jul-23 A Shoring Design Preparation & Submission

T2-ENG-Z10-SH.860 Shoring Design Review & Approval 6 12-Jul-23 A 18-Jul-23 A Shoring Design Review & Approval

T2-ENG-Z10-SI.845 Soil Improvement Design Preparation & Submission 103 12-Jan-23 A 15-May-23 A Soil Improvement Design Preparation & Submission

T2-ENG-Z10-SI.850 Soil Improvement Design Review & Approval 104 14-Jan-23 A 17-May-23 A Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 1128 01-Jan-23 A 17-Oct-26 17-Oct-26, CIVIL SHOP


CIVIL/ ZONE WISE 174 02-Feb-23 A 30-Aug-23 A 30-Aug-23 A, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 174 02-Feb-23 A 30-Aug-23 A 30-Aug-23 A, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z10-EC.100 Plan and Profile Shop Drawings Preparation & Submission 13 02-Feb-23 A 16-Feb-23 A Plan and Profile Shop Drawings Preparation & Submission

JAH-Z10-EC.110 Plan and Profile Shop Drawings Review & Approval 18 16-Feb-23 A 08-Mar-23 A Plan and Profile Shop Drawings Review & Approval

JAH-Z10-EC.120 Builder work Shop Drawings Preparation and submission 14 01-Aug-23 A 16-Aug-23 A Builder work Shop Drawings Preparation and submission

JAH-Z10-EC.130 Builder work Shop Drawings Review & Approval 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 1116 01-Jan-23 A 17-Oct-26 17-Oct-26, CIVIL/SEGM


CIVIL-SEG-T2-Z10-01 418 20-Apr-23 A 04-Sep-24 04-Sep-24, CIVIL-SEG-T2-Z10-01
JAH-Z10-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 06-Aug-24 22-Aug-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 22-Aug-24 04-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-02 433 20-Apr-23 A 22-Sep-24 22-Sep-24, CIVIL-SEG-T2-Z10-02


JAH-Z10-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 20-Apr-23 A 04-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 24-Aug-24 09-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 09-Sep-24 22-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-03 28 16-Aug-23 A 17-Sep-23 A 17-Sep-23 A, CIVIL-SEG-T2-Z10-03


JAH-Z10-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 22-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 07-Sep-23 A 17-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 16-Aug-23 A 31-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-03-EC-130 Reinforcement Shop Drawings Review & Approval 10 31-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-04 60 20-Apr-23 A 05-Jul-23 A 05-Jul-23 A, CIVIL-SEG-T2-Z10-04


JAH-Z10-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 20-Apr-23 A 06-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 07-May-23 A 15-May-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-04-EC-120 Reinforcement Shop Drawings Preparation and submission 13 05-Jun-23 A 19-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-04-EC-130 Reinforcement Shop Drawings Review & Approval 11 20-Jun-23 A 05-Jul-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-05 1042 01-Jan-23 A 17-Oct-26 17-Oct-26, CIVIL-SEG-


JAH-Z10-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 17-May-23 A 31-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Jun-23 A 11-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-05-EC-120 Reinforcement Shop Drawings Preparation and submission 70 01-Jan-23 A 03-Oct-26 Reinforcement Shop Draw

JAH-Z10-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-T2-Z10-06 186 16-Feb-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL-SEG-T2-Z10-06


JAH-Z10-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 16-Feb-23 A 02-Mar-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Mar-23 A 16-Mar-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-06-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-06-EC-130 Reinforcement Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
61 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-T2-Z10-07 80 03-Jan-23 A 11-Dec-23 11-Dec-23, CIVIL-SEG-T2-Z10-07
JAH-Z10-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 28-Aug-23 A 11-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 12-Sep-23 A 20-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-07-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-07-EC-130 Reinforcement Shop Drawings Review & Approval 62 03-Jan-23 A 11-Dec-23 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-08 22 02-Sep-23 A 27-Sep-23 A 27-Sep-23 A, CIVIL-SEG-T2-Z10-08


JAH-Z10-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 02-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 16-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-08-EC-120 Reinforcement Shop Drawings Preparation and submission 13 03-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-08-EC-130 Reinforcement Shop Drawings Review & Approval 9 17-Sep-23 A 27-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-09 102 27-May-23 A 26-Sep-23 A 26-Sep-23 A, CIVIL-SEG-T2-Z10-09


JAH-Z10-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 02-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 17-Sep-23 A 26-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-May-23 A 11-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-09-EC-130 Reinforcement Shop Drawings Review & Approval 5 11-Jun-23 A 15-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-10 30 08-May-23 A 11-Jun-23 A 11-Jun-23 A, CIVIL-SEG-T2-Z10-10


JAH-Z10-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 17-May-23 A 31-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 01-Jun-23 A 11-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-10-EC-120 Reinforcement Shop Drawings Preparation and submission 13 08-May-23 A 22-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-10-EC-130 Reinforcement Shop Drawings Review & Approval 4 23-May-23 A 27-May-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-11 28 14-May-23 A 14-Jun-23 A 14-Jun-23 A, CIVIL-SEG-T2-Z10-11


JAH-Z10-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 17-May-23 A 31-May-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jun-23 A 14-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-11-EC-120 Reinforcement Shop Drawings Preparation and submission 13 14-May-23 A 28-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-11-EC-130 Reinforcement Shop Drawings Review & Approval 11 29-May-23 A 10-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-12 117 11-May-23 A 28-Sep-23 A 28-Sep-23 A, CIVIL-SEG-T2-Z10-12


JAH-Z10-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 03-Sep-23 A 17-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 18-Sep-23 A 28-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-12-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-May-23 A 25-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-12-EC-130 Reinforcement Shop Drawings Review & Approval 7 27-May-23 A 03-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-13 26 14-May-23 A 12-Jun-23 A 12-Jun-23 A, CIVIL-SEG-T2-Z10-13


JAH-Z10-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 18-May-23 A 01-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 01-Jun-23 A 12-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-13-EC-120 Reinforcement Shop Drawings Preparation and submission 13 14-May-23 A 28-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-13-EC-130 Reinforcement Shop Drawings Review & Approval 13 29-May-23 A 12-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-14 173 03-Jan-23 A 14-Dec-23 14-Dec-23, CIVIL-SEG-T2-Z10-14


JAH-Z10-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 04-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 64 03-Jan-23 A 14-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-14-EC-120 Reinforcement Shop Drawings Preparation and submission 13 11-May-23 A 25-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-14-EC-130 Reinforcement Shop Drawings Review & Approval 10 27-May-23 A 06-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-15 179 16-May-23 A 14-Dec-23 14-Dec-23, CIVIL-SEG-T2-Z10-15


JAH-Z10-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 13 04-Sep-23 A 18-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Dec-23 14-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-15-EC-120 Reinforcement Shop Drawings Preparation and submission 13 16-May-23 A 30-May-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z10-15-EC-130 Reinforcement Shop Drawings Review & Approval 9 31-May-23 A 10-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-16 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL-SEG-T2-Z10-16

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
62 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z10-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-17 40 19-Dec-23 03-Feb-24 03-Feb-24, CIVIL-SEG-T2-Z10-17


JAH-Z10-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-18 40 06-Jan-24 20-Feb-24 20-Feb-24, CIVIL-SEG-T2-Z10-18


JAH-Z10-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 06-Jan-24 21-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Jan-24 06-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Jan-24 06-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Feb-24 20-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-19 40 23-Jan-24 09-Mar-24 09-Mar-24, CIVIL-SEG-T2-Z10-19


JAH-Z10-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-24 07-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-24 24-Feb-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Feb-24 24-Feb-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-24 09-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-20 40 10-Feb-24 26-Mar-24 26-Mar-24, CIVIL-SEG-T2-Z10-20


JAH-Z10-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Feb-24 25-Feb-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Feb-24 12-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Feb-24 12-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Mar-24 26-Mar-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-21 40 27-Feb-24 16-Apr-24 16-Apr-24, CIVIL-SEG-T2-Z10-21


JAH-Z10-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-24 13-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Mar-24 30-Mar-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Mar-24 30-Mar-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Mar-24 16-Apr-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T2-Z10-22 40 16-Mar-24 04-May-24 04-May-24, CIVIL-SEG-T2-Z10-22


JAH-Z10-22-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Mar-24 31-Mar-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z10-22-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 02-Apr-24 20-Apr-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z10-22-EC-120 Reinforcement Shop Drawings Preparation and submission 14 31-Mar-24 20-Apr-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z10-22-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Apr-24 04-May-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 113 09-Nov-24 20-Mar-25 20-Mar-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 79 19-Dec-24 20-Mar-25 20-Mar-25, POWER SYSTEM
EARTHING SYSTEM 52 19-Dec-24 17-Feb-25 17-Feb-25, EARTHING SYSTEM
JAH-Z10-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 19-Dec-24 05-Jan-25 Earthing system Shop Drawings Preparation & Submission

JAH-Z10-EEP-160 Earthing system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 38 05-Jan-25 17-Feb-25 17-Feb-25, LIGHTING SYSTEM


JAH-Z10-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 05-Jan-25 21-Jan-25 Lighting system Shop Drawings Preparation & Submission

JAH-Z10-EEP-110 Lighting system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 32 21-Jan-25 26-Feb-25 26-Feb-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z10-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 21-Jan-25 06-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z10-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 23-Feb-25 26-Feb-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 18 06-Feb-25 26-Feb-25 26-Feb-25, SMALL POWER SYSTEM
JAH-Z10-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 06-Feb-25 23-Feb-25 Small Power system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
63 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z10-EEP-130 Small Power system Shop Drawings Review & Approval 4 23-Feb-25 26-Feb-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 33 11-Feb-25 20-Mar-25 20-Mar-25, POWER DISTRIBUTION


JAH-Z10-EEP-170 Generator Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Generator Shop Drawings Preparation & Submission

JAH-Z10-EEP-180 Generator Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 Generator Shop Drawings Review & Approval

JAH-Z10-EEP-190 UPS Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 UPS Shop Drawings Preparation & Submission

JAH-Z10-EEP-200 UPS Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 UPS Shop Drawings Review & Approval

JAH-Z10-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z10-EEP-220 MDBs Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 MDBs Shop Drawings Review & Approval

JAH-Z10-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z10-EEP-240 MCCB Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 MCCB Shop Drawings Review & Approval

JAH-Z10-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z10-EEP-260 SMSB Shop Drawings Review & Approval 12 27-Feb-25 12-Mar-25 SMSB Shop Drawings Review & Approval

JAH-Z10-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 DB Pannels Shop Drawings Preparation & Submission

JAH-Z10-EEP-280 DB Shop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 DB Shop Drawings Review & Approval

JAH-Z10-EEP-290 Isolators Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 Isolators Shop Drawings Preparation & Submission

JAH-Z10-EEP-300 Isolator Shop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 Isolator Shop Drawings Review & Approval

JAH-Z10-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z10-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 08-Mar-25 20-Mar-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 09-Nov-24 27-Feb-25 27-Feb-25, LOW CURRENT SYSTEM


FIRE ALARM SYSTEM 86 09-Nov-24 17-Feb-25 17-Feb-25, FIRE ALARM SYSTEM
JAH-Z10-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 09-Nov-24 25-Nov-24 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z10-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 81 25-Nov-24 27-Feb-25 27-Feb-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
JAH-Z10-EEL-180 ICT System Shop Drawings Preparation & Submission 14 25-Nov-24 11-Dec-24 ICT System Shop Drawings Preparation & Submission

JAH-Z10-EEL-190 ICT System Shop Drawings Review & Approval 4 24-Feb-25 27-Feb-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 59 11-Dec-24 17-Feb-25 17-Feb-25, ACCESS CONTROL SYSTEM
JAH-Z10-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 Access Control system Shop Drawings Preparation & Submission

JAH-Z10-EEL-150 Access Control system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 45 28-Dec-24 17-Feb-25 17-Feb-25, PUBLIC ADDRESS SYSTEM
JAH-Z10-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 Public Address system Shop Drawings Preparation & Submission

JAH-Z10-EEL-170 Public Address system Shop Drawings Review & Approval 4 13-Feb-25 17-Feb-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 40 13-Jan-25 27-Feb-25 27-Feb-25, SCADA SYSTEM


JAH-Z10-EEL-120 Scada system Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 Scada system Shop Drawings Preparation & Submission

JAH-Z10-EEL-130 Scada system Shop Drawings Review & Approval 12 15-Feb-25 27-Feb-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 29-Jan-25 27-Feb-25 27-Feb-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z10-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 29-Jan-25 15-Feb-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z10-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 15-Feb-25 27-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 60 17-Dec-24 24-Feb-25 24-Feb-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 60 17-Dec-24 24-Feb-25 24-Feb-25, FIRE FIGHTING
JAH-Z10-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 17-Dec-24 02-Jan-25 Firefighting system Shop Drawings Preparation & Submission

JAH-Z10-EM-110 Firefighting system Shop Drawings Review & Approval 12 11-Feb-25 24-Feb-25 Firefighting system Shop Drawings Review & Approval

HVAC 46 02-Jan-25 24-Feb-25 24-Feb-25, HVAC


JAH-Z10-EM-120 HVAC system Shop Drawings Preparation & Submission 14 02-Jan-25 19-Jan-25 HVAC system Shop Drawings Preparation & Submission

JAH-Z10-EM-130 HVAC system Shop Drawings Review & Approval 12 11-Feb-25 24-Feb-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 19-Jan-25 17-Feb-25 17-Feb-25, PLUMBING


JAH-Z10-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 19-Jan-25 04-Feb-25 Plumbing system Shop Drawings Preparation & Submission

JAH-Z10-EM-150 Plumbing system Shop Drawings Review & Approval 12 04-Feb-25 17-Feb-25 Plumbing system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
64 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DRY CULVERT 198 31-Aug-24 24-Apr-25 24-Apr-25, DRY CULVERT
CIVIL SHOP DRAWINGS 193 31-Aug-24 19-Apr-25 19-Apr-25, CIVIL SHOP DRAWINGS
CIVIL/ ZONE WISE 40 31-Aug-24 16-Oct-24 16-Oct-24, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL- WISE 40 31-Aug-24 16-Oct-24 16-Oct-24, CIVIL / STRUCTURAL-ZONE WISE
D-Z10-EC.100 Plan and Profile Shop Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Plan and Profile Shop Drawings Preparation & Submission

D-Z10-EC.110 Plan and Profile Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Plan and Profile Shop Drawings Review & Approval

D-Z10-EC.120 Builder work Shop Drawings Preparation and submission 14 16-Sep-24 03-Oct-24 Builder work Shop Drawings Preparation and submission

D-Z10-EC.130 Builder work Shop Drawings Review & Approval 12 03-Oct-24 16-Oct-24 Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 154 17-Oct-24 19-Apr-25 19-Apr-25, CIVIL/SEGMENT WISE


DRY CULVERT-CIVIL-D-Z10-01
CULVERT-CIVIL-D 40 17-Oct-24 02-Dec-24 02-Dec-24, DRY CULVERT-CIVIL-D-Z10-01
D-Z10-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 17-Oct-24 02-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 04-Nov-24 18-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z10-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 02-Nov-24 18-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z10-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 18-Nov-24 02-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-02
CULVERT-CIVIL-D 40 29-Oct-24 14-Dec-24 14-Dec-24, DRY CULVERT-CIVIL-D-Z10-02
D-Z10-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 29-Oct-24 13-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Concrete Dimension Shop Drawings Review & Approval

D-Z10-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 13-Nov-24 30-Nov-24 Reinforcement Shop Drawings Preparation and submission

D-Z10-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 30-Nov-24 14-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-03
CULVERT-CIVIL-D 40 10-Nov-24 25-Dec-24 25-Dec-24, DRY CULVERT-CIVIL-D-Z10-03
D-Z10-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 10-Nov-24 25-Nov-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z10-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 25-Nov-24 11-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z10-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 11-Dec-24 25-Dec-24 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-04
CULVERT-CIVIL-D 40 21-Nov-24 06-Jan-25 06-Jan-25, DRY CULVERT-CIVIL-D-Z10-04
D-Z10-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 21-Nov-24 07-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Concrete Dimension Shop Drawings Review & Approval

D-Z10-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 07-Dec-24 23-Dec-24 Reinforcement Shop Drawings Preparation and submission

D-Z10-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 23-Dec-24 06-Jan-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-05
CULVERT-CIVIL-D 40 03-Dec-24 18-Jan-25 18-Jan-25, DRY CULVERT-CIVIL-D-Z10-05
D-Z10-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 03-Dec-24 18-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-05-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Dec-24 04-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Jan-25 18-Jan-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-06
CULVERT-CIVIL-D 40 15-Dec-24 29-Jan-25 29-Jan-25, DRY CULVERT-CIVIL-D-Z10-06
D-Z10-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 15-Dec-24 30-Dec-24 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Jan-25 15-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-06-EC-120 Reinforcement Shop Drawings Preparation and submission 14 30-Dec-24 15-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-06-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Jan-25 29-Jan-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-07
CULVERT-CIVIL-D 40 26-Dec-24 10-Feb-25 10-Feb-25, DRY CULVERT-CIVIL-D-Z10-07
D-Z10-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 26-Dec-24 11-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 13-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-07-EC-120 Reinforcement Shop Drawings Preparation and submission 14 11-Jan-25 27-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-07-EC-130 Reinforcement Shop Drawings Review & Approval 12 27-Jan-25 10-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-08
CULVERT-CIVIL-D 40 07-Jan-25 22-Feb-25 22-Feb-25, DRY CULVERT-CIVIL-D-Z10-08
D-Z10-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 07-Jan-25 22-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 25-Jan-25 08-Feb-25 Concrete Dimension Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
65 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-08-EC-120 Reinforcement Shop Drawings Preparation and submission 14 22-Jan-25 08-Feb-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-08-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Feb-25 22-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-09
CULVERT-CIVIL-D 40 19-Jan-25 05-Mar-25 05-Mar-25, DRY CULVERT-CIVIL-D-Z10-09
D-Z10-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Jan-25 03-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Feb-25 19-Feb-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-09-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Feb-25 19-Feb-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-09-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Feb-25 05-Mar-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-10
CULVERT-CIVIL-D 40 30-Jan-25 17-Mar-25 17-Mar-25, DRY CULVERT-CIVIL-D-Z10-10
D-Z10-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Jan-25 15-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Feb-25 03-Mar-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-10-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Feb-25 03-Mar-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Mar-25 17-Mar-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-11
CULVERT-CIVIL-D 40 11-Feb-25 29-Mar-25 29-Mar-25, DRY CULVERT-CIVIL-D-Z10-11
D-Z10-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 11-Feb-25 26-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 01-Mar-25 15-Mar-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-11-EC-120 Reinforcement Shop Drawings Preparation and submission 14 26-Feb-25 15-Mar-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-11-EC-130 Reinforcement Shop Drawings Review & Approval 12 15-Mar-25 29-Mar-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-12
CULVERT-CIVIL-D 40 23-Feb-25 14-Apr-25 14-Apr-25, DRY CULVERT-CIVIL-D-Z10-12
D-Z10-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Feb-25 10-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-12-EC-120 Reinforcement Shop Drawings Preparation and submission 14 10-Mar-25 26-Mar-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-12-EC-130 Reinforcement Shop Drawings Review & Approval 12 26-Mar-25 14-Apr-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-13
CULVERT-CIVIL-D 40 19-Dec-24 03-Feb-25 03-Feb-25, DRY CULVERT-CIVIL-D-Z10-13
D-Z10-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-24 04-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-25 20-Jan-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-13-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Jan-25 20-Jan-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-13-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-25 03-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-14
CULVERT-CIVIL-D 40 31-Dec-24 15-Feb-25 15-Feb-25, DRY CULVERT-CIVIL-D-Z10-14
D-Z10-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 31-Dec-24 15-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 18-Jan-25 01-Feb-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-14-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Jan-25 01-Feb-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-14-EC-130 Reinforcement Shop Drawings Review & Approval 12 01-Feb-25 15-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-15
CULVERT-CIVIL-D 40 12-Jan-25 26-Feb-25 26-Feb-25, DRY CULVERT-CIVIL-D-Z10-15
D-Z10-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 12-Jan-25 27-Jan-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 29-Jan-25 12-Feb-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-15-EC-120 Reinforcement Shop Drawings Preparation and submission 14 27-Jan-25 12-Feb-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-15-EC-130 Reinforcement Shop Drawings Review & Approval 12 12-Feb-25 26-Feb-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-16
CULVERT-CIVIL-D 40 23-Jan-25 10-Mar-25 10-Mar-25, DRY CULVERT-CIVIL-D-Z10-16
D-Z10-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 23-Jan-25 08-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 10-Feb-25 24-Feb-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 08-Feb-25 24-Feb-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Feb-25 10-Mar-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-17
CULVERT-CIVIL-D 40 04-Feb-25 22-Mar-25 22-Mar-25, DRY CULVERT-CIVIL-D-Z10-17
D-Z10-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 04-Feb-25 19-Feb-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 22-Feb-25 08-Mar-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-17-EC-120 Reinforcement Shop Drawings Preparation and submission 14 19-Feb-25 08-Mar-25 Reinforcement Shop Drawings Preparation and submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
66 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-17-EC-130 Reinforcement Shop Drawings Review & Approval 12 08-Mar-25 22-Mar-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-18
CULVERT-CIVIL-D 40 16-Feb-25 07-Apr-25 07-Apr-25, DRY CULVERT-CIVIL-D-Z10-18
D-Z10-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Feb-25 03-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 05-Mar-25 19-Mar-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-18-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Mar-25 19-Mar-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-18-EC-130 Reinforcement Shop Drawings Review & Approval 12 19-Mar-25 07-Apr-25 Reinforcement Shop Drawings Review & Approval

DRY CULVERT-CIVIL-D-Z10-19
CULVERT-CIVIL-D 40 27-Feb-25 19-Apr-25 19-Apr-25, DRY CULVERT-CIVIL-D-Z10-19
D-Z10-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 27-Feb-25 15-Mar-25 Concrete Dimension Shop Drawings Preparation & Submission

D-Z10-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Concrete Dimension Shop Drawings Review & Approval

D-Z10-19-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Mar-25 05-Apr-25 Reinforcement Shop Drawings Preparation and submission

D-Z10-19-EC-130 Reinforcement Shop Drawings Review & Approval 12 05-Apr-25 19-Apr-25 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRA 98 16-Dec-24 14-Apr-25 14-Apr-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 65 25-Jan-25 14-Apr-25 14-Apr-25, POWER SYSTEM
EARTHING SYSTEM 46 25-Jan-25 18-Mar-25 18-Mar-25, EARTHING SYSTEM
D-Z10-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 25-Jan-25 09-Feb-25 Earthing system Shop Drawings Preparation & Submission

D-Z10-EEP-160 Earthing system Shop Drawings Review & Approval 12 04-Mar-25 18-Mar-25 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 32 09-Feb-25 18-Mar-25 18-Mar-25, LIGHTING SYSTEM


D-Z10-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 09-Feb-25 25-Feb-25 Lighting system Shop Drawings Preparation & Submission

D-Z10-EEP-110 Lighting system Shop Drawings Review & Approval 12 04-Mar-25 18-Mar-25 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 18 25-Feb-25 18-Mar-25 18-Mar-25, CABLE TRAY /CABLE ROUTING SYSTEM
D-Z10-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 25-Feb-25 13-Mar-25 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

D-Z10-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 13-Mar-25 18-Mar-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYST


SYSTEM 18 19-Mar-25 14-Apr-25 14-Apr-25, SMALL POWER SYSTEM
D-Z10-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 19-Mar-25 09-Apr-25 Small Power system Shop Drawings Preparation & Submission

D-Z10-EEP-130 Small Power system Shop Drawings Review & Approval 4 09-Apr-25 14-Apr-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION
DISTRIBUTIO 26 24-Feb-25 26-Mar-25 26-Mar-25, POWER DISTRIBUTION
D-Z10-EEP-170 Generator Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Generator Shop Drawings Preparation & Submission

D-Z10-EEP-180 Generator Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Generator Shop Drawings Review & Approval

D-Z10-EEP-190 UPS Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 UPS Shop Drawings Preparation & Submission

D-Z10-EEP-200 UPS Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 UPS Shop Drawings Review & Approval

D-Z10-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 MDBs Pannels Shop Drawings Preparation & Submission

D-Z10-EEP-220 MDBs Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 MDBs Shop Drawings Review & Approval

D-Z10-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 MCC Pannels Shop Drawings Preparation & Submission

D-Z10-EEP-240 MCCB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 MCCB Shop Drawings Review & Approval

D-Z10-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 SMSB Pannels Shop Drawings Preparation & Submission

D-Z10-EEP-260 SMSB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 SMSB Shop Drawings Review & Approval

D-Z10-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 DB Pannels Shop Drawings Preparation & Submission

D-Z10-EEP-280 DB Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 DB Shop Drawings Review & Approval

D-Z10-EEP-290 Isolators Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Isolators Shop Drawings Preparation & Submission

D-Z10-EEP-300 Isolator Shop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 Isolator Shop Drawings Review & Approval

D-Z10-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

D-Z10-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 12-Mar-25 26-Mar-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM


SYSTE 95 16-Dec-24 10-Apr-25 10-Apr-25, LOW CURRENT SYSTEM
FIRE ALARM SYSTEM 95 16-Dec-24 10-Apr-25 10-Apr-25, FIRE ALARM SYSTEM
D-Z10-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 16-Dec-24 01-Jan-25 Fire Alarm system Shop Drawings Preparation & Submission

D-Z10-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 81 01-Jan-25 10-Apr-25 10-Apr-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
67 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
D-Z10-EEL-180 ICT System Shop Drawings Preparation & Submission 14 01-Jan-25 18-Jan-25 ICT System Shop Drawings Preparation & Submission

D-Z10-EEL-190 ICT System Shop Drawings Review & Approval 4 06-Apr-25 10-Apr-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 68 18-Jan-25 10-Apr-25 10-Apr-25, ACCESS CONTROL SYSTEM
D-Z10-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 18-Jan-25 02-Feb-25 Access Control system Shop Drawings Preparation & Submission

D-Z10-EEL-150 Access Control system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Access Control system Shop Drawings Review & Approval

RODDENT REPPELENT
REPPELEN SYSTEM 54 03-Feb-25 10-Apr-25 10-Apr-25, RODDENT REPPELENT SYSTEM
D-Z10-EEL-160 Roddent Repplent system Shop Drawings Preparation & Submission 14 03-Feb-25 18-Feb-25 Roddent Repplent system Shop Drawings Preparation & Submission

D-Z10-EEL-170 Roddent Repplent system Shop Drawings Review & Approval 4 06-Apr-25 10-Apr-25 Roddent Repplent system Shop Drawings Review & Approval

SCADA SYSTEM 40 18-Feb-25 10-Apr-25 10-Apr-25, SCADA SYSTEM


D-Z10-EEL-120 Scada system Shop Drawings Preparation & Submission 14 18-Feb-25 06-Mar-25 Scada system Shop Drawings Preparation & Submission

D-Z10-EEL-130 Scada system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCO TETRA 26 06-Mar-25 10-Apr-25 10-Apr-25, RADIO RE- BROADCOASTING/ TETRA
D-Z10-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 06-Mar-25 23-Mar-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

D-Z10-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 23-Mar-25 10-Apr-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DR
DRAWINGS 86 11-Jan-25 24-Apr-25 24-Apr-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 86 11-Jan-25 24-Apr-25 24-Apr-25, FIRE FIGHTING
D-Z10-EM-FF.100 Firefighting system Shop Drawings Preparation & Submission 14 11-Jan-25 26-Jan-25 Firefighting system Shop Drawings Preparation & Submission

D-Z10-EM-FF.110 Firefighting system Shop Drawings Review & Approval 12 10-Apr-25 24-Apr-25 Firefighting system Shop Drawings Review & Approval

HVAC 55 26-Jan-25 05-Apr-25 05-Apr-25, HVAC


D-Z10-EM-HVAC.12 HVAC system Shop Drawings Preparation & Submission 14 26-Jan-25 11-Feb-25 HVAC system Shop Drawings Preparation & Submission

D-Z10-EM-HVAC.13 HVAC system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 11-Feb-25 13-Mar-25 13-Mar-25, PLUMBING


D-Z10-EM-PB.140 Plumbing system Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Plumbing system Shop Drawings Preparation & Submission

D-Z10-EM-PB.150 Plumbing system Shop Drawings Review & Approval 12 27-Feb-25 13-Mar-25 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 28 30-Jan-25 03-Mar-25 03-Mar-25, WET UTILITIES


DRAINAGE NET WORK 28 30-Jan-25 03-Mar-25 03-Mar-25, DRAINAGE NET WORK
T2-ENG-Z10-WC-D.1 Plan and Profile Shop Drawing Review & Approval 14 16-Feb-25 03-Mar-25 Plan and Profile Shop Drawing Review & Approval

T2-ENGZ10-WC-D.18 Plan and Profile Shop Drawing Prepration &Submission 14 30-Jan-25 16-Feb-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 31 19-Mar-25 29-Apr-25 29-Apr-25, DRY UTILITIES


POWER 31 19-Mar-25 29-Apr-25 29-Apr-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 19-Mar-25 16-Apr-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 16-Apr-25 29-Apr-25 Review and approval power system shopdrawings

ROADS 70 29-Dec-24 19-Mar-25 19-Mar-25, ROADS


T2-ENG-Z10-R.400 Plan and Profile Shop Drawing Preparation & Submission 14 29-Dec-24 14-Jan-25 Plan and Profile Shop Drawing Preparation & Submission

T2-ENG-Z10-R.405 Plan and Profile Shop Drawing Review & Approval 14 14-Jan-25 30-Jan-25 Plan and Profile Shop Drawing Review & Approval

T2-ENG-Z10-R.410 Road Cross Sections Shop Drawing Preparation & Submission 14 30-Jan-25 16-Feb-25 Road Cross Sections Shop Drawing Preparation & Submission

T2-ENG-Z10-R.415 Road Cross Sections Shop Drawing Review & Approval 14 16-Feb-25 03-Mar-25 Road Cross Sections Shop Drawing Review & Approval

T2-ENG-Z10-R.420 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 16-Feb-25 04-Mar-25 Guiding Signs and Marking Shop Drawing Preparation & Submission

T2-ENG-Z10-R.425 Guiding Signs and Marking Shop Drawing Review & Approval 14 04-Mar-25 19-Mar-25 Guiding Signs and Marking Shop Drawing Review & Approval

TUNNEL 3 1264 01-Oct-22 A 17-Oct-26 17-Oct-26, TUNNEL 3


ZONE 11 - FROM STA. 0
0+020 ~ 0+434.07 1264 01-Oct-22 A 17-Oct-26 17-Oct-26, ZONE 11 - F
ENGINEERING 1264 01-Oct-22 A 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 1264 01-Oct-22 A 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 206 01-Oct-22 A 31-May-23 A 31-May-23 A, EARTH WORKS
T3-ENG-Z11-EX.845 Cross Section Shop Drawing Preparation & Submission 15 01-Oct-22 A 17-Oct-22 A Cross Section Shop Drawing Preparation & Submission

T3-ENG-Z11-EX.850 Cross Section Shop Drawing Review & Approval 6 17-Oct-22 A 23-Oct-22 A Cross Section Shop Drawing Review & Approval

T3-ENG-Z11-SI.855 Soil Improvement Design Preparation & Submission 104 18-Jan-23 A 22-May-23 A Soil Improvement Design Preparation & Submission

T3-ENG-Z11-SI.860 Soil Improvement Design Review & Approval 100 01-Feb-23 A 31-May-23 A Soil Improvement Design Review & Approval

CIVIL SHOP DRAWINGS 1264 08-Dec-22 A 17-Oct-26 17-Oct-26, CIVIL SHOP

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
68 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL/ ZONE WISE 92 06-Jun-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL/ ZONE WISE
CIVIL / STRUCTURAL-ZONE
STRUCTURAL-Z WISE 92 06-Jun-23 A 25-Sep-23 A 25-Sep-23 A, CIVIL / STRUCTURAL-ZONE WISE
JAH-Z11-EC.100 Plan and Profile Shop Drawings Preparation & Submission 85 06-Jun-23 A 16-Sep-23 A Plan and Profile Shop Drawings Preparation & Submission

JAH-Z11-EC.110 Plan and Profile Shop Drawings Review & Approval 83 17-Jun-23 A 25-Sep-23 A Plan and Profile Shop Drawings Review & Approval

JAH-Z11-EC.120 Builder work Shop Drawings Preparation and submission 12 17-Aug-23 A 30-Aug-23 A Builder work Shop Drawings Preparation and submission

JAH-Z11-EC.130 Builder work Shop Drawings Review & Approval 6 31-Aug-23 A 06-Sep-23 A Builder work Shop Drawings Review & Approval

CIVIL/SEGMENT WISE 1264 08-Dec-22 A 17-Oct-26 17-Oct-26, CIVIL/SEGM


CIVIL-SEG-T3-Z11-01 40 16-Sep-24 02-Nov-24 02-Nov-24, CIVIL-SEG-T3-Z11-01
JAH-Z11-01-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 16-Sep-24 03-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-01-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Oct-24 19-Oct-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-01-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Oct-24 19-Oct-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-01-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Oct-24 02-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-02 40 05-Oct-24 19-Nov-24 19-Nov-24, CIVIL-SEG-T3-Z11-02


JAH-Z11-02-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-02-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-02-EC-120 Reinforcement Shop Drawings Preparation and submission 14 21-Oct-24 05-Nov-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-02-EC-130 Reinforcement Shop Drawings Review & Approval 12 06-Nov-24 19-Nov-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-03 40 02-Dec-23 16-Jan-24 16-Jan-24, CIVIL-SEG-T3-Z11-03


JAH-Z11-03-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-03-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Dec-23 02-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-03-EC-120 Reinforcement Shop Drawings Preparation and submission 14 17-Dec-23 02-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-03-EC-130 Reinforcement Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-04 40 19-Dec-23 03-Feb-24 03-Feb-24, CIVIL-SEG-T3-Z11-04


JAH-Z11-04-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Dec-23 03-Jan-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-04-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 06-Jan-24 20-Jan-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-04-EC-120 Reinforcement Shop Drawings Preparation and submission 14 03-Jan-24 20-Jan-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-04-EC-130 Reinforcement Shop Drawings Review & Approval 12 20-Jan-24 03-Feb-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-05 17 29-Aug-23 A 17-Sep-23 A 17-Sep-23 A, CIVIL-SEG-T3-Z11-05


JAH-Z11-05-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 02-Sep-23 A 05-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-05-EC-110 Concrete Dimension Shop Drawings Review & Approval 10 05-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-05-EC-120 Reinforcement Shop Drawings Preparation and submission 6 29-Aug-23 A 04-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-05-EC-130 Reinforcement Shop Drawings Review & Approval 12 04-Sep-23 A 17-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-06 385 08-Dec-22 A 09-Dec-23 09-Dec-23, CIVIL-SEG-T3-Z11-06


JAH-Z11-06-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 82 08-Dec-22 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-06-EC-110 Concrete Dimension Shop Drawings Review & Approval 384 28-Dec-22 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-06-EC-120 Reinforcement Shop Drawings Preparation and submission 7 26-Aug-23 A 02-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-06-EC-130 Reinforcement Shop Drawings Review & Approval 10 02-Sep-23 A 12-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-07 20 21-Aug-23 A 12-Sep-23 A 12-Sep-23 A, CIVIL-SEG-T3-Z11-07


JAH-Z11-07-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 6 22-Aug-23 A 28-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-07-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 28-Aug-23 A 12-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-07-EC-120 Reinforcement Shop Drawings Preparation and submission 9 21-Aug-23 A 30-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-07-EC-130 Reinforcement Shop Drawings Review & Approval 11 30-Aug-23 A 11-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-08 80 12-Jun-23 A 16-Sep-23 A 16-Sep-23 A, CIVIL-SEG-T3-Z11-08


JAH-Z11-08-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 29-Aug-23 A 06-Sep-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-08-EC-110 Concrete Dimension Shop Drawings Review & Approval 9 06-Sep-23 A 16-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-08-EC-120 Reinforcement Shop Drawings Preparation and submission 6 12-Jun-23 A 18-Jun-23 A Reinforcement Shop Drawings Preparation and submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
69 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z11-08-EC-130 Reinforcement Shop Drawings Review & Approval 8 18-Jun-23 A 26-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-09 21 10-Aug-23 A 03-Sep-23 A 03-Sep-23 A, CIVIL-SEG-T3-Z11-09


JAH-Z11-09-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 8 10-Aug-23 A 19-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-09-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Aug-23 A 31-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-09-EC-120 Reinforcement Shop Drawings Preparation and submission 9 10-Aug-23 A 20-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-09-EC-130 Reinforcement Shop Drawings Review & Approval 13 20-Aug-23 A 03-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-10 25 09-Aug-23 A 06-Sep-23 A 06-Sep-23 A, CIVIL-SEG-T3-Z11-10


JAH-Z11-10-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 9 09-Aug-23 A 19-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-10-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 19-Aug-23 A 31-Aug-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-10-EC-120 Reinforcement Shop Drawings Preparation and submission 10 14-Aug-23 A 24-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-10-EC-130 Reinforcement Shop Drawings Review & Approval 12 24-Aug-23 A 06-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-11 24 08-Aug-23 A 04-Sep-23 A 04-Sep-23 A, CIVIL-SEG-T3-Z11-11


JAH-Z11-11-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 10 09-Aug-23 A 20-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-11-EC-110 Concrete Dimension Shop Drawings Review & Approval 14 20-Aug-23 A 04-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-11-EC-120 Reinforcement Shop Drawings Preparation and submission 11 08-Aug-23 A 20-Aug-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-11-EC-130 Reinforcement Shop Drawings Review & Approval 14 20-Aug-23 A 04-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-12 150 19-Dec-22 A 09-Dec-23 09-Dec-23, CIVIL-SEG-T3-Z11-12


JAH-Z11-12-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 70 19-Dec-22 A 09-Dec-23 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-12-EC-110 Concrete Dimension Shop Drawings Review & Approval 61 27-Dec-22 A 07-Dec-23 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-12-EC-120 Reinforcement Shop Drawings Preparation and submission 5 01-Jun-23 A 06-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-12-EC-130 Reinforcement Shop Drawings Review & Approval 8 06-Jun-23 A 14-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-13 139 03-Apr-23 A 18-Sep-23 A 18-Sep-23 A, CIVIL-SEG-T3-Z11-13


JAH-Z11-13-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 116 03-Apr-23 A 22-Aug-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-13-EC-110 Concrete Dimension Shop Drawings Review & Approval 22 09-Aug-23 A 03-Sep-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-13-EC-120 Reinforcement Shop Drawings Preparation and submission 7 01-Sep-23 A 09-Sep-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-13-EC-130 Reinforcement Shop Drawings Review & Approval 9 09-Sep-23 A 18-Sep-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-14 62 01-Apr-23 A 14-Jun-23 A 14-Jun-23 A, CIVIL-SEG-T3-Z11-14


JAH-Z11-14-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 4 01-Apr-23 A 04-Apr-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-14-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 04-Apr-23 A 12-Apr-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-14-EC-120 Reinforcement Shop Drawings Preparation and submission 5 01-Jun-23 A 06-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-14-EC-130 Reinforcement Shop Drawings Review & Approval 8 06-Jun-23 A 14-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-15 18 01-Jun-23 A 21-Jun-23 A 21-Jun-23 A, CIVIL-SEG-T3-Z11-15


JAH-Z11-15-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 01-Jun-23 A 13-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-15-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-15-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-15-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-16 40 30-Aug-26 17-Oct-26 17-Oct-26, CIVIL-SEG-


JAH-Z11-16-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 30-Aug-26 15-Sep-26 Concrete Dimension Shop D

JAH-Z11-16-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 17-Sep-26 03-Oct-26 Concrete Dimension Shop

JAH-Z11-16-EC-120 Reinforcement Shop Drawings Preparation and submission 14 15-Sep-26 03-Oct-26 Reinforcement Shop Draw

JAH-Z11-16-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Oct-26 17-Oct-26 Reinforcement Shop Dra

CIVIL-SEG-T3-Z11-17 18 01-Jun-23 A 21-Jun-23 A 21-Jun-23 A, CIVIL-SEG-T3-Z11-17


JAH-Z11-17-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 01-Jun-23 A 13-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-17-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-17-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-17-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
70 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CIVIL-SEG-T3-Z11-18 18 01-Jun-23 A 21-Jun-23 A 21-Jun-23 A, CIVIL-SEG-T3-Z11-18
JAH-Z11-18-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 01-Jun-23 A 13-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-18-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-18-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-18-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-19 18 01-Jun-23 A 21-Jun-23 A 21-Jun-23 A, CIVIL-SEG-T3-Z11-19


JAH-Z11-19-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 11 01-Jun-23 A 13-Jun-23 A Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-19-EC-110 Concrete Dimension Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-19-EC-120 Reinforcement Shop Drawings Preparation and submission 11 01-Jun-23 A 13-Jun-23 A Reinforcement Shop Drawings Preparation and submission

JAH-Z11-19-EC-130 Reinforcement Shop Drawings Review & Approval 8 13-Jun-23 A 21-Jun-23 A Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-20 40 01-Aug-24 16-Sep-24 16-Sep-24, CIVIL-SEG-T3-Z11-20


JAH-Z11-20-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 01-Aug-24 18-Aug-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-20-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-20-EC-120 Reinforcement Shop Drawings Preparation and submission 14 18-Aug-24 03-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-20-EC-130 Reinforcement Shop Drawings Review & Approval 12 03-Sep-24 16-Sep-24 Reinforcement Shop Drawings Review & Approval

CIVIL-SEG-T3-Z11-21 40 19-Aug-24 05-Oct-24 05-Oct-24, CIVIL-SEG-T3-Z11-21


JAH-Z11-21-EC-100 Concrete Dimension Shop Drawings Preparation & Submission 14 19-Aug-24 04-Sep-24 Concrete Dimension Shop Drawings Preparation & Submission

JAH-Z11-21-EC-110 Concrete Dimension Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Concrete Dimension Shop Drawings Review & Approval

JAH-Z11-21-EC-120 Reinforcement Shop Drawings Preparation and submission 14 04-Sep-24 21-Sep-24 Reinforcement Shop Drawings Preparation and submission

JAH-Z11-21-EC-130 Reinforcement Shop Drawings Review & Approval 12 21-Sep-24 05-Oct-24 Reinforcement Shop Drawings Review & Approval

ELECTRICAL SHOP DRAWINGS


DRAW 172 13-Oct-24 06-May-25 06-May-25, ELECTRICAL SHOP DRAWINGS
POWER SYSTEM 153 05-Nov-24 06-May-25 06-May-25, POWER SYSTEM
EARTHING SYSTEM 48 05-Nov-24 30-Dec-24 30-Dec-24, EARTHING SYSTEM
JAH-Z11-EEP-150 Earthing system Shop Drawings Preparation & Submission 14 05-Nov-24 21-Nov-24 Earthing system Shop Drawings Preparation & Submission

JAH-Z11-EEP-160 Earthing system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Earthing system Shop Drawings Review & Approval

LIGHTING SYSTEM 34 21-Nov-24 30-Dec-24 30-Dec-24, LIGHTING SYSTEM


JAH-Z11-EEP-100 Lighting system Shop Drawings Preparation & Submission 14 21-Nov-24 08-Dec-24 Lighting system Shop Drawings Preparation & Submission

JAH-Z11-EEP-110 Lighting system Shop Drawings Review & Approval 12 17-Dec-24 30-Dec-24 Lighting system Shop Drawings Review & Approval

CABLE TRAY /CABLE ROUTING SYSTEM 125 08-Dec-24 06-May-25 06-May-25, CABLE TRAY /CABLE ROUTING SYSTEM
JAH-Z11-EEP-140 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission 14 08-Dec-24 24-Dec-24 Cable Tray/ Cable Routing system Shop Drawings Preparation & Submission

JAH-Z11-EEP-320 Cable Tray/ Cable Routing system Shop Drawings Review & Approval 4 03-May-25 06-May-25 Cable Tray/ Cable Routing system Shop Drawings Review & Approval

SMALL POWER SYSTEM


SYSTE 18 24-Dec-24 13-Jan-25 13-Jan-25, SMALL POWER SYSTEM
JAH-Z11-EEP-120 Small Power system Shop Drawings Preparation & Submission 14 24-Dec-24 09-Jan-25 Small Power system Shop Drawings Preparation & Submission

JAH-Z11-EEP-130 Small Power system Shop Drawings Review & Approval 4 09-Jan-25 13-Jan-25 Small Power system Shop Drawings Review & Approval

POWER DISTRIBUTION 26 21-Dec-24 19-Jan-25 19-Jan-25, POWER DISTRIBUTION


JAH-Z11-EEP-170 Generator Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Generator Shop Drawings Preparation & Submission

JAH-Z11-EEP-180 Generator Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Generator Shop Drawings Review & Approval

JAH-Z11-EEP-190 UPS Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 UPS Shop Drawings Preparation & Submission

JAH-Z11-EEP-200 UPS Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 UPS Shop Drawings Review & Approval

JAH-Z11-EEP-210 MDBs Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 MDBs Pannels Shop Drawings Preparation & Submission

JAH-Z11-EEP-220 MDBs Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 MDBs Shop Drawings Review & Approval

JAH-Z11-EEP-230 MCC Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 MCC Pannels Shop Drawings Preparation & Submission

JAH-Z11-EEP-240 MCCB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 MCCB Shop Drawings Review & Approval

JAH-Z11-EEP-250 SMSB Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 SMSB Pannels Shop Drawings Preparation & Submission

JAH-Z11-EEP-260 SMSB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 SMSB Shop Drawings Review & Approval

JAH-Z11-EEP-270 DB Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 DB Pannels Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
71 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-Z11-EEP-280 DB Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 DB Shop Drawings Review & Approval

JAH-Z11-EEP-290 Isolators Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Isolators Shop Drawings Preparation & Submission

JAH-Z11-EEP-300 Isolator Shop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 Isolator Shop Drawings Review & Approval

JAH-Z11-EEP-310 LCP /ELC Pannels Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 LCP /ELC Pannels Shop Drawings Preparation & Submission

JAH-Z11-EEP-330 LCP / ELC PannelsShop Drawings Review & Approval 12 06-Jan-25 19-Jan-25 LCP / ELC PannelsShop Drawings Review & Approval

LOW CURRENT SYSTEM 95 13-Oct-24 01-Feb-25 01-Feb-25, LOW CURRENT SYSTEM


FIRE ALARM SYSTEM 68 13-Oct-24 31-Dec-24 31-Dec-24, FIRE ALARM SYSTEM
JAH-Z11-EEL-100 Fire Alarm system Shop Drawings Preparation & Submission 14 13-Oct-24 29-Oct-24 Fire Alarm system Shop Drawings Preparation & Submission

JAH-Z11-EEL-110 Fire Alarm system Shop Drawings Review & Approval 12 18-Dec-24 31-Dec-24 Fire Alarm system Shop Drawings Review & Approval

ICT SYSTEM (VIDEO S


SURVILLEIENCE, IP TELEPHONE, IP DATA) 63 29-Oct-24 11-Jan-25 11-Jan-25, ICT SYSTEM (VIDEO SURVILLEIENCE, IP TELEPHONE, IP DATA)
JAH-Z11-EEL-180 ICT System Shop Drawings Preparation & Submission 14 29-Oct-24 14-Nov-24 ICT System Shop Drawings Preparation & Submission

JAH-Z11-EEL-190 ICT System Shop Drawings Review & Approval 4 07-Jan-25 11-Jan-25 ICT System Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 50 14-Nov-24 11-Jan-25 11-Jan-25, ACCESS CONTROL SYSTEM
JAH-Z11-EEL-140 Access Control system Shop Drawings Preparation & Submission 14 14-Nov-24 01-Dec-24 Access Control system Shop Drawings Preparation & Submission

JAH-Z11-EEL-150 Access Control system Shop Drawings Review & Approval 12 29-Dec-24 11-Jan-25 Access Control system Shop Drawings Review & Approval

PUBLIC ADDRESS SYSTEM


SYS 45 01-Dec-24 21-Jan-25 21-Jan-25, PUBLIC ADDRESS SYSTEM
JAH-Z11-EEL-160 Public Address system Shop Drawings Preparation & Submission 14 01-Dec-24 17-Dec-24 Public Address system Shop Drawings Preparation & Submission

JAH-Z11-EEL-170 Public Address system Shop Drawings Review & Approval 4 18-Jan-25 21-Jan-25 Public Address system Shop Drawings Review & Approval

SCADA SYSTEM 31 17-Dec-24 21-Jan-25 21-Jan-25, SCADA SYSTEM


JAH-Z11-EEL-120 Scada system Shop Drawings Preparation & Submission 14 17-Dec-24 02-Jan-25 Scada system Shop Drawings Preparation & Submission

JAH-Z11-EEL-130 Scada system Shop Drawings Review & Approval 12 08-Jan-25 21-Jan-25 Scada system Shop Drawings Review & Approval

RADIO RE- BROADCOASTING/


BROADCOA TETRA 26 02-Jan-25 01-Feb-25 01-Feb-25, RADIO RE- BROADCOASTING/ TETRA
JAH-Z11-EEL-200 Radio Re-Broad coasting system Shop Drawings Preparation & Submission 14 02-Jan-25 19-Jan-25 Radio Re-Broad coasting system Shop Drawings Preparation & Submission

JAH-Z11-EEL-210 Radio Re-Broad coasting system Shop Drawings Review & Approval 12 19-Jan-25 01-Feb-25 Radio Re-Broad coasting system Shop Drawings Review & Approval

MECHANICAL SHOP DRAWINGS


DRA 88 27-Oct-24 05-Feb-25 05-Feb-25, MECHANICAL SHOP DRAWINGS
FIRE FIGHTING 82 27-Oct-24 29-Jan-25 29-Jan-25, FIRE FIGHTING
JAH-Z11-EM-100 Firefighting system Shop Drawings Preparation & Submission 14 27-Oct-24 12-Nov-24 Firefighting system Shop Drawings Preparation & Submission

JAH-Z11-EM-110 Firefighting system Shop Drawings Review & Approval 12 16-Jan-25 29-Jan-25 Firefighting system Shop Drawings Review & Approval

HVAC 74 12-Nov-24 05-Feb-25 05-Feb-25, HVAC


JAH-Z11-EM-120 HVAC system Shop Drawings Preparation & Submission 14 12-Nov-24 28-Nov-24 HVAC system Shop Drawings Preparation & Submission

JAH-Z11-EM-130 HVAC system Shop Drawings Review & Approval 12 23-Jan-25 05-Feb-25 HVAC system Shop Drawings Review & Approval

PLUMBING 26 28-Nov-24 28-Dec-24 28-Dec-24, PLUMBING


JAH-Z11-EM-140 Plumbing system Shop Drawings Preparation & Submission 14 28-Nov-24 15-Dec-24 Plumbing system Shop Drawings Preparation & Submission

JAH-Z11-EM-150 Plumbing system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Plumbing system Shop Drawings Review & Approval

WET UTILITIES 28 22-Mar-25 27-Apr-25 27-Apr-25, WET UTILITIES


DRAINAGE NET WORK 28 22-Mar-25 27-Apr-25 27-Apr-25, DRAINAGE NET WORK
T3-CON-Z11-WC-D.1 Plan and Profile Shop Drawing Review & Approval 14 12-Apr-25 27-Apr-25 Plan and Profile Shop Drawing Review & Approval

T3-ENGZ11-WC-D.19 Plan and Profile Shop Drawing Prepration &Submission 14 22-Mar-25 12-Apr-25 Plan and Profile Shop Drawing Prepration &Submission

DRY UTILITIES 31 31-Dec-24 05-Feb-25 05-Feb-25, DRY UTILITIES


POWER 31 31-Dec-24 05-Feb-25 05-Feb-25, POWER
JAH-Z7-DU-EN-PWR Prepare and submit power system shopdrawings 20 31-Dec-24 23-Jan-25 Prepare and submit power system shopdrawings

JAH-Z7-DU-EN-PWR Review and approval power system shopdrawings 11 23-Jan-25 05-Feb-25 Review and approval power system shopdrawings

ROADS 70 02-Jun-25 25-Aug-25 25-Aug-25, ROADS


T3-ENG-Z11-R.430 Plan and Profile Shop Drawing Preparation & Submission 14 02-Jun-25 22-Jun-25 Plan and Profile Shop Drawing Preparation & Submission

T3-ENG-Z11-R.435 Plan and Profile Shop Drawing Review & Approval 14 22-Jun-25 08-Jul-25 Plan and Profile Shop Drawing Review & Approval

T3-ENG-Z11-R.440 Road Cross Sections Shop Drawing Preparation & Submission 14 08-Jul-25 24-Jul-25 Road Cross Sections Shop Drawing Preparation & Submission

T3-ENG-Z11-R.445 Road Cross Sections Shop Drawing Review & Approval 14 24-Jul-25 09-Aug-25 Road Cross Sections Shop Drawing Review & Approval

T3-ENG-Z11-R.450 Guiding Signs and Marking Shop Drawing Preparation & Submission 14 24-Jul-25 10-Aug-25 Guiding Signs and Marking Shop Drawing Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
72 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
T3-ENG-Z11-R.455 Guiding Signs and Marking Shop Drawing Review & Approval 14 10-Aug-25 25-Aug-25 Guiding Signs and Marking Shop Drawing Review & Approval

EGRESS STAIR 330 02-Dec-23 30-Dec-24 30-Dec-24, EGRESS STAIR


EGRESS STAIR 02 (IN ZO
ZONE 02) 230 10-Jan-24 14-Oct-24 14-Oct-24, EGRESS STAIR 02 (IN ZONE 02)
ENGINEERING 230 10-Jan-24 14-Oct-24 14-Oct-24, ENGINEERING
SHOP DRAWINGS 230 10-Jan-24 14-Oct-24 14-Oct-24, SHOP DRAWINGS
STRUCTURE 193 10-Jan-24 29-Aug-24 29-Aug-24, STRUCTURE
ES.2-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 10-Jan-24 25-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.2-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 25-Jan-24 11-Feb-24 Foundation Shop Drawings Review & Approval

ES.2-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 Walls Shop Drawings Preparation & Submission

ES.2-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 26-Jun-24 13-Jul-24 Walls Shop Drawings Review & Approval

ES.2-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 29-Jul-24 13-Aug-24 Slab Shop Drawings Preparation & Submission

ES.2-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 13-Aug-24 29-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 30-Jun-24 18-Aug-24 18-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 35 30-Jun-24 10-Aug-24 10-Aug-24, FIRE FIGHTING SYSTEM
ES.2-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

ES.2-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 24-Jul-24 10-Aug-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 16-Jul-24 18-Aug-24 18-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.2-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 HVAC Shop Drawings Preparation & Submission

ES.2-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 01-Aug-24 18-Aug-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 108 03-Jun-24 14-Oct-24 14-Oct-24, ELECTRICAL


CABLE TRAYS 55 03-Jun-24 12-Aug-24 12-Aug-24, CABLE TRAYS
ES.2-EN-E-D..60 Cable Tray Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Cable Tray Shop Drawings Preparation & Submission

ES.2-EN-E-D..65 Cable Tray Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 46 24-Jun-24 17-Aug-24 17-Aug-24, POWER CABLES


ES.2-EN-E-D..70 Power Cables Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Power Cables Shop Drawings Preparation & Submission

ES.2-EN-E-D..75 Power Cables Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 43 10-Jul-24 29-Aug-24 29-Aug-24, LIGHTING SYSTEM


ES.2-EN-E-D..80 Lighting System Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.2-EN-E-D..85 Lighting System Shop Drawings Review & Approval 12 15-Aug-24 29-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 33 27-Jul-24 03-Sep-24 03-Sep-24, ELECTRICAL INSTALLATIONS
ES.2-EN-E-D..90 Electrical Installations Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Electrical Installations Shop Drawings Preparation & Submission

ES.2-EN-E-D..95 Electrical Installations Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 12-Aug-24 11-Sep-24 11-Sep-24, LIGHTNING PROTECTION SYSTEM


ES.2-EN-E-D..100 Lightning Protection Drawings Preparation & Submission 14 12-Aug-24 28-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.2-EN-E-D..105 Lightning Protection Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 09-Jul-24 14-Oct-24 14-Oct-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 57 09-Jul-24 15-Sep-24 15-Sep-24, FIRE DETECTION AND ALARM SYSTEM
ES.2-EN-EL-D..60 Fire Alarm Shop Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.2-EN-EL-D..65 Fire Alarm Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 50 25-Jul-24 22-Sep-24 22-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.2-EN-EL-D..70 Telephone Shop Drawings Preparation & Submission 14 25-Jul-24 11-Aug-24 Telephone Shop Drawings Preparation & Submission

ES.2-EN-EL-D..75 Telephone Shop Drawings Review & Approval 12 08-Sep-24 22-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 40 11-Aug-24 28-Sep-24 28-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.2-EN-EL-D..80 Public Address system Shop Drawings Preparation & Submission 14 11-Aug-24 27-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.2-EN-EL-D..85 Public Address system Shop Drawings Review & Approval 12 12-Sep-24 28-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 27-Aug-24 06-Oct-24 06-Oct-24, VIDEO SURVEILLANCE


ES.2-EN-EL-D..90 Video Surveillance system Shop Drawings Preparation & Submission 14 27-Aug-24 12-Sep-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.2-EN-EL-D..95 Video Surveillance system Shop Drawings Review & Approval 12 21-Sep-24 06-Oct-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 12-Sep-24 14-Oct-24 14-Oct-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
73 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.2-EN-EL-D..100 Access Control system Shop Drawings Preparation & Submission 14 12-Sep-24 30-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.2-EN-EL-D..105 Access Control system Shop Drawings Review & Approval 12 30-Sep-24 14-Oct-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 04 (IN ZO


ZONE 02) 230 21-Dec-23 25-Sep-24 25-Sep-24, EGRESS STAIR 04 (IN ZONE 02)
ENGINEERING 230 21-Dec-23 25-Sep-24 25-Sep-24, ENGINEERING
SHOP DRAWINGS 230 21-Dec-23 25-Sep-24 25-Sep-24, SHOP DRAWINGS
STRUCTURE 194 21-Dec-23 12-Aug-24 12-Aug-24, STRUCTURE
ES.4-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 21-Dec-23 07-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.4-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 07-Jan-24 23-Jan-24 Foundation Shop Drawings Review & Approval

ES.4-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Walls Shop Drawings Preparation & Submission

ES.4-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 03-Jun-24 23-Jun-24 Walls Shop Drawings Review & Approval

ES.4-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Slab Shop Drawings Preparation & Submission

ES.4-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 27-Jul-24 12-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 06-Jun-24 30-Jul-24 30-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 35 06-Jun-24 22-Jul-24 22-Jul-24, FIRE FIGHTING SYSTEM
ES.4-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 06-Jun-24 27-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.4-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 06-Jul-24 22-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 27-Jun-24 30-Jul-24 30-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.4-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.4-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 14-Jul-24 30-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 108 15-May-24 25-Sep-24 25-Sep-24, ELECTRICAL


CABLE TRAYS 55 15-May-24 24-Jul-24 24-Jul-24, CABLE TRAYS
ES.4-EN-E-D-CT.60 Cable Tray Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Cable Tray Shop Drawings Preparation & Submission

ES.4-EN-E-D-CT.65 Cable Tray Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 46 01-Jun-24 29-Jul-24 29-Jul-24, POWER CABLES


ES.4-EN-E-D-PC.70 Power Cables Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.4-EN-E-D-PC.75 Power Cables Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 43 22-Jun-24 11-Aug-24 11-Aug-24, LIGHTING SYSTEM


ES.4-EN-E-D-LS.80 Lighting System Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.4-EN-E-D-LS.85 Lighting System Shop Drawings Review & Approval 12 28-Jul-24 11-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 33 08-Jul-24 15-Aug-24 15-Aug-24, ELECTRICAL INSTALLATIONS
ES.4-EN-E-D-EI.90 Electrical Installations Shop Drawings Preparation & Submission 14 08-Jul-24 24-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.4-EN-E-D-EI.95 Electrical Installations Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 24-Jul-24 24-Aug-24 24-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.4-EN-E-D-LPS.100 Lightning Protection Drawings Preparation & Submission 14 24-Jul-24 10-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.4-EN-E-D-LPS.105 Lightning Protection Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 20-Jun-24 25-Sep-24 25-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 57 20-Jun-24 27-Aug-24 27-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.4-EN-EL-D-FD.60 Fire Alarm Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.4-EN-EL-D-FD.65 Fire Alarm Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 50 07-Jul-24 03-Sep-24 03-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.4-EN-EL-D-CS.70 Telephone Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.4-EN-EL-D-CS.75 Telephone Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 40 23-Jul-24 08-Sep-24 08-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.4-EN-EL-D-VE.80 Public Address system Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.4-EN-EL-D-VE.85 Public Address system Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 08-Aug-24 16-Sep-24 16-Sep-24, VIDEO SURVEILLANCE


ES.4-EN-EL-D-VS.90 Video Surveillance system Shop Drawings Preparation & Submission 14 08-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.4-EN-EL-D-VS.95 Video Surveillance system Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 25-Aug-24 25-Sep-24 25-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
74 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.4-EN-EL-D-AC.10 Access Control system Shop Drawings Preparation & Submission 14 25-Aug-24 10-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.4-EN-EL-D-AC.10 Access Control system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 03 (IN ZO


ZONE 02) 223 03-Apr-24 30-Dec-24 30-Dec-24, EGRESS STAIR 03 (IN ZONE 02)
ENGINEERING 223 03-Apr-24 30-Dec-24 30-Dec-24, ENGINEERING
SHOP DRAWINGS 223 03-Apr-24 30-Dec-24 30-Dec-24, SHOP DRAWINGS
STRUCTURE 195 03-Apr-24 26-Nov-24 26-Nov-24, STRUCTURE
ES.3-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Foundation Shop Drawings Preparation & Submission

ES.3-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 23-Apr-24 09-May-24 Foundation Shop Drawings Review & Approval

ES.3-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 03-Sep-24 19-Sep-24 Walls Shop Drawings Preparation & Submission

ES.3-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 19-Sep-24 06-Oct-24 Walls Shop Drawings Review & Approval

ES.3-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 26-Oct-24 10-Nov-24 Slab Shop Drawings Preparation & Submission

ES.3-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 10-Nov-24 26-Nov-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 15-Sep-24 04-Nov-24 04-Nov-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 15-Sep-24 31-Oct-24 31-Oct-24, FIRE FIGHTING SYSTEM
ES.3-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 15-Sep-24 02-Oct-24 Fire Fighting Shop Drawings Preparation & Submission

ES.3-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 15-Oct-24 31-Oct-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Oct-24 04-Nov-24 04-Nov-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.3-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Oct-24 19-Oct-24 HVAC Shop Drawings Preparation & Submission

ES.3-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 19-Oct-24 04-Nov-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 31-Aug-24 30-Dec-24 30-Dec-24, ELECTRICAL


CABLE TRAYS 51 31-Aug-24 31-Oct-24 31-Oct-24, CABLE TRAYS
ES.3-EN-E-D.10 Cable Tray Shop Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Cable Tray Shop Drawings Preparation & Submission

ES.3-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 17-Oct-24 31-Oct-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 16-Sep-24 06-Nov-24 06-Nov-24, POWER CABLES


ES.3-EN-E-D.20 Power Cables Shop Drawings Preparation & Submission 14 16-Sep-24 03-Oct-24 Power Cables Shop Drawings Preparation & Submission

ES.3-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 03-Oct-24 19-Nov-24 19-Nov-24, LIGHTING SYSTEM


ES.3-EN-E-D.30 Lighting System Shop Drawings Preparation & Submission 14 03-Oct-24 20-Oct-24 Lighting System Shop Drawings Preparation & Submission

ES.3-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 05-Nov-24 19-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 20-Oct-24 24-Nov-24 24-Nov-24, ELECTRICAL INSTALLATIONS
ES.3-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 20-Oct-24 05-Nov-24 Electrical Installations Shop Drawings Preparation & Submission

ES.3-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 05-Nov-24 05-Dec-24 05-Dec-24, LIGHTNING PROTECTION SYSTEM


ES.3-EN-E-D.50 Lightning Protection Drawings Preparation & Submission 14 05-Nov-24 21-Nov-24 Lightning Protection Drawings Preparation & Submission

ES.3-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 25-Sep-24 30-Dec-24 30-Dec-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 25-Sep-24 05-Dec-24 05-Dec-24, FIRE DETECTION AND ALARM SYSTEM
ES.3-EN-EL-D.10 Fire Alarm Shop Drawings Preparation & Submission 14 25-Sep-24 12-Oct-24 Fire Alarm Shop Drawings Preparation & Submission

ES.3-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 21-Nov-24 05-Dec-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 12-Oct-24 11-Dec-24 11-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.3-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Telephone Shop Drawings Preparation & Submission

ES.3-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 27-Nov-24 11-Dec-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 28-Oct-24 17-Dec-24 17-Dec-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.3-EN-EL-D.30 Public Address system Shop Drawings Preparation & Submission 14 28-Oct-24 13-Nov-24 Public Address system Shop Drawings Preparation & Submission

ES.3-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 03-Dec-24 17-Dec-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 13-Nov-24 22-Dec-24 22-Dec-24, VIDEO SURVEILLANCE


ES.3-EN-EL-D.40 Video Surveillance system Shop Drawings Preparation & Submission 14 13-Nov-24 30-Nov-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.3-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 08-Dec-24 22-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 30-Nov-24 30-Dec-24 30-Dec-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
75 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.3-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 30-Nov-24 16-Dec-24 Access Control system Shop Drawings Preparation & Submission

ES.3-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 16-Dec-24 30-Dec-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 10 (IN ZO


ZONE 03) 230 02-Dec-23 03-Sep-24 03-Sep-24, EGRESS STAIR 10 (IN ZONE 03)
ENGINEERING 230 02-Dec-23 03-Sep-24 03-Sep-24, ENGINEERING
SHOP DRAWINGS 230 02-Dec-23 03-Sep-24 03-Sep-24, SHOP DRAWINGS
STRUCTURE 210 02-Dec-23 10-Aug-24 10-Aug-24, STRUCTURE
ES.10-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.10-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.10-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Walls Shop Drawings Preparation & Submission

ES.10-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 21-May-24 06-Jun-24 Walls Shop Drawings Review & Approval

ES.10-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 09-Jul-24 24-Jul-24 Slab Shop Drawings Preparation & Submission

ES.10-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 25-Jul-24 10-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 16-May-24 09-Jul-24 09-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 16-May-24 06-Jul-24 06-Jul-24, FIRE FIGHTING SYSTEM
ES.10-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.10-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 19-Jun-24 06-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Jun-24 09-Jul-24 09-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.10-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.10-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 01-May-24 03-Sep-24 03-Sep-24, ELECTRICAL


CABLE TRAYS 51 01-May-24 06-Jul-24 06-Jul-24, CABLE TRAYS
ES.10-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 01-May-24 18-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.10-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 18-May-24 11-Jul-24 11-Jul-24, POWER CABLES


ES.10-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.10-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 03-Jun-24 24-Jul-24 24-Jul-24, LIGHTING SYSTEM


ES.10-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.10-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 24-Jun-24 29-Jul-24 29-Jul-24, ELECTRICAL INSTALLATIONS
ES.10-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.10-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 10-Jul-24 10-Aug-24 10-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.10-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.10-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 26-May-24 03-Sep-24 03-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 26-May-24 10-Aug-24 10-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.10-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.10-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 11-Jun-24 15-Aug-24 15-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.10-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.10-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 02-Jul-24 21-Aug-24 21-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.10-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.10-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 18-Jul-24 26-Aug-24 26-Aug-24, VIDEO SURVEILLANCE


ES.10-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.10-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 04-Aug-24 03-Sep-24 03-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
76 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.10-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.10-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 13 (IN ZO


ZONE 03) 230 17-Dec-23 18-Sep-24 18-Sep-24, EGRESS STAIR 13 (IN ZONE 03)
ENGINEERING 230 17-Dec-23 18-Sep-24 18-Sep-24, ENGINEERING
SHOP DRAWINGS 230 17-Dec-23 18-Sep-24 18-Sep-24, SHOP DRAWINGS
STRUCTURE 210 17-Dec-23 26-Aug-24 26-Aug-24, STRUCTURE
ES.13-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.13-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Review & Approval

ES.13-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Walls Shop Drawings Preparation & Submission

ES.13-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 05-Jun-24 26-Jun-24 Walls Shop Drawings Review & Approval

ES.13-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 24-Jul-24 10-Aug-24 Slab Shop Drawings Preparation & Submission

ES.13-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 10-Aug-24 26-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 02-Jun-24 24-Jul-24 24-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 02-Jun-24 21-Jul-24 21-Jul-24, FIRE FIGHTING SYSTEM
ES.13-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 02-Jun-24 22-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.13-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 04-Jul-24 21-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jun-24 24-Jul-24 24-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.13-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jun-24 08-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.13-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 08-Jul-24 24-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 18-May-24 18-Sep-24 18-Sep-24, ELECTRICAL


CABLE TRAYS 51 18-May-24 21-Jul-24 21-Jul-24, CABLE TRAYS
ES.13-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Cable Tray Shop Drawings Preparation & Submission

ES.13-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 03-Jun-24 27-Jul-24 27-Jul-24, POWER CABLES


ES.13-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.13-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 24-Jun-24 08-Aug-24 08-Aug-24, LIGHTING SYSTEM


ES.13-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.13-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Jul-24 13-Aug-24 13-Aug-24, ELECTRICAL INSTALLATIONS
ES.13-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Jul-24 25-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.13-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 30-Jul-24 13-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 27-Jul-24 25-Aug-24 25-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.13-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 27-Jul-24 11-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.13-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 11-Jun-24 18-Sep-24 18-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 11-Jun-24 25-Aug-24 25-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.13-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.13-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 02-Jul-24 31-Aug-24 31-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.13-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.13-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 18-Jul-24 05-Sep-24 05-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.13-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.13-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 22-Aug-24 05-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 04-Aug-24 10-Sep-24 10-Sep-24, VIDEO SURVEILLANCE


ES.13-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 04-Aug-24 19-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.13-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 27-Aug-24 10-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 20-Aug-24 18-Sep-24 18-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
77 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.13-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.13-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 14 (IN ZO


ZONE 04) 253 02-Dec-23 30-Sep-24 30-Sep-24, EGRESS STAIR 14 (IN ZONE 04)
ENGINEERING 253 02-Dec-23 30-Sep-24 30-Sep-24, ENGINEERING
SHOP DRAWINGS 253 02-Dec-23 30-Sep-24 30-Sep-24, SHOP DRAWINGS
STRUCTURE 210 27-Dec-23 05-Sep-24 05-Sep-24, STRUCTURE
ES.14-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 27-Dec-23 13-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.14-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 13-Jan-24 29-Jan-24 Foundation Shop Drawings Review & Approval

ES.14-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Walls Shop Drawings Preparation & Submission

ES.14-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-Jun-24 07-Jul-24 Walls Shop Drawings Review & Approval

ES.14-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Preparation & Submission

ES.14-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 20-Aug-24 05-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 12-Jun-24 04-Aug-24 04-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 12-Jun-24 31-Jul-24 31-Jul-24, FIRE FIGHTING SYSTEM
ES.14-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 12-Jun-24 02-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

ES.14-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 15-Jul-24 31-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 03-Jul-24 04-Aug-24 04-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.14-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.14-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 253 02-Dec-23 30-Sep-24 30-Sep-24, ELECTRICAL


CABLE TRAYS 202 02-Dec-23 31-Jul-24 31-Jul-24, CABLE TRAYS
ES.14-EN-E-D-CT.60 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

ES.14-EN-E-D-CT.65 Cable Tray Shop Drawings Review & Approval 12 17-Jul-24 31-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 193 17-Dec-23 06-Aug-24 06-Aug-24, POWER CABLES


ES.14-EN-E-D-PC.70 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

ES.14-EN-E-D-PC.75 Power Cables Shop Drawings Review & Approval 12 23-Jul-24 06-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 190 02-Jan-24 19-Aug-24 19-Aug-24, LIGHTING SYSTEM


ES.14-EN-E-D-LS.80 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

ES.14-EN-E-D-LS.85 Lighting System Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 180 18-Jan-24 24-Aug-24 24-Aug-24, ELECTRICAL INSTALLATIONS
ES.14-EN-E-D-EI.90 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

ES.14-EN-E-D-EI.95 Electrical Installations Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 04-Feb-24 05-Mar-24 05-Mar-24, LIGHTNING PROTECTION SYSTEM


ES.14-EN-E-D-LPS.100 Lightning Protection Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Lightning Protection Drawings Preparation & Submission

ES.14-EN-E-D-LPS.105 Lightning Protection Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 26-Jun-24 30-Sep-24 30-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 26-Jun-24 04-Sep-24 04-Sep-24, FIRE DETECTION AND ALARM SYSTEM
ES.14-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.14-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 13-Jul-24 10-Sep-24 10-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.14-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.14-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 27-Aug-24 10-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 29-Jul-24 16-Sep-24 16-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.14-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.14-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 02-Sep-24 16-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 14-Aug-24 21-Sep-24 21-Sep-24, VIDEO SURVEILLANCE


ES.14-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 14-Aug-24 29-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.14-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 07-Sep-24 21-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 31-Aug-24 30-Sep-24 30-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
78 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.14-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 31-Aug-24 15-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.14-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 15-Sep-24 30-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 17 (IN ZO


ZONE 04) 230 02-Dec-23 03-Sep-24 03-Sep-24, EGRESS STAIR 17 (IN ZONE 04)
ENGINEERING 230 02-Dec-23 03-Sep-24 03-Sep-24, ENGINEERING
SHOP DRAWINGS 230 02-Dec-23 03-Sep-24 03-Sep-24, SHOP DRAWINGS
STRUCTURE 205 02-Dec-23 04-Aug-24 04-Aug-24, STRUCTURE
ES.17-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.17-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.17-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Walls Shop Drawings Preparation & Submission

ES.17-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 21-May-24 06-Jun-24 Walls Shop Drawings Review & Approval

ES.17-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 Slab Shop Drawings Preparation & Submission

ES.17-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 20-Jul-24 04-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 16-May-24 09-Jul-24 09-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 16-May-24 06-Jul-24 06-Jul-24, FIRE FIGHTING SYSTEM
ES.17-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.17-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 19-Jun-24 06-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 02-Jun-24 09-Jul-24 09-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.17-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.17-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 01-May-24 03-Sep-24 03-Sep-24, ELECTRICAL


CABLE TRAYS 51 01-May-24 06-Jul-24 06-Jul-24, CABLE TRAYS
ES.17-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 01-May-24 18-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.17-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 22-Jun-24 06-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 18-May-24 11-Jul-24 11-Jul-24, POWER CABLES


ES.17-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.17-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 03-Jun-24 24-Jul-24 24-Jul-24, LIGHTING SYSTEM


ES.17-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.17-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 10-Jul-24 24-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 24-Jun-24 29-Jul-24 29-Jul-24, ELECTRICAL INSTALLATIONS
ES.17-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.17-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 10-Jul-24 10-Aug-24 10-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.17-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.17-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 26-May-24 03-Sep-24 03-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 26-May-24 10-Aug-24 10-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.17-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.17-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 11-Jun-24 15-Aug-24 15-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.17-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.17-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 02-Jul-24 21-Aug-24 21-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.17-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.17-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 18-Jul-24 26-Aug-24 26-Aug-24, VIDEO SURVEILLANCE


ES.17-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.17-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 04-Aug-24 03-Sep-24 03-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
79 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.17-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.17-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 18 (IN ZO


ZONE 04) 229 02-Dec-23 02-Sep-24 02-Sep-24, EGRESS STAIR 18 (IN ZONE 04)
ENGINEERING 229 02-Dec-23 02-Sep-24 02-Sep-24, ENGINEERING
SHOP DRAWINGS 229 02-Dec-23 02-Sep-24 02-Sep-24, SHOP DRAWINGS
STRUCTURE 200 02-Dec-23 29-Jul-24 29-Jul-24, STRUCTURE
ES.18-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.18-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.18-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission

ES.18-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval

ES.18-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 27-Jun-24 13-Jul-24 Slab Shop Drawings Preparation & Submission

ES.18-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 14-Jul-24 29-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 15-May-24 08-Jul-24 08-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 15-May-24 04-Jul-24 04-Jul-24, FIRE FIGHTING SYSTEM
ES.18-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.18-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.18-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.18-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 30-Apr-24 02-Sep-24 02-Sep-24, ELECTRICAL


CABLE TRAYS 51 30-Apr-24 04-Jul-24 04-Jul-24, CABLE TRAYS
ES.18-EN-E-D.10 Cable Tray Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.18-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 16-May-24 10-Jul-24 10-Jul-24, POWER CABLES


ES.18-EN-E-D.20 Power Cables Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.18-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 02-Jun-24 23-Jul-24 23-Jul-24, LIGHTING SYSTEM


ES.18-EN-E-D.30 Lighting System Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.18-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.18-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.18-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 09-Jul-24 08-Aug-24 08-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.18-EN-E-D.50 Lightning Protection Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.18-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 25-May-24 02-Sep-24 02-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 25-May-24 08-Aug-24 08-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.18-EN-EL-D.10 Fire Alarm Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.18-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.18-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.18-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 01-Jul-24 20-Aug-24 20-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.18-EN-EL-D.30 Public Address system Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.18-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 17-Jul-24 25-Aug-24 25-Aug-24, VIDEO SURVEILLANCE


ES.18-EN-EL-D.40 Video Surveillance system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.18-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 03-Aug-24 02-Sep-24 02-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
80 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.18-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.18-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 19 (IN ZO


ZONE 05) 229 23-Jan-24 26-Oct-24 26-Oct-24, EGRESS STAIR 19 (IN ZONE 05)
ENGINEERING 229 23-Jan-24 26-Oct-24 26-Oct-24, ENGINEERING
SHOP DRAWINGS 229 23-Jan-24 26-Oct-24 26-Oct-24, SHOP DRAWINGS
STRUCTURE 200 23-Jan-24 19-Sep-24 19-Sep-24, STRUCTURE
ES.19-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 23-Jan-24 07-Feb-24 Foundation Shop Drawings Preparation & Submission

ES.19-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 07-Feb-24 24-Feb-24 Foundation Shop Drawings Review & Approval

ES.19-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Walls Shop Drawings Preparation & Submission

ES.19-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 16-Jul-24 01-Aug-24 Walls Shop Drawings Review & Approval

ES.19-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Aug-24 03-Sep-24 Slab Shop Drawings Preparation & Submission

ES.19-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Sep-24 19-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 11-Jul-24 29-Aug-24 29-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 11-Jul-24 26-Aug-24 26-Aug-24, FIRE FIGHTING SYSTEM
ES.19-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 11-Jul-24 28-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

ES.19-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 10-Aug-24 26-Aug-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 28-Jul-24 29-Aug-24 29-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.19-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 28-Jul-24 13-Aug-24 HVAC Shop Drawings Preparation & Submission

ES.19-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 13-Aug-24 29-Aug-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 26-Jun-24 26-Oct-24 26-Oct-24, ELECTRICAL


CABLE TRAYS 51 26-Jun-24 26-Aug-24 26-Aug-24, CABLE TRAYS
ES.19-EN-E-D.10 Cable Tray Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Cable Tray Shop Drawings Preparation & Submission

ES.19-EN-E-D.15 Cable Tray Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 13-Jul-24 01-Sep-24 01-Sep-24, POWER CABLES


ES.19-EN-E-D.20 Power Cables Shop Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Power Cables Shop Drawings Preparation & Submission

ES.19-EN-E-D.25 Power Cables Shop Drawings Review & Approval 12 18-Aug-24 01-Sep-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 29-Jul-24 14-Sep-24 14-Sep-24, LIGHTING SYSTEM


ES.19-EN-E-D.30 Lighting System Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Lighting System Shop Drawings Preparation & Submission

ES.19-EN-E-D.35 Lighting System Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 14-Aug-24 18-Sep-24 18-Sep-24, ELECTRICAL INSTALLATIONS
ES.19-EN-E-D.40 Electrical Installations Shop Drawings Preparation & Submission 14 14-Aug-24 31-Aug-24 Electrical Installations Shop Drawings Preparation & Submission

ES.19-EN-E-D.45 Electrical Installations Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 31-Aug-24 01-Oct-24 01-Oct-24, LIGHTNING PROTECTION SYSTEM


ES.19-EN-E-D.50 Lightning Protection Drawings Preparation & Submission 14 31-Aug-24 16-Sep-24 Lightning Protection Drawings Preparation & Submission

ES.19-EN-E-D.55 Lightning Protection Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 21-Jul-24 26-Oct-24 26-Oct-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 21-Jul-24 01-Oct-24 01-Oct-24, FIRE DETECTION AND ALARM SYSTEM
ES.19-EN-EL-D.10 Fire Alarm Shop Drawings Preparation & Submission 14 21-Jul-24 06-Aug-24 Fire Alarm Shop Drawings Preparation & Submission

ES.19-EN-EL-D.15 Fire Alarm Shop Drawings Review & Approval 12 16-Sep-24 01-Oct-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 06-Aug-24 07-Oct-24 07-Oct-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.19-EN-EL-D.20 Telephone Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Telephone Shop Drawings Preparation & Submission

ES.19-EN-EL-D.25 Telephone Shop Drawings Review & Approval 12 22-Sep-24 07-Oct-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 22-Aug-24 13-Oct-24 13-Oct-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.19-EN-EL-D.30 Public Address system Shop Drawings Preparation & Submission 14 22-Aug-24 08-Sep-24 Public Address system Shop Drawings Preparation & Submission

ES.19-EN-EL-D.35 Public Address system Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 08-Sep-24 17-Oct-24 17-Oct-24, VIDEO SURVEILLANCE


ES.19-EN-EL-D.40 Video Surveillance system Shop Drawings Preparation & Submission 14 08-Sep-24 25-Sep-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.19-EN-EL-D.45 Video Surveillance system Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 25-Sep-24 26-Oct-24 26-Oct-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
81 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.19-EN-EL-D.50 Access Control system Shop Drawings Preparation & Submission 14 25-Sep-24 12-Oct-24 Access Control system Shop Drawings Preparation & Submission

ES.19-EN-EL-D.55 Access Control system Shop Drawings Review & Approval 12 12-Oct-24 26-Oct-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 20 (IN ZO


ZONE 05) 230 17-Jan-24 21-Oct-24 21-Oct-24, EGRESS STAIR 20 (IN ZONE 05)
ENGINEERING 230 17-Jan-24 21-Oct-24 21-Oct-24, ENGINEERING
SHOP DRAWINGS 230 17-Jan-24 21-Oct-24 21-Oct-24, SHOP DRAWINGS
STRUCTURE 205 17-Jan-24 19-Sep-24 19-Sep-24, STRUCTURE
ES.20-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 17-Jan-24 01-Feb-24 Foundation Shop Drawings Preparation & Submission

ES.20-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 01-Feb-24 18-Feb-24 Foundation Shop Drawings Review & Approval

ES.20-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Walls Shop Drawings Preparation & Submission

ES.20-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 11-Jul-24 28-Jul-24 Walls Shop Drawings Review & Approval

ES.20-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Aug-24 03-Sep-24 Slab Shop Drawings Preparation & Submission

ES.20-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Sep-24 19-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 07-Jul-24 25-Aug-24 25-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 07-Jul-24 21-Aug-24 21-Aug-24, FIRE FIGHTING SYSTEM
ES.20-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

ES.20-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 05-Aug-24 21-Aug-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jul-24 25-Aug-24 25-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.20-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 HVAC Shop Drawings Preparation & Submission

ES.20-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 08-Aug-24 25-Aug-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 22-Jun-24 21-Oct-24 21-Oct-24, ELECTRICAL


CABLE TRAYS 51 22-Jun-24 21-Aug-24 21-Aug-24, CABLE TRAYS
ES.20-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Cable Tray Shop Drawings Preparation & Submission

ES.20-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 07-Aug-24 21-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 08-Jul-24 27-Aug-24 27-Aug-24, POWER CABLES


ES.20-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 08-Jul-24 24-Jul-24 Power Cables Shop Drawings Preparation & Submission

ES.20-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 24-Jul-24 09-Sep-24 09-Sep-24, LIGHTING SYSTEM


ES.20-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 24-Jul-24 10-Aug-24 Lighting System Shop Drawings Preparation & Submission

ES.20-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 26-Aug-24 09-Sep-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Aug-24 14-Sep-24 14-Sep-24, ELECTRICAL INSTALLATIONS
ES.20-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Aug-24 26-Aug-24 Electrical Installations Shop Drawings Preparation & Submission

ES.20-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 26-Aug-24 26-Sep-24 26-Sep-24, LIGHTNING PROTECTION SYSTEM


ES.20-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Lightning Protection Drawings Preparation & Submission

ES.20-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 16-Jul-24 21-Oct-24 21-Oct-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 16-Jul-24 26-Sep-24 26-Sep-24, FIRE DETECTION AND ALARM SYSTEM
ES.20-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 Fire Alarm Shop Drawings Preparation & Submission

ES.20-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 11-Sep-24 26-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 01-Aug-24 02-Oct-24 02-Oct-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.20-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 01-Aug-24 18-Aug-24 Telephone Shop Drawings Preparation & Submission

ES.20-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 17-Sep-24 02-Oct-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 18-Aug-24 08-Oct-24 08-Oct-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.20-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 18-Aug-24 03-Sep-24 Public Address system Shop Drawings Preparation & Submission

ES.20-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 24-Sep-24 08-Oct-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 03-Sep-24 13-Oct-24 13-Oct-24, VIDEO SURVEILLANCE


ES.20-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 03-Sep-24 19-Sep-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.20-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 19-Sep-24 21-Oct-24 21-Oct-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
82 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.20-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 19-Sep-24 07-Oct-24 Access Control system Shop Drawings Preparation & Submission

ES.20-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 07-Oct-24 21-Oct-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 22 (IN ZO


ZONE 05) 229 19-Dec-23 19-Sep-24 19-Sep-24, EGRESS STAIR 22 (IN ZONE 05)
ENGINEERING 229 19-Dec-23 19-Sep-24 19-Sep-24, ENGINEERING
SHOP DRAWINGS 229 19-Dec-23 19-Sep-24 19-Sep-24, SHOP DRAWINGS
STRUCTURE 193 19-Dec-23 07-Aug-24 07-Aug-24, STRUCTURE
ES.22-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 19-Dec-23 04-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.22-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 04-Jan-24 20-Jan-24 Foundation Shop Drawings Review & Approval

ES.22-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 21-May-24 06-Jun-24 Walls Shop Drawings Preparation & Submission

ES.22-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 06-Jun-24 27-Jun-24 Walls Shop Drawings Review & Approval

ES.22-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Preparation & Submission

ES.22-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 23-Jul-24 07-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 02-Jun-24 25-Jul-24 25-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 02-Jun-24 22-Jul-24 22-Jul-24, FIRE FIGHTING SYSTEM
ES.22-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.22-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 06-Jul-24 22-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 23-Jun-24 25-Jul-24 25-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.22-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.22-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 09-Jul-24 25-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 19-May-24 19-Sep-24 19-Sep-24, ELECTRICAL


CABLE TRAYS 51 19-May-24 22-Jul-24 22-Jul-24, CABLE TRAYS
ES.22-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 19-May-24 03-Jun-24 Cable Tray Shop Drawings Preparation & Submission

ES.22-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 08-Jul-24 22-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 03-Jun-24 28-Jul-24 28-Jul-24, POWER CABLES


ES.22-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.22-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 24-Jun-24 10-Aug-24 10-Aug-24, LIGHTING SYSTEM


ES.22-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.22-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 10-Jul-24 14-Aug-24 14-Aug-24, ELECTRICAL INSTALLATIONS
ES.22-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.22-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 27-Jul-24 26-Aug-24 26-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.22-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.22-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 12-Jun-24 19-Sep-24 19-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 12-Jun-24 26-Aug-24 26-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.22-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 12-Jun-24 02-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.22-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 12-Aug-24 26-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 02-Jul-24 01-Sep-24 01-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.22-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.22-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 18-Aug-24 01-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 18-Jul-24 07-Sep-24 07-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.22-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.22-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 24-Aug-24 07-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 04-Aug-24 11-Sep-24 11-Sep-24, VIDEO SURVEILLANCE


ES.22-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.22-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 28-Aug-24 11-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 20-Aug-24 19-Sep-24 19-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
83 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.22-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.22-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 09 (IN ZO


ZONE 03) 232 02-Dec-23 05-Sep-24 05-Sep-24, EGRESS STAIR 09 (IN ZONE 03)
ENGINEERING 232 02-Dec-23 05-Sep-24 05-Sep-24, ENGINEERING
SHOP DRAWINGS 232 02-Dec-23 05-Sep-24 05-Sep-24, SHOP DRAWINGS
STRUCTURE 224 02-Dec-23 26-Aug-24 26-Aug-24, STRUCTURE
ES.9-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.9-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.9-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 07-May-24 23-May-24 Walls Shop Drawings Preparation & Submission

ES.9-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 23-May-24 09-Jun-24 Walls Shop Drawings Review & Approval

ES.9-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 25-Jul-24 10-Aug-24 Slab Shop Drawings Preparation & Submission

ES.9-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 11-Aug-24 26-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 19-May-24 11-Jul-24 11-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 19-May-24 08-Jul-24 08-Jul-24, FIRE FIGHTING SYSTEM
ES.9-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 19-May-24 04-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.9-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 04-Jun-24 11-Jul-24 11-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.9-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 04-Jun-24 25-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.9-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 25-Jun-24 11-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 04-May-24 05-Sep-24 05-Sep-24, ELECTRICAL


CABLE TRAYS 51 04-May-24 08-Jul-24 08-Jul-24, CABLE TRAYS
ES.9-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.9-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 24-Jun-24 08-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 20-May-24 14-Jul-24 14-Jul-24, POWER CABLES


ES.9-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.9-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 30-Jun-24 14-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 05-Jun-24 27-Jul-24 27-Jul-24, LIGHTING SYSTEM


ES.9-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.9-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 26-Jun-24 31-Jul-24 31-Jul-24, ELECTRICAL INSTALLATIONS
ES.9-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.9-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 17-Jul-24 31-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 13-Jul-24 12-Aug-24 12-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.9-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 13-Jul-24 29-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.9-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 28-May-24 05-Sep-24 05-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 28-May-24 12-Aug-24 12-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.9-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 28-May-24 13-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.9-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 29-Jul-24 12-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 13-Jun-24 18-Aug-24 18-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.9-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.9-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 04-Aug-24 18-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 04-Jul-24 24-Aug-24 24-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.9-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 04-Jul-24 21-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.9-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 10-Aug-24 24-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 21-Jul-24 28-Aug-24 28-Aug-24, VIDEO SURVEILLANCE


ES.9-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 21-Jul-24 06-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.9-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 14-Aug-24 28-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 06-Aug-24 05-Sep-24 05-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
84 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.9-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.9-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 22-Aug-24 05-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 05 (IN ZO


ZONE 09) 223 19-Dec-23 12-Sep-24 12-Sep-24, EGRESS STAIR 05 (IN ZONE 09)
ENGINEERING 223 19-Dec-23 12-Sep-24 12-Sep-24, ENGINEERING
SHOP DRAWINGS 223 19-Dec-23 12-Sep-24 12-Sep-24, SHOP DRAWINGS
STRUCTURE 193 19-Dec-23 07-Aug-24 07-Aug-24, STRUCTURE
ES.5-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 19-Dec-23 04-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.5-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 04-Jan-24 20-Jan-24 Foundation Shop Drawings Review & Approval

ES.5-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 14-May-24 30-May-24 Walls Shop Drawings Preparation & Submission

ES.5-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 30-May-24 20-Jun-24 Walls Shop Drawings Review & Approval

ES.5-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Preparation & Submission

ES.5-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 23-Jul-24 07-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 26-May-24 18-Jul-24 18-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 26-May-24 15-Jul-24 15-Jul-24, FIRE FIGHTING SYSTEM
ES.5-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.5-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 29-Jun-24 15-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 11-Jun-24 18-Jul-24 18-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.5-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.5-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 02-Jul-24 18-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 12-May-24 12-Sep-24 12-Sep-24, ELECTRICAL


CABLE TRAYS 51 12-May-24 15-Jul-24 15-Jul-24, CABLE TRAYS
ES.5-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 12-May-24 27-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.5-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 27-May-24 21-Jul-24 21-Jul-24, POWER CABLES


ES.5-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.5-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 12-Jun-24 03-Aug-24 03-Aug-24, LIGHTING SYSTEM


ES.5-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.5-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 03-Jul-24 07-Aug-24 07-Aug-24, ELECTRICAL INSTALLATIONS
ES.5-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 03-Jul-24 20-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.5-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 24-Jul-24 07-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 20-Jul-24 19-Aug-24 19-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.5-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 20-Jul-24 05-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.5-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 05-Jun-24 12-Sep-24 12-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 05-Jun-24 19-Aug-24 19-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.5-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 05-Jun-24 25-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.5-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 05-Aug-24 19-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 25-Jun-24 25-Aug-24 25-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.5-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.5-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 11-Jul-24 31-Aug-24 31-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.5-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 11-Jul-24 28-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.5-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 17-Aug-24 31-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 28-Jul-24 04-Sep-24 04-Sep-24, VIDEO SURVEILLANCE


ES.5-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 28-Jul-24 13-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.5-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 21-Aug-24 04-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 13-Aug-24 12-Sep-24 12-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
85 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.5-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 13-Aug-24 29-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.5-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 29-Aug-24 12-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 12 (IN ZO


ZONE 10) 229 31-Dec-23 03-Oct-24 03-Oct-24, EGRESS STAIR 12 (IN ZONE 10)
ENGINEERING 229 31-Dec-23 03-Oct-24 03-Oct-24, ENGINEERING
SHOP DRAWINGS 229 31-Dec-23 03-Oct-24 03-Oct-24, SHOP DRAWINGS
STRUCTURE 200 31-Dec-23 28-Aug-24 28-Aug-24, STRUCTURE
ES.12-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 31-Dec-23 16-Jan-24 Foundation Shop Drawings Preparation & Submission

ES.12-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 16-Jan-24 01-Feb-24 Foundation Shop Drawings Review & Approval

ES.12-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Walls Shop Drawings Preparation & Submission

ES.12-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Walls Shop Drawings Review & Approval

ES.12-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Slab Shop Drawings Preparation & Submission

ES.12-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 12-Aug-24 28-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 19-Jun-24 07-Aug-24 07-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 19-Jun-24 04-Aug-24 04-Aug-24, FIRE FIGHTING SYSTEM
ES.12-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 19-Jun-24 06-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

ES.12-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 06-Jul-24 07-Aug-24 07-Aug-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.12-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 HVAC Shop Drawings Preparation & Submission

ES.12-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jul-24 07-Aug-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 30-May-24 03-Oct-24 03-Oct-24, ELECTRICAL


CABLE TRAYS 51 30-May-24 04-Aug-24 04-Aug-24, CABLE TRAYS
ES.12-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Cable Tray Shop Drawings Preparation & Submission

ES.12-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 20-Jun-24 10-Aug-24 10-Aug-24, POWER CABLES


ES.12-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Power Cables Shop Drawings Preparation & Submission

ES.12-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 27-Jul-24 10-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 07-Jul-24 22-Aug-24 22-Aug-24, LIGHTING SYSTEM


ES.12-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Lighting System Shop Drawings Preparation & Submission

ES.12-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 08-Aug-24 22-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jul-24 27-Aug-24 27-Aug-24, ELECTRICAL INSTALLATIONS
ES.12-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Electrical Installations Shop Drawings Preparation & Submission

ES.12-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 08-Aug-24 08-Sep-24 08-Sep-24, LIGHTNING PROTECTION SYSTEM


ES.12-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 08-Aug-24 25-Aug-24 Lightning Protection Drawings Preparation & Submission

ES.12-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 29-Jun-24 03-Oct-24 03-Oct-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 29-Jun-24 08-Sep-24 08-Sep-24, FIRE DETECTION AND ALARM SYSTEM
ES.12-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 29-Jun-24 15-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

ES.12-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Aug-24 08-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 15-Jul-24 14-Sep-24 14-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.12-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 15-Jul-24 31-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.12-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Aug-24 14-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 31-Jul-24 19-Sep-24 19-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.12-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 31-Jul-24 17-Aug-24 Public Address system Shop Drawings Preparation & Submission

ES.12-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 17-Aug-24 25-Sep-24 25-Sep-24, VIDEO SURVEILLANCE


ES.12-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 17-Aug-24 02-Sep-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.12-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 02-Sep-24 03-Oct-24 03-Oct-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
86 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.12-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Access Control system Shop Drawings Preparation & Submission

ES.12-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 15 (IN ZO


ZONE 11) 229 02-Dec-23 02-Sep-24 02-Sep-24, EGRESS STAIR 15 (IN ZONE 11)
ENGINEERING 229 02-Dec-23 02-Sep-24 02-Sep-24, ENGINEERING
SHOP DRAWINGS 229 02-Dec-23 02-Sep-24 02-Sep-24, SHOP DRAWINGS
STRUCTURE 195 02-Dec-23 23-Jul-24 23-Jul-24, STRUCTURE
ES.156-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.156-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.156-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission

ES.156-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval

ES.156-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 22-Jun-24 07-Jul-24 Slab Shop Drawings Preparation & Submission

ES.156-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 07-Jul-24 23-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 15-May-24 08-Jul-24 08-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 15-May-24 04-Jul-24 04-Jul-24, FIRE FIGHTING SYSTEM
ES.156-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.156-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.156-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.156-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 30-Apr-24 02-Sep-24 02-Sep-24, ELECTRICAL


CABLE TRAYS 51 30-Apr-24 04-Jul-24 04-Jul-24, CABLE TRAYS
ES.156-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.156-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 16-May-24 10-Jul-24 10-Jul-24, POWER CABLES


ES.156-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.156-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 02-Jun-24 23-Jul-24 23-Jul-24, LIGHTING SYSTEM


ES.156-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.156-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.156-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.156-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 09-Jul-24 08-Aug-24 08-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.156-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.156-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 25-May-24 02-Sep-24 02-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 25-May-24 08-Aug-24 08-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.156-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.156-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.156-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.156-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 01-Jul-24 20-Aug-24 20-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.156-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.156-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 17-Jul-24 25-Aug-24 25-Aug-24, VIDEO SURVEILLANCE


ES.156-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.156-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 03-Aug-24 02-Sep-24 02-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
87 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.156-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.156-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval

EGRESS STAIR 16 (IN ZO


ZONE 11) 229 02-Dec-23 02-Sep-24 02-Sep-24, EGRESS STAIR 16 (IN ZONE 11)
ENGINEERING 229 02-Dec-23 02-Sep-24 02-Sep-24, ENGINEERING
SHOP DRAWINGS 229 02-Dec-23 02-Sep-24 02-Sep-24, SHOP DRAWINGS
STRUCTURE 193 02-Dec-23 21-Jul-24 21-Jul-24, STRUCTURE
ES.16-EN-D.ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

ES.16-EN-D.ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

ES.16-EN-D.ST.140 Walls Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Walls Shop Drawings Preparation & Submission

ES.16-EN-D.ST.145 Walls Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Walls Shop Drawings Review & Approval

ES.16-EN-D.ST.150 Slab Shop Drawings Preparation & Submission 14 19-Jun-24 04-Jul-24 Slab Shop Drawings Preparation & Submission

ES.16-EN-D.ST.155 Slab Shop Drawings Review & Approval 14 04-Jul-24 21-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 42 15-May-24 08-Jul-24 08-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 39 15-May-24 04-Jul-24 04-Jul-24, FIRE FIGHTING SYSTEM
ES.16-EN-M-D.30 Fire Fighting Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

ES.16-EN-M-D.35 Fire Fighting Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Review & Approval

DUCTING SYSTEM/AIR C
CONDITIONING WORKS 28 01-Jun-24 08-Jul-24 08-Jul-24, DUCTING SYSTEM/AIR CONDITIONING WORKS
ES.16-EN-M-D.40 HVAC Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 HVAC Shop Drawings Preparation & Submission

ES.16-EN-M-D.45 HVAC Shop Drawings Review & Approval 14 22-Jun-24 08-Jul-24 HVAC Shop Drawings Review & Approval

ELECTRICAL 102 30-Apr-24 02-Sep-24 02-Sep-24, ELECTRICAL


CABLE TRAYS 51 30-Apr-24 04-Jul-24 04-Jul-24, CABLE TRAYS
ES.16-EN-E-D.60 Cable Tray Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 Cable Tray Shop Drawings Preparation & Submission

ES.16-EN-E-D.65 Cable Tray Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 43 16-May-24 10-Jul-24 10-Jul-24, POWER CABLES


ES.16-EN-E-D.70 Power Cables Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Power Cables Shop Drawings Preparation & Submission

ES.16-EN-E-D.75 Power Cables Shop Drawings Review & Approval 12 26-Jun-24 10-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 02-Jun-24 23-Jul-24 23-Jul-24, LIGHTING SYSTEM


ES.16-EN-E-D.80 Lighting System Shop Drawings Preparation & Submission 14 02-Jun-24 23-Jun-24 Lighting System Shop Drawings Preparation & Submission

ES.16-EN-E-D.85 Lighting System Shop Drawings Review & Approval 12 09-Jul-24 23-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 30 23-Jun-24 28-Jul-24 28-Jul-24, ELECTRICAL INSTALLATIONS
ES.16-EN-E-D.90 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

ES.16-EN-E-D.95 Electrical Installations Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION SYSTEM 26 09-Jul-24 08-Aug-24 08-Aug-24, LIGHTNING PROTECTION SYSTEM


ES.16-EN-E-D.100 Lightning Protection Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 Lightning Protection Drawings Preparation & Submission

ES.16-EN-E-D.105 Lightning Protection Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Lightning Protection Shop Drawings Review & Approval

LOW CURRENT 81 25-May-24 02-Sep-24 02-Sep-24, LOW CURRENT


FIRE DETECTION AND A
ALARM SYSTEM 60 25-May-24 08-Aug-24 08-Aug-24, FIRE DETECTION AND ALARM SYSTEM
ES.16-EN-EL-D.60 Fire Alarm Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

ES.16-EN-EL-D.65 Fire Alarm Shop Drawings Review & Approval 12 25-Jul-24 08-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SYST EMERGENCY TELEPHONE 52 10-Jun-24 14-Aug-24 14-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
ES.16-EN-EL-D.70 Telephone Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Telephone Shop Drawings Preparation & Submission

ES.16-EN-EL-D.75 Telephone Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


AN PUBLIC ADDRESS SYSTEM 43 01-Jul-24 20-Aug-24 20-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
ES.16-EN-EL-D.80 Public Address system Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Public Address system Shop Drawings Preparation & Submission

ES.16-EN-EL-D.85 Public Address system Shop Drawings Review & Approval 12 06-Aug-24 20-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 33 17-Jul-24 25-Aug-24 25-Aug-24, VIDEO SURVEILLANCE


ES.16-EN-EL-D.90 Video Surveillance system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

ES.16-EN-EL-D.95 Video Surveillance system Shop Drawings Review & Approval 12 11-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SYS 26 03-Aug-24 02-Sep-24 02-Sep-24, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
88 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ES.16-EN-EL-D.100 Access Control system Shop Drawings Preparation & Submission 14 03-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission

ES.16-EN-EL-D.105 Access Control system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Access Control system Shop Drawings Review & Approval

MEP ROOMS &LIFT S


STATION AND PUMP STATION 1105 01-Mar-23 A 17-Oct-26 17-Oct-26, MEP ROOM
VECHICULAR ROOM 1036 01-Mar-23 A 27-Jul-26 27-Jul-26, VECHICULAR ROOM
VECHICULAR ROOM 01
0 (IN ZONE 01) 438 08-Jan-24 18-Jun-25 18-Jun-25, VECHICULAR ROOM 01 (IN ZONE 01)
ENGINEERING 438 08-Jan-24 18-Jun-25 18-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 438 08-Jan-24 18-Jun-25 18-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 08-Jan-24 08-Feb-24 08-Feb-24, EARTH WORKS
JAH-ENG-VR01-SI.86 Soil Improvement Design Preparation & Submission 14 08-Jan-24 24-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-VR01-SI.87 Soil Improvement Design Review & Approval 14 24-Jan-24 08-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 174 24-Feb-24 21-Sep-24 21-Sep-24, STRUCTURE


VTR-1-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 24-Feb-24 11-Mar-24 Foundation Shop Drawings Preparation & Submission

VTR-1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Mar-24 26-Mar-24 Foundation Shop Drawings Review & Approval

VTR-1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Jul-24 01-Aug-24 Walls Shop Drawings Preparation & Submission

VTR-1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 03-Aug-24 18-Aug-24 Walls Shop Drawings Review & Approval

VTR-1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Slab Shop Drawings Preparation & Submission

VTR-1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 05-Sep-24 21-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 207 06-Jul-24 04-Mar-25 04-Mar-25, MECHANICAL


FIRE FIGHTING SYSTEM 207 06-Jul-24 04-Mar-25 04-Mar-25, FIRE FIGHTING SYSTEM
VTR-1-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 06-Jul-24 21-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

VTR-1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 16-Feb-25 04-Mar-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 184 22-Jul-24 22-Feb-25 22-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 22-Jul-24 06-Aug-24 HVAC Shop Drawings Preparation & Submission

VTR-1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 05-Feb-25 22-Feb-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 164 06-Aug-24 15-Feb-25 15-Feb-25, PLUMBING SYSTEM


VTR-1-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 06-Aug-24 22-Aug-24 Plumbing System Shop Drawings Preparation & Submission

VTR-1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 29-Jan-25 15-Feb-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL new 151 22-Aug-24 16-Feb-25 16-Feb-25, ELECTRICAL new


CABLE TRAYS 135 22-Aug-24 28-Jan-25 28-Jan-25, CABLE TRAYS
VTR-1-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 22-Aug-24 08-Sep-24 Cable Tray Shop Drawings Preparation & Submission

VTR-1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 15-Jan-25 28-Jan-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 47 08-Dec-24 30-Jan-25 30-Jan-25, POWER CABLES


VTR-1-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 08-Dec-24 24-Dec-24 Power Cables Shop Drawings Preparation & Submission

VTR-1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 18-Jan-25 30-Jan-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 29 24-Dec-24 26-Jan-25 26-Jan-25, LIGHTING SYSTEM


VTR-1-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 24-Dec-24 08-Jan-25 Lighting System Shop Drawings Preparation & Submission

VTR-1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 13-Jan-25 26-Jan-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 26 09-Jan-25 08-Feb-25 08-Feb-25, ELECTRICAL INSTALLATIONS
VTR-1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 09-Jan-25 25-Jan-25 Electrical Installations Shop Drawings Preparation & Submission

VTR-1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Jan-25 08-Feb-25 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 111 08-Sep-24 16-Jan-25 16-Jan-25, LIGHTNING PROTECTION SYSTEM
VTR-1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 08-Sep-24 25-Sep-24 Lightning Protection Drawings Preparation & Submission

VTR-1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 04-Jan-25 16-Jan-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 97 25-Sep-24 16-Jan-25 16-Jan-25, EARTHING SYSTEM


VTR-1-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 25-Sep-24 12-Oct-24 Earthing System Shop Drawings Preparation & Submission

VTR-1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 04-Jan-25 16-Jan-25 Earthing System Drawings Review & Approval

LOW CURRENT 109 12-Oct-24 16-Feb-25 16-Feb-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 100 12-Oct-24 05-Feb-25 05-Feb-25, FIRE DETECTION AND ALARM SYSTEM
VTR-1-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 12-Oct-24 28-Oct-24 Fire Alarm Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
89 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR-1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 95 28-Oct-24 16-Feb-25 16-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 28-Oct-24 13-Nov-24 Telephone Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 81 13-Nov-24 16-Feb-25 16-Feb-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR-1-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 13-Nov-24 30-Nov-24 Public Address system Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 68 30-Nov-24 16-Feb-25 16-Feb-25, VIDEO SURVEILLANCE


VTR-1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 30-Nov-24 16-Dec-24 Video Surveillance system Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 54 16-Dec-24 16-Feb-25 16-Feb-25, ACCESS CONTROL SYSTEM
VTR-1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 16-Dec-24 31-Dec-24 Access Control system Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 40 01-Jan-25 16-Feb-25 16-Feb-25, RADIO RE-BROADCASTING SYSTEM
VTR-1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-Jan-25 16-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 16-Jan-25 16-Feb-25 16-Feb-25, SCADA SYSTEM


VTR-1-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 16-Jan-25 02-Feb-25 SCADA system Shop Drawings Preparation & Submission

VTR-1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 02-Feb-25 16-Feb-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 131 09-Jan-25 18-Jun-25 18-Jun-25, DRY UTILITIES


POWER 131 09-Jan-25 18-Jun-25 18-Jun-25, POWER
POWER LV 131 09-Jan-25 18-Jun-25 18-Jun-25, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 09-Jan-25 02-Feb-25 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 111 02-Feb-25 18-Jun-25 18-Jun-25, MEDIUM VOLTAGE


MEP-VR01-ENG-PW Prepare and submit medium voltage shopdrawings 20 02-Feb-25 24-Feb-25 Prepare and submit medium voltage shopdrawings

MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval medium voltage shopdrawings

TRANSFORMER 91 25-Feb-25 18-Jun-25 18-Jun-25, TRANSFORMER


MEP-VR01-ENG-PW Prepare and submit transformer shopdrawings 20 25-Feb-25 19-Mar-25 Prepare and submit transformer shopdrawings

MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval transformer shopdrawings

RMU 71 19-Mar-25 18-Jun-25 18-Jun-25, RMU


MEP-VR01-ENG-PW Prepare and submit RMU shopdrawings 20 19-Mar-25 16-Apr-25 Prepare and submit RMU shopdrawings

MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval RMU shopdrawings

MVSG 51 16-Apr-25 18-Jun-25 18-Jun-25, MVSG


MEP-VR01-ENG-PW Prepare and submit MVSG shopdrawings 20 16-Apr-25 10-May-25 Prepare and submit MVSG shopdrawings

MEP-VR01-ENG-PW Review and approval MVSG shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval MVSG shopdrawings

BATTERY ROOM 31 10-May-25 18-Jun-25 18-Jun-25, BATTERY ROOM


MEP-VR01-ENG-PW Prepare and submit Battery room shopdrawings 20 10-May-25 02-Jun-25 Prepare and submit Battery room shopdrawings

MEP-VR01-ENG-PW Review and approval Battery room shopdrawings 11 02-Jun-25 18-Jun-25 Review and approval Battery room shopdrawings

VECHICULAR ROOM 06 (IN ZONE 04) 348 02-Dec-23 19-Jan-25 19-Jan-25, VECHICULAR ROOM 06 (IN ZONE 04)
ENGINEERING 348 02-Dec-23 19-Jan-25 19-Jan-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 348 02-Dec-23 19-Jan-25 19-Jan-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-VR06-SI.88 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-VR06-SI.89 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 162 02-Jan-24 17-Jul-24 17-Jul-24, STRUCTURE


VTR.6-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Preparation & Submission

VTR.6-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Feb-24 05-Mar-24 Foundation Shop Drawings Review & Approval

VTR.6-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
90 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR.6-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Feb-24 20-Feb-24 Walls Shop Drawings Review & Approval

VTR.6-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Slab Shop Drawings Preparation & Submission

VTR.6-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 01-Jul-24 17-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 225 20-Feb-24 18-Nov-24 18-Nov-24, MECHANICAL


FIRE FIGHTING SYSTEM 185 20-Feb-24 02-Oct-24 02-Oct-24, FIRE FIGHTING SYSTEM
VTR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Fire Fighting Shop Drawings Preparation & Submission

VTR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 16-Sep-24 02-Oct-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 48 24-Sep-24 18-Nov-24 18-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR.6-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 24-Sep-24 10-Oct-24 HVAC Shop Drawings Preparation & Submission

VTR.6-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 03-Nov-24 18-Nov-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 10-Oct-24 11-Nov-24 11-Nov-24, PLUMBING SYSTEM


VTR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 10-Oct-24 26-Oct-24 Plumbing System Shop Drawings Preparation & Submission

VTR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 27-Oct-24 11-Nov-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 07-Mar-24 27-Oct-24 27-Oct-24, ELECTRICAL


CABLE TRAYS 154 07-Mar-24 10-Sep-24 10-Sep-24, CABLE TRAYS
VTR.6-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Cable Tray Shop Drawings Preparation & Submission

VTR.6-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 28-Aug-24 10-Sep-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 140 24-Mar-24 10-Sep-24 10-Sep-24, POWER CABLES


VTR.6-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Power Cables Shop Drawings Preparation & Submission

VTR.6-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 28-Aug-24 10-Sep-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 26 13-Apr-24 12-May-24 12-May-24, LIGHTING SYSTEM


VTR.6-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Lighting System Shop Drawings Preparation & Submission

VTR.6-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 29-Apr-24 12-May-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 109 29-Apr-24 07-Sep-24 07-Sep-24, ELECTRICAL INSTALLATIONS
VTR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Electrical Installations Shop Drawings Preparation & Submission

VTR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Aug-24 07-Sep-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 88 15-May-24 29-Aug-24 29-Aug-24, LIGHTNING PROTECTION SYSTEM
VTR.6-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 15-May-24 30-May-24 Lightning Protection Drawings Preparation & Submission

VTR.6-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 17-Aug-24 29-Aug-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 74 30-May-24 29-Aug-24 29-Aug-24, EARTHING SYSTEM


VTR.6-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Earthing System Shop Drawings Preparation & Submission

VTR.6-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 17-Aug-24 29-Aug-24 Earthing System Drawings Review & Approval

LOW CURRENT 109 20-Jun-24 27-Oct-24 27-Oct-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 77 20-Jun-24 18-Sep-24 18-Sep-24, FIRE DETECTION AND ALARM SYSTEM
VTR.6-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 63 07-Jul-24 18-Sep-24 18-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR.6-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Telephone Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 49 23-Jul-24 18-Sep-24 18-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR.6-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Public Address system Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 35 08-Aug-24 18-Sep-24 18-Sep-24, VIDEO SURVEILLANCE


VTR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 08-Aug-24 25-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 25-Aug-24 25-Sep-24 25-Sep-24, ACCESS CONTROL SYSTEM
VTR.6-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 25-Aug-24 10-Sep-24 Access Control system Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 10-Sep-24 25-Sep-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 10-Sep-24 12-Oct-24 12-Oct-24, RADIO RE-BROADCASTING SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
91 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 28-Sep-24 12-Oct-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 28-Sep-24 27-Oct-24 27-Oct-24, SCADA SYSTEM


VTR.6-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 28-Sep-24 14-Oct-24 SCADA system Shop Drawings Preparation & Submission

VTR.6-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Oct-24 27-Oct-24 SCADA system Shop Drawings Review & Approval

DRY ULTITIES 91 05-Oct-24 19-Jan-25 19-Jan-25, DRY ULTITIES


POWER 91 05-Oct-24 19-Jan-25 19-Jan-25, POWER
POWER LV 82 05-Oct-24 08-Jan-25 08-Jan-25, POWER LV
DU-P-PLV.100 Prepare and submit power system shopdrawings 20 05-Oct-24 28-Oct-24 Prepare and submit power system shopdrawings

DU-P-PLV.110 Review and approval power system shopdrawings 11 26-Dec-24 08-Jan-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 63 28-Oct-24 09-Jan-25 09-Jan-25, MEDIUM VOLTAGE


DU-P-PMV.100 Prepare and submit medium voltage shopdrawings 20 28-Oct-24 20-Nov-24 Prepare and submit medium voltage shopdrawings

DU-P-PMV.110 Review and approval medium voltage shopdrawings 11 28-Dec-24 09-Jan-25 Review and approval medium voltage shopdrawings

TRANSFORMER 49 20-Nov-24 18-Jan-25 18-Jan-25, TRANSFORMER


DU-P-PT.100 Prepare and submit transformer shopdrawings 20 20-Nov-24 14-Dec-24 Prepare and submit transformer shopdrawings

DU-P-PT.110 Review and approval transformer shopdrawings 11 04-Jan-25 18-Jan-25 Review and approval transformer shopdrawings

RMU 31 14-Dec-24 19-Jan-25 19-Jan-25, RMU


DU-P-PRMU.100 Prepare and submit RMU shopdrawings 20 14-Dec-24 06-Jan-25 Prepare and submit RMU shopdrawings

DU-P-PRMU.110 Review and approval RMU shopdrawings 11 06-Jan-25 19-Jan-25 Review and approval RMU shopdrawings

VECHICULAR ROOM 10 (IN ZONE 05) 420 02-Dec-23 17-Apr-25 17-Apr-25, VECHICULAR ROOM 10 (IN ZONE 05)
ENGINEERING 420 02-Dec-23 17-Apr-25 17-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 420 02-Dec-23 17-Apr-25 17-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-VR10-SI.89 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-VR10-SI.90 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 155 02-Jan-24 09-Jul-24 09-Jul-24, STRUCTURE


VTR.10-ENG-CV-ST.1 Foundation Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Preparation & Submission

VTR.10-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 13-Apr-24 28-Apr-24 Foundation Shop Drawings Review & Approval

VTR.10-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission

VTR.10-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 23-Jun-24 09-Jul-24 Walls Shop Drawings Review & Approval

VTR.10-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Slab Shop Drawings Preparation & Submission

VTR.10-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Slab Shop Drawings Review & Approval

MECHANICAL 251 07-Mar-24 04-Jan-25 04-Jan-25, MECHANICAL


FIRE FIGHTING SYSTEM 223 07-Mar-24 02-Dec-24 02-Dec-24, FIRE FIGHTING SYSTEM
VTR.10-ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Fire Fighting Shop Drawings Preparation & Submission

VTR.10-ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 16-Nov-24 02-Dec-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 237 24-Mar-24 04-Jan-25 04-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR.10-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 HVAC Shop Drawings Preparation & Submission

VTR.10-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 18-Dec-24 04-Jan-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 13-Apr-24 14-May-24 14-May-24, PLUMBING SYSTEM


VTR.10-ENG-MC-PI. Plumbing System Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Plumbing System Shop Drawings Preparation & Submission

VTR.10-ENG-MC-PI. Plumbing System Shop Drawings Review & Approval 14 29-Apr-24 14-May-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 15-May-24 31-Dec-24 31-Dec-24, ELECTRICAL


CABLE TRAYS 168 15-May-24 03-Dec-24 03-Dec-24, CABLE TRAYS
VTR.10-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Cable Tray Shop Drawings Preparation & Submission

VTR.10-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 154 30-May-24 03-Dec-24 03-Dec-24, POWER CABLES


VTR.10-ENG-EL-PC. Power Cables Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Power Cables Shop Drawings Preparation & Submission

VTR.10-ENG-EL-PC. Power Cables Shop Drawings Review & Approval 12 19-Nov-24 03-Dec-24 Power Cables Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
92 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 132 20-Jun-24 24-Nov-24 24-Nov-24, LIGHTING SYSTEM
VTR.10-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Lighting System Shop Drawings Preparation & Submission

VTR.10-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 119 07-Jul-24 24-Nov-24 24-Nov-24, ELECTRICAL INSTALLATIONS
VTR.10-ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 07-Jul-24 23-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

VTR.10-ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 23-Jul-24 17-Nov-24 17-Nov-24, LIGHTNING PROTECTION SYSTEM
VTR.10-ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 23-Jul-24 08-Aug-24 Lightning Protection Drawings Preparation & Submission

VTR.10-ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 85 08-Aug-24 17-Nov-24 17-Nov-24, EARTHING SYSTEM


VTR.10-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 08-Aug-24 25-Aug-24 Earthing System Shop Drawings Preparation & Submission

VTR.10-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Earthing System Drawings Review & Approval

LOW CURRENT 109 25-Aug-24 31-Dec-24 31-Dec-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 107 25-Aug-24 28-Dec-24 28-Dec-24, FIRE DETECTION AND ALARM SYSTEM
VTR.10-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 25-Aug-24 10-Sep-24 Fire Alarm Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 93 10-Sep-24 28-Dec-24 28-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR.10-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Telephone Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 79 28-Sep-24 28-Dec-24 28-Dec-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR.10-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 28-Sep-24 14-Oct-24 Public Address system Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 65 14-Oct-24 28-Dec-24 28-Dec-24, VIDEO SURVEILLANCE


VTR.10-ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 14-Oct-24 29-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 51 30-Oct-24 28-Dec-24 28-Dec-24, ACCESS CONTROL SYSTEM
VTR.10-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 30-Oct-24 14-Nov-24 Access Control system Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 37 14-Nov-24 28-Dec-24 28-Dec-24, RADIO RE-BROADCASTING SYSTEM
VTR.10-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 14-Nov-24 01-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 15-Dec-24 28-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 01-Dec-24 31-Dec-24 31-Dec-24, SCADA SYSTEM


VTR.10-ENG-ELL-S SCADA system Shop Drawings Preparation & Submission 14 01-Dec-24 17-Dec-24 SCADA system Shop Drawings Preparation & Submission

VTR.10-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 17-Dec-24 31-Dec-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 91 29-Dec-24 17-Apr-25 17-Apr-25, DRY UTILITIES


POWER 91 29-Dec-24 17-Apr-25 17-Apr-25, POWER
POWER LV 82 29-Dec-24 08-Apr-25 08-Apr-25, POWER LV
SD-DU-P-PLV.15 Review and approval power system shopdrawings 11 20-Mar-25 08-Apr-25 Review and approval power system shopdrawings

SD-DU-P-PLV.5 Prepare and submit power system shopdrawings 20 29-Dec-24 20-Jan-25 Prepare and submit power system shopdrawings

MEDIUM VOLTAGE 63 21-Jan-25 08-Apr-25 08-Apr-25, MEDIUM VOLTAGE


SD-DU-P-PMV.15 Review and approval medium voltage shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval medium voltage shopdrawings

SD-DU-P-PMV.5 Prepare and submit medium voltage shopdrawings 20 21-Jan-25 12-Feb-25 Prepare and submit medium voltage shopdrawings

TRANSFORMER 49 12-Feb-25 16-Apr-25 16-Apr-25, TRANSFORMER


SD-DU-P-PT.100 Prepare and submit transformer shopdrawings 20 12-Feb-25 08-Mar-25 Prepare and submit transformer shopdrawings

SD-DU-P-PT.105 Review and approval transformer shopdrawings 11 03-Apr-25 16-Apr-25 Review and approval transformer shopdrawings

RMU 31 08-Mar-25 17-Apr-25 17-Apr-25, RMU


SD-DU-P-PRMU.100 Prepare and submit RMU shopdrawings 20 08-Mar-25 05-Apr-25 Prepare and submit RMU shopdrawings

SD-DU-P-PRMU.105 Review and approval RMU shopdrawings 11 05-Apr-25 17-Apr-25 Review and approval RMU shopdrawings

VECHICULAR ROOM 3C (IN ZONE 08) 335 22-Jun-25 27-Jul-26 27-Jul-26, VECHICULAR ROOM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
93 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 335 22-Jun-25 27-Jul-26 27-Jul-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 335 22-Jun-25 27-Jul-26 27-Jul-26, SHOP DRAWING SU
STRUCTURE 179 22-Jun-25 17-Jan-26 17-Jan-26, STRUCTURE
VR-3C-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 22-Jun-25 07-Jul-25 Foundation Shop Drawings Preparation & Submission

VR-3C-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 07-Jul-25 23-Jul-25 Foundation Shop Drawings Review & Approval

VR-3C-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 11-Nov-25 27-Nov-25 Walls Shop Drawings Preparation & Submission

VR-3C-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 27-Nov-25 14-Dec-25 Walls Shop Drawings Review & Approval

VR-3C-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 15-Dec-25 31-Dec-25 Slab Shop Drawings Preparation & Submission

VR-3C-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 31-Dec-25 17-Jan-26 Slab Shop Drawings Review & Approval

MECHANICAL 77 23-Dec-25 28-Mar-26 28-Mar-26, MECHANICAL


FIRE FIGHTING SYSTEM 28 23-Dec-25 25-Jan-26 25-Jan-26, FIRE FIGHTING SYSTEM
VR-3C-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 23-Dec-25 08-Jan-26 Fire Fighting Shop Drawings Preparation & Submission

VR-3C-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 08-Jan-26 25-Jan-26 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 18-Feb-26 28-Mar-26 28-Mar-26, VENTILATION SYSTEM/AIR CO
VR-3C-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 18-Feb-26 07-Mar-26 HVAC Shop Drawings Preparation & Submission

VR-3C-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 07-Mar-26 28-Mar-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 17-Jan-26 18-Feb-26 18-Feb-26, PLUMBING SYSTEM


VR-3C-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 17-Jan-26 02-Feb-26 Plumbing System Shop Drawings Preparation & Sub

VR-3C-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 02-Feb-26 18-Feb-26 Plumbing System Shop Drawings Review & Appro

ELECTRICAL 68 18-Dec-25 08-Mar-26 08-Mar-26, ELECTRICAL


CABLE TRAYS 40 10-Jan-26 25-Feb-26 25-Feb-26, CABLE TRAYS
VR-3C-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 10-Jan-26 26-Jan-26 Cable Tray Shop Drawings Preparation & Submission

VR-3C-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 26-Jan-26 25-Feb-26 25-Feb-26, POWER CABLES


VR-3C-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Power Cables Shop Drawings Preparation & Submis

VR-3C-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 10-Jan-26 25-Feb-26 25-Feb-26, LIGHTING SYSTEM


VR-3C-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 10-Jan-26 26-Jan-26 Lighting System Shop Drawings Preparation & Subm

VR-3C-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Lighting System Shop Drawings Review & Appro

ELECTRICAL INSTALLATIONS
INSTALLAT 26 26-Jan-26 25-Feb-26 25-Feb-26, ELECTRICAL INSTALLATIONS
VR-3C-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Electrical Installations Shop Drawings Preparation &

VR-3C-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Electrical Installations Shop Drawings Review & A

LIGHTNING PROTECTION
PROTECTIO SYSTEM 46 03-Jan-26 25-Feb-26 25-Feb-26, LIGHTNING PROTECTION SYSTE
VR-3C-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Jan-26 19-Jan-26 Lightning Protection Drawings Preparation & Submiss

VR-3C-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Lightning Protection Shop Drawings Review & Ap

EARTHING SYSTEM 26 19-Jan-26 18-Feb-26 18-Feb-26, EARTHING SYSTEM


VR-3C-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 19-Jan-26 04-Feb-26 Earthing System Shop Drawings Preparation & Subm

VR-3C-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 04-Feb-26 18-Feb-26 Earthing System Drawings Review & Approval

LOW CURRENT 68 18-Dec-25 08-Mar-26 08-Mar-26, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 40 10-Jan-26 25-Feb-26 25-Feb-26, FIRE DETECTION AND ALARM SY
VR-3C-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 10-Jan-26 26-Jan-26 Fire Alarm Shop Drawings Preparation & Submission

VR-3C-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 26 26-Jan-26 25-Feb-26 25-Feb-26, COMMUNICATION SYSTEM/ EME
VR-3C-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Telephone Shop Drawings Preparation & Submissio

VR-3C-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 26 26-Jan-26 25-Feb-26 25-Feb-26, VOICE EVACAUTION AND PUBLI
VR-3C-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 26-Jan-26 11-Feb-26 Public Address system Shop Drawings Preparation &

VR-3C-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Public Address system Shop Drawings Review & A

VIDEO SURVEILLANCE 59 18-Dec-25 25-Feb-26 25-Feb-26, VIDEO SURVEILLANCE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
94 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VR-3C-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 Video Surveillance system Shop Drawings Preparation &

VR-3C-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Feb-26 25-Feb-26 Video Surveillance system Shop Drawings Review

ACCESS CONTROL SY
SYSTEM 54 04-Jan-26 08-Mar-26 08-Mar-26, ACCESS CONTROL SYSTEM
VR-3C-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Jan-26 20-Jan-26 Access Control system Shop Drawings Preparation &

VR-3C-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 Access Control system Shop Drawings Review &

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 40 20-Jan-26 08-Mar-26 08-Mar-26, RADIO RE-BROADCASTING SYS
VR-3C-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jan-26 05-Feb-26 Radio Re Broadcasting system Shop Drawings Prepa

VR-3C-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 Radio Re Broadcasting system Shop Drawings Re

SCADA SYSTEM 26 05-Feb-26 08-Mar-26 08-Mar-26, SCADA SYSTEM


VR-3C-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 05-Feb-26 22-Feb-26 SCADA system Shop Drawings Preparation & Sub

VR-3C-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Feb-26 08-Mar-26 SCADA system Shop Drawings Review & Appr

DRY UTILITIES 91 08-Apr-26 27-Jul-26 27-Jul-26, DRY UTILITIES


POWER 91 08-Apr-26 27-Jul-26 27-Jul-26, POWER
POWER LV 82 08-Apr-26 16-Jul-26 16-Jul-26, POWER LV
DU-P-LV.200 Prepare and submit power system shopdrawings 20 08-Apr-26 02-May-26 Prepare and submit power system shopdraw

DU-P-LV.205 Review and approval power system shopdrawings 11 04-Jul-26 16-Jul-26 Review and approval power system

MEDIUM VOLTAGE 63 02-May-26 18-Jul-26 18-Jul-26, MEDIUM VOLTAGE


DU-P-MV.200 Prepare and submit medium voltage shopdrawings 20 02-May-26 25-May-26 Prepare and submit medium voltage shop

DU-P-MV.205 Review and approval medium voltage shopdrawings 11 04-Jul-26 18-Jul-26 Review and approval medium volta

TRANSFORMER 49 25-May-26 25-Jul-26 25-Jul-26, TRANSFORMER


DU-P-T.200 Prepare and submit transformer shopdrawings 20 25-May-26 20-Jun-26 Prepare and submit transformer shopd

DU-P-T.205 Review and approval transformer shopdrawings 11 12-Jul-26 25-Jul-26 Review and approval transformer s

RMU 31 21-Jun-26 27-Jul-26 27-Jul-26, RMU


DU-P-RMU.200 Prepare and submit RMU shopdrawings 20 21-Jun-26 13-Jul-26 Prepare and submit RMU shopdraw

DU-P-RMU.205 Review and approval RMU shopdrawings 11 13-Jul-26 27-Jul-26 Review and approval RMU shopd

VECHICULAR ROOM 3A (IN ZONE 09) 452 10-Dec-23 03-Jun-25 03-Jun-25, VECHICULAR ROOM 3A (IN ZONE 09)
ENGINEERING 452 10-Dec-23 03-Jun-25 03-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 452 10-Dec-23 03-Jun-25 03-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 10-Dec-23 10-Jan-24 10-Jan-24, EARTH WORKS
T1-ENG-VR3A-SI.875 Soil Improvement Design Preparation & Submission 14 10-Dec-23 26-Dec-23 Soil Improvement Design Preparation & Submission

T1-ENG-VR3A-SI.880 Soil Improvement Design Review & Approval 14 26-Dec-23 10-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 174 19-Mar-24 16-Oct-24 16-Oct-24, STRUCTURE


VTR-3A-ENG-CV-ST.1 Foundation Shop Drawings Preparation & Submission 14 19-Mar-24 03-Apr-24 Foundation Shop Drawings Preparation & Submission

VTR-3A-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 09-May-24 26-May-24 Foundation Shop Drawings Review & Approval

VTR-3A-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 04-Apr-24 23-Apr-24 Walls Shop Drawings Preparation & Submission

VTR-3A-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 30-Sep-24 16-Oct-24 Walls Shop Drawings Review & Approval

VTR-3A-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Slab Shop Drawings Preparation & Submission

VTR-3A-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 09-May-24 26-May-24 Slab Shop Drawings Review & Approval

MECHANICAL 89 10-Dec-24 24-Mar-25 24-Mar-25, MECHANICAL


FIRE FIGHTING SYSTEM 28 10-Dec-24 12-Jan-25 12-Jan-25, FIRE FIGHTING SYSTEM
VTR-3A-ENG-MC-ST Fire Fighting Shop Drawings Preparation & Submission 14 10-Dec-24 26-Dec-24 Fire Fighting Shop Drawings Preparation & Submission

VTR-3A-ENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 26-Dec-24 12-Jan-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 30 03-Feb-25 10-Mar-25 10-Mar-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-3A-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 03-Feb-25 19-Feb-25 HVAC Shop Drawings Preparation & Submission

VTR-3A-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 22-Feb-25 10-Mar-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 19-Feb-25 24-Mar-25 24-Mar-25, PLUMBING SYSTEM


VTR-3A-ENG-MC-PI Plumbing System Shop Drawings Preparation & Submission 14 19-Feb-25 08-Mar-25 Plumbing System Shop Drawings Preparation & Submission

VTR-3A-ENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 08-Mar-25 24-Mar-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 123 16-Sep-24 08-Feb-25 08-Feb-25, ELECTRICAL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
95 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
CABLE TRAYS 68 16-Oct-24 04-Jan-25 04-Jan-25, CABLE TRAYS
VTR-3A-ENG-EL-CT. Cable Tray Shop Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Cable Tray Shop Drawings Preparation & Submission

VTR-3A-ENG-EL-CT. Cable Tray Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 54 02-Nov-24 04-Jan-25 04-Jan-25, POWER CABLES


VTR-3A-ENG-EL-PC Power Cables Shop Drawings Preparation & Submission 14 02-Nov-24 18-Nov-24 Power Cables Shop Drawings Preparation & Submission

VTR-3A-ENG-EL-PC Power Cables Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 18-Nov-24 04-Jan-25 04-Jan-25, LIGHTING SYSTEM


VTR-3A-ENG-EL-LS. Lighting System Shop Drawings Preparation & Submission 14 18-Nov-24 04-Dec-24 Lighting System Shop Drawings Preparation & Submission

VTR-3A-ENG-EL-LS. Lighting System Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 26 04-Dec-24 04-Jan-25 04-Jan-25, ELECTRICAL INSTALLATIONS
VTR-3A-ENG-EL-EI. Electrical Installations Shop Drawings Preparation & Submission 14 04-Dec-24 21-Dec-24 Electrical Installations Shop Drawings Preparation & Submission

VTR-3A-ENG-EL-EI. Electrical Installations Shop Drawings Review & Approval 12 21-Dec-24 04-Jan-25 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 87 16-Sep-24 28-Dec-24 28-Dec-24, LIGHTNING PROTECTION SYSTEM
VTR-3A-ENG-EL-LP. Lightning Protection Drawings Preparation & Submission 14 16-Sep-24 03-Oct-24 Lightning Protection Drawings Preparation & Submission

VTR-3A-ENG-EL-LP. Lightning Protection Shop Drawings Review & Approval 12 14-Dec-24 28-Dec-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 73 03-Oct-24 28-Dec-24 28-Dec-24, EARTHING SYSTEM


VTR-3A-ENG-EL-ES. Earthing System Shop Drawings Preparation & Submission 14 03-Oct-24 20-Oct-24 Earthing System Shop Drawings Preparation & Submission

VTR-3A-ENG-EL-ES. Earthing System Drawings Review & Approval 12 14-Dec-24 28-Dec-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 20-Oct-24 08-Feb-25 08-Feb-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 20-Oct-24 28-Jan-25 28-Jan-25, FIRE DETECTION AND ALARM SYSTEM
VTR-3A-ENG-ELL-F Fire Alarm Shop Drawings Preparation & Submission 14 20-Oct-24 05-Nov-24 Fire Alarm Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 15-Jan-25 28-Jan-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 05-Nov-24 08-Feb-25 08-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-3A-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 05-Nov-24 21-Nov-24 Telephone Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 21-Nov-24 08-Feb-25 08-Feb-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR-3A-ENG-ELL-P Public Address system Shop Drawings Preparation & Submission 14 21-Nov-24 08-Dec-24 Public Address system Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-P Public Address system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 08-Dec-24 08-Feb-25 08-Feb-25, VIDEO SURVEILLANCE


VTR-3A-ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 08-Dec-24 24-Dec-24 Video Surveillance system Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 24-Dec-24 08-Feb-25 08-Feb-25, ACCESS CONTROL SYSTEM
VTR-3A-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 24-Dec-24 09-Jan-25 Access Control system Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 09-Jan-25 08-Feb-25 08-Feb-25, RADIO RE-BROADCASTING SYSTEM
VTR-3A-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 09-Jan-25 25-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 09-Jan-25 08-Feb-25 08-Feb-25, SCADA SYSTEM


VTR-3A-ENG-ELL-S SCADA system Shop Drawings Preparation & Submission 14 09-Jan-25 25-Jan-25 SCADA system Shop Drawings Preparation & Submission

VTR-3A-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 26-Jan-25 08-Feb-25 SCADA system Shop Drawings Review & Approval

DRY UTILTIES 44 13-Apr-25 03-Jun-25 03-Jun-25, DRY UTILTIES


POWER 44 13-Apr-25 03-Jun-25 03-Jun-25, POWER
POWER LV 31 13-Apr-25 19-May-25 19-May-25, POWER LV
DU-P-LV.300 Prepare and submit power system shopdrawings 20 13-Apr-25 05-May-25 Prepare and submit power system shopdrawings

DU-P-LV.305 Review and approval power system shopdrawings 11 05-May-25 19-May-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 13-Apr-25 19-May-25 19-May-25, MEDIUM VOLTAGE


DU-P-MV.300 Prepare and submit medium voltage shopdrawings 20 13-Apr-25 06-May-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.305 Review and approval medium voltage shopdrawings 11 06-May-25 19-May-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 13-Apr-25 19-May-25 19-May-25, TRANSFORMER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
96 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-T.300 Prepare and submit transformer shopdrawings 20 13-Apr-25 06-May-25 Prepare and submit transformer shopdrawings

DU-P-T.305 Review and approval transformer shopdrawings 11 06-May-25 19-May-25 Review and approval transformer shopdrawings

RMU 31 15-Apr-25 21-May-25 21-May-25, RMU


DU-P-RMU.300 Prepare and submit RMU shopdrawings 20 15-Apr-25 08-May-25 Prepare and submit RMU shopdrawings

DU-P-RMU.305 Review and approval RMU shopdrawings 11 08-May-25 21-May-25 Review and approval RMU shopdrawings

MRMU 31 17-Apr-25 24-May-25 24-May-25, MRMU


DU-P-MRMU.300 Prepare and submit MRMU shopdrawings 20 17-Apr-25 11-May-25 Prepare and submit MRMU shopdrawings

DU-P-MRMU.305 Review and approval MRMU shopdrawings 11 11-May-25 24-May-25 Review and approval MRMU shopdrawings

MVSG 31 21-Apr-25 27-May-25 27-May-25, MVSG


DU-P-MVSG.300 Prepare and submit MVSG shopdrawings 20 21-Apr-25 14-May-25 Prepare and submit MVSG shopdrawings

DU-P-MVSG.305 Review and approval MVSG shopdrawings 11 14-May-25 27-May-25 Review and approval MVSG shopdrawings

BATTERY ROOM 31 28-Apr-25 03-Jun-25 03-Jun-25, BATTERY ROOM


DU-P-BARM.300 Prepare and submit Battery room shopdrawings 20 28-Apr-25 21-May-25 Prepare and submit Battery room shopdrawings

DU-P-BARM.305 Review and approval Battery room shopdrawings 11 21-May-25 03-Jun-25 Review and approval Battery room shopdrawings

VECHICULAR ROOM 3B (IN ZONE 09) 354 01-Sep-24 29-Oct-25 29-Oct-25, VECHICULAR ROOM 3B (IN ZONE 09)
ENGINEERING 354 01-Sep-24 29-Oct-25 29-Oct-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 354 01-Sep-24 29-Oct-25 29-Oct-25, SHOP DRAWING SUBMITTAL AND APPROVA
STRUCTURE 181 01-Sep-24 07-Apr-25 07-Apr-25, STRUCTURE
VTR-3B-ENG-CV-ST.1 Foundation Shop Drawings Preparation & Submission 14 01-Sep-24 17-Sep-24 Foundation Shop Drawings Preparation & Submission

VTR-3B-ENG-CV-ST.1 Foundation Shop Drawings Review & Approval 14 21-Oct-24 06-Nov-24 Foundation Shop Drawings Review & Approval

VTR-3B-ENG-CV-ST.1 Walls Shop Drawings Preparation & Submission 14 17-Sep-24 05-Oct-24 Walls Shop Drawings Preparation & Submission

VTR-3B-ENG-CV-ST.1 Walls Shop Drawings Review & Approval 14 17-Mar-25 07-Apr-25 Walls Shop Drawings Review & Approval

VTR-3B-ENG-CV-ST.1 Slab Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Slab Shop Drawings Preparation & Submission

VTR-3B-ENG-CV-ST.1 Slab Shop Drawings Review & Approval 14 21-Oct-24 06-Nov-24 Slab Shop Drawings Review & Approval

MECHANICAL 84 13-May-25 23-Aug-25 23-Aug-25, MECHANICAL


FIRE FIGHTING SYSTEM 35 13-May-25 26-Jun-25 26-Jun-25, FIRE FIGHTING SYSTEM
VTR-3B-ENG-MC-ST Fire Fighting Shop Drawings Preparation & Submission 14 13-May-25 29-May-25 Fire Fighting Shop Drawings Preparation & Submission

VTR-3B-ENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 10-Jun-25 26-Jun-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 70 29-May-25 23-Aug-25 23-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WORK
VTR-3B-ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 29-May-25 18-Jun-25 HVAC Shop Drawings Preparation & Submission

VTR-3B-ENG-MC-HC HVAC Shop Drawings Review & Approval 14 06-Aug-25 23-Aug-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 18-Jun-25 21-Jul-25 21-Jul-25, PLUMBING SYSTEM


VTR-3B-ENG-MC-PI Plumbing System Shop Drawings Preparation & Submission 14 18-Jun-25 05-Jul-25 Plumbing System Shop Drawings Preparation & Submission

VTR-3B-ENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 05-Jul-25 21-Jul-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 21-Nov-24 13-Jul-25 13-Jul-25, ELECTRICAL


CABLE TRAYS 172 21-Nov-24 18-Jun-25 18-Jun-25, CABLE TRAYS
VTR-3B-ENG-EL-CT. Cable Tray Shop Drawings Preparation & Submission 14 21-Nov-24 08-Dec-24 Cable Tray Shop Drawings Preparation & Submission

VTR-3B-ENG-EL-CT. Cable Tray Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 158 08-Dec-24 18-Jun-25 18-Jun-25, POWER CABLES


VTR-3B-ENG-EL-PC. Power Cables Shop Drawings Preparation & Submission 14 08-Dec-24 24-Dec-24 Power Cables Shop Drawings Preparation & Submission

VTR-3B-ENG-EL-PC. Power Cables Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 144 24-Dec-24 18-Jun-25 18-Jun-25, LIGHTING SYSTEM


VTR-3B-ENG-EL-LS. Lighting System Shop Drawings Preparation & Submission 14 24-Dec-24 09-Jan-25 Lighting System Shop Drawings Preparation & Submission

VTR-3B-ENG-EL-LS. Lighting System Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 130 09-Jan-25 18-Jun-25 18-Jun-25, ELECTRICAL INSTALLATIONS
VTR-3B-ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 09-Jan-25 26-Jan-25 Electrical Installations Shop Drawings Preparation & Submission

VTR-3B-ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 116 26-Jan-25 18-Jun-25 18-Jun-25, TRANSFORMERS INSTALLATION
VTR-3B-ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 26-Jan-25 11-Feb-25 Transformers Installation Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
97 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VTR-3B-ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 01-Jun-25 18-Jun-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 11-Feb-25 11-Jun-25 11-Jun-25, LIGHTNING PROTECTION SYSTEM
VTR-3B-ENG-EL-LP. Lightning Protection Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Lightning Protection Drawings Preparation & Submission

VTR-3B-ENG-EL-LP. Lightning Protection Shop Drawings Review & Approval 12 25-May-25 11-Jun-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 83 27-Feb-25 11-Jun-25 11-Jun-25, EARTHING SYSTEM


VTR-3B-ENG-EL-ES. Earthing System Shop Drawings Preparation & Submission 14 27-Feb-25 16-Mar-25 Earthing System Shop Drawings Preparation & Submission

VTR-3B-ENG-EL-ES. Earthing System Drawings Review & Approval 12 25-May-25 11-Jun-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 16-Mar-25 13-Jul-25 13-Jul-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 16-Mar-25 02-Jul-25 02-Jul-25, FIRE DETECTION AND ALARM SYSTEM
VTR-3B-ENG-ELL-F Fire Alarm Shop Drawings Preparation & Submission 14 16-Mar-25 05-Apr-25 Fire Alarm Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 18-Jun-25 02-Jul-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 06-Apr-25 13-Jul-25 13-Jul-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-3B-ENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 06-Apr-25 21-Apr-25 Telephone Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-P Telephone Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 21-Apr-25 13-Jul-25 13-Jul-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR-3B-ENG-ELL-P Public Address system Shop Drawings Preparation & Submission 14 21-Apr-25 07-May-25 Public Address system Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-P Public Address system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 07-May-25 13-Jul-25 13-Jul-25, VIDEO SURVEILLANCE


VTR-3B-ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 07-May-25 24-May-25 Video Surveillance system Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 24-May-25 13-Jul-25 13-Jul-25, ACCESS CONTROL SYSTEM
VTR-3B-ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 24-May-25 12-Jun-25 Access Control system Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 12-Jun-25 13-Jul-25 13-Jul-25, RADIO RE-BROADCASTING SYSTEM
VTR-3B-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 12-Jun-25 13-Jul-25 13-Jul-25, SCADA SYSTEM


VTR-3B-ENG-ELL-S SCADA system Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 SCADA system Shop Drawings Preparation & Submission

VTR-3B-ENG-ELL-S SCADA system Shop Drawings Review & Approval 12 29-Jun-25 13-Jul-25 SCADA system Shop Drawings Review & Approval

DRY UTITIES 32 21-Sep-25 29-Oct-25 29-Oct-25, DRY UTITIES


POWER 32 21-Sep-25 29-Oct-25 29-Oct-25, POWER
POWER LV 31 21-Sep-25 28-Oct-25 28-Oct-25, POWER LV
DU-P-LV.400 Prepare and submit power system shopdrawings 20 21-Sep-25 15-Oct-25 Prepare and submit power system shopdrawings

DU-P-LV.405 Review and approval power system shopdrawings 11 15-Oct-25 28-Oct-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 22-Sep-25 29-Oct-25 29-Oct-25, MEDIUM VOLTAGE


DU-P-MV.400 Prepare and submit medium voltage shopdrawings 20 22-Sep-25 16-Oct-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.405 Review and approval medium voltage shopdrawings 11 16-Oct-25 29-Oct-25 Review and approval medium voltage shopdrawings

VECHICULAR ROOM 11 (IN ZONE 10) 601 01-May-23 A 20-Apr-25 20-Apr-25, VECHICULAR ROOM 11 (IN ZONE 10)
ENGINEERING 601 01-May-23 A 20-Apr-25 20-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 601 01-May-23 A 20-Apr-25 20-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 13 01-May-23 A 15-May-23 A 15-May-23 A, EARTH WORKS
T2-ENG-VR11-SI.925 Soil Improvement Design Preparation & Submission 9 01-May-23 A 10-May-23 A Soil Improvement Design Preparation & Submission

T3-ENG-VR11-SI.930 Soil Improvement Design Review & Approval 5 10-May-23 A 15-May-23 A Soil Improvement Design Review & Approval

STRUCTURE 188 13-Feb-24 29-Sep-24 29-Sep-24, STRUCTURE


VR.11-ENG-CV-ST.130 Foundation Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Foundation Shop Drawings Preparation & Submission

VR.11-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 29-Feb-24 17-Mar-24 Foundation Shop Drawings Review & Approval

VR.11-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 24-Apr-24 11-May-24 Walls Shop Drawings Preparation & Submission

VR.11-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 11-May-24 27-May-24 Walls Shop Drawings Review & Approval

VR.11-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 26-Aug-24 11-Sep-24 Slab Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
98 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VR.11-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 11-Sep-24 29-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 63 03-Oct-24 15-Dec-24 15-Dec-24, MECHANICAL


FIRE FIGHTING SYSTEM 42 03-Oct-24 20-Nov-24 20-Nov-24, FIRE FIGHTING SYSTEM
VR.11-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 03-Oct-24 19-Oct-24 Fire Fighting Shop Drawings Preparation & Submission

VR.11-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 04-Nov-24 20-Nov-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 19-Oct-24 20-Nov-24 20-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VR.11-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 19-Oct-24 04-Nov-24 HVAC Shop Drawings Preparation & Submission

VR.11-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 04-Nov-24 20-Nov-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 12-Nov-24 15-Dec-24 15-Dec-24, PLUMBING SYSTEM


VR.11-ENG-MC-PI.11 Plumbing System Shop Drawings Preparation & Submission 14 12-Nov-24 28-Nov-24 Plumbing System Shop Drawings Preparation & Submission

VR.11-ENG-MC-PI.11 Plumbing System Shop Drawings Review & Approval 14 28-Nov-24 15-Dec-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 123 15-Jul-24 07-Dec-24 07-Dec-24, ELECTRICAL


CABLE TRAYS 61 02-Sep-24 12-Nov-24 12-Nov-24, CABLE TRAYS
VR.11-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Cable Tray Shop Drawings Preparation & Submission

VR.11-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 47 18-Sep-24 12-Nov-24 12-Nov-24, POWER CABLES


VR.11-ENG-EL-PC.11 Power Cables Shop Drawings Preparation & Submission 14 18-Sep-24 05-Oct-24 Power Cables Shop Drawings Preparation & Submission

VR.11-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 33 06-Oct-24 12-Nov-24 12-Nov-24, LIGHTING SYSTEM


VR.11-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 06-Oct-24 21-Oct-24 Lighting System Shop Drawings Preparation & Submission

VR.11-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 29-Oct-24 12-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 26 21-Oct-24 20-Nov-24 20-Nov-24, ELECTRICAL INSTALLATIONS
VR.11-ENG-EL-EI.110 Electrical Installations Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Electrical Installations Shop Drawings Preparation & Submission

VR.11-ENG-EL-EI.115 Electrical Installations Shop Drawings Review & Approval 12 06-Nov-24 20-Nov-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 15-Jul-24 05-Nov-24 05-Nov-24, LIGHTNING PROTECTION SYSTEM
VR.11-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 15-Jul-24 31-Jul-24 Lightning Protection Drawings Preparation & Submission

VR.11-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 83 31-Jul-24 05-Nov-24 05-Nov-24, EARTHING SYSTEM


VR.11-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 31-Jul-24 17-Aug-24 Earthing System Shop Drawings Preparation & Submission

VR.11-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 23-Oct-24 05-Nov-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 17-Aug-24 07-Dec-24 07-Dec-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 17-Aug-24 26-Nov-24 26-Nov-24, FIRE DETECTION AND ALARM SYSTEM
VR.11-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 17-Aug-24 02-Sep-24 Fire Alarm Shop Drawings Preparation & Submission

VR.11-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 12-Nov-24 26-Nov-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 02-Sep-24 07-Dec-24 07-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VR.11-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Telephone Shop Drawings Preparation & Submission

VR.11-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 18-Sep-24 07-Dec-24 07-Dec-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VR.11-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 18-Sep-24 05-Oct-24 Public Address system Shop Drawings Preparation & Submission

VR.11-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 06-Oct-24 07-Dec-24 07-Dec-24, VIDEO SURVEILLANCE


VR.11-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 06-Oct-24 21-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

VR.11-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 21-Oct-24 07-Dec-24 07-Dec-24, ACCESS CONTROL SYSTEM
VR.11-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Access Control system Shop Drawings Preparation & Submission

VR.11-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Nov-24 07-Dec-24 07-Dec-24, RADIO RE-BROADCASTING SYSTEM
VR.11-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VR.11-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
99 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
SCADA SYSTEM 26 06-Nov-24 07-Dec-24 07-Dec-24, SCADA SYSTEM
VR.11-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 SCADA system Shop Drawings Preparation & Submission

VR.11-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 23-Nov-24 07-Dec-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 51 15-Feb-25 20-Apr-25 20-Apr-25, DRY UTILITIES


POWER 51 15-Feb-25 20-Apr-25 20-Apr-25, POWER
POWER LV 31 15-Feb-25 23-Mar-25 23-Mar-25, POWER LV
DU-P-LV.500 Prepare and submit power system shopdrawings 20 15-Feb-25 10-Mar-25 Prepare and submit power system shopdrawings

DU-P-LV.505 Review and approval power system shopdrawings 11 10-Mar-25 23-Mar-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 16-Feb-25 24-Mar-25 24-Mar-25, MEDIUM VOLTAGE


DU-P-MV.500 Prepare and submit medium voltage shopdrawings 20 16-Feb-25 11-Mar-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.505 Review and approval medium voltage shopdrawings 11 11-Mar-25 24-Mar-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 23-Feb-25 05-Apr-25 05-Apr-25, TRANSFORMER


DU-P-T.500 Prepare and submit transformer shopdrawings 20 23-Feb-25 18-Mar-25 Prepare and submit transformer shopdrawings

DU-P-T.505 Review and approval transformer shopdrawings 11 18-Mar-25 05-Apr-25 Review and approval transformer shopdrawings

RMU 31 25-Feb-25 07-Apr-25 07-Apr-25, RMU


DU-P-RMU.500 Prepare and submit RMU shopdrawings 20 25-Feb-25 20-Mar-25 Prepare and submit RMU shopdrawings

DU-P-RMU.505 Review and approval RMU shopdrawings 11 20-Mar-25 07-Apr-25 Review and approval RMU shopdrawings

MRMU 31 27-Feb-25 09-Apr-25 09-Apr-25, MRMU


DU-P-MRMU.500 Prepare and submit MRMU shopdrawings 20 27-Feb-25 23-Mar-25 Prepare and submit MRMU shopdrawings

DU-P-MRMU.505 Review and approval MRMU shopdrawings 11 23-Mar-25 09-Apr-25 Review and approval MRMU shopdrawings

MVSG 31 03-Mar-25 13-Apr-25 13-Apr-25, MVSG


DU-P-MVSG.500 Prepare and submit MVSG shopdrawings 20 03-Mar-25 26-Mar-25 Prepare and submit MVSG shopdrawings

DU-P-MVSG.505 Review and approval MVSG shopdrawings 11 26-Mar-25 13-Apr-25 Review and approval MVSG shopdrawings

BATTERY ROOM 31 10-Mar-25 20-Apr-25 20-Apr-25, BATTERY ROOM


DU-P-BARM.500 Prepare and submit Battery room shopdrawings 20 10-Mar-25 07-Apr-25 Prepare and submit Battery room shopdrawings

DU-P-BARM.505 Review and approval Battery room shopdrawings 11 07-Apr-25 20-Apr-25 Review and approval Battery room shopdrawings

VECHICULAR ROOM 12A


12 (IN ZONE 11) 586 19-Apr-23 A 20-Mar-25 20-Mar-25, VECHICULAR ROOM 12A (IN ZONE 11)
ENGINEERING 586 19-Apr-23 A 20-Mar-25 20-Mar-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 586 19-Apr-23 A 20-Mar-25 20-Mar-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 12 19-Apr-23 A 06-May-23 A 06-May-23 A, EARTH WORKS
T3-ENG-VR12A-SI.93 Soil Improvement Design Preparation & Submission 8 19-Apr-23 A 01-May-23 A Soil Improvement Design Preparation & Submission

T3-ENG-VR12A-SI.94 Soil Improvement Design Review & Approval 5 01-May-23 A 06-May-23 A Soil Improvement Design Review & Approval

STRUCTURE 227 13-Jan-24 12-Oct-24 12-Oct-24, STRUCTURE


VTR-12AENG-CV-ST. Foundation Shop Drawings Preparation & Submission 14 13-Jan-24 28-Jan-24 Foundation Shop Drawings Preparation & Submission

VTR-12AENG-CV-ST. Foundation Shop Drawings Review & Approval 14 05-Aug-24 21-Aug-24 Foundation Shop Drawings Review & Approval

VTR-12AENG-CV-ST. Walls Shop Drawings Preparation & Submission 14 29-Jan-24 13-Feb-24 Walls Shop Drawings Preparation & Submission

VTR-12AENG-CV-ST. Walls Shop Drawings Review & Approval 14 25-Sep-24 12-Oct-24 Walls Shop Drawings Review & Approval

VTR-12AENG-CV-ST. Slab Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Slab Shop Drawings Preparation & Submission

VTR-12AENG-CV-ST. Slab Shop Drawings Review & Approval 14 29-Feb-24 17-Mar-24 Slab Shop Drawings Review & Approval

MECHANICAL 81 12-Oct-24 14-Jan-25 14-Jan-25, MECHANICAL


FIRE FIGHTING SYSTEM 32 12-Oct-24 18-Nov-24 18-Nov-24, FIRE FIGHTING SYSTEM
VTR-12AENG-MC-ST Fire Fighting Shop Drawings Preparation & Submission 14 12-Oct-24 27-Oct-24 Fire Fighting Shop Drawings Preparation & Submission

VTR-12AENG-MC-ST Fire Fighting Shop Drawings Review & Approval 14 02-Nov-24 18-Nov-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 67 28-Oct-24 14-Jan-25 14-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VTR-12AENG-MC-H HVAC Shop Drawings Preparation & Submission 14 28-Oct-24 12-Nov-24 HVAC Shop Drawings Preparation & Submission

VTR-12AENG-MC-H HVAC Shop Drawings Review & Approval 14 29-Dec-24 14-Jan-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 12-Nov-24 15-Dec-24 15-Dec-24, PLUMBING SYSTEM


VTR-12AENG-MC-PI Plumbing System Shop Drawings Preparation & Submission 14 12-Nov-24 28-Nov-24 Plumbing System Shop Drawings Preparation & Submission

VTR-12AENG-MC-PI Plumbing System Shop Drawings Review & Approval 14 28-Nov-24 15-Dec-24 Plumbing System Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
100 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL 193 17-Apr-24 04-Dec-24 04-Dec-24, ELECTRICAL
CABLE TRAYS 172 17-Apr-24 10-Nov-24 10-Nov-24, CABLE TRAYS
VTR-12AENG-EL-CT Cable Tray Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Cable Tray Shop Drawings Preparation & Submission

VTR-12AENG-EL-CT Cable Tray Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 158 04-May-24 10-Nov-24 10-Nov-24, POWER CABLES


VTR-12AENG-EL-PC Power Cables Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Power Cables Shop Drawings Preparation & Submission

VTR-12AENG-EL-PC Power Cables Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 144 20-May-24 10-Nov-24 10-Nov-24, LIGHTING SYSTEM


VTR-12AENG-EL-LS Lighting System Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Lighting System Shop Drawings Preparation & Submission

VTR-12AENG-EL-LS Lighting System Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 130 05-Jun-24 10-Nov-24 10-Nov-24, ELECTRICAL INSTALLATIONS
VTR-12AENG-EL-EI. Electrical Installations Shop Drawings Preparation & Submission 14 05-Jun-24 26-Jun-24 Electrical Installations Shop Drawings Preparation & Submission

VTR-12AENG-EL-EI. Electrical Installations Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 126 26-Jun-24 20-Nov-24 20-Nov-24, TRANSFORMERS INSTALLATION
VTR-12AENG-EL-TI. Transformers Installation Shop Drawings Preparation & Submission 14 26-Jun-24 13-Jul-24 Transformers Installation Shop Drawings Preparation & Submission

VTR-12AENG-EL-TI. Transformers Installation Shop Drawings Review & Approval 12 06-Nov-24 20-Nov-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 13-Jul-24 03-Nov-24 03-Nov-24, LIGHTNING PROTECTION SYSTEM
VTR-12AENG-EL-LP Lightning Protection Drawings Preparation & Submission 14 13-Jul-24 28-Jul-24 Lightning Protection Drawings Preparation & Submission

VTR-12AENG-EL-LP Lightning Protection Shop Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 83 29-Jul-24 03-Nov-24 03-Nov-24, EARTHING SYSTEM


VTR-12AENG-EL-ES Earthing System Shop Drawings Preparation & Submission 14 29-Jul-24 13-Aug-24 Earthing System Shop Drawings Preparation & Submission

VTR-12AENG-EL-ES Earthing System Drawings Review & Approval 12 20-Oct-24 03-Nov-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 13-Aug-24 04-Dec-24 04-Dec-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 13-Aug-24 24-Nov-24 24-Nov-24, FIRE DETECTION AND ALARM SYSTEM
VTR-12AENG-ELL-F Fire Alarm Shop Drawings Preparation & Submission 14 13-Aug-24 29-Aug-24 Fire Alarm Shop Drawings Preparation & Submission

VTR-12AENG-ELL-F Fire Alarm Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 29-Aug-24 24-Nov-24 24-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VTR-12AENG-ELL-P Telephone Shop Drawings Preparation & Submission 14 29-Aug-24 15-Sep-24 Telephone Shop Drawings Preparation & Submission

VTR-12AENG-ELL-P Telephone Shop Drawings Review & Approval 12 10-Nov-24 24-Nov-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 15-Sep-24 04-Dec-24 04-Dec-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VTR-12AENG-ELL-P Public Address system Shop Drawings Preparation & Submission 14 15-Sep-24 02-Oct-24 Public Address system Shop Drawings Preparation & Submission

VTR-12AENG-ELL-P Public Address system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 02-Oct-24 04-Dec-24 04-Dec-24, VIDEO SURVEILLANCE


VTR-12AENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 02-Oct-24 19-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

VTR-12AENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 19-Oct-24 04-Dec-24 04-Dec-24, ACCESS CONTROL SYSTEM
VTR-12AENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 19-Oct-24 04-Nov-24 Access Control system Shop Drawings Preparation & Submission

VTR-12AENG-ELL-A Access Control system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 04-Nov-24 04-Dec-24 04-Dec-24, RADIO RE-BROADCASTING SYSTEM
VTR-12AENG-ELL-R Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 04-Nov-24 20-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VTR-12AENG-ELL-R Radio Re Broadcasting system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 04-Nov-24 04-Dec-24 04-Dec-24, SCADA SYSTEM


VTR-12AENG-ELL-S SCADA system Shop Drawings Preparation & Submission 14 04-Nov-24 20-Nov-24 SCADA system Shop Drawings Preparation & Submission

VTR-12AENG-ELL-S SCADA system Shop Drawings Review & Approval 12 20-Nov-24 04-Dec-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 12-Feb-25 20-Mar-25 20-Mar-25, DRY UTILITIES


POWER 31 12-Feb-25 20-Mar-25 20-Mar-25, POWER
POWER LV 31 12-Feb-25 20-Mar-25 20-Mar-25, POWER LV
DU-P-LV.600 Prepare and submit power system shopdrawings 20 12-Feb-25 08-Mar-25 Prepare and submit power system shopdrawings

DU-P-LV.605 Review and approval power system shopdrawings 11 08-Mar-25 20-Mar-25 Review and approval power system shopdrawings

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
101 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
VECHICULAR ROOM 12B
12 (IN ZONE 11) 534 01-Mar-23 A 01-Dec-24 01-Dec-24, VECHICULAR ROOM 12B (IN ZONE 11)
ENGINEERING 534 01-Mar-23 A 01-Dec-24 01-Dec-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 534 01-Mar-23 A 01-Dec-24 01-Dec-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 24 01-Mar-23 A 28-Mar-23 A 28-Mar-23 A, EARTH WORKS
T3-ENG-VR12B-SI.945 Soil Improvement Design Preparation & Submission 8 01-Mar-23 A 09-Mar-23 A Soil Improvement Design Preparation & Submission

T3-ENG-VR12B-SI.950 Soil Improvement Design Review & Approval 20 06-Mar-23 A 28-Mar-23 A Soil Improvement Design Review & Approval

STRUCTURE 106 02-Dec-23 03-Apr-24 03-Apr-24, STRUCTURE


VR.12-ENG-CV-ST.130 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

VR.12-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Review & Approval

VR.12-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission

VR.12-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 18-Mar-24 03-Apr-24 Walls Shop Drawings Review & Approval

VR.12-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission

VR.12-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 84 04-Jun-24 15-Sep-24 15-Sep-24, MECHANICAL


FIRE FIGHTING SYSTEM 35 04-Jun-24 20-Jul-24 20-Jul-24, FIRE FIGHTING SYSTEM
VR.12-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 04-Jun-24 25-Jun-24 Fire Fighting Shop Drawings Preparation & Submission

VR.12-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 03-Jul-24 20-Jul-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 70 25-Jun-24 15-Sep-24 15-Sep-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
VR.12-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 HVAC Shop Drawings Preparation & Submission

VR.12-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 29-Aug-24 15-Sep-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 11-Jul-24 13-Aug-24 13-Aug-24, PLUMBING SYSTEM


VR.12-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 11-Jul-24 28-Jul-24 Plumbing System Shop Drawings Preparation & Submission

VR.12-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 28-Jul-24 13-Aug-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 26-Dec-23 15-Aug-24 15-Aug-24, ELECTRICAL


CABLE TRAYS 175 26-Dec-23 25-Jul-24 25-Jul-24, CABLE TRAYS
VR.12-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 26-Dec-23 11-Jan-24 Cable Tray Shop Drawings Preparation & Submission

VR.12-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 149 11-Jan-24 11-Jul-24 11-Jul-24, POWER CABLES


VR.12-ENG-EL-PC.11 Power Cables Shop Drawings Preparation & Submission 14 11-Jan-24 28-Jan-24 Power Cables Shop Drawings Preparation & Submission

VR.12-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 135 28-Jan-24 11-Jul-24 11-Jul-24, LIGHTING SYSTEM


VR.12-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 28-Jan-24 13-Feb-24 Lighting System Shop Drawings Preparation & Submission

VR.12-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 121 13-Feb-24 11-Jul-24 11-Jul-24, ELECTRICAL INSTALLATIONS
VR.12-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 13-Feb-24 29-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

VR.12-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 107 29-Feb-24 11-Jul-24 11-Jul-24, TRANSFORMERS INSTALLATION
VR.12-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 29-Feb-24 17-Mar-24 Transformers Installation Shop Drawings Preparation & Submission

VR.12-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 27-Jun-24 11-Jul-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 88 17-Mar-24 04-Jul-24 04-Jul-24, LIGHTNING PROTECTION SYSTEM
VR.12-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 17-Mar-24 01-Apr-24 Lightning Protection Drawings Preparation & Submission

VR.12-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 74 02-Apr-24 04-Jul-24 04-Jul-24, EARTHING SYSTEM


VR.12-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 02-Apr-24 21-Apr-24 Earthing System Shop Drawings Preparation & Submission

VR.12-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 21-Apr-24 15-Aug-24 15-Aug-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 78 21-Apr-24 25-Jul-24 25-Jul-24, FIRE DETECTION AND ALARM SYSTEM
VR.12-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 21-Apr-24 07-May-24 Fire Alarm Shop Drawings Preparation & Submission

VR.12-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Fire Alarm Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
102 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 64 07-May-24 25-Jul-24 25-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
VR.12-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 07-May-24 23-May-24 Telephone Shop Drawings Preparation & Submission

VR.12-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 59 23-May-24 05-Aug-24 05-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
VR.12-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 23-May-24 09-Jun-24 Public Address system Shop Drawings Preparation & Submission

VR.12-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 09-Jun-24 05-Aug-24 05-Aug-24, VIDEO SURVEILLANCE


VR.12-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 09-Jun-24 30-Jun-24 Video Surveillance system Shop Drawings Preparation & Submission

VR.12-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 30-Jun-24 05-Aug-24 05-Aug-24, ACCESS CONTROL SYSTEM
VR.12-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-Jun-24 16-Jul-24 Access Control system Shop Drawings Preparation & Submission

VR.12-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 16-Jul-24 15-Aug-24 15-Aug-24, RADIO RE-BROADCASTING SYSTEM
VR.12-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 16-Jul-24 01-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

VR.12-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 01-Aug-24 15-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 06-Jul-24 05-Aug-24 05-Aug-24, SCADA SYSTEM


VR.12-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 06-Jul-24 22-Jul-24 SCADA system Shop Drawings Preparation & Submission

VR.12-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Jul-24 05-Aug-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 40 15-Oct-24 01-Dec-24 01-Dec-24, DRY UTILITIES


POWER 40 15-Oct-24 01-Dec-24 01-Dec-24, POWER
POWER LV 31 15-Oct-24 20-Nov-24 20-Nov-24, POWER LV
DU-P-LV.700 Prepare and submit power system shopdrawings 20 15-Oct-24 07-Nov-24 Prepare and submit power system shopdrawings

DU-P-LV.705 Review and approval power system shopdrawings 11 07-Nov-24 20-Nov-24 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 16-Oct-24 21-Nov-24 21-Nov-24, MEDIUM VOLTAGE


DU-P-MV.700 Prepare and submit medium voltage shopdrawings 20 16-Oct-24 07-Nov-24 Prepare and submit medium voltage shopdrawings

DU-P-MV.705 Review and approval medium voltage shopdrawings 11 09-Nov-24 21-Nov-24 Review and approval medium voltage shopdrawings

TRANSFORMER 31 23-Oct-24 28-Nov-24 28-Nov-24, TRANSFORMER


DU-P-T.700 Prepare and submit transformer shopdrawings 20 23-Oct-24 16-Nov-24 Prepare and submit transformer shopdrawings

DU-P-T.705 Review and approval transformer shopdrawings 11 16-Nov-24 28-Nov-24 Review and approval transformer shopdrawings

RMU 31 26-Oct-24 01-Dec-24 01-Dec-24, RMU


DU-P-RMU.700 Prepare and submit RMU shopdrawings 20 26-Oct-24 17-Nov-24 Prepare and submit RMU shopdrawings

DU-P-RMU.705 Review and approval RMU shopdrawings 11 18-Nov-24 01-Dec-24 Review and approval RMU shopdrawings

UTILITY ROOM 876 02-Dec-23 17-Oct-26 17-Oct-26, UTILITY RO


UTILITY ROOM 19 (IN ZONE
ZO 01) ON BACKFILL (FLD +15.85 m) 618 02-Dec-23 09-Dec-25 09-Dec-25, UTILITY ROOM 19 (IN ZONE 01) ON BAC
ENGINEERING 618 02-Dec-23 09-Dec-25 09-Dec-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 618 02-Dec-23 09-Dec-25 09-Dec-25, SHOP DRAWING SUBMITTAL AND APPR
EARTH WORKS 515 02-Dec-23 11-Aug-25 11-Aug-25, EARTH WORKS
JAH-ENG-UR19-SI.93 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR19-SI.93 Soil Improvement Design Review & Approval 14 26-Jul-25 11-Aug-25 Soil Improvement Design Review & Approval

STRUCTURE 173 08-Feb-25 04-Sep-25 04-Sep-25, STRUCTURE


UCR.19ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 08-Feb-25 24-Feb-25 Foundation Shop Drawings Preparation & Submission

UCR.19ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 29-Mar-25 19-Apr-25 Foundation Shop Drawings Review & Approval

UCR.19ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 24-Feb-25 12-Mar-25 Walls Shop Drawings Preparation & Submission

UCR.19ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 20-Aug-25 04-Sep-25 Walls Shop Drawings Review & Approval

UCR.19ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 12-Mar-25 29-Mar-25 Slab Shop Drawings Preparation & Submission

UCR.19ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 29-Mar-25 19-Apr-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 05-Jul-25 07-Sep-25 07-Sep-25, MECHANICAL


FIRE FIGHTING SYSTEM 45 05-Jul-25 25-Aug-25 25-Aug-25, FIRE FIGHTING SYSTEM
UCR.19ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 05-Jul-25 21-Jul-25 Fire Fighting Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
103 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.19ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 09-Aug-25 25-Aug-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 21-Jul-25 07-Sep-25 07-Sep-25, VENTILATION SYSTEM/AIR CONDITIONING WOR
UCR.19ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 21-Jul-25 05-Aug-25 HVAC Shop Drawings Preparation & Submission

UCR.19ENG-MC-HC HVAC Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 06-Aug-25 07-Sep-25 07-Sep-25, PLUMBING SYSTEM


UCR.19ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 06-Aug-25 21-Aug-25 Plumbing System Shop Drawings Preparation & Submission

UCR.19ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 201 28-Dec-24 26-Aug-25 26-Aug-25, ELECTRICAL


CABLE TRAYS 183 28-Dec-24 05-Aug-25 05-Aug-25, CABLE TRAYS
UCR.19ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 Cable Tray Shop Drawings Preparation & Submission

UCR.19ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 23-Jul-25 05-Aug-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 187 13-Jan-25 26-Aug-25 26-Aug-25, POWER CABLES


UCR.19ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 Power Cables Shop Drawings Preparation & Submission

UCR.19ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 12-Aug-25 26-Aug-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 157 29-Jan-25 07-Aug-25 07-Aug-25, LIGHTING SYSTEM


UCR.19ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 29-Jan-25 13-Feb-25 Lighting System Shop Drawings Preparation & Submission

UCR.19ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 151 15-Feb-25 17-Aug-25 17-Aug-25, ELECTRICAL INSTALLATIONS
UCR.19ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 15-Feb-25 02-Mar-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.19ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 137 02-Mar-25 17-Aug-25 17-Aug-25, TRANSFORMERS INSTALLATION
UCR.19ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.19ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 115 18-Mar-25 07-Aug-25 07-Aug-25, LIGHTNING PROTECTION SYSTEM
UCR.19ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 Lightning Protection Drawings Preparation & Submission

UCR.19ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 101 08-Apr-25 07-Aug-25 07-Aug-25, EARTHING SYSTEM


UCR.19ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 08-Apr-25 24-Apr-25 Earthing System Shop Drawings Preparation & Submission

UCR.19ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 26-Jul-25 07-Aug-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 24-Apr-25 17-Aug-25 17-Aug-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 24-Apr-25 06-Aug-25 06-Aug-25, FIRE DETECTION AND ALARM SYSTEM
UCR.19ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Apr-25 11-May-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.19ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 11-May-25 06-Aug-25 06-Aug-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHO
UCR.19ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Telephone Shop Drawings Preparation & Submission

UCR.19ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 59 27-May-25 06-Aug-25 06-Aug-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTE
UCR.19ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 27-May-25 16-Jun-25 Public Address system Shop Drawings Preparation & Submission

UCR.19ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 16-Jun-25 06-Aug-25 06-Aug-25, VIDEO SURVEILLANCE


UCR.19ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 16-Jun-25 02-Jul-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR.19ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 02-Jul-25 06-Aug-25 06-Aug-25, ACCESS CONTROL SYSTEM
UCR.19ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Access Control system Shop Drawings Preparation & Submission

UCR.19ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 24-Jul-25 06-Aug-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 19-Jul-25 17-Aug-25 17-Aug-25, RADIO RE-BROADCASTING SYSTEM
UCR.19ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 19-Jul-25 03-Aug-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.19ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 19-Jul-25 17-Aug-25 17-Aug-25, SCADA SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
104 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.19ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 19-Jul-25 03-Aug-25 SCADA system Shop Drawings Preparation & Submission

UCR.19ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 04-Aug-25 17-Aug-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 03-Nov-25 09-Dec-25 09-Dec-25, DRY UTILITIES


POWER 31 03-Nov-25 09-Dec-25 09-Dec-25, POWER
POWER LV 31 03-Nov-25 09-Dec-25 09-Dec-25, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 03-Nov-25 26-Nov-25 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 26-Nov-25 09-Dec-25 Review and approval power system shopdrawings

UTILITY ROOM 21 (IN ZONE


ZO 01) (FLD +0.5 m) 278 02-Dec-23 29-Oct-24 29-Oct-24, UTILITY ROOM 21 (IN ZONE 01) (FLD +0.5 m)
ENGINEERING 278 02-Dec-23 29-Oct-24 29-Oct-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 278 02-Dec-23 29-Oct-24 29-Oct-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 21-Dec-23 22-Jan-24 22-Jan-24, EARTH WORKS
JAH-ENG-UR21-SI.94 Soil Improvement Design Preparation & Submission 14 21-Dec-23 07-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR21-SI.94 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 106 02-Dec-23 03-Apr-24 03-Apr-24, STRUCTURE


UCR.21ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

UCR.21ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval

UCR.21ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission

UCR.21ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Mar-24 03-Apr-24 Walls Shop Drawings Review & Approval

UCR.21ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission

UCR.21ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 68 13-Apr-24 04-Jul-24 04-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 45 13-Apr-24 03-Jun-24 03-Jun-24, FIRE FIGHTING SYSTEM
UCR.21ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 13-Apr-24 28-Apr-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.21ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 18-May-24 03-Jun-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 28-Apr-24 04-Jul-24 04-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.21ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 28-Apr-24 14-May-24 HVAC Shop Drawings Preparation & Submission

UCR.21ENG-MC-HC HVAC Shop Drawings Review & Approval 14 13-Jun-24 04-Jul-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 14-May-24 20-Jun-24 20-Jun-24, PLUMBING SYSTEM


UCR.21ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 14-May-24 30-May-24 Plumbing System Shop Drawings Preparation & Submission

UCR.21ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-May-24 20-Jun-24 Plumbing System Shop Drawings Review & Approval

DRY UTILITIES 48 02-Sep-24 29-Oct-24 29-Oct-24, DRY UTILITIES


POWER 48 02-Sep-24 29-Oct-24 29-Oct-24, POWER
POWER LV 31 02-Sep-24 09-Oct-24 09-Oct-24, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 02-Sep-24 26-Sep-24 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 26-Sep-24 09-Oct-24 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 03-Sep-24 10-Oct-24 10-Oct-24, MEDIUM VOLTAGE


MEP-VR01-ENG-PW Prepare and submit medium voltage shopdrawings 20 03-Sep-24 28-Sep-24 Prepare and submit medium voltage shopdrawings

MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 28-Sep-24 10-Oct-24 Review and approval medium voltage shopdrawings

TRANSFORMER 31 10-Sep-24 17-Oct-24 17-Oct-24, TRANSFORMER


MEP-VR01-ENG-PW Prepare and submit transformer shopdrawings 20 10-Sep-24 05-Oct-24 Prepare and submit transformer shopdrawings

MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 05-Oct-24 17-Oct-24 Review and approval transformer shopdrawings

RMU 31 12-Sep-24 20-Oct-24 20-Oct-24, RMU


MEP-VR01-ENG-PW Prepare and submit RMU shopdrawings 20 12-Sep-24 07-Oct-24 Prepare and submit RMU shopdrawings

MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 07-Oct-24 20-Oct-24 Review and approval RMU shopdrawings

MVSG 31 15-Sep-24 22-Oct-24 22-Oct-24, MVSG


MEP-VR01-ENG-PW Prepare and submit MVSG shopdrawings 20 15-Sep-24 09-Oct-24 Prepare and submit MVSG shopdrawings

MEP-VR01-ENG-PW Review and approval MVSG shopdrawings 11 09-Oct-24 22-Oct-24 Review and approval MVSG shopdrawings

BATTERY ROOM 31 22-Sep-24 29-Oct-24 29-Oct-24, BATTERY ROOM


MEP-VR01-ENG-PW Prepare and submit Battery room shopdrawings 20 22-Sep-24 16-Oct-24 Prepare and submit Battery room shopdrawings

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
105 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MEP-VR01-ENG-PW Review and approval Battery room shopdrawings 11 16-Oct-24 29-Oct-24 Review and approval Battery room shopdrawings

ELECTRICAL 151 23-Dec-23 24-Jun-24 24-Jun-24, ELECTRICAL


CABLE TRAYS 62 21-Mar-24 04-Jun-24 04-Jun-24, CABLE TRAYS
UCR.21ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 21-Mar-24 06-Apr-24 Cable Tray Shop Drawings Preparation & Submission

UCR.21ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 21-May-24 04-Jun-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 48 07-Apr-24 04-Jun-24 04-Jun-24, POWER CABLES


UCR.21ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 07-Apr-24 25-Apr-24 Power Cables Shop Drawings Preparation & Submission

UCR.21ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 21-May-24 04-Jun-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 26 25-Apr-24 26-May-24 26-May-24, LIGHTING SYSTEM


UCR.21ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 25-Apr-24 12-May-24 Lighting System Shop Drawings Preparation & Submission

UCR.21ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 12-May-24 26-May-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 130 23-Dec-23 26-May-24 26-May-24, ELECTRICAL INSTALLATIONS
UCR.21ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Dec-23 08-Jan-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.21ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 12-May-24 26-May-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 116 08-Jan-24 26-May-24 26-May-24, TRANSFORMERS INSTALLATION
UCR.21ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 08-Jan-24 24-Jan-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.21ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 12-May-24 26-May-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 96 24-Jan-24 19-May-24 19-May-24, LIGHTNING PROTECTION SYSTEM
UCR.21ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 24-Jan-24 10-Feb-24 Lightning Protection Drawings Preparation & Submission

UCR.21ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 05-May-24 19-May-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 83 10-Feb-24 19-May-24 19-May-24, EARTHING SYSTEM


UCR.21ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 10-Feb-24 26-Feb-24 Earthing System Shop Drawings Preparation & Submission

UCR.21ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 05-May-24 19-May-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 26-Feb-24 24-Jun-24 24-Jun-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 26-Feb-24 09-Jun-24 09-Jun-24, FIRE DETECTION AND ALARM SYSTEM
UCR.21ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 26-Feb-24 13-Mar-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.21ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 26-May-24 09-Jun-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 13-Mar-24 24-Jun-24 24-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.21ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Mar-24 28-Mar-24 Telephone Shop Drawings Preparation & Submission

UCR.21ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 30-Mar-24 24-Jun-24 24-Jun-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.21ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 30-Mar-24 17-Apr-24 Public Address system Shop Drawings Preparation & Submission

UCR.21ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 17-Apr-24 24-Jun-24 24-Jun-24, VIDEO SURVEILLANCE


UCR.21ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.21ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 04-May-24 24-Jun-24 24-Jun-24, ACCESS CONTROL SYSTEM
UCR.21ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-May-24 20-May-24 Access Control system Shop Drawings Preparation & Submission

UCR.21ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-May-24 24-Jun-24 24-Jun-24, RADIO RE-BROADCASTING SYSTEM
UCR.21ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.21ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 20-May-24 24-Jun-24 24-Jun-24, SCADA SYSTEM


UCR.21ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 20-May-24 05-Jun-24 SCADA system Shop Drawings Preparation & Submission

UCR.21ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 05-Jun-24 24-Jun-24 SCADA system Shop Drawings Review & Approval

UTILITY ROOM 22 (IN ZO


ZONE 01) (FLD +1.85 m) 278 02-Dec-23 29-Oct-24 29-Oct-24, UTILITY ROOM 22 (IN ZONE 01) (FLD +1.85 m)
ENGINEERING 278 02-Dec-23 29-Oct-24 29-Oct-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 278 02-Dec-23 29-Oct-24 29-Oct-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 20-Jan-24 20-Feb-24 20-Feb-24, EARTH WORKS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
106 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-UR22-SI.95 Soil Improvement Design Preparation & Submission 14 20-Jan-24 05-Feb-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR22-SI.95 Soil Improvement Design Review & Approval 14 05-Feb-24 20-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 121 02-Dec-23 24-Apr-24 24-Apr-24, STRUCTURE


UCR.22ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

UCR.22ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval

UCR.22ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission

UCR.22ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Apr-24 24-Apr-24 Walls Shop Drawings Review & Approval

UCR.22ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission

UCR.22ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 184 02-Dec-23 10-Jul-24 10-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 173 02-Dec-23 27-Jun-24 27-Jun-24, FIRE FIGHTING SYSTEM
UCR.22ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Fighting Shop Drawings Preparation & Submission

UCR.22ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 06-Jun-24 27-Jun-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 170 17-Dec-23 10-Jul-24 10-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.22ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission

UCR.22ENG-MC-HC HVAC Shop Drawings Review & Approval 14 24-Jun-24 10-Jul-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 02-Jan-24 04-Feb-24 04-Feb-24, PLUMBING SYSTEM


UCR.22ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Plumbing System Shop Drawings Preparation & Submission

UCR.22ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 05-Dec-23 25-Jul-24 25-Jul-24, ELECTRICAL


CABLE TRAYS 162 05-Dec-23 19-Jun-24 19-Jun-24, CABLE TRAYS
UCR.22ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 05-Dec-23 21-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.22ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 148 21-Dec-23 19-Jun-24 19-Jun-24, POWER CABLES


UCR.22ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 21-Dec-23 07-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.22ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 126 07-Jan-24 05-Jun-24 05-Jun-24, LIGHTING SYSTEM


UCR.22ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 07-Jan-24 23-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.22ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 23-May-24 05-Jun-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 120 23-Jan-24 19-Jun-24 19-Jun-24, ELECTRICAL INSTALLATIONS
UCR.22ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Jan-24 08-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.22ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 106 08-Feb-24 19-Jun-24 19-Jun-24, TRANSFORMERS INSTALLATION
UCR.22ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 08-Feb-24 25-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.22ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 85 25-Feb-24 05-Jun-24 05-Jun-24, LIGHTNING PROTECTION SYSTEM
UCR.22ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 25-Feb-24 12-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.22ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 23-May-24 05-Jun-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 71 12-Mar-24 05-Jun-24 05-Jun-24, EARTHING SYSTEM


UCR.22ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.22ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 23-May-24 05-Jun-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 28-Mar-24 25-Jul-24 25-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 28-Mar-24 15-Jul-24 15-Jul-24, FIRE DETECTION AND ALARM SYSTEM
UCR.22ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 28-Mar-24 17-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.22ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 17-Apr-24 25-Jul-24 25-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.22ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 17-Apr-24 02-May-24 Telephone Shop Drawings Preparation & Submission

UCR.22ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 04-May-24 25-Jul-24 25-Jul-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
107 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.22ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 04-May-24 19-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.22ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 19-May-24 25-Jul-24 25-Jul-24, VIDEO SURVEILLANCE


UCR.22ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 19-May-24 04-Jun-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.22ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 04-Jun-24 25-Jul-24 25-Jul-24, ACCESS CONTROL SYSTEM
UCR.22ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Jun-24 25-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.22ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-Jun-24 25-Jul-24 25-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.22ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.22ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 25-Jun-24 25-Jul-24 25-Jul-24, SCADA SYSTEM


UCR.22ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 25-Jun-24 11-Jul-24 SCADA system Shop Drawings Preparation & Submission

UCR.22ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Jul-24 25-Jul-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 22-Sep-24 29-Oct-24 29-Oct-24, DRY UTILITIES


POWER 31 22-Sep-24 29-Oct-24 29-Oct-24, POWER
POWER LV 31 22-Sep-24 29-Oct-24 29-Oct-24, POWER LV
DU-P-LV.900 Prepare and submit power system shopdrawings 20 22-Sep-24 16-Oct-24 Prepare and submit power system shopdrawings

DU-P-LV.905 Review and approval power system shopdrawings 11 16-Oct-24 29-Oct-24 Review and approval power system shopdrawings

UTILITY ROOM 18 (IN ZONE


ZO 02) ON BACKFILL (FLD +15 m) 274 12-Jun-25 04-May-26 04-May-26, UTILITY ROOM 18 (IN ZON
ENGINEERING 274 12-Jun-25 04-May-26 04-May-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 274 12-Jun-25 04-May-26 04-May-26, SHOP DRAWING SUBMITT
EARTH WORKS 28 06-Sep-25 09-Oct-25 09-Oct-25, EARTH WORKS
JAH-ENG-UR18-SI.96 Soil Improvement Design Preparation & Submission 14 06-Sep-25 22-Sep-25 Soil Improvement Design Preparation & Submission

JAH-ENG-UR18-SI.96 Soil Improvement Design Review & Approval 14 22-Sep-25 09-Oct-25 Soil Improvement Design Review & Approval

STRUCTURE 121 05-Jul-25 24-Nov-25 24-Nov-25, STRUCTURE


UCR.18ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 05-Jul-25 20-Jul-25 Foundation Shop Drawings Preparation & Submission

UCR.18ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Foundation Shop Drawings Review & Approval

UCR.18ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 21-Jul-25 05-Aug-25 Walls Shop Drawings Preparation & Submission

UCR.18ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 08-Nov-25 24-Nov-25 Walls Shop Drawings Review & Approval

UCR.18ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 05-Aug-25 21-Aug-25 Slab Shop Drawings Preparation & Submission

UCR.18ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 21-Aug-25 07-Sep-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 19-Nov-25 24-Jan-26 24-Jan-26, MECHANICAL


FIRE FIGHTING SYSTEM 33 19-Nov-25 28-Dec-25 28-Dec-25, FIRE FIGHTING SYSTEM
UCR.18ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 19-Nov-25 06-Dec-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.18ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 11-Dec-25 28-Dec-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 30 06-Dec-25 10-Jan-26 10-Jan-26, VENTILATION SYSTEM/AIR CONDITIO
UCR.18ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 06-Dec-25 22-Dec-25 HVAC Shop Drawings Preparation & Submission

UCR.18ENG-MC-HC HVAC Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 22-Dec-25 24-Jan-26 24-Jan-26, PLUMBING SYSTEM


UCR.18ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 22-Dec-25 07-Jan-26 Plumbing System Shop Drawings Preparation & Submis

UCR.18ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 07-Jan-26 24-Jan-26 Plumbing System Shop Drawings Review & Approva

ELECTRICAL 193 12-Jun-25 25-Jan-26 25-Jan-26, ELECTRICAL


CABLE TRAYS 162 12-Jun-25 20-Dec-25 20-Dec-25, CABLE TRAYS
UCR.18ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 Cable Tray Shop Drawings Preparation & Submission

UCR.18ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 148 29-Jun-25 20-Dec-25 20-Dec-25, POWER CABLES


UCR.18ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 29-Jun-25 15-Jul-25 Power Cables Shop Drawings Preparation & Submission

UCR.18ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Power Cables Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
108 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 126 15-Jul-25 10-Dec-25 10-Dec-25, LIGHTING SYSTEM
UCR.18ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 15-Jul-25 31-Jul-25 Lighting System Shop Drawings Preparation & Submission

UCR.18ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 120 31-Jul-25 20-Dec-25 20-Dec-25, ELECTRICAL INSTALLATIONS
UCR.18ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 31-Jul-25 17-Aug-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.18ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Electrical Installations Shop Drawings Review & Approva

TRANSFORMERS INSTALLATION
INSTA 106 17-Aug-25 20-Dec-25 20-Dec-25, TRANSFORMERS INSTALLATION
UCR.18ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 17-Aug-25 01-Sep-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.18ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 06-Dec-25 20-Dec-25 Transformers Installation Shop Drawings Review & Appro

LIGHTNING PROTECTION
PROTECTIO SYSTEM 85 02-Sep-25 10-Dec-25 10-Dec-25, LIGHTNING PROTECTION SYSTEM
UCR.18ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 02-Sep-25 17-Sep-25 Lightning Protection Drawings Preparation & Submission

UCR.18ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 71 17-Sep-25 10-Dec-25 10-Dec-25, EARTHING SYSTEM


UCR.18ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 17-Sep-25 05-Oct-25 Earthing System Shop Drawings Preparation & Submission

UCR.18ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 26-Nov-25 10-Dec-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 05-Oct-25 25-Jan-26 25-Jan-26, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 05-Oct-25 14-Jan-26 14-Jan-26, FIRE DETECTION AND ALARM SYSTE
UCR.18ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 05-Oct-25 21-Oct-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.18ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 31-Dec-25 14-Jan-26 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 21-Oct-25 25-Jan-26 25-Jan-26, COMMUNICATION SYSTEM/ EMERG
UCR.18ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 21-Oct-25 06-Nov-25 Telephone Shop Drawings Preparation & Submission

UCR.18ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 06-Nov-25 25-Jan-26 25-Jan-26, VOICE EVACAUTION AND PUBLIC A
UCR.18ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 06-Nov-25 23-Nov-25 Public Address system Shop Drawings Preparation & Submis

UCR.18ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Public Address system Shop Drawings Review & App

VIDEO SURVEILLANCE 54 23-Nov-25 25-Jan-26 25-Jan-26, VIDEO SURVEILLANCE


UCR.18ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 23-Nov-25 09-Dec-25 Video Surveillance system Shop Drawings Preparation & S

UCR.18ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Video Surveillance system Shop Drawings Review &

ACCESS CONTROL SY
SYSTEM 40 09-Dec-25 25-Jan-26 25-Jan-26, ACCESS CONTROL SYSTEM
UCR.18ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 09-Dec-25 25-Dec-25 Access Control system Shop Drawings Preparation & Sub

UCR.18ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Access Control system Shop Drawings Review & Ap

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-Dec-25 25-Jan-26 25-Jan-26, RADIO RE-BROADCASTING SYSTEM
UCR.18ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-Dec-25 11-Jan-26 Radio Re Broadcasting system Shop Drawings Preparat

UCR.18ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 Radio Re Broadcasting system Shop Drawings Review

SCADA SYSTEM 26 25-Dec-25 25-Jan-26 25-Jan-26, SCADA SYSTEM


UCR.18ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 25-Dec-25 11-Jan-26 SCADA system Shop Drawings Preparation & Submiss

UCR.18ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Jan-26 25-Jan-26 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 29-Mar-26 04-May-26 04-May-26, DRY UTILITIES


POWER 31 29-Mar-26 04-May-26 04-May-26, POWER
POWER LV 31 29-Mar-26 04-May-26 04-May-26, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 29-Mar-26 21-Apr-26 Prepare and submit power system shopdrawi

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 21-Apr-26 04-May-26 Review and approval power system shopdr

UTILITY ROOM 30 (IN D


D09) (NO AFFECT-FLD -0.8m) 264 02-Dec-23 14-Oct-24 14-Oct-24, UTILITY ROOM 30 (IN D09) (NO AFFECT-FLD -0.8m)
ENGINEERING 264 02-Dec-23 14-Oct-24 14-Oct-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 264 02-Dec-23 14-Oct-24 14-Oct-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-UR30-SI.97 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR30-SI.97 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 02-Dec-23 27-Apr-24 27-Apr-24, STRUCTURE


UCR-30ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Foundation Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
109 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-30ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval

UCR-30ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Walls Shop Drawings Preparation & Submission

UCR-30ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 07-Apr-24 27-Apr-24 Walls Shop Drawings Review & Approval

UCR-30ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Slab Shop Drawings Preparation & Submission

UCR-30ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 31-Mar-24 08-Jun-24 08-Jun-24, MECHANICAL


FIRE FIGHTING SYSTEM 56 31-Mar-24 08-Jun-24 08-Jun-24, FIRE FIGHTING SYSTEM
UCR-30ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 31-Mar-24 20-Apr-24 Fire Fighting Shop Drawings Preparation & Submission

UCR-30ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 20-Apr-24 08-Jun-24 08-Jun-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-30ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 20-Apr-24 06-May-24 HVAC Shop Drawings Preparation & Submission

UCR-30ENG-MC-HC HVAC Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 06-May-24 08-Jun-24 08-Jun-24, PLUMBING SYSTEM


UCR-30ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 06-May-24 22-May-24 Plumbing System Shop Drawings Preparation & Submission

UCR-30ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 22-May-24 08-Jun-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 18-Dec-23 06-Aug-24 06-Aug-24, ELECTRICAL


CABLE TRAYS 162 18-Dec-23 02-Jul-24 02-Jul-24, CABLE TRAYS
UCR-30ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 18-Dec-23 03-Jan-24 Cable Tray Shop Drawings Preparation & Submission

UCR-30ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 13-Jun-24 02-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 148 03-Jan-24 02-Jul-24 02-Jul-24, POWER CABLES


UCR-30ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 03-Jan-24 20-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR-30ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 13-Jun-24 02-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 103 20-Jan-24 21-May-24 21-May-24, LIGHTING SYSTEM


UCR-30ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 20-Jan-24 04-Feb-24 Lighting System Shop Drawings Preparation & Submission

UCR-30ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 07-May-24 21-May-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 97 05-Feb-24 30-May-24 30-May-24, ELECTRICAL INSTALLATIONS
UCR-30ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 05-Feb-24 20-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR-30ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 16-May-24 30-May-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 83 20-Feb-24 30-May-24 30-May-24, TRANSFORMERS INSTALLATION
UCR-30ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Transformers Installation Shop Drawings Preparation & Submission

UCR-30ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 16-May-24 30-May-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 55 07-Mar-24 14-May-24 14-May-24, LIGHTNING PROTECTION SYSTEM
UCR-30ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR-30ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 30-Apr-24 14-May-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 41 24-Mar-24 14-May-24 14-May-24, EARTHING SYSTEM


UCR-30ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Earthing System Shop Drawings Preparation & Submission

UCR-30ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 30-Apr-24 14-May-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 13-Apr-24 06-Aug-24 06-Aug-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 13-Apr-24 27-Jul-24 27-Jul-24, FIRE DETECTION AND ALARM SYSTEM
UCR-30ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR-30ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 29-Apr-24 06-Aug-24 06-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-30ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 29-Apr-24 15-May-24 Telephone Shop Drawings Preparation & Submission

UCR-30ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 15-May-24 06-Aug-24 06-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-30ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 15-May-24 01-Jun-24 Public Address system Shop Drawings Preparation & Submission

UCR-30ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 01-Jun-24 06-Aug-24 06-Aug-24, VIDEO SURVEILLANCE


UCR-30ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 01-Jun-24 22-Jun-24 Video Surveillance system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
110 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-30ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 22-Jun-24 06-Aug-24 06-Aug-24, ACCESS CONTROL SYSTEM
UCR-30ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 22-Jun-24 08-Jul-24 Access Control system Shop Drawings Preparation & Submission

UCR-30ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Jul-24 06-Aug-24 06-Aug-24, RADIO RE-BROADCASTING SYSTEM
UCR-30ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Jul-24 23-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-30ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 08-Jul-24 06-Aug-24 06-Aug-24, SCADA SYSTEM


UCR-30ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 08-Jul-24 23-Jul-24 SCADA system Shop Drawings Preparation & Submission

UCR-30ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 24-Jul-24 06-Aug-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 07-Sep-24 14-Oct-24 14-Oct-24, DRY UTILITIES


POWER 31 07-Sep-24 14-Oct-24 14-Oct-24, POWER
POWER LV 31 07-Sep-24 14-Oct-24 14-Oct-24, POWER LV
36320 Prepare and submit power system shopdrawings 20 07-Sep-24 01-Oct-24 Prepare and submit power system shopdrawings

36330 Review and approval power system shopdrawings 11 01-Oct-24 14-Oct-24 Review and approval power system shopdrawings

UTILITY ROOM 31 (IN D


D09) (FLD -0.9 m) 733 02-Dec-23 27-Apr-26 27-Apr-26, UTILITY ROOM 31 (IN D09)
ENGINEERING 733 02-Dec-23 27-Apr-26 27-Apr-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 733 02-Dec-23 27-Apr-26 27-Apr-26, SHOP DRAWING SUBMITTA
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-UR31-SI.98 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR31-SI.98 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 09-Apr-25 03-Sep-25 03-Sep-25, STRUCTURE


UCR-31ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 09-Apr-25 26-Apr-25 Foundation Shop Drawings Preparation & Submission

UCR-31ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 27-May-25 16-Jun-25 Foundation Shop Drawings Review & Approval

UCR-31ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 26-Apr-25 11-May-25 Walls Shop Drawings Preparation & Submission

UCR-31ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Aug-25 03-Sep-25 Walls Shop Drawings Review & Approval

UCR-31ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 12-May-25 27-May-25 Slab Shop Drawings Preparation & Submission

UCR-31ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 27-May-25 16-Jun-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 05-Nov-25 10-Jan-26 10-Jan-26, MECHANICAL


FIRE FIGHTING SYSTEM 28 05-Nov-25 08-Dec-25 08-Dec-25, FIRE FIGHTING SYSTEM
UCR-31ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 05-Nov-25 22-Nov-25 Fire Fighting Shop Drawings Preparation & Submission

UCR-31ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-Nov-25 08-Dec-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 37 22-Nov-25 04-Jan-26 04-Jan-26, VENTILATION SYSTEM/AIR CONDITIO
UCR-31ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 22-Nov-25 08-Dec-25 HVAC Shop Drawings Preparation & Submission

UCR-31ENG-MC-HC HVAC Shop Drawings Review & Approval 14 18-Dec-25 04-Jan-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 08-Dec-25 10-Jan-26 10-Jan-26, PLUMBING SYSTEM


UCR-31ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 08-Dec-25 24-Dec-25 Plumbing System Shop Drawings Preparation & Submiss

UCR-31ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 13-Apr-25 27-Nov-25 27-Nov-25, ELECTRICAL


CABLE TRAYS 177 13-Apr-25 09-Nov-25 09-Nov-25, CABLE TRAYS
UCR-31ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 13-Apr-25 28-Apr-25 Cable Tray Shop Drawings Preparation & Submission

UCR-31ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 163 28-Apr-25 09-Nov-25 09-Nov-25, POWER CABLES


UCR-31ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 28-Apr-25 14-May-25 Power Cables Shop Drawings Preparation & Submission

UCR-31ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 149 14-May-25 09-Nov-25 09-Nov-25, LIGHTING SYSTEM


UCR-31ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 14-May-25 31-May-25 Lighting System Shop Drawings Preparation & Submission

UCR-31ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 135 31-May-25 09-Nov-25 09-Nov-25, ELECTRICAL INSTALLATIONS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
111 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-31ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 31-May-25 19-Jun-25 Electrical Installations Shop Drawings Preparation & Submission

UCR-31ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 121 19-Jun-25 09-Nov-25 09-Nov-25, TRANSFORMERS INSTALLATION
UCR-31ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 19-Jun-25 06-Jul-25 Transformers Installation Shop Drawings Preparation & Submission

UCR-31ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 26-Oct-25 09-Nov-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 101 06-Jul-25 02-Nov-25 02-Nov-25, LIGHTNING PROTECTION SYSTEM
UCR-31ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 06-Jul-25 22-Jul-25 Lightning Protection Drawings Preparation & Submission

UCR-31ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 20-Oct-25 02-Nov-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 88 22-Jul-25 02-Nov-25 02-Nov-25, EARTHING SYSTEM


UCR-31ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 22-Jul-25 07-Aug-25 Earthing System Shop Drawings Preparation & Submission

UCR-31ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Oct-25 02-Nov-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 07-Aug-25 27-Nov-25 27-Nov-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 07-Aug-25 17-Nov-25 17-Nov-25, FIRE DETECTION AND ALARM SYSTEM
UCR-31ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 07-Aug-25 24-Aug-25 Fire Alarm Shop Drawings Preparation & Submission

UCR-31ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Nov-25 17-Nov-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 24-Aug-25 27-Nov-25 27-Nov-25, COMMUNICATION SYSTEM/ EMERGENCY
UCR-31ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 24-Aug-25 09-Sep-25 Telephone Shop Drawings Preparation & Submission

UCR-31ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 09-Sep-25 27-Nov-25 27-Nov-25, VOICE EVACAUTION AND PUBLIC ADDR
UCR-31ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 09-Sep-25 25-Sep-25 Public Address system Shop Drawings Preparation & Submission

UCR-31ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 27-Sep-25 27-Nov-25 27-Nov-25, VIDEO SURVEILLANCE


UCR-31ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 27-Sep-25 12-Oct-25 Video Surveillance system Shop Drawings Preparation & Submiss

UCR-31ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Video Surveillance system Shop Drawings Review & Appro

ACCESS CONTROL SY
SYSTEM 40 12-Oct-25 27-Nov-25 27-Nov-25, ACCESS CONTROL SYSTEM
UCR-31ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 12-Oct-25 28-Oct-25 Access Control system Shop Drawings Preparation & Submissio

UCR-31ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 28-Oct-25 27-Nov-25 27-Nov-25, RADIO RE-BROADCASTING SYSTEM
UCR-31ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 28-Oct-25 13-Nov-25 Radio Re Broadcasting system Shop Drawings Preparation &

UCR-31ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 Radio Re Broadcasting system Shop Drawings Review & Ap

SCADA SYSTEM 26 28-Oct-25 27-Nov-25 27-Nov-25, SCADA SYSTEM


UCR-31ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 28-Oct-25 13-Nov-25 SCADA system Shop Drawings Preparation & Submission

UCR-31ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 13-Nov-25 27-Nov-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 17-Mar-26 27-Apr-26 27-Apr-26, DRY UTILITIES


POWER 31 17-Mar-26 27-Apr-26 27-Apr-26, POWER
POWER LV 31 17-Mar-26 27-Apr-26 27-Apr-26, POWER LV
36520 Prepare and submit power system shopdrawings 20 17-Mar-26 14-Apr-26 Prepare and submit power system shopdrawin

36530 Review and approval power system shopdrawings 11 14-Apr-26 27-Apr-26 Review and approval power system shopdra

UTILITY ROOM 32 (IN D


D09) (FLD -0.5 m) 536 02-Dec-23 03-Sep-25 03-Sep-25, UTILITY ROOM 32 (IN D09) (FLD -0.5 m)
ENGINEERING 536 02-Dec-23 03-Sep-25 03-Sep-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 536 02-Dec-23 03-Sep-25 03-Sep-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-UR132-SI.9 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR32-SI.99 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 23-Nov-24 21-Apr-25 21-Apr-25, STRUCTURE


UCR-32ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Foundation Shop Drawings Preparation & Submission

UCR-32ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Jan-25 27-Jan-25 Foundation Shop Drawings Review & Approval

UCR-32ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Walls Shop Drawings Preparation & Submission

UCR-32ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 05-Apr-25 21-Apr-25 Walls Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
112 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-32ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-Dec-24 11-Jan-25 Slab Shop Drawings Preparation & Submission

UCR-32ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Jan-25 27-Jan-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 20-Feb-25 30-Apr-25 30-Apr-25, MECHANICAL


FIRE FIGHTING SYSTEM 56 20-Feb-25 30-Apr-25 30-Apr-25, FIRE FIGHTING SYSTEM
UCR-32ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 20-Feb-25 08-Mar-25 Fire Fighting Shop Drawings Preparation & Submission

UCR-32ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 08-Mar-25 30-Apr-25 30-Apr-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-32ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 08-Mar-25 24-Mar-25 HVAC Shop Drawings Preparation & Submission

UCR-32ENG-MC-HC HVAC Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 24-Mar-25 30-Apr-25 30-Apr-25, PLUMBING SYSTEM


UCR-32ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 24-Mar-25 14-Apr-25 Plumbing System Shop Drawings Preparation & Submission

UCR-32ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 14-Apr-25 30-Apr-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 18-Sep-24 06-May-25 06-May-25, ELECTRICAL


CABLE TRAYS 181 18-Sep-24 22-Apr-25 22-Apr-25, CABLE TRAYS
UCR-32ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 18-Sep-24 05-Oct-24 Cable Tray Shop Drawings Preparation & Submission

UCR-32ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 167 05-Oct-24 22-Apr-25 22-Apr-25, POWER CABLES


UCR-32ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Power Cables Shop Drawings Preparation & Submission

UCR-32ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 153 21-Oct-24 22-Apr-25 22-Apr-25, LIGHTING SYSTEM


UCR-32ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Lighting System Shop Drawings Preparation & Submission

UCR-32ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 139 06-Nov-24 22-Apr-25 22-Apr-25, ELECTRICAL INSTALLATIONS
UCR-32ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Electrical Installations Shop Drawings Preparation & Submission

UCR-32ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 125 23-Nov-24 22-Apr-25 22-Apr-25, TRANSFORMERS INSTALLATION
UCR-32ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Transformers Installation Shop Drawings Preparation & Submission

UCR-32ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 121 09-Dec-24 04-May-25 04-May-25, LIGHTNING PROTECTION SYSTEM
UCR-32ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Lightning Protection Drawings Preparation & Submission

UCR-32ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 20-Apr-25 04-May-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 107 25-Dec-24 04-May-25 04-May-25, EARTHING SYSTEM


UCR-32ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 25-Dec-24 11-Jan-25 Earthing System Shop Drawings Preparation & Submission

UCR-32ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Apr-25 04-May-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 11-Jan-25 06-May-25 06-May-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 11-Jan-25 06-May-25 06-May-25, FIRE DETECTION AND ALARM SYSTEM
UCR-32ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 11-Jan-25 27-Jan-25 Fire Alarm Shop Drawings Preparation & Submission

UCR-32ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 27-Jan-25 06-May-25 06-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-32ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 27-Jan-25 12-Feb-25 Telephone Shop Drawings Preparation & Submission

UCR-32ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 12-Feb-25 06-May-25 06-May-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-32ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 12-Feb-25 27-Feb-25 Public Address system Shop Drawings Preparation & Submission

UCR-32ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 01-Mar-25 06-May-25 06-May-25, VIDEO SURVEILLANCE


UCR-32ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 01-Mar-25 16-Mar-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR-32ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 16-Mar-25 06-May-25 06-May-25, ACCESS CONTROL SYSTEM
UCR-32ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Access Control system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
113 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-32ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Apr-25 06-May-25 06-May-25, RADIO RE-BROADCASTING SYSTEM
UCR-32ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Apr-25 22-Apr-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-32ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 06-Apr-25 06-May-25 06-May-25, SCADA SYSTEM


UCR-32ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 06-Apr-25 22-Apr-25 SCADA system Shop Drawings Preparation & Submission

UCR-32ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 29-Jul-25 03-Sep-25 03-Sep-25, DRY UTILITIES


POWER 31 29-Jul-25 03-Sep-25 03-Sep-25, POWER
POWER LV 31 29-Jul-25 03-Sep-25 03-Sep-25, POWER LV
DU-P-LV.950 Prepare and submit power system shopdrawings 20 29-Jul-25 21-Aug-25 Prepare and submit power system shopdrawings

DU-P-LV.955 Review and approval power system shopdrawings 11 21-Aug-25 03-Sep-25 Review and approval power system shopdrawings

UTILITY ROOM 33 (IN D


D09 ) (FLD -0.5m) 411 02-Dec-23 08-Apr-25 08-Apr-25, UTILITY ROOM 33 (IN D09 ) (FLD -0.5m)
ENGINEERING 411 02-Dec-23 08-Apr-25 08-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 411 02-Dec-23 08-Apr-25 08-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-UR33-SI.10 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR33-SI.10 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 22-Apr-24 18-Sep-24 18-Sep-24, STRUCTURE


UCR-33ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 22-Apr-24 08-May-24 Foundation Shop Drawings Preparation & Submission

UCR-33ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 10-Jun-24 01-Jul-24 Foundation Shop Drawings Review & Approval

UCR-33ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 08-May-24 25-May-24 Walls Shop Drawings Preparation & Submission

UCR-33ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 02-Sep-24 18-Sep-24 Walls Shop Drawings Review & Approval

UCR-33ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Slab Shop Drawings Preparation & Submission

UCR-33ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 10-Jun-24 01-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 68 10-Sep-24 30-Nov-24 30-Nov-24, MECHANICAL


FIRE FIGHTING SYSTEM 56 10-Sep-24 16-Nov-24 16-Nov-24, FIRE FIGHTING SYSTEM
UCR-33ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 10-Sep-24 28-Sep-24 Fire Fighting Shop Drawings Preparation & Submission

UCR-33ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 30-Oct-24 16-Nov-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 28-Sep-24 30-Nov-24 30-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-33ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 28-Sep-24 14-Oct-24 HVAC Shop Drawings Preparation & Submission

UCR-33ENG-MC-HC HVAC Shop Drawings Review & Approval 14 13-Nov-24 30-Nov-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 14-Oct-24 16-Nov-24 16-Nov-24, PLUMBING SYSTEM


UCR-33ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 14-Oct-24 30-Oct-24 Plumbing System Shop Drawings Preparation & Submission

UCR-33ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-Oct-24 16-Nov-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 298 02-Dec-23 21-Nov-24 21-Nov-24, ELECTRICAL


CABLE TRAYS 286 02-Dec-23 07-Nov-24 07-Nov-24, CABLE TRAYS
UCR-33ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR-33ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 272 17-Dec-23 07-Nov-24 07-Nov-24, POWER CABLES


UCR-33ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR-33ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 258 02-Jan-24 07-Nov-24 07-Nov-24, LIGHTING SYSTEM


UCR-33ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR-33ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 244 18-Jan-24 07-Nov-24 07-Nov-24, ELECTRICAL INSTALLATIONS
UCR-33ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR-33ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 230 04-Feb-24 07-Nov-24 07-Nov-24, TRANSFORMERS INSTALLATION

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
114 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-33ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR-33ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 24-Oct-24 07-Nov-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 210 20-Feb-24 31-Oct-24 31-Oct-24, LIGHTNING PROTECTION SYSTEM
UCR-33ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR-33ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 17-Oct-24 31-Oct-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 26 07-Mar-24 07-Apr-24 07-Apr-24, EARTHING SYSTEM


UCR-33ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR-33ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Mar-24 07-Apr-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 01-Aug-24 21-Nov-24 21-Nov-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 01-Aug-24 21-Nov-24 21-Nov-24, FIRE DETECTION AND ALARM SYSTEM
UCR-33ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 01-Aug-24 18-Aug-24 Fire Alarm Shop Drawings Preparation & Submission

UCR-33ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 18-Aug-24 21-Nov-24 21-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-33ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Aug-24 02-Sep-24 Telephone Shop Drawings Preparation & Submission

UCR-33ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 03-Sep-24 21-Nov-24 21-Nov-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-33ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 03-Sep-24 18-Sep-24 Public Address system Shop Drawings Preparation & Submission

UCR-33ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 18-Sep-24 21-Nov-24 21-Nov-24, VIDEO SURVEILLANCE


UCR-33ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 18-Sep-24 06-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR-33ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 06-Oct-24 21-Nov-24 21-Nov-24, ACCESS CONTROL SYSTEM
UCR-33ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Access Control system Shop Drawings Preparation & Submission

UCR-33ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 22-Oct-24 21-Nov-24 21-Nov-24, RADIO RE-BROADCASTING SYSTEM
UCR-33ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 22-Oct-24 07-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-33ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 22-Oct-24 21-Nov-24 21-Nov-24, SCADA SYSTEM


UCR-33ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 22-Oct-24 07-Nov-24 SCADA system Shop Drawings Preparation & Submission

UCR-33ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 07-Nov-24 21-Nov-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 45 10-Feb-25 08-Apr-25 08-Apr-25, DRY UTILITIES


POWER 45 10-Feb-25 08-Apr-25 08-Apr-25, POWER
POWER LV 31 10-Feb-25 18-Mar-25 18-Mar-25, POWER LV
DU-P-LV.1006 Prepare and submit power system shopdrawings 20 10-Feb-25 05-Mar-25 Prepare and submit power system shopdrawings

DU-P-LV.1011 Review and approval power system shopdrawings 11 05-Mar-25 18-Mar-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 26-Feb-25 08-Apr-25 08-Apr-25, MEDIUM VOLTAGE


DU-P-MV.1006 Prepare and submit medium voltage shopdrawings 20 26-Feb-25 22-Mar-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.1011 Review and approval medium voltage shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 26-Feb-25 08-Apr-25 08-Apr-25, TRANSFORMER


DU-P-T.1006 Prepare and submit transformer shopdrawings 20 26-Feb-25 22-Mar-25 Prepare and submit transformer shopdrawings

DU-P-T.1011 Review and approval transformer shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval transformer shopdrawings

RMU 31 26-Feb-25 08-Apr-25 08-Apr-25, RMU


DU-P-RMU.1006 Prepare and submit RMU shopdrawings 20 26-Feb-25 22-Mar-25 Prepare and submit RMU shopdrawings

DU-P-RMU.1011 Review and approval RMU shopdrawings 11 22-Mar-25 08-Apr-25 Review and approval RMU shopdrawings

UTILITY ROOM 15 (IN ZONE


ZO 03) ON BACKFILL (FLD +14.55 m) 298 11-Dec-24 03-Dec-25 03-Dec-25, UTILITY ROOM 15 (IN ZONE 03) ON BACK
ENGINEERING 298 11-Dec-24 03-Dec-25 03-Dec-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 298 11-Dec-24 03-Dec-25 03-Dec-25, SHOP DRAWING SUBMITTAL AND APPRO
EARTH WORKS 28 09-Apr-25 11-May-25 11-May-25, EARTH WORKS
JAH-ENG-UR15-SI.10 Soil Improvement Design Preparation & Submission 14 09-Apr-25 26-Apr-25 Soil Improvement Design Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
115 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
JAH-ENG-UR15-SI.10 Soil Improvement Design Review & Approval 14 26-Apr-25 11-May-25 Soil Improvement Design Review & Approval

STRUCTURE 122 30-Jan-25 30-Jun-25 30-Jun-25, STRUCTURE


UCR.15ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 30-Jan-25 16-Feb-25 Foundation Shop Drawings Preparation & Submission

UCR.15ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 20-Mar-25 09-Apr-25 Foundation Shop Drawings Review & Approval

UCR.15ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 16-Feb-25 04-Mar-25 Walls Shop Drawings Preparation & Submission

UCR.15ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 14-Jun-25 30-Jun-25 Walls Shop Drawings Review & Approval

UCR.15ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 04-Mar-25 20-Mar-25 Slab Shop Drawings Preparation & Submission

UCR.15ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 20-Mar-25 09-Apr-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 25-May-25 02-Aug-25 02-Aug-25, MECHANICAL


FIRE FIGHTING SYSTEM 56 25-May-25 02-Aug-25 02-Aug-25, FIRE FIGHTING SYSTEM
UCR.15ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 25-May-25 14-Jun-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.15ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 14-Jun-25 02-Aug-25 02-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.15ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 14-Jun-25 30-Jun-25 HVAC Shop Drawings Preparation & Submission

UCR.15ENG-MC-HC HVAC Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 30-Jun-25 02-Aug-25 02-Aug-25, PLUMBING SYSTEM


UCR.15ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 30-Jun-25 16-Jul-25 Plumbing System Shop Drawings Preparation & Submission

UCR.15ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 16-Jul-25 02-Aug-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 11-Dec-24 02-Aug-25 02-Aug-25, ELECTRICAL


CABLE TRAYS 186 11-Dec-24 24-Jul-25 24-Jul-25, CABLE TRAYS
UCR.15ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 Cable Tray Shop Drawings Preparation & Submission

UCR.15ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 172 28-Dec-24 24-Jul-25 24-Jul-25, POWER CABLES


UCR.15ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 Power Cables Shop Drawings Preparation & Submission

UCR.15ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 150 13-Jan-25 15-Jul-25 15-Jul-25, LIGHTING SYSTEM


UCR.15ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 Lighting System Shop Drawings Preparation & Submission

UCR.15ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 144 29-Jan-25 24-Jul-25 24-Jul-25, ELECTRICAL INSTALLATIONS
UCR.15ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 29-Jan-25 15-Feb-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.15ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 130 15-Feb-25 24-Jul-25 24-Jul-25, TRANSFORMERS INSTALLATION
UCR.15ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 15-Feb-25 03-Mar-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.15ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 10-Jul-25 24-Jul-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 108 03-Mar-25 15-Jul-25 15-Jul-25, LIGHTNING PROTECTION SYSTEM
UCR.15ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 03-Mar-25 19-Mar-25 Lightning Protection Drawings Preparation & Submission

UCR.15ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 94 19-Mar-25 15-Jul-25 15-Jul-25, EARTHING SYSTEM


UCR.15ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 19-Mar-25 09-Apr-25 Earthing System Shop Drawings Preparation & Submission

UCR.15ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 01-Jul-25 15-Jul-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 09-Apr-25 02-Aug-25 02-Aug-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 09-Apr-25 02-Aug-25 02-Aug-25, FIRE DETECTION AND ALARM SYSTEM
UCR.15ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 09-Apr-25 24-Apr-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.15ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 26-Apr-25 02-Aug-25 02-Aug-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHO
UCR.15ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Apr-25 11-May-25 Telephone Shop Drawings Preparation & Submission

UCR.15ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 11-May-25 02-Aug-25 02-Aug-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTE
UCR.15ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Public Address system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
116 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.15ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 27-May-25 02-Aug-25 02-Aug-25, VIDEO SURVEILLANCE


UCR.15ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 27-May-25 16-Jun-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR.15ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 16-Jun-25 02-Aug-25 02-Aug-25, ACCESS CONTROL SYSTEM
UCR.15ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 16-Jun-25 02-Jul-25 Access Control system Shop Drawings Preparation & Submission

UCR.15ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 02-Jul-25 02-Aug-25 02-Aug-25, RADIO RE-BROADCASTING SYSTEM
UCR.15ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.15ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Jul-25 02-Aug-25 02-Aug-25, SCADA SYSTEM


UCR.15ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Jul-25 19-Jul-25 SCADA system Shop Drawings Preparation & Submission

UCR.15ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 19-Jul-25 02-Aug-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 28-Oct-25 03-Dec-25 03-Dec-25, DRY UTILITIES


POWER 31 28-Oct-25 03-Dec-25 03-Dec-25, POWER
POWER LV 31 28-Oct-25 03-Dec-25 03-Dec-25, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 28-Oct-25 20-Nov-25 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 20-Nov-25 03-Dec-25 Review and approval power system shopdrawings

UTILITY ROOM 16 (IN ZONE


ZO 03) ON BACKFILL (FLD +15.85 m) 216 10-Dec-24 27-Aug-25 27-Aug-25, UTILITY ROOM 16 (IN ZONE 03) ON BACKFILL (FL
ENGINEERING 216 10-Dec-24 27-Aug-25 27-Aug-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 216 10-Dec-24 27-Aug-25 27-Aug-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 09-Apr-25 11-May-25 11-May-25, EARTH WORKS
JAH-ENG-UR16-SI.10 Soil Improvement Design Preparation & Submission 14 09-Apr-25 26-Apr-25 Soil Improvement Design Preparation & Submission

JAH-ENG-UR16-SI.10 Soil Improvement Design Review & Approval 14 26-Apr-25 11-May-25 Soil Improvement Design Review & Approval

STRUCTURE 120 21-Jan-25 18-Jun-25 18-Jun-25, STRUCTURE


UCR.16ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 21-Jan-25 06-Feb-25 Foundation Shop Drawings Preparation & Submission

UCR.16ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Mar-25 26-Mar-25 Foundation Shop Drawings Review & Approval

UCR.16ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 06-Feb-25 23-Feb-25 Walls Shop Drawings Preparation & Submission

UCR.16ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 29-May-25 18-Jun-25 Walls Shop Drawings Review & Approval

UCR.16ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 23-Feb-25 11-Mar-25 Slab Shop Drawings Preparation & Submission

UCR.16ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Mar-25 26-Mar-25 Slab Shop Drawings Review & Approval

MECHANICAL 79 24-May-25 27-Aug-25 27-Aug-25, MECHANICAL


FIRE FIGHTING SYSTEM 56 24-May-25 31-Jul-25 31-Jul-25, FIRE FIGHTING SYSTEM
UCR.16ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 24-May-25 12-Jun-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.16ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 15-Jul-25 31-Jul-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 65 12-Jun-25 27-Aug-25 27-Aug-25, VENTILATION SYSTEM/AIR CONDITIONING WOR
UCR.16ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 12-Jun-25 29-Jun-25 HVAC Shop Drawings Preparation & Submission

UCR.16ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Aug-25 27-Aug-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 29-Jun-25 31-Jul-25 31-Jul-25, PLUMBING SYSTEM


UCR.16ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 29-Jun-25 15-Jul-25 Plumbing System Shop Drawings Preparation & Submission

UCR.16ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 15-Jul-25 31-Jul-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 10-Dec-24 31-Jul-25 31-Jul-25, ELECTRICAL


CABLE TRAYS 186 10-Dec-24 23-Jul-25 23-Jul-25, CABLE TRAYS
UCR.16ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 10-Dec-24 26-Dec-24 Cable Tray Shop Drawings Preparation & Submission

UCR.16ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 172 26-Dec-24 23-Jul-25 23-Jul-25, POWER CABLES


UCR.16ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 26-Dec-24 12-Jan-25 Power Cables Shop Drawings Preparation & Submission

UCR.16ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 158 12-Jan-25 23-Jul-25 23-Jul-25, LIGHTING SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
117 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.16ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 12-Jan-25 28-Jan-25 Lighting System Shop Drawings Preparation & Submission

UCR.16ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 144 28-Jan-25 23-Jul-25 23-Jul-25, ELECTRICAL INSTALLATIONS
UCR.16ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 28-Jan-25 13-Feb-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.16ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 130 13-Feb-25 23-Jul-25 23-Jul-25, TRANSFORMERS INSTALLATION
UCR.16ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 13-Feb-25 02-Mar-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.16ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 09-Jul-25 23-Jul-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 110 02-Mar-25 16-Jul-25 16-Jul-25, LIGHTNING PROTECTION SYSTEM
UCR.16ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Lightning Protection Drawings Preparation & Submission

UCR.16ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 02-Jul-25 16-Jul-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 96 18-Mar-25 16-Jul-25 16-Jul-25, EARTHING SYSTEM


UCR.16ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 Earthing System Shop Drawings Preparation & Submission

UCR.16ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 02-Jul-25 16-Jul-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 08-Apr-25 31-Jul-25 31-Jul-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 08-Apr-25 31-Jul-25 31-Jul-25, FIRE DETECTION AND ALARM SYSTEM
UCR.16ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 08-Apr-25 23-Apr-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.16ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 24-Apr-25 31-Jul-25 31-Jul-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHON
UCR.16ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 24-Apr-25 10-May-25 Telephone Shop Drawings Preparation & Submission

UCR.16ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 10-May-25 31-Jul-25 31-Jul-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.16ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 10-May-25 26-May-25 Public Address system Shop Drawings Preparation & Submission

UCR.16ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 26-May-25 31-Jul-25 31-Jul-25, VIDEO SURVEILLANCE


UCR.16ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 26-May-25 15-Jun-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR.16ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 15-Jun-25 31-Jul-25 31-Jul-25, ACCESS CONTROL SYSTEM
UCR.16ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 15-Jun-25 01-Jul-25 Access Control system Shop Drawings Preparation & Submission

UCR.16ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 01-Jul-25 31-Jul-25 31-Jul-25, RADIO RE-BROADCASTING SYSTEM
UCR.16ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-Jul-25 17-Jul-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.16ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 01-Jul-25 31-Jul-25 31-Jul-25, SCADA SYSTEM


UCR.16ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 01-Jul-25 17-Jul-25 SCADA system Shop Drawings Preparation & Submission

UCR.16ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Jul-25 31-Jul-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 17-Jun-25 23-Jul-25 23-Jul-25, DRY UTILITIES


POWER 31 17-Jun-25 23-Jul-25 23-Jul-25, POWER
POWER LV 31 17-Jun-25 23-Jul-25 23-Jul-25, POWER LV
DU-P-LV.1200 Prepare and submit power system shopdrawings 20 17-Jun-25 10-Jul-25 Prepare and submit power system shopdrawings

DU-P-LV.1205 Review and approval power system shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 17-Jun-25 23-Jul-25 23-Jul-25, MEDIUM VOLTAGE


DU-P-MV.1200 Prepare and submit medium voltage shopdrawings 20 17-Jun-25 10-Jul-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.1205 Review and approval medium voltage shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 17-Jun-25 23-Jul-25 23-Jul-25, TRANSFORMER


DU-P-T.1200 Prepare and submit transformer shopdrawings 20 17-Jun-25 10-Jul-25 Prepare and submit transformer shopdrawings

DU-P-T.1205 Review and approval transformer shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval transformer shopdrawings

RMU 31 17-Jun-25 23-Jul-25 23-Jul-25, RMU


DU-P-RMU.1200 Prepare and submit RMU shopdrawings 20 17-Jun-25 10-Jul-25 Prepare and submit RMU shopdrawings

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
118 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-RMU.1205 Review and approval RMU shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval RMU shopdrawings

UTILITY ROOM 13 (IN ZONE


ZO 04) ON BACKFILL (FLD +13.35 m) 733 02-Dec-23 28-Apr-26 28-Apr-26, UTILITY ROOM 13 (IN ZONE
ENGINEERING 733 02-Dec-23 28-Apr-26 28-Apr-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 733 02-Dec-23 28-Apr-26 28-Apr-26, SHOP DRAWING SUBMITTA
EARTH WORKS 28 08-Dec-25 08-Jan-26 08-Jan-26, EARTH WORKS
JAH-ENG-UR13-SI.10 Soil Improvement Design Preparation & Submission 14 08-Dec-25 24-Dec-25 Soil Improvement Design Preparation & Submission

JAH-ENG-UR13-SI.10 Soil Improvement Design Review & Approval 14 24-Dec-25 08-Jan-26 Soil Improvement Design Review & Approval

STRUCTURE 123 05-Oct-25 25-Feb-26 25-Feb-26, STRUCTURE


UCR.13ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 05-Oct-25 21-Oct-25 Foundation Shop Drawings Preparation & Submission

UCR.13ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Nov-25 08-Dec-25 Foundation Shop Drawings Review & Approval

UCR.13ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 21-Oct-25 06-Nov-25 Walls Shop Drawings Preparation & Submission

UCR.13ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 09-Feb-26 25-Feb-26 Walls Shop Drawings Review & Approval

UCR.13ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Nov-25 23-Nov-25 Slab Shop Drawings Preparation & Submission

UCR.13ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Nov-25 08-Dec-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 23-Jun-24 27-Aug-24 27-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 33 23-Jun-24 31-Jul-24 31-Jul-24, FIRE FIGHTING SYSTEM
UCR.13ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 23-Jun-24 09-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.13ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 15-Jul-24 31-Jul-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 09-Jul-24 27-Aug-24 27-Aug-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.13ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 09-Jul-24 25-Jul-24 HVAC Shop Drawings Preparation & Submission

UCR.13ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Aug-24 27-Aug-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 25-Jul-24 27-Aug-24 27-Aug-24, PLUMBING SYSTEM


UCR.13ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 25-Jul-24 11-Aug-24 Plumbing System Shop Drawings Preparation & Submission

UCR.13ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 11-Aug-24 27-Aug-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 733 02-Dec-23 28-Apr-26 28-Apr-26, ELECTRICAL


CABLE TRAYS 40 02-Dec-23 16-Jan-24 16-Jan-24, CABLE TRAYS
UCR.13ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.13ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 17-Dec-23 16-Jan-24 16-Jan-24, POWER CABLES


UCR.13ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.13ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 26 02-Jan-24 01-Feb-24 01-Feb-24, LIGHTING SYSTEM


UCR.13ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.13ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 18-Jan-24 01-Feb-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.13ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.13ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.13ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.13ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 664 20-Feb-24 28-Apr-26 28-Apr-26, LIGHTNING PROTECTION S
UCR.13ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.13ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 14-Apr-26 28-Apr-26 Lightning Protection Shop Drawings Review

EARTHING SYSTEM 650 07-Mar-24 28-Apr-26 28-Apr-26, EARTHING SYSTEM


UCR.13ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.13ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 14-Apr-26 28-Apr-26 Earthing System Drawings Review & Appro

LOW CURRENT 193 02-Dec-23 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 26 24-Mar-24 27-Apr-24 27-Apr-24, FIRE DETECTION AND ALARM SYSTEM
UCR.13ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
119 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.13ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.13ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

UCR.13ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 26 29-Apr-24 28-May-24 28-May-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.13ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.13ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 13-Jun-24 13-Jun-24, VIDEO SURVEILLANCE


UCR.13ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.13ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.13ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.13ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.13ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.13ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Dec-23 31-Dec-23 31-Dec-23, SCADA SYSTEM


UCR.13ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 SCADA system Shop Drawings Preparation & Submission

UCR.13ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 40 26-Nov-24 12-Jan-25 12-Jan-25, DRY UTILITIES


POWER 40 26-Nov-24 12-Jan-25 12-Jan-25, POWER
POWER LV 31 26-Nov-24 01-Jan-25 01-Jan-25, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 26-Nov-24 19-Dec-24 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 19-Dec-24 01-Jan-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 27-Nov-24 02-Jan-25 02-Jan-25, MEDIUM VOLTAGE


MEP-VR01-ENG-PW Prepare and submit medium voltage shopdrawings 20 27-Nov-24 21-Dec-24 Prepare and submit medium voltage shopdrawings

MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 21-Dec-24 02-Jan-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 04-Dec-24 09-Jan-25 09-Jan-25, TRANSFORMER


MEP-VR01-ENG-PW Prepare and submit transformer shopdrawings 20 04-Dec-24 28-Dec-24 Prepare and submit transformer shopdrawings

MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 28-Dec-24 09-Jan-25 Review and approval transformer shopdrawings

RMU 31 07-Dec-24 12-Jan-25 12-Jan-25, RMU


MEP-VR01-ENG-PW Prepare and submit RMU shopdrawings 20 07-Dec-24 30-Dec-24 Prepare and submit RMU shopdrawings

MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 30-Dec-24 12-Jan-25 Review and approval RMU shopdrawings

UTILITY ROOM 14 (IN ZONE


ZO 04) ON BACKFILL (FLD +14 m) 701 02-Dec-23 16-Mar-26 16-Mar-26, UTILITY ROOM 14 (IN ZONE 04)
ENGINEERING 701 02-Dec-23 16-Mar-26 16-Mar-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 701 02-Dec-23 16-Mar-26 16-Mar-26, SHOP DRAWING SUBMITTAL A
EARTH WORKS 28 29-Dec-25 29-Jan-26 29-Jan-26, EARTH WORKS
JAH-ENG-UR14-SI.10 Soil Improvement Design Preparation & Submission 14 29-Dec-25 14-Jan-26 Soil Improvement Design Preparation & Submission

JAH-ENG-UR14-SI.10 Soil Improvement Design Review & Approval 14 14-Jan-26 29-Jan-26 Soil Improvement Design Review & Approval

STRUCTURE 121 26-Oct-25 16-Mar-26 16-Mar-26, STRUCTURE


UCR.14ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 26-Oct-25 11-Nov-25 Foundation Shop Drawings Preparation & Submission

UCR.14ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 14-Dec-25 29-Dec-25 Foundation Shop Drawings Review & Approval

UCR.14ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 11-Nov-25 27-Nov-25 Walls Shop Drawings Preparation & Submission

UCR.14ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 28-Feb-26 16-Mar-26 Walls Shop Drawings Review & Approval

UCR.14ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 27-Nov-25 14-Dec-25 Slab Shop Drawings Preparation & Submission

UCR.14ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 14-Dec-25 29-Dec-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 02-Dec-23 04-Feb-24 04-Feb-24, MECHANICAL


FIRE FIGHTING SYSTEM 28 02-Dec-23 02-Jan-24 02-Jan-24, FIRE FIGHTING SYSTEM
UCR.14ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Fighting Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
120 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.14ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.14ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission

UCR.14ENG-MC-HC HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 02-Jan-24 04-Feb-24 04-Feb-24, PLUMBING SYSTEM


UCR.14ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Plumbing System Shop Drawings Preparation & Submission

UCR.14ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 699 02-Dec-23 14-Mar-26 14-Mar-26, ELECTRICAL


CABLE TRAYS 40 02-Dec-23 16-Jan-24 16-Jan-24, CABLE TRAYS
UCR.14ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.14ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 17-Dec-23 16-Jan-24 16-Jan-24, POWER CABLES


UCR.14ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.14ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 671 02-Jan-24 14-Mar-26 14-Mar-26, LIGHTING SYSTEM


UCR.14ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.14ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Lighting System Shop Drawings Review & Appr

ELECTRICAL INSTALLATIONS
INSTALLAT 69 18-Jan-24 08-Apr-24 08-Apr-24, ELECTRICAL INSTALLATIONS
UCR.14ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.14ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 55 04-Feb-24 08-Apr-24 08-Apr-24, TRANSFORMERS INSTALLATION
UCR.14ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.14ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 25-Mar-24 08-Apr-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 629 20-Feb-24 14-Mar-26 14-Mar-26, LIGHTNING PROTECTION SYST
UCR.14ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.14ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Lightning Protection Shop Drawings Review & A

EARTHING SYSTEM 615 07-Mar-24 14-Mar-26 14-Mar-26, EARTHING SYSTEM


UCR.14ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.14ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 28-Feb-26 14-Mar-26 Earthing System Drawings Review & Approval

LOW CURRENT 193 02-Dec-23 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 26 24-Mar-24 27-Apr-24 27-Apr-24, FIRE DETECTION AND ALARM SYSTEM
UCR.14ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.14ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.14ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

UCR.14ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 40 29-Apr-24 13-Jun-24 13-Jun-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.14ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.14ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 13-Jun-24 13-Jun-24, VIDEO SURVEILLANCE


UCR.14ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.14ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.14ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.14ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.14ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.14ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Dec-23 31-Dec-23 31-Dec-23, SCADA SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
121 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.14ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 SCADA system Shop Drawings Preparation & Submission

UCR.14ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 81 07-May-24 14-Aug-24 14-Aug-24, DRY UTILITIES


POWER 81 07-May-24 14-Aug-24 14-Aug-24, POWER
POWER LV 31 07-May-24 12-Jun-24 12-Jun-24, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 07-May-24 30-May-24 Prepare and submit power system shopdrawings

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 26-May-24 06-Jul-24 06-Jul-24, MEDIUM VOLTAGE


MEP-VR01-ENG-PW Prepare and submit medium voltage shopdrawings 20 26-May-24 23-Jun-24 Prepare and submit medium voltage shopdrawings

MEP-VR01-ENG-PW Review and approval medium voltage shopdrawings 11 23-Jun-24 06-Jul-24 Review and approval medium voltage shopdrawings

TRANSFORMER 31 20-Jun-24 27-Jul-24 27-Jul-24, TRANSFORMER


MEP-VR01-ENG-PW Prepare and submit transformer shopdrawings 20 20-Jun-24 13-Jul-24 Prepare and submit transformer shopdrawings

MEP-VR01-ENG-PW Review and approval transformer shopdrawings 11 14-Jul-24 27-Jul-24 Review and approval transformer shopdrawings

RMU 31 09-Jul-24 14-Aug-24 14-Aug-24, RMU


MEP-VR01-ENG-PW Prepare and submit RMU shopdrawings 20 09-Jul-24 31-Jul-24 Prepare and submit RMU shopdrawings

MEP-VR01-ENG-PW Review and approval RMU shopdrawings 11 01-Aug-24 14-Aug-24 Review and approval RMU shopdrawings

UTILITY ROOM 11 (IN ZONE


ZO 05) ON BACKFILL (FLD +14.55 m) 704 02-Dec-23 25-Mar-26 25-Mar-26, UTILITY ROOM 11 (IN ZONE 05
ENGINEERING 704 02-Dec-23 25-Mar-26 25-Mar-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 704 02-Dec-23 25-Mar-26 25-Mar-26, SHOP DRAWING SUBMITTAL A
EARTH WORKS 28 07-Jan-26 09-Feb-26 09-Feb-26, EARTH WORKS
JAH-ENG-UR11-SI.10 Soil Improvement Design Preparation & Submission 14 07-Jan-26 24-Jan-26 Soil Improvement Design Preparation & Submission

JAH-ENG-UR11-SI.10 Soil Improvement Design Review & Approval 14 24-Jan-26 09-Feb-26 Soil Improvement Design Review & Approval

STRUCTURE 116 04-Nov-25 25-Mar-26 25-Mar-26, STRUCTURE


UCR.11ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Foundation Shop Drawings Preparation & Submission

UCR.11ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Foundation Shop Drawings Review & Approval

UCR.11ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Walls Shop Drawings Preparation & Submission

UCR.11ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 04-Mar-26 25-Mar-26 Walls Shop Drawings Review & Approval

UCR.11ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 07-Dec-25 23-Dec-25 Slab Shop Drawings Preparation & Submission

UCR.11ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Slab Shop Drawings Review & Approval

MECHANICAL 56 02-Dec-23 04-Feb-24 04-Feb-24, MECHANICAL


FIRE FIGHTING SYSTEM 28 02-Dec-23 02-Jan-24 02-Jan-24, FIRE FIGHTING SYSTEM
UCR.11ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Fighting Shop Drawings Preparation & Submission

UCR.11ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.11ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission

UCR.11ENG-MC-HC HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 02-Jan-24 04-Feb-24 04-Feb-24, PLUMBING SYSTEM


UCR.11ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Plumbing System Shop Drawings Preparation & Submission

UCR.11ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 669 02-Dec-23 08-Feb-26 08-Feb-26, ELECTRICAL


CABLE TRAYS 40 02-Dec-23 16-Jan-24 16-Jan-24, CABLE TRAYS
UCR.11ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.11ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 17-Dec-23 16-Jan-24 16-Jan-24, POWER CABLES


UCR.11ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.11ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 641 02-Jan-24 08-Feb-26 08-Feb-26, LIGHTING SYSTEM


UCR.11ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.11ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Lighting System Shop Drawings Review & Approva

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
122 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.11ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.11ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.11ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.11ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 600 20-Feb-24 08-Feb-26 08-Feb-26, LIGHTNING PROTECTION SYSTEM
UCR.11ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.11ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Lightning Protection Shop Drawings Review & Appr

EARTHING SYSTEM 586 07-Mar-24 08-Feb-26 08-Feb-26, EARTHING SYSTEM


UCR.11ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.11ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Earthing System Drawings Review & Approval

LOW CURRENT 193 02-Dec-23 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 26 24-Mar-24 27-Apr-24 27-Apr-24, FIRE DETECTION AND ALARM SYSTEM
UCR.11ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.11ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.11ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

UCR.11ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 26 29-Apr-24 28-May-24 28-May-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.11ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.11ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 13-Jun-24 13-Jun-24, VIDEO SURVEILLANCE


UCR.11ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.11ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.11ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.11ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.11ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.11ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Dec-23 31-Dec-23 31-Dec-23, SCADA SYSTEM


UCR.11ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 SCADA system Shop Drawings Preparation & Submission

UCR.11ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 07-May-24 12-Jun-24 12-Jun-24, DRY UTILITIES


POWER 31 07-May-24 12-Jun-24 12-Jun-24, POWER
POWER LV 31 07-May-24 12-Jun-24 12-Jun-24, POWER LV
DU-P-LV.1500 Prepare and submit power system shopdrawings 20 07-May-24 30-May-24 Prepare and submit power system shopdrawings

DU-P-LV.1505 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings

UTILITY ROOM 12 (IN ZONE


ZO 05) ON BACKFILL (FLD +13.85m) 313 02-Jun-25 16-Jun-26 16-Jun-26, UTILITY ROOM 12 (IN Z
ENGINEERING 313 02-Jun-25 16-Jun-26 16-Jun-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 313 02-Jun-25 16-Jun-26 16-Jun-26, SHOP DRAWING SUBM
EARTH WORKS 28 11-Jan-26 12-Feb-26 12-Feb-26, EARTH WORKS
JAH-ENG-UR12-SI.10 Soil Improvement Design Preparation & Submission 14 11-Jan-26 27-Jan-26 Soil Improvement Design Preparation & Submission

JAH-ENG-UR12-SI.10 Soil Improvement Design Review & Approval 14 27-Jan-26 12-Feb-26 Soil Improvement Design Review & Approval

STRUCTURE 112 04-Nov-25 15-Mar-26 15-Mar-26, STRUCTURE


UCR.12ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Foundation Shop Drawings Preparation & Submission

UCR.12ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Foundation Shop Drawings Review & Approval

UCR.12ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Walls Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
123 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.12ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 26-Feb-26 15-Mar-26 Walls Shop Drawings Review & Approval

UCR.12ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 07-Dec-25 23-Dec-25 Slab Shop Drawings Preparation & Submission

UCR.12ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 23-Dec-25 08-Jan-26 Slab Shop Drawings Review & Approval

MECHANICAL 68 02-Dec-25 19-Feb-26 19-Feb-26, MECHANICAL


FIRE FIGHTING SYSTEM 56 02-Dec-25 05-Feb-26 05-Feb-26, FIRE FIGHTING SYSTEM
UCR.12ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-25 18-Dec-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.12ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 20-Jan-26 05-Feb-26 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 18-Dec-25 19-Feb-26 19-Feb-26, VENTILATION SYSTEM/AIR COND
UCR.12ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 HVAC Shop Drawings Preparation & Submission

UCR.12ENG-MC-HC HVAC Shop Drawings Review & Approval 14 03-Feb-26 19-Feb-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 04-Jan-26 05-Feb-26 05-Feb-26, PLUMBING SYSTEM


UCR.12ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 04-Jan-26 20-Jan-26 Plumbing System Shop Drawings Preparation & Subm

UCR.12ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 20-Jan-26 05-Feb-26 Plumbing System Shop Drawings Review & Approv

ELECTRICAL 209 02-Jun-25 07-Feb-26 07-Feb-26, ELECTRICAL


CABLE TRAYS 192 02-Jun-25 17-Jan-26 17-Jan-26, CABLE TRAYS
UCR.12ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Jun-25 22-Jun-25 Cable Tray Shop Drawings Preparation & Submission

UCR.12ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 03-Jan-26 17-Jan-26 Cable Tray Shop Drawings Review & Approval

POWER CABLES 178 22-Jun-25 17-Jan-26 17-Jan-26, POWER CABLES


UCR.12ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 22-Jun-25 08-Jul-25 Power Cables Shop Drawings Preparation & Submission

UCR.12ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 03-Jan-26 17-Jan-26 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 174 08-Jul-25 28-Jan-26 28-Jan-26, LIGHTING SYSTEM


UCR.12ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 08-Jul-25 24-Jul-25 Lighting System Shop Drawings Preparation & Submission

UCR.12ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 160 24-Jul-25 28-Jan-26 28-Jan-26, ELECTRICAL INSTALLATIONS
UCR.12ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 24-Jul-25 10-Aug-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.12ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Electrical Installations Shop Drawings Review & App

TRANSFORMERS INSTALLATION
INSTA 146 10-Aug-25 28-Jan-26 28-Jan-26, TRANSFORMERS INSTALLATION
UCR.12ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 10-Aug-25 26-Aug-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.12ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Transformers Installation Shop Drawings Review & A

LIGHTNING PROTECTION
PROTECTIO SYSTEM 140 26-Aug-25 07-Feb-26 07-Feb-26, LIGHTNING PROTECTION SYSTEM
UCR.12ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 26-Aug-25 11-Sep-25 Lightning Protection Drawings Preparation & Submission

UCR.12ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 24-Jan-26 07-Feb-26 Lightning Protection Shop Drawings Review & Appr

EARTHING SYSTEM 126 11-Sep-25 07-Feb-26 07-Feb-26, EARTHING SYSTEM


UCR.12ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 11-Sep-25 28-Sep-25 Earthing System Shop Drawings Preparation & Submission

UCR.12ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Jan-26 07-Feb-26 Earthing System Drawings Review & Approval

LOW CURRENT 104 29-Sep-25 28-Jan-26 28-Jan-26, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 104 29-Sep-25 28-Jan-26 28-Jan-26, FIRE DETECTION AND ALARM SYST
UCR.12ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 29-Sep-25 14-Oct-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.12ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 14-Oct-25 18-Jan-26 18-Jan-26, COMMUNICATION SYSTEM/ EMERGE
UCR.12ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 14-Oct-25 30-Oct-25 Telephone Shop Drawings Preparation & Submission

UCR.12ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 76 30-Oct-25 28-Jan-26 28-Jan-26, VOICE EVACAUTION AND PUBLIC A
UCR.12ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 30-Oct-25 16-Nov-25 Public Address system Shop Drawings Preparation & Submis

UCR.12ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Public Address system Shop Drawings Review & App

VIDEO SURVEILLANCE 54 16-Nov-25 18-Jan-26 18-Jan-26, VIDEO SURVEILLANCE


UCR.12ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 16-Nov-25 02-Dec-25 Video Surveillance system Shop Drawings Preparation & Su

UCR.12ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Video Surveillance system Shop Drawings Review & A

ACCESS CONTROL SY
SYSTEM 49 02-Dec-25 28-Jan-26 28-Jan-26, ACCESS CONTROL SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
124 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.12ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 02-Dec-25 18-Dec-25 Access Control system Shop Drawings Preparation & Sub

UCR.12ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 14-Jan-26 28-Jan-26 Access Control system Shop Drawings Review & Ap

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 18-Dec-25 18-Jan-26 18-Jan-26, RADIO RE-BROADCASTING SYSTEM
UCR.12ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 Radio Re Broadcasting system Shop Drawings Preparatio

UCR.12ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 Radio Re Broadcasting system Shop Drawings Review

SCADA SYSTEM 26 18-Dec-25 18-Jan-26 18-Jan-26, SCADA SYSTEM


UCR.12ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 18-Dec-25 04-Jan-26 SCADA system Shop Drawings Preparation & Submiss

UCR.12ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 04-Jan-26 18-Jan-26 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 07-May-26 16-Jun-26 16-Jun-26, DRY UTILITIES


POWER 31 07-May-26 16-Jun-26 16-Jun-26, POWER
POWER LV 31 07-May-26 16-Jun-26 16-Jun-26, POWER LV
MEP-VR01-ENG-PW Prepare and submit power system shopdrawings 20 07-May-26 02-Jun-26 Prepare and submit power system shopd

MEP-VR01-ENG-PW Review and approval power system shopdrawings 11 02-Jun-26 16-Jun-26 Review and approval power system sh

UTILITY ROOM 1 (IN ZO


ZONE 06) (FLD +0.8 m) 451 27-Dec-23 23-Jun-25 23-Jun-25, UTILITY ROOM 1 (IN ZONE 06) (FLD +0.8 m)
ENGINEERING 451 27-Dec-23 23-Jun-25 23-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 451 27-Dec-23 23-Jun-25 23-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 27-Dec-23 28-Jan-24 28-Jan-24, EARTH WORKS
JAH-ENG-UR1-SI.119 Soil Improvement Design Preparation & Submission 14 27-Dec-23 13-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR1-SI.119 Soil Improvement Design Review & Approval 14 13-Jan-24 28-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 04-Mar-24 03-Aug-24 03-Aug-24, STRUCTURE


UCR.1-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 04-Mar-24 20-Mar-24 Foundation Shop Drawings Preparation & Submission

UCR.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Foundation Shop Drawings Review & Approval

UCR.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Walls Shop Drawings Preparation & Submission

UCR.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 17-Jul-24 03-Aug-24 Walls Shop Drawings Review & Approval

UCR.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Apr-24 25-Apr-24 Slab Shop Drawings Preparation & Submission

UCR.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Slab Shop Drawings Review & Approval

MECHANICAL 65 12-Dec-24 26-Feb-25 26-Feb-25, MECHANICAL


FIRE FIGHTING SYSTEM 64 12-Dec-24 25-Feb-25 25-Feb-25, FIRE FIGHTING SYSTEM
UCR.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 12-Dec-24 29-Dec-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 09-Feb-25 25-Feb-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 51 29-Dec-24 26-Feb-25 26-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 29-Dec-24 14-Jan-25 HVAC Shop Drawings Preparation & Submission

UCR.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 10-Feb-25 26-Feb-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 14-Jan-25 16-Feb-25 16-Feb-25, PLUMBING SYSTEM


UCR.1-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 14-Jan-25 30-Jan-25 Plumbing System Shop Drawings Preparation & Submission

UCR.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 30-Jan-25 16-Feb-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 18-Aug-24 05-Apr-25 05-Apr-25, ELECTRICAL


CABLE TRAYS 185 18-Aug-24 22-Mar-25 22-Mar-25, CABLE TRAYS
UCR.1-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 18-Aug-24 03-Sep-24 Cable Tray Shop Drawings Preparation & Submission

UCR.1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 09-Mar-25 22-Mar-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 171 03-Sep-24 22-Mar-25 22-Mar-25, POWER CABLES


UCR.1-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 03-Sep-24 18-Sep-24 Power Cables Shop Drawings Preparation & Submission

UCR.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 09-Mar-25 22-Mar-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 141 19-Sep-24 03-Mar-25 03-Mar-25, LIGHTING SYSTEM


UCR.1-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 19-Sep-24 06-Oct-24 Lighting System Shop Drawings Preparation & Submission

UCR.1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 138 06-Oct-24 16-Mar-25 16-Mar-25, ELECTRICAL INSTALLATIONS
UCR.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 06-Oct-24 22-Oct-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 02-Mar-25 16-Mar-25 Electrical Installations Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
125 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
TRANSFORMERS INSTALLATION
INSTA 124 22-Oct-24 16-Mar-25 16-Mar-25, TRANSFORMERS INSTALLATION
UCR.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 22-Oct-24 07-Nov-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 02-Mar-25 16-Mar-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 07-Nov-24 03-Mar-25 03-Mar-25, LIGHTNING PROTECTION SYSTEM
UCR.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 07-Nov-24 24-Nov-24 Lightning Protection Drawings Preparation & Submission

UCR.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 85 24-Nov-24 03-Mar-25 03-Mar-25, EARTHING SYSTEM


UCR.1-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 24-Nov-24 10-Dec-24 Earthing System Shop Drawings Preparation & Submission

UCR.1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 18-Feb-25 03-Mar-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 10-Dec-24 05-Apr-25 05-Apr-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 10-Dec-24 05-Apr-25 05-Apr-25, FIRE DETECTION AND ALARM SYSTEM
UCR.1-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 10-Dec-24 26-Dec-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 26-Dec-24 05-Apr-25 05-Apr-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-Dec-24 12-Jan-25 Telephone Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 12-Jan-25 05-Apr-25 05-Apr-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.1-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 12-Jan-25 28-Jan-25 Public Address system Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 28-Jan-25 05-Apr-25 05-Apr-25, VIDEO SURVEILLANCE


UCR.1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 28-Jan-25 13-Feb-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 13-Feb-25 05-Apr-25 05-Apr-25, ACCESS CONTROL SYSTEM
UCR.1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 13-Feb-25 01-Mar-25 Access Control system Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 02-Mar-25 05-Apr-25 05-Apr-25, RADIO RE-BROADCASTING SYSTEM
UCR.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 02-Mar-25 17-Mar-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Mar-25 05-Apr-25 05-Apr-25, SCADA SYSTEM


UCR.1-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Mar-25 17-Mar-25 SCADA system Shop Drawings Preparation & Submission

UCR.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Mar-25 05-Apr-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 14-May-25 23-Jun-25 23-Jun-25, DRY UTILITIES


POWER 31 14-May-25 23-Jun-25 23-Jun-25, POWER
POWER LV 31 14-May-25 23-Jun-25 23-Jun-25, POWER LV
DU-P-LV.1715 Prepare and submit power system shopdrawings 20 14-May-25 09-Jun-25 Prepare and submit power system shopdrawings

DU-P-LV.1720 Review and approval power system shopdrawings 11 10-Jun-25 23-Jun-25 Review and approval power system shopdrawings

UTILITY ROOM 2 (IN ZO


ZONE 06) (FLD +0.8 m) 427 21-Dec-23 17-May-25 17-May-25, UTILITY ROOM 2 (IN ZONE 06) (FLD +0.8 m)
ENGINEERING 427 21-Dec-23 17-May-25 17-May-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 427 21-Dec-23 17-May-25 17-May-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 21-Dec-23 22-Jan-24 22-Jan-24, EARTH WORKS
JAH-ENG-UR02-SI.11 Soil Improvement Design Preparation & Submission 14 21-Dec-23 07-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR02-SI.11 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 30-Dec-23 25-May-24 25-May-24, STRUCTURE


UCR.2-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 30-Dec-23 15-Jan-24 Foundation Shop Drawings Preparation & Submission

UCR.2-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 17-Feb-24 03-Mar-24 Foundation Shop Drawings Review & Approval

UCR.2-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 15-Jan-24 31-Jan-24 Walls Shop Drawings Preparation & Submission

UCR.2-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 08-May-24 25-May-24 Walls Shop Drawings Review & Approval

UCR.2-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 31-Jan-24 17-Feb-24 Slab Shop Drawings Preparation & Submission

UCR.2-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 17-Feb-24 03-Mar-24 Slab Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
126 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MECHANICAL 79 11-Jul-24 12-Oct-24 12-Oct-24, MECHANICAL
FIRE FIGHTING SYSTEM 56 11-Jul-24 14-Sep-24 14-Sep-24, FIRE FIGHTING SYSTEM
UCR.2-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 11-Jul-24 28-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.2-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 28-Aug-24 14-Sep-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 65 28-Jul-24 12-Oct-24 12-Oct-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.2-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 28-Jul-24 12-Aug-24 HVAC Shop Drawings Preparation & Submission

UCR.2-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 25-Sep-24 12-Oct-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 13-Aug-24 14-Sep-24 14-Sep-24, PLUMBING SYSTEM


UCR.2-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 13-Aug-24 28-Aug-24 Plumbing System Shop Drawings Preparation & Submission

UCR.2-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 28-Aug-24 14-Sep-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 407 14-Jan-24 17-May-25 17-May-25, ELECTRICAL


CABLE TRAYS 196 14-Jan-24 05-Sep-24 05-Sep-24, CABLE TRAYS
UCR.2-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 14-Jan-24 30-Jan-24 Cable Tray Shop Drawings Preparation & Submission

UCR.2-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 182 30-Jan-24 05-Sep-24 05-Sep-24, POWER CABLES


UCR.2-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 30-Jan-24 14-Feb-24 Power Cables Shop Drawings Preparation & Submission

UCR.2-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 168 15-Feb-24 05-Sep-24 05-Sep-24, LIGHTING SYSTEM


UCR.2-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 15-Feb-24 02-Mar-24 Lighting System Shop Drawings Preparation & Submission

UCR.2-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 154 02-Mar-24 05-Sep-24 05-Sep-24, ELECTRICAL INSTALLATIONS
UCR.2-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 02-Mar-24 18-Mar-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.2-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 140 18-Mar-24 05-Sep-24 05-Sep-24, TRANSFORMERS INSTALLATION
UCR.2-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.2-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 126 03-Apr-24 05-Sep-24 05-Sep-24, LIGHTNING PROTECTION SYSTEM
UCR.2-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Lightning Protection Drawings Preparation & Submission

UCR.2-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 112 23-Apr-24 05-Sep-24 05-Sep-24, EARTHING SYSTEM


UCR.2-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Earthing System Shop Drawings Preparation & Submission

UCR.2-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 24-Aug-24 05-Sep-24 Earthing System Drawings Review & Approval

LOW CURRENT 310 09-May-24 17-May-25 17-May-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 110 09-May-24 19-Sep-24 19-Sep-24, FIRE DETECTION AND ALARM SYSTEM
UCR.2-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 09-May-24 26-May-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 96 26-May-24 19-Sep-24 19-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.2-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Telephone Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 83 11-Jun-24 19-Sep-24 19-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.2-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Public Address system Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 69 02-Jul-24 19-Sep-24 19-Sep-24, VIDEO SURVEILLANCE


UCR.2-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 55 18-Jul-24 19-Sep-24 19-Sep-24, ACCESS CONTROL SYSTEM
UCR.2-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 18-Jul-24 03-Aug-24 Access Control system Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 05-Sep-24 19-Sep-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 04-Aug-24 02-Sep-24 02-Sep-24, RADIO RE-BROADCASTING SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
127 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.2-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 04-Aug-24 19-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 19-Aug-24 02-Sep-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 16-Apr-25 17-May-25 17-May-25, SCADA SYSTEM


UCR.2-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 16-Apr-25 03-May-25 SCADA system Shop Drawings Preparation & Submission

UCR.2-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 03-May-25 17-May-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 10-Dec-24 15-Jan-25 15-Jan-25, DRY UTILITIES


POWER 31 10-Dec-24 15-Jan-25 15-Jan-25, POWER
POWER LV 31 10-Dec-24 15-Jan-25 15-Jan-25, POWER LV
DU-P-LV.1915 Prepare and submit power system shopdrawings 20 10-Dec-24 02-Jan-25 Prepare and submit power system shopdrawings

DU-P-LV.1920 Review and approval power system shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 10-Dec-24 15-Jan-25 15-Jan-25, MEDIUM VOLTAGE


DU-P-MV.1915 Prepare and submit medium voltage shopdrawings 20 10-Dec-24 02-Jan-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.1920 Review and approval medium voltage shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 10-Dec-24 15-Jan-25 15-Jan-25, TRANSFORMER


DU-P-T.1915 Prepare and submit transformer shopdrawings 20 10-Dec-24 02-Jan-25 Prepare and submit transformer shopdrawings

DU-P-T.1920 Review and approval transformer shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval transformer shopdrawings

RMU 31 10-Dec-24 15-Jan-25 15-Jan-25, RMU


DU-P-RMU.1915 Prepare and submit RMU shopdrawings 20 10-Dec-24 02-Jan-25 Prepare and submit RMU shopdrawings

DU-P-RMU.1920 Review and approval RMU shopdrawings 11 02-Jan-25 15-Jan-25 Review and approval RMU shopdrawings

UTILITY ROOM 3 (IN ZO


ZONE 06) (FLD +0.8 m) 544 02-Dec-23 14-Sep-25 14-Sep-25, UTILITY ROOM 3 (IN ZONE 06) (FLD +0.8 m)
ENGINEERING 544 02-Dec-23 14-Sep-25 14-Sep-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 544 02-Dec-23 14-Sep-25 14-Sep-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
JAH-ENG-UR03-SI.11 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR03-SI.11 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 19-Aug-24 12-Jan-25 12-Jan-25, STRUCTURE


UCR.3-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 19-Aug-24 04-Sep-24 Foundation Shop Drawings Preparation & Submission

UCR.3-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 08-Oct-24 24-Oct-24 Foundation Shop Drawings Review & Approval

UCR.3-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 04-Sep-24 21-Sep-24 Walls Shop Drawings Preparation & Submission

UCR.3-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 26-Dec-24 12-Jan-25 Walls Shop Drawings Review & Approval

UCR.3-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 21-Sep-24 08-Oct-24 Slab Shop Drawings Preparation & Submission

UCR.3-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 08-Oct-24 24-Oct-24 Slab Shop Drawings Review & Approval

MECHANICAL 67 02-Mar-25 24-May-25 24-May-25, MECHANICAL


FIRE FIGHTING SYSTEM 67 02-Mar-25 24-May-25 24-May-25, FIRE FIGHTING SYSTEM
UCR.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 07-May-25 24-May-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 18-Mar-25 11-May-25 11-May-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.3-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 HVAC Shop Drawings Preparation & Submission

UCR.3-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 24-Apr-25 11-May-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 08-Apr-25 11-May-25 11-May-25, PLUMBING SYSTEM


UCR.3-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 08-Apr-25 24-Apr-25 Plumbing System Shop Drawings Preparation & Submission

UCR.3-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Apr-25 11-May-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 208 29-Sep-24 03-Jun-25 03-Jun-25, ELECTRICAL


CABLE TRAYS 181 29-Sep-24 03-May-25 03-May-25, CABLE TRAYS
UCR.3-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 29-Sep-24 15-Oct-24 Cable Tray Shop Drawings Preparation & Submission

UCR.3-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 167 15-Oct-24 03-May-25 03-May-25, POWER CABLES


UCR.3-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 15-Oct-24 31-Oct-24 Power Cables Shop Drawings Preparation & Submission

UCR.3-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Power Cables Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
128 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LIGHTING SYSTEM 153 31-Oct-24 03-May-25 03-May-25, LIGHTING SYSTEM
UCR.3-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 31-Oct-24 17-Nov-24 Lighting System Shop Drawings Preparation & Submission

UCR.3-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 139 17-Nov-24 03-May-25 03-May-25, ELECTRICAL INSTALLATIONS
UCR.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 17-Nov-24 03-Dec-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 140 03-Dec-24 20-May-25 20-May-25, TRANSFORMERS INSTALLATION
UCR.3-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 03-Dec-24 18-Dec-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.3-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 06-May-25 20-May-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 111 19-Dec-24 03-May-25 03-May-25, LIGHTNING PROTECTION SYSTEM
UCR.3-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 19-Dec-24 04-Jan-25 Lightning Protection Drawings Preparation & Submission

UCR.3-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 19-Apr-25 03-May-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 91 04-Jan-25 26-Apr-25 26-Apr-25, EARTHING SYSTEM


UCR.3-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 04-Jan-25 20-Jan-25 Earthing System Shop Drawings Preparation & Submission

UCR.3-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 12-Apr-25 26-Apr-25 Earthing System Drawings Review & Approval

LOW CURRENT 110 20-Jan-25 03-Jun-25 03-Jun-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 20-Jan-25 17-May-25 17-May-25, FIRE DETECTION AND ALARM SYSTEM
UCR.3-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 20-Jan-25 05-Feb-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-May-25 17-May-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 05-Feb-25 17-May-25 17-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.3-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 05-Feb-25 22-Feb-25 Telephone Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 03-May-25 17-May-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 22-Feb-25 17-May-25 17-May-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.3-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 22-Feb-25 10-Mar-25 Public Address system Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 10-Mar-25 17-May-25 17-May-25, VIDEO SURVEILLANCE


UCR.3-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 10-Mar-25 26-Mar-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 26-Mar-25 17-May-25 17-May-25, ACCESS CONTROL SYSTEM
UCR.3-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 26-Mar-25 16-Apr-25 Access Control system Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 16-Apr-25 17-May-25 17-May-25, RADIO RE-BROADCASTING SYSTEM
UCR.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 16-Apr-25 03-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-May-25 17-May-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 04-May-25 03-Jun-25 03-Jun-25, SCADA SYSTEM


UCR.3-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 04-May-25 20-May-25 SCADA system Shop Drawings Preparation & Submission

UCR.3-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 20-May-25 03-Jun-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 09-Aug-25 14-Sep-25 14-Sep-25, DRY UTILITIES


POWER 31 09-Aug-25 14-Sep-25 14-Sep-25, POWER
POWER LV 31 09-Aug-25 14-Sep-25 14-Sep-25, POWER LV
DU-P-LV.2100 Prepare and submit power system shopdrawings 20 09-Aug-25 31-Aug-25 Prepare and submit power system shopdrawings

DU-P-LV.2105 Review and approval power system shopdrawings 11 31-Aug-25 14-Sep-25 Review and approval power system shopdrawings

UTILITY ROOM 4 (IN ZO


ZONE 06) (FLD +0.8 m) 802 25-Feb-24 17-Oct-26 17-Oct-26, UTILITY RO
ENGINEERING 802 25-Feb-24 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 802 25-Feb-24 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 28 13-Sep-26 17-Oct-26 17-Oct-26, EARTH WO
JAH-ENG-UR04-SI.11 Soil Improvement Design Preparation & Submission 14 13-Sep-26 30-Sep-26 Soil Improvement Design P

JAH-ENG-UR04-SI.11 Soil Improvement Design Review & Approval 14 30-Sep-26 17-Oct-26 Soil Improvement Design

STRUCTURE 123 25-Feb-24 27-Jul-24 27-Jul-24, STRUCTURE


UCR.4-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 25-Feb-24 12-Mar-24 Foundation Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
129 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.4-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 17-Apr-24 04-May-24 Foundation Shop Drawings Review & Approval

UCR.4-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 12-Mar-24 28-Mar-24 Walls Shop Drawings Preparation & Submission

UCR.4-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 10-Jul-24 27-Jul-24 Walls Shop Drawings Review & Approval

UCR.4-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 28-Mar-24 17-Apr-24 Slab Shop Drawings Preparation & Submission

UCR.4-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 17-Apr-24 04-May-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 14-Sep-24 19-Nov-24 19-Nov-24, MECHANICAL


FIRE FIGHTING SYSTEM 56 14-Sep-24 19-Nov-24 19-Nov-24, FIRE FIGHTING SYSTEM
UCR.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 01-Oct-24 19-Nov-24 19-Nov-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.4-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 HVAC Shop Drawings Preparation & Submission

UCR.4-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 17-Oct-24 19-Nov-24 19-Nov-24, PLUMBING SYSTEM


UCR.4-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 Plumbing System Shop Drawings Preparation & Submission

UCR.4-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 03-Nov-24 19-Nov-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 197 04-Apr-24 30-Nov-24 30-Nov-24, ELECTRICAL


CABLE TRAYS 181 04-Apr-24 11-Nov-24 11-Nov-24, CABLE TRAYS
UCR.4-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 04-Apr-24 24-Apr-24 Cable Tray Shop Drawings Preparation & Submission

UCR.4-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 167 24-Apr-24 11-Nov-24 11-Nov-24, POWER CABLES


UCR.4-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 24-Apr-24 11-May-24 Power Cables Shop Drawings Preparation & Submission

UCR.4-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 169 11-May-24 30-Nov-24 30-Nov-24, LIGHTING SYSTEM


UCR.4-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 11-May-24 27-May-24 Lighting System Shop Drawings Preparation & Submission

UCR.4-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 16-Nov-24 30-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 139 27-May-24 11-Nov-24 11-Nov-24, ELECTRICAL INSTALLATIONS
UCR.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 27-May-24 12-Jun-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 125 12-Jun-24 11-Nov-24 11-Nov-24, TRANSFORMERS INSTALLATION
UCR.4-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 12-Jun-24 03-Jul-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.4-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 28-Oct-24 11-Nov-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 105 03-Jul-24 04-Nov-24 04-Nov-24, LIGHTNING PROTECTION SYSTEM
UCR.4-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 03-Jul-24 18-Jul-24 Lightning Protection Drawings Preparation & Submission

UCR.4-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 91 20-Jul-24 04-Nov-24 04-Nov-24, EARTHING SYSTEM


UCR.4-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 20-Jul-24 04-Aug-24 Earthing System Shop Drawings Preparation & Submission

UCR.4-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 21-Oct-24 04-Nov-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 04-Aug-24 25-Nov-24 25-Nov-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 04-Aug-24 25-Nov-24 25-Nov-24, FIRE DETECTION AND ALARM SYSTEM
UCR.4-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 20-Aug-24 25-Nov-24 25-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.4-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Telephone Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 05-Sep-24 25-Nov-24 25-Nov-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.4-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 05-Sep-24 22-Sep-24 Public Address system Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 22-Sep-24 25-Nov-24 25-Nov-24, VIDEO SURVEILLANCE


UCR.4-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 22-Sep-24 09-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
130 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.4-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 09-Oct-24 25-Nov-24 25-Nov-24, ACCESS CONTROL SYSTEM
UCR.4-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 09-Oct-24 26-Oct-24 Access Control system Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 26-Oct-24 25-Nov-24 25-Nov-24, RADIO RE-BROADCASTING SYSTEM
UCR.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 26-Oct-24 11-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 26-Oct-24 25-Nov-24 25-Nov-24, SCADA SYSTEM


UCR.4-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 26-Oct-24 11-Nov-24 SCADA system Shop Drawings Preparation & Submission

UCR.4-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 11-Nov-24 25-Nov-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 13-Feb-25 22-Mar-25 22-Mar-25, DRY UTILITIES


POWER 31 13-Feb-25 22-Mar-25 22-Mar-25, POWER
POWER LV 31 13-Feb-25 22-Mar-25 22-Mar-25, POWER LV
DU-P-LV.2300 Prepare and submit power system shopdrawings 20 13-Feb-25 08-Mar-25 Prepare and submit power system shopdrawings

DU-P-LV.2305 Review and approval power system shopdrawings 11 09-Mar-25 22-Mar-25 Review and approval power system shopdrawings

UTILITY ROOM 5 (IN ZONE


ZO 06) ON BACKFILL (FLD +13 m) 315 05-May-25 17-May-26 17-May-26, UTILITY ROOM 5 (IN ZON
ENGINEERING 315 05-May-25 17-May-26 17-May-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 315 05-May-25 17-May-26 17-May-26, SHOP DRAWING SUBMIT
EARTH WORKS 28 29-Oct-25 01-Dec-25 01-Dec-25, EARTH WORKS
JAH-ENG-UR05-SI.11 Soil Improvement Design Preparation & Submission 14 29-Oct-25 15-Nov-25 Soil Improvement Design Preparation & Submission

JAH-ENG-UR05-SI.11 Soil Improvement Design Review & Approval 14 15-Nov-25 01-Dec-25 Soil Improvement Design Review & Approval

STRUCTURE 117 18-Aug-25 04-Jan-26 04-Jan-26, STRUCTURE


UCR.5-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 18-Aug-25 03-Sep-25 Foundation Shop Drawings Preparation & Submission

UCR.5-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 07-Oct-25 23-Oct-25 Foundation Shop Drawings Review & Approval

UCR.5-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 03-Sep-25 20-Sep-25 Walls Shop Drawings Preparation & Submission

UCR.5-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 18-Dec-25 04-Jan-26 Walls Shop Drawings Review & Approval

UCR.5-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Sep-25 07-Oct-25 Slab Shop Drawings Preparation & Submission

UCR.5-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 07-Oct-25 23-Oct-25 Slab Shop Drawings Review & Approval

MECHANICAL 68 06-Nov-25 24-Jan-26 24-Jan-26, MECHANICAL


FIRE FIGHTING SYSTEM 56 06-Nov-25 10-Jan-26 10-Jan-26, FIRE FIGHTING SYSTEM
UCR.5-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 06-Nov-25 23-Nov-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.5-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 23-Nov-25 24-Jan-26 24-Jan-26, VENTILATION SYSTEM/AIR CONDITI
UCR.5-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 23-Nov-25 08-Dec-25 HVAC Shop Drawings Preparation & Submission

UCR.5-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 07-Jan-26 24-Jan-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 09-Dec-25 10-Jan-26 10-Jan-26, PLUMBING SYSTEM


UCR.5-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 09-Dec-25 24-Dec-25 Plumbing System Shop Drawings Preparation & Submiss

UCR.5-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 24-Dec-25 10-Jan-26 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 315 05-May-25 17-May-26 17-May-26, ELECTRICAL


CABLE TRAYS 203 05-May-25 01-Jan-26 01-Jan-26, CABLE TRAYS
UCR.5-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 05-May-25 21-May-25 Cable Tray Shop Drawings Preparation & Submission

UCR.5-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Cable Tray Shop Drawings Review & Approval

POWER CABLES 190 21-May-25 01-Jan-26 01-Jan-26, POWER CABLES


UCR.5-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 21-May-25 10-Jun-25 Power Cables Shop Drawings Preparation & Submission

UCR.5-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 176 10-Jun-25 01-Jan-26 01-Jan-26, LIGHTING SYSTEM


UCR.5-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 10-Jun-25 26-Jun-25 Lighting System Shop Drawings Preparation & Submission

UCR.5-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 162 26-Jun-25 01-Jan-26 01-Jan-26, ELECTRICAL INSTALLATIONS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
131 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.5-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 26-Jun-25 13-Jul-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.5-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Dec-25 01-Jan-26 Electrical Installations Shop Drawings Review & Approv

TRANSFORMERS INSTALLATION
INSTA 260 13-Jul-25 17-May-26 17-May-26, TRANSFORMERS INSTAL
UCR.5-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 13-Jul-25 28-Jul-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.5-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 03-May-26 17-May-26 Transformers Installation Shop Drawings

LIGHTNING PROTECTION
PROTECTIO SYSTEM 128 29-Jul-25 25-Dec-25 25-Dec-25, LIGHTNING PROTECTION SYSTEM
UCR.5-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 29-Jul-25 13-Aug-25 Lightning Protection Drawings Preparation & Submission

UCR.5-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 13-Dec-25 25-Dec-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 114 13-Aug-25 25-Dec-25 25-Dec-25, EARTHING SYSTEM


UCR.5-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 13-Aug-25 30-Aug-25 Earthing System Shop Drawings Preparation & Submission

UCR.5-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 13-Dec-25 25-Dec-25 Earthing System Drawings Review & Approval

LOW CURRENT 104 30-Aug-25 30-Dec-25 30-Dec-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 30-Aug-25 21-Dec-25 21-Dec-25, FIRE DETECTION AND ALARM SYSTEM
UCR.5-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 30-Aug-25 15-Sep-25 Fire Alarm Shop Drawings Preparation & Submission

UCR.5-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 15-Sep-25 21-Dec-25 21-Dec-25, COMMUNICATION SYSTEM/ EMERGEN
UCR.5-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 15-Sep-25 02-Oct-25 Telephone Shop Drawings Preparation & Submission

UCR.5-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 76 02-Oct-25 30-Dec-25 30-Dec-25, VOICE EVACAUTION AND PUBLIC AD
UCR.5-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 02-Oct-25 19-Oct-25 Public Address system Shop Drawings Preparation & Submission

UCR.5-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 17-Dec-25 30-Dec-25 Public Address system Shop Drawings Review & Appro

VIDEO SURVEILLANCE 54 19-Oct-25 21-Dec-25 21-Dec-25, VIDEO SURVEILLANCE


UCR.5-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 19-Oct-25 04-Nov-25 Video Surveillance system Shop Drawings Preparation & Subm

UCR.5-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Video Surveillance system Shop Drawings Review & App

ACCESS CONTROL SY
SYSTEM 40 04-Nov-25 21-Dec-25 21-Dec-25, ACCESS CONTROL SYSTEM
UCR.5-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Access Control system Shop Drawings Preparation & Submis

UCR.5-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Access Control system Shop Drawings Review & Approv

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Nov-25 21-Dec-25 21-Dec-25, RADIO RE-BROADCASTING SYSTEM
UCR.5-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Radio Re Broadcasting system Shop Drawings Preparation &

UCR.5-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 Radio Re Broadcasting system Shop Drawings Review &

SCADA SYSTEM 26 20-Nov-25 21-Dec-25 21-Dec-25, SCADA SYSTEM


UCR.5-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 SCADA system Shop Drawings Preparation & Submission

UCR.5-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 07-Dec-25 21-Dec-25 SCADA system Shop Drawings Review & Approval

DRU UTILITIES 31 11-Apr-26 17-May-26 17-May-26, DRU UTILITIES


POWER 31 11-Apr-26 17-May-26 17-May-26, POWER
POWER LV 31 11-Apr-26 17-May-26 17-May-26, POWER LV
DU-P-LV.2500 Prepare and submit power system shopdrawings 20 11-Apr-26 04-May-26 Prepare and submit power system shopdraw

DU-P-LV.2505 Review and approval power system shopdrawings 11 04-May-26 17-May-26 Review and approval power system shopd

MEDIUM VOLTAGE 31 11-Apr-26 17-May-26 17-May-26, MEDIUM VOLTAGE


DU-P-MV.2500 Prepare and submit medium voltage shopdrawings 20 11-Apr-26 04-May-26 Prepare and submit medium voltage shopdr

DU-P-MV.2505 Review and approval medium voltage shopdrawings 11 04-May-26 17-May-26 Review and approval medium voltage shop

TRANSFORMER 31 11-Apr-26 17-May-26 17-May-26, TRANSFORMER


DU-P-T.2500 Prepare and submit transformer shopdrawings 20 11-Apr-26 04-May-26 Prepare and submit transformer shopdrawin

DU-P-T.2505 Review and approval transformer shopdrawings 11 04-May-26 17-May-26 Review and approval transformer shopdra

RMU 31 11-Apr-26 17-May-26 17-May-26, RMU


DU-P-RMU.2500 Prepare and submit RMU shopdrawings 20 11-Apr-26 04-May-26 Prepare and submit RMU shopdrawings

DU-P-RMU.2505 Review and approval RMU shopdrawings 11 04-May-26 17-May-26 Review and approval RMU shopdrawings

UTILITY ROOM 6 (IN ZO


ZONE 06) (FLD +0.6 m) 240 02-Dec-23 15-Sep-24 15-Sep-24, UTILITY ROOM 6 (IN ZONE 06) (FLD +0.6 m)
ENGINEERING 240 02-Dec-23 15-Sep-24 15-Sep-24, ENGINEERING

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
132 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 240 02-Dec-23 15-Sep-24 15-Sep-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Jan-24 03-Feb-24 03-Feb-24, EARTH WORKS
JAH-ENG-UR06-SI.11 Soil Improvement Design Preparation & Submission 14 02-Jan-24 18-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR06-SI.11 Soil Improvement Design Review & Approval 14 18-Jan-24 03-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 123 04-Mar-24 03-Aug-24 03-Aug-24, STRUCTURE


UCR.6-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 04-Mar-24 20-Mar-24 Foundation Shop Drawings Preparation & Submission

UCR.6-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Foundation Shop Drawings Review & Approval

UCR.6-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 20-Mar-24 06-Apr-24 Walls Shop Drawings Preparation & Submission

UCR.6-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 17-Jul-24 03-Aug-24 Walls Shop Drawings Review & Approval

UCR.6-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 06-Apr-24 25-Apr-24 Slab Shop Drawings Preparation & Submission

UCR.6-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 25-Apr-24 11-May-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 02-Dec-23 04-Feb-24 04-Feb-24, MECHANICAL


FIRE FIGHTING SYSTEM 28 02-Dec-23 02-Jan-24 02-Jan-24, FIRE FIGHTING SYSTEM
UCR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Fighting Shop Drawings Preparation & Submission

UCR.6-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.6-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission

UCR.6-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 02-Jan-24 04-Feb-24 04-Feb-24, PLUMBING SYSTEM


UCR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Plumbing System Shop Drawings Preparation & Submission

UCR.6-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 240 02-Dec-23 15-Sep-24 15-Sep-24, ELECTRICAL


CABLE TRAYS 40 02-Dec-23 16-Jan-24 16-Jan-24, CABLE TRAYS
UCR.6-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.6-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 17-Dec-23 16-Jan-24 16-Jan-24, POWER CABLES


UCR.6-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.6-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 213 02-Jan-24 15-Sep-24 15-Sep-24, LIGHTING SYSTEM


UCR.6-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.6-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 40 18-Jan-24 05-Mar-24 05-Mar-24, ELECTRICAL INSTALLATIONS
UCR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.6-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 26 04-Feb-24 05-Mar-24 05-Mar-24, TRANSFORMERS INSTALLATION
UCR.6-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.6-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 20-Feb-24 05-Mar-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 171 20-Feb-24 15-Sep-24 15-Sep-24, LIGHTNING PROTECTION SYSTEM
UCR.6-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.6-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 157 07-Mar-24 15-Sep-24 15-Sep-24, EARTHING SYSTEM


UCR.6-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.6-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 01-Sep-24 15-Sep-24 Earthing System Drawings Review & Approval

LOW CURRENT 193 02-Dec-23 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 26 24-Mar-24 27-Apr-24 27-Apr-24, FIRE DETECTION AND ALARM SYSTEM
UCR.6-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.6-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
133 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.6-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 54 29-Apr-24 04-Jul-24 04-Jul-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.6-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 13-Jun-24 13-Jun-24, VIDEO SURVEILLANCE


UCR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.6-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 02-Dec-23 31-Dec-23 31-Dec-23, SCADA SYSTEM


UCR.6-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 SCADA system Shop Drawings Preparation & Submission

UCR.6-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 17-Dec-23 31-Dec-23 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 07-May-24 12-Jun-24 12-Jun-24, DRY UTILITIES


POWER 31 07-May-24 12-Jun-24 12-Jun-24, POWER
POWER LV 31 07-May-24 12-Jun-24 12-Jun-24, POWER LV
DU-P-LV.2650 Prepare and submit power system shopdrawings 20 07-May-24 30-May-24 Prepare and submit power system shopdrawings

DU-P-LV.2655 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings

UTILITY ROOM 7 (IN ZO


ZONE 06) (FLD +0.5 m) 876 02-Dec-23 17-Oct-26 17-Oct-26, UTILITY RO
ENGINEERING 876 02-Dec-23 17-Oct-26 17-Oct-26, ENGINEERI
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 876 02-Dec-23 17-Oct-26 17-Oct-26, SHOP DRAW
EARTH WORKS 28 13-Sep-26 17-Oct-26 17-Oct-26, EARTH WO
JAH-ENG-UR07-SI.11 Soil Improvement Design Preparation & Submission 14 13-Sep-26 30-Sep-26 Soil Improvement Design P

JAH-ENG-UR07-SI.11 Soil Improvement Design Review & Approval 14 30-Sep-26 17-Oct-26 Soil Improvement Design

STRUCTURE 108 16-Dec-23 23-Apr-24 23-Apr-24, STRUCTURE


UCR.7-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 16-Dec-23 01-Jan-24 Foundation Shop Drawings Preparation & Submission

UCR.7-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 03-Feb-24 18-Feb-24 Foundation Shop Drawings Review & Approval

UCR.7-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 01-Jan-24 17-Jan-24 Walls Shop Drawings Preparation & Submission

UCR.7-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 03-Apr-24 23-Apr-24 Walls Shop Drawings Review & Approval

UCR.7-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 17-Jan-24 03-Feb-24 Slab Shop Drawings Preparation & Submission

UCR.7-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 03-Feb-24 18-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 68 14-Apr-24 07-Jul-24 07-Jul-24, MECHANICAL


FIRE FIGHTING SYSTEM 45 14-Apr-24 05-Jun-24 05-Jun-24, FIRE FIGHTING SYSTEM
UCR.7-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 14-Apr-24 30-Apr-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.7-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 20-May-24 05-Jun-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 30-Apr-24 07-Jul-24 07-Jul-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.7-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 HVAC Shop Drawings Preparation & Submission

UCR.7-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 20-Jun-24 07-Jul-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 16-May-24 23-Jun-24 23-Jun-24, PLUMBING SYSTEM


UCR.7-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Plumbing System Shop Drawings Preparation & Submission

UCR.7-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 02-Jun-24 23-Jun-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 213 02-Dec-23 14-Aug-24 14-Aug-24, ELECTRICAL


CABLE TRAYS 40 02-Dec-23 16-Jan-24 16-Jan-24, CABLE TRAYS
UCR.7-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.7-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 26 17-Dec-23 16-Jan-24 16-Jan-24, POWER CABLES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
134 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.7-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.7-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 02-Jan-24 16-Jan-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 135 02-Jan-24 12-Jun-24 12-Jun-24, LIGHTING SYSTEM


UCR.7-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.7-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 29-May-24 12-Jun-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 139 18-Jan-24 07-Jul-24 07-Jul-24, ELECTRICAL INSTALLATIONS
UCR.7-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.7-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 23-Jun-24 07-Jul-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 125 04-Feb-24 07-Jul-24 07-Jul-24, TRANSFORMERS INSTALLATION
UCR.7-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.7-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 23-Jun-24 07-Jul-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 144 20-Feb-24 14-Aug-24 14-Aug-24, LIGHTNING PROTECTION SYSTEM
UCR.7-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.7-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 130 07-Mar-24 14-Aug-24 14-Aug-24, EARTHING SYSTEM


UCR.7-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.7-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 31-Jul-24 14-Aug-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 24-Mar-24 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 26 24-Mar-24 27-Apr-24 27-Apr-24, FIRE DETECTION AND ALARM SYSTEM
UCR.7-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 13-Apr-24 27-Apr-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 54 13-Apr-24 13-Jun-24 13-Jun-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.7-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 26 29-Apr-24 28-May-24 28-May-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.7-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 15-May-24 28-May-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 13-Jun-24 13-Jun-24, VIDEO SURVEILLANCE


UCR.7-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 30-May-24 13-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
UCR.7-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.7-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 03-Apr-24 06-May-24 06-May-24, SCADA SYSTEM


UCR.7-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 SCADA system Shop Drawings Preparation & Submission

UCR.7-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 23-Apr-24 06-May-24 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 40 17-Sep-24 04-Nov-24 04-Nov-24, DRY UTILITIES


POWER 40 17-Sep-24 04-Nov-24 04-Nov-24, POWER
POWER LV 31 17-Sep-24 24-Oct-24 24-Oct-24, POWER LV
DU-P-LV.2850 Prepare and submit power system shopdrawings 20 17-Sep-24 12-Oct-24 Prepare and submit power system shopdrawings

DU-P-LV.2855 Review and approval power system shopdrawings 11 12-Oct-24 24-Oct-24 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 18-Sep-24 26-Oct-24 26-Oct-24, MEDIUM VOLTAGE


DU-P-MV.2850 Prepare and submit medium voltage shopdrawings 20 18-Sep-24 12-Oct-24 Prepare and submit medium voltage shopdrawings

DU-P-MV.2855 Review and approval medium voltage shopdrawings 11 12-Oct-24 26-Oct-24 Review and approval medium voltage shopdrawings

TRANSFORMER 31 26-Sep-24 02-Nov-24 02-Nov-24, TRANSFORMER


DU-P-T.2850 Prepare and submit transformer shopdrawings 20 26-Sep-24 20-Oct-24 Prepare and submit transformer shopdrawings

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
135 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-T.2855 Review and approval transformer shopdrawings 11 20-Oct-24 02-Nov-24 Review and approval transformer shopdrawings

RMU 31 29-Sep-24 04-Nov-24 04-Nov-24, RMU


DU-P-RMU.2850 Prepare and submit RMU shopdrawings 20 29-Sep-24 21-Oct-24 Prepare and submit RMU shopdrawings

DU-P-RMU.2855 Review and approval RMU shopdrawings 11 21-Oct-24 04-Nov-24 Review and approval RMU shopdrawings

UTILITY ROOM 8 (IN ZO


ZONE 06) (FLD +1.7 m) 198 02-Dec-23 27-Jul-24 27-Jul-24, UTILITY ROOM 8 (IN ZONE 06) (FLD +1.7 m)
ENGINEERING 198 02-Dec-23 27-Jul-24 27-Jul-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 198 02-Dec-23 27-Jul-24 27-Jul-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 21-Dec-23 22-Jan-24 22-Jan-24, EARTH WORKS
JAH-ENG-UR08-SI.11 Soil Improvement Design Preparation & Submission 14 21-Dec-23 07-Jan-24 Soil Improvement Design Preparation & Submission

JAH-ENG-UR08-SI.11 Soil Improvement Design Review & Approval 14 07-Jan-24 22-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 18-Dec-23 13-May-24 13-May-24, STRUCTURE


UCR.8-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 18-Dec-23 03-Jan-24 Foundation Shop Drawings Preparation & Submission

UCR.8-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 05-Feb-24 20-Feb-24 Foundation Shop Drawings Review & Approval

UCR.8-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 03-Jan-24 20-Jan-24 Walls Shop Drawings Preparation & Submission

UCR.8-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 27-Apr-24 13-May-24 Walls Shop Drawings Review & Approval

UCR.8-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 20-Jan-24 05-Feb-24 Slab Shop Drawings Preparation & Submission

UCR.8-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 05-Feb-24 20-Feb-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 02-Dec-23 04-Feb-24 04-Feb-24, MECHANICAL


FIRE FIGHTING SYSTEM 28 02-Dec-23 02-Jan-24 02-Jan-24, FIRE FIGHTING SYSTEM
UCR.8-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-23 17-Dec-23 Fire Fighting Shop Drawings Preparation & Submission

UCR.8-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 28 17-Dec-23 18-Jan-24 18-Jan-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.8-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 HVAC Shop Drawings Preparation & Submission

UCR.8-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 02-Jan-24 18-Jan-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 02-Jan-24 04-Feb-24 04-Feb-24, PLUMBING SYSTEM


UCR.8-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Plumbing System Shop Drawings Preparation & Submission

UCR.8-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 07-Dec-23 27-Jul-24 27-Jul-24, ELECTRICAL


CABLE TRAYS 177 07-Dec-23 09-Jul-24 09-Jul-24, CABLE TRAYS
UCR.8-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 07-Dec-23 24-Dec-23 Cable Tray Shop Drawings Preparation & Submission

UCR.8-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 163 24-Dec-23 09-Jul-24 09-Jul-24, POWER CABLES


UCR.8-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 24-Dec-23 09-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR.8-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 141 09-Jan-24 30-Jun-24 30-Jun-24, LIGHTING SYSTEM


UCR.8-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 09-Jan-24 25-Jan-24 Lighting System Shop Drawings Preparation & Submission

UCR.8-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 135 25-Jan-24 09-Jul-24 09-Jul-24, ELECTRICAL INSTALLATIONS
UCR.8-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 25-Jan-24 10-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.8-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 121 11-Feb-24 09-Jul-24 09-Jul-24, TRANSFORMERS INSTALLATION
UCR.8-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 11-Feb-24 26-Feb-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.8-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 25-Jun-24 09-Jul-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 99 26-Feb-24 30-Jun-24 30-Jun-24, LIGHTNING PROTECTION SYSTEM
UCR.8-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 26-Feb-24 13-Mar-24 Lightning Protection Drawings Preparation & Submission

UCR.8-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 86 13-Mar-24 30-Jun-24 30-Jun-24, EARTHING SYSTEM


UCR.8-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 13-Mar-24 30-Mar-24 Earthing System Shop Drawings Preparation & Submission

UCR.8-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Earthing System Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
136 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOW CURRENT 95 30-Mar-24 27-Jul-24 27-Jul-24, LOW CURRENT
FIRE DETECTION AND ALARM SYSTEM 86 30-Mar-24 17-Jul-24 17-Jul-24, FIRE DETECTION AND ALARM SYSTEM
UCR.8-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 30-Mar-24 18-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Jul-24 17-Jul-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 18-Apr-24 27-Jul-24 27-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.8-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Apr-24 05-May-24 Telephone Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 05-May-24 27-Jul-24 27-Jul-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.8-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 05-May-24 21-May-24 Public Address system Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 21-May-24 27-Jul-24 27-Jul-24, VIDEO SURVEILLANCE


UCR.8-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 21-May-24 06-Jun-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 06-Jun-24 27-Jul-24 27-Jul-24, ACCESS CONTROL SYSTEM
UCR.8-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 06-Jun-24 27-Jun-24 Access Control system Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 27-Jun-24 27-Jul-24 27-Jul-24, RADIO RE-BROADCASTING SYSTEM
UCR.8-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 27-Jun-24 27-Jul-24 27-Jul-24, SCADA SYSTEM


UCR.8-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 27-Jun-24 14-Jul-24 SCADA system Shop Drawings Preparation & Submission

UCR.8-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Jul-24 27-Jul-24 SCADA system Shop Drawings Review & Approval

DRY UTILTIES 31 07-May-24 12-Jun-24 12-Jun-24, DRY UTILTIES


POWER 31 07-May-24 12-Jun-24 12-Jun-24, POWER
POWER LV 31 07-May-24 12-Jun-24 12-Jun-24, POWER LV
DU-P-LV.3000 Prepare and submit power system shopdrawings 20 07-May-24 30-May-24 Prepare and submit power system shopdrawings

DU-P-LV.3005 Review and approval power system shopdrawings 11 30-May-24 12-Jun-24 Review and approval power system shopdrawings

UTILITY ROOM 9 (IN ZO


ZONE 06) (FLD +0.2 m) 424 10-Dec-23 30-Apr-25 30-Apr-25, UTILITY ROOM 9 (IN ZONE 06) (FLD +0.2 m)
ENGINEERING 424 10-Dec-23 30-Apr-25 30-Apr-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 424 10-Dec-23 30-Apr-25 30-Apr-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 10-Dec-23 10-Jan-24 10-Jan-24, EARTH WORKS
JAH-ENG-UR09-SI.11 Soil Improvement Design Preparation & Submission 14 10-Dec-23 26-Dec-23 Soil Improvement Design Preparation & Submission

JAH-ENG-UR09-SI.11 Soil Improvement Design Review & Approval 14 26-Dec-23 10-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 123 01-May-24 28-Sep-24 28-Sep-24, STRUCTURE


UCR.9-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 01-May-24 18-May-24 Foundation Shop Drawings Preparation & Submission

UCR.9-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Foundation Shop Drawings Review & Approval

UCR.9-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-May-24 03-Jun-24 Walls Shop Drawings Preparation & Submission

UCR.9-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 10-Sep-24 28-Sep-24 Walls Shop Drawings Review & Approval

UCR.9-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 03-Jun-24 24-Jun-24 Slab Shop Drawings Preparation & Submission

UCR.9-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 24-Jun-24 09-Jul-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 21-Oct-24 24-Dec-24 24-Dec-24, MECHANICAL


FIRE FIGHTING SYSTEM 56 21-Oct-24 24-Dec-24 24-Dec-24, FIRE FIGHTING SYSTEM
UCR.9-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Fire Fighting Shop Drawings Preparation & Submission

UCR.9-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 06-Nov-24 24-Dec-24 24-Dec-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR.9-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 06-Nov-24 21-Nov-24 HVAC Shop Drawings Preparation & Submission

UCR.9-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 23-Nov-24 24-Dec-24 24-Dec-24, PLUMBING SYSTEM


UCR.9-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 23-Nov-24 08-Dec-24 Plumbing System Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
137 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.9-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 08-Dec-24 24-Dec-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 24-Jun-24 05-Feb-25 05-Feb-25, ELECTRICAL


CABLE TRAYS 149 24-Jun-24 16-Dec-24 16-Dec-24, CABLE TRAYS
UCR.9-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 24-Jun-24 10-Jul-24 Cable Tray Shop Drawings Preparation & Submission

UCR.9-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 135 10-Jul-24 16-Dec-24 16-Dec-24, POWER CABLES


UCR.9-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 10-Jul-24 27-Jul-24 Power Cables Shop Drawings Preparation & Submission

UCR.9-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 90 27-Jul-24 10-Nov-24 10-Nov-24, LIGHTING SYSTEM


UCR.9-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Lighting System Shop Drawings Preparation & Submission

UCR.9-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 107 12-Aug-24 16-Dec-24 16-Dec-24, ELECTRICAL INSTALLATIONS
UCR.9-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 12-Aug-24 28-Aug-24 Electrical Installations Shop Drawings Preparation & Submission

UCR.9-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 94 28-Aug-24 16-Dec-24 16-Dec-24, TRANSFORMERS INSTALLATION
UCR.9-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 28-Aug-24 14-Sep-24 Transformers Installation Shop Drawings Preparation & Submission

UCR.9-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 03-Dec-24 16-Dec-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 48 14-Sep-24 10-Nov-24 10-Nov-24, LIGHTNING PROTECTION SYSTEM
UCR.9-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Lightning Protection Drawings Preparation & Submission

UCR.9-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 34 01-Oct-24 10-Nov-24 10-Nov-24, EARTHING SYSTEM


UCR.9-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 Earthing System Shop Drawings Preparation & Submission

UCR.9-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 17-Oct-24 05-Feb-25 05-Feb-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 17-Oct-24 05-Feb-25 05-Feb-25, FIRE DETECTION AND ALARM SYSTEM
UCR.9-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 17-Oct-24 02-Nov-24 Fire Alarm Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 03-Nov-24 05-Feb-25 05-Feb-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR.9-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 03-Nov-24 18-Nov-24 Telephone Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 18-Nov-24 05-Feb-25 05-Feb-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR.9-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 18-Nov-24 04-Dec-24 Public Address system Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 04-Dec-24 05-Feb-25 05-Feb-25, VIDEO SURVEILLANCE


UCR.9-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 04-Dec-24 21-Dec-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 21-Dec-24 05-Feb-25 05-Feb-25, ACCESS CONTROL SYSTEM
UCR.9-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Access Control system Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 06-Jan-25 05-Feb-25 05-Feb-25, RADIO RE-BROADCASTING SYSTEM
UCR.9-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 06-Jan-25 22-Jan-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 06-Jan-25 05-Feb-25 05-Feb-25, SCADA SYSTEM


UCR.9-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 06-Jan-25 22-Jan-25 SCADA system Shop Drawings Preparation & Submission

UCR.9-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 22-Jan-25 05-Feb-25 SCADA system Shop Drawings Review & Approval

DRY UTILTIES 31 20-Mar-25 30-Apr-25 30-Apr-25, DRY UTILTIES


POWER 31 20-Mar-25 30-Apr-25 30-Apr-25, POWER
POWER LV 31 20-Mar-25 30-Apr-25 30-Apr-25, POWER LV
DU-P-LV.3200 Prepare and submit power system shopdrawings 20 20-Mar-25 17-Apr-25 Prepare and submit power system shopdrawings

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
138 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-P-LV.3205 Review and approval power system shopdrawings 11 17-Apr-25 30-Apr-25 Review and approval power system shopdrawings

UTILITY ROOM 17 (IN ZO


ZONE 09) (FLD +15.85 m) 286 23-Jun-25 01-Jun-26 01-Jun-26, UTILITY ROOM 17 (IN ZO
ENGINEERING 286 23-Jun-25 01-Jun-26 01-Jun-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 286 23-Jun-25 01-Jun-26 01-Jun-26, SHOP DRAWING SUBMIT
EARTH WORKS 28 26-Aug-25 28-Sep-25 28-Sep-25, EARTH WORKS
T1-ENG-UR17-SI.1100 Soil Improvement Design Preparation & Submission 14 26-Aug-25 11-Sep-25 Soil Improvement Design Preparation & Submission

T1-ENG-UR17-SI.1105 Soil Improvement Design Review & Approval 14 11-Sep-25 28-Sep-25 Soil Improvement Design Review & Approval

STRUCTURE 123 23-Jun-25 13-Nov-25 13-Nov-25, STRUCTURE


UCR.17ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 23-Jun-25 09-Jul-25 Foundation Shop Drawings Preparation & Submission

UCR.17ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-Aug-25 26-Aug-25 Foundation Shop Drawings Review & Approval

UCR.17ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 09-Jul-25 26-Jul-25 Walls Shop Drawings Preparation & Submission

UCR.17ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 29-Oct-25 13-Nov-25 Walls Shop Drawings Review & Approval

UCR.17ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 26-Jul-25 11-Aug-25 Slab Shop Drawings Preparation & Submission

UCR.17ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-Aug-25 26-Aug-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 17-Nov-25 21-Jan-26 21-Jan-26, MECHANICAL


FIRE FIGHTING SYSTEM 56 17-Nov-25 21-Jan-26 21-Jan-26, FIRE FIGHTING SYSTEM
UCR.17ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 17-Nov-25 03-Dec-25 Fire Fighting Shop Drawings Preparation & Submission

UCR.17ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 03-Dec-25 21-Jan-26 21-Jan-26, VENTILATION SYSTEM/AIR CONDITI
UCR.17ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 03-Dec-25 20-Dec-25 HVAC Shop Drawings Preparation & Submission

UCR.17ENG-MC-HC HVAC Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 20-Dec-25 21-Jan-26 21-Jan-26, PLUMBING SYSTEM


UCR.17ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 20-Dec-25 05-Jan-26 Plumbing System Shop Drawings Preparation & Submis

UCR.17ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 05-Jan-26 21-Jan-26 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 26-Jun-25 08-Feb-26 08-Feb-26, ELECTRICAL


CABLE TRAYS 127 26-Jun-25 23-Nov-25 23-Nov-25, CABLE TRAYS
UCR.17ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 26-Jun-25 13-Jul-25 Cable Tray Shop Drawings Preparation & Submission

UCR.17ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 121 13-Jul-25 02-Dec-25 02-Dec-25, POWER CABLES


UCR.17ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 13-Jul-25 29-Jul-25 Power Cables Shop Drawings Preparation & Submission

UCR.17ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 18-Nov-25 02-Dec-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 100 29-Jul-25 23-Nov-25 23-Nov-25, LIGHTING SYSTEM


UCR.17ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 29-Jul-25 14-Aug-25 Lighting System Shop Drawings Preparation & Submission

UCR.17ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 117 14-Aug-25 30-Dec-25 30-Dec-25, ELECTRICAL INSTALLATIONS
UCR.17ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 14-Aug-25 31-Aug-25 Electrical Installations Shop Drawings Preparation & Submission

UCR.17ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 16-Dec-25 30-Dec-25 Electrical Installations Shop Drawings Review & Approv

TRANSFORMERS INSTALLATION
INSTA 103 31-Aug-25 30-Dec-25 30-Dec-25, TRANSFORMERS INSTALLATION
UCR.17ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 31-Aug-25 15-Sep-25 Transformers Installation Shop Drawings Preparation & Submission

UCR.17ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 16-Dec-25 30-Dec-25 Transformers Installation Shop Drawings Review & App

LIGHTNING PROTECTION
PROTECTIO SYSTEM 58 16-Sep-25 23-Nov-25 23-Nov-25, LIGHTNING PROTECTION SYSTEM
UCR.17ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 16-Sep-25 02-Oct-25 Lightning Protection Drawings Preparation & Submission

UCR.17ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 44 02-Oct-25 23-Nov-25 23-Nov-25, EARTHING SYSTEM


UCR.17ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 02-Oct-25 19-Oct-25 Earthing System Shop Drawings Preparation & Submission

UCR.17ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 10-Nov-25 23-Nov-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 19-Oct-25 08-Feb-26 08-Feb-26, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 19-Oct-25 08-Feb-26 08-Feb-26, FIRE DETECTION AND ALARM SYS
UCR.17ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 19-Oct-25 04-Nov-25 Fire Alarm Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
139 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR.17ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 04-Nov-25 08-Feb-26 08-Feb-26, COMMUNICATION SYSTEM/ EMER
UCR.17ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 04-Nov-25 20-Nov-25 Telephone Shop Drawings Preparation & Submission

UCR.17ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 20-Nov-25 08-Feb-26 08-Feb-26, VOICE EVACAUTION AND PUBLIC
UCR.17ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 20-Nov-25 07-Dec-25 Public Address system Shop Drawings Preparation & Subm

UCR.17ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Public Address system Shop Drawings Review & Ap

VIDEO SURVEILLANCE 54 07-Dec-25 08-Feb-26 08-Feb-26, VIDEO SURVEILLANCE


UCR.17ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 07-Dec-25 23-Dec-25 Video Surveillance system Shop Drawings Preparation &

UCR.17ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Video Surveillance system Shop Drawings Review &

ACCESS CONTROL SY
SYSTEM 40 23-Dec-25 08-Feb-26 08-Feb-26, ACCESS CONTROL SYSTEM
UCR.17ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 23-Dec-25 08-Jan-26 Access Control system Shop Drawings Preparation & S

UCR.17ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Access Control system Shop Drawings Review & A

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Jan-26 08-Feb-26 08-Feb-26, RADIO RE-BROADCASTING SYSTE
UCR.17ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Jan-26 25-Jan-26 Radio Re Broadcasting system Shop Drawings Prepara

UCR.17ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 Radio Re Broadcasting system Shop Drawings Revie

SCADA SYSTEM 26 08-Jan-26 08-Feb-26 08-Feb-26, SCADA SYSTEM


UCR.17ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 08-Jan-26 25-Jan-26 SCADA system Shop Drawings Preparation & Submi

UCR.17ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 25-Jan-26 08-Feb-26 SCADA system Shop Drawings Review & Approva

DRY UTILITIES 31 22-Apr-26 01-Jun-26 01-Jun-26, DRY UTILITIES


POWER 31 22-Apr-26 01-Jun-26 01-Jun-26, POWER
POWER LV 31 22-Apr-26 01-Jun-26 01-Jun-26, POWER LV
DU-P-LV.3300 Prepare and submit power system shopdrawings 20 22-Apr-26 16-May-26 Prepare and submit power system shopdra

DU-P-LV.3305 Review and approval power system shopdrawings 11 16-May-26 01-Jun-26 Review and approval power system shop

MEDIUM VOLTAGE 31 22-Apr-26 01-Jun-26 01-Jun-26, MEDIUM VOLTAGE


DU-P-MV.3300 Prepare and submit medium voltage shopdrawings 20 22-Apr-26 16-May-26 Prepare and submit medium voltage shopd

DU-P-MV.3305 Review and approval medium voltage shopdrawings 11 16-May-26 01-Jun-26 Review and approval medium voltage sh

TRANSFORMER 31 22-Apr-26 01-Jun-26 01-Jun-26, TRANSFORMER


DU-P-T.3300 Prepare and submit transformer shopdrawings 20 22-Apr-26 16-May-26 Prepare and submit transformer shopdraw

DU-P-T.3305 Review and approval transformer shopdrawings 11 16-May-26 01-Jun-26 Review and approval transformer shopdr

RMU 31 22-Apr-26 01-Jun-26 01-Jun-26, RMU


DU-P-RMU.3300 Prepare and submit RMU shopdrawings 20 22-Apr-26 16-May-26 Prepare and submit RMU shopdrawings

DU-P-RMU.3305 Review and approval RMU shopdrawings 11 16-May-26 01-Jun-26 Review and approval RMU shopdrawing

UTILITY ROOM 29 (IN ZONE


ZO 09) (FLD -0.9 m) 303 27-Dec-23 23-Dec-24 23-Dec-24, UTILITY ROOM 29 (IN ZONE 09) (FLD -0.9 m)
ENGINEERING 303 27-Dec-23 23-Dec-24 23-Dec-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 303 27-Dec-23 23-Dec-24 23-Dec-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 25-Jan-24 26-Feb-24 26-Feb-24, EARTH WORKS
T1-ENG-UR29-SI.1090 Soil Improvement Design Preparation & Submission 14 25-Jan-24 11-Feb-24 Soil Improvement Design Preparation & Submission

T1-ENG-UR29-SI.1095 Soil Improvement Design Review & Approval 14 11-Feb-24 26-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 123 19-Mar-24 18-Aug-24 18-Aug-24, STRUCTURE


UCR-29ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 19-Mar-24 04-Apr-24 Foundation Shop Drawings Preparation & Submission

UCR-29ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 11-May-24 26-May-24 Foundation Shop Drawings Review & Approval

UCR-29ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 04-Apr-24 24-Apr-24 Walls Shop Drawings Preparation & Submission

UCR-29ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 01-Aug-24 18-Aug-24 Walls Shop Drawings Review & Approval

UCR-29ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 24-Apr-24 11-May-24 Slab Shop Drawings Preparation & Submission

UCR-29ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 11-May-24 26-May-24 Slab Shop Drawings Review & Approval

MECHANICAL 56 13-Jun-24 21-Aug-24 21-Aug-24, MECHANICAL


FIRE FIGHTING SYSTEM 56 13-Jun-24 21-Aug-24 21-Aug-24, FIRE FIGHTING SYSTEM
UCR-29ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Fire Fighting Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
140 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-29ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 04-Jul-24 21-Aug-24 21-Aug-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-29ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 04-Jul-24 21-Jul-24 HVAC Shop Drawings Preparation & Submission

UCR-29ENG-MC-HC HVAC Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 21-Jul-24 21-Aug-24 21-Aug-24, PLUMBING SYSTEM


UCR-29ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 21-Jul-24 06-Aug-24 Plumbing System Shop Drawings Preparation & Submission

UCR-29ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 06-Aug-24 21-Aug-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 193 27-Dec-23 17-Aug-24 17-Aug-24, ELECTRICAL


CABLE TRAYS 181 27-Dec-23 03-Aug-24 03-Aug-24, CABLE TRAYS
UCR-29ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 27-Dec-23 13-Jan-24 Cable Tray Shop Drawings Preparation & Submission

UCR-29ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 167 13-Jan-24 03-Aug-24 03-Aug-24, POWER CABLES


UCR-29ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 13-Jan-24 29-Jan-24 Power Cables Shop Drawings Preparation & Submission

UCR-29ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 153 29-Jan-24 03-Aug-24 03-Aug-24, LIGHTING SYSTEM


UCR-29ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 29-Jan-24 14-Feb-24 Lighting System Shop Drawings Preparation & Submission

UCR-29ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 139 14-Feb-24 03-Aug-24 03-Aug-24, ELECTRICAL INSTALLATIONS
UCR-29ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 14-Feb-24 02-Mar-24 Electrical Installations Shop Drawings Preparation & Submission

UCR-29ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 125 02-Mar-24 03-Aug-24 03-Aug-24, TRANSFORMERS INSTALLATION
UCR-29ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 02-Mar-24 17-Mar-24 Transformers Installation Shop Drawings Preparation & Submission

UCR-29ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 20-Jul-24 03-Aug-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 105 18-Mar-24 27-Jul-24 27-Jul-24, LIGHTNING PROTECTION SYSTEM
UCR-29ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 18-Mar-24 02-Apr-24 Lightning Protection Drawings Preparation & Submission

UCR-29ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 91 02-Apr-24 27-Jul-24 27-Jul-24, EARTHING SYSTEM


UCR-29ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 02-Apr-24 22-Apr-24 Earthing System Shop Drawings Preparation & Submission

UCR-29ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 13-Jul-24 27-Jul-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 22-Apr-24 17-Aug-24 17-Aug-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 22-Apr-24 17-Aug-24 17-Aug-24, FIRE DETECTION AND ALARM SYSTEM
UCR-29ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 22-Apr-24 08-May-24 Fire Alarm Shop Drawings Preparation & Submission

UCR-29ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 08-May-24 17-Aug-24 17-Aug-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-29ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 08-May-24 25-May-24 Telephone Shop Drawings Preparation & Submission

UCR-29ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 25-May-24 17-Aug-24 17-Aug-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-29ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Public Address system Shop Drawings Preparation & Submission

UCR-29ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 10-Jun-24 17-Aug-24 17-Aug-24, VIDEO SURVEILLANCE


UCR-29ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 Video Surveillance system Shop Drawings Preparation & Submission

UCR-29ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 01-Jul-24 17-Aug-24 17-Aug-24, ACCESS CONTROL SYSTEM
UCR-29ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 01-Jul-24 17-Jul-24 Access Control system Shop Drawings Preparation & Submission

UCR-29ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 17-Jul-24 17-Aug-24 17-Aug-24, RADIO RE-BROADCASTING SYSTEM
UCR-29ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-29ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 17-Jul-24 17-Aug-24 17-Aug-24, SCADA SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
141 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-29ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 17-Jul-24 03-Aug-24 SCADA system Shop Drawings Preparation & Submission

UCR-29ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 03-Aug-24 17-Aug-24 SCADA system Shop Drawings Review & Approval

DRY UTILITES 31 17-Nov-24 23-Dec-24 23-Dec-24, DRY UTILITES


POWER 31 17-Nov-24 23-Dec-24 23-Dec-24, POWER
POWER LV 31 17-Nov-24 23-Dec-24 23-Dec-24, POWER LV
37650 Prepare and submit power system shopdrawings 20 17-Nov-24 10-Dec-24 Prepare and submit power system shopdrawings

37660 Review and approval power system shopdrawings 11 10-Dec-24 23-Dec-24 Review and approval power system shopdrawings

UTILITY ROOM 26 (IN ZONE


ZO 10) (FLD -1.4 m) 505 29-Feb-24 28-Oct-25 28-Oct-25, UTILITY ROOM 26 (IN ZONE 10) (FLD -1.4 m)
ENGINEERING 505 29-Feb-24 28-Oct-25 28-Oct-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 505 29-Feb-24 28-Oct-25 28-Oct-25, SHOP DRAWING SUBMITTAL AND APPROVA
EARTH WORKS 28 29-Feb-24 01-Apr-24 01-Apr-24, EARTH WORKS
T2-ENG-UR26-SI.1080 Soil Improvement Design Preparation & Submission 14 29-Feb-24 17-Mar-24 Soil Improvement Design Preparation & Submission

T2-ENG-UR26-SI.1085 Soil Improvement Design Review & Approval 14 17-Mar-24 01-Apr-24 Soil Improvement Design Review & Approval

STRUCTURE 123 25-Jan-25 25-Jun-25 25-Jun-25, STRUCTURE


UCR-26ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 25-Jan-25 09-Feb-25 Foundation Shop Drawings Preparation & Submission

UCR-26ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 13-Mar-25 03-Apr-25 Foundation Shop Drawings Review & Approval

UCR-26ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 10-Feb-25 25-Feb-25 Walls Shop Drawings Preparation & Submission

UCR-26ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 09-Jun-25 25-Jun-25 Walls Shop Drawings Review & Approval

UCR-26ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 25-Feb-25 13-Mar-25 Slab Shop Drawings Preparation & Submission

UCR-26ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 13-Mar-25 03-Apr-25 Slab Shop Drawings Review & Approval

MECHANICAL 56 20-Apr-25 26-Jun-25 26-Jun-25, MECHANICAL


FIRE FIGHTING SYSTEM 56 20-Apr-25 26-Jun-25 26-Jun-25, FIRE FIGHTING SYSTEM
UCR-26ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 20-Apr-25 06-May-25 Fire Fighting Shop Drawings Preparation & Submission

UCR-26ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 06-May-25 26-Jun-25 26-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-26ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 06-May-25 22-May-25 HVAC Shop Drawings Preparation & Submission

UCR-26ENG-MC-HC HVAC Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 22-May-25 26-Jun-25 26-Jun-25, PLUMBING SYSTEM


UCR-26ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 22-May-25 11-Jun-25 Plumbing System Shop Drawings Preparation & Submission

UCR-26ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 11-Jun-25 26-Jun-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 230 06-Nov-24 10-Aug-25 10-Aug-25, ELECTRICAL


CABLE TRAYS 220 06-Nov-24 29-Jul-25 29-Jul-25, CABLE TRAYS
UCR-26ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Cable Tray Shop Drawings Preparation & Submission

UCR-26ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 206 23-Nov-24 29-Jul-25 29-Jul-25, POWER CABLES


UCR-26ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Power Cables Shop Drawings Preparation & Submission

UCR-26ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 15-Jul-25 29-Jul-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 171 09-Dec-24 03-Jul-25 03-Jul-25, LIGHTING SYSTEM


UCR-26ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Lighting System Shop Drawings Preparation & Submission

UCR-26ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 21-Jun-25 03-Jul-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 172 25-Dec-24 21-Jul-25 21-Jul-25, ELECTRICAL INSTALLATIONS
UCR-26ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 25-Dec-24 09-Jan-25 Electrical Installations Shop Drawings Preparation & Submission

UCR-26ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 07-Jul-25 21-Jul-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 158 11-Jan-25 21-Jul-25 21-Jul-25, TRANSFORMERS INSTALLATION
UCR-26ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 11-Jan-25 26-Jan-25 Transformers Installation Shop Drawings Preparation & Submission

UCR-26ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 07-Jul-25 21-Jul-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 161 26-Jan-25 10-Aug-25 10-Aug-25, LIGHTNING PROTECTION SYSTEM
UCR-26ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 26-Jan-25 11-Feb-25 Lightning Protection Drawings Preparation & Submission

UCR-26ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 27-Jul-25 10-Aug-25 Lightning Protection Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
142 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EARTHING SYSTEM 109 11-Feb-25 26-Jun-25 26-Jun-25, EARTHING SYSTEM
UCR-26ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 11-Feb-25 27-Feb-25 Earthing System Shop Drawings Preparation & Submission

UCR-26ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 27-Feb-25 26-Jun-25 26-Jun-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 27-Feb-25 26-Jun-25 26-Jun-25, FIRE DETECTION AND ALARM SYSTEM
UCR-26ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 27-Feb-25 16-Mar-25 Fire Alarm Shop Drawings Preparation & Submission

UCR-26ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 16-Mar-25 26-Jun-25 26-Jun-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-26ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 16-Mar-25 06-Apr-25 Telephone Shop Drawings Preparation & Submission

UCR-26ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 06-Apr-25 26-Jun-25 26-Jun-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-26ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 06-Apr-25 22-Apr-25 Public Address system Shop Drawings Preparation & Submission

UCR-26ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 22-Apr-25 26-Jun-25 26-Jun-25, VIDEO SURVEILLANCE


UCR-26ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 22-Apr-25 08-May-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR-26ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 08-May-25 26-Jun-25 26-Jun-25, ACCESS CONTROL SYSTEM
UCR-26ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 08-May-25 25-May-25 Access Control system Shop Drawings Preparation & Submission

UCR-26ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 25-May-25 26-Jun-25 26-Jun-25, RADIO RE-BROADCASTING SYSTEM
UCR-26ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 25-May-25 14-Jun-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-26ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 25-May-25 26-Jun-25 26-Jun-25, SCADA SYSTEM


UCR-26ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 25-May-25 14-Jun-25 SCADA system Shop Drawings Preparation & Submission

UCR-26ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 14-Jun-25 26-Jun-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 21-Sep-25 28-Oct-25 28-Oct-25, DRY UTILITIES


POWER 31 21-Sep-25 28-Oct-25 28-Oct-25, POWER
POWER LV 31 21-Sep-25 28-Oct-25 28-Oct-25, POWER LV
DU-P-LV.4000 Prepare and submit power system shopdrawings 20 21-Sep-25 15-Oct-25 Prepare and submit power system shopdrawings

DU-P-LV.4005 Review and approval power system shopdrawings 11 15-Oct-25 28-Oct-25 Review and approval power system shopdrawings

UTILITY ROOM 27 (IN ZONE


ZO 10) (FLD -0.9 m) 463 08-Jan-24 17-Jul-25 17-Jul-25, UTILITY ROOM 27 (IN ZONE 10) (FLD -0.9 m)
ENGINEERING 463 08-Jan-24 17-Jul-25 17-Jul-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 463 08-Jan-24 17-Jul-25 17-Jul-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 08-Jan-24 08-Feb-24 08-Feb-24, EARTH WORKS
T2-ENG-UR27-SI.1070 Soil Improvement Design Preparation & Submission 14 08-Jan-24 24-Jan-24 Soil Improvement Design Preparation & Submission

T2-ENG-UR27-SI.1075 Soil Improvement Design Review & Approval 14 24-Jan-24 08-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 123 15-Oct-24 08-Mar-25 08-Mar-25, STRUCTURE


UCR-27ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 15-Oct-24 30-Oct-24 Foundation Shop Drawings Preparation & Submission

UCR-27ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 02-Dec-24 18-Dec-24 Foundation Shop Drawings Review & Approval

UCR-27ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 31-Oct-24 16-Nov-24 Walls Shop Drawings Preparation & Submission

UCR-27ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 19-Feb-25 08-Mar-25 Walls Shop Drawings Review & Approval

UCR-27ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 16-Nov-24 02-Dec-24 Slab Shop Drawings Preparation & Submission

UCR-27ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 02-Dec-24 18-Dec-24 Slab Shop Drawings Review & Approval

MECHANICAL 68 04-Jan-25 23-Mar-25 23-Mar-25, MECHANICAL


FIRE FIGHTING SYSTEM 56 04-Jan-25 09-Mar-25 09-Mar-25, FIRE FIGHTING SYSTEM
UCR-27ENG-MC-ST. Fire Fighting Shop Drawings Preparation & Submission 14 04-Jan-25 20-Jan-25 Fire Fighting Shop Drawings Preparation & Submission

UCR-27ENG-MC-ST. Fire Fighting Shop Drawings Review & Approval 14 22-Feb-25 09-Mar-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 54 20-Jan-25 23-Mar-25 23-Mar-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
UCR-27ENG-MC-HC HVAC Shop Drawings Preparation & Submission 14 20-Jan-25 05-Feb-25 HVAC Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
143 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
UCR-27ENG-MC-HC HVAC Shop Drawings Review & Approval 14 08-Mar-25 23-Mar-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 05-Feb-25 09-Mar-25 09-Mar-25, PLUMBING SYSTEM


UCR-27ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 05-Feb-25 22-Feb-25 Plumbing System Shop Drawings Preparation & Submission

UCR-27ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 22-Feb-25 09-Mar-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 226 27-Jul-24 22-Apr-25 22-Apr-25, ELECTRICAL


CABLE TRAYS 217 27-Jul-24 10-Apr-25 10-Apr-25, CABLE TRAYS
UCR-27ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 27-Jul-24 12-Aug-24 Cable Tray Shop Drawings Preparation & Submission

UCR-27ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 24-Mar-25 10-Apr-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 203 12-Aug-24 10-Apr-25 10-Apr-25, POWER CABLES


UCR-27ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 12-Aug-24 28-Aug-24 Power Cables Shop Drawings Preparation & Submission

UCR-27ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 24-Mar-25 10-Apr-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 165 28-Aug-24 09-Mar-25 09-Mar-25, LIGHTING SYSTEM


UCR-27ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 28-Aug-24 14-Sep-24 Lighting System Shop Drawings Preparation & Submission

UCR-27ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 151 14-Sep-24 09-Mar-25 09-Mar-25, ELECTRICAL INSTALLATIONS
UCR-27ENG-EL-EI.1 Electrical Installations Shop Drawings Preparation & Submission 14 14-Sep-24 30-Sep-24 Electrical Installations Shop Drawings Preparation & Submission

UCR-27ENG-EL-EI.1 Electrical Installations Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INSTA 137 01-Oct-24 09-Mar-25 09-Mar-25, TRANSFORMERS INSTALLATION
UCR-27ENG-EL-TI.1 Transformers Installation Shop Drawings Preparation & Submission 14 01-Oct-24 16-Oct-24 Transformers Installation Shop Drawings Preparation & Submission

UCR-27ENG-EL-TI.1 Transformers Installation Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 157 16-Oct-24 22-Apr-25 22-Apr-25, LIGHTNING PROTECTION SYSTEM
UCR-27ENG-EL-LP.1 Lightning Protection Drawings Preparation & Submission 14 16-Oct-24 02-Nov-24 Lightning Protection Drawings Preparation & Submission

UCR-27ENG-EL-LP.1 Lightning Protection Shop Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 143 02-Nov-24 22-Apr-25 22-Apr-25, EARTHING SYSTEM


UCR-27ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 02-Nov-24 18-Nov-24 Earthing System Shop Drawings Preparation & Submission

UCR-27ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 08-Apr-25 22-Apr-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 18-Nov-24 09-Mar-25 09-Mar-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 95 18-Nov-24 09-Mar-25 09-Mar-25, FIRE DETECTION AND ALARM SYSTEM
UCR-27ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 18-Nov-24 04-Dec-24 Fire Alarm Shop Drawings Preparation & Submission

UCR-27ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 81 04-Dec-24 09-Mar-25 09-Mar-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
UCR-27ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 04-Dec-24 21-Dec-24 Telephone Shop Drawings Preparation & Submission

UCR-27ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 21-Dec-24 09-Mar-25 09-Mar-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
UCR-27ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 21-Dec-24 06-Jan-25 Public Address system Shop Drawings Preparation & Submission

UCR-27ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 54 06-Jan-25 09-Mar-25 09-Mar-25, VIDEO SURVEILLANCE


UCR-27ENG-ELL-V Video Surveillance system Shop Drawings Preparation & Submission 14 06-Jan-25 22-Jan-25 Video Surveillance system Shop Drawings Preparation & Submission

UCR-27ENG-ELL-V Video Surveillance system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 40 22-Jan-25 09-Mar-25 09-Mar-25, ACCESS CONTROL SYSTEM
UCR-27ENG-ELL-A Access Control system Shop Drawings Preparation & Submission 14 22-Jan-25 08-Feb-25 Access Control system Shop Drawings Preparation & Submission

UCR-27ENG-ELL-A Access Control system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 08-Feb-25 09-Mar-25 09-Mar-25, RADIO RE-BROADCASTING SYSTEM
UCR-27ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 08-Feb-25 24-Feb-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

UCR-27ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 08-Feb-25 09-Mar-25 09-Mar-25, SCADA SYSTEM


UCR-27ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 08-Feb-25 24-Feb-25 SCADA system Shop Drawings Preparation & Submission

UCR-27ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 24-Feb-25 09-Mar-25 SCADA system Shop Drawings Review & Approval

DRY UTILITIES 31 11-Jun-25 17-Jul-25 17-Jul-25, DRY UTILITIES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
144 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER 31 11-Jun-25 17-Jul-25 17-Jul-25, POWER
POWER LV 31 11-Jun-25 17-Jul-25 17-Jul-25, POWER LV
DU-P-LV.5000 Prepare and submit power system shopdrawings 20 11-Jun-25 05-Jul-25 Prepare and submit power system shopdrawings

DU-P-LV.5005 Review and approval power system shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval power system shopdrawings

MEDIUM VOLTAGE 31 11-Jun-25 17-Jul-25 17-Jul-25, MEDIUM VOLTAGE


DU-P-MV.5000 Prepare and submit medium voltage shopdrawings 20 11-Jun-25 05-Jul-25 Prepare and submit medium voltage shopdrawings

DU-P-MV.5005 Review and approval medium voltage shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval medium voltage shopdrawings

TRANSFORMER 31 11-Jun-25 17-Jul-25 17-Jul-25, TRANSFORMER


DU-P-T.5000 Prepare and submit transformer shopdrawings 20 11-Jun-25 05-Jul-25 Prepare and submit transformer shopdrawings

DU-P-T.5005 Review and approval transformer shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval transformer shopdrawings

RMU 31 11-Jun-25 17-Jul-25 17-Jul-25, RMU


DU-P-RMU.5000 Prepare and submit RMU shopdrawings 20 11-Jun-25 05-Jul-25 Prepare and submit RMU shopdrawings

DU-P-RMU.5005 Review and approval RMU shopdrawings 11 05-Jul-25 17-Jul-25 Review and approval RMU shopdrawings

LIFTSTATION 730 17-Dec-23 11-May-26 11-May-26, LIFTSTATION


lIFTING STATION 02 (IN ZONE 06) 730 17-Dec-23 11-May-26 11-May-26, lIFTING STATION 02 (IN ZO
ENGINEERING 730 17-Dec-23 11-May-26 11-May-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 730 17-Dec-23 11-May-26 11-May-26, SHOP DRAWING SUBMIT
EARTH WORKS 41 17-Dec-23 03-Feb-24 03-Feb-24, EARTH WORKS
LS2-EN-SD-EW.100 Shoring Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Shoring Design Preparation & Submission

LS2-EN-SD-EW.105 Soil Improvement Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Soil Improvement Design Preparation & Submission

LS2-EN-SD-EW.110 Shoring Design Review & Approval 14 02-Jan-24 18-Jan-24 Shoring Design Review & Approval

LS2-EN-SD-EW.115 Soil Improvement Design Review & Approval 14 18-Jan-24 03-Feb-24 Soil Improvement Design Review & Approval

STRUCTURE 150 04-Feb-24 04-Aug-24 04-Aug-24, STRUCTURE


LS2-EN-SD-STR.100 Foundation Shop Drawings Preparation & Submission 14 04-Feb-24 19-Feb-24 Foundation Shop Drawings Preparation & Submission

LS2-EN-SD-STR.105 Foundation Shop Drawings Review & Approval 14 19-Feb-24 06-Mar-24 Foundation Shop Drawings Review & Approval

LS2-EN-SD-STR.110 Walls Shop Drawings Preparation & Submission 14 09-Mar-24 25-Mar-24 Walls Shop Drawings Preparation & Submission

LS2-EN-SD-STR.115 Walls Shop Drawings Review & Approval 14 25-Mar-24 14-Apr-24 Walls Shop Drawings Review & Approval

LS2-EN-SD-STR.120 Slab Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Slab Shop Drawings Preparation & Submission

LS2-EN-SD-STR.125 Slab Shop Drawings Review & Approval 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 647 03-Mar-24 19-Apr-26 19-Apr-26, MECHANICAL


FIRE FIGHTING SYSTEM 611 03-Mar-24 03-Mar-26 03-Mar-26, FIRE FIGHTING SYSTEM
LS2-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Preparation & Submission 14 03-Mar-24 18-Mar-24 Fire Fighting Shop Drawings Preparation & Submission

LS2-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Review & Approval 14 15-Feb-26 03-Mar-26 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 73 19-Jan-26 19-Apr-26 19-Apr-26, VENTILATION SYSTEM/AIR
LS2-EN-SD-M-VEN.1 HVAC Shop Drawings Preparation & Submission 14 19-Jan-26 04-Feb-26 HVAC Shop Drawings Preparation & Submission

LS2-EN-SD-M-VEN.1 HVAC Shop Drawings Review & Approval 14 02-Apr-26 19-Apr-26 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 04-Feb-26 09-Mar-26 09-Mar-26, PLUMBING SYSTEM


LS2-EN-SD-M-PS.100 Plumbing System Shop Drawings Preparation & Submission 14 04-Feb-26 21-Feb-26 Plumbing System Shop Drawings Preparation & Su

LS2-EN-SD-M-PS.105 Plumbing System Shop Drawings Review & Approval 14 21-Feb-26 09-Mar-26 Plumbing System Shop Drawings Review & App

ELECTRICAL 665 03-Mar-24 11-May-26 11-May-26, ELECTRICAL


CABLE TRAYS 665 03-Mar-24 11-May-26 11-May-26, CABLE TRAYS
LS2-EN-SD-E-CT.100 Cable Tray Shop Drawings Preparation & Submission 14 03-Mar-24 18-Mar-24 Cable Tray Shop Drawings Preparation & Submission

LS2-EN-SD-E-CT.105 Cable Tray Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Cable Tray Shop Drawings Review & App

POWER CABLES 625 18-Mar-24 11-Apr-26 11-Apr-26, POWER CABLES


LS2-EN-SD-E-PC.100 Power Cables Shop Drawings Preparation & Submission 14 18-Mar-24 03-Apr-24 Power Cables Shop Drawings Preparation & Submission

LS2-EN-SD-E-PC.105 Power Cables Shop Drawings Review & Approval 12 28-Mar-26 11-Apr-26 Power Cables Shop Drawings Review & App

LIGHTING SYSTEM 637 03-Apr-24 11-May-26 11-May-26, LIGHTING SYSTEM


LS2-EN-SD-E-LS.100 Lighting System Shop Drawings Preparation & Submission 14 03-Apr-24 23-Apr-24 Lighting System Shop Drawings Preparation & Submission

LS2-EN-SD-E-LS.105 Lighting System Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Lighting System Shop Drawings Review &

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
145 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 26 29-Jan-26 01-Mar-26 01-Mar-26, ELECTRICAL INSTALLATIONS
LS2-EN-SD-E-EI.100 Electrical Installations Shop Drawings Preparation & Submission 14 29-Jan-26 15-Feb-26 Electrical Installations Shop Drawings Preparation &

LS2-EN-SD-E-EI.105 Electrical Installations Shop Drawings Review & Approval 12 15-Feb-26 01-Mar-26 Electrical Installations Shop Drawings Review & A

LIGHTNING PROTECTION
PROTECTIO SYSTEM 624 23-Apr-24 11-May-26 11-May-26, LIGHTNING PROTECTION
LS2-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Lightning Protection Drawings Preparation & Submission

LS2-EN-SD-E-LPS.10 Lightning Protection Shop Drawings Review & Approval 12 27-Apr-26 11-May-26 Lightning Protection Shop Drawings Revie

EARTHING SYSTEM 610 09-May-24 11-May-26 11-May-26, EARTHING SYSTEM


LS2-EN-SD-E-ES.100 Earthing System Shop Drawings Preparation & Submission 14 09-May-24 26-May-24 Earthing System Shop Drawings Preparation & Submission

LS2-EN-SD-E-ES.105 Earthing System Drawings Review & Approval 12 27-Apr-26 11-May-26 Earthing System Drawings Review & App

LOW CURRENT 577 26-May-24 19-Apr-26 19-Apr-26, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 577 26-May-24 19-Apr-26 19-Apr-26, FIRE DETECTION AND ALAR
LS2-EN-SD-LC-FD.1 Fire Alarm Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Fire Alarm Shop Drawings Preparation & Submission

LS2-EN-SD-LC-FD.1 Fire Alarm Shop Drawings Review & Approval 12 06-Apr-26 19-Apr-26 Fire Alarm Shop Drawings Review & Appro

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 11-Jun-24 08-Sep-24 08-Sep-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS2-EN-SD-LC-CS.1 Telephone Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Telephone Shop Drawings Preparation & Submission

LS2-EN-SD-LC-CS.1 Telephone Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 02-Jul-24 18-Sep-24 18-Sep-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
LS2-EN-SD-LC-VE.1 Public Address system Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Public Address system Shop Drawings Preparation & Submission

LS2-EN-SD-LC-VE.1 Public Address system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 18-Jul-24 08-Sep-24 08-Sep-24, VIDEO SURVEILLANCE


LS2-EN-SD-LC-VS.1 Video Surveillance system Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Video Surveillance system Shop Drawings Preparation & Submission

LS2-EN-SD-LC-VS.1 Video Surveillance system Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 04-Aug-24 08-Sep-24 08-Sep-24, ACCESS CONTROL SYSTEM
LS2-EN-SD-LC-ACS Access Control system Shop Drawings Preparation & Submission 14 04-Aug-24 19-Aug-24 Access Control system Shop Drawings Preparation & Submission

LS2-EN-SD-LC-ACS Access Control system Shop Drawings Review & Approval 12 26-Aug-24 08-Sep-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Aug-24 18-Sep-24 18-Sep-24, RADIO RE-BROADCASTING SYSTEM
LS2-EN-SD-LC-RRB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

LS2-EN-SD-LC-RRB Radio Re Broadcasting system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 20-Aug-24 18-Sep-24 18-Sep-24, SCADA SYSTEM


LS2-EN-SD-LC-SS.1 SCADA system Shop Drawings Preparation & Submission 14 20-Aug-24 04-Sep-24 SCADA system Shop Drawings Preparation & Submission

LS2-EN-SD-LC-SS.1 SCADA system Shop Drawings Review & Approval 12 04-Sep-24 18-Sep-24 SCADA system Shop Drawings Review & Approval

lIFTING STATION 03 (IN ZONE 10) 261 17-Dec-23 26-Oct-24 26-Oct-24, lIFTING STATION 03 (IN ZONE 10)
ENGINEERING 261 17-Dec-23 26-Oct-24 26-Oct-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 261 17-Dec-23 26-Oct-24 26-Oct-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 92 17-Dec-23 02-Apr-24 02-Apr-24, EARTH WORKS
LS3-EN-SD-EW.10 Shoring Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Shoring Design Preparation & Submission

LS3-EN-SD-EW.15 Soil Improvement Design Preparation & Submission 14 17-Dec-23 02-Jan-24 Soil Improvement Design Preparation & Submission

LS3-EN-SD-EW.20 Soil Improvement Design Review & Approval 14 17-Mar-24 02-Apr-24 Soil Improvement Design Review & Approval

LS3-EN-SD-EW.25 Shoring Design Review & Approval 14 18-Jan-24 04-Feb-24 Shoring Design Review & Approval

STRUCTURE 205 17-Dec-23 20-Aug-24 20-Aug-24, STRUCTURE


LS3-EN-SD-STR.10 Foundation Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Foundation Shop Drawings Preparation & Submission

LS3-EN-SD-STR.15 Foundation Shop Drawings Review & Approval 14 05-Mar-24 21-Mar-24 Foundation Shop Drawings Review & Approval

LS3-EN-SD-STR.20 Walls Shop Drawings Preparation & Submission 14 14-Apr-24 30-Apr-24 Walls Shop Drawings Preparation & Submission

LS3-EN-SD-STR.25 Walls Shop Drawings Review & Approval 14 30-Apr-24 16-May-24 Walls Shop Drawings Review & Approval

LS3-EN-SD-STR.30 Slab Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Preparation & Submission

LS3-EN-SD-STR.35 Slab Shop Drawings Review & Approval 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL-1 261 17-Dec-23 26-Oct-24 26-Oct-24, MECHANICAL-1


FIRE FIGHTING SYSTEM 250 17-Dec-23 13-Oct-24 13-Oct-24, FIRE FIGHTING SYSTEM
LS3-EN-SD-ME-FFS. Fire Fighting Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Fire Fighting Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
146 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LS3-EN-SD-ME-FFS. Fire Fighting Shop Drawings Review & Approval 14 26-Sep-24 13-Oct-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 07-Sep-24 26-Oct-24 26-Oct-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
LS3-EN-SD-ME-VS.1 HVAC Shop Drawings Preparation & Submission 14 07-Sep-24 22-Sep-24 HVAC Shop Drawings Preparation & Submission

LS3-EN-SD-ME-VS.1 HVAC Shop Drawings Review & Approval 14 09-Oct-24 26-Oct-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 22-Sep-24 26-Oct-24 26-Oct-24, PLUMBING SYSTEM


LS3-EN-SD-ME-PS.1 Plumbing System Shop Drawings Preparation & Submission 14 22-Sep-24 09-Oct-24 Plumbing System Shop Drawings Preparation & Submission

LS3-EN-SD-ME-PS.1 Plumbing System Shop Drawings Review & Approval 14 09-Oct-24 26-Oct-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 179 17-Dec-23 21-Jul-24 21-Jul-24, ELECTRICAL


CABLE TRAYS 137 17-Dec-23 28-May-24 28-May-24, CABLE TRAYS
LS3-EN-SD-E-CT.10 Cable Tray Shop Drawings Preparation & Submission 14 17-Dec-23 02-Jan-24 Cable Tray Shop Drawings Preparation & Submission

LS3-EN-SD-E-CT.15 Cable Tray Shop Drawings Review & Approval 12 14-May-24 28-May-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 123 02-Jan-24 28-May-24 28-May-24, POWER CABLES


LS3-EN-SD-E-PC.10 Power Cables Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Power Cables Shop Drawings Preparation & Submission

LS3-EN-SD-E-PC.15 Power Cables Shop Drawings Review & Approval 12 14-May-24 28-May-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 109 18-Jan-24 28-May-24 28-May-24, LIGHTING SYSTEM


LS3-EN-SD-E-LS.10 Lighting System Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Lighting System Shop Drawings Preparation & Submission

LS3-EN-SD-E-LS.15 Lighting System Shop Drawings Review & Approval 12 14-May-24 28-May-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 103 04-Feb-24 06-Jun-24 06-Jun-24, ELECTRICAL INSTALLATIONS
LS3-EN-SD-E-EI.10 Electrical Installations Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Electrical Installations Shop Drawings Preparation & Submission

LS3-EN-SD-E-EI.15 Electrical Installations Shop Drawings Review & Approval 12 23-May-24 06-Jun-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 81 20-Feb-24 28-May-24 28-May-24, LIGHTNING PROTECTION SYSTEM
LS3-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 20-Feb-24 07-Mar-24 Lightning Protection Drawings Preparation & Submission

LS3-EN-SD-E-LPS.15 Lightning Protection Shop Drawings Review & Approval 12 14-May-24 28-May-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 91 07-Mar-24 30-Jun-24 30-Jun-24, EARTHING SYSTEM


LS3-EN-SD-E-ES.10 Earthing System Shop Drawings Preparation & Submission 14 07-Mar-24 24-Mar-24 Earthing System Shop Drawings Preparation & Submission

LS3-EN-SD-E-ES.15 Earthing System Drawings Review & Approval 12 11-Jun-24 30-Jun-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 24-Mar-24 21-Jul-24 21-Jul-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 68 24-Mar-24 19-Jun-24 19-Jun-24, FIRE DETECTION AND ALARM SYSTEM
LS3-EN-SD-E-LC-FD Fire Alarm Shop Drawings Preparation & Submission 14 24-Mar-24 13-Apr-24 Fire Alarm Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-FD Fire Alarm Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 68 13-Apr-24 04-Jul-24 04-Jul-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS3-EN-SD-E-LC-CS Telephone Shop Drawings Preparation & Submission 14 13-Apr-24 29-Apr-24 Telephone Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-CS Telephone Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 63 29-Apr-24 15-Jul-24 15-Jul-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
LS3-EN-SD-E-LC-VE Public Address system Shop Drawings Preparation & Submission 14 29-Apr-24 14-May-24 Public Address system Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-VE Public Address system Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 26 15-May-24 19-Jun-24 19-Jun-24, VIDEO SURVEILLANCE


LS3-EN-SD-E-LC-VS Video Surveillance system Shop Drawings Preparation & Submission 14 15-May-24 30-May-24 Video Surveillance system Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-VS Video Surveillance system Shop Drawings Review & Approval 12 01-Jun-24 19-Jun-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 26 30-May-24 04-Jul-24 04-Jul-24, ACCESS CONTROL SYSTEM
LS3-EN-SD-E-LC-AC Access Control system Shop Drawings Preparation & Submission 14 30-May-24 20-Jun-24 Access Control system Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-AC Access Control system Shop Drawings Review & Approval 12 20-Jun-24 04-Jul-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 20-Jun-24 21-Jul-24 21-Jul-24, RADIO RE-BROADCASTING SYSTEM
LS3-EN-SD-E-LC-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 20-Jun-24 07-Jul-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 07-Jul-24 21-Jul-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 10-Jun-24 15-Jul-24 15-Jul-24, SCADA SYSTEM


LS3-EN-SD-E-LC-SS SCADA system Shop Drawings Preparation & Submission 14 10-Jun-24 01-Jul-24 SCADA system Shop Drawings Preparation & Submission

LS3-EN-SD-E-LC-SS SCADA system Shop Drawings Review & Approval 12 01-Jul-24 15-Jul-24 SCADA system Shop Drawings Review & Approval

lIFTING STATION 04 (IN ZONE 11) 283 02-Jan-24 07-Dec-24 07-Dec-24, lIFTING STATION 04 (IN ZONE 11)

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
147 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ENGINEERING 283 02-Jan-24 07-Dec-24 07-Dec-24, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 283 02-Jan-24 07-Dec-24 07-Dec-24, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 78 02-Jan-24 02-Apr-24 02-Apr-24, EARTH WORKS
LS4-EN-SD-EW.10 Shoring Design Preparation & Submission 14 02-Jan-24 18-Jan-24 Shoring Design Preparation & Submission

LS4-EN-SD-EW.15 Soil Improvement Design Preparation & Submission 14 29-Feb-24 17-Mar-24 Soil Improvement Design Preparation & Submission

LS4-EN-SD-EW.20 Shoring Design Review & Approval 14 18-Jan-24 04-Feb-24 Shoring Design Review & Approval

LS4-EN-SD-EW.25 Soil Improvement Design Review & Approval 14 17-Mar-24 02-Apr-24 Soil Improvement Design Review & Approval

STRUCTURE 136 06-Mar-24 20-Aug-24 20-Aug-24, STRUCTURE


LS4-EN-SD-STR.10 Foundation Shop Drawings Preparation & Submission 14 06-Mar-24 21-Mar-24 Foundation Shop Drawings Preparation & Submission

LS4-EN-SD-STR.15 Foundation Shop Drawings Review & Approval 14 13-Apr-24 29-Apr-24 Foundation Shop Drawings Review & Approval

LS4-EN-SD-STR.20 Walls Shop Drawings Preparation & Submission 14 17-Apr-24 04-May-24 Walls Shop Drawings Preparation & Submission

LS4-EN-SD-STR.25 Walls Shop Drawings Review & Approval 14 04-May-24 20-May-24 Walls Shop Drawings Review & Approval

LS4-EN-SD-STR.30 Slab Shop Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Slab Shop Drawings Preparation & Submission

LS4-EN-SD-STR.35 Slab Shop Drawings Review & Approval 14 04-Aug-24 20-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 228 06-Mar-24 07-Dec-24 07-Dec-24, MECHANICAL


FIRE FIGHTING SYSTEM 220 06-Mar-24 27-Nov-24 27-Nov-24, FIRE FIGHTING SYSTEM
LS4-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Preparation & Submission 14 06-Mar-24 21-Mar-24 Fire Fighting Shop Drawings Preparation & Submission

LS4-EN-SD-M-FFS.1 Fire Fighting Shop Drawings Review & Approval 14 11-Nov-24 27-Nov-24 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 50 09-Oct-24 07-Dec-24 07-Dec-24, VENTILATION SYSTEM/AIR CONDITIONING WORKS
LS4-EN-SD-M-VS.10 HVAC Shop Drawings Preparation & Submission 14 09-Oct-24 26-Oct-24 HVAC Shop Drawings Preparation & Submission

LS4-EN-SD-M-VS.15 HVAC Shop Drawings Review & Approval 14 20-Nov-24 07-Dec-24 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 26-Oct-24 27-Nov-24 27-Nov-24, PLUMBING SYSTEM


LS4-EN-SD-M-PS.10 Plumbing System Shop Drawings Preparation & Submission 14 26-Oct-24 11-Nov-24 Plumbing System Shop Drawings Preparation & Submission

LS4-EN-SD-M-PS.15 Plumbing System Shop Drawings Review & Approval 14 11-Nov-24 27-Nov-24 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 211 06-Mar-24 17-Nov-24 17-Nov-24, ELECTRICAL


CABLE TRAYS 173 06-Mar-24 03-Oct-24 03-Oct-24, CABLE TRAYS
LS4-EN-SD-E-CT.10 Cable Tray Shop Drawings Preparation & Submission 14 06-Mar-24 21-Mar-24 Cable Tray Shop Drawings Preparation & Submission

LS4-EN-SD-E-CT.15 Cable Tray Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 171 23-Mar-24 17-Oct-24 17-Oct-24, POWER CABLES


LS4-EN-SD-E-PC.10 Power Cables Shop Drawings Preparation & Submission 14 23-Mar-24 07-Apr-24 Power Cables Shop Drawings Preparation & Submission

LS4-EN-SD-E-PC.15 Power Cables Shop Drawings Review & Approval 12 03-Oct-24 17-Oct-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 146 07-Apr-24 03-Oct-24 03-Oct-24, LIGHTING SYSTEM


LS4-EN-SD-E-LS.10 Lighting System Shop Drawings Preparation & Submission 14 07-Apr-24 27-Apr-24 Lighting System Shop Drawings Preparation & Submission

LS4-EN-SD-E-LS.15 Lighting System Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 140 27-Apr-24 13-Oct-24 13-Oct-24, ELECTRICAL INSTALLATIONS
LS4-EN-SD-E-EI10 Electrical Installations Shop Drawings Preparation & Submission 14 27-Apr-24 13-May-24 Electrical Installations Shop Drawings Preparation & Submission

LS4-EN-SD-E-EI15 Electrical Installations Shop Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 118 13-May-24 03-Oct-24 03-Oct-24, LIGHTNING PROTECTION SYSTEM
LS4-EN-SD-E-LPS.10 Lightning Protection Drawings Preparation & Submission 14 13-May-24 29-May-24 Lightning Protection Drawings Preparation & Submission

LS4-EN-SD-E-LPS.15 Lightning Protection Shop Drawings Review & Approval 12 18-Sep-24 03-Oct-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 112 29-May-24 13-Oct-24 13-Oct-24, EARTHING SYSTEM


LS4-EN-SD-E-ES.10 Earthing System Shop Drawings Preparation & Submission 14 29-May-24 19-Jun-24 Earthing System Shop Drawings Preparation & Submission

LS4-EN-SD-E-ES.15 Earthing System Drawings Review & Approval 12 29-Sep-24 13-Oct-24 Earthing System Drawings Review & Approval

LOW CURRENT 128 19-Jun-24 17-Nov-24 17-Nov-24, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 119 19-Jun-24 06-Nov-24 06-Nov-24, FIRE DETECTION AND ALARM SYSTEM
LS4-EN-SD-E-LCFD Fire Alarm Shop Drawings Preparation & Submission 14 19-Jun-24 06-Jul-24 Fire Alarm Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCFD Fire Alarm Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 72 13-Aug-24 06-Nov-24 06-Nov-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
LS4-EN-SD-E-LCCS Telephone Shop Drawings Preparation & Submission 14 13-Aug-24 28-Aug-24 Telephone Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
148 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LS4-EN-SD-E-LCCS Telephone Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 28-Aug-24 17-Nov-24 17-Nov-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
LS4-EN-SD-E-LCVE Public Address system Shop Drawings Preparation & Submission 14 28-Aug-24 14-Sep-24 Public Address system Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCVE Public Address system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 14-Sep-24 06-Nov-24 06-Nov-24, VIDEO SURVEILLANCE


LS4-EN-SD-E-LCVS Video Surveillance system Shop Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Video Surveillance system Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCVS Video Surveillance system Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 01-Oct-24 06-Nov-24 06-Nov-24, ACCESS CONTROL SYSTEM
LS4-EN-SD-E-LCAC Access Control system Shop Drawings Preparation & Submission 14 01-Oct-24 17-Oct-24 Access Control system Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCAC Access Control system Shop Drawings Review & Approval 12 23-Oct-24 06-Nov-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 17-Oct-24 17-Nov-24 17-Nov-24, RADIO RE-BROADCASTING SYSTEM
LS4-EN-SD-E-LCRR Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCRR Radio Re Broadcasting system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 17-Oct-24 17-Nov-24 17-Nov-24, SCADA SYSTEM


LS4-EN-SD-E-LCSS SCADA system Shop Drawings Preparation & Submission 14 17-Oct-24 03-Nov-24 SCADA system Shop Drawings Preparation & Submission

LS4-EN-SD-E-LCSS SCADA system Shop Drawings Review & Approval 12 03-Nov-24 17-Nov-24 SCADA system Shop Drawings Review & Approval

lIFTING STATION 05 (IN ZONE 04) 446 18-Jan-24 09-Jul-25 09-Jul-25, lIFTING STATION 05 (IN ZONE 04)
ENGINEERING 446 18-Jan-24 09-Jul-25 09-Jul-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 446 18-Jan-24 09-Jul-25 09-Jul-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 18-Jan-24 20-Feb-24 20-Feb-24, EARTH WORKS
JAH-ENG-SH-LS05.97 Shoring Design Preparation & Submission 14 18-Jan-24 04-Feb-24 Shoring Design Preparation & Submission

JAH-ENG-SH-LS05.98 Shoring Design Review & Approval 14 04-Feb-24 20-Feb-24 Shoring Design Review & Approval

STRUCTURE 195 16-Nov-24 09-Jul-25 09-Jul-25, STRUCTURE


PMP.3-ENG-CV-ST.130 Foundation Shop Drawings Preparation & Submission 14 16-Nov-24 02-Dec-24 Foundation Shop Drawings Preparation & Submission

PMP.3-ENG-CV-ST.135 Foundation Shop Drawings Review & Approval 14 25-Jan-25 09-Feb-25 Foundation Shop Drawings Review & Approval

PMP.3-ENG-CV-ST.140 Walls Shop Drawings Preparation & Submission 14 01-Mar-25 16-Mar-25 Walls Shop Drawings Preparation & Submission

PMP.3-ENG-CV-ST.145 Walls Shop Drawings Review & Approval 14 16-Mar-25 06-Apr-25 Walls Shop Drawings Review & Approval

PMP.3-ENG-CV-ST.150 Slab Shop Drawings Preparation & Submission 14 03-Jun-25 23-Jun-25 Slab Shop Drawings Preparation & Submission

PMP.3-ENG-CV-ST.155 Slab Shop Drawings Review & Approval 14 23-Jun-25 09-Jul-25 Slab Shop Drawings Review & Approval

MECHANICAL 160 02-Dec-24 14-Jun-25 14-Jun-25, MECHANICAL


FIRE FIGHTING SYSTEM 160 02-Dec-24 14-Jun-25 14-Jun-25, FIRE FIGHTING SYSTEM
PMP.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 02-Dec-24 18-Dec-24 Fire Fighting Shop Drawings Preparation & Submission

PMP.3-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 23-Apr-25 14-Jun-25 14-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
PMP.3-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 23-Apr-25 10-May-25 HVAC Shop Drawings Preparation & Submission

PMP.3-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 10-May-25 14-Jun-25 14-Jun-25, PLUMBING SYSTEM


PMP.3-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 10-May-25 26-May-25 Plumbing System Shop Drawings Preparation & Submission

PMP.3-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 26-May-25 14-Jun-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 137 18-Dec-24 01-Jun-25 01-Jun-25, ELECTRICAL


CABLE TRAYS 100 18-Dec-24 17-Apr-25 17-Apr-25, CABLE TRAYS
PMP.3-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 18-Dec-24 02-Jan-25 Cable Tray Shop Drawings Preparation & Submission

PMP.3-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 03-Apr-25 17-Apr-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 46 18-Feb-25 17-Apr-25 17-Apr-25, POWER CABLES


PMP.3-ENG-EL-PC.11 Power Cables Shop Drawings Preparation & Submission 14 18-Feb-25 06-Mar-25 Power Cables Shop Drawings Preparation & Submission

PMP.3-ENG-EL-PC.11 Power Cables Shop Drawings Review & Approval 12 03-Apr-25 17-Apr-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 40 06-Mar-25 27-Apr-25 27-Apr-25, LIGHTING SYSTEM


PMP.3-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 06-Mar-25 23-Mar-25 Lighting System Shop Drawings Preparation & Submission

PMP.3-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Lighting System Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
149 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ELECTRICAL INSTALLATIONS
INSTALLAT 26 23-Mar-25 27-Apr-25 27-Apr-25, ELECTRICAL INSTALLATIONS
PMP.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 23-Mar-25 13-Apr-25 Electrical Installations Shop Drawings Preparation & Submission

PMP.3-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 101 04-Jan-25 06-May-25 06-May-25, LIGHTNING PROTECTION SYSTEM
PMP.3-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 04-Jan-25 19-Jan-25 Lightning Protection Drawings Preparation & Submission

PMP.3-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 88 19-Jan-25 06-May-25 06-May-25, EARTHING SYSTEM


PMP.3-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 19-Jan-25 04-Feb-25 Earthing System Shop Drawings Preparation & Submission

PMP.3-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 22-Apr-25 06-May-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 04-Feb-25 01-Jun-25 01-Jun-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 04-Feb-25 21-May-25 21-May-25, FIRE DETECTION AND ALARM SYSTEM
PMP.3-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 04-Feb-25 20-Feb-25 Fire Alarm Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 07-May-25 21-May-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 20-Feb-25 21-May-25 21-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
PMP.3-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 20-Feb-25 09-Mar-25 Telephone Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 07-May-25 21-May-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 09-Mar-25 01-Jun-25 01-Jun-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
PMP.3-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 09-Mar-25 25-Mar-25 Public Address system Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 25-Mar-25 21-May-25 21-May-25, VIDEO SURVEILLANCE


PMP.3-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 25-Mar-25 15-Apr-25 Video Surveillance system Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 07-May-25 21-May-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 15-Apr-25 21-May-25 21-May-25, ACCESS CONTROL SYSTEM
PMP.3-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 15-Apr-25 01-May-25 Access Control system Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 07-May-25 21-May-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 01-May-25 01-Jun-25 01-Jun-25, RADIO RE-BROADCASTING SYSTEM
PMP.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 01-May-25 18-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 01-May-25 01-Jun-25 01-Jun-25, SCADA SYSTEM


PMP.3-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 01-May-25 18-May-25 SCADA system Shop Drawings Preparation & Submission

PMP.3-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 18-May-25 01-Jun-25 SCADA system Shop Drawings Review & Approval

lIFTING STATION 01 (IN ZONE 03) 418 04-Feb-24 23-Jun-25 23-Jun-25, lIFTING STATION 01 (IN ZONE 03)
ENGINEERING 418 04-Feb-24 23-Jun-25 23-Jun-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMITT AND APPROVAL 418 04-Feb-24 23-Jun-25 23-Jun-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 78 04-Feb-24 08-May-24 08-May-24, EARTH WORKS
JAH-ENG-SH-LS06.98 Shoring Design Preparation & Submission 14 04-Feb-24 20-Feb-24 Shoring Design Preparation & Submission

JAH-ENG-SH-LS06.99 Shoring Design Review & Approval 14 20-Feb-24 07-Mar-24 Shoring Design Review & Approval

JAH-ENG-SI-LS06.100 Soil Improvement Design Review & Approval 14 22-Apr-24 08-May-24 Soil Improvement Design Review & Approval

JAH-ENG-SI-LS06.995 Soil Improvement Design Preparation & Submission 14 02-Apr-24 22-Apr-24 Soil Improvement Design Preparation & Submission

STRUCTURE 166 04-Mar-24 22-Sep-24 22-Sep-24, STRUCTURE


PMP.4-ENG-CV-ST.130 Foundation Shop Drawings Preparation & Submission 14 04-Mar-24 20-Mar-24 Foundation Shop Drawings Preparation & Submission

PMP.4-ENG-CV-ST.140 Foundation Shop Drawings Review & Approval 14 20-Mar-24 06-Apr-24 Foundation Shop Drawings Review & Approval

PMP.4-ENG-CV-ST.150 Walls Shop Drawings Preparation & Submission 14 16-May-24 02-Jun-24 Walls Shop Drawings Preparation & Submission

PMP.4-ENG-CV-ST.160 Walls Shop Drawings Review & Approval 14 02-Jun-24 23-Jun-24 Walls Shop Drawings Review & Approval

PMP.4-ENG-CV-ST.170 Slab Shop Drawings Preparation & Submission 14 20-Aug-24 05-Sep-24 Slab Shop Drawings Preparation & Submission

PMP.4-ENG-CV-ST.180 Slab Shop Drawings Review & Approval 14 05-Sep-24 22-Sep-24 Slab Shop Drawings Review & Approval

MECHANICAL 160 11-Dec-24 23-Jun-25 23-Jun-25, MECHANICAL


FIRE FIGHTING SYSTEM 160 11-Dec-24 23-Jun-25 23-Jun-25, FIRE FIGHTING SYSTEM
PMP.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 11-Dec-24 26-Dec-24 Fire Fighting Shop Drawings Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
150 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PMP.4-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM/ CONDITIONING WORKS 42 03-May-25 23-Jun-25 23-Jun-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
PMP.4-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 03-May-25 19-May-25 HVAC Shop Drawings Preparation & Submission

PMP.4-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 19-May-25 23-Jun-25 23-Jun-25, PLUMBING SYSTEM


PMP.4-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 19-May-25 03-Jun-25 Plumbing System Shop Drawings Preparation & Submission

PMP.4-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 04-Jun-25 23-Jun-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 137 28-Dec-24 12-Jun-25 12-Jun-25, ELECTRICAL


CABLE TRAYS 100 28-Dec-24 27-Apr-25 27-Apr-25, CABLE TRAYS
PMP.4-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 28-Dec-24 12-Jan-25 Cable Tray Shop Drawings Preparation & Submission

PMP.4-ENG-EL-CT.12 Cable Tray Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Cable Tray Shop Drawings Review & Approval

POWER CABLES 58 09-Mar-25 20-May-25 20-May-25, POWER CABLES


PMP.4-ENG-EL-PC.11 Power Cables Shop Drawings Preparation & Submission 14 09-Mar-25 25-Mar-25 Power Cables Shop Drawings Preparation & Submission

PMP.4-ENG-EL-PC.12 Power Cables Shop Drawings Review & Approval 12 06-May-25 20-May-25 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 32 25-Mar-25 06-May-25 06-May-25, LIGHTING SYSTEM


PMP.4-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 25-Mar-25 15-Apr-25 Lighting System Shop Drawings Preparation & Submission

PMP.4-ENG-EL-LS.12 Lighting System Shop Drawings Review & Approval 12 22-Apr-25 06-May-25 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLAT 26 15-Apr-25 15-May-25 15-May-25, ELECTRICAL INSTALLATIONS
PMP.4-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 15-Apr-25 01-May-25 Electrical Installations Shop Drawings Preparation & Submission

PMP.4-ENG-EL-EI.12 Electrical Installations Shop Drawings Review & Approval 12 01-May-25 15-May-25 Electrical Installations Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTIO SYSTEM 86 12-Jan-25 27-Apr-25 27-Apr-25, LIGHTNING PROTECTION SYSTEM
PMP.4-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 12-Jan-25 28-Jan-25 Lightning Protection Drawings Preparation & Submission

PMP.4-ENG-EL-LP.12 Lightning Protection Shop Drawings Review & Approval 12 13-Apr-25 27-Apr-25 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 88 28-Jan-25 15-May-25 15-May-25, EARTHING SYSTEM


PMP.4-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 28-Jan-25 13-Feb-25 Earthing System Shop Drawings Preparation & Submission

PMP.4-ENG-EL-ES.12 Earthing System Drawings Review & Approval 12 01-May-25 15-May-25 Earthing System Drawings Review & Approval

LOW CURRENT 95 13-Feb-25 12-Jun-25 12-Jun-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 13-Feb-25 31-May-25 31-May-25, FIRE DETECTION AND ALARM SYSTEM
PMP.4-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 13-Feb-25 02-Mar-25 Fire Alarm Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 17-May-25 31-May-25 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYS
SYSTEM/ EMERGENCY TELEPHONE 73 02-Mar-25 31-May-25 31-May-25, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
PMP.4-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 02-Mar-25 18-Mar-25 Telephone Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 17-May-25 31-May-25 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 18-Mar-25 12-Jun-25 12-Jun-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
PMP.4-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 18-Mar-25 08-Apr-25 Public Address system Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE 45 08-Apr-25 31-May-25 31-May-25, VIDEO SURVEILLANCE


PMP.4-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 08-Apr-25 24-Apr-25 Video Surveillance system Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 17-May-25 31-May-25 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SY
SYSTEM 31 24-Apr-25 31-May-25 31-May-25, ACCESS CONTROL SYSTEM
PMP.4-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 24-Apr-25 11-May-25 Access Control system Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 17-May-25 31-May-25 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 11-May-25 12-Jun-25 12-Jun-25, RADIO RE-BROADCASTING SYSTEM
PMP.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 Radio Re Broadcasting system Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 11-May-25 12-Jun-25 12-Jun-25, SCADA SYSTEM


PMP.4-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 11-May-25 27-May-25 SCADA system Shop Drawings Preparation & Submission

PMP.4-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 27-May-25 12-Jun-25 SCADA system Shop Drawings Review & Approval

IRRIGATION & FIRE FIGHTING


FIGH PUMP STATION ( 2 NOS) 406 02-Dec-23 27-Mar-25 27-Mar-25, IRRIGATION & FIRE FIGHTING PUMP STATION ( 2 NOS)

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
151 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
IRRIGATION & FIRE FIG
FIGHTING PUMP STATION SOUTH STATION 357 02-Dec-23 29-Jan-25 29-Jan-25, IRRIGATION & FIRE FIGHTING PUMP STATION SOUTH STATION
SOUTH STATION 357 02-Dec-23 29-Jan-25 29-Jan-25, SOUTH STATION
ENGINEERING 357 02-Dec-23 29-Jan-25 29-Jan-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMIT AND APPROVAL 357 02-Dec-23 29-Jan-25 29-Jan-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
IRS-ENG-SH-LS02.94 Shoring Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Shoring Design Preparation & Submission

IRS-ENG-SH-LS02.95 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval

IRS-ENG-SI-LS02.955 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

IRS-ENG-SI-LS02.960 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 194 02-Jan-24 24-Aug-24 24-Aug-24, STRUCTURE


IRS.1-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Preparation & Submission

IRS.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 18-Jan-24 04-Feb-24 Foundation Shop Drawings Review & Approval

IRS.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 31-Mar-24 20-Apr-24 Walls Shop Drawings Preparation & Submission

IRS.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 20-Apr-24 06-May-24 Walls Shop Drawings Review & Approval

IRS.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 22-Jul-24 07-Aug-24 Slab Shop Drawings Preparation & Submission

IRS.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 07-Aug-24 24-Aug-24 Slab Shop Drawings Review & Approval

MECHANICAL 261 21-Mar-24 29-Jan-25 29-Jan-25, MECHANICAL


FIRE FIGHTING SYSTEM
SYSTE 238 21-Mar-24 02-Jan-25 02-Jan-25, FIRE FIGHTING SYSTEM
IRS.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Fire Fighting Shop Drawings Preparation & Submission

IRS.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 17-Dec-24 02-Jan-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM CONDITIONING WORKS 30 11-Dec-24 15-Jan-25 15-Jan-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
IRS.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 11-Dec-24 28-Dec-24 HVAC Shop Drawings Preparation & Submission

IRS.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 30-Dec-24 15-Jan-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 28-Dec-24 29-Jan-25 29-Jan-25, PLUMBING SYSTEM


IRS.1-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 Plumbing System Shop Drawings Preparation & Submission

IRS.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 13-Jan-25 29-Jan-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 229 21-Mar-24 23-Dec-24 23-Dec-24, ELECTRICAL


CABLE TRAYS 109 21-Mar-24 04-Aug-24 04-Aug-24, CABLE TRAYS
IRS.1-ENG-EL-CT.11 Cable Tray Shop Drawings Preparation & Submission 14 21-Mar-24 07-Apr-24 Cable Tray Shop Drawings Preparation & Submission

IRS.1-ENG-EL-CT.11 Cable Tray Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 95 07-Apr-24 04-Aug-24 04-Aug-24, POWER CABLES


IRS.1-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 07-Apr-24 25-Apr-24 Power Cables Shop Drawings Preparation & Submission

IRS.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 81 27-Apr-24 04-Aug-24 04-Aug-24, LIGHTING SYSTEM


IRS.1-ENG-EL-LS.11 Lighting System Shop Drawings Preparation & Submission 14 27-Apr-24 12-May-24 Lighting System Shop Drawings Preparation & Submission

IRS.1-ENG-EL-LS.11 Lighting System Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLA 150 12-May-24 10-Nov-24 10-Nov-24, ELECTRICAL INSTALLATIONS
IRS.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 12-May-24 28-May-24 Electrical Installations Shop Drawings Preparation & Submission

IRS.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INST 136 28-May-24 10-Nov-24 10-Nov-24, TRANSFORMERS INSTALLATION
IRS.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 28-May-24 13-Jun-24 Transformers Installation Shop Drawings Preparation & Submission

IRS.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 27-Oct-24 10-Nov-24 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTI SYSTEM 40 13-Jun-24 04-Aug-24 04-Aug-24, LIGHTNING PROTECTION SYSTEM
IRS.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 13-Jun-24 04-Jul-24 Lightning Protection Drawings Preparation & Submission

IRS.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 26 04-Jul-24 04-Aug-24 04-Aug-24, EARTHING SYSTEM


IRS.1-ENG-EL-ES.11 Earthing System Shop Drawings Preparation & Submission 14 04-Jul-24 21-Jul-24 Earthing System Shop Drawings Preparation & Submission

IRS.1-ENG-EL-ES.11 Earthing System Drawings Review & Approval 12 21-Jul-24 04-Aug-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 02-Sep-24 23-Dec-24 23-Dec-24, LOW CURRENT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
152 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
FIRE DETECTION AND ALARM SYSTEM 86 02-Sep-24 12-Dec-24 12-Dec-24, FIRE DETECTION AND ALARM SYSTEM
IRS.1-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 02-Sep-24 18-Sep-24 Fire Alarm Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SY EMERGENCY TELEPHONE 73 18-Sep-24 12-Dec-24 12-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
IRS.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 18-Sep-24 06-Oct-24 Telephone Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 06-Oct-24 23-Dec-24 23-Dec-24, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
IRS.1-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 06-Oct-24 21-Oct-24 Public Address system Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE
SURVEILLANC 45 22-Oct-24 12-Dec-24 12-Dec-24, VIDEO SURVEILLANCE
IRS.1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 22-Oct-24 06-Nov-24 Video Surveillance system Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 31 06-Nov-24 12-Dec-24 12-Dec-24, ACCESS CONTROL SYSTEM
IRS.1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Access Control system Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 23-Nov-24 23-Dec-24 23-Dec-24, RADIO RE-BROADCASTING SYSTEM
IRS.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 23-Nov-24 23-Dec-24 23-Dec-24, SCADA SYSTEM


IRS.1-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 SCADA system Shop Drawings Preparation & Submission

IRS.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 09-Dec-24 23-Dec-24 SCADA system Shop Drawings Review & Approval

IRRIGATION & FIRE FIG


FIGHTING PUMP STATION NORTH STATION 406 02-Dec-23 27-Mar-25 27-Mar-25, IRRIGATION & FIRE FIGHTING PUMP STATION NORTH STATION
NORTH STATION 406 02-Dec-23 27-Mar-25 27-Mar-25, NORTH STATION
ENGINEERING 406 02-Dec-23 27-Mar-25 27-Mar-25, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBMIT AND APPROVAL 406 02-Dec-23 27-Mar-25 27-Mar-25, SHOP DRAWING SUBMITTAL AND APPROVAL
EARTH WORKS 28 02-Dec-23 02-Jan-24 02-Jan-24, EARTH WORKS
IRN-ENG-SH-LS02.9 Shoring Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Shoring Design Preparation & Submission

IRN-ENG-SH-LS02.9 Shoring Design Review & Approval 14 17-Dec-23 02-Jan-24 Shoring Design Review & Approval

IRN-ENG-SI-LS02.95 Soil Improvement Design Preparation & Submission 14 02-Dec-23 17-Dec-23 Soil Improvement Design Preparation & Submission

IRN-ENG-SI-LS02.96 Soil Improvement Design Review & Approval 14 17-Dec-23 02-Jan-24 Soil Improvement Design Review & Approval

STRUCTURE 116 02-Jan-24 21-May-24 21-May-24, STRUCTURE


IRN.1-ENG-CV-ST.13 Foundation Shop Drawings Preparation & Submission 14 02-Jan-24 18-Jan-24 Foundation Shop Drawings Preparation & Submission

IRN.1-ENG-CV-ST.13 Foundation Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Foundation Shop Drawings Review & Approval

IRN.1-ENG-CV-ST.14 Walls Shop Drawings Preparation & Submission 14 18-Jan-24 04-Feb-24 Walls Shop Drawings Preparation & Submission

IRN.1-ENG-CV-ST.14 Walls Shop Drawings Review & Approval 14 05-May-24 21-May-24 Walls Shop Drawings Review & Approval

IRN.1-ENG-CV-ST.15 Slab Shop Drawings Preparation & Submission 14 04-Feb-24 20-Feb-24 Slab Shop Drawings Preparation & Submission

IRN.1-ENG-CV-ST.15 Slab Shop Drawings Review & Approval 14 20-Feb-24 07-Mar-24 Slab Shop Drawings Review & Approval

MECHANICAL 249 23-Apr-24 15-Feb-25 15-Feb-25, MECHANICAL


FIRE FIGHTING SYSTEM
SYSTE 226 23-Apr-24 19-Jan-25 19-Jan-25, FIRE FIGHTING SYSTEM
IRN.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Fire Fighting Shop Drawings Preparation & Submission

IRN.1-ENG-MC-ST.1 Fire Fighting Shop Drawings Review & Approval 14 02-Jan-25 19-Jan-25 Fire Fighting Shop Drawings Review & Approval

VENTILATION SYSTEM/AIR
SYSTEM CONDITIONING WORKS 30 28-Dec-24 01-Feb-25 01-Feb-25, VENTILATION SYSTEM/AIR CONDITIONING WORKS
IRN.1-ENG-MC-HC. HVAC Shop Drawings Preparation & Submission 14 28-Dec-24 13-Jan-25 HVAC Shop Drawings Preparation & Submission

IRN.1-ENG-MC-HC. HVAC Shop Drawings Review & Approval 14 15-Jan-25 01-Feb-25 HVAC Shop Drawings Review & Approval

PLUMBING SYSTEM 28 13-Jan-25 15-Feb-25 15-Feb-25, PLUMBING SYSTEM


IRN.1-ENG-MC-PI.1 Plumbing System Shop Drawings Preparation & Submission 14 13-Jan-25 29-Jan-25 Plumbing System Shop Drawings Preparation & Submission

IRN.1-ENG-MC-PI.1 Plumbing System Shop Drawings Review & Approval 14 29-Jan-25 15-Feb-25 Plumbing System Shop Drawings Review & Approval

ELECTRICAL 285 23-Apr-24 27-Mar-25 27-Mar-25, ELECTRICAL


CABLE TRAYS 109 23-Apr-24 03-Sep-24 03-Sep-24, CABLE TRAYS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
153 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
IRN.1-ENG-EL-CT.1 Cable Tray Shop Drawings Preparation & Submission 14 23-Apr-24 09-May-24 Cable Tray Shop Drawings Preparation & Submission

IRN.1-ENG-EL-CT.1 Cable Tray Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Cable Tray Shop Drawings Review & Approval

POWER CABLES 95 09-May-24 03-Sep-24 03-Sep-24, POWER CABLES


IRN.1-ENG-EL-PC.1 Power Cables Shop Drawings Preparation & Submission 14 09-May-24 26-May-24 Power Cables Shop Drawings Preparation & Submission

IRN.1-ENG-EL-PC.1 Power Cables Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Power Cables Shop Drawings Review & Approval

LIGHTING SYSTEM 81 26-May-24 03-Sep-24 03-Sep-24, LIGHTING SYSTEM


IRN.1-ENG-EL-LS.1 Lighting System Shop Drawings Preparation & Submission 14 26-May-24 11-Jun-24 Lighting System Shop Drawings Preparation & Submission

IRN.1-ENG-EL-LS.1 Lighting System Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Lighting System Shop Drawings Review & Approval

ELECTRICAL INSTALLATIONS
INSTALLA 138 11-Jun-24 25-Nov-24 25-Nov-24, ELECTRICAL INSTALLATIONS
IRN.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Preparation & Submission 14 11-Jun-24 02-Jul-24 Electrical Installations Shop Drawings Preparation & Submission

IRN.1-ENG-EL-EI.11 Electrical Installations Shop Drawings Review & Approval 12 12-Nov-24 25-Nov-24 Electrical Installations Shop Drawings Review & Approval

TRANSFORMERS INSTALLATION
INST 229 02-Jul-24 27-Mar-25 27-Mar-25, TRANSFORMERS INSTALLATION
IRN.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Preparation & Submission 14 02-Jul-24 18-Jul-24 Transformers Installation Shop Drawings Preparation & Submission

IRN.1-ENG-EL-TI.11 Transformers Installation Shop Drawings Review & Approval 12 15-Mar-25 27-Mar-25 Transformers Installation Shop Drawings Review & Approval

LIGHTNING PROTECTION
PROTECTI SYSTEM 40 18-Jul-24 03-Sep-24 03-Sep-24, LIGHTNING PROTECTION SYSTEM
IRN.1-ENG-EL-LP.11 Lightning Protection Drawings Preparation & Submission 14 18-Jul-24 04-Aug-24 Lightning Protection Drawings Preparation & Submission

IRN.1-ENG-EL-LP.11 Lightning Protection Shop Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Lightning Protection Shop Drawings Review & Approval

EARTHING SYSTEM 26 04-Aug-24 03-Sep-24 03-Sep-24, EARTHING SYSTEM


IRN.1-ENG-EL-ES.1 Earthing System Shop Drawings Preparation & Submission 14 04-Aug-24 20-Aug-24 Earthing System Shop Drawings Preparation & Submission

IRN.1-ENG-EL-ES.1 Earthing System Drawings Review & Approval 12 20-Aug-24 03-Sep-24 Earthing System Drawings Review & Approval

LOW CURRENT 95 18-Sep-24 08-Jan-25 08-Jan-25, LOW CURRENT


FIRE DETECTION AND ALARM SYSTEM 86 18-Sep-24 29-Dec-24 29-Dec-24, FIRE DETECTION AND ALARM SYSTEM
IRN.1-ENG-ELL-FA Fire Alarm Shop Drawings Preparation & Submission 14 18-Sep-24 05-Oct-24 Fire Alarm Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-FA Fire Alarm Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Fire Alarm Shop Drawings Review & Approval

COMMUNICATION SYSTEM/
SY EMERGENCY TELEPHONE 73 05-Oct-24 29-Dec-24 29-Dec-24, COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
IRN.1-ENG-ELL-PH Telephone Shop Drawings Preparation & Submission 14 05-Oct-24 21-Oct-24 Telephone Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-PH Telephone Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Telephone Shop Drawings Review & Approval

VOICE EVACAUTION AND


A PUBLIC ADDRESS SYSTEM 68 21-Oct-24 08-Jan-25 08-Jan-25, VOICE EVACAUTION AND PUBLIC ADDRESS SYSTEM
IRN.1-ENG-ELL-PA Public Address system Shop Drawings Preparation & Submission 14 21-Oct-24 06-Nov-24 Public Address system Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-PA Public Address system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 Public Address system Shop Drawings Review & Approval

VIDEO SURVEILLANCE
SURVEILLANC 45 06-Nov-24 29-Dec-24 29-Dec-24, VIDEO SURVEILLANCE
IRN.1-ENG-ELL-VS Video Surveillance system Shop Drawings Preparation & Submission 14 06-Nov-24 23-Nov-24 Video Surveillance system Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-VS Video Surveillance system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Video Surveillance system Shop Drawings Review & Approval

ACCESS CONTROL SYSTEM


SY 31 23-Nov-24 29-Dec-24 29-Dec-24, ACCESS CONTROL SYSTEM
IRN.1-ENG-ELL-AC Access Control system Shop Drawings Preparation & Submission 14 23-Nov-24 09-Dec-24 Access Control system Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-AC Access Control system Shop Drawings Review & Approval 12 15-Dec-24 29-Dec-24 Access Control system Shop Drawings Review & Approval

RADIO RE-BROADCASTING
RE-BROADCAS SYSTEM 26 09-Dec-24 08-Jan-25 08-Jan-25, RADIO RE-BROADCASTING SYSTEM
IRN.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 Radio Re Broadcasting system Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-RB Radio Re Broadcasting system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 Radio Re Broadcasting system Shop Drawings Review & Approval

SCADA SYSTEM 26 09-Dec-24 08-Jan-25 08-Jan-25, SCADA SYSTEM


IRN.1-ENG-ELL-SD SCADA system Shop Drawings Preparation & Submission 14 09-Dec-24 25-Dec-24 SCADA system Shop Drawings Preparation & Submission

IRN.1-ENG-ELL-SD SCADA system Shop Drawings Review & Approval 12 25-Dec-24 08-Jan-25 SCADA system Shop Drawings Review & Approval

PEDESTRIAN BRIDGES
BRIDGE 733 26-Feb-24 28-Jul-26 28-Jul-26, PEDESTRIAN BRIDG
BRIDGE NO.01 626 25-May-24 17-Jun-26 17-Jun-26, BRIDGE NO.01
ENGINEERING 626 25-May-24 17-Jun-26 17-Jun-26, ENGINEERING
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTURAL/ME 78 25-May-24 28-Aug-24 28-Aug-24, CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
PB1-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 25-May-24 10-Jun-24 Earthworks Shop Drawings Preparation & Submission

PB1-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 10-Jun-24 29-Jun-24 Earthworks Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
154 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB1-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 29-Jun-24 15-Jul-24 Bridge Structural Shop Drawings Submission

PB1-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 15-Jul-24 29-Jul-24 Bridge Structural Shop Drawings Review & Approval

PB1-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 29-Jul-24 14-Aug-24 Bridge Drainage Shop Drawings Preparation & Submission

PB1-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 14-Aug-24 28-Aug-24 Bridge Drainage Shop Drawings Review & Approval

ARCHITECTURAL 26 20-Aug-25 18-Sep-25 18-Sep-25, ARCHITECTURAL


PB1-EN-ARCH.100 Architectural Shop Drawings Preparation & Submission 14 20-Aug-25 06-Sep-25 Architectural Shop Drawings Preparation & Submission

PB1-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 06-Sep-25 18-Sep-25 Architectural Shop Drawings Review & Approval

DRY UTILITIES 82 15-Apr-25 23-Jul-25 23-Jul-25, DRY UTILITIES


ELEVATORS 31 15-Apr-25 21-May-25 21-May-25, ELEVATORS
PB1-EN-DU-ELEV.100 Prepare and submit elevators shopdrawings 20 15-Apr-25 08-May-25 Prepare and submit elevators shopdrawings

PB1-EN-DU-ELEV.105 Review and approval elevators shopdrawings 11 08-May-25 21-May-25 Review and approval elevators shopdrawings

LV (Elevator Panel to LV p
panel) 51 21-May-25 23-Jul-25 23-Jul-25, LV (Elevator Panel to LV panel)
PB1-EN-DU-LV.100 Prepare and submit LV elevator shopdrawings 20 21-May-25 17-Jun-25 Prepare and submit LV elevator shopdrawings

PB1-EN-DU-LV.105 Review and approval LV elevator shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval LV elevator shopdrawings

LIGHTING SYSTEM (Under


(Unde Brigde lighting)) 31 17-Jun-25 23-Jul-25 23-Jul-25, LIGHTING SYSTEM (Under Brigde lighting))
PB1-EN-DU-LS.100 Prepare and submit Lighting system shopdrawings 20 17-Jun-25 10-Jul-25 Prepare and submit Lighting system shopdrawings

PB1-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 10-Jul-25 23-Jul-25 Review and approval Lighting system shopdrawings

ELEVATOR 275 28-Aug-24 23-Jul-25 23-Jul-25, ELEVATOR


PB1-EN-ELEV.100 Elevator Structural Shop Drawings Submission 14 28-Aug-24 14-Sep-24 Elevator Structural Shop Drawings Submission

PB1-EN-ELEV.105 Elevator Structural Shop Drawings Review & Approval 12 08-Oct-24 21-Oct-24 Elevator Structural Shop Drawings Review & Approval

PB1-EN-ELEV.110 Elevator Drainage Shop Drawings Preparation & Submission 14 14-Sep-24 01-Oct-24 Elevator Drainage Shop Drawings Preparation & Submission

PB1-EN-ELEV.115 Elevator Drainage Shop Drawings Review & Approval 12 01-Oct-24 15-Oct-24 Elevator Drainage Shop Drawings Review & Approval

PB1-EN-ELEV.120 Elevator Shop Drawings Preparation & Submission 14 24-Jun-25 10-Jul-25 Elevator Shop Drawings Preparation & Submission

PB1-EN-ELEV.125 Elevator Shop Drawings Review & Approval 12 10-Jul-25 23-Jul-25 Elevator Shop Drawings Review & Approval

ROAD 113 29-Jan-26 17-Jun-26 17-Jun-26, ROAD


PB1-EN-RD.100 Plan and Profile Preparation & Submission 14 29-Jan-26 15-Feb-26 Plan and Profile Preparation & Submission

PB1-EN-RD.105 Plan and Profile Review & Approval 14 15-Feb-26 02-Mar-26 Plan and Profile Review & Approval

PB1-EN-RD.110 Road Cross Sections Preparation & Submission 14 03-Mar-26 18-Mar-26 Road Cross Sections Preparation & Submission

PB1-EN-RD.115 Road Cross Sections Review & Approval 14 18-Mar-26 08-Apr-26 Road Cross Sections Review & Approval

PB1-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 13-May-26 01-Jun-26 Guiding Signs and Marking Preparation

PB1-EN-RD.125 Guiding Signs and Marking Review & Approval 14 02-Jun-26 17-Jun-26 Guiding Signs and Marking Review &

BRIDGE NO.02 662 23-May-24 28-Jul-26 28-Jul-26, BRIDGE NO.02


ENGINEERING 662 23-May-24 28-Jul-26 28-Jul-26, ENGINEERING
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTURAL/ME 78 23-May-24 27-Aug-24 27-Aug-24, CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
PB2-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 23-May-24 09-Jun-24 Earthworks Shop Drawings Preparation & Submission

PB2-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 09-Jun-24 27-Jun-24 Earthworks Shop Drawings Review & Approval

PB2-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 27-Jun-24 14-Jul-24 Bridge Structural Shop Drawings Submission

PB2-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 14-Jul-24 28-Jul-24 Bridge Structural Shop Drawings Review & Approval

PB2-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 28-Jul-24 13-Aug-24 Bridge Drainage Shop Drawings Preparation & Submission

PB2-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 13-Aug-24 27-Aug-24 Bridge Drainage Shop Drawings Review & Approval

ARCHITECTURAL 26 27-Aug-24 26-Sep-24 26-Sep-24, ARCHITECTURAL


PB2-EN-ARCH.100 Architectural Shop Drawings Preparation & Submission 14 27-Aug-24 12-Sep-24 Architectural Shop Drawings Preparation & Submission

PB2-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 12-Sep-24 26-Sep-24 Architectural Shop Drawings Review & Approval

ELEVATOR 54 20-Sep-25 23-Nov-25 23-Nov-25, ELEVATOR


PB2-EN-ELE.100 Elevator Structural Shop Drawings Submission 14 20-Sep-25 07-Oct-25 Elevator Structural Shop Drawings Submission

PB2-EN-ELE.105 Elevator Structural Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Structural Shop Drawings Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
155 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB2-EN-ELE.110 Elevator Drainage Shop Drawings Preparation & Submission 14 07-Oct-25 23-Oct-25 Elevator Drainage Shop Drawings Preparation & Submission

PB2-EN-ELE.115 Elevator Drainage Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Drainage Shop Drawings Review & Approval

PB2-EN-ELE.120 Elevator Shop Drawings Preparation & Submission 14 23-Oct-25 09-Nov-25 Elevator Shop Drawings Preparation & Submission

PB2-EN-ELE.125 Elevator Shop Drawings Review & Approval 12 09-Nov-25 23-Nov-25 Elevator Shop Drawings Review & Approval

DRY UTILITIES 77 04-Mar-26 10-Jun-26 10-Jun-26, DRY UTILITIES


ELEVATORS 31 04-Mar-26 14-Apr-26 14-Apr-26, ELEVATORS
PB2-EN-DU-ELEV.100 Prepare and submit elevators shopdrawings 20 04-Mar-26 01-Apr-26 Prepare and submit elevators shopdrawings

PB2-EN-DU-ELEV.105 Review and approval elevators shopdrawings 11 01-Apr-26 14-Apr-26 Review and approval elevators shopdrawings

LV (Elevator Panel to LV p
panel) 31 23-Apr-26 02-Jun-26 02-Jun-26, LV (Elevator Panel to LV pan
PB2-EN-DU-LV.100 Prepare and submit LV elevator shopdrawings 20 23-Apr-26 17-May-26 Prepare and submit LV elevator shopdraw

PB2-EN-DU-LV.105 Review and approval LV elevator shopdrawings 11 17-May-26 02-Jun-26 Review and approval LV elevator shopd

LIGHTING SYSTEM (Under


(Unde Brigde lighting)) 31 02-May-26 10-Jun-26 10-Jun-26, LIGHTING SYSTEM (Un
PB2-EN-DU-LS.100 Prepare and submit Lighting system shopdrawings 20 02-May-26 25-May-26 Prepare and submit Lighting system shop

PB2-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 25-May-26 10-Jun-26 Review and approval Lighting system s

ROAD 76 27-Apr-26 28-Jul-26 28-Jul-26, ROAD


PB-EN-B2-R.100 Plan and Profile Preparation & Submission 14 27-Apr-26 13-May-26 Plan and Profile Preparation & Submission

PB-EN-B2-R.105 Plan and Profile Review & Approval 14 13-May-26 02-Jun-26 Plan and Profile Review & Approval

PB-EN-B2-R.110 Road Cross Sections Preparation & Submission 14 02-Jun-26 18-Jun-26 Road Cross Sections Preparation & Su

PB-EN-B2-R.115 Road Cross Sections Review & Approval 14 18-Jun-26 05-Jul-26 Road Cross Sections Review & App

PB-EN-B2-R.120 Guiding Signs and Marking Preparation & Submission 14 25-Jun-26 12-Jul-26 Guiding Signs and Marking Prepara

PB-EN-B2-R.125 Guiding Signs and Marking Review & Approval 14 12-Jul-26 28-Jul-26 Guiding Signs and Marking Revie

BRIDGE NO.03 526 12-Sep-24 07-Jun-26 07-Jun-26, BRIDGE NO.03


ENGINEERING 526 12-Sep-24 07-Jun-26 07-Jun-26, ENGINEERING
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTURAL/ME 78 12-Sep-24 12-Dec-24 12-Dec-24, CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
PB3-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 12-Sep-24 30-Sep-24 Earthworks Shop Drawings Preparation & Submission

PB3-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 30-Sep-24 13-Oct-24 Earthworks Shop Drawings Review & Approval

PB3-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 14-Oct-24 29-Oct-24 Bridge Structural Shop Drawings Submission

PB3-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 30-Oct-24 12-Nov-24 Bridge Structural Shop Drawings Review & Approval

PB3-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 12-Nov-24 28-Nov-24 Bridge Drainage Shop Drawings Preparation & Submission

PB3-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 28-Nov-24 12-Dec-24 Bridge Drainage Shop Drawings Review & Approval

ARCHITECTURAL 26 06-Aug-25 06-Sep-25 06-Sep-25, ARCHITECTURAL


PB3-EN-ARCH.100 Architectural Shop Drawings Preparation & Submission 14 06-Aug-25 23-Aug-25 Architectural Shop Drawings Preparation & Submission

PB3-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 23-Aug-25 06-Sep-25 Architectural Shop Drawings Review & Approval

DRY UTILITIES 31 18-Mar-26 28-Apr-26 28-Apr-26, DRY UTILITIES


LIGHTING SYSTEM (Under
(Unde Brigde lighting)) 31 18-Mar-26 28-Apr-26 28-Apr-26, LIGHTING SYSTEM (Under B
PB3-EN-DU-LS.100 Prepare and submit Lighting system shopdrawings 20 18-Mar-26 15-Apr-26 Prepare and submit Lighting system shopdraw

PB3-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 15-Apr-26 28-Apr-26 Review and approval Lighting system shopd

ROAD 70 10-Mar-26 07-Jun-26 07-Jun-26, ROAD


PB3-EN-RD.100 Plan and Profile Preparation & Submission 14 10-Mar-26 30-Mar-26 Plan and Profile Preparation & Submission

PB3-EN-RD.105 Plan and Profile Review & Approval 14 31-Mar-26 15-Apr-26 Plan and Profile Review & Approval

PB3-EN-RD.110 Road Cross Sections Preparation & Submission 14 15-Apr-26 02-May-26 Road Cross Sections Preparation & Submis

PB3-EN-RD.115 Road Cross Sections Review & Approval 14 06-May-26 23-May-26 Road Cross Sections Review & Approva

PB3-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 02-May-26 18-May-26 Guiding Signs and Marking Preparation &

PB3-EN-RD.125 Guiding Signs and Marking Review & Approval 14 18-May-26 07-Jun-26 Guiding Signs and Marking Review &

BRIDGE NO.04 621 26-Feb-24 11-Mar-26 11-Mar-26, BRIDGE NO.04


ENGINEERING 621 26-Feb-24 11-Mar-26 11-Mar-26, ENGINEERING
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTURAL/ME 78 26-Feb-24 30-May-24 30-May-24, CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
156 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
PB4-EN-CSME.100 Earthworks Shop Drawings Preparation & Submission 14 26-Feb-24 13-Mar-24 Earthworks Shop Drawings Preparation & Submission

PB4-EN-CSME.105 Earthworks Shop Drawings Review & Approval 12 13-Mar-24 27-Mar-24 Earthworks Shop Drawings Review & Approval

PB4-EN-CSME.110 Bridge Structural Shop Drawings Submission 14 27-Mar-24 16-Apr-24 Bridge Structural Shop Drawings Submission

PB4-EN-CSME.115 Bridge Structural Shop Drawings Review & Approval 12 16-Apr-24 30-Apr-24 Bridge Structural Shop Drawings Review & Approval

PB4-EN-CSME.120 Bridge Drainage Shop Drawings Preparation & Submission 14 30-Apr-24 16-May-24 Bridge Drainage Shop Drawings Preparation & Submission

PB4-EN-CSME.125 Bridge Drainage Shop Drawings Review & Approval 12 16-May-24 30-May-24 Bridge Drainage Shop Drawings Review & Approval

ARCHITECTURAL 26 19-Apr-25 19-May-25 19-May-25, ARCHITECTURAL


PB4-EN-ARCH.100 Architectural Shop Drawings Preparation & Submission 14 19-Apr-25 05-May-25 Architectural Shop Drawings Preparation & Submission

PB4-EN-ARCH.105 Architectural Shop Drawings Review & Approval 12 05-May-25 19-May-25 Architectural Shop Drawings Review & Approval

DRY UTILITIES 31 28-Dec-25 02-Feb-26 02-Feb-26, DRY UTILITIES


LIGHTING SYSTEM (Under
(Unde Brigde lighting)) 31 28-Dec-25 02-Feb-26 02-Feb-26, LIGHTING SYSTEM (Under Brigde ligh
PB4-EN-DU-LS.100 Prepare and submit Lighting system shopdrawings 20 28-Dec-25 20-Jan-26 Prepare and submit Lighting system shopdrawings

PB4-EN-DU-LS.105 Review and approval Lighting system shopdrawings 11 20-Jan-26 02-Feb-26 Review and approval Lighting system shopdrawings

ROAD 70 20-Dec-25 11-Mar-26 11-Mar-26, ROAD


PB4-EN-RD.100 Plan and Profile Preparation & Submission 14 20-Dec-25 05-Jan-26 Plan and Profile Preparation & Submission

PB4-EN-RD.105 Plan and Profile Review & Approval 14 05-Jan-26 21-Jan-26 Plan and Profile Review & Approval

PB4-EN-RD.110 Road Cross Sections Preparation & Submission 14 21-Jan-26 07-Feb-26 Road Cross Sections Preparation & Submission

PB4-EN-RD.115 Road Cross Sections Review & Approval 14 10-Feb-26 26-Feb-26 Road Cross Sections Review & Approval

PB4-EN-RD.120 Guiding Signs and Marking Preparation & Submission 14 07-Feb-26 23-Feb-26 Guiding Signs and Marking Preparation & Submiss

PB4-EN-RD.125 Guiding Signs and Marking Review & Approval 14 23-Feb-26 11-Mar-26 Guiding Signs and Marking Review & Approval

EXTERNAL SURROUNDING
SURROUN UTILITIES 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, EXTERNAL SURROUN
ENGINEERING 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, ENGINEERING
SHOP DRAWING SUBMITTAL
SUBM AND APPROVAL 1148 14-Aug-22 A 04-Jul-26 04-Jul-26, SHOP DRAWING SUBM
WET UTILITIES 1025 14-Aug-22 A 01-Feb-26 01-Feb-26, WET UTILITIES
WET UTILITIES PART 01(ZONE
01(Z 06) 131 20-Feb-24 30-Jul-24 30-Jul-24, WET UTILITIES PART 01(ZONE 06)
POTABLE WATER NETWORK
NETW 90 13-Apr-24 30-Jul-24 30-Jul-24, POTABLE WATER NETWORK
EX-ENG-WU-PW-P01 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P01 Plan and Profile Shop Drawing Review & Approval 14 14-Jul-24 30-Jul-24 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 57 15-May-24 24-Jul-24 24-Jul-24, IRRIGATION NETWORK


EX-ENG-WU-IR-P01.1 Plan and Profile Shop Drawing Prepration &Submission 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P01.1 Plan and Profile Shop Drawing Review & Approval 14 08-Jul-24 24-Jul-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 67 29-Apr-24 20-Jul-24 20-Jul-24, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P01 Plan and Profile Shop Drawing Prepration &Submission 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P01 Plan and Profile Shop Drawing Review & Approval 14 03-Jul-24 20-Jul-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 87 24-Mar-24 11-Jul-24 11-Jul-24, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P01 Plan and Profile Shop Drawing Prepration &Submission 14 24-Mar-24 13-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P01 Plan and Profile Shop Drawing Review & Approval 14 25-Jun-24 11-Jul-24 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 28 30-May-24 07-Jul-24 07-Jul-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P01 Plan and Profile Shop Drawing Prepration &Submission 14 30-May-24 20-Jun-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P01 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 63 07-Mar-24 23-May-24 23-May-24, STORM NET WORK


EX-ENG-WU-SW-P01 Plan and Profile Shop Drawing Prepration &Submission 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P01 Plan and Profile Shop Drawing Review & Approval 14 07-May-24 23-May-24 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 28 20-Feb-24 24-Mar-24 24-Mar-24, SEWER NET WORK


EX-ENG-WU-SE-P01. Plan and Profile Shop Drawing Prepration &Submission 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P01. Plan and Profile Shop Drawing Review & Approval 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 02(ZONE


02(Z 06&S1&S2&S3&CROWD3 AND4) 125 04-Feb-24 07-Jul-24 07-Jul-24, WET UTILITIES PART 02(ZONE 06&S1&S2&S3&CROWD3 AND4)
POTABLE WATER NETWORK
NETW 64 24-Mar-24 09-Jun-24 09-Jun-24, POTABLE WATER NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
157 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EX-ENG-WU-PW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 24-Mar-24 13-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P02 Plan and Profile Shop Drawing Review & Approval 14 25-May-24 09-Jun-24 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 28 29-Apr-24 30-May-24 30-May-24, IRRIGATION NETWORK


EX-ENG-WU-IR-P02.2 Plan and Profile Shop Drawing Prepration &Submission 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P02.2 Plan and Profile Shop Drawing Review & Approval 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 28 13-Apr-24 14-May-24 14-May-24, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P02 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P02 Plan and Profile Shop Drawing Review & Approval 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 60 07-Mar-24 20-May-24 20-May-24, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P02 Plan and Profile Shop Drawing Prepration &Submission 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P02 Plan and Profile Shop Drawing Review & Approval 14 04-May-24 20-May-24 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 42 15-May-24 07-Jul-24 07-Jul-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P02 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval

AUTOMATIC WASTE COLLECTION


COL NETWORK 28 30-May-24 07-Jul-24 07-Jul-24, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 30-May-24 20-Jun-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-AW-P02 Plan and Profile Shop Drawing Review & Approval 14 20-Jun-24 07-Jul-24 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 28 20-Feb-24 24-Mar-24 24-Mar-24, STORM NET WORK


EX-ENG-WU-SW-P02 Plan and Profile Shop Drawing Prepration &Submission 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P02 Plan and Profile Shop Drawing Review & Approval 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 28 04-Feb-24 07-Mar-24 07-Mar-24, SEWER NET WORK


EX-ENG-WU-SE-P02. Plan and Profile Shop Drawing Prepration &Submission 14 04-Feb-24 20-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P02. Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 03(ZONE


03(Z 5 AND 7) 622 18-Jan-24 01-Feb-26 01-Feb-26, WET UTILITIES PART 03(ZONE 5 AND
POTABLE WATER NETWORK
NETW 581 07-Mar-24 01-Feb-26 01-Feb-26, POTABLE WATER NETWORK
EX-ENG-WU-PW-P03 Plan and Profile Shop Drawing Prepration &Submission 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P03 Plan and Profile Shop Drawing Review & Approval 14 17-Jan-26 01-Feb-26 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 536 13-Apr-24 13-Jan-26 13-Jan-26, IRRIGATION NETWORK


EX-ENG-WU-IR-P03.1 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P03.2 Plan and Profile Shop Drawing Review & Approval 14 28-Dec-25 13-Jan-26 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 519 29-Apr-24 10-Jan-26 10-Jan-26, CHILLED WATER SUPPLY & RETURN N
EX-ENG-WU-CW-P03 Plan and Profile Shop Drawing Prepration &Submission 14 29-Apr-24 14-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P03 Plan and Profile Shop Drawing Review & Approval 14 24-Dec-25 10-Jan-26 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 588 04-Feb-24 08-Jan-26 08-Jan-26, STORM NET WORK
EX-ENG-WU-SW-P03 Plan and Profile Shop Drawing Prepration &Submission 14 04-Feb-24 20-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P03 Plan and Profile Shop Drawing Review & Approval 14 23-Dec-25 08-Jan-26 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 572 18-Jan-24 04-Dec-25 04-Dec-25, SEWER NET WORK
EX-ENG-WU-SE-P03. Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P03. Plan and Profile Shop Drawing Review & Approval 14 18-Nov-25 04-Dec-25 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 04(CROWD


04(C 1&2 AND S4) 511 02-Jan-24 07-Sep-25 07-Sep-25, WET UTILITIES PART 04(CROWD 1&2 AND S4)
POTABLE WATER NETWORK
NETW 469 20-Feb-24 07-Sep-25 07-Sep-25, POTABLE WATER NETWORK
EX-ENG-WU-PW-P04 Plan and Profile Shop Drawing Prepration &Submission 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P04 Plan and Profile Shop Drawing Review & Approval 14 21-Aug-25 07-Sep-25 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 408 24-Mar-24 30-Jul-25 30-Jul-25, IRRIGATION NETWORK


EX-ENG-WU-IR-P04.1 Plan and Profile Shop Drawing Prepration &Submission 14 24-Mar-24 13-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P04.1 Plan and Profile Shop Drawing Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 435 04-Feb-24 13-Jul-25 13-Jul-25, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P04 Plan and Profile Shop Drawing Prepration &Submission 14 04-Feb-24 20-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P04 Plan and Profile Shop Drawing Review & Approval 14 26-Jun-25 13-Jul-25 Plan and Profile Shop Drawing Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
158 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
AUTOMATIC WASTE COLLECTION
COL NETWORK 340 15-May-24 29-Jun-25 29-Jun-25, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P04 Plan and Profile Shop Drawing Prepration &Submission 14 15-May-24 30-May-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-AW-P04 Plan and Profile Shop Drawing Review & Approval 14 12-Jun-25 29-Jun-25 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 437 18-Jan-24 29-Jun-25 29-Jun-25, STORM NET WORK
EX-ENG-WU-SW-P04 Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P04 Plan and Profile Shop Drawing Review & Approval 14 12-Jun-25 29-Jun-25 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 386 02-Jan-24 10-Apr-25 10-Apr-25, SEWER NET WORK
EX-ENG-WU-SE-P04. Plan and Profile Shop Drawing Prepration &Submission 14 02-Jan-24 18-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P04. Plan and Profile Shop Drawing Review & Approval 14 20-Mar-25 10-Apr-25 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 05((ZONE


05(( 04 AND S7) 612 17-Dec-23 18-Dec-25 18-Dec-25, WET UTILITIES PART 05((ZONE 04 AND S
POTABLE WATER NETWORK
NETW 520 04-Feb-24 21-Oct-25 21-Oct-25, POTABLE WATER NETWORK
EX-ENG-WU-PW-P05 Plan and Profile Shop Drawing Prepration &Submission 14 04-Feb-24 20-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P05 Plan and Profile Shop Drawing Review & Approval 14 06-Oct-25 21-Oct-25 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 492 07-Mar-24 20-Oct-25 20-Oct-25, IRRIGATION NETWORK


EX-ENG-WU-IR-P05.1 Plan and Profile Shop Drawing Prepration &Submission 14 07-Mar-24 24-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P05.1 Plan and Profile Shop Drawing Review & Approval 14 05-Oct-25 20-Oct-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 555 20-Feb-24 16-Dec-25 16-Dec-25, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P05 Plan and Profile Shop Drawing Prepration &Submission 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P05 Plan and Profile Shop Drawing Review & Approval 14 01-Dec-25 16-Dec-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 584 18-Jan-24 18-Dec-25 18-Dec-25, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P05 Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P05 Plan and Profile Shop Drawing Review & Approval 14 03-Dec-25 18-Dec-25 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 515 13-Apr-24 18-Dec-25 18-Dec-25, CHILLED WATER SUPPLY & RETURN NE
EX-ENG-WU-CW-P05 Plan and Profile Shop Drawing Prepration &Submission 14 13-Apr-24 29-Apr-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P05 Plan and Profile Shop Drawing Review & Approval 14 03-Dec-25 18-Dec-25 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 589 02-Jan-24 08-Dec-25 08-Dec-25, STORM NET WORK
EX-ENG-WU-SW-P05 Plan and Profile Shop Drawing Prepration &Submission 14 02-Jan-24 18-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P05 Plan and Profile Shop Drawing Review & Approval 14 23-Nov-25 08-Dec-25 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 555 17-Dec-23 13-Oct-25 13-Oct-25, SEWER NET WORK
EX-ENG-WU-SE-P05. Plan and Profile Shop Drawing Prepration &Submission 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P05. Plan and Profile Shop Drawing Review & Approval 14 28-Sep-25 13-Oct-25 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 06(ZONE


06(Z 09 AND S5) 490 02-Dec-23 12-Jul-25 12-Jul-25, WET UTILITIES PART 06(ZONE 09 AND S5)
POTABLE WATER NETWORK
NETW 448 18-Jan-24 12-Jul-25 12-Jul-25, POTABLE WATER NETWORK
EX-ENG-WU-PW-P06 Plan and Profile Shop Drawing Prepration &Submission 14 18-Jan-24 04-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P06 Plan and Profile Shop Drawing Review & Approval 14 26-Jun-25 12-Jul-25 Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 416 20-Feb-24 06-Jul-25 06-Jul-25, IRRIGATION NETWORK


EX-ENG-WU-IR-P06.1 Plan and Profile Shop Drawing Prepration &Submission 14 20-Feb-24 07-Mar-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P06.1 Plan and Profile Shop Drawing Review & Approval 14 21-Jun-25 06-Jul-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 452 02-Jan-24 30-Jun-25 30-Jun-25, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P06 Plan and Profile Shop Drawing Prepration &Submission 14 02-Jan-24 18-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P06 Plan and Profile Shop Drawing Review & Approval 14 15-Jun-25 30-Jun-25 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 458 17-Dec-23 21-Jun-25 21-Jun-25, STORM NET WORK
EX-ENG-WU-SW-P06 Plan and Profile Shop Drawing Prepration &Submission 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P06 Plan and Profile Shop Drawing Review & Approval 14 02-Jun-25 21-Jun-25 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 449 02-Dec-23 21-May-25 21-May-25, SEWER NET WORK
EX-ENG-WU-SE-P06. Plan and Profile Shop Drawing Prepration &Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P06. Plan and Profile Shop Drawing Review & Approval 14 06-May-25 21-May-25 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 07(ZONE


07(Z 08&2&3 AND S8&D9) 480 14-Aug-22 A 21-Apr-24 21-Apr-24, WET UTILITIES PART 07(ZONE 08&2&3 AND S8&D9)
POTABLE WATER NETWORK
NETW 17 25-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
159 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EX-ENG-WU-PW-P07 Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P07 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 84 10-Jan-24 21-Apr-24 21-Apr-24, IRRIGATION NETWORK


EX-ENG-WU-IR-P07.1 Plan and Profile Shop Drawing Prepration &Submission 14 10-Jan-24 27-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P07.1 Plan and Profile Shop Drawing Review & Approval 14 02-Apr-24 21-Apr-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 13 01-Oct-22 A 15-Oct-22 A 15-Oct-22 A, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P07 Plan and Profile Shop Drawing Prepration &Submission 7 01-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P07 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 293 14-Aug-22 A 19-Mar-24 19-Mar-24, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P07 Plan and Profile Shop Drawing Prepration &Submission 293 14-Aug-22 A 09-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P07 Plan and Profile Shop Drawing Review & Approval 289 17-Aug-22 A 19-Mar-24 Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 34 27-Jan-24 06-Mar-24 06-Mar-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P07 Plan and Profile Shop Drawing Prepration &Submission 14 27-Jan-24 12-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P07 Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 06-Mar-24 Plan and Profile Shop Drawing Review & Approval

AUTOMATIC WASTE COLLECTION


COL NETWORK 28 12-Feb-24 16-Mar-24 16-Mar-24, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P07 Plan and Profile Shop Drawing Prepration &Submission 14 12-Feb-24 28-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-AW-P07 Plan and Profile Shop Drawing Review & Approval 14 28-Feb-24 16-Mar-24 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 15 12-Oct-22 A 29-Oct-22 A 29-Oct-22 A, STORM NET WORK


EX-ENG-WU-SW-P07 Plan and Profile Shop Drawing Prepration &Submission 8 12-Oct-22 A 20-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P07 Plan and Profile Shop Drawing Review & Approval 8 20-Oct-22 A 29-Oct-22 A Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 9 28-Sep-22 A 08-Oct-22 A 08-Oct-22 A, SEWER NET WORK


EX-ENG-WU-SE-P07. Plan and Profile Shop Drawing Prepration &Submission 5 28-Sep-22 A 03-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P07. Plan and Profile Shop Drawing Review & Approval 5 03-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 08(ZONE


08(Z 01 AND D10) 770 15-Aug-22 A 07-Apr-25 07-Apr-25, WET UTILITIES PART 08(ZONE 01 AND D10)
POTABLE WATER NETWORK
NETW 17 25-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK
EX-ENG-WU-PW-P08 Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P08 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 390 25-Dec-23 07-Apr-25 07-Apr-25, IRRIGATION NETWORK


EX-ENG-WU-IR-P08.1 Plan and Profile Shop Drawing Prepration &Submission 14 25-Dec-23 10-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P08.1 Plan and Profile Shop Drawing Review & Approval 14 18-Mar-25 07-Apr-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 293 15-Aug-22 A 04-Mar-25 04-Mar-25, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P08 Plan and Profile Shop Drawing Prepration &Submission 293 15-Aug-22 A 09-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P08 Plan and Profile Shop Drawing Review & Approval 289 18-Aug-22 A 04-Mar-25 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 13 01-Oct-22 A 15-Oct-22 A 15-Oct-22 A, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P08 Plan and Profile Shop Drawing Prepration &Submission 7 01-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P08 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 310 10-Jan-24 15-Jan-25 15-Jan-25, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P08 Plan and Profile Shop Drawing Prepration &Submission 14 10-Jan-24 27-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P08 Plan and Profile Shop Drawing Review & Approval 14 31-Dec-24 15-Jan-25 Plan and Profile Shop Drawing Review & Approval

AUTOMATIC WASTE COLLECTION


COL NETWORK 28 27-Jan-24 28-Feb-24 28-Feb-24, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P08 Plan and Profile Shop Drawing Prepration &Submission 14 27-Jan-24 12-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-AW-P08 Plan and Profile Shop Drawing Review & Approval 14 12-Feb-24 28-Feb-24 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 15 12-Oct-22 A 29-Oct-22 A 29-Oct-22 A, STORM NET WORK


EX-ENG-WU-SW-P08 Plan and Profile Shop Drawing Prepration &Submission 8 12-Oct-22 A 20-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P08 Plan and Profile Shop Drawing Review & Approval 8 20-Oct-22 A 29-Oct-22 A Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 28 02-Dec-23 02-Jan-24 02-Jan-24, SEWER NET WORK


EX-ENG-WU-SE-P08. Plan and Profile Shop Drawing Prepration &Submission 14 02-Dec-23 17-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P08. Plan and Profile Shop Drawing Review & Approval 14 17-Dec-23 02-Jan-24 Plan and Profile Shop Drawing Review & Approval

WET UTILITIES PART 09(ZONE


09(Z 02 AND D09) 480 17-Aug-22 A 21-Apr-24 21-Apr-24, WET UTILITIES PART 09(ZONE 02 AND D09)

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
160 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POTABLE WATER NETWORK
NETW 17 25-Oct-22 A 13-Nov-22 A 13-Nov-22 A, POTABLE WATER NETWORK
EX-ENG-WU-PW-P09 Plan and Profile Shop Drawing Prepration &Submission 7 25-Oct-22 A 01-Nov-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-PW-P09 Plan and Profile Shop Drawing Review & Approval 11 01-Nov-22 A 13-Nov-22 A Plan and Profile Shop Drawing Review & Approval

IRRIGATION NETWORK 112 10-Dec-23 21-Apr-24 21-Apr-24, IRRIGATION NETWORK


EX-ENG-WU-IR-P09.1 Plan and Profile Shop Drawing Prepration &Submission 14 10-Dec-23 25-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-IR-P09.1 Plan and Profile Shop Drawing Review & Approval 14 02-Apr-24 21-Apr-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER DISTRIBUTION


DISTRIBUT SYSTEM 293 17-Aug-22 A 06-Apr-24 06-Apr-24, GREY WATER DISTRIBUTION SYSTEM
EX-ENG-WU-GD-P09 Plan and Profile Shop Drawing Prepration &Submission 293 17-Aug-22 A 09-Dec-23 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GD-P09 Plan and Profile Shop Drawing Review & Approval 289 21-Aug-22 A 06-Apr-24 Plan and Profile Shop Drawing Review & Approval

GREY WATER COLLECTION


COLLECTI NETWORK 13 01-Oct-22 A 15-Oct-22 A 15-Oct-22 A, GREY WATER COLLECTION NETWORK
EX-ENG-WU-GC-P09 Plan and Profile Shop Drawing Prepration &Submission 7 01-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-GC-P09 Plan and Profile Shop Drawing Review & Approval 7 08-Oct-22 A 15-Oct-22 A Plan and Profile Shop Drawing Review & Approval

CHILLED WATER SUPPLY & RETURN NETWORK 62 25-Dec-23 06-Mar-24 06-Mar-24, CHILLED WATER SUPPLY & RETURN NETWORK
EX-ENG-WU-CW-P09 Plan and Profile Shop Drawing Prepration &Submission 14 25-Dec-23 10-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-CW-P09 Plan and Profile Shop Drawing Review & Approval 14 20-Feb-24 06-Mar-24 Plan and Profile Shop Drawing Review & Approval

AUTOMATIC WASTE COLLECTION


COL NETWORK 56 10-Jan-24 16-Mar-24 16-Mar-24, AUTOMATIC WASTE COLLECTION NETWORK
EX-ENG-WU-AW-P09 Plan and Profile Shop Drawing Prepration &Submission 14 10-Jan-24 27-Jan-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-AW-P09 Plan and Profile Shop Drawing Review & Approval 14 28-Feb-24 16-Mar-24 Plan and Profile Shop Drawing Review & Approval

STORM NET WORK 28 25-Jan-24 26-Feb-24 26-Feb-24, STORM NET WORK


EX-ENG-WU-SW-P09 Plan and Profile Shop Drawing Prepration &Submission 14 25-Jan-24 11-Feb-24 Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SW-P09 Plan and Profile Shop Drawing Review & Approval 14 11-Feb-24 26-Feb-24 Plan and Profile Shop Drawing Review & Approval

SEWER NET WORK 9 28-Sep-22 A 08-Oct-22 A 08-Oct-22 A, SEWER NET WORK


EX-ENG-WU-SE-P09. Plan and Profile Shop Drawing Prepration &Submission 5 28-Sep-22 A 03-Oct-22 A Plan and Profile Shop Drawing Prepration &Submission

EX-ENG-WU-SE-P09. Plan and Profile Shop Drawing Review & Approval 5 03-Oct-22 A 08-Oct-22 A Plan and Profile Shop Drawing Review & Approval

DRY UTILITIES 787 02-Dec-23 04-Jul-26 04-Jul-26, DRY UTILITIES


BESIDE ZONE 1 543 02-Dec-23 13-Sep-25 13-Sep-25, BESIDE ZONE 1
ZONE 01 543 02-Dec-23 13-Sep-25 13-Sep-25, ZONE 01
POWER 543 02-Dec-23 13-Sep-25 13-Sep-25, POWER
MV 542 02-Dec-23 10-Sep-25 10-Sep-25, MV
MV CABLES PROPOS
PROPOSED INSTALLATION 542 02-Dec-23 10-Sep-25 10-Sep-25, MV CABLES PROPOSED INSTALLATION
DU-BZ1-Z1-PMV.29 prepare and submit shopdrawing for MV Proposed cable 20 02-Dec-23 24-Dec-23 prepare and submit shopdrawing for MV Proposed cable

DU-BZ1-Z1-PMV.29 review and approval shopdrawing for MV Proposed cable 11 28-Aug-25 10-Sep-25 review and approval shopdrawing for MV Proposed cable

MV UNIT SUB-STATION
SUB-STATIO 73 16-Jun-25 08-Sep-25 08-Sep-25, MV UNIT SUB-STATION
DU-BZ1-Z1-PMV.30 prepare and submit shopdrawing for MV unit sub- station 20 16-Jun-25 09-Jul-25 prepare and submit shopdrawing for MV unit sub- station

DU-BZ1-Z1-PMV.30 review and approval shopdrawing for MV unit sub- station 11 26-Aug-25 08-Sep-25 review and approval shopdrawing for MV unit sub- station

LV (Unit Sub-station to LV panel) 56 09-Jul-25 13-Sep-25 13-Sep-25, LV (Unit Sub-station to LV panel)


DU-BZ1-Z1-PLV.220 prepare and submit shopdrawing for LV unit sub- station 20 09-Jul-25 02-Aug-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ1-Z1-PLV.225 review and approval shopdrawing for LV unit sub- station 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(St Lighting) 31 02-Aug-25 07-Sep-25 07-Sep-25, LIGHTING SYSTEM (Street Lighting)
DU-BZ1-Z1-PLS.220 prepare and submit shopdrawing for lighting system 20 02-Aug-25 25-Aug-25 prepare and submit shopdrawing for lighting system

DU-BZ1-Z1-PLS.225 review and approval shopdrawing for lighting system 11 25-Aug-25 07-Sep-25 review and approval shopdrawing for lighting system

LOW CURRENTS 119 23-Apr-25 13-Sep-25 13-Sep-25, LOW CURRENTS


TELECOME NETWORK 116 23-Apr-25 09-Sep-25 09-Sep-25, TELECOME NETWORK
TELECOME NETWORK
NETWOR (Proposed Duct bank) 116 23-Apr-25 09-Sep-25 09-Sep-25, TELECOME NETWORK (Proposed Duct bank)
DU-BZ1-Z1-LC-TN prepare and submit shopdrawing for telecom network proposed 20 23-Apr-25 17-May-25 prepare and submit shopdrawing for telecom network proposed

DU-BZ1-Z1-LC-TN review and approval shopdrawing for telecom network proposed 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for telecom network proposed

ELV NETWORK 99 17-May-25 13-Sep-25 13-Sep-25, ELV NETWORK


ELV NETWORK 96 17-May-25 09-Sep-25 09-Sep-25, ELV NETWORK
DU-BZ1-Z1-LC-ELV prepare and submit shopdrawing for ELV Network 20 17-May-25 12-Jun-25 prepare and submit shopdrawing for ELV Network

DU-BZ1-Z1-LC-ELV review and approval shopdrawing for ELV Network 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for ELV Network

ICT NETWORK 79 12-Jun-25 13-Sep-25 13-Sep-25, ICT NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
161 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ1-Z1-LC-ELV prepare and submit shopdrawing for ICT Network 20 12-Jun-25 06-Jul-25 prepare and submit shopdrawing for ICT Network

DU-BZ1-Z1-LC-ELV review and approval shopdrawing for ICT Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for ICT Network

SECURITY NETWORK 59 06-Jul-25 13-Sep-25 13-Sep-25, SECURITY NETWORK


DU-BZ1-Z1-LC-ELV prepare and submit shopdrawing for Security Network 20 06-Jul-25 28-Jul-25 prepare and submit shopdrawing for Security Network

DU-BZ1-Z1-LC-ELV review and approval shopdrawing for Security Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 29-Jul-25 03-Sep-25 03-Sep-25, SCADA SYSTEM


DU-BZ1-Z1-LC-ELV prepare and submit shopdrawing for SCADA Network 20 29-Jul-25 20-Aug-25 prepare and submit shopdrawing for SCADA Network

DU-BZ1-Z1-LC-ELV review and approval shopdrawing for SCADA Network 11 20-Aug-25 03-Sep-25 review and approval shopdrawing for SCADA Network

AIP 523 24-Dec-23 13-Sep-25 13-Sep-25, AIP


POWER 523 24-Dec-23 13-Sep-25 13-Sep-25, POWER
MV 522 24-Dec-23 10-Sep-25 10-Sep-25, MV
MV CABLES RELOCA
RELOCATION / DIVERTING 517 24-Dec-23 04-Sep-25 04-Sep-25, MV CABLES RELOCATION / DIVERTING
DU-BZ1-AIP-PMV. prepare and submit shopdrawing for MV cable relocation 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for MV cable relocation

DU-BZ1-AIP-PMV. review and approval shopdrawing for MV cable relocation 11 23-Aug-25 04-Sep-25 review and approval shopdrawing for MV cable relocation

MV CABLES PROPOS
PROPOSED INSTALLATION 31 05-Aug-25 10-Sep-25 10-Sep-25, MV CABLES PROPOSED INSTALLATION
DU-BZ1-AIP-PMV. prepare and submit shopdrawing for MV Proposed cable 20 05-Aug-25 28-Aug-25 prepare and submit shopdrawing for MV Proposed cable

DU-BZ1-AIP-PMV. review and approval shopdrawing for MV Proposed cable 11 28-Aug-25 10-Sep-25 review and approval shopdrawing for MV Proposed cable

MV UNIT SUB-STATION
SUB-STATIO 31 03-Aug-25 08-Sep-25 08-Sep-25, MV UNIT SUB-STATION
DU-BZ1-AIP-PMV. prepare and submit shopdrawing for MV unit sub- station 20 03-Aug-25 26-Aug-25 prepare and submit shopdrawing for MV unit sub- station

DU-BZ1-AIP-PMV. review and approval shopdrawing for MV unit sub- station 11 26-Aug-25 08-Sep-25 review and approval shopdrawing for MV unit sub- station

LV (Unit Sub-station to LV panel) 31 07-Aug-25 13-Sep-25 13-Sep-25, LV (Unit Sub-station to LV panel)


DU-BZ1-AIP-PLV.28 prepare and submit shopdrawing for LV unit sub- station 20 07-Aug-25 30-Aug-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ1-AIP-PLV.28 review and approval shopdrawing for LV unit sub- station 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(St Lighting) 31 02-Aug-25 07-Sep-25 07-Sep-25, LIGHTING SYSTEM (Street Lighting)
DU-BZ1-AIP-PLS.28 prepare and submit shopdrawing for lighting system 20 02-Aug-25 25-Aug-25 prepare and submit shopdrawing for lighting system

DU-BZ1-AIP-PLS.28 review and approval shopdrawing for lighting system 11 25-Aug-25 07-Sep-25 review and approval shopdrawing for lighting system

LOW CURRENTS 39 29-Jul-25 13-Sep-25 13-Sep-25, LOW CURRENTS


ELV NETWORK 39 29-Jul-25 13-Sep-25 13-Sep-25, ELV NETWORK
ELV NETWORK 31 04-Aug-25 09-Sep-25 09-Sep-25, ELV NETWORK
DU-BZ1-AIP-LC.28 prepare and submit shopdrawing for ELV Network 20 04-Aug-25 27-Aug-25 prepare and submit shopdrawing for ELV Network

DU-BZ1-AIP-LC.28 review and approval shopdrawing for ELV Network 11 27-Aug-25 09-Sep-25 review and approval shopdrawing for ELV Network

ICT NETWORK 31 07-Aug-25 13-Sep-25 13-Sep-25, ICT NETWORK


DU-BZ1-AIP-LC.29 prepare and submit shopdrawing for ICT Network 20 07-Aug-25 30-Aug-25 prepare and submit shopdrawing for ICT Network

DU-BZ1-AIP-LC.29 review and approval shopdrawing for ICT Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 07-Aug-25 13-Sep-25 13-Sep-25, SECURITY NETWORK


DU-BZ1-AIP-LC.30 prepare and submit shopdrawing for Security Network 20 07-Aug-25 30-Aug-25 prepare and submit shopdrawing for Security Network

DU-BZ1-AIP-LC.30 review and approval shopdrawing for Security Network 11 30-Aug-25 13-Sep-25 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 29-Jul-25 03-Sep-25 03-Sep-25, SCADA SYSTEM


DU-BZ1-AIP-LC.31 prepare and submit shopdrawing for SCADA Network 20 29-Jul-25 20-Aug-25 prepare and submit shopdrawing for SCADA Network

DU-BZ1-AIP-LC.31 review and approval shopdrawing for SCADA Network 11 20-Aug-25 03-Sep-25 review and approval shopdrawing for SCADA Network

BESIDE ZONE 2 693 16-Jan-24 27-Apr-26 27-Apr-26, BESIDE ZONE 2


POWER 693 16-Jan-24 27-Apr-26 27-Apr-26, POWER
MV 693 16-Jan-24 27-Apr-26 27-Apr-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 693 16-Jan-24 27-Apr-26 27-Apr-26, MV CABLES PROPOSED INS
DU-BZ2-PMV.340 prepare and submit shopdrawing for MV Proposed cable 20 16-Jan-24 08-Feb-24 prepare and submit shopdrawing for MV Proposed cable

DU-BZ2-PMV.345 review and approval shopdrawing for MV Proposed cable 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for MV

LV (Unit Sub-station to L
LV panel) 51 22-Feb-26 27-Apr-26 27-Apr-26, LV (Unit Sub-station to LV pane
DU-BZ2-PLV.340 prepare and submit shopdrawing for LV unit sub- station 20 22-Feb-26 17-Mar-26 prepare and submit shopdrawing for LV unit sub

DU-BZ2-PLV.345 review and approval shopdrawing for LV unit sub- station 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for LV u

LIGHTING SYSTEM (Street


(Str Lighting) 31 17-Mar-26 27-Apr-26 27-Apr-26, LIGHTING SYSTEM (Street L

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
162 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ2-PLS.340 prepare and submit shopdrawing for lighting system 20 17-Mar-26 14-Apr-26 prepare and submit shopdrawing for lighting s

DU-BZ2-PLS.345 review and approval shopdrawing for lighting system 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for lightin

LOW CURRENTS 111 15-Dec-25 27-Apr-26 27-Apr-26, LOW CURRENTS


TELECOME NETWORK 111 15-Dec-25 27-Apr-26 27-Apr-26, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 111 15-Dec-25 27-Apr-26 27-Apr-26, TELECOME NETWORK (Pro
DU-BZ2-LC-TN.340 prepare and submit shopdrawing for telecom network proposed 20 15-Dec-25 07-Jan-26 prepare and submit shopdrawing for telecom network pro

DU-BZ2-LC-TN.345 review and approval shopdrawing for telecom network proposed 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for teleco

ELV NETWORK 91 07-Jan-26 27-Apr-26 27-Apr-26, ELV NETWORK


ELV NETWORK 91 07-Jan-26 27-Apr-26 27-Apr-26, ELV NETWORK
DU-BZ2-LC-ELVN.3 prepare and submit shopdrawing for ELV Network 20 07-Jan-26 29-Jan-26 prepare and submit shopdrawing for ELV Network

DU-BZ2-LC-ELVN.3 review and approval shopdrawing for ELV Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for ELV N

ICT NETWORK 71 31-Jan-26 27-Apr-26 27-Apr-26, ICT NETWORK


DU-BZ2-LC-ELVN.3 prepare and submit shopdrawing for ICT Network 20 31-Jan-26 22-Feb-26 prepare and submit shopdrawing for ICT Network

DU-BZ2-LC-ELVN.3 review and approval shopdrawing for ICT Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for ICT N

SECURITY NETWORK 51 22-Feb-26 27-Apr-26 27-Apr-26, SECURITY NETWORK


DU-BZ2-LC-ELVN.3 prepare and submit shopdrawing for Security Network 20 22-Feb-26 17-Mar-26 prepare and submit shopdrawing for Security Ne

DU-BZ2-LC-ELVN.3 review and approval shopdrawing for Security Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for Secur

SCADA SYSTEM 31 17-Mar-26 27-Apr-26 27-Apr-26, SCADA SYSTEM


DU-BZ2-LC-ELVN.3 prepare and submit shopdrawing for SCADA Network 20 17-Mar-26 14-Apr-26 prepare and submit shopdrawing for SCADA

DU-BZ2-LC-ELVN.3 review and approval shopdrawing for SCADA Network 11 14-Apr-26 27-Apr-26 review and approval shopdrawing for SCAD

BESIDE ZONE 3 614 08-Feb-24 12-Feb-26 12-Feb-26, BESIDE ZONE 3


POWER 566 08-Feb-24 18-Dec-25 18-Dec-25, POWER
MV 566 08-Feb-24 18-Dec-25 18-Dec-25, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 566 08-Feb-24 18-Dec-25 18-Dec-25, MV CABLES PROPOSED INSTALLATION
DU-BZ3-PMV.370 prepare and submit shopdrawing for MV Proposed cable 20 08-Feb-24 03-Mar-24 prepare and submit shopdrawing for MV Proposed cable

DU-BZ3-PMV.375 review and approval shopdrawing for MV Proposed cable 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for MV Proposed cable

MV UNIT SUB-STATION 71 27-Sep-25 18-Dec-25 18-Dec-25, MV UNIT SUB-STATION


DU-BZ3-PMV.380 prepare and submit shopdrawing for MV unit sub- station 20 27-Sep-25 20-Oct-25 prepare and submit shopdrawing for MV unit sub- station

DU-BZ3-PMV.385 review and approval shopdrawing for MV unit sub- station 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for MV unit sub- statio

LV (Unit Sub-station to L
LV panel) 51 20-Oct-25 18-Dec-25 18-Dec-25, LV (Unit Sub-station to LV panel)
DU-BZ3-PLV.380 prepare and submit shopdrawing for LV unit sub- station 20 20-Oct-25 12-Nov-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ3-PLV.385 review and approval shopdrawing for LV unit sub- station 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(Str Lighting) 31 12-Nov-25 18-Dec-25 18-Dec-25, LIGHTING SYSTEM (Street Lighting)
DU-BZ3-PLS.390 prepare and submit shopdrawing for lighting system 20 12-Nov-25 06-Dec-25 prepare and submit shopdrawing for lighting system

DU-BZ3-PLS.395 review and approval shopdrawing for lighting system 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for lighting system

LOW CURRENTS 139 02-Sep-25 12-Feb-26 12-Feb-26, LOW CURRENTS


TELECOME NETWORK 91 02-Sep-25 18-Dec-25 18-Dec-25, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 91 02-Sep-25 18-Dec-25 18-Dec-25, TELECOME NETWORK (Proposed Duct ba
DU-BZ3-LC-TN.390 prepare and submit shopdrawing for telecom network proposed 20 02-Sep-25 27-Sep-25 prepare and submit shopdrawing for telecom network proposed

DU-BZ3-LC-TN.395 review and approval shopdrawing for telecom network proposed 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for telecom network pro

ELV NETWORK 119 27-Sep-25 12-Feb-26 12-Feb-26, ELV NETWORK


ELV NETWORK 69 27-Sep-25 16-Dec-25 16-Dec-25, ELV NETWORK
DU-BZ3-LC-ELVN.3 prepare and submit shopdrawing for ELV Network 20 27-Sep-25 20-Oct-25 prepare and submit shopdrawing for ELV Network

DU-BZ3-LC-ELVN.3 review and approval shopdrawing for ELV Network 11 02-Dec-25 16-Dec-25 review and approval shopdrawing for ELV Network

ICT NETWORK 99 20-Oct-25 12-Feb-26 12-Feb-26, ICT NETWORK


DU-BZ3-LC-ELVN.4 prepare and submit shopdrawing for ICT Network 20 20-Oct-25 12-Nov-25 prepare and submit shopdrawing for ICT Network

DU-BZ3-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 31-Jan-26 12-Feb-26 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 12-Nov-25 18-Dec-25 18-Dec-25, SECURITY NETWORK


DU-BZ3-LC-ELVN.4 prepare and submit shopdrawing for Security Network 20 12-Nov-25 06-Dec-25 prepare and submit shopdrawing for Security Network

DU-BZ3-LC-ELVN.4 review and approval shopdrawing for Security Network 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 07-Jan-26 12-Feb-26 12-Feb-26, SCADA SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
163 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ3-LC-ELVN.4 prepare and submit shopdrawing for SCADA Network 20 07-Jan-26 31-Jan-26 prepare and submit shopdrawing for SCADA Networ

DU-BZ3-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 31-Jan-26 12-Feb-26 review and approval shopdrawing for SCADA Netw

BESIDE ZONE 4 641 03-Mar-24 13-Apr-26 13-Apr-26, BESIDE ZONE 4


POWER 600 03-Mar-24 19-Feb-26 19-Feb-26, POWER
MV 600 03-Mar-24 19-Feb-26 19-Feb-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 600 03-Mar-24 19-Feb-26 19-Feb-26, MV CABLES PROPOSED INSTALLA
DU-BZ4-PMV.400 prepare and submit shopdrawing for MV Proposed cable 20 03-Mar-24 26-Mar-24 prepare and submit shopdrawing for MV Proposed cable

DU-BZ4-PMV.405 review and approval shopdrawing for MV Proposed cable 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for MV Propos

MV UNIT SUB-STATION 76 24-Nov-25 19-Feb-26 19-Feb-26, MV UNIT SUB-STATION


DU-BZ4-PMV.410 prepare and submit shopdrawing for MV unit sub- station 20 24-Nov-25 17-Dec-25 prepare and submit shopdrawing for MV unit sub- station

DU-BZ4-PMV.415 review and approval shopdrawing for MV unit sub- station 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for MV unit sub

LV (Unit Sub-station to L
LV panel) 56 17-Dec-25 19-Feb-26 19-Feb-26, LV (Unit Sub-station to LV panel)
DU-BZ4-PLV.410 prepare and submit shopdrawing for LV unit sub- station 20 17-Dec-25 10-Jan-26 prepare and submit shopdrawing for LV unit sub- statio

DU-BZ4-PLV.415 review and approval shopdrawing for LV unit sub- station 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for LV unit sub-

LIGHTING SYSTEM (Street


(Str Lighting) 31 10-Jan-26 15-Feb-26 15-Feb-26, LIGHTING SYSTEM (Street Lighting)
DU-BZ4-PLS.410 prepare and submit shopdrawing for lighting system 20 10-Jan-26 01-Feb-26 prepare and submit shopdrawing for lighting system

DU-BZ4-PLS.415 review and approval shopdrawing for lighting system 11 02-Feb-26 15-Feb-26 review and approval shopdrawing for lighting syste

LOW CURRENTS 131 06-Nov-25 13-Apr-26 13-Apr-26, LOW CURRENTS


TELECOME NETWORK 88 06-Nov-25 17-Feb-26 17-Feb-26, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 88 06-Nov-25 17-Feb-26 17-Feb-26, TELECOME NETWORK (Proposed D
DU-BZ4-LC-TN.410 prepare and submit shopdrawing for telecom network proposed 20 06-Nov-25 30-Nov-25 prepare and submit shopdrawing for telecom network propos

DU-BZ4-LC-TN.415 review and approval shopdrawing for telecom network proposed 11 04-Feb-26 17-Feb-26 review and approval shopdrawing for telecom netw

ELV NETWORK 111 30-Nov-25 13-Apr-26 13-Apr-26, ELV NETWORK


ELV NETWORK 69 30-Nov-25 17-Feb-26 17-Feb-26, ELV NETWORK
DU-BZ4-LC-ELVN.4 prepare and submit shopdrawing for ELV Network 20 30-Nov-25 22-Dec-25 prepare and submit shopdrawing for ELV Network

DU-BZ4-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 04-Feb-26 17-Feb-26 review and approval shopdrawing for ELV Network

ICT NETWORK 51 23-Dec-25 19-Feb-26 19-Feb-26, ICT NETWORK


DU-BZ4-LC-ELVN.4 prepare and submit shopdrawing for ICT Network 20 23-Dec-25 14-Jan-26 prepare and submit shopdrawing for ICT Network

DU-BZ4-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 14-Jan-26 19-Feb-26 19-Feb-26, SECURITY NETWORK


DU-BZ4-LC-ELVN.4 prepare and submit shopdrawing for Security Network 20 14-Jan-26 07-Feb-26 prepare and submit shopdrawing for Security Networ

DU-BZ4-LC-ELVN.4 review and approval shopdrawing for Security Network 11 07-Feb-26 19-Feb-26 review and approval shopdrawing for Security Netw

SCADA SYSTEM 31 03-Mar-26 13-Apr-26 13-Apr-26, SCADA SYSTEM


DU-BZ4-LC-ELVN.4 prepare and submit shopdrawing for SCADA Network 20 03-Mar-26 31-Mar-26 prepare and submit shopdrawing for SCADA N

DU-BZ4-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 31-Mar-26 13-Apr-26 review and approval shopdrawing for SCAD

BESIDE ZONE 5 658 26-Mar-24 30-May-26 30-May-26, BESIDE ZONE 5


POWER 609 26-Mar-24 29-Mar-26 29-Mar-26, POWER
MV 31 26-Mar-24 05-May-24 05-May-24, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 31 26-Mar-24 05-May-24 05-May-24, MV CABLES PROPOSED INSTALLATION
DU-BZ5-PMV.440 prepare and submit shopdrawing for MV Proposed cable 20 26-Mar-24 22-Apr-24 prepare and submit shopdrawing for MV Proposed cable

DU-BZ5-PMV.445 review and approval shopdrawing for MV Proposed cable 11 22-Apr-24 05-May-24 review and approval shopdrawing for MV Proposed cable

LV (Unit Sub-station to L
LV panel) 51 25-Jan-26 29-Mar-26 29-Mar-26, LV (Unit Sub-station to LV panel)
DU-BZ5-PLV.440 prepare and submit shopdrawing for LV unit sub- station 20 25-Jan-26 16-Feb-26 prepare and submit shopdrawing for LV unit sub- s

DU-BZ5-PLV.445 review and approval shopdrawing for LV unit sub- station 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for LV unit

LIGHTING SYSTEM (Street


(Str Lighting) 31 16-Feb-26 29-Mar-26 29-Mar-26, LIGHTING SYSTEM (Street Ligh
DU-BZ5-PLS.440 prepare and submit shopdrawing for lighting system 20 16-Feb-26 11-Mar-26 prepare and submit shopdrawing for lighting syste

DU-BZ5-PLS.445 review and approval shopdrawing for lighting system 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for lighting s

LOW CURRENTS 159 17-Nov-25 30-May-26 30-May-26, LOW CURRENTS


TELECOME NETWORK 110 17-Nov-25 29-Mar-26 29-Mar-26, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 110 17-Nov-25 29-Mar-26 29-Mar-26, TELECOME NETWORK (Propo
DU-BZ5-LC-TN.440 prepare and submit shopdrawing for telecom network proposed 20 17-Nov-25 09-Dec-25 prepare and submit shopdrawing for telecom network propo

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
164 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ5-LC-TN.445 review and approval shopdrawing for telecom network proposed 11 11-Mar-26 29-Mar-26 review and approval shopdrawing for telecom n

ELV NETWORK 139 10-Dec-25 30-May-26 30-May-26, ELV NETWORK


ELV NETWORK 88 10-Dec-25 28-Mar-26 28-Mar-26, ELV NETWORK
DU-BZ5-LC-ELVN.4 prepare and submit shopdrawing for ELV Network 20 10-Dec-25 01-Jan-26 prepare and submit shopdrawing for ELV Network

DU-BZ5-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 10-Mar-26 28-Mar-26 review and approval shopdrawing for ELV Net

ICT NETWORK 119 01-Jan-26 30-May-26 30-May-26, ICT NETWORK


DU-BZ5-LC-ELVN.4 prepare and submit shopdrawing for ICT Network 20 01-Jan-26 25-Jan-26 prepare and submit shopdrawing for ICT Network

DU-BZ5-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 13-May-26 30-May-26 review and approval shopdrawing for IC

SECURITY NETWORK 43 25-Jan-26 16-Mar-26 16-Mar-26, SECURITY NETWORK


DU-BZ5-LC-ELVN.4 prepare and submit shopdrawing for Security Network 20 25-Jan-26 17-Feb-26 prepare and submit shopdrawing for Security Netwo

DU-BZ5-LC-ELVN.4 review and approval shopdrawing for Security Network 11 03-Mar-26 16-Mar-26 review and approval shopdrawing for Security N

SCADA SYSTEM 31 17-Feb-26 30-Mar-26 30-Mar-26, SCADA SYSTEM


DU-BZ5-LC-ELVN.4 prepare and submit shopdrawing for SCADA Network 20 17-Feb-26 12-Mar-26 prepare and submit shopdrawing for SCADA Ne

DU-BZ5-LC-ELVN.4 review and approval shopdrawing for SCADA Network 11 12-Mar-26 30-Mar-26 review and approval shopdrawing for SCADA

BESIDE ZONE 6 498 05-May-24 22-Dec-25 22-Dec-25, BESIDE ZONE 6


POWER 496 05-May-24 20-Dec-25 20-Dec-25, POWER
MV 496 05-May-24 20-Dec-25 20-Dec-25, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 496 05-May-24 20-Dec-25 20-Dec-25, MV CABLES PROPOSED INSTALLATION
DU-BZ6-PMV.470 prepare and submit shopdrawing for MV Proposed cable 20 05-May-24 28-May-24 prepare and submit shopdrawing for MV Proposed cable

DU-BZ6-PMV.475 review and approval shopdrawing for MV Proposed cable 11 07-Dec-25 20-Dec-25 review and approval shopdrawing for MV Proposed cabl

MV UNIT SUB-STATION 31 28-May-24 08-Jul-24 08-Jul-24, MV UNIT SUB-STATION


DU-BZ6-PMV.480 prepare and submit shopdrawing for MV unit sub- station 20 28-May-24 25-Jun-24 prepare and submit shopdrawing for MV unit sub- station

DU-BZ6-PMV.485 review and approval shopdrawing for MV unit sub- station 11 25-Jun-24 08-Jul-24 review and approval shopdrawing for MV unit sub- station

LV (Unit Sub-station to L
LV panel) 54 18-Oct-25 20-Dec-25 20-Dec-25, LV (Unit Sub-station to LV panel)
DU-BZ6-PLV.480 prepare and submit shopdrawing for LV unit sub- station 20 18-Oct-25 10-Nov-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ6-PLV.485 review and approval shopdrawing for LV unit sub- station 11 07-Dec-25 20-Dec-25 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(Str Lighting) 31 10-Nov-25 16-Dec-25 16-Dec-25, LIGHTING SYSTEM (Street Lighting)
DU-BZ6-PLS.480 prepare and submit shopdrawing for lighting system 20 10-Nov-25 03-Dec-25 prepare and submit shopdrawing for lighting system

DU-BZ6-PLS.485 review and approval shopdrawing for lighting system 11 03-Dec-25 16-Dec-25 review and approval shopdrawing for lighting system

LOW CURRENTS 119 04-Aug-25 22-Dec-25 22-Dec-25, LOW CURRENTS


TELECOME NETWORK 116 04-Aug-25 18-Dec-25 18-Dec-25, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 116 04-Aug-25 18-Dec-25 18-Dec-25, TELECOME NETWORK (Proposed Duct ba
DU-BZ6-LC-TN.480 prepare and submit shopdrawing for telecom network proposed 20 04-Aug-25 27-Aug-25 prepare and submit shopdrawing for telecom network proposed

DU-BZ6-LC-TN.485 review and approval shopdrawing for telecom network proposed 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for telecom network pro

ELV NETWORK 99 27-Aug-25 22-Dec-25 22-Dec-25, ELV NETWORK


ELV NETWORK 99 27-Aug-25 22-Dec-25 22-Dec-25, ELV NETWORK
DU-BZ6-LC-ELVN.4 prepare and submit shopdrawing for ELV Network 20 27-Aug-25 20-Sep-25 prepare and submit shopdrawing for ELV Network

DU-BZ6-LC-ELVN.4 review and approval shopdrawing for ELV Network 11 09-Dec-25 22-Dec-25 review and approval shopdrawing for ELV Network

ICT NETWORK 77 20-Sep-25 18-Dec-25 18-Dec-25, ICT NETWORK


DU-BZ6-LC-ELVN.4 prepare and submit shopdrawing for ICT Network 20 20-Sep-25 14-Oct-25 prepare and submit shopdrawing for ICT Network

DU-BZ6-LC-ELVN.4 review and approval shopdrawing for ICT Network 11 06-Dec-25 18-Dec-25 review and approval shopdrawing for ICT Network

SECURITY NETWORK 55 14-Oct-25 17-Dec-25 17-Dec-25, SECURITY NETWORK


DU-BZ6-LC-ELVN.5 prepare and submit shopdrawing for Security Network 20 14-Oct-25 06-Nov-25 prepare and submit shopdrawing for Security Network

DU-BZ6-LC-ELVN.5 review and approval shopdrawing for Security Network 11 04-Dec-25 17-Dec-25 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 06-Nov-25 13-Dec-25 13-Dec-25, SCADA SYSTEM


DU-BZ6-LC-ELVN.5 prepare and submit shopdrawing for SCADA Network 20 06-Nov-25 30-Nov-25 prepare and submit shopdrawing for SCADA Network

DU-BZ6-LC-ELVN.5 review and approval shopdrawing for SCADA Network 11 30-Nov-25 13-Dec-25 review and approval shopdrawing for SCADA Network

BESIDE ZONE 7 336 25-May-25 04-Jul-26 04-Jul-26, BESIDE ZONE 7


POWER 288 25-May-25 04-May-26 04-May-26, POWER
LV (Unit Sub-station to L
LV panel) 288 25-May-25 04-May-26 04-May-26, LV (Unit Sub-station to LV pan
DU-BZ7-PLV.510 prepare and submit shopdrawing for LV unit sub- station 20 25-May-25 21-Jun-25 prepare and submit shopdrawing for LV unit sub- station

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
165 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-BZ7-PLV.515 review and approval shopdrawing for LV unit sub- station 11 21-Apr-26 04-May-26 review and approval shopdrawing for LV

LIGHTING SYSTEM (Street


(Str Lighting) 111 21-Dec-25 04-May-26 04-May-26, LIGHTING SYSTEM (Street
DU-BZ7-PLS.510 prepare and submit shopdrawing for lighting system 20 21-Dec-25 13-Jan-26 prepare and submit shopdrawing for lighting system

DU-BZ7-PLS.515 review and approval shopdrawing for lighting system 11 21-Apr-26 04-May-26 review and approval shopdrawing for light

LOW CURRENTS 140 13-Jan-26 04-Jul-26 04-Jul-26, LOW CURRENTS


TELECOME NETWORK 91 13-Jan-26 04-May-26 04-May-26, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 91 13-Jan-26 04-May-26 04-May-26, TELECOME NETWORK (Pr
DU-BZ7-LC-TN.510 prepare and submit shopdrawing for telecom network proposed 20 13-Jan-26 05-Feb-26 prepare and submit shopdrawing for telecom network

DU-BZ7-LC-TN.515 review and approval shopdrawing for telecom network proposed 11 21-Apr-26 04-May-26 review and approval shopdrawing for telec

ELV NETWORK 120 05-Feb-26 04-Jul-26 04-Jul-26, ELV NETWORK


ELV NETWORK 69 05-Feb-26 02-May-26 02-May-26, ELV NETWORK
DU-BZ7-LC-ELVN.5 prepare and submit shopdrawing for ELV Network 20 05-Feb-26 01-Mar-26 prepare and submit shopdrawing for ELV Network

DU-BZ7-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 19-Apr-26 02-May-26 review and approval shopdrawing for ELV

ICT NETWORK 100 01-Mar-26 04-Jul-26 04-Jul-26, ICT NETWORK


DU-BZ7-LC-ELVN.5 prepare and submit shopdrawing for ICT Network 20 01-Mar-26 29-Mar-26 prepare and submit shopdrawing for ICT Netw

DU-BZ7-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 21-Jun-26 04-Jul-26 review and approval shopdrawing fo

SECURITY NETWORK 31 29-Mar-26 04-May-26 04-May-26, SECURITY NETWORK


DU-BZ7-LC-ELVN.5 prepare and submit shopdrawing for Security Network 20 29-Mar-26 21-Apr-26 prepare and submit shopdrawing for Security

DU-BZ7-LC-ELVN.5 review and approval shopdrawing for Security Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for Secu

BESIDE ZONE 8 260 21-Jun-25 26-Apr-26 26-Apr-26, BESIDE ZONE 8


POWER 260 21-Jun-25 26-Apr-26 26-Apr-26, POWER
LV (Unit Sub-station to L
LV panel) 260 21-Jun-25 26-Apr-26 26-Apr-26, LV (Unit Sub-station to LV pane
DU-BZ8-PLV.530 prepare and submit shopdrawing for LV unit sub- station 20 21-Jun-25 14-Jul-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ8-PLV.535 review and approval shopdrawing for LV unit sub- station 11 13-Apr-26 26-Apr-26 review and approval shopdrawing for LV u

LIGHTING SYSTEM (Street


(Str Lighting) 110 09-Dec-25 22-Apr-26 22-Apr-26, LIGHTING SYSTEM (Street Li
DU-BZ8-PLS.530 prepare and submit shopdrawing for lighting system 20 09-Dec-25 01-Jan-26 prepare and submit shopdrawing for lighting system

DU-BZ8-PLS.535 review and approval shopdrawing for lighting system 11 09-Apr-26 22-Apr-26 review and approval shopdrawing for lightin

LOW CURRENTS 93 01-Jan-26 25-Apr-26 25-Apr-26, LOW CURRENTS


TELECOME NETWORK 93 01-Jan-26 25-Apr-26 25-Apr-26, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 93 01-Jan-26 25-Apr-26 25-Apr-26, TELECOME NETWORK (Pro
DU-BZ8-LC-TN.530 prepare and submit shopdrawing for telecom network proposed 20 01-Jan-26 25-Jan-26 prepare and submit shopdrawing for telecom network p

DU-BZ8-LC-TN.535 review and approval shopdrawing for telecom network proposed 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for teleco

ELV NETWORK 73 25-Jan-26 25-Apr-26 25-Apr-26, ELV NETWORK


ELV NETWORK 73 25-Jan-26 25-Apr-26 25-Apr-26, ELV NETWORK
DU-BZ8-LC-ELVN.5 prepare and submit shopdrawing for ELV Network 20 25-Jan-26 17-Feb-26 prepare and submit shopdrawing for ELV Network

DU-BZ8-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for ELV N

ICT NETWORK 53 17-Feb-26 25-Apr-26 25-Apr-26, ICT NETWORK


DU-BZ8-LC-ELVN.5 prepare and submit shopdrawing for ICT Network 20 17-Feb-26 12-Mar-26 prepare and submit shopdrawing for ICT Networ

DU-BZ8-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 12-Apr-26 25-Apr-26 review and approval shopdrawing for ICT N

SECURITY NETWORK 31 12-Mar-26 22-Apr-26 22-Apr-26, SECURITY NETWORK


DU-BZ8-LC-ELVN.5 prepare and submit shopdrawing for Security Network 20 12-Mar-26 09-Apr-26 prepare and submit shopdrawing for Security N

DU-BZ8-LC-ELVN.5 review and approval shopdrawing for Security Network 11 09-Apr-26 22-Apr-26 review and approval shopdrawing for Securi

BESIDE ZONE 9 111 14-Jul-25 22-Nov-25 22-Nov-25, BESIDE ZONE 9


POWER 109 14-Jul-25 18-Nov-25 18-Nov-25, POWER
MV 109 14-Jul-25 18-Nov-25 18-Nov-25, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 109 14-Jul-25 18-Nov-25 18-Nov-25, MV CABLES PROPOSED INSTALLATION
DU-BZ9-PMV.550 prepare and submit shopdrawing for MV Proposed cable 20 14-Jul-25 06-Aug-25 prepare and submit shopdrawing for MV Proposed cable

DU-BZ9-PMV.555 review and approval shopdrawing for MV Proposed cable 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for MV Proposed cable

LV (Unit Sub-station to L
LV panel) 89 06-Aug-25 18-Nov-25 18-Nov-25, LV (Unit Sub-station to LV panel)
DU-BZ9-PLV.550 prepare and submit shopdrawing for LV unit sub- station 20 06-Aug-25 30-Aug-25 prepare and submit shopdrawing for LV unit sub- station

DU-BZ9-PLV.555 review and approval shopdrawing for LV unit sub- station 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for LV unit sub- station

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
166 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOW CURRENTS 71 30-Aug-25 22-Nov-25 22-Nov-25, LOW CURRENTS
ELV NETWORK 71 30-Aug-25 22-Nov-25 22-Nov-25, ELV NETWORK
ELV NETWORK 69 30-Aug-25 18-Nov-25 18-Nov-25, ELV NETWORK
DU-BZ9-LC-ELVN.5 prepare and submit shopdrawing for ELV Network 20 30-Aug-25 22-Sep-25 prepare and submit shopdrawing for ELV Network

DU-BZ9-LC-ELVN.5 review and approval shopdrawing for ELV Network 11 05-Nov-25 18-Nov-25 review and approval shopdrawing for ELV Network

ICT NETWORK 51 22-Sep-25 22-Nov-25 22-Nov-25, ICT NETWORK


DU-BZ9-LC-ELVN.5 prepare and submit shopdrawing for ICT Network 20 22-Sep-25 16-Oct-25 prepare and submit shopdrawing for ICT Network

DU-BZ9-LC-ELVN.5 review and approval shopdrawing for ICT Network 11 09-Nov-25 22-Nov-25 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 16-Oct-25 22-Nov-25 22-Nov-25, SECURITY NETWORK


DU-BZ9-LC-ELVN.5 prepare and submit shopdrawing for Security Network 20 16-Oct-25 09-Nov-25 prepare and submit shopdrawing for Security Network

DU-BZ9-LC-ELVN.5 review and approval shopdrawing for Security Network 11 09-Nov-25 22-Nov-25 review and approval shopdrawing for Security Network

SB1 31 17-Jan-24 22-Feb-24 22-Feb-24, SB1


POWER 31 17-Jan-24 22-Feb-24 22-Feb-24, POWER
MV 31 17-Jan-24 22-Feb-24 22-Feb-24, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 31 17-Jan-24 22-Feb-24 22-Feb-24, MV CABLES PROPOSED INSTALLATION
DU-SB1-PMV.570 prepare and submit shopdrawing for MV Proposed cable 20 17-Jan-24 10-Feb-24 prepare and submit shopdrawing for MV Proposed cable

DU-SB1-PMV.575 review and approval shopdrawing for MV Proposed cable 11 10-Feb-24 22-Feb-24 review and approval shopdrawing for MV Proposed cable

SB2 253 09-Mar-24 07-Jan-25 07-Jan-25, SB2


POWER 218 09-Mar-24 28-Nov-24 28-Nov-24, POWER
MV 161 09-Mar-24 21-Sep-24 21-Sep-24, MV
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 09-Mar-24 17-Apr-24 17-Apr-24, MV CABLES RELOCATION / DIVERTING
DU-SB2-PMV.570 prepare and submit shopdrawing for MV cable relocation 20 09-Mar-24 01-Apr-24 prepare and submit shopdrawing for MV cable relocation

DU-SB2-PMV.575 review and approval shopdrawing for MV cable relocation 11 01-Apr-24 17-Apr-24 review and approval shopdrawing for MV cable relocation

MV CABLES PROPOSED
PROPOSE INSTALLATION 31 15-Aug-24 21-Sep-24 21-Sep-24, MV CABLES PROPOSED INSTALLATION
DU-SB2-PMV.580 prepare and submit shopdrawing for MV Proposed cable 20 15-Aug-24 08-Sep-24 prepare and submit shopdrawing for MV Proposed cable

DU-SB2-PMV.585 review and approval shopdrawing for MV Proposed cable 11 08-Sep-24 21-Sep-24 review and approval shopdrawing for MV Proposed cable

LIGHTING SYSTEM (Street


(Str Lighting) 31 23-Oct-24 28-Nov-24 28-Nov-24, LIGHTING SYSTEM (Street Lighting)
DU-SB2-PLS.580 prepare and submit shopdrawing for lighting system 20 23-Oct-24 14-Nov-24 prepare and submit shopdrawing for lighting system

DU-SB2-PLS.585 review and approval shopdrawing for lighting system 11 14-Nov-24 28-Nov-24 review and approval shopdrawing for lighting system

LOW CURRENTS 133 05-Aug-24 07-Jan-25 07-Jan-25, LOW CURRENTS


TELECOME NETWORK 71 05-Aug-24 27-Oct-24 27-Oct-24, TELECOME NETWORK
TELECOME NETWORK Divertion and relocation 41 05-Aug-24 21-Sep-24 21-Sep-24, TELECOME NETWORK Divertion and relocation
DU-SB2-LC-TN.580 prepare and submit shopdrawing for telecome divertion 20 05-Aug-24 27-Aug-24 prepare and submit shopdrawing for telecome divertion

DU-SB2-LC-TN.585 review and approval shopdrawing for telecome divertion 11 08-Sep-24 21-Sep-24 review and approval shopdrawing for telecome divertion

TELECOME NETWORK Canceled 41 27-Aug-24 16-Oct-24 16-Oct-24, TELECOME NETWORK Canceled


DU-SB2-LC-TN.590 prepare and submit shopdrawing for telecom network canceled 20 27-Aug-24 19-Sep-24 prepare and submit shopdrawing for telecom network canceled

DU-SB2-LC-TN.595 review and approval shopdrawing for telecom network canceled 11 03-Oct-24 16-Oct-24 review and approval shopdrawing for telecom network canceled

TELECOME NETWORK (Proposed Duct bank) 31 19-Sep-24 27-Oct-24 27-Oct-24, TELECOME NETWORK (Proposed Duct bank)
DU-SB2-LC-TN.600 prepare and submit shopdrawing for telecom network proposed 20 19-Sep-24 14-Oct-24 prepare and submit shopdrawing for telecom network proposed

DU-SB2-LC-TN.605 review and approval shopdrawing for telecom network proposed 11 14-Oct-24 27-Oct-24 review and approval shopdrawing for telecom network proposed

ELV NETWORK 31 02-Dec-24 07-Jan-25 07-Jan-25, ELV NETWORK


ELV NETWORK 31 02-Dec-24 07-Jan-25 07-Jan-25, ELV NETWORK
DU-SB2-LC-ELVN.6 prepare and submit shopdrawing for ELV Network 20 02-Dec-24 25-Dec-24 prepare and submit shopdrawing for ELV Network

DU-SB2-LC-ELVN.6 review and approval shopdrawing for ELV Network 11 25-Dec-24 07-Jan-25 review and approval shopdrawing for ELV Network

SB3 31 17-Mar-24 25-Apr-24 25-Apr-24, SB3


POWER 31 17-Mar-24 25-Apr-24 25-Apr-24, POWER
MV 31 17-Mar-24 25-Apr-24 25-Apr-24, MV
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 17-Mar-24 25-Apr-24 25-Apr-24, MV CABLES RELOCATION / DIVERTING
DU-SB3-PMV.600 prepare and submit shopdrawing for MV cable relocation 20 17-Mar-24 13-Apr-24 prepare and submit shopdrawing for MV cable relocation

DU-SB3-PMV.605 review and approval shopdrawing for MV cable relocation 11 13-Apr-24 25-Apr-24 review and approval shopdrawing for MV cable relocation

SB4 31 03-Jun-24 14-Jul-24 14-Jul-24, SB4


POWER 31 03-Jun-24 14-Jul-24 14-Jul-24, POWER
MV 31 03-Jun-24 14-Jul-24 14-Jul-24, MV

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
167 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 03-Jun-24 14-Jul-24 14-Jul-24, MV CABLES RELOCATION / DIVERTING
DU-SB4-PMV.600 prepare and submit shopdrawing for MV cable relocation 20 03-Jun-24 01-Jul-24 prepare and submit shopdrawing for MV cable relocation

DU-SB4-PMV.605 review and approval shopdrawing for MV cable relocation 11 01-Jul-24 14-Jul-24 review and approval shopdrawing for MV cable relocation

SB5 95 21-Aug-24 11-Dec-24 11-Dec-24, SB5


POWER 31 21-Aug-24 28-Sep-24 28-Sep-24, POWER
MV 31 21-Aug-24 28-Sep-24 28-Sep-24, MV
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 21-Aug-24 28-Sep-24 28-Sep-24, MV CABLES RELOCATION / DIVERTING
DU-SB5-PMV.600 prepare and submit shopdrawing for MV cable relocation 20 21-Aug-24 14-Sep-24 prepare and submit shopdrawing for MV cable relocation

DU-SB5-PMV.605 review and approval shopdrawing for MV cable relocation 11 14-Sep-24 28-Sep-24 review and approval shopdrawing for MV cable relocation

LOW CURRENTS 31 05-Nov-24 11-Dec-24 11-Dec-24, LOW CURRENTS


TELECOME NETWORK 31 05-Nov-24 11-Dec-24 11-Dec-24, TELECOME NETWORK
TELECOME NETWORK Divertion and relocation 31 05-Nov-24 11-Dec-24 11-Dec-24, TELECOME NETWORK Divertion and relocation
DU-SB5-LC-TN.600 prepare and submit shopdrawing for telecome divertion 20 05-Nov-24 28-Nov-24 prepare and submit shopdrawing for telecome divertion

DU-SB5-LC-TN.605 review and approval shopdrawing for telecome divertion 11 28-Nov-24 11-Dec-24 review and approval shopdrawing for telecome divertion

D10 291 27-Jan-24 09-Jan-25 09-Jan-25, D10


POWER 274 27-Jan-24 22-Dec-24 22-Dec-24, POWER
HV 31 27-Jan-24 03-Mar-24 03-Mar-24, HV
HV 110KV CABLE RELOCATION
RELO 31 27-Jan-24 03-Mar-24 03-Mar-24, HV 110KV CABLE RELOCATION
DU-D10-PHV.600 prepare and submit shopdrawing for HV cable relocation 20 27-Jan-24 19-Feb-24 prepare and submit shopdrawing for HV cable relocation

DU-D10-PHV.605 review and approval shopdrawing for HV cable relocation 11 19-Feb-24 03-Mar-24 review and approval shopdrawing for HV cable relocation

MV 89 20-May-24 04-Sep-24 04-Sep-24, MV


MV CABLES PROPOSED
PROPOSE INSTALLATION 31 20-May-24 30-Jun-24 30-Jun-24, MV CABLES PROPOSED INSTALLATION
DU-D10-PMV.600 prepare and submit shopdrawing for MV Proposed cable 20 20-May-24 12-Jun-24 prepare and submit shopdrawing for MV Proposed cable

DU-D10-PMV.605 review and approval shopdrawing for MV Proposed cable 11 12-Jun-24 30-Jun-24 review and approval shopdrawing for MV Proposed cable

MV UNIT SUB-STATION 31 30-Jul-24 04-Sep-24 04-Sep-24, MV UNIT SUB-STATION


DU-D10-PMV.610 prepare and submit shopdrawing for MV unit sub- station 20 30-Jul-24 22-Aug-24 prepare and submit shopdrawing for MV unit sub- station

DU-D10-PMV.615 review and approval shopdrawing for MV unit sub- station 11 22-Aug-24 04-Sep-24 review and approval shopdrawing for MV unit sub- station

LV (Unit Sub-station to L
LV panel) 31 25-Sep-24 31-Oct-24 31-Oct-24, LV (Unit Sub-station to LV panel)
DU-D10-PLV.610 prepare and submit shopdrawing for LV unit sub- station 20 25-Sep-24 17-Oct-24 prepare and submit shopdrawing for LV unit sub- station

DU-D10-PLV.615 review and approval shopdrawing for LV unit sub- station 11 17-Oct-24 31-Oct-24 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(Str Lighting) 31 16-Nov-24 22-Dec-24 22-Dec-24, LIGHTING SYSTEM (Street Lighting)
DU-D10-PLS.610 prepare and submit shopdrawing for lighting system 20 16-Nov-24 08-Dec-24 prepare and submit shopdrawing for lighting system

DU-D10-PLS.615 review and approval shopdrawing for lighting system 11 08-Dec-24 22-Dec-24 review and approval shopdrawing for lighting system

LOW CURRENTS 238 28-Mar-24 09-Jan-25 09-Jan-25, LOW CURRENTS


TELECOME NETWORK 31 28-Mar-24 07-May-24 07-May-24, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 31 28-Mar-24 07-May-24 07-May-24, TELECOME NETWORK (Proposed Duct bank)
DU-D10-LC-TN.610 prepare and submit shopdrawing for telecom network proposed 20 28-Mar-24 24-Apr-24 prepare and submit shopdrawing for telecom network proposed

DU-D10-LC-TN.615 review and approval shopdrawing for telecom network proposed 11 24-Apr-24 07-May-24 review and approval shopdrawing for telecom network proposed

ELV NETWORK 176 12-Jun-24 09-Jan-25 09-Jan-25, ELV NETWORK


ELV NETWORK 31 12-Jun-24 23-Jul-24 23-Jul-24, ELV NETWORK
DU-D10-LC-ELVN.6 prepare and submit shopdrawing for ELV Network 20 12-Jun-24 10-Jul-24 prepare and submit shopdrawing for ELV Network

DU-D10-LC-ELVN.6 review and approval shopdrawing for ELV Network 11 10-Jul-24 23-Jul-24 review and approval shopdrawing for ELV Network

ICT NETWORK 31 15-Aug-24 21-Sep-24 21-Sep-24, ICT NETWORK


DU-D10-LC-ELVN.6 prepare and submit shopdrawing for ICT Network 20 15-Aug-24 07-Sep-24 prepare and submit shopdrawing for ICT Network

DU-D10-LC-ELVN.6 review and approval shopdrawing for ICT Network 11 07-Sep-24 21-Sep-24 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 10-Sep-24 17-Oct-24 17-Oct-24, SECURITY NETWORK


DU-D10-LC-ELVN.6 prepare and submit shopdrawing for Security Network 20 10-Sep-24 05-Oct-24 prepare and submit shopdrawing for Security Network

DU-D10-LC-ELVN.6 review and approval shopdrawing for Security Network 11 05-Oct-24 17-Oct-24 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 04-Dec-24 09-Jan-25 09-Jan-25, SCADA SYSTEM


DU-D10-LC-ELVN.6 prepare and submit shopdrawing for SCADA Network 20 04-Dec-24 28-Dec-24 prepare and submit shopdrawing for SCADA Network

DU-D10-LC-ELVN.6 review and approval shopdrawing for SCADA Network 11 28-Dec-24 09-Jan-25 review and approval shopdrawing for SCADA Network

D9 321 02-Dec-23 18-Dec-24 18-Dec-24, D9

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
168 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
POWER 169 02-Dec-23 23-Jun-24 23-Jun-24, POWER
MV 117 02-Dec-23 18-Apr-24 18-Apr-24, MV
MV CABLES RELOCAT
RELOCATION / DIVERTING 31 02-Dec-23 07-Jan-24 07-Jan-24, MV CABLES RELOCATION / DIVERTING
DU-D9-PMV.640 prepare and submit shopdrawing for MV cable relocation 20 02-Dec-23 24-Dec-23 prepare and submit shopdrawing for MV cable relocation

DU-D9-PMV.645 review and approval shopdrawing for MV cable relocation 11 24-Dec-23 07-Jan-24 review and approval shopdrawing for MV cable relocation

MV CABLES PROPOSED
PROPOSE INSTALLATION 97 24-Dec-23 18-Apr-24 18-Apr-24, MV CABLES PROPOSED INSTALLATION
DU-D9-PMV.650 prepare and submit shopdrawing for MV Proposed cable 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for MV Proposed cable

DU-D9-PMV.655 review and approval shopdrawing for MV Proposed cable 11 02-Apr-24 18-Apr-24 review and approval shopdrawing for MV Proposed cable

MV UNIT SUB-STATION 31 16-Jan-24 21-Feb-24 21-Feb-24, MV UNIT SUB-STATION


DU-D9-PMV.660 prepare and submit shopdrawing for MV unit sub- station 20 16-Jan-24 08-Feb-24 prepare and submit shopdrawing for MV unit sub- station

DU-D9-PMV.665 review and approval shopdrawing for MV unit sub- station 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for MV unit sub- station

LV (Unit Sub-station to L
LV panel) 31 12-Mar-24 21-Apr-24 21-Apr-24, LV (Unit Sub-station to LV panel)
DU-D9-PLV.660 prepare and submit shopdrawing for LV unit sub- station 20 12-Mar-24 03-Apr-24 prepare and submit shopdrawing for LV unit sub- station

DU-D9-PLV.665 review and approval shopdrawing for LV unit sub- station 11 03-Apr-24 21-Apr-24 review and approval shopdrawing for LV unit sub- station

LIGHTING SYSTEM (Street


(Str Lighting) 31 13-May-24 23-Jun-24 23-Jun-24, LIGHTING SYSTEM (Street Lighting)
DU-D9-PLL.660 prepare and submit shopdrawing for lighting system 20 13-May-24 05-Jun-24 prepare and submit shopdrawing for lighting system

DU-D9-PLL.665 review and approval shopdrawing for lighting system 11 05-Jun-24 23-Jun-24 review and approval shopdrawing for lighting system

LOW CURRENTS 199 25-Apr-24 18-Dec-24 18-Dec-24, LOW CURRENTS


TELECOME NETWORK 84 25-Apr-24 06-Aug-24 06-Aug-24, TELECOME NETWORK
TELECOME NETWORK (Proposed Duct bank) 84 25-Apr-24 06-Aug-24 06-Aug-24, TELECOME NETWORK (Proposed Duct bank)
DU-D9-LC-TN.660 prepare and submit shopdrawing for telecom network proposed 20 25-Apr-24 19-May-24 prepare and submit shopdrawing for telecom network proposed

DU-D9-LC-TN.665 review and approval shopdrawing for telecom network proposed 11 23-Jul-24 06-Aug-24 review and approval shopdrawing for telecom network proposed

ELV NETWORK 179 19-May-24 18-Dec-24 18-Dec-24, ELV NETWORK


ELV NETWORK 31 19-May-24 29-Jun-24 29-Jun-24, ELV NETWORK
DU-D9-LC-ELVN.66 prepare and submit shopdrawing for ELV Network 20 19-May-24 11-Jun-24 prepare and submit shopdrawing for ELV Network

DU-D9-LC-ELVN.66 review and approval shopdrawing for ELV Network 11 11-Jun-24 29-Jun-24 review and approval shopdrawing for ELV Network

ICT NETWORK 31 22-Jul-24 27-Aug-24 27-Aug-24, ICT NETWORK


DU-D9-LC-ELVN.67 prepare and submit shopdrawing for ICT Network 20 22-Jul-24 13-Aug-24 prepare and submit shopdrawing for ICT Network

DU-D9-LC-ELVN.67 review and approval shopdrawing for ICT Network 11 13-Aug-24 27-Aug-24 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 17-Aug-24 22-Sep-24 22-Sep-24, SECURITY NETWORK


DU-D9-LC-ELVN.68 prepare and submit shopdrawing for Security Network 20 17-Aug-24 09-Sep-24 prepare and submit shopdrawing for Security Network

DU-D9-LC-ELVN.68 review and approval shopdrawing for Security Network 11 09-Sep-24 22-Sep-24 review and approval shopdrawing for Security Network

SCADA SYSTEM 31 12-Nov-24 18-Dec-24 18-Dec-24, SCADA SYSTEM


DU-D9-LC-ELVN.69 prepare and submit shopdrawing for SCADA Network 20 12-Nov-24 05-Dec-24 prepare and submit shopdrawing for SCADA Network

DU-D9-LC-ELVN.69 review and approval shopdrawing for SCADA Network 11 05-Dec-24 18-Dec-24 review and approval shopdrawing for SCADA Network

CROWD CORRIDOR NO.01 BESIDE ZONE 10 122 08-Dec-25 04-May-26 04-May-26, CROWD CORRIDOR NO.01
POWER 71 08-Dec-25 01-Mar-26 01-Mar-26, POWER
MV 71 08-Dec-25 01-Mar-26 01-Mar-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 71 08-Dec-25 01-Mar-26 01-Mar-26, MV CABLES PROPOSED INSTALL
DU-CC01BZ10-PMV prepare and submit shopdrawing for MV Proposed cable 20 08-Dec-25 31-Dec-25 prepare and submit shopdrawing for MV Proposed cable

DU-CC01BZ10-PMV review and approval shopdrawing for MV Proposed cable 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for MV Propo

LV (Unit Sub-station to L
LV panel) 51 31-Dec-25 01-Mar-26 01-Mar-26, LV (Unit Sub-station to LV panel)
DU-CC01BZ10-PLV.6 prepare and submit shopdrawing for LV unit sub- station 20 31-Dec-25 24-Jan-26 prepare and submit shopdrawing for LV unit sub- stati

DU-CC01BZ10-PLV.6 review and approval shopdrawing for LV unit sub- station 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for LV unit sub

LOW CURRENTS 82 24-Jan-26 04-May-26 04-May-26, LOW CURRENTS


ELV NETWORK 82 24-Jan-26 04-May-26 04-May-26, ELV NETWORK
ELV NETWORK 31 24-Jan-26 01-Mar-26 01-Mar-26, ELV NETWORK
DU-CC01BZ10-LCEN prepare and submit shopdrawing for ELV Network 20 24-Jan-26 16-Feb-26 prepare and submit shopdrawing for ELV Network

DU-CC01BZ10-LCEN review and approval shopdrawing for ELV Network 11 16-Feb-26 01-Mar-26 review and approval shopdrawing for ELV Netwo

ICT NETWORK 51 01-Mar-26 04-May-26 04-May-26, ICT NETWORK


DU-CC01BZ10-LCEN prepare and submit shopdrawing for ICT Network 20 01-Mar-26 29-Mar-26 prepare and submit shopdrawing for ICT Netw

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
169 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
DU-CC01BZ10-LCEN review and approval shopdrawing for ICT Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for ICT

SECURITY NETWORK 31 29-Mar-26 04-May-26 04-May-26, SECURITY NETWORK


DU-CC01BZ10-LCEN prepare and submit shopdrawing for Security Network 20 29-Mar-26 21-Apr-26 prepare and submit shopdrawing for Security

DU-CC01BZ10-LCEN review and approval shopdrawing for Security Network 11 21-Apr-26 04-May-26 review and approval shopdrawing for Secu

CROWD CORRIDOR NO.02 BESIDE ZONE 11 111 17-Sep-25 26-Jan-26 26-Jan-26, CROWD CORRIDOR NO.02 BESIDE Z
POWER 109 17-Sep-25 24-Jan-26 24-Jan-26, POWER
MV 109 17-Sep-25 24-Jan-26 24-Jan-26, MV
MV CABLES PROPOSED
PROPOSE INSTALLATION 109 17-Sep-25 24-Jan-26 24-Jan-26, MV CABLES PROPOSED INSTALLATI
DU-CC02BZ11-PMV prepare and submit shopdrawing for MV Proposed cable 20 17-Sep-25 12-Oct-25 prepare and submit shopdrawing for MV Proposed cable

DU-CC02BZ11-PMV review and approval shopdrawing for MV Proposed cable 11 11-Jan-26 24-Jan-26 review and approval shopdrawing for MV Proposed

LV (Unit Sub-station to L
LV panel) 89 12-Oct-25 24-Jan-26 24-Jan-26, LV (Unit Sub-station to LV panel)
DU-CC02BZ11-PLV.6 prepare and submit shopdrawing for LV unit sub- station 20 12-Oct-25 04-Nov-25 prepare and submit shopdrawing for LV unit sub- station

DU-CC02BZ11-PLV.6 review and approval shopdrawing for LV unit sub- station 11 11-Jan-26 24-Jan-26 review and approval shopdrawing for LV unit sub- st

LOW CURRENTS 71 04-Nov-25 26-Jan-26 26-Jan-26, LOW CURRENTS


ELV NETWORK 71 04-Nov-25 26-Jan-26 26-Jan-26, ELV NETWORK
ELV NETWORK 69 04-Nov-25 24-Jan-26 24-Jan-26, ELV NETWORK
DU-CC02BZ11-LCEN prepare and submit shopdrawing for ELV Network 20 04-Nov-25 27-Nov-25 prepare and submit shopdrawing for ELV Network

DU-CC02BZ11-LCEN review and approval shopdrawing for ELV Network 11 10-Jan-26 24-Jan-26 review and approval shopdrawing for ELV Network

ICT NETWORK 51 27-Nov-25 26-Jan-26 26-Jan-26, ICT NETWORK


DU-CC02BZ11-LCEN prepare and submit shopdrawing for ICT Network 20 27-Nov-25 21-Dec-25 prepare and submit shopdrawing for ICT Network

DU-CC02BZ11-LCEN review and approval shopdrawing for ICT Network 11 13-Jan-26 26-Jan-26 review and approval shopdrawing for ICT Network

SECURITY NETWORK 31 21-Dec-25 26-Jan-26 26-Jan-26, SECURITY NETWORK


DU-CC02BZ11-LCEN prepare and submit shopdrawing for Security Network 20 21-Dec-25 13-Jan-26 prepare and submit shopdrawing for Security Network

DU-CC02BZ11-LCEN review and approval shopdrawing for Security Network 11 13-Jan-26 26-Jan-26 review and approval shopdrawing for Security Netwo

CROWD CORRIDOR NO.03 BETWEEN SUPERBLOCK 2&3 129 02-Dec-23 02-May-24 02-May-24, CROWD CORRIDOR NO.03 BETWEEN SUPERBLOCK 2&3
POWER 129 02-Dec-23 02-May-24 02-May-24, POWER
LV (Unit Sub-station to L
LV panel) 129 02-Dec-23 02-May-24 02-May-24, LV (Unit Sub-station to LV panel)
DU-CC03BSB2&3-P.7 prepare and submit shopdrawing for LV unit sub- station 20 02-Dec-23 24-Dec-23 prepare and submit shopdrawing for LV unit sub- station

DU-CC03BSB2&3-P.7 review and approval shopdrawing for LV unit sub- station 11 20-Apr-24 02-May-24 review and approval shopdrawing for LV unit sub- station

LOW CURRENTS 82 24-Dec-23 28-Mar-24 28-Mar-24, LOW CURRENTS


ELV NETWORK 82 24-Dec-23 28-Mar-24 28-Mar-24, ELV NETWORK
ELV NETWORK 31 24-Dec-23 29-Jan-24 29-Jan-24, ELV NETWORK
DU-CC3BSB2&3-LC prepare and submit shopdrawing for ELV Network 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for ELV Network

DU-CC3BSB2&3-LC review and approval shopdrawing for ELV Network 11 16-Jan-24 29-Jan-24 review and approval shopdrawing for ELV Network

SECURITY NETWORK 31 21-Feb-24 28-Mar-24 28-Mar-24, SECURITY NETWORK


DU-CC3BSB2&3-LC prepare and submit shopdrawing for Security Network 20 21-Feb-24 16-Mar-24 prepare and submit shopdrawing for Security Network

DU-CC3BSB2&3-LC review and approval shopdrawing for Security Network 11 16-Mar-24 28-Mar-24 review and approval shopdrawing for Security Network

CROWD CORRIDOR NO.04 IN SUPERBLOCK 1 102 24-Dec-23 24-Apr-24 24-Apr-24, CROWD CORRIDOR NO.04 IN SUPERBLOCK 1
POWER 31 24-Dec-23 29-Jan-24 29-Jan-24, POWER
LV (Unit Sub-station to L
LV panel) 31 24-Dec-23 29-Jan-24 29-Jan-24, LV (Unit Sub-station to LV panel)
DU-CC04INSB1-PLV. prepare and submit shopdrawing for LV unit sub- station 20 24-Dec-23 16-Jan-24 prepare and submit shopdrawing for LV unit sub- station

DU-CC04INSB1-PLV. review and approval shopdrawing for LV unit sub- station 11 16-Jan-24 29-Jan-24 review and approval shopdrawing for LV unit sub- station

LOW CURRENTS 82 16-Jan-24 24-Apr-24 24-Apr-24, LOW CURRENTS


ELV NETWORK 82 16-Jan-24 24-Apr-24 24-Apr-24, ELV NETWORK
ELV NETWORK 31 16-Jan-24 21-Feb-24 21-Feb-24, ELV NETWORK
DU-CC04INSB1-LC. prepare and submit shopdrawing for ELV Network 20 16-Jan-24 08-Feb-24 prepare and submit shopdrawing for ELV Network

DU-CC04INSB1-LC. review and approval shopdrawing for ELV Network 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for ELV Network

SECURITY NETWORK 31 16-Mar-24 24-Apr-24 24-Apr-24, SECURITY NETWORK


DU-CC04INSB1-LC. prepare and submit shopdrawing for Security Network 20 16-Mar-24 08-Apr-24 prepare and submit shopdrawing for Security Network

DU-CC04INSB1-LC. review and approval shopdrawing for Security Network 11 08-Apr-24 24-Apr-24 review and approval shopdrawing for Security Network

CROWD CORRIDOR NO.04 IN SUPERBLOCK 2 102 16-Jan-24 18-May-24 18-May-24, CROWD CORRIDOR NO.04 IN SUPERBLOCK 2
POWER 31 16-Jan-24 21-Feb-24 21-Feb-24, POWER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
170 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LV (Unit Sub-station to L
LV panel) 31 16-Jan-24 21-Feb-24 21-Feb-24, LV (Unit Sub-station to LV panel)
DU-CC04INSB2-PLV. prepare and submit shopdrawing for LV unit sub- station 20 16-Jan-24 08-Feb-24 prepare and submit shopdrawing for LV unit sub- station

DU-CC04INSB2-PLV. review and approval shopdrawing for LV unit sub- station 11 08-Feb-24 21-Feb-24 review and approval shopdrawing for LV unit sub- station

LOW CURRENTS 82 08-Feb-24 18-May-24 18-May-24, LOW CURRENTS


ELV NETWORK 82 08-Feb-24 18-May-24 18-May-24, ELV NETWORK
ELV NETWORK 31 08-Feb-24 16-Mar-24 16-Mar-24, ELV NETWORK
DU-CC04INSB2-LC. prepare and submit shopdrawing for ELV Network 20 08-Feb-24 03-Mar-24 prepare and submit shopdrawing for ELV Network

DU-CC04INSB2-LC. review and approval shopdrawing for ELV Network 11 03-Mar-24 16-Mar-24 review and approval shopdrawing for ELV Network

SECURITY NETWORK 31 08-Apr-24 18-May-24 18-May-24, SECURITY NETWORK


DU-CC04INSB2-LC. prepare and submit shopdrawing for Security Network 20 08-Apr-24 05-May-24 prepare and submit shopdrawing for Security Network

DU-CC04INSB2-LC. review and approval shopdrawing for Security Network 11 05-May-24 18-May-24 review and approval shopdrawing for Security Network

EXTERNAL MAIN ROADS


ROA (OUTSIDE) 325 23-Aug-25 15-Sep-26 15-Sep-26, EXTERNAL MA
ENGINEERING 325 23-Aug-25 15-Sep-26 15-Sep-26, ENGINEERING
GENERAL 28 23-Aug-25 25-Sep-25 25-Sep-25, GENERAL
EMR-ENG-GE.100 Typical Section Preparation & Submission 14 23-Aug-25 08-Sep-25 Typical Section Preparation & Submission

EMR-ENG-GE.105 Typical Sections Review & Approval 14 08-Sep-25 25-Sep-25 Typical Sections Review & Approval

HARAM BOULEVARD ROAD


R 297 25-Sep-25 15-Sep-26 15-Sep-26, HARAM BOUL
EMR-ENG-HBR.490 Plan and Profile Preparation & Submission 14 25-Sep-25 12-Oct-25 Plan and Profile Preparation & Submission

EMR-ENG-HBR.495 Plan and Profile Review & Approval 14 15-Apr-26 02-May-26 Plan and Profile Review & Approval

EMR-ENG-HBR.500 Road Cross Sections Preparation & Submission 14 02-May-26 18-May-26 Road Cross Sections Preparation & Subm

EMR-ENG-HBR.505 Road Cross Sections Review & Approval 14 18-May-26 07-Jun-26 Road Cross Sections Review & Approv

EMR-ENG-HBR.510 Guiding Signs and Marking Preparation & Submission 14 13-Aug-26 30-Aug-26 Guiding Signs and Marking P

EMR-ENG-HBR.515 Guiding Signs and Marking Review & Approval 14 30-Aug-26 15-Sep-26 Guiding Signs and Marking

HARAM RAMP NOURTH 01 169 12-Oct-25 02-May-26 02-May-26, HARAM RAMP NOURTH 0
EMR-ENG-JH-R-N1.100 Plan and Profile Preparation & Submission 14 12-Oct-25 27-Oct-25 Plan and Profile Preparation & Submission

EMR-ENG-JH-R-N1.105 Plan and Profile Review & Approval 14 21-Jan-26 07-Feb-26 Plan and Profile Review & Approval

EMR-ENG-JH-R-N1.110 Road Cross Sections Preparation & Submission 14 07-Feb-26 23-Feb-26 Road Cross Sections Preparation & Submission

EMR-ENG-JH-R-N1.115 Road Cross Sections Review & Approval 14 23-Feb-26 11-Mar-26 Road Cross Sections Review & Approval

EMR-ENG-JH-R-N1.120 Guiding Signs and Marking Preparation & Submission 14 30-Mar-26 15-Apr-26 Guiding Signs and Marking Preparation & Su

EMR-ENG-JH-R-N1.125 Guiding Signs and Marking Review & Approval 14 15-Apr-26 02-May-26 Guiding Signs and Marking Review & App

HARAM RAMP NOURTH 02 147 28-Oct-25 22-Apr-26 22-Apr-26, HARAM RAMP NOURTH 02
EMR-ENG-JH-R-N2.100 Plan and Profile Preparation & Submission 14 28-Oct-25 12-Nov-25 Plan and Profile Preparation & Submission

EMR-ENG-JH-R-N2.105 Plan and Profile Review & Approval 14 31-Jan-26 16-Feb-26 Plan and Profile Review & Approval

EMR-ENG-JH-R-N2.110 Road Cross Sections Preparation & Submission 14 16-Feb-26 04-Mar-26 Road Cross Sections Preparation & Submission

EMR-ENG-JH-R-N2.115 Road Cross Sections Review & Approval 14 04-Mar-26 25-Mar-26 Road Cross Sections Review & Approval

EMR-ENG-JH-R-N2.120 Guiding Signs and Marking Preparation & Submission 14 16-Mar-26 06-Apr-26 Guiding Signs and Marking Preparation & Sub

EMR-ENG-JH-R-N2.125 Guiding Signs and Marking Review & Approval 14 06-Apr-26 22-Apr-26 Guiding Signs and Marking Review & Appr

HARAM RAMP SOUTH 01 80 14-Dec-25 16-Mar-26 16-Mar-26, HARAM RAMP SOUTH 01


EMR-ENG-JH-R-S1.100 Plan and Profile Preparation & Submission 14 14-Dec-25 30-Dec-25 Plan and Profile Preparation & Submission

EMR-ENG-JH-R-S1.105 Plan and Profile Review & Approval 14 30-Dec-25 15-Jan-26 Plan and Profile Review & Approval

EMR-ENG-JH-R-S1.110 Road Cross Sections Preparation & Submission 14 15-Jan-26 01-Feb-26 Road Cross Sections Preparation & Submission

EMR-ENG-JH-R-S1.115 Road Cross Sections Review & Approval 14 01-Feb-26 16-Feb-26 Road Cross Sections Review & Approval

EMR-ENG-JH-R-S1.120 Guiding Signs and Marking Preparation & Submission 14 12-Feb-26 01-Mar-26 Guiding Signs and Marking Preparation & Submis

EMR-ENG-JH-R-S1.125 Guiding Signs and Marking Review & Approval 14 01-Mar-26 16-Mar-26 Guiding Signs and Marking Review & Approval

HARAM RAMP SOUTH 02 105 12-Nov-25 15-Mar-26 15-Mar-26, HARAM RAMP SOUTH 02
EMR-ENG-JH-R-S2.100 Plan and Profile Preparation & Submission 14 12-Nov-25 29-Nov-25 Plan and Profile Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
171 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EMR-ENG-JH-R-S2.105 Plan and Profile Review & Approval 14 30-Dec-25 15-Jan-26 Plan and Profile Review & Approval

EMR-ENG-JH-R-S2.110 Road Cross Sections Preparation & Submission 14 15-Jan-26 01-Feb-26 Road Cross Sections Preparation & Submission

EMR-ENG-JH-R-S2.115 Road Cross Sections Review & Approval 14 01-Feb-26 16-Feb-26 Road Cross Sections Review & Approval

EMR-ENG-JH-R-S2.120 Guiding Signs and Marking Preparation & Submission 14 11-Feb-26 28-Feb-26 Guiding Signs and Marking Preparation & Submis

EMR-ENG-JH-R-S2.125 Guiding Signs and Marking Review & Approval 14 28-Feb-26 15-Mar-26 Guiding Signs and Marking Review & Approval

AIRPORT ROAD 156 29-Nov-25 07-Jun-26 07-Jun-26, AIRPORT ROAD


EMR-ENG-AR.100 Plan and Profile Preparation & Submission 14 29-Nov-25 15-Dec-25 Plan and Profile Preparation & Submission

EMR-ENG-AR.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval

EMR-ENG-AR.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi

EMR-ENG-AR.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval

EMR-ENG-AR.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &

EMR-ENG-AR.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &

AIRPORT ROAD RAMP 01 142 15-Dec-25 07-Jun-26 07-Jun-26, AIRPORT ROAD RAMP 0
EMR-ENG-AR-R1.100 Plan and Profile Preparation & Submission 14 15-Dec-25 31-Dec-25 Plan and Profile Preparation & Submission

EMR-ENG-AR-R1.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval

EMR-ENG-AR-R1.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi

EMR-ENG-AR-R1.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval

EMR-ENG-AR-R1.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &

EMR-ENG-AR-R1.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &

AIRPORT ROAD RAMP 02 128 31-Dec-25 07-Jun-26 07-Jun-26, AIRPORT ROAD RAMP 0
EMR-ENG-AR-R2.100 Plan and Profile Preparation & Submission 14 31-Dec-25 17-Jan-26 Plan and Profile Preparation & Submission

EMR-ENG-AR-R2.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval

EMR-ENG-AR-R2.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi

EMR-ENG-AR-R2.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval

EMR-ENG-AR-R2.120 Guiding Signs and Marking Preparation & Submission 14 03-May-26 18-May-26 Guiding Signs and Marking Preparation &

EMR-ENG-AR-R2.125 Guiding Signs and Marking Review & Approval 14 19-May-26 07-Jun-26 Guiding Signs and Marking Review &

AIRPORT ROAD Grade 01 112 17-Jan-26 04-Jun-26 04-Jun-26, AIRPORT ROAD Grade 01
EMR-ENG-AR-G1.100 Plan and Profile Preparation & Submission 14 17-Jan-26 02-Feb-26 Plan and Profile Preparation & Submission

EMR-ENG-AR-G1.105 Plan and Profile Review & Approval 14 12-Mar-26 02-Apr-26 Plan and Profile Review & Approval

EMR-ENG-AR-G1.110 Road Cross Sections Preparation & Submission 14 02-Apr-26 18-Apr-26 Road Cross Sections Preparation & Submissi

EMR-ENG-AR-G1.115 Road Cross Sections Review & Approval 14 19-Apr-26 04-May-26 Road Cross Sections Review & Approval

EMR-ENG-AR-G1.120 Guiding Signs and Marking Preparation & Submission 14 30-Apr-26 16-May-26 Guiding Signs and Marking Preparation &

EMR-ENG-AR-G1.125 Guiding Signs and Marking Review & Approval 14 17-May-26 04-Jun-26 Guiding Signs and Marking Review & A

KAAR ROAD 159 02-Feb-26 15-Aug-26 15-Aug-26, KAAR ROAD


EMR-ENG-KAAR.100 Plan and Profile Preparation & Submission 14 02-Feb-26 18-Feb-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR.105 Plan and Profile Review & Approval 14 24-May-26 13-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR.110 Road Cross Sections Preparation & Submission 14 13-Jun-26 29-Jun-26 Road Cross Sections Preparation & S

EMR-ENG-KAAR.115 Road Cross Sections Review & Approval 14 29-Jun-26 15-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR.120 Guiding Signs and Marking Preparation & Submission 14 13-Jul-26 29-Jul-26 Guiding Signs and Marking Prepa

EMR-ENG-KAAR.125 Guiding Signs and Marking Review & Approval 14 29-Jul-26 15-Aug-26 Guiding Signs and Marking Rev

KAAR ROAD RAMP 01 148 18-Feb-26 18-Aug-26 18-Aug-26, KAAR ROAD RA


EMR-ENG-KAAR-R1.100 Plan and Profile Preparation & Submission 14 18-Feb-26 07-Mar-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR-R1.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-R1.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
172 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EMR-ENG-KAAR-R1.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-R1.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-R1.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re

KAAR ROAD RAMP 02 135 07-Mar-26 19-Aug-26 19-Aug-26, KAAR ROAD RA


EMR-ENG-KAAR-R2.100 Plan and Profile Preparation & Submission 14 07-Mar-26 28-Mar-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR-R2.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-R2.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

EMR-ENG-KAAR-R2.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-R2.120 Guiding Signs and Marking Preparation & Submission 14 18-Jul-26 03-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-R2.125 Guiding Signs and Marking Review & Approval 14 03-Aug-26 19-Aug-26 Guiding Signs and Marking Re

KAAR ROAD AT GRADE


GRAD 01 128 28-Mar-26 27-Aug-26 27-Aug-26, KAAR ROAD AT
EMR-ENG-KAAR-G1.100 Plan and Profile Preparation & Submission 14 28-Mar-26 12-Apr-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR-G1.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-G1.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

EMR-ENG-KAAR-G1.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-G1.120 Guiding Signs and Marking Preparation & Submission 14 26-Jul-26 11-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-G1.125 Guiding Signs and Marking Review & Approval 14 11-Aug-26 27-Aug-26 Guiding Signs and Marking Re

KAAR ROAD AT GRADE


GRAD 02 111 13-Apr-26 24-Aug-26 24-Aug-26, KAAR ROAD AT
EMR-ENG-KAAR-G2.100 Plan and Profile Preparation & Submission 14 13-Apr-26 28-Apr-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR-G2.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-G2.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

EMR-ENG-KAAR-G2.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-G2.120 Guiding Signs and Marking Preparation & Submission 14 22-Jul-26 08-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-G2.125 Guiding Signs and Marking Review & Approval 14 08-Aug-26 24-Aug-26 Guiding Signs and Marking Re

KAAR ROAD AT GRADE


GRAD 03 93 28-Apr-26 18-Aug-26 18-Aug-26, KAAR ROAD AT
EMR-ENG-KAAR-G3.100 Plan and Profile Preparation & Submission 14 28-Apr-26 14-May-26 Plan and Profile Preparation & Submission

EMR-ENG-KAAR-G3.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-G3.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

EMR-ENG-KAAR-G3.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-G3.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-G3.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re

KAAR ROAD AT GRADE


GRAD 04 79 14-May-26 18-Aug-26 18-Aug-26, KAAR ROAD AT
EMR-ENG-KAAR-G4.100 Plan and Profile Preparation & Submission 14 14-May-26 03-Jun-26 Plan and Profile Preparation & Submiss

EMR-ENG-KAAR-G4.105 Plan and Profile Review & Approval 14 03-Jun-26 20-Jun-26 Plan and Profile Review & Approval

EMR-ENG-KAAR-G4.110 Road Cross Sections Preparation & Submission 14 20-Jun-26 06-Jul-26 Road Cross Sections Preparation &

EMR-ENG-KAAR-G4.115 Road Cross Sections Review & Approval 14 06-Jul-26 22-Jul-26 Road Cross Sections Review & Ap

EMR-ENG-KAAR-G4.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-26 02-Aug-26 Guiding Signs and Marking Prep

EMR-ENG-KAAR-G4.125 Guiding Signs and Marking Review & Approval 14 02-Aug-26 18-Aug-26 Guiding Signs and Marking Re

GANTRY SIGNBOARD 28 25-Mar-26 27-Apr-26 27-Apr-26, GANTRY SIGNBOARD


ER-ENG-GS.110 Shop Drawings Preparation & Submission 14 25-Mar-26 11-Apr-26 Shop Drawings Preparation & Submission

ER-ENG-GS.115 Shop Drawings Review & Approval 14 11-Apr-26 27-Apr-26 Shop Drawings Review & Approval

LOCAL ROADS AND PAVINGS 998 10-Jan-23 A 20-Apr-26 20-Apr-26, LOCAL ROADS AND PAVING
ENGINEERING 998 10-Jan-23 A 20-Apr-26 20-Apr-26, ENGINEERING
NORTH 977 04-Feb-23 A 20-Apr-26 20-Apr-26, NORTH

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
173 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LOCAL ROAD NO. 01 888 09-Mar-23 A 03-Feb-26 03-Feb-26, LOCAL ROAD NO. 01
LR-ENG-N-R1.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R1.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval

LR-ENG-N-R1.110 Road Cross Sections Preparation & Submission 14 17-Dec-25 03-Jan-26 Road Cross Sections Preparation & Submission

LR-ENG-N-R1.115 Road Cross Sections Review & Approval 14 05-Jan-26 20-Jan-26 Road Cross Sections Review & Approval

LR-ENG-N-R1.120 Guiding Signs and Marking Preparation & Submission 14 03-Jan-26 19-Jan-26 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R1.125 Guiding Signs and Marking Review & Approval 14 19-Jan-26 03-Feb-26 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 03 888 09-Mar-23 A 03-Feb-26 03-Feb-26, LOCAL ROAD NO. 03
LR-ENG-N-R3.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R3.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval

LR-ENG-N-R3.110 Road Cross Sections Preparation & Submission 14 17-Dec-25 03-Jan-26 Road Cross Sections Preparation & Submission

LR-ENG-N-R3.115 Road Cross Sections Review & Approval 14 05-Jan-26 20-Jan-26 Road Cross Sections Review & Approval

LR-ENG-N-R3.120 Guiding Signs and Marking Preparation & Submission 14 03-Jan-26 19-Jan-26 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R3.125 Guiding Signs and Marking Review & Approval 14 19-Jan-26 03-Feb-26 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 05 669 09-Mar-23 A 19-May-25 19-May-25, LOCAL ROAD NO. 05
LR-ENG-N-R5.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R5.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval

LR-ENG-N-R5.110 Road Cross Sections Preparation & Submission 14 27-Mar-25 17-Apr-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R5.115 Road Cross Sections Review & Approval 14 20-Apr-25 05-May-25 Road Cross Sections Review & Approval

LR-ENG-N-R5.120 Guiding Signs and Marking Preparation & Submission 14 17-Apr-25 04-May-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R5.125 Guiding Signs and Marking Review & Approval 14 04-May-25 19-May-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 07 669 09-Mar-23 A 19-May-25 19-May-25, LOCAL ROAD NO. 07
LR-ENG-N-R7.100 Plan and Profile Preparation & Submission 7 09-Mar-23 A 16-Mar-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R7.105 Plan and Profile Review & Approval 6 16-Mar-23 A 22-Mar-23 A Plan and Profile Review & Approval

LR-ENG-N-R7.110 Road Cross Sections Preparation & Submission 14 27-Mar-25 17-Apr-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R7.115 Road Cross Sections Review & Approval 14 20-Apr-25 05-May-25 Road Cross Sections Review & Approval

LR-ENG-N-R7.120 Guiding Signs and Marking Preparation & Submission 14 17-Apr-25 04-May-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R7.125 Guiding Signs and Marking Review & Approval 14 04-May-25 19-May-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 09 769 18-Jun-23 A 23-Dec-25 23-Dec-25, LOCAL ROAD NO. 09
LR-ENG-N-R9.100 Plan and Profile Preparation & Submission 5 18-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R9.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval

LR-ENG-N-R9.110 Road Cross Sections Preparation & Submission 14 05-Nov-25 22-Nov-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R9.115 Road Cross Sections Review & Approval 14 24-Nov-25 09-Dec-25 Road Cross Sections Review & Approval

LR-ENG-N-R9.120 Guiding Signs and Marking Preparation & Submission 14 22-Nov-25 08-Dec-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R9.125 Guiding Signs and Marking Review & Approval 14 08-Dec-25 23-Dec-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 25 70 18-Nov-25 07-Feb-26 07-Feb-26, LOCAL ROAD NO. 25


LR-ENG-N-R25.100 Plan and Profile Preparation & Submission 14 18-Nov-25 04-Dec-25 Plan and Profile Preparation & Submission

LR-ENG-N-R25.105 Plan and Profile Review & Approval 14 04-Dec-25 21-Dec-25 Plan and Profile Review & Approval

LR-ENG-N-R25.110 Road Cross Sections Preparation & Submission 14 21-Dec-25 06-Jan-26 Road Cross Sections Preparation & Submission

LR-ENG-N-R25.115 Road Cross Sections Review & Approval 14 08-Jan-26 24-Jan-26 Road Cross Sections Review & Approval

LR-ENG-N-R25.120 Guiding Signs and Marking Preparation & Submission 14 06-Jan-26 22-Jan-26 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R25.125 Guiding Signs and Marking Review & Approval 14 22-Jan-26 07-Feb-26 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 26 868 04-Feb-23 A 09-Dec-25 09-Dec-25, LOCAL ROAD NO. 26
LR-ENG-N-R26.100 Plan and Profile Preparation & Submission 6 04-Feb-23 A 09-Feb-23 A Plan and Profile Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
174 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-N-R26.105 Plan and Profile Review & Approval 4 09-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval

LR-ENG-N-R26.110 Road Cross Sections Preparation & Submission 14 21-Oct-25 06-Nov-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R26.115 Road Cross Sections Review & Approval 14 09-Nov-25 25-Nov-25 Road Cross Sections Review & Approval

LR-ENG-N-R26.120 Guiding Signs and Marking Preparation & Submission 14 06-Nov-25 23-Nov-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R26.125 Guiding Signs and Marking Review & Approval 14 23-Nov-25 09-Dec-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 29 876 06-Feb-23 A 20-Dec-25 20-Dec-25, LOCAL ROAD NO. 29
LR-ENG-N-R29.100 Plan and Profile Preparation & Submission 5 06-Feb-23 A 11-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R29.105 Plan and Profile Review & Approval 3 11-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval

LR-ENG-N-R29.110 Road Cross Sections Preparation & Submission 14 02-Nov-25 18-Nov-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R29.115 Road Cross Sections Review & Approval 14 20-Nov-25 06-Dec-25 Road Cross Sections Review & Approval

LR-ENG-N-R29.120 Guiding Signs and Marking Preparation & Submission 14 18-Nov-25 04-Dec-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R29.125 Guiding Signs and Marking Review & Approval 14 04-Dec-25 20-Dec-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 31 70 14-Sep-25 06-Dec-25 06-Dec-25, LOCAL ROAD NO. 31


LR-ENG-N-R31.100 Plan and Profile Preparation & Submission 14 14-Sep-25 01-Oct-25 Plan and Profile Preparation & Submission

LR-ENG-N-R31.105 Plan and Profile Review & Approval 14 01-Oct-25 18-Oct-25 Plan and Profile Review & Approval

LR-ENG-N-R31.110 Road Cross Sections Preparation & Submission 14 18-Oct-25 03-Nov-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R31.115 Road Cross Sections Review & Approval 14 05-Nov-25 22-Nov-25 Road Cross Sections Review & Approval

LR-ENG-N-R31.120 Guiding Signs and Marking Preparation & Submission 14 03-Nov-25 19-Nov-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R31.125 Guiding Signs and Marking Review & Approval 14 19-Nov-25 06-Dec-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 32 495 04-Feb-23 A 18-Sep-24 18-Sep-24, LOCAL ROAD NO. 32
LR-ENG-N-R32.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-N-R32.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval

LR-ENG-N-R32.110 Road Cross Sections Preparation & Submission 14 01-Aug-24 17-Aug-24 Road Cross Sections Preparation & Submission

LR-ENG-N-R32.115 Road Cross Sections Review & Approval 14 19-Aug-24 04-Sep-24 Road Cross Sections Review & Approval

LR-ENG-N-R32.120 Guiding Signs and Marking Preparation & Submission 14 17-Aug-24 02-Sep-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R32.125 Guiding Signs and Marking Review & Approval 14 02-Sep-24 18-Sep-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 33 70 27-Jun-24 16-Sep-24 16-Sep-24, LOCAL ROAD NO. 33


LR-ENG-N-R33.100 Plan and Profile Preparation & Submission 14 27-Jun-24 14-Jul-24 Plan and Profile Preparation & Submission

LR-ENG-N-R33.105 Plan and Profile Review & Approval 14 14-Jul-24 29-Jul-24 Plan and Profile Review & Approval

LR-ENG-N-R33.110 Road Cross Sections Preparation & Submission 14 30-Jul-24 14-Aug-24 Road Cross Sections Preparation & Submission

LR-ENG-N-R33.115 Road Cross Sections Review & Approval 14 17-Aug-24 02-Sep-24 Road Cross Sections Review & Approval

LR-ENG-N-R33.120 Guiding Signs and Marking Preparation & Submission 14 14-Aug-24 31-Aug-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R33.125 Guiding Signs and Marking Review & Approval 14 31-Aug-24 16-Sep-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 34 178 11-Aug-25 08-Mar-26 08-Mar-26, LOCAL ROAD NO. 34
LR-ENG-N-R34.100 Plan and Profile Preparation & Submission 14 11-Aug-25 26-Aug-25 Plan and Profile Preparation & Submission

LR-ENG-N-R34.105 Plan and Profile Review & Approval 14 01-Jan-26 18-Jan-26 Plan and Profile Review & Approval

LR-ENG-N-R34.110 Road Cross Sections Preparation & Submission 14 18-Jan-26 03-Feb-26 Road Cross Sections Preparation & Submission

LR-ENG-N-R34.115 Road Cross Sections Review & Approval 14 05-Feb-26 22-Feb-26 Road Cross Sections Review & Approval

LR-ENG-N-R34.120 Guiding Signs and Marking Preparation & Submission 14 03-Feb-26 19-Feb-26 Guiding Signs and Marking Preparation & Submiss

LR-ENG-N-R34.125 Guiding Signs and Marking Review & Approval 14 19-Feb-26 08-Mar-26 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 36 138 26-Aug-25 04-Feb-26 04-Feb-26, LOCAL ROAD NO. 36
LR-ENG-N-R36.100 Plan and Profile Preparation & Submission 14 26-Aug-25 11-Sep-25 Plan and Profile Preparation & Submission

LR-ENG-N-R36.105 Plan and Profile Review & Approval 14 02-Dec-25 18-Dec-25 Plan and Profile Review & Approval

LR-ENG-N-R36.110 Road Cross Sections Preparation & Submission 14 18-Dec-25 04-Jan-26 Road Cross Sections Preparation & Submission

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
175 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-N-R36.115 Road Cross Sections Review & Approval 14 06-Jan-26 21-Jan-26 Road Cross Sections Review & Approval

LR-ENG-N-R36.120 Guiding Signs and Marking Preparation & Submission 14 04-Jan-26 20-Jan-26 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R36.125 Guiding Signs and Marking Review & Approval 14 20-Jan-26 04-Feb-26 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 45 70 11-Sep-25 03-Dec-25 03-Dec-25, LOCAL ROAD NO. 45


LR-ENG-N-R45.100 Plan and Profile Preparation & Submission 14 11-Sep-25 29-Sep-25 Plan and Profile Preparation & Submission

LR-ENG-N-R45.105 Plan and Profile Review & Approval 14 29-Sep-25 15-Oct-25 Plan and Profile Review & Approval

LR-ENG-N-R45.110 Road Cross Sections Preparation & Submission 14 15-Oct-25 01-Nov-25 Road Cross Sections Preparation & Submission

LR-ENG-N-R45.115 Road Cross Sections Review & Approval 14 01-Nov-25 17-Nov-25 Road Cross Sections Review & Approval

LR-ENG-N-R45.120 Guiding Signs and Marking Preparation & Submission 14 01-Nov-25 17-Nov-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-N-R45.125 Guiding Signs and Marking Review & Approval 14 17-Nov-25 03-Dec-25 Guiding Signs and Marking Review & Approval

AMIDA RAMP - A 128 16-Nov-25 19-Apr-26 19-Apr-26, AMIDA RAMP - A


LR-ENG-N-RAR-A.100 Plan and Profile Preparation & Submission 14 16-Nov-25 02-Dec-25 Plan and Profile Preparation & Submission

LR-ENG-N-RAR-A.105 Plan and Profile Review & Approval 14 02-Feb-26 18-Feb-26 Plan and Profile Review & Approval

LR-ENG-N-RAR-A.110 Road Cross Sections Preparation & Submission 14 18-Feb-26 07-Mar-26 Road Cross Sections Preparation & Submission

LR-ENG-N-RAR-A.115 Road Cross Sections Review & Approval 14 07-Mar-26 28-Mar-26 Road Cross Sections Review & Approval

LR-ENG-N-RAR-A.120 Guiding Signs and Marking Preparation & Submission 14 12-Mar-26 02-Apr-26 Guiding Signs and Marking Preparation & Sub

LR-ENG-N-RAR-A.125 Guiding Signs and Marking Review & Approval 14 02-Apr-26 19-Apr-26 Guiding Signs and Marking Review & Appro

AMIDA RAMP - B 114 02-Dec-25 19-Apr-26 19-Apr-26, AMIDA RAMP - B


LR-ENG-N-RAR-B.100 Plan and Profile Preparation & Submission 14 02-Dec-25 17-Dec-25 Plan and Profile Preparation & Submission

LR-ENG-N-RAR-B.105 Plan and Profile Review & Approval 14 02-Feb-26 18-Feb-26 Plan and Profile Review & Approval

LR-ENG-N-RAR-B.110 Road Cross Sections Preparation & Submission 14 18-Feb-26 07-Mar-26 Road Cross Sections Preparation & Submission

LR-ENG-N-RAR-B.115 Road Cross Sections Review & Approval 14 07-Mar-26 28-Mar-26 Road Cross Sections Review & Approval

LR-ENG-N-RAR-B.120 Guiding Signs and Marking Preparation & Submission 14 12-Mar-26 02-Apr-26 Guiding Signs and Marking Preparation & Sub

LR-ENG-N-RAR-B.125 Guiding Signs and Marking Review & Approval 14 02-Apr-26 19-Apr-26 Guiding Signs and Marking Review & Appro

EXISTING ROAD (NEAR HARAM RAMP NORTH - 01) 101 18-Dec-25 20-Apr-26 20-Apr-26, EXISTING ROAD (NEAR HA
LR-ENG-EX-N1.100 Plan and Profile Preparation & Submission 14 18-Dec-25 03-Jan-26 Plan and Profile Preparation & Submission

LR-ENG-EX-N1.105 Plan and Profile Review & Approval 14 09-Feb-26 25-Feb-26 Plan and Profile Review & Approval

LR-ENG-EX-N1.110 Road Cross Sections Preparation & Submission 14 25-Feb-26 14-Mar-26 Road Cross Sections Preparation & Submission

LR-ENG-EX-N1.115 Road Cross Sections Review & Approval 14 16-Mar-26 06-Apr-26 Road Cross Sections Review & Approval

LR-ENG-EX-N1.120 Guiding Signs and Marking Preparation & Submission 14 14-Mar-26 04-Apr-26 Guiding Signs and Marking Preparation & Sub

LR-ENG-EX-N1.125 Guiding Signs and Marking Review & Approval 14 04-Apr-26 20-Apr-26 Guiding Signs and Marking Review & Appro

EXISTING ROAD (NEAR HARAM RAMP NORTH - 02) 80 03-Jan-26 12-Apr-26 12-Apr-26, EXISTING ROAD (NEAR HAR
LR-ENG-EX-N2.100 Plan and Profile Preparation & Submission 14 03-Jan-26 19-Jan-26 Plan and Profile Preparation & Submission

LR-ENG-EX-N2.105 Plan and Profile Review & Approval 14 01-Feb-26 17-Feb-26 Plan and Profile Review & Approval

LR-ENG-EX-N2.110 Road Cross Sections Preparation & Submission 14 17-Feb-26 05-Mar-26 Road Cross Sections Preparation & Submission

LR-ENG-EX-N2.115 Road Cross Sections Review & Approval 14 08-Mar-26 29-Mar-26 Road Cross Sections Review & Approval

LR-ENG-EX-N2.120 Guiding Signs and Marking Preparation & Submission 14 05-Mar-26 26-Mar-26 Guiding Signs and Marking Preparation & Subm

LR-ENG-EX-N2.125 Guiding Signs and Marking Review & Approval 14 26-Mar-26 12-Apr-26 Guiding Signs and Marking Review & Appro

AIRPORT ROAD GRAD 70 19-Jan-26 15-Apr-26 15-Apr-26, AIRPORT ROAD GRAD


LR-ENG-AR-G.100 Plan and Profile Preparation & Submission 14 19-Jan-26 04-Feb-26 Plan and Profile Preparation & Submission

LR-ENG-AR-G.105 Plan and Profile Review & Approval 14 04-Feb-26 21-Feb-26 Plan and Profile Review & Approval

LR-ENG-AR-G.110 Road Cross Sections Preparation & Submission 14 21-Feb-26 09-Mar-26 Road Cross Sections Preparation & Submission

LR-ENG-AR-G.115 Road Cross Sections Review & Approval 14 09-Mar-26 30-Mar-26 Road Cross Sections Review & Approval

LR-ENG-AR-G.120 Guiding Signs and Marking Preparation & Submission 14 09-Mar-26 30-Mar-26 Guiding Signs and Marking Preparation & Sub

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
176 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-AR-G.125 Guiding Signs and Marking Review & Approval 14 30-Mar-26 15-Apr-26 Guiding Signs and Marking Review & Appro

SOUTH 902 10-Jan-23 A 23-Dec-25 23-Dec-25, SOUTH


LOCAL ROAD NO. 11 451 18-Jun-23 A 08-Dec-24 08-Dec-24, LOCAL ROAD NO. 11
LR-ENG-S-R11.100 Plan and Profile Preparation & Submission 5 18-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R11.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval

LR-ENG-S-R11.110 Road Cross Sections Preparation & Submission 14 21-Oct-24 06-Nov-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R11.115 Road Cross Sections Review & Approval 14 06-Nov-24 21-Nov-24 Road Cross Sections Review & Approval

LR-ENG-S-R11.120 Guiding Signs and Marking Preparation & Submission 14 06-Nov-24 23-Nov-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R11.125 Guiding Signs and Marking Review & Approval 14 23-Nov-24 08-Dec-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 10 70 04-Aug-24 24-Oct-24 24-Oct-24, LOCAL ROAD NO. 10


LR-ENG-S-R10.100 Plan and Profile Preparation & Submission 14 04-Aug-24 20-Aug-24 Plan and Profile Preparation & Submission

LR-ENG-S-R10.105 Plan and Profile Review & Approval 14 20-Aug-24 05-Sep-24 Plan and Profile Review & Approval

LR-ENG-S-R10.110 Road Cross Sections Preparation & Submission 14 05-Sep-24 22-Sep-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R10.115 Road Cross Sections Review & Approval 14 25-Sep-24 10-Oct-24 Road Cross Sections Review & Approval

LR-ENG-S-R10.120 Guiding Signs and Marking Preparation & Submission 14 22-Sep-24 09-Oct-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R10.125 Guiding Signs and Marking Review & Approval 14 09-Oct-24 24-Oct-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 12 394 24-Aug-23 A 05-Dec-24 05-Dec-24, LOCAL ROAD NO. 12
LR-ENG-S-R12.100 Plan and Profile Preparation & Submission 7 24-Aug-23 A 31-Aug-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R12.105 Plan and Profile Review & Approval 4 31-Aug-23 A 04-Sep-23 A Plan and Profile Review & Approval

LR-ENG-S-R12.110 Road Cross Sections Preparation & Submission 14 16-Oct-24 02-Nov-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R12.115 Road Cross Sections Review & Approval 14 02-Nov-24 17-Nov-24 Road Cross Sections Review & Approval

LR-ENG-S-R12.120 Guiding Signs and Marking Preparation & Submission 14 04-Nov-24 20-Nov-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R12.125 Guiding Signs and Marking Review & Approval 14 20-Nov-24 05-Dec-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 13 462 18-Jun-23 A 21-Dec-24 21-Dec-24, LOCAL ROAD NO. 13
LR-ENG-S-R13.100 Plan and Profile Preparation & Submission 5 18-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R13.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval

LR-ENG-S-R13.110 Road Cross Sections Preparation & Submission 14 03-Nov-24 19-Nov-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R13.115 Road Cross Sections Review & Approval 14 19-Nov-24 04-Dec-24 Road Cross Sections Review & Approval

LR-ENG-S-R13.120 Guiding Signs and Marking Preparation & Submission 14 19-Nov-24 05-Dec-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R13.125 Guiding Signs and Marking Review & Approval 14 05-Dec-24 21-Dec-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 14 506 04-Feb-23 A 02-Oct-24 02-Oct-24, LOCAL ROAD NO. 14
LR-ENG-S-R14.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R14.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval

LR-ENG-S-R14.110 Road Cross Sections Preparation & Submission 14 14-Aug-24 31-Aug-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R14.115 Road Cross Sections Review & Approval 14 02-Sep-24 17-Sep-24 Road Cross Sections Review & Approval

LR-ENG-S-R14.120 Guiding Signs and Marking Preparation & Submission 14 31-Aug-24 16-Sep-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R14.125 Guiding Signs and Marking Review & Approval 14 16-Sep-24 02-Oct-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 15 551 10-Jan-23 A 30-Oct-24 30-Oct-24, LOCAL ROAD NO. 15
LR-ENG-S-R15.100 Plan and Profile Preparation & Submission 16 10-Jan-23 A 28-Jan-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R15.105 Plan and Profile Review & Approval 13 18-Jan-23 A 01-Feb-23 A Plan and Profile Review & Approval

LR-ENG-S-R15.110 Road Cross Sections Preparation & Submission 14 11-Sep-24 29-Sep-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R15.115 Road Cross Sections Review & Approval 14 01-Oct-24 16-Oct-24 Road Cross Sections Review & Approval

LR-ENG-S-R15.120 Guiding Signs and Marking Preparation & Submission 14 29-Sep-24 15-Oct-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R15.125 Guiding Signs and Marking Review & Approval 14 15-Oct-24 30-Oct-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 16 508 11-Feb-23 A 12-Oct-24 12-Oct-24, LOCAL ROAD NO. 16

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
177 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R16.100 Plan and Profile Preparation & Submission 2 15-Feb-23 A 16-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R16.105 Plan and Profile Review & Approval 5 11-Feb-23 A 15-Feb-23 A Plan and Profile Review & Approval

LR-ENG-S-R16.110 Road Cross Sections Preparation & Submission 14 24-Aug-24 09-Sep-24 Road Cross Sections Preparation & Submission

LR-ENG-S-R16.115 Road Cross Sections Review & Approval 14 11-Sep-24 28-Sep-24 Road Cross Sections Review & Approval

LR-ENG-S-R16.120 Guiding Signs and Marking Preparation & Submission 14 09-Sep-24 26-Sep-24 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R16.125 Guiding Signs and Marking Review & Approval 14 26-Sep-24 12-Oct-24 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 17 722 15-Jun-23 A 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 17
LR-ENG-S-R17.100 Plan and Profile Preparation & Submission 7 15-Jun-23 A 22-Jun-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R17.105 Plan and Profile Review & Approval 9 22-Jun-23 A 05-Jul-23 A Plan and Profile Review & Approval

LR-ENG-S-R17.110 Road Cross Sections Preparation & Submission 14 08-Sep-25 25-Sep-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R17.115 Road Cross Sections Review & Approval 14 28-Sep-25 13-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R17.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R17.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 18 115 01-May-25 16-Sep-25 16-Sep-25, LOCAL ROAD NO. 18
LR-ENG-S-R18.100 Plan and Profile Preparation & Submission 14 01-May-25 18-May-25 Plan and Profile Preparation & Submission

LR-ENG-S-R18.105 Plan and Profile Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Review & Approval

LR-ENG-S-R18.110 Road Cross Sections Preparation & Submission 14 30-Jul-25 16-Aug-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R18.115 Road Cross Sections Review & Approval 14 18-Aug-25 02-Sep-25 Road Cross Sections Review & Approval

LR-ENG-S-R18.120 Guiding Signs and Marking Preparation & Submission 14 16-Aug-25 01-Sep-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R18.125 Guiding Signs and Marking Review & Approval 14 01-Sep-25 16-Sep-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 20 143 18-May-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 20
LR-ENG-S-R20.100 Plan and Profile Preparation & Submission 14 18-May-25 03-Jun-25 Plan and Profile Preparation & Submission

LR-ENG-S-R20.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R20.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R20.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R20.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R20.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 21 129 03-Jun-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 21
LR-ENG-S-R21.100 Plan and Profile Preparation & Submission 14 03-Jun-25 23-Jun-25 Plan and Profile Preparation & Submission

LR-ENG-S-R21.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R21.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R21.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R21.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R21.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 22 107 23-Jun-25 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 22
LR-ENG-S-R22.100 Plan and Profile Preparation & Submission 14 23-Jun-25 09-Jul-25 Plan and Profile Preparation & Submission

LR-ENG-S-R22.105 Plan and Profile Review & Approval 14 20-Aug-25 06-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R22.110 Road Cross Sections Preparation & Submission 14 06-Sep-25 22-Sep-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R22.115 Road Cross Sections Review & Approval 14 22-Sep-25 08-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R22.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R22.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 23 70 09-Jul-25 29-Sep-25 29-Sep-25, LOCAL ROAD NO. 23


LR-ENG-S-R23.100 Plan and Profile Preparation & Submission 14 09-Jul-25 26-Jul-25 Plan and Profile Preparation & Submission

LR-ENG-S-R23.105 Plan and Profile Review & Approval 14 26-Jul-25 11-Aug-25 Plan and Profile Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
178 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R23.110 Road Cross Sections Preparation & Submission 14 11-Aug-25 27-Aug-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R23.115 Road Cross Sections Review & Approval 14 30-Aug-25 14-Sep-25 Road Cross Sections Review & Approval

LR-ENG-S-R23.120 Guiding Signs and Marking Preparation & Submission 14 27-Aug-25 13-Sep-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R23.125 Guiding Signs and Marking Review & Approval 14 13-Sep-25 29-Sep-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 24 829 10-Jan-23 A 29-Sep-25 29-Sep-25, LOCAL ROAD NO. 24
LR-ENG-S-R24.100 Plan and Profile Preparation & Submission 23 10-Jan-23 A 05-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R24.105 Plan and Profile Review & Approval 17 18-Jan-23 A 06-Feb-23 A Plan and Profile Review & Approval

LR-ENG-S-R24.110 Road Cross Sections Preparation & Submission 14 11-Aug-25 27-Aug-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R24.115 Road Cross Sections Review & Approval 14 30-Aug-25 14-Sep-25 Road Cross Sections Review & Approval

LR-ENG-S-R24.120 Guiding Signs and Marking Preparation & Submission 14 27-Aug-25 13-Sep-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R24.125 Guiding Signs and Marking Review & Approval 14 13-Sep-25 29-Sep-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 38 772 04-Feb-23 A 17-Aug-25 17-Aug-25, LOCAL ROAD NO. 38
LR-ENG-S-R38.100 Plan and Profile Preparation & Submission 5 04-Feb-23 A 08-Feb-23 A Plan and Profile Preparation & Submission

LR-ENG-S-R38.105 Plan and Profile Review & Approval 5 08-Feb-23 A 13-Feb-23 A Plan and Profile Review & Approval

LR-ENG-S-R38.110 Road Cross Sections Preparation & Submission 14 28-Jun-25 14-Jul-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R38.115 Road Cross Sections Review & Approval 14 14-Jul-25 29-Jul-25 Road Cross Sections Review & Approval

LR-ENG-S-R38.120 Guiding Signs and Marking Preparation & Submission 14 16-Jul-25 02-Aug-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R38.125 Guiding Signs and Marking Review & Approval 14 02-Aug-25 17-Aug-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 41 284 21-Nov-24 27-Oct-25 27-Oct-25, LOCAL ROAD NO. 41
LR-ENG-S-R41.100 Plan and Profile Preparation & Submission 14 21-Nov-24 07-Dec-24 Plan and Profile Preparation & Submission

LR-ENG-S-R41.105 Plan and Profile Review & Approval 14 23-Aug-25 08-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R41.110 Road Cross Sections Preparation & Submission 14 08-Sep-25 25-Sep-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R41.115 Road Cross Sections Review & Approval 14 28-Sep-25 13-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R41.120 Guiding Signs and Marking Preparation & Submission 14 25-Sep-25 12-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R41.125 Guiding Signs and Marking Review & Approval 14 12-Oct-25 27-Oct-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 42 319 07-Dec-24 23-Dec-25 23-Dec-25, LOCAL ROAD NO. 42
LR-ENG-S-R42.100 Plan and Profile Preparation & Submission 14 07-Dec-24 23-Dec-24 Plan and Profile Preparation & Submission

LR-ENG-S-R42.105 Plan and Profile Review & Approval 14 27-Aug-25 13-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R42.110 Road Cross Sections Preparation & Submission 14 13-Sep-25 30-Sep-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R42.115 Road Cross Sections Review & Approval 14 30-Sep-25 15-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R42.120 Guiding Signs and Marking Preparation & Submission 14 20-Nov-25 07-Dec-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R42.125 Guiding Signs and Marking Review & Approval 14 07-Dec-25 23-Dec-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 43 260 23-Dec-24 01-Nov-25 01-Nov-25, LOCAL ROAD NO. 43
LR-ENG-S-R43.100 Plan and Profile Preparation & Submission 14 23-Dec-24 08-Jan-25 Plan and Profile Preparation & Submission

LR-ENG-S-R43.105 Plan and Profile Review & Approval 14 27-Aug-25 13-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R43.110 Road Cross Sections Preparation & Submission 14 13-Sep-25 30-Sep-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R43.115 Road Cross Sections Review & Approval 14 02-Oct-25 18-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R43.120 Guiding Signs and Marking Preparation & Submission 14 30-Sep-25 16-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R43.125 Guiding Signs and Marking Review & Approval 14 16-Oct-25 01-Nov-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 44 248 08-Jan-25 03-Nov-25 03-Nov-25, LOCAL ROAD NO. 44
LR-ENG-S-R44.100 Plan and Profile Preparation & Submission 14 08-Jan-25 25-Jan-25 Plan and Profile Preparation & Submission

LR-ENG-S-R44.105 Plan and Profile Review & Approval 14 30-Aug-25 15-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R44.110 Road Cross Sections Preparation & Submission 14 15-Sep-25 02-Oct-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R44.115 Road Cross Sections Review & Approval 14 05-Oct-25 20-Oct-25 Road Cross Sections Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
179 of 180
Critical Remaining Work
Milestone
MONTRING SCHEDULE FORRUA AL MADINAH MAIN
INFRASTRUCTURE PACKAGEC -REV0 C-40
Engineering Schedule
Activity ID Activity Name Original Start Finish
Duration 2022 2023 2024 2025 2026 2027
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
LR-ENG-S-R44.120 Guiding Signs and Marking Preparation & Submission 14 02-Oct-25 19-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R44.125 Guiding Signs and Marking Review & Approval 14 19-Oct-25 03-Nov-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 48 236 25-Jan-25 05-Nov-25 05-Nov-25, LOCAL ROAD NO. 48
LR-ENG-S-R48.100 Plan and Profile Preparation & Submission 14 25-Jan-25 10-Feb-25 Plan and Profile Preparation & Submission

LR-ENG-S-R48.105 Plan and Profile Review & Approval 14 01-Sep-25 17-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-R48.110 Road Cross Sections Preparation & Submission 14 17-Sep-25 05-Oct-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R48.115 Road Cross Sections Review & Approval 14 07-Oct-25 22-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-R48.120 Guiding Signs and Marking Preparation & Submission 14 05-Oct-25 21-Oct-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R48.125 Guiding Signs and Marking Review & Approval 14 21-Oct-25 05-Nov-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 49 70 10-Feb-25 06-May-25 06-May-25, LOCAL ROAD NO. 49


LR-ENG-S-R49.100 Plan and Profile Preparation & Submission 14 10-Feb-25 26-Feb-25 Plan and Profile Preparation & Submission

LR-ENG-S-R49.105 Plan and Profile Review & Approval 14 26-Feb-25 15-Mar-25 Plan and Profile Review & Approval

LR-ENG-S-R49.110 Road Cross Sections Preparation & Submission 14 15-Mar-25 05-Apr-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R49.115 Road Cross Sections Review & Approval 14 07-Apr-25 22-Apr-25 Road Cross Sections Review & Approval

LR-ENG-S-R49.120 Guiding Signs and Marking Preparation & Submission 14 05-Apr-25 21-Apr-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R49.125 Guiding Signs and Marking Review & Approval 14 21-Apr-25 06-May-25 Guiding Signs and Marking Review & Approval

LOCAL ROAD NO. 54 70 28-Jun-25 16-Sep-25 16-Sep-25, LOCAL ROAD NO. 54


LR-ENG-S-R54.100 Plan and Profile Preparation & Submission 14 28-Jun-25 14-Jul-25 Plan and Profile Preparation & Submission

LR-ENG-S-R54.105 Plan and Profile Review & Approval 14 14-Jul-25 30-Jul-25 Plan and Profile Review & Approval

LR-ENG-S-R54.110 Road Cross Sections Preparation & Submission 14 30-Jul-25 16-Aug-25 Road Cross Sections Preparation & Submission

LR-ENG-S-R54.115 Road Cross Sections Review & Approval 14 18-Aug-25 02-Sep-25 Road Cross Sections Review & Approval

LR-ENG-S-R54.120 Guiding Signs and Marking Preparation & Submission 14 16-Aug-25 01-Sep-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-R54.125 Guiding Signs and Marking Review & Approval 14 01-Sep-25 16-Sep-25 Guiding Signs and Marking Review & Approval

AMIDA ROAD 75 23-Aug-25 18-Nov-25 18-Nov-25, AMIDA ROAD


LR-ENG-S-AR.100 Plan and Profile Preparation & Submission 14 23-Aug-25 08-Sep-25 Plan and Profile Preparation & Submission

LR-ENG-S-AR.105 Plan and Profile Review & Approval 14 08-Sep-25 25-Sep-25 Plan and Profile Review & Approval

LR-ENG-S-AR.110 Road Cross Sections Preparation & Submission 14 25-Sep-25 12-Oct-25 Road Cross Sections Preparation & Submission

LR-ENG-S-AR.115 Road Cross Sections Review & Approval 14 12-Oct-25 27-Oct-25 Road Cross Sections Review & Approval

LR-ENG-S-AR.120 Guiding Signs and Marking Preparation & Submission 14 18-Oct-25 03-Nov-25 Guiding Signs and Marking Preparation & Submission

LR-ENG-S-AR.125 Guiding Signs and Marking Review & Approval 14 03-Nov-25 18-Nov-25 Guiding Signs and Marking Review & Approval

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
180 of 180
Critical Remaining Work
Milestone