Concrete and Steel Quantity for 05‐02‐2024

Quantity
S.No Bill No Tunnel Section No Segmet No Zone Start Station End Station Remarks
Work Place Concrete m3 Steel Ton

1 7.3E Tunnel 3 Sec 32 T3_Z‐11_SEG‐19 Zone 11 0+380.351 0+400.351 Screed 23.50 Plain Cement Concrete (PCC )

2 7.1 Dry Culvert Sec 106 DC_Z‐6_SEG‐17 Zone 6 2+278.874 2+298.874 Screed 8.73 Plain Cement Concrete (PCC )

3 7.1 Dry Culvert Sec 107 DC_Z‐6_SEG‐18 Zone 6 2+298.874 2+318.874 Screed 8.70 Plain Cement Concrete (PCC )

4 7.2 Wet Culvert Sec 100 WC_Z‐6_SEG‐35 Zone 6 2+863.746 2+883.746 Both Side Walls 128.00 20.48 Reinforced concrete

Total Quantity For Date 05‐02‐2024 168.93 20.48