FUTKBUM

l:.:t,..iiL:.-r.. I i J:'r iiEFCI=T


Inspection Visit Repod No NOINo lnspector's Name Date
SLB-rvlER o3GDP'HES- VR-001 P83- N-C7J-007 REV 1 KARTIKEYAN KR SHNA 26 FEA 2424

ASSIGNMENT DETAILS:

Type of lnspection:
tr lvlonltoring n tr Final lnspect on
(Tickbax)

Scope oI lnspeclion:
! Surveilance n Witness Test ng

lnspection Charqe No: Project PO: CON P83 KES PROC OOOT 23
TREATED GAS HEATER
Client: SLB Equipment / lvlaierial:
(P UT 1235001 02)
Clieni Contact:
Project Name: FPSO P 83 BUZ]OS PROJECT
Client Contact Email
Next Visit Date: 11 IVIARCH 2024

INSPECTION DETAILS:
HES Sub-Vendor:
Vendor Location: 17 JALAN BESUT, S]NGAPORE Sub-Vendor Location:
Sub-Vendor PO
Vendor PO Number: CON P83 KES PROC OOOT 23
Number:
Sub-Vendor Gontact
Vendor Contact Name: SAKT SH
Name:
NA

Sub-Vendor Contact
V€ndor Contact Title: PROJECT ENGINEER
Title:
Sub-Vendor Contact
Vendor Contact Tel: 62659708
Tel:
NA

PO Order Status: ! Complele r Partial (NOTE: Select by clicking on Box)

Name Company
KARTIKFYAN KR SHNA
SAKT SH HES PRO.]ECT ENGINEER
RtNA (SEATR]Ut/t) TP
FAB O PONTE PETROBRAS INSPECTION TECHNIC ON
INSPECTION TECHN]C ON

Puryose of Visit (Bullet Points):


. VlSUAL CHECKS FOR WELD SPATTER. SHARP EDGES. FOREIGN I\4ATERIAL INCLUSION, SURFACE DEFECTS
AND WORKIIIANSH P PR!OR TO LNSERTION OF TUBE BUNDLE,
lnspection Summary / Findings (Bullet Poinis):
Camnent on all aspects of the equipment inclLtding prccedure to used and complied with, quantity abseNed, visual
obseNatians. dinensianal checks, and specific tests identified in the NOI and |TP.
. TUBE SHELL INTERNAL V]SUAL FOUND SHARP EDGES AND BEING RECTIF ED ONS]TE I\,4MEDATELY

Areas ot Concem t Actiqns Required (Bullet Points):


FUTKBUM

. DRAWNG Rev.

lnspection Crileria, i.e. Speciticeiions / Standards / Brawings / ITP (wilh revision)i


Documents /
Document Number Rev s on Approva code
Specfications
t-PR-3010 2P 1235 CODE 1

97A C7,1 107


DRAW]NG I DE 3010 2P 1235- CODE 2
451-C7J-018

lnspection Equipment
Equ pment Descripi on Calbraton Expiry Date

HSE Findings / Summary (Bullet Points):


Any JSA? Taol Bax? Pre-Jab Meeting arganized and attended? Any safety issues during inspection?

Specific Comments / Action(s) to be followed up (Bullel Points):


Anything nat completed during inspection or outstanding far the arder?

Packaging/Shipping comments (Bullet Points):


Please camment an whether this is in accardance with \he specified packaging pracedure such as specific destination
requirements for matetials (Eg. Forttmber requiremenls check ISPM 15 far Australta ancl this ISPM 15 ceftificate
MUST be attached in the repan)

IRN No: NA

NCR Reference: NA

Punch List Nol NA

NA

Prcoared bv lnsoector Reviewed bv Fulkrum


Name KARTLKEYANKRISHNA Name: Name
Date. 26 FEB 2024 Date: Date:
Position THIRD,PAR\Y INSPECTOR Position:
Endorseme?tl I Endorsement: Endorsement:
K#TIKEYAN
/ CERT NO: I Nry^
(swpygr'r ""i."il:
FUTKRUM

Photo, P.83 TREATED GAS HEATER (P UT ]23500] 02)


ffil
Photo 2: TIJBF SHFI I MA-TFRA! VFR F]CATION

LNTERNALVISUAL PR OR NSERTION OF TUBE


Phoio 3: BUNDLE
Photo 4: TRY FIT TUBE BI-INDLE WTHTEMPLATE

End of Report