UKURAN TERTAHAN (GRAM) TERTAHAN (%) TERTAHAN KUMULATIF (%) LOLOS KUMULATIF (%)
AYAKAN Split Screen Abu Batu Filler Split Screen Abu Batu Filler Split Screen Abu Batu Filler Split Screen Abu Batu Filler
(MM) A B C D A B C D A B C D A B C D
31.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00
25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00
19.10 706.00 0.00 0.00 0.00 11.77 0.00 0.00 0.00 11.77 0.00 0.00 0.00 88.23 100.00 100.00 100.00
12.70 3820.00 0.00 0.00 0.00 63.67 0.00 0.00 0.00 75.43 0.00 0.00 0.00 24.57 100.00 100.00 100.00
9.52 931.00 0.00 0.00 0.00 15.52 0.00 0.00 0.00 90.95 0.00 0.00 0.00 9.05 100.00 100.00 100.00
4.75 543.00 265.00 0.00 0.00 9.05 10.60 0.00 0.00 100.00 10.60 0.00 0.00 0.00 89.40 100.00 100.00
2.36 0.00 335.00 0.00 0.00 0.00 13.40 0.00 0.00 100.00 24.00 0.00 0.00 0.00 76.00 100.00 100.00
1.18 0.00 632.00 0.00 0.00 0.00 25.28 0.00 0.00 100.00 49.28 0.00 0.00 0.00 50.72 100.00 100.00
0.60 0.00 1083.00 0.00 0.00 0.00 43.32 0.00 0.00 100.00 92.60 0.00 0.00 0.00 7.40 100.00 100.00
0.30 0.00 115.00 0.00 0.00 0.00 4.60 0.00 0.00 100.00 97.20 0.00 0.00 0.00 2.80 100.00 100.00
0.075 0.00 70.00 0.00 0.00 0.00 2.80 0.00 0.00 100.00 100.00 0.00 0.00 0.00 0.00 100.00 100.00
0.045 0.00 0.00 250.00 250.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 0.00 0.00
Jumlah 6000.0 2500.00 250.00 250.00 100.00 100.00 100.00 100.00
Catatan : Banyuwangi,
URAIAN JENIS SUMBER
AGREGAT A Split Lab. Uji Bahan
AGREGAT B Screen Lab. Uji Bahan
AGREGAT C Abu Batu Lab. Uji Bahan
AGREGAT D Semen Portland Lab. Uji Bahan
file:///conversion/tmp/activity_task_scratch/738276306.xls ASPAL
LABORATORIUM UJI BAHAN
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI BANYUWANGI
JL. RAYA JEMBER KILOMETER 13 LABANASEM, KABAT, BANYUWANGI,KODE POS (68461), Tlp. (0333) 686780 BANYUWANGI
LOLOS KUMULATIF (%) LOLOS KUMULATIF (%), GABUNGAN AGREGAT LOLOS KUM. (%), GAB. AGG. UNTUK WC (AUS 2/WC)
UKURAN Split Screen Abu Batu Filler Split Screen Abu Batu Filler Gabungan Agregat JUMLAH GAB. BERDASARKAN SPEK. NO. 023/T/BM/1999
AYAKAN (A) (B) (C) (D) (A) (B) (C) (D) A+B+C+D Spesifikasi Gradasi Daerah Dihindari Titik Kontrol
(MM)
100 100 100 100 32.00 60.00 5.00 3.00 100.00 Fuller Bawah Atas Min. Maks.
37.50 100.0 100.0 100.0 100.0 32.00 60.00 5.00 3.00 100.00 100.0
25.40 100.0 100.0 100.0 100.0 32.00 60.00 5.00 3.00 100.00 100.0
19.00 88.2 100.0 100.0 100.0 28.23 60.00 5.00 3.00 96.23 100.0 100 100
12.70 24.6 100.0 100.0 100.0 7.86 60.00 5.00 3.00 75.86 83.4 90 100
9.50 9.0 100.0 100.0 100.0 2.90 60.00 5.00 3.00 70.90 73.2 77 90
4.75 0.0 89.4 100.0 100.0 0.00 53.64 5.00 3.00 61.64 53.6 53 69
2.36 0.0 76.0 100.0 100.0 0.00 45.60 5.00 3.00 53.60 39.1 39.1 39.1 33 53
1.18 0.0 50.7 100.0 100.0 0.00 30.43 5.00 3.00 38.43 28.6 25.6 31.6 21 40
0.60 0.0 7.4 100.0 100.0 0.00 4.44 5.00 3.00 12.44 21.1 19.1 23.1 14 30
0.30 0.0 2.8 100.0 100.0 0.00 1.68 5.00 3.00 9.68 15.5 15.5 15.5 9 22
0.074 0.0 0.0 100.0 100.0 0.00 0.00 5.00 3.00 8.00 8.2 4 9
0.045 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.0
LOLOS KUMULATIF (%)
SPEK. GAB. AGREGAT UNTUK CAMP. BERASPAL DG. PENDEKATAN KEPADATAN MUTLAK
100
80
60
40
20
0
0.01 0.10 1.00 10.00 100.00
UKURAN AYAKAN (MM), SKALA LOG.
UKURAN AYAKAN (MM), SKALA LOG.
BERASPAL DG. KEPADATAN MUTLAK (NO. 023/T/BM/1999)
LOLOS KUMULATIF (%) LOLOS KUMULATIF (%), GABUNGAN AGREGAT LOLOS KUM. (%), GAB. AGG. UNTUK WC (AUS 2/WC)
UKURAN Split Screen Abu Batu Filler Split Screen Abu Batu Filler Gabungan Agregat JUMLAH GAB. BERDASARKAN SPEK. NO. 023/T/BM/1999
AYAKAN (A) (B) (C) (D) (A) (B) (C) (D) A+B+C+D Spesifikasi Gradasi Daerah Dihindari Titik Kontrol
(MM)
100 100 100 100 31.00 60.00 5.00 4.00 100.00 Fuller Bawah Atas Min. Maks.
37.50 100.0 100.0 100.0 100.0 31.00 60.00 5.00 4.00 100.00 100.0
25.40 100.0 100.0 100.0 100.0 31.00 60.00 5.00 4.00 100.00 100.0
19.00 88.2 100.0 100.0 100.0 27.35 60.00 5.00 4.00 96.35 100.0 100 100
12.70 24.6 100.0 100.0 100.0 7.62 60.00 5.00 4.00 76.62 83.4 90 100
9.50 9.0 100.0 100.0 100.0 2.81 60.00 5.00 4.00 71.81 73.2 77 90
4.75 0.0 89.4 100.0 100.0 0.00 53.64 5.00 4.00 62.64 53.6 53 69
2.36 0.0 76.0 100.0 100.0 0.00 45.60 5.00 4.00 54.60 39.1 39.1 39.1 33 53
1.18 0.0 50.7 100.0 100.0 0.00 30.43 5.00 4.00 39.43 28.6 25.6 31.6 21 40
0.60 0.0 7.4 100.0 100.0 0.00 4.44 5.00 4.00 13.44 21.1 19.1 23.1 14 30
0.30 0.0 2.8 100.0 100.0 0.00 1.68 5.00 4.00 10.68 15.5 15.5 15.5 9 22
0.074 0.0 0.0 100.0 100.0 0.00 0.00 5.00 4.00 9.00 8.2 4 9
0.045 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.0
LOLOS KUMULATIF (%)
SPEK. GAB. AGREGAT UNTUK CAMP. BERASPAL DG. PENDEKATAN KEPADATAN MUTLAK
100
80
60
40
20
0
0.01 0.10 1.00 10.00 100.00
Lampiran/Surat No. :
Nomor Contoh :
Pekerjaan :
Tanggal Uji :
Catatan :
URAIAN JENIS SUMBER
AGREGAT A Split Lab. Uji Bahan
AGREGAT B Screen Lab. Uji Bahan
AGREGAT C Abu Batu Lab. Uji Bahan
AGREGAT D Semen Portland Lab. Uji Bahan
RIUM UJI BAHAN
N TEKNIK SIPIL
EGERI BANYUWANGI
D Tlp. (022) 2013789 (Central), 2016150 (Sipil), 2014583 (Pusatek), Ext. 266 BANDUNG
AGREGAT
96a/ AASHTO T.27-1999)
BANYUWANGI,