WORK METHOD STATEMENT FOR TIE BEAM, LINTEL & CHUJJA OF

TURPENTINE BUILDING

Project Name: AMAR Projects


Project Venue: Sanand II, Ahmedabad, Gujrat
Parties Concerned:
Client: P&G, Ahmedabad
PMC: LTTS
Contractor: SIBIPL
MOS REF NO: AMAR/LTTS/SIBIPL/045/R-00/24-25
INDEX

1. Introduction
2. Location of Works
3. Equipment and Tools (as required)
4. PPE’S to be used
5. Supervision (PERSONS INVOLVED)
6. Site preparation & Work Precaution
7. Method Statement/Safe Work Procedure
8. Safety documents to be produced before commencing the work
9. Emergency Procedures
10. Rolls and Responsibility
11. Environmental
12. Approval and review

1. Introduction:
 This document covers Tie beams, Lintel Beam & Chujja for Turpentine building
construction works.

2. Location of Works:
 Existing Turpentine Building

3. Equipment and Tools (as required):

Page 1 of 6
AMAR/LTTS/SIBIPL/045/R-00/23-24
 Die (As per making Dia of Bar)
 Bar Cutting Machine (If required)
 Binding Wire
 Hook
 Line Dori
 Chalk
 Measuring Tape
 Hammer
 Plumb
 Surveying Machine
 Scaffolding- cup-lock type (If required)
 Tie Rod with spanner
 Transit Mixture- 02 Nos
 Square Sheet (Standard)- 01 Nos
 Spade- 03 Nos
 Shovel- 02 Nos
 Trowel- 02 Nos
 Vibrator (Electric) with Needle- 01 Nos
 Vibrator (Diesel) Needle- 01 Nos
 Gamela- 10 Nos
 Panja- 02 Nos
 Fanti- 02 Nos
 Randa- 02 Nos
 Tarpaulin- 01 Nos
 Concrete Bucket (0.50 Cum)- 01 Nos
 Wheel barrow-02 Nos
 Fire Blanket with Fire Booth (if required)
 Fire extinguisher
 Bar caps
 Stopper for wheel chock

4. PPE’S (Personal Protective Equipment) to be used


Personal protection equipment:
 Hard hats (Safety helmets)
 Safety Shoe/ Gum Boot
 Eye Protection (face shield/ goggles)
 Hand Gloves (Cotton/ Rubber/Leather/Cut resistance)
 Reflective jacket/ Leather Apron
 Shoulder pad

5. Supervision (PERSONS INVOLVED)


The site operations shall be carried by the following personal:
 Site Engineer- 01 Nos
 Safety Engineer- 01 Nos
 TM Operator- 02 Nos
Page 2 of 6
AMAR/LTTS/SIBIPL/045/R-00/23-24
 TM Helper- 02 Nos
 Vibrator Operator- 01 Nos
 Electrician- 01 Nos
 Signal Man- 02 Nos
 Skilled- 10 Nos
 Un-Skilled- 20 Nos

6. Site preparation & Work Precaution:


 Arrange the toolbox talk/specific training for the job to be executed.
 The First Aid Box should be near at site.
 Proper training to all manpower & site engineer to work safely.

7. Method Statement/ Safe Work Procedure


 Scaffolding should be check and green tags before start the activity
 Shuttering procedure will carry out after checking from LTTS.
 Check the shuttering from LTTS.
 Cutting and bending of bar for tie beam is carried out at yard.
 Binding of reinforcement for tie beam is to be done as per approved BBS
 Check the reinforcement from LTTS and cover maintain as per overlapping and
approved BBS or Drawing
 RCC will proceed after checking.
 Curing 7 days after using jute bags/ spraying.

 Scaffolding Works
 All scaffolds should be approved and inspected from LTTS
 The approved Toe guard should be used for height work
 Ladder should be clamp over the scaffolding pipe at top and bottom rail
 The scaffolding should be checked before use the man movement or access for
works.
 Yellow tagging to be fix for making the scaffolding, green tagging will be fix after
checked and okay for uses and approved by LTTS.
 After Green Tag of scaffolding to be used for works

 Method for Bolt Fixing


 1st Method: We weld the bolt before fixing the shuttering board.
 2nd Method: If we fix the shuttering board before welding the bolt then there is a
chance of fire, for that, Either we will provide a fire blanket or provide Non-
combustible Sheet to cover the oil-polished shuttering boards to prevent it from
fire.
 Also, will make sure to provide a suitable fire extinguisher for emergency.

8. Safety documents to be produced before commencing the work


 Take all the Work permits for this activity
 Review of JSA with respect to the method of statement.
 Toolbox Talk should be recorded as per the format.
 Inspection of all electrical tools shall be recorded as per the format.

Page 3 of 6
AMAR/LTTS/SIBIPL/045/R-00/23-24
9. Emergency Procedures
 The site Engineer has to report any incident to the Site Manager immediately as
per Emergency Procedure, If any person gets injured during working time
immediately send it to the nearest Plant First Aid Centre and hand it over to
medical if get more injured.
 The engineer has to take control of the danger and rescue the incident.
 The site manager has to inform the first aider.
 Site manager to call Plant ambulance (in P&G scope) (if required).
 The site manager alerts to doctor and asks for treatment (In P&G scope)
 Site manager to inform Project Manager, client and concern government
authorities if required.

Mr. Munna Kumar

10. Rolls and Responsibility


Site Manager-
 Check and confirm the site clearances for safe working.
 Check and review the documents of the vehicle
 Explain the procedure to the site engineer.
 Nominate site supervisor for work location till the work completion.
 Ensure Work permit is taken before commencing the work.
Site Engineer-
 Check for the work permit is generated.
 Check and review the documents of the vehicles.
 Conduct work specific training to the workman.
 Explain the procedure to the Contractor workman.
 Coordination with safety engineer for continuous monitoring of activity.
 Conducting Tool Box Meeting before start of work.
 Ensure the House Keeping
Site Supervisor Responsibility-
 Collect all the certificates and documents required for the works and submit to site
engineer for final verification
 Assure the entire area has been barricaded.
 Supervisor presence should be there till the work completes.

Page 4 of 6
AMAR/LTTS/SIBIPL/045/R-00/23-24
 Ensure the house keeping.

Safety Engineer-
 Prepare JSA for the work to be done basis MOS, and get reviewed by the
Team.
 Work Permit to be verified after checking the safety requirements.
 To Check the Condition and review the documents of the vehicles, tools and
tackles.
 Close monitoring of activity and emergency procedure.
 Coordinate the Tool Box Meeting before start of work
 To conduct the job specific safety training.
 Coordination with site engineer for continuous monitoring of activity.
 Ensure the House Keeping
 Collect all the certificates and documents required for equipment, tools and
tackles and submit to site engineer for final verification
 Assure the entire area has been barricaded.
 Supervisor presence should be there till the work completes.
 Ensure the house keeping.

11. Environmental:
This section will need to reflect environmental issues associated with the work
 Noise will be within permissible limits
 Reduction of dust

12. Approval and review:


 This method statement should be reviewed by the site management team and a
copy of it will be circulated to those nominated for comment and the nominated
staff member to be finally approved All comments made should be recorded on
the approval sheet.

 This Method Statement has been reviewed by:

Name
Company SIBIPL SIBIPL SIBIPL
Title Construction Manager Safety Manager Project Manager
Signature
Date

 This Method Statement has been reviewed and approved by:

Page 5 of 6
AMAR/LTTS/SIBIPL/045/R-00/23-24
Name
Company LTTS LTTS
Title Project Engineer/Manager Safety Engineer/Manager

Signature

Date

Page 6 of 6