Download as pdf or txt
Download as pdf or txt
You are on page 1of 219

SURVEY – 1:

BENCHMARK NETWORK
SETTING WITH LEVELING

SURVEY 1-1 Setting up of Bench Marks

SURVEY 1-2 Leveling

SURVEY 1-3 Benchmark Data


R03
TP
WBCW32 PB384
C DM 1

CDM1 BM.Pas
CDM2 C DM 2

WBCW31 PP119 BM.1


CDM4
C DM 4

CDM5 CP.64
WBCW29 C DM 5

WBCW27 CDM6
W B C W2 7
C DM 6

CIDM9
R04 WBCW26
C ID M 9

PB166 AC
CDM8
WBCW22 CLDM12
W B C W2 1

WBCW21 CID024 C L DT 2 7

CLDT27
AKW8 CLDT24
R05 BM02GRL
WBCW19 B M 0 2 GR L

PP1145
AKW12 PP782 WBCW18
WBCW17
W B C W1 8

AKW09
A K W 12

A K W 09
W B C W1 7

PB360
AKW14 CLDT20
C L DT 2 0

PSABCC40 AKW13 A K W 14
A K W 13

AKW15 A K W 15

CLDT18 C L DT 1 8

AKW17 AKW16 PB363


A K W 17

A K W 16

CLDT19 CLDT16
C L DT 1 9

C L DT 1 6

CLDT14 C L DT 1 4

PP1115B
P P 1 1 1 5B

AKW18 CLDT13 C L DT 1 3

TB8 R11 CLDT11


CLDT10
C L DT 1 1

PP775 SEK020
WBCW12
C L DT 1 0

S1
S E K 02 0

PP917 CLDT9 C LD T 4
C LD T 9

PP920 CLDT4
PB37 T32 CDK17 C10
G T10

GT10 S05028
CDK16
S 0 5 0 28

C D K 16

CDKT2
WL01
C DK T 2

GT08 CDK15 R03


G T08

C D K 15

PP825A R12 CDK12 PP930


WBCW07
C D K 12

GT04 G T04

CDK13 CDK10 C D K 13 C D K 10

KB19 R11 CDK11 CDK9


C D K 11

PWSCSKT02
P WS C S K T 02

CDK7
R05 C4 BM02
C DK 7

B M 02

PSA5 CDK4
GT1 GRW03 CLDA7
C DK 4

G R W 03

WBCK1 CDK3
C L DA 7

PSA4
W BC K1

PB64
C DK 3

GRW04 G R W 04
WBCK4 CDK1 W BC K4
P B6 4

PB55
C DK 1

PSA3 WBCK10 W BC K6
W B C K 10

WBCK6 W BC K7

GRW7 R13 WBCK7


GRW08 CLK1
KRT7 NWP487
C L K1
G R W 08

GRW10 R14
GRW09 CLK2
G R W 09

C L K2

GRW11 CLK8
G R W 11

PSA1
C L K8

PP878 PBM30 C L K1 6

CLK16
R10 R09
GOLF
BM97
G OL F

PSA14 UM01 CL32


U M 01

GRW15
GRW17
GRW18 G R W 18
G R W 17

GRW16
PST0 GRW20 G R W 20

KRT24
GRW22 KRT25 PBM34
GRW23 R02
K RT 2 5

PST3 GRW24
G R W 23

GRW26
P ST3
G R W 24

KRT27 K RT 2 7

M P W 23

MPW23 CL28
R05 GRL099
G R W 26

MPW22
M P W 25

GRW27 MPW25
M P W 22
G RL 0 9 9

G R W 27

GRW28 G R W 28

MPW19
PST87GRL102 GRW29 MPW20
M P W 19

M P W 20

P ST8 7 G RL 1 0 2

GRW30 G R W 30

GRW32 MPW17
PST6 PST8 CL24
P ST8 G R W 32

MPW16 M W P 16

M P W 15
MPW15
C L 24

CL39
GRL9 MPW13 M P W 13

CL21
M P W 14

TP38 MPW14
BM28 TA23 MPW11

R09 P57
CL13 C L 13

R06 PP553 CL11


MPW02
TL103

BM Network CL01
NWP60
CL0
for River R07
Cross-sectional
1-1
1-2
Route Stretch BM_Str BM_End Elev Dist DateChaged
R02 1 NWP 487 CL 32 4.669 5953
R02 2 CL 32 CL 28 4.625 3453
R02 3 CL 28 CL 39 -0.672 3245
R02 4 CL 39 CL 21 0.107 2445
R02 5 CL 21 P 57 11.397 1831
R02 6 P 57 TL 103 5.721 3290
R02 7 TL 103 CL 01 -4.902 3160
R03 1 WBCW 29 WBCW 31 -4.593 1316 2007/9/13
R03 2 WBCW 31 WBCW 32 0.968 476
R03 3 WBCW 32 PP 119 0.347 1279 2007/9/12
R03 4 PP 119 PB 384 -1.627 1924 2007/9/12
R03 5 PB 384 PB 166 0.56 2701 2007/9/12
R03 6 PB 166 CLDM 12 -0.026 1565 2007/9/12
R03 7 CLDM 12 CLDT 24 0.756 369
R03 8 CLD 024 PP 1145 0.841 1177
R03 9 PP 1145 PB 360 0.034 669 2007/9/12
R03 10 PB 360 PP 917 2.354 2044 2007/9/13
R03 11 PP 917 C 10 -0.198 395
R03 12 C 10 PP 930 1.661 2759
R03 13 PP 930 C4 1.314 623
R03 14 C 4 NWP 487 2.196 2601
R04 15 PP 775 AK W18 0.875 1860
R04 16 AK W18 PP 782 -2.34 3205
R04 1 PP 782 AK W08 -0.277 529
R04 2 AK W08 WBC W29 2.932 2019
R05 3 GRL 09 TP 38 2.81 1008
R05 4 TP 38 PST 6 -8.302 2104 2007/9/13
R05 1 PST 6 PST 0 0.122 691
R05 2 PST 0 PST 14 -1.543 2904
R05 3 PST 14 PSA 1 -2.981 3126
R05 4 PSA 1 PSA 3 2.526 2193
R05 5 PSA 3 PSA 5 -7.811 2379
R05 6 PSA 5 PP 825A -0.059 2304
R05 7 PP825A KB 19 -1.564 2385
R05 8 KB 19 TB 8 -0.349 3227
R05 9 TB 8 PSABCC 40 -1.13 774
R05 10 PSABCC 40 PP 775 0.553 2294
R06 11 PP 553 TA 23 -6.519 1416
R06 12 TA 23 BM 28 2.281 2925
R06 1 BM 28 GRL 09 -8.819 2685
R07 2 CL 01 PP 553 4.026 2357
R08 3 PB 55 NWP 487 2.416 2131
R09 1 PB 55 KRT 7 -0.427 6171
R09 1 KRT 7 BM 97 3.503 3643
R09 1 BM 97 KR T24 2.312 1747
R09 2 KR T24 PBM 34 0.502 2300
R09 3 PBM 34 MPW 17 3.727 2349
R09 4 MPW 17 MPW 11 8.087 2262
R09 5 MPW 11 MPW 02 -0.257 3182
R09 6 MPW 02 PP 553 9.906 2886
R10 7 GRL 09 GR W29 -4.78 2324
R10 8 GR W29 GR W22 0.605 3180
R10 1 GR W22 GR W16 -3.614 2801
R10 2 GR W16 GR W15 -1.33 2405
R10 3 GR W15 GR W10 -3.363 2276
R10 4 GR W10 GR W07 -0.559 728
R11 5 WBC W29 WBC W26 -2.964 3262
R11 6 WBC W26 WBC W22 2.068 695
R11 1 WBC W22 WBC W19 1.03 757
R11 2 WBC W19 PB 363 -0.496 1388
R11 3 PB 363 WB W12 0.297 978
R11 4 WB W12 WL 01 0.939 1296
R11 5 WL 01 WBC W07 0.6 1617
R11 6 WBC W07 PB 55 0.738 1072
R12 7 GR W07 GT 01 -2.031 963
R12 8 GT 01 T 32 -1.565 2057
R12 1 T32 PB 37 -2.993 1822
R12 2 PB 37 S1 1.112 2931
R12 3S1 PP 775 0.945 1802
R13 4 PB 55 GR W07 1.124 991

1-3
LEVELING CALCULATION
R02
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 NWP 487 9.877


4.669 5,953 -0.007
2 CL 32 14.539
4.625 3,453 -0.007
3 CL 28 19.157
-0.672 3,245 -0.007
4 CL 39 18.478
0.107 2,445 -0.006
5 CL 21 18.579
11.397 1,831 -0.007
6 P 57 29.969
5.721 3,290 -0.007
7 TL 103 35.683
-4.902 3,160 -0.007
8 CL 01 30.774
30.774

-0.048

20.945 23,377 CLOSE 30.774


START 9.877
⊿h 20.897
Σh 20.945
Mis Closure -0.048

1-4
LEVELING CALCULATION
R02
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 NWP 487 9.877


-0.960
Original
2 8.917
NWP 487

CLOSE
START
⊿h
Σh
Mis Closure

1-5
LEVELING CALCULATION
R03
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 WBCW 29 5.257
-4.593 1,316 0.002
2 WBCW 31 0.666
0.968 476 0.003
3 WBCW 32 1.637
0.347 1,279 0.002
4 PP 119 1.986
-1.627 1,924 0.002
5 PB 384 0.361
0.560 2,701 0.003
6 PB 166 0.924
-0.026 1,565 0.002
7 CLDM 12 0.900
0.756 369 0.003
8 CLD 024 1.659
0.841 1,177 0.002
9 PP 1145 2.502
0.034 669 0.002
10 PB 360 2.538
2.354 2,044 0.003
11 PP 917 4.895
-0.198 395 0.002
12 C 10 4.699
1.661 2,759 0.002
13 PP 930 6.362
1.314 623 0.003
14 C4 7.679
2.196 2,601 0.002
15 NWP 487 9.877
9.877

0.033

4.587 19,898 CLOSE 9.877


START 5.257
⊿h 4.620
Σh 4.587
Mis Closure 0.033

1-6
LEVELING CALCULATION
R04
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 PP 775 4.055
0.875 1,860 0.003
2 AK W18 4.933
-2.340 3,205 0.003
3 PP 782 2.596
-0.277 529 0.003
4 AK W08 2.322
2.932 2,019 0.003
5 WBCW29 5.257
5.257

0.012

1.190 7,613 CLOSE 5.257


START 4.055
⊿h 1.202
Σh 1.190
Mis Closure 0.012

1-7
LEVELING CALCULATION
R05
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 GRL 09 21.716
2.810 1,008 0.006
2 TP 38 24.532
-8.302 2,104 0.005
3 PST 6 16.235
0.122 691 0.006
4 PST 0 16.363
-1.543 2,904 0.005
5 PST 14 14.825
-2.981 3,126 0.006
6 PSA 1 11.850
2.526 2,193 0.005
7 PSA 3 14.381
-7.811 2,379 0.006
8 PSA 5 6.576
-0.059 2,304 0.006
9 PP825A 6.523
-1.564 2,385 0.005
10 KB 19 4.964
-0.349 3,227 0.006
11 TB 8 4.621
-1.130 774 0.005
PSABCC
12 3.496
40
0.553 2,294 0.006
13 PP 775 4.055
4.055

0.067

-17.728 25,389 CLOSE 4.055


START 21.716
⊿h -17.661
Σh -17.728
Mis Closure 0.067

1-8
LEVELING CALCULATION
R06
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 PP 553 34.795
-6.519 1,416 -0.007
2 TA 23 28.269
2.281 2,925 -0.008
3 BM 28 30.542
-8.819 2,685 -0.007
4 GRL09 21.716
21.716

-0.022

-13.057 7,026 CLOSE 21.716


START 34.795
⊿h -13.079
Σh -13.057
Mis Closure -0.022

1-9
LEVELING CALCULATION
R09
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 PB 55 7.468
-0.427 6,171 -0.003
2 KRT 7 7.038
3.503 3,643 -0.003
3 BM 97 10.538
2.312 1,747 -0.004
4 KR T24 12.846
0.502 2,300 -0.003
5 PBM 34 13.345
3.727 2,349 -0.003
6 MPW 17 17.069
8.087 2,262 -0.003
7 MPW 11 25.153
-0.257 3,182 -0.004
8 MPW 02 24.892
9.906 2,886 -0.003
9 PP553 34.795
34.795

-0.026

27.353 24,540 CLOSE 34.795


START 7.468
⊿h 27.327
Σh 27.353
Mis Closure -0.026

1-10
LEVELING CALCULATION
R10
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 GRL 09 21.716
-4.780 2,324 -0.013
2 GR W29 16.923
0.605 3,180 -0.013
3 GR W22 17.515
-3.614 2,801 -0.013
4 GR W16 13.888
-1.330 2,405 -0.013
5 GR W15 12.545
-3.363 2,276 -0.013
6 GR W10 9.169
-0.559 728 -0.013
7 GR W07 8.597
8.597

-0.078

-13.041 13,714 CLOSE 8.597


START 21.716
⊿h -13.119
Σh -13.041
Mis Closure -0.078

1-11
LEVELING CALCULATION
R11
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 WBC W29 5.257


-2.964 3,262 0.000
2 WBC W26 2.293
2.068 695 0.000
3 WBC W22 4.361
1.030 757 0.000
4 WBC W19 5.391
-0.496 1,388 0.000
5 PB 363 4.895
0.297 978 -0.001
6 WB W12 5.191
0.939 1,296 0.000
7 WL 01 6.130
0.600 1,617 0.000
8 WBC W07 6.730
0.738 1,072 0.000
9 PB 55 7.468
7.468

-0.001

2.212 11,065 CLOSE 7.468


START 5.257
⊿h 2.211
Σh 2.212
Mis Closure -0.001

1-12
LEVELING CALCULATION
R12
STATION Diff Ht Dist (m) Corr ELEVATION REMARKS

1 GR W07 8.597
-2.031 963 -0.002
2 GT 01 6.564
-1.565 2,057 -0.002
3 T32 4.997
-2.993 1,822 -0.002
4 PB 37 2.002
1.112 2,931 -0.002
5 S1 3.112
0.945 1,802 -0.002
6 PP 775 4.055
4.055

-0.010

-4.532 9,575 CLOSE 4.055


START 8.597
⊿h -4.542
Σh -4.532
Mis Closure -0.010

1-13
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. AKW8

KONSTRUKSI BM. DIPAKU

UKURAN BM.
AKW8N
ELEVASI KOORDINAT AKW8

2.322
06º 08 19
06 2 LS 106
19.2 106º 46 32 9 BT
32.9
DIPASANG TANGGAL
LOKASI
JL. Teluk Gong Raya
DISKRIPSI :
Dipaku Dipojok Taman
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

1-14
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. AKW8N

KONSTRUKSI BM. DIPAKU

UKURAN BM.
AKW8N
ELEVASI KOORDINAT AKW8

2.421
19 2 LS 106º 46 32.9
06º 08 19.2 32 9 BT
DIPASANG TANGGAL
LOKASI
JL TELUK GONG RAYA
DISKRIPSI :
Dipaku Dipojok Taman
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

1-15
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
MOVED TO

Diskripsi :
BENCH MARK NO. AKW09

KONSTRUKSI BM. S.3-PEMDA DKI

UKURAN BM. 40.cm X 40.cm

ELEVASI KOORDINAT

1.964 106° 46' 18.1" BT


06° 09' 06.3" LS
DIPASANG TANGGAL

JL.PANGERAN TUBAGUS ANGKE

DISKRIPSI :
± 100.m Sebelah Selatan Pertigaan
Jl.Pangeran Tubagus Angke &
Jl.Jembatan Genit

Foto Detail BM. Foto Situasi BM.

1-16
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW09R

KONSTRUKSI BM. S.3-PEMDA DKI

UKURAN BM. 40.cm X 40.cm

ELEVASI KOORDINAT

1.964 106° 46' 18.1" BT


06° 09' 06.3" LS
DIPASANG TANGGAL

JL.PANGERAN TUBAGUS ANGKE

DISKRIPSI :
± 100.m Sebelah Selatan Pertigaan
Jl.Pangeran Tubagus Angke &
Jl.Jembatan Genit

Foto Detail BM. Foto Situasi BM.

1-17
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW12

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.876 106° 46' 22.84" BT


06° 08' 16.85" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

1-18
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.996
1 996 106
106° 46
46' 18.29
18 29" BT
06° 09' 05.05" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

1-19
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW14

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.370 106° 46' 14.04" BT


06° 09' 12.73" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

1-20
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW15

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.556 106° 46' 11.30" BT


06° 09' 17.67" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

1-21
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.021 106° 46' 09.45" BT


06° 09' 21.01" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

1-22
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. AKW17

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.264 106° 46' 07.50" BT


06° 09' 24.52" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di
Jl.Pangeran Tubagus Angke

Jakarta

Foto Detail BM. Foto Situasi BM.

10

1-23
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. AKW18

KONSTRUKSI BM. DIPAKU

UKURAN BM.
AKW18N
ELEVASI KOORDINAT
AKW18
4.933
06º 09 28.5
06 28 5 LS 106
106º 46 04 5 BT
04.5
DIPASANG TANGGAL
LOKASI
JL DAAN MOGOT
DISKRIPSI :
Dipaku Dikanstin Jembatan
Kali Angke, Jalan Bawah Fly Over
Daan Mogot
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

11

1-24
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. AKW18N

KONSTRUKSI BM. DIPAKU

UKURAN BM.
AKW18N
ELEVASI KOORDINAT
AKW18
4.995
06º 09 28
06 5 LS 106
28.5 106º 46 04 5 BT
04.5
DIPASANG TANGGAL
LOKASI
JL DAAN MOGOT
DISKRIPSI :
Dipaku Dikanstin Jembatan
Kali Angke, Jalan Bawah Fly Over
Daan Mogot
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

12

1-25
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. BM02

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

8 174
8.174 106° 50
106 50' 36.2
36 2" BT
06° 11' 27.2" LS RS.Cikini
DIPASANG TANGGAL
LOKASI
JL. RADEN SALEH
DISKRIPSI :
Pada Patok Beton Dekat Jembatan
K.Ciliwung di Jl.Raden Saleh
(Sudut Baratdaya)
Jakarta

Foto Detail BM. Foto Situasi BM.

13

1-26
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. BM02GRL

KONSTRUKSI BM. DIPAKU PADA


BM.K-GRL.03 - TGP

UKURAN BM.

ELEVASI KOORDINAT

2.102 106° 47' 17.21" BT


06° 08' 36.71" LS
DIPASANG TANGGAL
LOKASI
JL.PANGERAN TUBAGUS ANGKE
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Pangeran Tubagus Angke -
Jl.Jelambar Timur
Jakarta

Foto Detail BM. Foto Situasi BM.

14

1-27
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. BM28

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

30.542 06º 16 04.6 LS 106º 47 49.8 BT

DIPASANG TANGGAL
LOKASI
JLN FATMAWATI
DISKRIPSI : BM28
Dipaku Diatas Pondasi Tiang
Papan Nama Depan Panin Bank
Jl Fatmawati Seberang Jalan Kantor
Depdiknas, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

15

1-28
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. BM97

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT
BM97
10.538 06º 13 35.1 LS 106º 49 02.5 BT

DIPASANG TANGGAL
LOKASI
JLN GATOT SUBROTO
DISKRIPSI :
Ditanam disebelah timur Jembatan
Kali Krukut, Jalan Gatot Subroto
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

16

1-29
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. C4

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

7.679
06º 11 27.5 LS 106º 50 36.0 BT
DIPASANG TANGGAL
LOKASI
Jalan Raden Saleh
DISKRIPSI :
Bench Mark Dipasang Pada Ujung
Jembatan Jl Raden Saleh
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

17

1-30
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. C4N

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

8.218
06º 11 27
06 5 LS 106
27.5 106º 50 36.0
36 0 BT
DIPASANG TANGGAL
LOKASI
Jalan Raden Saleh
DISKRIPSI :
Bench Mark Dipasang Pada Ujung
Jembatan Jl Raden Saleh
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

18

1-31
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. C10

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT C10N

4.699
06º 10 19.2 LS 106º 49 54.8 BT
DIPASANG TANGGAL
LOKASI
Jalan Perwira
C10
DISKRIPSI :
Dibobok Pada Ujung Jembatan
Jalan Perwira / Kali Ciliwung
Sebelah Selatan Masjid Istiqlal
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

19

1-32
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. C10N

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT C10N

5.143
06º 10 19
06 2 LS 106
19.2 106º 49 54.8
54 8 BT
DIPASANG TANGGAL
LOKASI
Jalan Perwira C10
DISKRIPSI :
Dibobok Pada Ujung Jembatan
Jalan Perwira / Kali Ciliwung
Sebelah Selatan Masjid Istiqlal
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

20

1-33
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

4.061 106° 49' 36.18" BT


06° 12' 04.09" LS
DIPASANG TANGGAL
LOKASI
JL.SUMENEP
DISKRIPSI :
Dipaku Di
Jl.Sumenep

Jakarta

Foto Detail BM. Foto Situasi BM.

21

1-34
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK3

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.313 106° 49' 21.08" BT


06° 11' 50.53" LS
DIPASANG TANGGAL
LOKASI
JL. BETUNG
DISKRIPSI :
Dipaku Di
Jl.Betung

Jakarta

Foto Detail BM. Foto Situasi BM.

22

1-35
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK4

KONSTRUKSI BM. DIPAKU DI TEMBOK

UKURAN BM.

ELEVASI KOORDINAT SOGO

4.004 106° 49' 14.85" BT HOTEL HYATT


06° 11' 38.46" LS
DIPASANG TANGGAL 2007
LOKASI
JL.KEBON KACANG
DISKRIPSI :
Dipaku Di Perempatan
Jl.Kebon Kacang-Teluk Betung
Di Sebelah Barat Sogo
Jakarta

Foto Detail BM. Foto Situasi BM.

23

1-36
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK7

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

5.316 106° 49' 22.20" BT


06° 11' 16.48" LS
DIPASANG TANGGAL
LOKASI
JL. KEBON KACANG
DISKRIPSI :
Dipaku Di
Jl.Kebon Kacang

Jakarta

Foto Detail BM. Foto Situasi BM.

24

1-37
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CDK 9

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.261 06º 11 12.9 LS 106º 49 21.4 BT

DIPASANG TANGGAL
LOKASI
Jln. KH. Wahid Hasyim
DISKRIPSI :
Dipaku ditepi Ujung jembatan
Kali Cideng Jl KH Wahid Hasyim
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

25

1-38
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK10

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.104 106° 49' 18.70" BT


06° 11' 00.19" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KEBON SIRIH
DISKRIPSI :
Dipaku Di
Jl.Kebon Sirih
Dekat Departemen Agama
Jakarta

Foto Detail BM. Foto Situasi BM.

26

1-39
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK11

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.386 106° 49' 07.79" BT


06° 10' 57.17" LS
DIPASANG TANGGAL
LOKASI
JL. KEBON SIRIH
DISKRIPSI :
Dipaku Di
Jl.Kebon Sirih

Jakarta

Foto Detail BM. Foto Situasi BM.

27

1-40
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK12

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.562 106° 49' 00.83" BT


06° 10' 55.19" LS
DIPASANG TANGGAL
LOKASI
JL. KEBON SIRIH
DISKRIPSI :
Dipaku Di Perempatan
Jl.Kebon Sirih-Jati Baru-Abdul Muis

Jakarta

Foto Detail BM. Foto Situasi BM.

28

1-41
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.937 106° 48' 50.96" BT


06° 10' 54.62" LS
DIPASANG TANGGAL
LOKASI
JL.JATI BARU
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.Jati Baru

Jakarta

Foto Detail BM. Foto Situasi BM.

29

1-42
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK15

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.641 106° 48' 45.14" BT


06° 10' 42.41" LS
DIPASANG TANGGAL
LOKASI
JL.CIDENG BARAT
DISKRIPSI :
Dipaku Di Tepi Jalan
Jl.Cideng Barat

Jakarta

Foto Detail BM. Foto Situasi BM.

30

1-43
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.697 106° 48' 42.57" BT


06° 10' 32.69" LS
DIPASANG TANGGAL
LOKASI
JL. CIDENG BARAT
DISKRIPSI :
Dipaku Di Perempatan
Jl.Tanah Abang 2 - Jl.Cideng Barat

Jakarta

Foto Detail BM. Foto Situasi BM.

31

1-44
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDK 17

KONSTRUKSI BM. Paku Diatas Beton Pintu Air

UKURAN BM.

ELEVASI KOORDINAT

2.451 06º 10 18.0 LS 106º 48 39.5 BT

Pintu Air
DIPASANG TANGGAL Kali Cideng

LOKASI
Pintu Air Kali Cideng, di jalan Cideng Barat
CDK 17
DISKRIPSI :
terdapat di pintu air kali Cideng
+ 100 m dari sebelum perempatan
jalan Cideng Barat dengan jalan
Balik Papan

Foto Detail BM. Foto Situasi BM.

32

1-45
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDKT2

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.577 106° 48' 43.23" BT


06° 10' 35.18" LS
DIPASANG TANGGAL
LOKASI
JL. CIDENG BARAT
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Cideng Barat - Jl.Ciujung

Jakarta

Foto Detail BM. Foto Situasi BM.

33

1-46
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDM1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

-0.098 106° 47' 52.04" BT


06° 06' 37.98" LS
DIPASANG TANGGAL
LOKASI
JL. POMPA AIR
DISKRIPSI :
Dipaku Di
Jl.Pompa Air

Jakarta

Foto Detail BM. Foto Situasi BM.

34

1-47
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDM2

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.113 106° 48' 08.99" BT


06° 06' 42.05" LS
DIPASANG TANGGAL
LOKASI
JL. MUARA BARU
DISKRIPSI :
Dipaku Di Perempatan
Jl.Muara Baru - Jl.Pompa Air -
Jl.Pergudangan Muara Baru
Jakarta

Foto Detail BM. Foto Situasi BM.

35

1-48
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDM4

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.050 106° 48' 11.20" BT


06° 06' 58.97" LS
DIPASANG TANGGAL
LOKASI
JL. MUARA BARU
DISKRIPSI :
Dipaku Di
Jl.Muara Baru

Jakarta

Foto Detail BM. Foto Situasi BM.

36

1-49
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDM5

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

-0.063 106° 48' 14.49" BT


06° 07' 18.86" LS
DIPASANG TANGGAL
LOKASI
JL. MUARA BARU
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Muara Baru

Jakarta

Foto Detail BM. Foto Situasi BM.

37

1-50
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CDM6

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.822 106° 48' 08.11" BT


06° 07' 30.57" LS
DIPASANG TANGGAL
LOKASI
JL. PLUIT SELATAN RAYA
DISKRIPSI :
Dipaku Di
Jl.Pluit Selatan Raya

Jakarta

Foto Detail BM. Foto Situasi BM.

38

1-51
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CDM 08

KONSTRUKSI BM. Paku Diatas Beton Jembatan

UKURAN BM.

ELEVASI KOORDINAT

1.007 06º 48 17.0 LS 106º 07 41.8 BT

DIPASANG TANGGAL
LOKASI
Kantor Operasional PELINDO II Tanjung Priuk
DISKRIPSI :
Terdapat ditepi jembatan sungai
Cideng pada pertigaan menuju CDM 08
pasar ikan dan pelabuhan Tanjung
Priuk

Foto Detail BM. Foto Situasi BM.

39

1-52
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CID024

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.659
06º 08 20.5 LS 106º 48 42.3 BT
DIPASANG TANGGAL
LOKASI
Jln. Asemka
DISKRIPSI :
Dipaku pada ujung jembatan
Sungai Cideng, di Jln Asemka
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

40

1-53
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CID024N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.321
20 5 LS 106º 48 42.3
06º 08 20.5 42 3 BT
DIPASANG TANGGAL
LOKASI
Jln. Asemka
DISKRIPSI :
Dipaku pada ujung jembatan
Sungai Cideng, di Jln Asemka
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

41

1-54
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
MOVED TO

Diskripsi :
BENCH MARK NO. CIDM9

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.598 106° 48' 29.3" BT


06° 07' 40.2" LS
DIPASANG TANGGAL 2007
LOKASI
JL PAKIN
DISKRIPSI :
Besi Pada Pondasi Beton
Di Perempatan
Jl. Pakin & Jl. Ekor Kuning
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

42

1-55
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CIDM9R

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.598 106° 48' 29.3" BT


06° 07' 40.2" LS
DIPASANG TANGGAL 2007
LOKASI
JL PAKIN
DISKRIPSI :
Besi Pada Pondasi Beton
Di Perempatan
Jl. Pakin & Jl. Ekor Kuning
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

43

1-56
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL0

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

40.501 06º 18 18.8 LS 106º 51 32.8 BT

DIPASANG TANGGAL
LOKASI
CL.0
Jln.Kesehatan
DISKRIPSI :
Dipaku Ditepi Jl Kesehatan
Dekat JembatanTol Lingkar Luar
Selatan
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

44

1-57
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL01

KONSTRUKSI BM. DIBAUT

UKURAN BM.

ELEVASI KOORDINAT
CL.01
30.774 06º 18 09.1 LS 106º 51 17.6 BT

DIPASANG TANGGAL
LOKASI
Jln. Gedong Raya
DISKRIPSI :
Dibaut Diujung Jembatan
Kali Ciliwung JL Gedong Raya
Pasar Rebo
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

45

1-58
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL21

KONSTRUKSI BM. DIPAKU

UKURAN BM.
CL.21

ELEVASI KOORDINAT
18.579 06º 15 48.8 LS 106º 51 25.5 BT

DIPASANG TANGGAL
LOKASI
JL CILIWUNG I
DISKRIPSI :
Dipaku Pada Tanggul S. Ciliwung
Jl Ciliwung I Condet
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

46

1-59
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL24

KONSTRUKSI BM. DIPAKU

CL.24N
UKURAN BM.
CL.24
ELEVASI KOORDINAT

19.640
29 5 LS 106º 51 38.4
06º 15 29.5 38 4 BT
DIPASANG TANGGAL
LOKASI
Jln. Kalibata
DISKRIPSI :
Dipaku pada ujung Jembatan
Sungai Ciliwung Jl Kalibata
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

47

1-60
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL24N

KONSTRUKSI BM. DIPAKU

CL.24N
UKURAN BM.
CL.24
ELEVASI KOORDINAT

20.058
29 5 LS 106º 51 38.4
06º 15 29.5 38 4 BT
DIPASANG TANGGAL
LOKASI
Jln. Kalibata
DISKRIPSI :
Dipaku pada ujung Jembatan
Sungai Ciliwung Jl Kalibata
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

48

1-61
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL28

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

19.157
06º 14 36.2 LS 106º 51 45.1 BT
DIPASANG TANGGAL
LOKASI CL28
Jln. MT Haryono CL28N
DISKRIPSI :
Dipaku Pada Jembatan
Jl MT Haryono Kali Ciliwung
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

49

1-62
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL28N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

19.140
36 2 LS 106º 51 45.1
06º 14 36.2 45 1 BT
DIPASANG TANGGAL
LOKASI CL28
Jln. MT Haryono CL28N
DISKRIPSI :
Dipaku Pada Jembatan
Jl MT Haryono Kali Ciliwung
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

50

1-63
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CL13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

21.126 106° 51' 06.9" BT


06° 16' 22.7" LS
DIPASANG TANGGAL 2007
LOKASI
CONDET
DISKRIPSI :
Dipaku Di Dekat Tiang Listrik,
Pinggir K.Ciliwung, Jl.Rawa Elok
Kel.Balekambang-Condet,
RT.004/01, Depan Rumah No.115
Jakarta
Foto Detail BM. Foto Situasi BM.

51

1-64
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL32

KONSTRUKSI BM. DIBAUT

UKURAN BM.

ELEVASI KOORDINAT

14.539
31 0 LS 106º 51 47.9
06º 13 31.0 47 9 BT
DIPASANG TANGGAL
LOKASI
Jln. Kp. Melayu Besar
DISKRIPSI :
Dibaut pada ujung jembatan sungai
Ciliwung, Jln Kp Melayu Besar
Tebet Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

52

1-65
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CL32N

KONSTRUKSI BM. DIBAUT

UKURAN BM.

ELEVASI KOORDINAT

15.069
31 0 LS 106º 51 47.9
06º 13 31.0 47 9 BT
DIPASANG TANGGAL
LOKASI
Jln. Kp. Melayu Besar
DISKRIPSI :
Dibaut pada ujung jembatan sungai
Ciliwung, Jln Kp Melayu Besar
Tebet Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

53

1-66
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDA7

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.0620 106° 50' 40.3" BT


06° 11' 44.6" LS
DIPASANG TANGGAL 2007
LOKASI
JL. INSPEKSI
DISKRIPSI :
Dipaku Di Turap,
Sebelah Timur Jl.Inspeksi
Dekat Jl.Kenari
Jakarta

Foto Detail BM. Foto Situasi BM.

54

1-67
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDK7

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.724 106° 49' 05.84" BT


06° 09' 18.40" LS
DIPASANG TANGGAL 2007
LOKASI
JL. HAYAM WURUK
DISKRIPSI :
Dipaku Di
Jl.Hayam Wuruk
Antara Pertigaan Jl.Kebon Jeruk 13-
Jl.Masjid Kebon Jeruk
Jakarta
Foto Detail BM. Foto Situasi BM.

55

1-68
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDK13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.311 106° 49' 01.89" BT


06° 09' 00.64" LS
DIPASANG TANGGAL 2007
LOKASI
JL. HAYAM WURUK
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Hayam Wuruk - Jl.Mangga Besar

Jakarta

Foto Detail BM. Foto Situasi BM.

56

1-69
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDK18

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.906 106° 48' 59.08" BT


06° 08' 49.85" LS
DIPASANG TANGGAL 2007
LOKASI
JL. HAYAM WURUK
DISKRIPSI :
Dipaku Di
Jl.Hayam Wuruk
Dekat Jembatan Penyebrangan Org
Jakarta

Foto Detail BM. Foto Situasi BM.

57

1-70
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CLDM12

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.900
57 9 LS 106º 48 57.7
06º 07 57.9 57 7 BT
DIPASANG TANGGAL
LOKASI
Jln. Kampung Bandan
DISKRIPSI :
Dipaku pada penel PLN
Jalan,Kampung Bandan
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

58

1-71
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CLDM12N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.294
57 9 LS 106º 48 57.7
06º 07 57.9 57 7 BT
DIPASANG TANGGAL
LOKASI
Jln. Kampung Bandan
DISKRIPSI :
Dipaku pada penel PLN
Jalan,Kampung Bandan
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

59

1-72
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT4

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.362 106° 50' 06.27" BT


06° 09' 57.22" LS
DIPASANG TANGGAL
LOKASI
JL. DR.SUTOMO
DISKRIPSI :
Dipaku Di Pertigaan
Jl.DR.Sutomo - Jl.Pos &
Jl.Gedung Kesenian
Jakarta

Foto Detail BM. Foto Situasi BM.

60

1-73
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT9

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.023 106° 50' 18.35" BT


06° 09' 50.05" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Perempatan
Jl.Gunung Sahari - Jl.DR.Sutomo &
Jl.Gunung Sahari 5
Jakarta

Foto Detail BM. Foto Situasi BM.

61

1-74
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT10

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.536 106° 50' 17.51" BT


06° 09' 46.54" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Tepi Jl. Gn.Sahari

Jakarta

Foto Detail BM. Foto Situasi BM.

62

1-75
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT11

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.7335 106° 50' 16.73" BT


06° 09' 43.23" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Tepi Jl. Gn.Sahari

Jakarta

Foto Detail BM. Foto Situasi BM.

63

1-76
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.486 106° 50' 15.13" BT


06° 09' 36.53" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Tepi Jl. Gn.Sahari

Jakarta

Foto Detail BM. Foto Situasi BM.

64

1-77
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT14

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.184 106° 50' 14.39" BT


06° 09' 33.40" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Perempatan
Jl.Gunung Sahari - Jl.Angkasa &
Jl.KH.Samanhudi
Jakarta

Foto Detail BM. Foto Situasi BM.

65

1-78
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.4565 106° 50' 12.37" BT


06° 09' 25.46" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Gunung Sahari,
Dekat Hotel Golden
Jakarta

Foto Detail BM. Foto Situasi BM.

66

1-79
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT18

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.406 106° 50' 09.55" BT


06° 09' 14.38" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Gunung Sahari &
Jl. Gunung Sahari 9
Jakarta

Foto Detail BM. Foto Situasi BM.

67

1-80
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT19

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.3095 106° 50' 07.83" BT


06° 09' 07.62" LS
DIPASANG TANGGAL
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Gunung Sahari &
Jl. Gunung Sahari 10
Jakarta

Foto Detail BM. Foto Situasi BM.

68

1-81
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT20

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.226 106° 50' 05.83" BT


06° 08' 59.79" LS
DIPASANG TANGGAL 2007
LOKASI
JL. GUNUNG SAHARI
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Gunung Sahari &
Jl. Gunung Sahari 12
Jakarta

Foto Detail BM. Foto Situasi BM.

69

1-82
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLDT27

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

1.183 106° 49' 01.8" BT


06° 08' 17.3" LS
DIPASANG TANGGAL 2007
LOKASI
JL. JEMBATAN BATU
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Jembatan Batu - Jl. Mangga Dua
& Jl. Pangeran Jayakarta
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

70

1-83
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CLK1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

8.461 106°51'02.36" BT
06°12'35.11" LS
DIPASANG TANGGAL
LOKASI
JL. MANGGARAI UTARA 2
DISKRIPSI :
p
Dipaku Di
Jl.Manggarai Utara 2

Jakarta

Foto Detail BM. Foto Situasi BM.

71

1-84
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. CLK2

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

8.838

DIPASANG TANGGAL
LOKASI
JL. MANGGARAI UTARA 2
DISKRIPSI :
p
Dipaku Di
Jl.Manggarai Utara 2

Jakarta

Foto Detail BM. Foto Situasi BM.

72

1-85
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLK8

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

10.195 106° 51' 19.40" BT


06° 12' 58.50" LS
DIPASANG TANGGAL 2007
LOKASI
JL. MANGGARAI SELATAN 1
DISKRIPSI :
Pada Pondasi Tiang Rambu
Rel KA (Rel Ganda)
Di Pertigaan Jl.Manggarai Selatan 1
dan Jl.Manggarai Selatan 9
Jakarta
Foto Detail BM. Foto Situasi BM.

73

1-86
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. CLK16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.743 106° 51' 42.50" BT


06° 13' 04.98" LS
DIPASANG TANGGAL 2007
LOKASI
JL. BUKIT DURI TANJAKAN
DISKRIPSI :
Dipaku Di
Jl.Bukit Duri Pangkalan
RT.005/012, Kel.Bukit Duri
Kec.Tebet
Jakarta
Foto Detail BM. Foto Situasi BM.

74

1-87
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GOLF

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

12.567 106° 47' 41.39" BT


06° 13' 39.06" LS
DIPASANG TANGGAL
LOKASI
JL. SIMPRUK GOLF 1
DISKRIPSI :
Dipaku Di
Jl.Simpruk Golf 1

Jakarta

Foto Detail BM. Foto Situasi BM.

75

1-88
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRL9

KONSTRUKSI BM. TUGU

UKURAN BM.
GRL9
ELEVASI KOORDINAT

21.716 06º 15 40.6 LS 106º 47 07.1 BT

DIPASANG TANGGAL
LOKASI
PINTU AIR PINANG INDAH
DISKRIPSI :
Tugu Dipasang Didepan Rumah
Kopro Banjir Pintu Air Pinang
Indah, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

76

1-89
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRL099

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

18.120 106° 47' 21.04" BT


06° 14' 44.76" LS
DIPASANG TANGGAL
LOKASI
JL. GANDARIA
DISKRIPSI :
Dipaku Di
Jl.Gandaria

Jakarta

Foto Detail BM. Foto Situasi BM.

77

1-90
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRL102

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.028 106° 47' 20.84" BT


06° 15' 01.54" LS
DIPASANG TANGGAL
LOKASI
JL. ANTENE 10
DISKRIPSI :
Dipaku Di
Jl.Antene 10

Jakarta

Foto Detail BM. Foto Situasi BM.

78

1-91
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW02

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.191 106° 47' 33.89" BT


06° 12' 10.05" LS
DIPASANG TANGGAL
LOKASI
JL.PAKEMBANGAN
DISKRIPSI :
Dipaku Di
Jl.Pakembangan

Jakarta

Foto Detail BM. Foto Situasi BM.

79

1-92
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW03

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

5.7275 106° 47' 37.39" BT


06° 11' 42.49" LS
DIPASANG TANGGAL
LOKASI
JL.PAKEMBANGAN 1
DISKRIPSI :
Dipaku Di Perempatan
Jl.Pakembangan 1 &
Jl.Anggrek Rosliana 2
Jakarta

Foto Detail BM. Foto Situasi BM.

80

1-93
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW04

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.763 106° 47' 39.24" BT


06° 11' 59.11" LS
DIPASANG TANGGAL
LOKASI
JL.PAKEMBANGAN 1
DISKRIPSI :
Dipaku Di Perempatan
Jl.Pakembangan 1 - Jl.Jalak &
Jl.Sulaiman
Jakarta

Foto Detail BM. Foto Situasi BM.

81

1-94
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW7

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

8.597
06º 12 27.9 LS 106º 47 32.9 BT
DIPASANG TANGGAL
LOKASI
Jln. Palmerah Barat
DISKRIPSI :
Dipaku pada ujung jembatan sungai
Grlogol, Jln Palmerah Barat
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

82

1-95
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW7N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

9.313
27 9 LS 106º 47 32.9
06º 12 27.9 32 9 BT
DIPASANG TANGGAL
LOKASI
Jln. Palmerah Barat
DISKRIPSI :
Dipaku pada ujung jembatan sungai
Grogol, Jln Palmerah Barat
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

83

1-96
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW08

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.979 106° 47' 33.55" BT


06° 12' 37.00" LS
DIPASANG TANGGAL
LOKASI
JL.PLUIS
DISKRIPSI :
Dipaku Di Dekat
Jl.Pluis

Jakarta

Foto Detail BM. Foto Situasi BM.

84

1-97
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW09

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.595 106° 47' 37.30" BT


06° 12' 41.15" LS
DIPASANG TANGGAL
LOKASI
JL.PLUIS
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.Pluis - Jl.Gelora

Jakarta

Foto Detail BM. Foto Situasi BM.

85

1-98
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW10

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

9.169 06º 12 42.8 LS 106º 47 40.8 BT

DIPASANG TANGGAL
LOKASI GRW10
JL GELORA 8
DISKRIPSI :
Dipaku Diujung Jembatan
Jalan Gelora 8 Depan Pos Ronda
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

86

1-99
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW11

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

10.811 106° 47' 43.74" BT


06° 12' 50.59" LS
DIPASANG TANGGAL
LOKASI
JL.JURAGANAN
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.Juraganan

Jakarta

Foto Detail BM. Foto Situasi BM.

87

1-100
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW15

KONSTRUKSI BM. DIPAKU

UKURAN BM.
GRW15N

ELEVASI KOORDINAT

12.545
06º 13 45.2 LS 106º 47 44.9 BT
DIPASANG TANGGAL
GRW15
LOKASI
JL HANG LEKIR I
DISKRIPSI :
Dipaku Pada Tembok Jembatan
Kali Grogol Dekat Universitas
Mustopo , Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

88

1-101
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW15N

KONSTRUKSI BM. DIPAKU

UKURAN BM.
GRW15N

ELEVASI KOORDINAT

12.560
45 2 LS 106º 47 44.9
06º 13 45.2 44 9 BT
DIPASANG TANGGAL
LOKASI GRW15

JL HANG LEKIR I
DISKRIPSI :
Dipaku Pada Tembok Jembatan
Kali Grogol Dekat Universitas
Mustopo , Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

89

1-102
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
GRW16
13.888 06º 14 01.0 LS 106º 47 36.6 BT

DIPASANG TANGGAL
LOKASI
JL. PAKUBUWONO VI
DISKRIPSI :
Dipaku Pada Tembok Jembatan
Saluran Sekunder Jl. Pakubuwono
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

90

1-103
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW17

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

14.6675 106° 47' 20.81" BT


06° 14' 03.37" LS
DIPASANG TANGGAL
LOKASI
JL.MARTIMBANG
DISKRIPSI :
Dipaku Di Tepi Jalan
Jl.Martimbang

Jakarta

Foto Detail BM. Foto Situasi BM.

91

1-104
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW18

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.1515 106° 47' 09.66" BT


06° 14' 09.11" LS
DIPASANG TANGGAL 2007
LOKASI
JL.JAMBLANG
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.Jamblang

Jakarta

Foto Detail BM. Foto Situasi BM.

92

1-105
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW20

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

13.9535 106° 47' 11.68" BT


06° 14' 19.68" LS
DIPASANG TANGGAL
LOKASI
JL.PAKUBUWONO VI
DISKRIPSI :
Dipaku Di Dekat Pertigaan
Jl.Kebayoran - Jl.Pakubuwono VI
Jl.Kyai Maja
Jakarta

Foto Detail BM. Foto Situasi BM.

93

1-106
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW22

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT GRW22

17.515 06º 14 21.6 LS 106º 47 06.3 BT

DIPASANG TANGGAL
LOKASI
JL KEBAYORAN LAMA
DISKRIPSI :
Dipaku Pada Beton PDAM
Tepi Jalan Kebayoran Lama
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

94

1-107
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW23

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

15.8155 106° 47' 06.36" BT


06° 14' 33.18" LS
DIPASANG TANGGAL
LOKASI
KEBAYORAN LAMA
DISKRIPSI :
Dipaku Di Tepi Jalan
Jl.Pandan

Jakarta

Foto Detail BM. Foto Situasi BM.

95

1-108
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW24

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

15.788 106° 47' 08.12" BT


06° 14' 34.07" LS
DIPASANG TANGGAL
LOKASI
JL. MUNASIP
DISKRIPSI :
Dipaku Di
Jl.Munasip
Kebayoran Lama
Jakarta

Foto Detail BM. Foto Situasi BM.

96

1-109
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW26

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.834 106° 47' 19.77" BT


06° 14' 42.94" LS
DIPASANG TANGGAL
LOKASI
JL. GANDARIA
DISKRIPSI :
Dipaku Di Perempatan
Jl.Gandaria - Jl.Gandaria 1

Jakarta

Foto Detail BM. Foto Situasi BM.

97

1-110
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW27

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

20.207 106° 47' 22.19" BT


06° 14' 46.23" LS
DIPASANG TANGGAL
LOKASI
JL. GANDARIA
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Gandaria - Jl.Gandaria Tengah 2

Jakarta

Foto Detail BM. Foto Situasi BM.

98

1-111
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW28

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.043 106° 47' 20.72" BT


06° 14' 55.37" LS
DIPASANG TANGGAL
LOKASI
JL. KEMUNING
DISKRIPSI :
Dipaku Di
Jl.Kemuning

Jakarta

Foto Detail BM. Foto Situasi BM.

99

1-112
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW29

KONSTRUKSI BM. DIPAKU


GRW29
UKURAN BM.
GRW29N
ELEVASI KOORDINAT

16.923
06º 15 01.0 LS 106º 47 20.7 BT
DIPASANG TANGGAL
LOKASI
JL ANTENA
DISKRIPSI :
Dipaku Pada Pondasi Tiang Listrik
Jalan Antena
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

100

1-113
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GRW29N

KONSTRUKSI BM. DIPAKU


GRW29
UKURAN BM.
GRW29N
ELEVASI KOORDINAT

16.927
01 0 LS 106º 47 20.7
06º 15 01.0 20 7 BT
DIPASANG TANGGAL
LOKASI
JL ANTENA
DISKRIPSI :
Dipaku Pada Pondasi Tiang Listrik
Jalan Antena
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

101

1-114
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW30

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.208 106° 47' 20.77" BT


06° 15' 03.78" LS
DIPASANG TANGGAL
LOKASI
JL. ANTENE 4
DISKRIPSI :
Dipaku Di
Jl.Antene 4

Jakarta

Foto Detail BM. Foto Situasi BM.

102

1-115
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GRW32

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.964 106° 47' 12.15" BT


06° 15' 14.03" LS
DIPASANG TANGGAL
LOKASI
JL. H.SAJIM
DISKRIPSI :
Dipaku Di
Jl.H.Sajim

Jakarta

Foto Detail BM. Foto Situasi BM.

103

1-116
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. GT1

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

6.564 06º 11 39.6 LS 106º 47 32.3 BT

DIPASANG TANGGAL
LOKASI
Jln. Kemanggisan Grogol
DISKRIPSI :
Dipasang pada ujung jembatan
Sungai Grogol, Jl. Kemanggisan
Grogol, Jakarta - Barat

Foto Detail BM. Foto Situasi BM.

104

1-117
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GT04

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

5.396 106° 47' 32.00" BT


06° 11' 01.91" LS
DIPASANG TANGGAL
LOKASI
JL. KEMANGGISAN ILIR 1
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Kemanggisan ilir 1-
Jl.Arjuna Selatan
Jakarta

Foto Detail BM. Foto Situasi BM.

105

1-118
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GT08

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

5.1015 106° 47' 35.16" BT


06° 10' 35.21" LS
DIPASANG TANGGAL 2007
LOKASI
JL.LETJEN S.PARMAN
DISKRIPSI :
Dipaku Di Tepi Jalan
Jl.Letjen.S.Parman,
Dekat Mall Taman Anggrek
Jakarta

Foto Detail BM. Foto Situasi BM.

106

1-119
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. GT10

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

3.124 106° 47' 16.28" BT


06° 10' 13.84" LS
DIPASANG TANGGAL
LOKASI
JL. LETJEN S.PARMAN
DISKRIPSI :
Dipaku Di
Jl.LetJen S.Parman

Jakarta

Foto Detail BM. Foto Situasi BM.

107

1-120
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KB19

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT KB19

4.964
06º 10 57.2 LS 106º 45. 06.3 BT KB19N
DIPASANG TANGGAL
LOKASI
JL KEMBANG ABADI UTAMA
DISKRIPSI :
Pilar Ditanam Dipertigaan Jalan
Kembangan Abadi Utama Jalan
Puri Kembangan Dekat Tugu Batas
Samping Makam, Jakarta Barat

Foto Detail BM. Foto Situasi BM.

108

1-121
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KB19N

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT KB19

4.896
06º 10 57
06 2 LS 106
57.2 106º 45.
45 06 3 BT
06.3 KB19N
DIPASANG TANGGAL
LOKASI
JL KEMBANG ABADI UTAMA
DISKRIPSI :
Pilar Ditanam Dipertigaan Jalan
Kembangan Abadi Utama Jalan
Puri Kembangan Dekat Tugu Batas
Samping Makam, Jakarta Barat

Foto Detail BM. Foto Situasi BM.

109

1-122
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KRT7

KONSTRUKSI BM. DIPAKU

UKURAN BM.
KRT7
ELEVASI KOORDINAT

7.038
06º 12 34.7 LS 106º 48 45.5 BT
DIPASANG TANGGAL KRT7N

LOKASI
JL MUTIARA
DISKRIPSI :
Terletak Diujung Jembatan
Kali Krukut JL Mutiara
Jakarta pusat

Foto Detail BM. Foto Situasi BM.

110

1-123
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KRT7N

KONSTRUKSI BM. DIPAKU

UKURAN BM.
KRT7
ELEVASI KOORDINAT

7.012
34 7 LS 106º 48 45.5
06º 12 34.7 45 5 BT
DIPASANG TANGGAL KRT7N

LOKASI
JL MUTIARA
DISKRIPSI :
Terletak Diujung Jembatan
Kali Krukut JL Mutiara
Jakarta pusat

Foto Detail BM. Foto Situasi BM.

111

1-124
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KRT24

KONSTRUKSI BM. DIBAUT

UKURAN BM.
KRT24
ELEVASI KOORDINAT

12.846
06º 14 19.9 LS 106º 49 03.8 BT
DIPASANG TANGGAL KRT24N

LOKASI
JL KAPTEN TENDEAN
DISKRIPSI :
Terletak pada pojok beton
Tiang Lampu Jalan Depan
Pt Aneka Putra Sentosa Samping
Box Telkom
Jakarta Selatan
Foto Detail BM. Foto Situasi BM.

112

1-125
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. KRT24N

KONSTRUKSI BM. DIBAUT

UKURAN BM.
KRT24
ELEVASI KOORDINAT

13.082
19 9 LS 106º 49 03.8
06º 14 19.9 03 8 BT
DIPASANG TANGGAL KRT24N

LOKASI
JL KAPTEN TENDEAN
DISKRIPSI :
Terletak pada pojok beton
Tiang Lampu Jalan Depan
Pt Aneka Putra Sentosa Samping
Box Telkom
Jakarta Selatan
Foto Detail BM. Foto Situasi BM.

113

1-126
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. KRT25

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

11.377 106° 48' 55.59" BT


06° 14' 28.82" LS
DIPASANG TANGGAL
LOKASI
JL. WIJAYA TIMUR
DISKRIPSI :
Dipaku Di
Jl.Wijaya Timur

Jakarta

Foto Detail BM. Foto Situasi BM.

114

1-127
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. KRT27

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

12.552 106° 48' 52.70" BT


06° 14' 37.73" LS
DIPASANG TANGGAL
LOKASI
JL. WIJAYA TIMUR
DISKRIPSI :
Dipaku Di
Jl.Wijaya Timur

Jakarta

Foto Detail BM. Foto Situasi BM.

115

1-128
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW02

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
MPW02
24.892
06º 16 56.2 LS 106º 50 02.0 BT
DIPASANG TANGGAL
LOKASI
JLN KETAPANG
MPW02N
DISKRIPSI :
Dipaku pada bahu jembatan
Sungai Sodetan Mampang di Jalan
Ketapang, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

116

1-129
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW02N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
MPW02
24.931
56 2 LS 106º 50 02.0
06º 16 56.2 02 0 BT
DIPASANG TANGGAL
LOKASI
JLN KETAPANG MPW02N
DISKRIPSI :
Dipaku pada bahu jembatan
Sungai Sodetan Mampang di Jalan
Ketapang, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

117

1-130
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW11

KONSTRUKSI BM. DIBAUT

UKURAN BM.

ELEVASI KOORDINAT MPW11N

25.153
06º 15 57.8 LS 106º 49 49.7 BT
DIPASANG TANGGAL
LOKASI
JLN RAYA BOGOR
DISKRIPSI :
Dibaut Pada Tembok Jembatan
Jalan Warung Jati Barat di Sungai MPW11
Sodetan Mampang
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

118

1-131
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW11N

KONSTRUKSI BM. DIBAUT

UKURAN BM.

ELEVASI KOORDINAT MPW11N

22.018
57 8 LS 106º 49 49.7
06º 15 57.8 49 7 BT
DIPASANG TANGGAL
LOKASI
JLN RAYA BOGOR
DISKRIPSI :
Dibaut Pada Tembok Jembatan
Jalan Warung Jati Barat di Sungai MPW11
Sodetan Mampang
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

119

1-132
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW13

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.540 106° 49' 44.23" BT


06° 15' 40.00" LS
DIPASANG TANGGAL 2007
LOKASI
JL. MAMPANG PRAPATAN
DISKRIPSI :
Di Pertigaan Jl.Kemang Timur.5
(Dekat Jembatan) Kel.Kalibata,
Kec.Pancoran, RT.007/03
Masuk dari Jl.Daksa Piun
Jakarta
Foto Detail BM. Foto Situasi BM.

120

1-133
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW14

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.474 106° 49' 33.60" BT


06° 15' 42.54" LS
DIPASANG TANGGAL
LOKASI
JL. KEMANG TIMUR 7
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Kemang Timur 7 -
Jl.Kemang Timur 5
Jakarta

Foto Detail BM. Foto Situasi BM.

121

1-134
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW15

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.380 106° 49' 34.66" BT


06° 15' 33.56" LS
DIPASANG TANGGAL
LOKASI
JL KEMANG TIMUR 5
JL.
DISKRIPSI :
Dipaku Di
Jl.Kemang Timur 5

Jakarta

Foto Detail BM. Foto Situasi BM.

122

1-135
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW16

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.617 106° 49' 28.35" BT


06° 15' 28.81" LS
DIPASANG TANGGAL
LOKASI
JL KEMANG UTARA
JL.
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Kemang Utara -
Jl.Kemang Utara 9
Jakarta

Foto Detail BM. Foto Situasi BM.

123

1-136
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW17

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

17.069
06º 15 17.8 LS 106º 49 32.1 BT
DIPASANG TANGGAL
LOKASI
Jln. Kemang Utara
DISKRIPSI :
Dipaku pada ujung jembatan
Sungai Mampang Prapatan
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

124

1-137
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. MPW17N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

18.329
06º 15 17.8 LS 106º 49 32.1 BT
DIPASANG TANGGAL
LOKASI
Jln. Kemang Utara
DISKRIPSI :
Dipaku pada ujung jembatan
Sungai Mampang Prapatan
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

125

1-138
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW19

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.125 106° 49' 24.18" BT


06° 14' 54.57" LS
DIPASANG TANGGAL
LOKASI
JL PONDOK JAYA
JL.
DISKRIPSI :
Dipaku Di
Jl.Pondok Jaya

Jakarta

Foto Detail BM. Foto Situasi BM.

126

1-139
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW20

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

14.865 106° 49' 20.73" BT


06° 14' 55.10" LS
DIPASANG TANGGAL
LOKASI
JL PONDOK JAYA
JL.
DISKRIPSI :
Dipaku Di Perempatan
Jl.Pondok Jaya -
Jl.Pondok Jaya 4
Jakarta

Foto Detail BM. Foto Situasi BM.

127

1-140
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW22

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

14.387 106° 49' 20.25" BT


06° 14' 50.39" LS
DIPASANG TANGGAL
LOKASI
JL PONDOK JAYA 4
JL.
DISKRIPSI :
Dipaku Di
Jl.Pondok Jaya 4

Jakarta

Foto Detail BM. Foto Situasi BM.

128

1-141
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW23

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

15.141 106° 49' 20.97" BT


06° 14' 44.72" LS
DIPASANG TANGGAL
LOKASI
JL BANGKA 2C
JL.
DISKRIPSI :
Dipaku Di
Jl.Bangka 2C

Jakarta

Foto Detail BM. Foto Situasi BM.

129

1-142
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. MPW25

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

12.525 106° 49' 20.55" BT


06° 14' 37.87" LS
DIPASANG TANGGAL
LOKASI
JL PONDOK KARYA
JL.
DISKRIPSI :
Dipaku Di
Jl.Pondok Karya

Jakarta

Foto Detail BM. Foto Situasi BM.

130

1-143
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. NWP60

KONSTRUKSI BM. DIBOBOK


NWP.60
UKURAN BM.

ELEVASI KOORDINAT

41.161 06º 17 58.1 LS 106º 52 14.2 BT

DIPASANG TANGGAL
LOKASI
JLN RAYA BOGOR
DISKRIPSI :
Dibobok Pada Tembok Gudang
Air / Bangunan PAM Pasar Rebo
Jl Raya Bogor
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

131

1-144
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. NWP487

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

8.917 06º 12 28.3 LS 106º 50 54.6 BT

DIPASANG TANGGAL 5 juli 2007


LOKASI
Jln. Tambak
DISKRIPSI :
Dibobok Pada Lenengan Pintu Air
Manggarai Lama, dibawah
Jembatan Rel Kereta Api
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

132

1-145
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. P57

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

29.969 06º 16 16.2 LS 106º 51 29.3 BT

DIPASANG TANGGAL
P.57
LOKASI
Jln. Condet Raya
DISKRIPSI :
Dipaku Ditepi Jalan Raya Condet
Dekat Pertigaan Jl Eretan II
Condet Jakarta Timur

Foto Detail BM. Foto Situasi BM.

133

1-146
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PB37

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

2.002 06º 10 02.9 LS 106º 46 47.6 BT

DIPASANG TANGGAL
PB37
LOKASI
JL PELITA 2
DISKRIPSI :
Dibobok pada Gedung Pompa
Tomang Barat
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

134

1-147
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PB55

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

7.468 06º 11 54.4 LS 106º 48 35.9 BT

DIPASANG TANGGAL
LOKASI
PINTU AIR KARET
DISKRIPSI :
Dibobok Pada Tembok Bangunan PB55
Pintu Air Karet Sisi Kiri Sungai
Banjir Kanal Jl Administrasi
Jakarta pusat

Foto Detail BM. Foto Situasi BM.

135

1-148
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PB64

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

8.566 106° 50' 42.8" BT


06° 11' 57.7" LS
DIPASANG TANGGAL
LOKASI
JL. DIPONEGORO
DISKRIPSI :
Pada Beton PE.12, Jl. Diponegoro
di Sudut Barat Jembatan K.Ciliwung
(Dekat RSCM), Pertigaan
Jl.Diponegoro - Jl.Kimia
Jakarta
Foto Detail BM. Foto Situasi BM.

136

1-149
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PB166

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

0.924 06º 07 48.6 LS 106º 48 53.4 BT

DIPASANG TANGGAL
LOKASI
Jalan Lodan Raya
DISKRIPSI :
Dibobok Pada Jembatan Kereta Api
Kampung Muka (sebelah kiri)
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

137

1-150
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PB363

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

4.895 06º 09 10.4 LS 106º 47 41.9 BT

DIPASANG TANGGAL
LOKASI
Jln. DR. Latumenten
DISKRIPSI :
Dibobok pada lenengan Jembatan
Banjir Canal dijalan DR.
Latumenten
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

138

1-151
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PB384

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

0.361 06º 06 33.9 LS 106º 47 50.5 BT

DIPASANG TANGGAL
LOKASI
Bangunan Pompa Waduk Pluit
DISKRIPSI :
Dibobok Pada Pylon gedung
Pompa Pluit II
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

139

1-152
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PBM030

KONSTRUKSI BM. TEMBOK JEMBATAN

UKURAN BM. Wisma


Benhil
ELEVASI KOORDINAT

7.861 06º 12 56.2 LS 106º 49 00.0 BT

DIPASANG TANGGAL
LOKASI
Jln. Jend. Sudirman PB. 030
DISKRIPSI :
Terdapat di Jembatan Kali Krukut
Depan gedung Wisma Benhil
di jalan Jenderal Sudirman

Foto Detail BM. Foto Situasi BM.

140

1-153
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PBM34

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

13.345 06º 14 26.4 LS 106º 49 16.1 BT

DIPASANG TANGGAL
LOKASI
Jln. Kapten Tendean
DISKRIPSI :
Dibobok pada jembatan Sungai
Mampang, Jalan Kapten Tendean
Mampang Prapatan Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

141

1-154
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP119

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

1.986 06º 06 43.9 LS 106º 47 06.8 BT

DIPASANG TANGGAL
LOKASI
Jln. Pluit Karang Ayu
DISKRIPSI :
Dibobok pada Jembatan Sungai
Muara Karang Jl Pluit Karang Ayu
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

142

1-155
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP553

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT PP.553

34.795 06º 16 50.2 LS 106º 49 11.3 BT

DIPASANG TANGGAL
LOKASI
JLN AMPERA RAYA
DISKRIPSI :
Dipasang 20m ke utara Kantor
Pengadilan Negri Jaksel
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

143

1-156
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP775

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

4.055 06º 09 43.5 LS 106º 45 59.5 BT


PP775
DIPASANG TANGGAL
LOKASI
JL PESING KOENENG
DISKRIPSI :
Dibobok Pada Lenengan Jembatan
Sungai Sekretaris Jl pesing Koeneng
Kedoya, Jakarta Barat

Foto Detail BM. Foto Situasi BM.

144

1-157
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP782

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

2.596 06º 08 38.7 LS 106º 46 40.7 BT

DIPASANG TANGGAL
LOKASI
Jln. Pangeran Tubagus Angke
DISKRIPSI :
Dibobok Pada Lenengan Jembatan
Kali Angke Jalan Pangeran
Tubagus Angke Jakarta Barat

Foto Detail BM. Foto Situasi BM.

145

1-158
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP825A

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

6.523 06º 10 57.8 LS 106º 45 27.1 BT

DIPASANG TANGGAL
LOKASI
Jln. Jalan Raya Puri Kembangan
DISKRIPSI :
Dibobok pada Jembatan, di
Pertigaan Jalan Puri Kembangan
dengan Jalan Kedoya Raya
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

146

1-159
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP. 878

KONSTRUKSI BM. Besi

UKURAN BM.

ELEVASI KOORDINAT

10.931 06º 13 04.2 LS 106º 45 52.0 BT

DIPASANG TANGGAL
LOKASI
Dijembatan Kali Pesanggrahan PP 878
DISKRIPSI :
Terletak di jembatan Kali
Pesanggrahan di jalan Pos
Pengumben Lama + 50 meter
dari perempatan jalan Raya Joglo
dan jalan Pos Pengumben Lama
Foto Detail BM. Foto Situasi BM.

147

1-160
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP917

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

4.895 06º 10 04.6 LS 106º 49 52.8 BT

DIPASANG TANGGAL
LOKASI PP 917
Jalan Pos
DISKRIPSI :
Dibobok Pada Jembatan
Jalan Pos/ Kali Ciliwung
Belakang Pintu Air Masjid Istiqlal
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

148

1-161
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP 920

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI
KOORDINAT
3.252 06º 10 15.3 LS 106º 48 39.5 BT

DIPASANG TANGGAL
LOKASI
Jln. KH. Hasyim Asyhari
DISKRIPSI :
Dibobok pada Jembatan Sungai
Cideng Jln. KH. Hasyim Asyhari
Cideng Jakarta Barat

Foto Detail BM. Foto Situasi BM.

149

1-162
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP930

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

6.362 06º 10 54.1 LS 106º 50 11.2 BT

DIPASANG TANGGAL
LOKASI
JL PRAPATAN
DISKRIPSI :
Dibobok pada Lenengan Jembatan
Kwitang, Sungai Ciliwung
Jalan Prapatan, Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

150

1-163
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PP1115B

KONSTRUKSI BM. PIPA PARALON

UKURAN BM.

ELEVASI KOORDINAT

4.628 106° 44' 50.48" BT


06° 09' 38.32" LS
DIPASANG TANGGAL 2007
LOKASI
JL. INSPEKSI CENGKARENG DRAIN
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Inspeksi Cengkareng Drain -
Jl.Cempaka
Jakarta

Foto Detail BM. Foto Situasi BM.

151

1-164
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PP1145B

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

2.502 06º 08 44.4 LS 106º 50 03.0 BT

DIPASANG TANGGAL
LOKASI
Jalan Pangeran Jayakarta
DISKRIPSI :
Dibobok Pada Jembatan
Jalan Pangeran Jayakarta/ Kali
Ciliwung Bintang Mas
Jakarta Pusat

Foto Detail BM. Foto Situasi BM.

152

1-165
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT PSA1

11.850 06º 13 01.6 LS 106º 45 50.8 BT

DIPASANG TANGGAL
LOKASI
JL POS PENGUMBEN
DISKRIPSI :
Dipaku Diujung Jembatan
Sungai Pesanggrahan Jl Pos
Pengumben
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

153

1-166
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA3

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT PSA3


PSA3N
14.381
06º 12 14.8 LS 106º 46 02.2 BT
DIPASANG TANGGAL
LOKASI
JL H TOHA
DISKRIPSI :
Dipaku Dipertigaan Jl H Toha
Kampung Kebon Jeruk
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

154

1-167
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA3N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT PSA3


PSA3N
14.248
06º 12 14
06 8 LS 106
14.8 106º 46 02.2
02 2 BT
DIPASANG TANGGAL
LOKASI
JL H TOHA
DISKRIPSI :
Dipaku Dipertigaan Jl H Toha
Kampung Kebon Jeruk
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

155

1-168
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PSA4

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

10.5155 106° 45' 57.16" BT


06° 11' 55.20" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KEBON JERUK RAYA
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Kebon Jeruk Raya &
Jl.Masjid Assurur
Jakarta

Foto Detail BM. Foto Situasi BM.

156

1-169
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA5

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

6.576
06º 11 25.5 LS 106º 45 54.4 BT
DIPASANG TANGGAL
LOKASI
JL ARJUNA SELATAN PSA5N PSA5
DISKRIPSI :
Ditanam Ditepi Jalan Arjuna
Selatan, Didepan Bank Mega
Kebon Jeruk, Jakarta barat

Foto Detail BM. Foto Situasi BM.

157

1-170
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA5N

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

7.146
06º 11 25
06 5 LS 106
25.5 106º 45 54.4
54 4 BT
DIPASANG TANGGAL
LOKASI
JL ARJUNA SELATAN PSA5N PSA5
DISKRIPSI :
Ditanam Ditepi Jalan Arjuna
Selatan, Didepan Bank Mega
Kebon Jeruk, Jakarta barat

Foto Detail BM. Foto Situasi BM.

158

1-171
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA14

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

14.825
06º 13 38.1LS 106º 45 50.9 BT PSA14

DIPASANG TANGGAL
LOKASI
JL KAMPUNG 2
DISKRIPSI : PSA14N
Ditanam Diujung Jl Kampung 2
Dekat Tiang Listrik Kp Baru
Ulujami, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

159

1-172
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSA14N

KONSTRUKSI BM. TUGU

UKURAN BM.

ELEVASI KOORDINAT

14.402
06º 13 38
06 1LS 106
38.1LS 106º 45 50.9
50 9 BT PSA14

DIPASANG TANGGAL
LOKASI
JL KAMPUNG 2
DISKRIPSI : PSA14N
Ditanam Diujung Jl Kampung 2
Dekat Tiang Listrik Kp Baru
Ulujami, Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

160

1-173
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSABCC40

KONSTRUKSI BM. TUGU PSAPBCC40

UKURAN BM.

ELEVASI KOORDINAT

3.496 06º 09 13.3 LS 106º 44 52.6 BT

DIPASANG TANGGAL
LOKASI
PINTU AIR CENGKARENG DRAIN
DISKRIPSI :
Pilar Ditanam Dihalaman Rumah
Jaga Pintu Air Cengkareng Drain
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

161

1-174
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSTO

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.363 06º 14 15.6 LS 106º 45 52.5 BT


06º 14 15.6 LS 106º 45 52.5 BT
DIPASANG TANGGAL
LOKASI
Jln. Ciledug Raya
DISKRIPSI :
Dipaku pada Ujung Jembatan
Pasar Cipulir, Jalan Ciledug Raya
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

162

1-175
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PSTON

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.635 106º 45 52.5 BT


06º 14 15.6
06 15 6 LS
DIPASANG TANGGAL
LOKASI
Jln. Ciledug Raya
DISKRIPSI :
Dipaku pada Ujung Jembatan
Pasar Cipulir, Jalan Ciledug Raya
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

163

1-176
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PST3

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.706 106° 46' 04.09" BT


06° 14' 42.06" LS
DIPASANG TANGGAL
LOKASI
ULUJAMI
DISKRIPSI :
Dipaku Di
Jl.Perdatam Terusan

Jakarta

Foto Detail BM. Foto Situasi BM.

164

1-177
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. PST6

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.235 06º 15 16.0 LS 106º 46 02.5 BT

DIPASANG TANGGAL
PST06
LOKASI
JL PONCOL
DISKRIPSI :
Dipaku pada Tepi Saluran
Jl Poncol Belakang Masjid
Kp Tanah Kusir, Bintaro
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

165

1-178
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PST8

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

18.8035 106° 46' 09.24" BT


06° 15' 15.65" LS
DIPASANG TANGGAL
LOKASI
JL BINTARO RAYA
JL.
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.Bintaro Raya

Jakarta

Foto Detail BM. Foto Situasi BM.

166

1-179
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PST87

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

16.213 106° 46' 12.38" BT


06° 15' 10.73" LS
DIPASANG TANGGAL 2007
LOKASI
JL. BINTARO RAYA
DISKRIPSI :
Dipaku Di
Jl.Bintaro Raya
Di Dekat TPU Tanah Kusir
Jakarta

Foto Detail BM. Foto Situasi BM.

167

1-180
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. PWSCSKT02

KONSTRUKSI BM. BETON

UKURAN BM.

ELEVASI KOORDINAT

5.104 106° 46' 59.77" BT


06° 11' 17.12" LS
DIPASANG TANGGAL
LOKASI
JL. BATUSARI
DISKRIPSI :
Dipaku Di Perempatan
Jl.Batusari - Jl.Batusari 4 - Jl.Budhi
(Di tikungan Jl.Budhi)
Jakarta

Foto Detail BM. Foto Situasi BM.

168

1-181
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. S05028

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.026 106° 48' 22.25" BT


06° 10' 23.03" LS
DIPASANG TANGGAL
LOKASI
JL TANJUNG SELOR
JL.
DISKRIPSI :
Dipaku Di
Jl.Tanjung Selor

Jakarta

Foto Detail BM. Foto Situasi BM.

169

1-182
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO

IN
JABODETABEK
Diskripsi :
BENCH MARK NO. S1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
S1N S1
3.112
06º 09 53.3 LS 106º 46 21.3 BT
DIPASANG TANGGAL
LOKASI
JL PELITA 2
DISKRIPSI :
Dipaku Dikanstin Dekat Jembatan
Kali Sekretaris, Depan SD Pertiwi
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

170

1-183
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. S1N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
S1N S1
3.527
06º 09 53
06 3 LS 106
53.3 106º 46 21.3
21 3 BT
DIPASANG TANGGAL
LOKASI
JL PELITA 2
DISKRIPSI :
Dipaku Dikanstin Dekat Jembatan
Kali Sekretaris, Depan SD Pertiwi
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

171

1-184
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. S12001

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.851 106° 49' 15.17" BT


06° 08' 33.45" LS
DIPASANG TANGGAL 2007
LOKASI
JL. MANGGA BESAR 5
DISKRIPSI :
Dipaku Di
Jl.Mangga Besar 5

Jakarta

Foto Detail BM. Foto Situasi BM.

172

1-185
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. SEK020

KONSTRUKSI BM. DIPAKU DI BETON

UKURAN BM.

ELEVASI KOORDINAT

3.239 106° 46' 45.37" BT


06° 10' 00.26" LS
DIPASANG TANGGAL 2007
LOKASI
JL. DAAN MOGOT
DISKRIPSI :
Dipaku Di
Jl.Pelita 2
Dekat Waduk Tomang
Jakarta

Foto Detail BM. Foto Situasi BM.

173

1-186
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. T32

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

4.997 06º 10 24.5 LS 106º 47 21.8 BT

DIPASANG TANGGAL
LOKASI
Jalan S. Parman
DISKRIPSI :
Dipaku pada tiang lampu jalan T32
di Jalan S.Parman
Depan Polsek Tanjung Duren
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

174

1-187
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. TA23

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
TA23N
28.269
06º 16 06.2 LS 106º 48 40.9 BT
DIPASANG TANGGAL
LOKASI
JLN H. ABU
TA23
DISKRIPSI :
Dipaku pada beton tiang telpon
disamping masjid Al-Iklas di jalan
H. Abu, Cipete Selatan
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

175

1-188
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. TA23N

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT
TA23N
28.238
06 2 LS 106º 48 40.9
06º 16 06.2 40 9 BT
DIPASANG TANGGAL
LOKASI
JLN H. ABU
DISKRIPSI : TA23
Dipaku pada beton tiang telpon
disamping masjid Al-Iklas di jalan
H. Abu, Cipete Selatan
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

176

1-189
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. TB8

KONSTRUKSI BM. DIBOBOK

UKURAN BM.
TB8
ELEVASI KOORDINAT

4.621 06º 09 45.6LS 106º 44 52.3 BT

DIPASANG TANGGAL
LOKASI
PINTU AIR CENGKARENG DRAIN
DISKRIPSI :
Dibobok Diujung Jembatan
Sungai Cengkareng Drain Samping
PDAM
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

177

1-190
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. TL103

KONSTRUKSI BM. DIPAKU

UKURAN BM.
TL. 103
ELEVASI KOORDINAT

35.683 06º 17 11.3 LS 106º 51 01.9 BT

DIPASANG TANGGAL
LOKASI
Jl Kayumanis
DISKRIPSI :
Dipaku Pada Pondasi Tiang
Telepon Jl Kayumanis Condet
Jakarta Timur

Foto Detail BM. Foto Situasi BM.

178

1-191
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. TP38

KONSTRUKSI BM. DIBAUT

UKURAN BM. TP38

ELEVASI KOORDINAT

24.532 06º 15 43.4 LS 106º 46 57.2 BT

DIPASANG TANGGAL
LOKASI
JL. ISKANDAR MUDA
DISKRIPSI :
Dibaut Pada tiang rambu
Jalan Iskandar muda, Pondok indah
Jakarta Selatan

Foto Detail BM. Foto Situasi BM.

179

1-192
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. UM01

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

11.766 106° 47' 42.06" BT


06° 13' 45.23" LS
DIPASANG TANGGAL
LOKASI
JL TERUSAN HANG LEKIR 1
JL.
DISKRIPSI :
Dipaku Di Pertigaan
Jl.Terusan Hang Lekir 1 -
Jl.Terusan Hang Lekir 5
Jakarta

Foto Detail BM. Foto Situasi BM.

180

1-193
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCK1

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.502 106° 48' 38.88" BT


06° 11' 53.96" LS
DIPASANG TANGGAL
LOKASI
JL TENAGA LISTRIK
JL.
DISKRIPSI :
Dipaku Di
Jl.Tanaga Listrik

Jakarta

Foto Detail BM. Foto Situasi BM.

181

1-194
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCK4

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.862 106° 48' 56.4" BT


06° 12' 03.2" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KH. MAS MANSYUR
DISKRIPSI :
Dipaku Di
Jl.KH.Mas Mansyur

Jakarta

Foto Detail BM. Foto Situasi BM.

182

1-195
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCK6

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.667 106° 49' 27.4" BT


06° 12' 10.6" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KENDAL
DISKRIPSI :
Di Trotoar, Dekat Pot Bunga
2.5 m Dari Tepi Turap WBC

Jakarta

Foto Detail BM. Foto Situasi BM.

183

1-196
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
MOVED TO

Diskripsi :
BENCH MARK NO. WBCK7

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.853 106° 49' 38.3" BT


06° 12' 12.5" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KENDAL
DISKRIPSI :
Dipaku Di
Dekat Rel Kereta Api

Jakarta

Foto Detail BM. Foto Situasi BM.

184

1-197
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCK7R

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.853 106° 49' 38.3" BT


06° 12' 12.5" LS
DIPASANG TANGGAL 2007
LOKASI
JL. KENDAL
DISKRIPSI :
Dipaku Di
Dekat Rel Kereta Api

Jakarta

Foto Detail BM. Foto Situasi BM.

185

1-198
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
MOVED TO

Diskripsi :
BENCH MARK NO. WBCK10

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.921 106° 49' 51.5" BT


06° 12' 15.7" LS
DIPASANG TANGGAL 2007
LOKASI
JL. LATUHARHARI
DISKRIPSI :
Dipaku Di
Dekat Rel Kereta Api

Jakarta

Foto Detail BM. Foto Situasi BM.

186

1-199
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCK10R

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

7.921 106° 49' 51.5" BT


06° 12' 15.7" LS
DIPASANG TANGGAL 2007
LOKASI
JL. LATUHARHARI
DISKRIPSI :
Dipaku Di
Dekat Rel Kereta Api

Jakarta

Foto Detail BM. Foto Situasi BM.

187

1-200
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCW05

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

6.1895 106° 48' 36.26" BT


06° 11' 06.60" LS
DIPASANG TANGGAL
LOKASI
JL.KS.TUBUN
DISKRIPSI :
Dipaku Di Dekat Jembatan
Jl.KS.Tubun

Jakarta

Foto Detail BM. Foto Situasi BM.

188

1-201
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
MOVED TO

Diskripsi :
BENCH MARK NO. WBCW17

KONSTRUKSI BM. DIPAKU,


DI TEMBOK JALAN TOL

UKURAN BM.

ELEVASI KOORDINAT

5.173 106° 47' 32.2" BT


06° 08' 56.1" LS
DIPASANG TANGGAL 2007
LOKASI
JELAMBAR
DISKRIPSI :
Dipaku Di
Jl.DR. Latumeten

Jakarta

Foto Detail BM. Foto Situasi BM.

189

1-202
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCW17R

KONSTRUKSI BM. DIPAKU,


DI TEMBOK JALAN TOL

UKURAN BM.

ELEVASI KOORDINAT

5.173 106° 47' 32.2" BT


06° 08' 56.1" LS
DIPASANG TANGGAL 2007
LOKASI
JELAMBAR
DISKRIPSI :
Dipaku Di
Jl.DR. Latumeten

Jakarta

Foto Detail BM. Foto Situasi BM.

190

1-203
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCW18

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

4.146 106° 47' 26.45" BT


06° 08' 44.70" LS
DIPASANG TANGGAL
LOKASI
JELAMBAR
DISKRIPSI :
Dipaku Di
Jl.DR. Latumeten

Jakarta

Foto Detail BM. Foto Situasi BM.

191

1-204
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT MOVED TO
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW19

KONSTRUKSI BM. DIBAUT


WBCW19N

UKURAN BM.
WBCW19
ELEVASI KOORDINAT

5.391
06º 08 36.4 LS 106º 47 21.6 BT
DIPASANG TANGGAL
LOKASI
JL TUBAGUS ANGKE
DISKRIPSI :
WBCW19A Terletak Dibaut
Tiang Lampu Merah Jl Tubagus
Angke Dibawah Grogol Fly Over
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

192

1-205
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW19N

KONSTRUKSI BM. DIBAUT


WBCW19N

UKURAN BM. WBCW19

ELEVASI KOORDINAT

5.696
36 4 LS 106º 47 21.6
06º 08 36.4 21 6 BT
DIPASANG TANGGAL
LOKASI
JL TUBAGUS ANGKE
DISKRIPSI :
WBCW19A Terletak Dibaut
Tiang Lampu Merah Jl Tubagus
Angke Dibawah Grogol Fly Over
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

193

1-206
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCW21

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

4.079 106° 47' 12.2" BT


06° 08' 17.7" LS
DIPASANG TANGGAL 2007
LOKASI
JL.TELUK GONG RAYA
DISKRIPSI :
Dipaku Di Atas Turap WBC
Jl.Teluk Gong Raya - Jl.Inspeksi
Sisi Selatan Jl.Teluk Gong Raya,
Sebelah Barat Kali Banjir Kanal
Jakarta
Foto Detail BM. Foto Situasi BM.

194

1-207
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW22

KONSTRUKSI BM. DIPAKU


WBCW22

UKURAN BM.

ELEVASI KOORDINAT

4.361 06º 08 10.8 LS 106º 47 07.4 BT

DIPASANG TANGGAL
LOKASI
JL TELUK GONG
DISKRIPSI :
WBCW22 Terletak Pada Paku
Ujung Jembatan Sungai Grogol
Dekat Wihara Banjir Kanal
Jl Teluk Gong
Jakarta Barat
Foto Detail BM. Foto Situasi BM.

195

1-208
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW26

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

2.293 06º 07 38.2 LS 106º 46 40.0 BT

DIPASANG TANGGAL
LOKASI
TANGGUL WBC
DISKRIPSI :
WBCW26 Terletak Ditanggul
Diseberang Apartemen Teluk WBCW26
Indah
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

196

1-209
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. WBCW27

KONSTRUKSI BM. DIPAKU PERAHU


ERETAN

UKURAN BM.

ELEVASI KOORDINAT

2.660 106° 46' 36.0" BT


06° 07' 33.8" LS
DIPASANG TANGGAL 2007
LOKASI
KAPUK MUARA
DISKRIPSI :
Dipaku Di
Jl.Pluit Karang Karya 6

Jakarta

Foto Detail BM. Foto Situasi BM.

197

1-210
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW29

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

5.257 06º 07 23.5 LS 106º 46 26.8 BT

DIPASANG TANGGAL
LOKASI
Di Jembatan Pintu Keluar Tol Muara Karang
DISKRIPSI :
Dipaku pada Jalan Pintu Keluar
Tol Muara Karang
Jakarta Utara

Foto Detail BM. Foto Situasi BM.

198

1-211
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WBCW31

KONSTRUKSI BM. DIPAKU

UKURAN BM.

ELEVASI KOORDINAT

0.666 06º 06 56.8 LS 106º 46 28.3 BT

DIPASANG TANGGAL
LOKASI
JL PLUIT KARANG
WBCW31
DISKRIPSI :
WBCW31 Dipaku Pada Tepi
Perempatan Jalan Samping
Apartemen Riverado
Jakarta Barat

Foto Detail BM. Foto Situasi BM.

199

1-212
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK
Diskripsi :
BENCH MARK NO. WL1

KONSTRUKSI BM. DIBOBOK

UKURAN BM.

ELEVASI KOORDINAT

6.130 06º 10 26.9 LS 106º 48 22.7 BT

DIPASANG TANGGAL
LOKASI
PINTU AIR JL K CARINGIN WL01

DISKRIPSI :
Dibobok Pada Tembok Bangunan
WL Banjir Kanal, Belakang
Pompa Cideng Pinggir Sungai
Banjir Kanal
Jakarta Pusat
Foto Detail BM. Foto Situasi BM.

200

1-213
DISKRIPSI BENCH MARK (BM)
FOR
RIVER SURVEY AND DIGITAL DATA PROCESSING
FOR
INSTITUTIONAL REVITALIZATION PROJECT
FOR
FLOOD MANAGEMENT
IN
JABODETABEK

Diskripsi :
BENCH MARK NO. TP

KONSTRUKSI BM. Paku Beton Kantor Operasional


PELINDO II

UKURAN BM. Laut

BM Pasut
ELEVASI KOORDINAT Pos Pengamatan
Pasut
1.629 06º 06 24.4 LS 106º 53 27.1 BT
TP

DIPASANG TANGGAL Area Parkir


Laut
LOKASI
Kantor Operasional PELINDO II Tanjung Priuk
DISKRIPSI :
Terpasang di taman area dermaga
tepatnya pada Pos Pengamatan
Pasut + 20 m dari BM Pasut

Foto Detail BM. Foto Situasi BM.

201

1-214

You might also like