Jubilant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

JSA NO. Department / Routine/ Non


Job Title: New/ Revised
Activity/ No… Routine

Reference work Permit


no:- Supervisor:
JOB SAFETY ANALYSIS Prepared By:

Plant Location: -Unit-1


Department: Project
Niacinamide
Reviewed By:

Job Description:-
Approved By:

SEQUENCE OF TASK POTENTIAL HAZARDS PREVENTIVE MEASURES

 Plastering and chipping  Unskilled worker  Ensure that worker should be trained and well experienced.
work  Damage tools are using.  Inspect the tools prior to use.
 Exposure of workers to various  Wear the job specific PPEs like gloves, safety shoes, goggles etc.
hazards like eye injury, dust  Close supervision during work.
injury & hand injury etc.  No parallel activity is going on, only single activity should be
 Skin irritation followed.
 Slip, trip and fall  Ensure sufficient amount of lighting in the area.
 Use dust mask handling dry cement.
 Thoroughly wash the exposed body parts with fresh water and
soap after the work.
 Provision of covering on floors to collect fallen mortar.
 Ensure that area should be barricaded.