Jubilant Infrastructure Limited-Bharuch

Annexure-6
JOB SAFETY ANALYSIS

JSA NO. Department / Routine/ Non


Job Title: New/ Revised
Activity/ No… Routine

Reference work Permit


no:- Supervisor:
JOB SAFETY ANALYSIS Prepared By:

Plant Location: -Unit-1


Department: Project
Niacinamide
Reviewed By:

Job Description:-
Approved By:

SEQUENCE OF TASK POTENTIAL HAZARDS PREVENTIVE MEASURES

 Rebar installation/steel  Hand injury  Conduct tool box talk before start the work.
fixing work  Cut/puncture/hand injury  Make sure all protruded nail remove before wooden material
 Slip/Trip/Fall lying at the ground.
 Property damage  Cover re-bar to avoid tripping where access is necessary. Wire
 Pinch point mesh will be installed on top of rebar mats to minimize slip, trip
 Heat Stress/Exhaustion and fall hazards.
 Back injury  Remove all unwanted material and secure properly to keep
access and egress free from obstruction.
 Wear appropriate PPEs before starting the work.
 Tool must be inspected before used.
 Competent person must be deploy
 Ensure area are clear and materials properly stack within the
working area.
 All rebar’s that is protruding must be capped and kept
secured
 Workers will be oriented about the proper posture and
positioning during the execution of the job.