The document provides a 2 week look-ahead plan from March 25th to April 8th for various construction activities. It includes schedules for replacing the roof slab waterproofing system over four zones, carrying out ground improvement by lateral compaction of soil in internal areas, boundary wall repair, replacement of the waterproofing system on an underground tank, verification of a pump room and underground services, removing and reinstating a roof expansion joint, and external wall repair. The plan outlines the activity names, original planned durations, start dates and finish dates for each task.
The document provides a 2 week look-ahead plan from March 25th to April 8th for various construction activities. It includes schedules for replacing the roof slab waterproofing system over four zones, carrying out ground improvement by lateral compaction of soil in internal areas, boundary wall repair, replacement of the waterproofing system on an underground tank, verification of a pump room and underground services, removing and reinstating a roof expansion joint, and external wall repair. The plan outlines the activity names, original planned durations, start dates and finish dates for each task.
The document provides a 2 week look-ahead plan from March 25th to April 8th for various construction activities. It includes schedules for replacing the roof slab waterproofing system over four zones, carrying out ground improvement by lateral compaction of soil in internal areas, boundary wall repair, replacement of the waterproofing system on an underground tank, verification of a pump room and underground services, removing and reinstating a roof expansion joint, and external wall repair. The plan outlines the activity names, original planned durations, start dates and finish dates for each task.
The document provides a 2 week look-ahead plan from March 25th to April 8th for various construction activities. It includes schedules for replacing the roof slab waterproofing system over four zones, carrying out ground improvement by lateral compaction of soil in internal areas, boundary wall repair, replacement of the waterproofing system on an underground tank, verification of a pump room and underground services, removing and reinstating a roof expansion joint, and external wall repair. The plan outlines the activity names, original planned durations, start dates and finish dates for each task.
Original Planned Start Planned Finish Activity ID Activity Name Duration date date REPLACING THE EXISTING ROOF SLAB WATERPROOFING SYSTEM ZONE A A1380 Application of Aluminium flashing and sealant in vertical faces 4 26-Mar-24 29-Mar-24 A1390 Installation of 50mm thk thermal insulation boards 4 22-Mar-24 25-Mar-24 A1400 Installation of geo textile 4 26-Mar-24 29-Mar-24 A1410 Reinstate same type of roof tiles as pe existing design 3 30-Mar-24 01-Apr-24 ZONE B A1470 Application of Aluminium flashing and sealant in vertical faces 4 26-Mar-24 29-Mar-24 A1480 Installation of 50mm thk thermal insulation boards 4 22-Mar-24 25-Mar-24 A1490 Installation of geo textile 4 26-Mar-24 29-Mar-24 A1500 Reinstate same type of roof tiles as pe existing design 3 30-Mar-24 01-Apr-24 ZONE C Removal of existing finishes(Concrete Tiles,geotextile,Aggregates, A1510 10 18-Mar-24 27-Mar-24 insulation board,waterproofing membrane) A1520 Carryingout necessary concrete repairs 8 28-Mar-24 04-Apr-24 A1530 Installation of Two layers of 4mm thick SBS Membrane 5 05-Apr-24 09-Apr-24 A1540 Application of verticalsurface/Skirting 3 10-Apr-24 12-Apr-24 ZONE D Removal of existing finishes(Concrete Tiles,geotextile,Aggregates, A1600 10 18-Mar-24 27-Mar-24 insulation board,waterproofing membrane) A1610 Carryingout necessary concrete repairs 8 28-Mar-24 04-Apr-24 A1620 Installation of Two layers of 4mm thick SBS Membrane 5 05-Apr-24 09-Apr-24 A1630 Application of verticalsurface/Skirting 3 10-Apr-24 12-Apr-24 2 WEEKS LOOK-AHEAD PLAN 25th Mar-Apr 8th Original Planned Start Planned Finish Activity ID Activity Name Duration date date GROUND IMPROVEMENT BY LATERAL COMPACTION OF SOIL INTERNAL AREAS AREAS A1740 Lancer Placing and Injection 20 18-Mar-24 06-Apr-24 A1820 DCPT after soil stabilizing NA 28-Mar-24 09-Apr-24 BOUNDARY WALL REPAIR A1230 Boundry Wall Repairing and plastering 20 18-Mar-24 06-Apr-24 REPLACEMENT OF THE WATERPROOFING SYSTEM ON THE UNDERGROUND TANK A1770 Removing existing WP membrane and cleaning 10 14-Mar-24 23-Mar-24 A1780 Carrying out neccessary repairing works 6 24-Mar-24 29-Mar-24 A1800 Applying primer new hybrid polyurea coating 5 30-Mar-24 03-Apr-24 VERIFICATION OF PUMP ROOM AND UNDER GROUND SERVICES A1050 Carryout Necessary rectification 10 16-Mar-24 25-Mar-24 REMOVING AND REINSTATEMENT OF ROOF EXPANSION JOINT 20 A1690 Removing and reinstatement of roof expansion joint 10 20-Mar-24 29-Mar-24 EXTERNAL WALL REPAIR 20 A1230 External wall Reparing 20 29-Feb-24 19-Mar-24 A1231 Primer application 6 21-Mar-24 26-Mar-24