Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Differences between SAP ECC

and SAP S4HANA Finance


What are the indexes tables

The tables which are used to record the primary values in

 BSIK BSAK (Vendors),


 BSID BSAD (Customers) and
 BSIS BSAS (G/Ledgers)
What are the total tables

 FAGLFLEXA
 FAGLFLEXT
Now all these functionalities are part of ACDOCA Table

Old t-code as FAGL_FC_VAL Has been obsoleted and new T-code FAGL_FCV
has been added for the above-mentioned functionality apart from new T-code
new screen with Extension ledger and Simulation Accounting functionality
have also been added

In SAP ECC there are just 3 Currencies can be customized/Configured

Old T-Code: OB22

 Company Code Currency/Local Currency


 Global /Group currency
 Hard /Index currency
But now in SAP S4Hana, there are total 10 Currencies can be
maintained/Configured

 Company Code Currency/Local Currency


 Global /Group currency
 Freely defined Currency 1 to Free defined
Currency 8 New T-Code: FINSC_LEDGER

 G/L Accounts

There are number of pre-defined G/L Account Types from there you select its
type

No need to separately make Cost elements via KA01 and KA06 just need to
execute FS00 for both requirements.
 Customer and Vendor Master data

In SAP S4HANA ,you don’t need to run after separates t-codes for Customer
and Vendors Masters instead a single Function can be used called as BP
(business Partner) function can be used.

Apart from these new t-code, A very demanding Business Process Customer is
a vendor and vendor is a customer can be achieved with a single code for both
of the customer and vendor.

In SAP S4HANA credit management is mandatory and comes under the domain
of FSCM instead of SAP SD domain
In SAP S4HANA material ledger has been made mandatory for every
enterprise but Actual costing is still under the optional umbrella for the
business needs.

A new table called as universal journal has been added in S4HANA system What
the ate characteristics.

 ACDOCA has fields from CO, CO-PA, ML, AA that are not in BSEG.
BSEG has dedicated fields for open item management / payment that
are not in ACDOCA. Due to 999 line items limitation, BSEG is usually
aggregated. This limitation is not applicable for ACDOCA(DOCLN
field length is 6)
 Apparently BSEG is used for the “entry view” of documents, as well as
open item management. The Note points out that some postings do
not require the “entry view” so they are only contained in ACDOCA
(which is the “G/L view”). So ACDOCA has all documents, but not so
BSEG.

In SAP S4HANA system, There is real time integration Between FI and CO as


you will see there is no separate document for Co domain but with a
encrypted type way a one document is posted for CO domain. This is possible
because of Universal Journal added in the S4HANA system.
New Functionality named as technical clearing Account has been added in
S4HANA
 The Technical clearing account is a reconciliation account
It works in the same way for both account and ledger approaches.
Furthermore, you can also have more than one technical clearing
account. You define it in the configuration by the chart of accounts and
account determination.
 The Technical Clearing Account is a new account that you introduce
for accounts and cannot post to a single ledger only.
 If you are using Accounts Payable, you can take advantage of the
following benefits of integration: For an asset acquisition (without
reference to a purchase order), you can post the asset acquisition and
the corresponding payable due from a vendor in the same transaction.
This reduces data entry.
Major Differences found in Material
Management Module (MM ECC Vs MM S4)

In S4Hana material number Length has been increased to 40 digits

2. .

In SAP S/4 HANA, such as the ability to manage multiple units of measure for a
single material has been made possible.

3.

Advanced planning view. This is for Production Planning and Detailed


Scheduling (PP-DS). PP-DS is the production planning part of SAP APO, which is
integrated into S/4HANA. SAP APO is an additional module from SAP.

These are due to the integration of the basic version of Extended Warehouse
Management (EWM) into S/4HANA. The basic version is capable of managing an
average warehouse. The latest version of S/4HANA even has a full Fiori
dashboard that makes it easy to manage your warehouse. It’s a good idea to start
thinking about this, because SAP WM will stop in 2027.

The name of the view has changed, and the commodity code field is no longer
visible. You must now assign the commodity code to a material with a start and
end date. In addition, these data are no longer stored in MARC, which means that
the data are no longer site dependent.

This has to do with MRP subcontracting. In S/4HANA you must use an MRP area
for subcontracting. Also, the MRP area is now an active part of SAP: you cannot
deactivate it.

In S/4HANA the MRP planning can only be done on plant level and on MRP
area level. So, it can no longer be done on the basis of storage locations.

MRP in ECC is run through batch jobs and during off peak hours. However, there is no
need of batch job in S4H and MRP can now be run in real time with HANA.
MRP can be run on plant and MRP area level, but not on storage location level. In ECC

, Storage location can either be excluded from MRP or planned separately . SAP
recommends to use MRP area with MRP type (ND in case of exclusion or VB for
re- order point planning) for those scenarios at storage location level. MRP
with subcontracting has also been simplified.

SAP has plans to integrate the functionality of APO’s PPDS in core of S4H in future

releases and hence probably aligning the APO features like BOM to be selected
through production version for in-house, unified source of supply (no source list ,
only info record ) for external procurements with S4H core.

In addition to the above changes, SAP introduces a new material type, SERV. This
is an alternative to – or actually the improved version of – the DIEN material type.
You can use both material types for the same purpose. The main difference is
that you can only use SERV based on Fiori.

Restructuring of back-end tables and transactions


Few transactions are made obsolete such as MB01, MB02...MB05, MB0A,
MB11, 1A MBSU.

They have been replaced by Fiori apps for the better user experience and
improved performance and less load on data bases.
Inventory Management is reduced is reduced from 26 tables to a single table
and stored in the table (Simple table). Here are few transactions which are
MATDOC replaced with
the Fiori apps
An additional feature of the SAP Fiori app is the ability to search by
Inbound Delivery and other attributes. Serial numbers and batch
managed material cannot be used to do goods receipt in Fiori at the
moment. A bespoke development would be needed to support the batch
management functionality.

In ECC while doing the one step transfer the transaction code used is
MIGO with movement type 311. In Fiori it is the "Transfer Stock- In Plant".
This app will pull in information such as material details and shows the
material stock overview.
Major Differences found in Sales &
Distribution Module (ECC S&D Vs S4 S&D)

Functional changes occurred in S4hana.

SAP had two system solutions for credit management – one is credit
management (FI-AR-CR) with Sales & Distribution and another with financial
supply chain management (FIN-FSCM-CR) which has more advanced
functionalities. In S/4HANA, FIN-FSCM-CR is mandatory to be used for credit
management as stated in note 2270544. Sales order blocked for credit cannot
be approved with ECC transaction code like VKM3. A case with ‘Documented
credit decision’ DCD is created in S/4HANA which needs to be reviewed and
approved by a Credit analyst. Refer my below blog for more details on DCD in
S/4HANA 1909 release.
Customer rebates through existing SD rebate processing in ECC have been
replaced by settlement management-rebate condition contract through
condition contracts in S/4HANA

ECC SD revenue recognition is being replaced by SAP Revenue Accounting and


Reporting (RAR) due to new accounting standard released jointly by the
Financial Accounting Standards Board (FASB) and the International
Accounting Standards Board (IASB). New guideline is also in IFRS 15 issued in
2014.
Existing SD revenue recognition of ECC is based on Generally Accepted
Accounting Principles (US- GAAP), International Accounting Standards (IAS) /
Financial Reporting Standards (FRS) and it provides the option of recognizing
the revenue based on an event (like Goods issue, proof of delivery) or over a
period of time (based on specific set of dates) apart from standard way of
realizing revenue on billing. New standard introduces the 5-step model
(Identify the contract, separate performance obligations, determine
transaction price, allocate transaction price and recognize revenue). SAP’s new
Revenue Accounting and Reporting (RAR) solution is in S4H. for fundamental
changes with IFRS 15 and also to meet the requirement of parallel accounting
and cost recognition.
Some of Technical Changes in S4HANA

 Document index tables VAKPA, VAPMA, VLKPA, VLPMA,


VRKPA, VRPMA
 Rebate index table VBOX

 LIS tables S066, S067

 Status information moved from VBUK to VBAK , VBUP to VBAP


for Sales order, to LIKP & LIPS for delivery, to VBRK for billing
documents
 Selection of document header data and document header
status requires one SELECT statement (VBAK) instead of two
SELECT statements (VBAK and VBUK). Similarly for the item
tables.

 Extension of Sales document category (Data element VBTYP) from Char1


to Char4
 Only direct relationships are stored, not indirect relationship (STUFE) in
initial release of S/4HANA
 Indirect relationship with STUFE (Level of the document flow
record) restored for the purpose of Archiving in later release of
/4HANA
7. .

 More flexible pricing procedure determination

 possible number of customer condition table has been roughly doubled

 Possible accesses in access sequence table has been enhanced from 99


to 999
 The key of condition table (A Tables) can now be 255 characters
long (previously 100)
There is a new database table PRCD_ELEMENTS for pricing conditions to

replace earlier cluster table KONV of SAP ECC. New table is a transparent
table, hence can be accessed directly and has several extensions in its data
elements and fields as shown in below image (copied from SAP note
2220005).
(
8. Business partner
Business partner (BP) is the single point of entry for creation, change and display
of customer (as well as vendor) in S/4HANA. BP is a strategic object model in
S/4HANA as shown in below image. Conversion of customer (and vendor) to BP
is mandatory for conversion from ECC to S/4HANA. Refer SAP note 2265093 for
more details on BP, its benefits and the recommended approach for conversion
through Customer vendor integration (CVI).

(
Below image shows the data model for BP in S/4HANA. When a BP is created for a
customer (or vendor) for General data, Sales organization and company code in
S/4HANA , then those data also get stored in those old tables like KNA1 , KNVV and
KNB1 respectively along with BP tables like BUT000 etc.

ECC message determination through table NAST is replaced by Business rule


framework plus (BRF
+) and target architecture is based on Adobe document server and Adobe
forms only. Refer OSS note 2228611 for more details.
Existing WM module will be replaced by SAP’s new application for warehouse
management EWM . There will be 2 options.
 Native integration i.e., inbuilt in S4H
 Side car approach for decentralized deployment
There are several advantages in EWM w.r.t WM like complex warehouse
processing through Process oriented storage control (POSC) , improved
(easily customizable) RF functionality , Value added service like kitting ,
enhanced wave & replenishment processes, labor management etc.

You might also like