MATERIAL LIST

Project Name:
Project Location:

Item Mobilization Materials Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for Civil Works Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for Civil Works Qty. Unit Rate Cost Cost w/ 10% margin
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Item Materials for ducting Qty. Unit Rate Cost Cost w/ 10% margin
- -

-
-
-
-
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUBTOTAL - -

Total Budget
- AED
- AED w/ 10% margin

Prepared By: Approved By:

Project Coordinator Project Manager

Site Engineer

Procurement Specialist
MATERIAL LIST

Project Name: Jumeirah Park Villa M33


Project Location: Jumeira Park, Dubai

Item Mobilization Materials Qty. Unit Rate Cost Cost w/ 10% margin
1 Temporary Fencing 20 rolls 65.00 1,300.00 1,430.00
2 Personal protective equipment (PPE) 5 pcs 102.85 514.25 565.68
3 First Aid Kit 1 pc 23.00 23.00 25.30
4 Caution Tape 4 rolls 10.00 40.00 44.00
5 Safety Cones 8 pcs 20.00 160.00 176.00
6 Taslleeh Signage 1 pc 4,000.00 4,000.00 4,400.00
7 Vertical Storage Cabinet (HDPE) 2 pcs 2,900.00 5,800.00 6,380.00
SUBTOTAL 11,837.25 13,020.98

Item Materials Qty. Unit Rate Cost Cost


1 Weather-resistant Exterior paint 8 drums 130.00 1,040.00 1,144.00
2 Textured Paint 8 drums 91.00 728.00 800.80
3 Interior Paint 6 drums 270.00 1,620.00 1,782.00
4 Primer Paint 14 drums 95.00 1,330.00 1,463.00
5 Joint Compound 14 drums 50.00 700.00 770.00
6 Sand Paper 7 rolls 3.00 21.00 23.10
7 Paint rollers 10 pcs 10.50 105.00 115.50
8 Plastic stick 4 pcs 18.00 72.00 79.20
9 Paint brushes 10 pcs 7.35 73.50 80.85
10 Paint trays 4 pcs 10.00 40.00 44.00
11 Plastic sheeting 4 rolls 6.00 24.00 26.40
12 Masking Tape 1 box 55.00 55.00 60.50
SUBTOTAL 5,808.50 6,389.35

Item Tools Qty. Unit Rate Cost Cost


1 Scaffolding 20 sqm
2 Ladder 2 pcs
3 Power washer 1 pc

Total Budget
17,645.75 AED
19,410.33 AED w/ 10% margin

Prepared By: Approved By:

Project Coordinator Project Manager

Site Engineer

Procurement Specialist