Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

i

\
Exam. n-trt"t tZtX'6 & Laterl![gQ-
Ia TRIBHUVAN ITNIvERSITY
BE Full Marks 4A
INSTITUTE OF ENGINEERING Level
B. Arch. Pass Marks 16
Examilration Control Division Programme
I/II Time I % hrs.
2069 Bhadra Year / Part

.s - Bui Constructionl (AR


own words at'far qg practicable'
Candidates are required to give their answers in their
Attempt All questions.
Assume suitable data if necessary'

used between Siid ground floor


1. State the differences in temrs of ionstruction methods r(
. , and suspended ground floor. sopport
yo* **.,
with neat sketch. t8]
I
of forurdation. Explain pile foundation as deep foundatioo:^
g write down the functions
zJ
the improv"*t"* orilearine capacitv of soil'
..
#H ffii; "io*
12+4+41

i1 elevation' Give a
Arch. Sketch out various types of arch based on configuration
3t
-*,t
Defi.ne
il:T:ffi; ;i;;* concretebr*f;f ioua u.*i"s;d partition wall. [2+4+47

cross section (vertical) of stone


Differentiate between lintel and Arch. Sketch out a typical
[4+6]
and brick masonarv as a load bearing wall'
[ax3]
3/ write short notes on: (anY four)
--.-r/ Building layout
- $yfimbering of trench in hard soil
il Shallow ffench excavation
3/ Moist ne moveurent in building
DarnP Proofing materiais
-g/ *tl.*

P.3 1

You might also like