Company: Liquid Telecom South AfricaDepartment:

Prepared
Africa
By:Data
BruceCentresADCFRM
PageReviewed By:
- 00002
Hendrik
FUFBloomApproved
Date:
By: 27th
DeanNovember
Green 2018Version: 1.0Retention Period: 1 year

Africa Data Centres - Facility Utilisation Form ( FuF)


Customer Details

Customer Name Service ID


Access Bank

Authorised Staff Priority

Date Received Date Required

Delivery Date Installation Date 17/01/2024

Site Details

Region Site name


LAGOS LOS1.1

Area Row
MU1

Rack/s

ADC Infrastructure Approval

Initial & Surname Signature Date Contact Number(Cellular) Approved

ADC Colocation Approval

Initial & Surname Signature Date Contact Number(Cellular) Approved

_x000D_ Internal All Employees


#
Company: Liquid Telecom South AfricaDepartment: Africa Data CentresADCFRM - 00002 FUF Prepared By: Bruce PageReviewed By: Hendrik BloomApproved By: Dean Green Date: 27th November 2018Version: 1.0Retention Period: 1 year

Floor position
Cabinet Size
Space Power Current Weight AC Connections - A AC Connections - B Plug Type Comments
RU Equipment - Model # - Role Units
Watt Amps Kg Primary - Yes/No Secondary - Yes/No C13 / C19
( U's)
43
42
41
40
39
38
37
36
35
34 N9K-C93600CD-GX 1 1100 Yes Yes C13
33 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
32 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
31
30 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
29
28 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
27
26 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
25 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
24 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
23 N9K-C93180YC-FX3 1 650 29 Yes Yes C13
22 N9K-C93180YC-FX3 v 1 650 29 Yes Yes C13
21
20
19
18 C9800-40-K9 1 1100 10.34 Yes Yes C13
17
16 C9500-48Y4C-A 1 650 9.96 Yes Yes C13
15
14
13
12
11
10 APIC-M3 1 1050 32 A at -40 VDC 17.0 Kg Yes Yes C13
9
8 ND-NODE-L4 1 1050 17.0 Kg Yes Yes C13
7
6 C9300-24T-A 1 350 7.27 Yes Yes
5
4
3
2
1
MAX Allowed per Rack /Footprint 43 5500 32 1500

TOTALS 15 11150 0 288.57

_x000D_ Internal All Employees


#
Company: Liquid Telecom SouthPrepared
AfricaDepartment:
By: Bruce PageReviewed
Africa Data CentresADCFRM
By: Hendrik BloomApproved
Date:
- 00002
27thFUF
November
By: Dean
2018Version:
Green 1.0Retention Period: 1 year

Rack Options Full


Rack (32A) 43U
4 x 2U Cable Management
x 600mm x 1200mm
Rails 1 x Fibre Rail 4 x Wheels and 4
Half Rack
1 x Ethernet Rail x Feet
19U x 600mm x 1200mm
2 x Power Rails
4U Rack
4U x 600mm x 1000mm

2 x PDU's for Full racks

_x000D_ Internal All Employees


#
Company: Liquid Telecom South AfricaDepartment:
Prepared
AfricaBy:
Data
Bruce
CentresADCFRM
PageReviewed
- 00002
By: Hendrik
FUF BloomApproved Date:
By: Dean
27thGreen
November 2018Version: 1.0Retention Period: 1 year

32A
Single
C13 10A Single
Phase
Phase

Connected
Connected
directly under
to a PDU
the floor

32 A
C19 16A 3 Phase
3Phase

_x000D_ Internal All Employees


#