Professional Documents
Culture Documents
Get An: Architect
Get An: Architect
150
1000
1000
PPR WLR PPR WLR PPR WLR
100mm THK.
4
HB PPR WLR HB PPR WLR HB PPR WLR
2150
4 C.O.
REINFORCED
1150
SHO 20 mm Ø PPR WL SHO 20 mm Ø PPR WL SHO 20 mm Ø PPR WL
1300
F F F CONCRETE
20 mm Ø PPR WL 20 mm Ø PPR WL 20 mm Ø PPR WL
SLAB WITH
2500
F F F
WC WC WC
100MMØ
3150
KS KS KS
10mmØ TEMP.
3150
2800
2500
LAV LAV LAV
1500 LAV LAV LAV
SOIL PIPE
1200
WC WC WC BARS @
20 mm Ø PPR WL 20 mm Ø PPR WL 20 mm Ø PPR WL (OUTLET)
C.O. 200mm O.C.
F F F
3250
C.O. BOTHWAYS
650
3 3 DOWN DOWN DOWN
C.O.
2100
1850
150
UP UP UP
11500
11500
3200
3200
1950
HB HB HB
PLAN 100MMØ
20 mm Ø PPR WL 20 mm Ø PPR WL 20 mm Ø PPR WL SOIL PIPE (INLET)
2 2
5000
5900
3150
3150
4650
4150
100mm THK.
REINFORCED 100mmØ CO
CONCRETE SLAB
1 1 WITH 10mmØ TEMP. MANHOLE MANHOLE MANHOLE
1000
1000
BARS @ 200mm
GV WM CV
GV WM CV
GV WM CV
100
100
M
M
RAMP UP RAMP UP RAMP UP O.C. BOTHWAYS
350
FROM EXISTING
WATER SOURCE
FROM EXISTING
WATER SOURCE
FROM EXISTING
WATER SOURCE
AIR SPACE
OUTLET OUTLET
WATER LEVEL
150mm THK. CHB
GROUND FLOOR WATER LINE LAYOUT SECOND FLOOR WATER LINE LAYOUT WITH 10mmØ
VERTICAL BARS
@ 600mm O.C. & LEACHING LEACHING
SCALE: 1:100 SCALE: 1:100
WELL 2
1775
HORIZONTAL WELL 1
1500
INLET
1550
R
BARS ARRANGED
VST
AS SHOWN DIGESTIVE CHAMBER
CHLORINATED SAND
CHAMBER
TR
VS
TR
GRAVEL
VS
BOULDER
DS
D WATER CLOSET
2% SLOPE 2% SLOPE
150
150
TR
VS
VS
TR
50 BOLT & NUTS FESEAL GUM EARTHFILL
40 21
00 30
10 0 m
10 0 m
Ø PVC
m Ø
m
PV
CS
P
WL
C FO
SH
D
F
WCC
W FD 00
24 50
m
Ø
m D0Om
20
WmN
20
0
1
SCALE: 1:25
20 V
00 TR
Ø R SP VS LA AV
CO
m PP C
DETAIL OF WATER CLOSET CONNECTION
L S 0
m Ø PV P V
10
0 CS CW LA 10
m Ø PV PP
FD V 2
NR
m m
200 m
12 16 R Ø VØCRS WL
V LA WC
VS
TR
P DS WL P LP m P P P
OW 5 40 000 SP CS mP CS
00 W U m
CW PR
D
C CB CO PPR SS 0 Øm F D WC
20 m 0m0 Ø PV CSP
SP
PV S 00 PV Ø PV HB
0 2mm Ø
10
0 mm
Ø
0
10
0 B SH
FOD
F C
W C
W
24
FD
00 5 0
2
Ø
mm D0OmWm
0
N
KS
1020 mm Ø P
2 0 0
50
m m
m
V
Ø
EPPR
WL
CS
CO F
P ST
CV SP
R N T S
PV
P
VS
TR V
LA AV
F
KS 0m Ø PV VC
L CO
S P 2 m
O Ø P 0
V m Ø
CS CW LA m 90
L
PV SPPV 50 0m m UP
FD
10 200 m THREADED
0 L V
LA WC TR
S 5
16 50 Ø VØ C W VS
4 PmPPRSP
00 2 504 R P
P P WULP m
S S m CW
%
C B RS 0 Øm C D C
WL
31 000 C
PV Ø PV
C P
CO B P S 20 m2m 00m Ø PV CSP
F W
PV
2
R ESCUTCHEON
A
H
65
0
m
Ø
m 1 0020 mm Ø PV WL CO F
m
Ø PP
m m m Ø R m Ø
0 0 0 m P R 0 m 100 400 100 50MMØ
24
0 5 20
FK
S
2E0
50
m P
mm
Ø
P
PV
CS
P S
CV SP
T
P
CO 2 0
20
m
100mm THK. CHB 100mmØ PVC 16mmØ HANDLE TUBULAR OUTLET
P V VC VENT PIPE
0
CW
E
KS HB
20 Ø PV
O
S Ø P P
P m Ø MANHOLE COVER W/ w/ 10mmØ BAR
3 DOWNSPOUT
S AV
L
m m Ø
C CW 0m
L m UP m
O
PV PP 50 100mmØ DS PVC
FD
WLP
R
00
Ø VØCRS
32 500
m P P P
VWL
V
LA W C
VS
TR
S
10 0 0 m
2 20
0m
L
S
16mmØ LIFTING HANDLE REBARS
TAIL PIECE OF DRAIN
DS CB RS U
CO B PP S 2 0 0 m m0 Ø
11 mØmP VCS P
0m Ø P S
FD WC
%
RW
L 10mmØ REBARS SLIP JOINT NUTS
@600mm O.C.
2
H m
2 C O
%
0 m
1020 mm Ø P
V WL
C F
PP P 2
Ø
0 P R R m PU
20 0 mm P P T
0m IC AM HOR. @2-LAYER SLIP JOINT WASHER
10mmØ HANDLE BAR
100
VS P
E
CS
PT K
0 Ø
KS 5 2 R 150mmØ DP PVC
2
0 m C O B
(VARIABLE)
SLIP JOINT NUTS
G
INE
E0
4 RL 50
%
P WL
00 0
600 min.
P
600
50 2
CW PR
10 INRGCE WE
150mmØ DP PVC 250
15
SLIP JOINT WASHER
75mmØ PVC DOWN SPOUT
O
31 T E
V
P ØP L
UP
S
I U
EX SO
S
TRAP BODY
50 20
0 m 20
Ø
m mm
1 S
RA
MP OM ER
FRWAT
TO
2% SLOPE INLET
300
18 CO B E %
H 2
P
M MCV
3 OUTLET
O VW G
00 0 L
E
100
32 LIN
S
50
50
R
11 INGCE WE
IST UR SE
%
SLIP JOINT WASHER
100
00 2 UP EX SO O
50 MP OM ER
T
RA FRWAT
CLEAN OUT CAP
2 31
50 M MCV
GV
W
E PLAN
100 400 100 3-10mmØ REBARS
150mmØ DP PVC
LIN
0
10
0
INGCE WE
R 600 2% SLOPE
ISTUR
1 M
O E
FRWAT
EX SO
R TO
SE
SECTION 100 400 100
D ETAIL OF LAVATOR Y C ON N EC TION
600
DETAIL OF CATCH BASIN N T S
R.A. 9266
SECTION 20 sa Arkitekto PREPARED: PROJECT TITLE AND LOCATION: APPROVED: SHEET NO.:
F.J.EBUENGA
D ARCHIT
TE E
I
sealed, as instruments of service, are the intellectual UAP Hotline: +632 888 966 Website: https://www.united-architects.org ES
.
TH
EP
HILIPPIN
A R C H I T E C T U R E
properties and documents of the architect, whether the
#071, Brgy. 4, DM Nieves St. object for which they are made is executed or not. It shall FLOR JOHN C. EBUENGA, uap PROPOSED THREE-DOOR 7
Centro Camalig, Albay be unlawful for any person, without the consent of the FOR YOUR PLANS AND DESIGNS
ebuengaflorjohnc@gmail.com architect or author of said documents, to duplicate or to MASTER PLUMBER APARTMENT BUILDING OWNER P2 8
09207695112
make copies of said documents for use in the repetition
of and for other projects or buildings, whether partly or
in whole.
GET AN ARCHITECT PRC NO.:
VALIDITY:
PTR NO.:
PLACE ISSUED:
DATE:
TIN:
SYSAM SUBDIVISION, PEŇAFRANCIA, DARAGA, ALBAY