Project Title: RIW (SCDL) PARK AND RIDE AND NON-STADIUM BUS INFRASTRUCTURE WORKS –

PACKAGE 1
INR TRACKER -(GENERAL)
Project ID: PA 2021 C 023 G
Contract No: PA 2021 C 023 G
Project Incharge (IRIS Representative): Engr. Mazen
IRIS personnel
SR. NO: Sub Contractor Rev Discipline Type Method Statement ITP Activity INR Description Location Carriageway Start Chain End Chain Prepared Date Inspection Date Inspection Time Submitted Date Replied Date
Ref. INR NUMBER
1 n/a DY RIW23-P01-ICI-GEN-INR-A00001 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey checking for existing situation and topographic survey Al Bayt Stadium Parking Parking 22-Mar-22 23-Mar-22 9:00 AM 22-Mar-22 05-Apr-22

2 n/a DY RIW23-P01-ICI-GEN-INR-A00002 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey checking for existing situation and topographic survey Jelaiah Parking Depot 1 Parking 22-Mar-22 23-Mar-22 11:00 AM 22-Mar-22 28-Mar-22

3 n/a DY RIW23-P01-ICI-QUA-INR-A00001 0 QUA Superseded RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and Testing of existing ground Jelaiah Parking Depot 1 Parking 26-Mar-22 27-Mar-22 8:00 AM 26-Mar-22 02-Apr-22

4 n/a DY RIW23-P01-ICI-QUA-INR-A00001 1 QUA Active RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 See Attached Test Report Sampling and Testing of existing ground - Attached Test Report Jelaiah Parking Depot 1 Parking 14-Apr-22 16-Apr-22 8:00 AM 14-Apr-22 27-Apr-22

5 n/a DY RIW23-P01-ICI-GEN-INR-A00003 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey checking for existing situation and topographic survey Qatar University CPR-1 Parking 26-Mar-22 27-Mar-22 8:00 AM 26-Mar-22 28-Mar-22

Joint survey checking for existing situation and topographic survey of the
6 n/a DY RIW23-P01-ICI-GEN-INR-A00004 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Jelaiah Parking Depot 1 Parking 30-Mar-22 31-Mar-22 11:00AM 30-Mar-22 05-Apr-22
extension area

7 n/a DY RIW23-P01-ICI-QUA-INR-A00002 0 QUA Superseded RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Joint Survey and Sampling Joint survey verification and sampling from the rock stata Jelaiah Parking Depot 1 Parking 30-Mar-22 31-Mar-22 8:00 AM 30-Mar-22 05-Apr-22

Joint survey verification and sampling from the rock stata - Attached Test
8 n/a DY RIW23-P01-ICI-QUA-INR-A00002 1 QUA Active RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 See Attached Test Report Jelaiah Parking Depot 1 Parking 24-Apr-22 25-Apr-22 8:00 AM 24-Apr-22 27-Apr-22
Report
Visual inspection for the removal of existing balloon steel connections
9 n/a DY RIW23-P01-ICI-ROA-INR-A00001 0 ROA Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Visual Inspection Jelaiah Parking Depot 1 Parking 24-Apr-22 25-Apr-22 8:00 AM 24-Apr-22 02-Apr-22
and foundations
10 n/a DY RIW23-P01-ICI-ROA-INR-A00002 0 ROA Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint Survey Checking for Site Clearance Qatar University CPR-1 Part 1 Parking 02-Apr-22 03-Apr-22 8:00 AM 02-Apr-22 09-Apr-22
11 n/a DY RIW23-P01-ICI-ROA-INR-A00003 0 ROA Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint Survey Checking for Site Clearance Jelaiah Parking Depot 1 Parking 03-Apr-22 04-Apr-22 8:00 AM 03-Apr-22 09-Apr-22

12 n/a CG RIW23-P01-ICI-ROA-INR-A00004 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Visual Inspection for the removal of existing dewatering pipeline in Depot 1 Jelaiah Parking Depot 1 Parking 04-Apr-22 05-Apr-22 8:00 AM 04-Apr-22 11-Apr-22

13 n/a MZ RIW23-P01-ICI-QUA-INR-A00003 0 QUA Active RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and testing of Existing Gound Qatar University CPR-1 Part 1 Parking 05-Apr-22 06-Apr-22 8:00 AM 05-Apr-22 19-Apr-22
Preparation of excavated surfaces, all ground conditions with exception
14 n/a MZ RIW23-P01-ICI-ROA-INR-A00005 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Qatar University CPR-1 Part 1 Parking 05-Apr-22 06-Apr-22 8:00 AM 05-Apr-22 17-Apr-22
of top soil, rock and/or hard material
Preparation of excavated surfaces, all ground conditions with exception
15 n/a CG RIW23-P01-ICI-ROA-INR-A00006 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Jelaiah Parking Depot 1 Parking 0+000 0+0160 05-Apr-22 06-Apr-22 8:00 AM 05-Apr-22 17-Apr-22
of top soil, rock and/or hard material
Joint survey checking for the existing situation and Topographic Survey of
16 n/a MZ RIW23-P01-ICI-GEN-INR-A00005 0 GEN Superseded RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Qatar University CPR-1 Part 2 & 3 Parking 06-Apr-22 07-Apr-22 11:00AM 06-Apr-22 10-Apr-22
the extension area and Trial Pit
Preparation of excavated surfaces, all ground conditions with exception
17 n/a CG RIW23-P01-ICI-ROA-INR-A00007 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Jelaiah Parking Depot 1 Parking 0+390 0+455 06-Apr-22 07-Apr-22 9:00 AM 06-Apr-22 17-Apr-22
of top soil, rock and/or hard material
See Attached Approved
18 n/a CG RIW23-P01-ICI-ROA-INR-A00007 1 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Preparation of excavated surfaces - Attached Approved Shop Drawing Jelaiah Parking Depot 1 Parking 0+390 0+455 12-Jun-22 13-Jun-22 9:00 AM 12-Jun-22 22-Jun-22
Shop Drawing
19 n/a CG RIW23-P01-ICI-ROA-INR-A00008 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Preparation of excavated surfaces Jelaiah Parking Depot 1 Parking 0+260 0+390 07-Apr-22 09-Apr-22 9:00 AM 07-Apr-22 17-Apr-22
Removal of Existing of Street Lighting Foundation and 2 nos. of Manhole
20 n/a CG RIW23-P01-ICI-GEN-INR-A00006 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Visual Inspection Jelaiah Parking Depot 1 Parking 07-Apr-22 08-Apr-22 10:00AM 07-Apr-22 11-Apr-22
covers 2.3m
21 n/a DY RIW23-P01-ICI-QUA-INR-A00004 0 QUA Superseded RIW023-P01-ICI-GEN-MST-A00006 RIW023-P01-ICI-GEN-MNP-A00007 Sampling Sampling and testing of Sub-base in QPMC Plant QPMC Plant 07-Apr-22 08-Apr-22 8:00 AM 07-Apr-22 19-Apr-22

22 n/a DY RIW23-P01-ICI-QUA-INR-A00004 1 QUA Active RIW023-P01-ICI-GEN-MST-A00006 RIW023-P01-ICI-GEN-MNP-A00007 See Attached Test Report Sampling and testing of Sub-base in QPMC Plant - Attached Test Report QPMC Plant 01-May-22 05-May-22 8:00 AM 01-May-22 14-May-22

23 n/a DY RIW23-P01-ICI-GEN-INR-A00007 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey checking for existing situation and topographic survey CPR-02 Parking 07-Apr-22 09-Apr-22 10:00AM 07-Apr-22 14-Apr-22

24 n/a DY RIW23-P01-ICI-QUA-INR-A00005 0 QUA Superseded RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and Testing of existing ground CPR-02 Parking 07-Apr-22 09-Apr-22 9:00 AM 07-Apr-22 26-May-22
25 n/a DY RIW23-P01-ICI-QUA-INR-A00005 1 QUA Superseded RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and Testing of the Fill Area CPR-02 Parking 09-Jun-22 11-Jun-22 9:00 AM 09-Jun-22 15-Jun-22
26 n/a DY RIW23-P01-ICI-QUA-INR-A00005 2 QUA Superseded RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and Testing of the Fill Area CPR-02 Parking 16-Jun-22 18-Jun-22 9:00 AM 16-Jun-22 02-Jul-22
27 n/a DY RIW23-P01-ICI-QUA-INR-A00005 3 QUA Active RIIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Sampling Sampling and Testing of the Fill Area CPR-02 Parking 22-Jun-22 23-Jun-22 9:00 AM 22-Jun-22 05-Jul-22
28 n/a DY RIW23-P01-ICI-ROA-INR-A00009 0 ROA Superseded RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey checking for site clearance CPR-02 Parking 07-Apr-22 09-Apr-22 9:00 AM 07-Apr-22 16-Apr-22

Preparation of excavated surfaces, Visual inspection and compaction


29 n/a DY RIW23-P01-ICI-ROA-INR-A00010 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Joint survey, FDT, CBR CPR-02 Parking 07-Apr-22 09-Apr-22 9:00 AM 07-Apr-22 26-May-22
testing of formation & In place CBR testing for formation

30 n/a DY RIW23-P01-ICI-ROA-INR-A00010 1 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Surface Preparation of the Cut Area CPR-02 Parking 16-Jun-22 18-Jun-22 9:00 AM 16-Jun-22 05-Jul-22
31 n/a MZ RIW23-P01-ICI-ROA-INR-A00011 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Visual Inspection Verification of CBR for loose area Qatar University CPR-1 Part 2 Parking 09-Apr-22 10-Apr-22 8:00 AM 09-Apr-22 19-Apr-22

Preparation of excavated surfaces, Visual inspection and compaction


32 n/a MZ RIW23-P01-ICI-ROA-INR-A00012 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Joint survey, FDT, CBR Qatar University CPR-1 Part 1 Parking 09-Apr-22 10-Apr-22 9:00 AM 09-Apr-22 19-Apr-22
testing of formation & In place CBR testing for formation (Trimming)

Preparation of excavated surfaces, Visual inspection and compaction


33 n/a CG RIW23-P01-ICI-ROA-INR-A00013 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Joint survey, FDT, CBR Jelaiah Parking Depot 1 Parking 0+000 0+260 09-Apr-22 10-Apr-22 9:00 AM 09-Apr-22 19-Apr-22
testing of formation & In place CBR testing for formation (Trimming)

34 n/a MZ RIW23-P01-ICI-ROA-INR-A00014 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 visual Inspection, FDT Visual inspection and compaction testing of formation Qatar University CPR-1 Part 1 Parking 11-Apr-22 12-Apr-22 9:00 AM 11-Apr-22 19-Apr-22
35 n/a MZ RIW23-P01-ICI-ROA-INR-A00015 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 CBR In place CBR testing for formation Qatar University CPR-1 Part 1 Parking 11-Apr-22 12-Apr-22 9:00 AM 11-Apr-22 19-Apr-22

36 n/a MZ RIW23-P01-ICI-ROA-INR-A00015 1 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 See Attached Test Report In place CBR testing for formation - See Attached Test Report Qatar University CPR-1 Part 1 Parking 12-May-22 14-May-22 9:00 AM 12-May-22 17-May-22

See Attached Approved


37 n/a MZ RIW23-P01-ICI-ROA-INR-A00015 2 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 In place CBR testing for formation - See Attached Approved Shop Drawing Qatar University CPR-1 Part 1 Parking 26-Jun-22 27-Jun-22 9:00 AM 26-Jun-22 05-Jul-22
Shop Drawing
38 n/a DY RIW23-P01-ICI-QUA-INR-A00006 0 QUA Superseded RIW023-P01-ICI-GEN-MST-A00006 RIW023-P01-ICI-GEN-MNP-A00007 Sampling Sampling and testing of Sub-grade in QPMC Plant QPMC Plant 11-Apr-22 12-Apr-22 10:00 AM 11-Apr-22 19-Apr-22

39 n/a DY RIW23-P01-ICI-QUA-INR-A00006 1 QUA Superseded RIW023-P01-ICI-GEN-MST-A00006 RIW023-P01-ICI-GEN-MNP-A00007 See Attached Test Report Sampling and testing of Sub-grade in QPMC Plant - Attached Test Report QPMC Plant 01-May-22 05-May-22 9:00 AM 01-May-22 14-May-22

40 n/a DY RIW23-P01-ICI-QUA-INR-A00006 2 QUA Active RIW023-P01-ICI-GEN-MST-A00006 RIW023-P01-ICI-GEN-MNP-A00007 See Attached Test Report Sampling and testing of Sub-grade in QPMC Plant - Attached Test Report QPMC Plant 10-Sep-22 11-Sep-22 9:00 AM 10-Sep-22 13-Sep-22

41 n/a MZ RIW23-P01-ICI-ROA-INR-A00016 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 visual Inspection, FDT Visual inspection and compaction testing of formation Qatar University CPR-1 Part 1 Parking 12-Apr-22 13-Apr-22 8:00 AM 12-Apr-22 20-Apr-22
42 n/a MZ RIW23-P01-ICI-ROA-INR-A00017 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 CBR In place CBR testing for formation Qatar University CPR-1 Part 1 Parking 12-Apr-22 13-Apr-22 8:00 AM 12-Apr-22 19-Apr-22

43 n/a MZ RIW23-P01-ICI-ROA-INR-A00017 1 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 See Attached Test Report In place CBR testing for formation- See Attached Test Report Qatar University CPR-1 Part 1 Parking 12-May-22 14-May-22 8:00 AM 12-May-22 17-May-22

See Attached Approved


44 n/a MZ RIW23-P01-ICI-ROA-INR-A00017 2 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 In place CBR testing for formation- See Attached Approved Shop Drawing Qatar University CPR-1 Part 1 Parking 26-Jun-22 27-Jun-22 8:00 AM 26-Jun-22 05-Jul-22
Shop Drawing
45 n/a CG RIW23-P01-ICI-GEN-INR-A00008 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey for the establishment of Temporary Benchmarks Jelaiah Parking Depot 1 Parking 12-Apr-22 13-Apr-22 9:00AM 12-Apr-22 16-Apr-22
46 n/a CG RIW23-P01-ICI-ROA-INR-A00018 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 visual Inspection, FDT Visual inspection and compaction testing of formation Jelaiah Parking Depot 1 Parking 0+000 0+0125 12-Apr-22 13-Apr-22 8:00 AM 12-Apr-22 26-May-22
47 n/a CG RIW23-P01-ICI-ROA-INR-A00019 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 CBR In place CBR testing for formation Jelaiah Parking Depot 1 Parking 0+000 0+0125 12-Apr-22 13-Apr-22 8:00 AM 12-Apr-22 19-Apr-22

48 n/a CG RIW23-P01-ICI-ROA-INR-A00019 1 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 See Attached Test Report In place CBR testing for formation- See Attached Test Report Jelaiah Parking Depot 1 Parking 0+000 0+0125 12-May-22 14-May-22 8:00 AM 12-May-22 17-May-22

See Attached Approved


49 n/a CG RIW23-P01-ICI-ROA-INR-A00019 2 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 In place CBR testing for formation- See Attached Approved Shop Drawing Jelaiah Parking Depot 1 Parking 0+000 0+0125 12-Jun-22 13-Jun-22 8:00 AM 12-Jun-22 15-Jun-22
Shop Drawing
50 n/a CG RIW23-P01-ICI-ROA-INR-A00020 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 visual Inspection, FDT Visual inspection and compaction testing of formation Jelaiah Parking Depot 1 Parking 0+390 0+455 12-Apr-22 13-Apr-22 9:00 AM 12-Apr-22 20-Apr-22
See Attached Approved Visual inspection and compaction testing of formation - See Attached
51 n/a CG RIW23-P01-ICI-ROA-INR-A00020 1 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 Jelaiah Parking Depot 1 Parking 0+390 0+455 12-Jun-22 13-Jun-22 9:00 AM 12-Jun-22 22-Jun-22
Shop Drawing Shop Drawing
52 n/a CG RIW23-P01-ICI-ROA-INR-A00021 0 ROA Superseded RIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 CBR In place CBR testing for formation Jelaiah Parking Depot 1 Parking 0+390 0+455 12-Apr-22 13-Apr-22 9:00 AM 12-Apr-22 19-Apr-22

53 n/a CG RIW23-P01-ICI-ROA-INR-A00021 1 ROA Superseded RIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 See Attached Test Report In place CBR testing for formation- See Attached Test Report Jelaiah Parking Depot 1 Parking 0+390 0+455 12-May-22 14-May-22 9:00 AM 12-May-22 17-May-22

See Attached Approved


54 n/a CG RIW23-P01-ICI-ROA-INR-A00021 2 ROA Superseded RIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 In place CBR testing for formation- See Attached Approved Shop Drawing Jelaiah Parking Depot 1 Parking 0+390 0+455 16-Jun-22 18-Jun-22 9:00 AM 16-Jun-22 22-Jun-22
Shop Drawing
See Attached Approved In place CBR testing for formation- See Attached Approved Shop Drawing
55 n/a CG RIW23-P01-ICI-ROA-INR-A00021 3 ROA Active RIW23-P01-ICI-GEN-MST-A10016 RIW23-P01-ICI-GEN-MNP-A10017 Jelaiah Parking Depot 1 Parking 0+390 0+455 18-Jul-22 19-Jul-22 9:00 AM 18-Jul-22 21-Jul-22
Shop Drawing (Typical Pavement Details)
56 n/a CG RIW23-P01-ICI-ROA-INR-A00022 0 ROA Superseded RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 visual Inspection, FDT Visual inspection and compaction testing of formation Jelaiah Parking Depot 1 Parking 0+260 0+390 12-Apr-22 14-Apr-22 9:00 AM 12-Apr-22 20-Apr-22
Visual inspection and compaction testing of formation - See Attached Test
57 n/a CG RIW23-P01-ICI-ROA-INR-A00022 1 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 See Attached Test Report Jelaiah Parking Depot 1 Parking 0+260 0+390 08-Sep-22 10-Sep-22 9:00 AM 08-Sep-22 08-Oct-22
Report
58 n/a CG RIW23-P01-ICI-ROA-INR-A00023 0 ROA Active RIW023-P01-ICI-ROA-MST-A00043 RIW023-P01-ICI-ROA-MNP-A00044 CBR In place CBR testing for formation Jelaiah Parking Depot 1 Parking 0+260 0+390 12-Apr-22 14-Apr-22 9:00 AM 12-Apr-22 19-Apr-22
59 n/a MZ RIW23-P01-ICI-GEN-INR-A00009 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Joint survey Joint survey for the establishment of Temporary Benchmarks Qatar University CPR-1 & CBS-D4 Parking 14-Apr-22 16-Apr-22 9:00AM 14-Apr-22 20-Apr-22
60 n/a MZ RIW23-P01-ICI-GEN-INR-A00010 0 GEN Active RIW023-P01-ICI-GEN-MST-A00016 RIW023-P01-ICI-GEN-MNP-A00017 Visual Inspection Installation of Site Office Qatar University CPR-1 Parking 14-Apr-22 16-Apr-22 9:00AM 14-Apr-22 18-Apr-22