Calisma Talimati Rolling Machine
Calisma Talimati Rolling Machine
Referans FAU-F-PSG-0241
Grup
Kapsam
Tüm Faurecia fabrikaları
FAU-S-PSG-5025 Standardized Work Methods Guide
FAU-F-PSG-5006-EN Standardized Work Chart
İlgili Dökümanlar
FAU-F-PSG-5007-EN Standardized Work Combination Table
FAU-F-PSG-5015-EN Standard Work Audit
Yayın n° 07
Internal Documentation
Specific protection for FCP documentation is applied to this document according to the icons’ information.
Faurecia Internal Doc. Property Make sure you use the last published version
FAU-F-PSG-0241
FCP Issue 07 - 09/10
Faurecia Internal Doc. Property Make sure you use the last published version
FAU-F-PSG-0241
FCP Issue 07 - 09/10
Döküman N° XXXXXXXX
OPERASYON TALİMATI Fabrika Izmit FCM Kontrol plan Ref. XXXXXXXXXXXX Oluşturma Tarihi 8/18/2022
+Revizyon tarihi 18.08.2022
Oluşturan SV/GL Onaylayan Q- Temsilcisi HSE Temsilcisi UAP Müdürü
Kritik HSE/Ergo
Önemli/
Müşteri İçin Kritik
CTC KRİTİK NOKTA
SEMBOLLERİ
Temizlik bezi
Standard Q-
gereksinimleri
Verimlilik
(Önemli nokta)
KALİTE
KONTROLÜ
El ile Ekipman Görsel Duyarak
Üretime başlanmaz GL
İşe başalamadan önce 1.1 ve 1.2 numaralı resimlerdeki saat veya SV haber ver.
Rolling makinesinin ve cetvel üzerindeki değerlerin doğru olup olmadığı kontrol
1 et. Levhaların yerleştirildiği makine girişinde bulunan
kontrolü fikstürün cetvel üzerindeki konumunu ve pozisyonunu
kontrol et. Resim 1.3
2.1 2.2
Rolling işlemine girecek olan metal levhaların temiz ve
Rolling işine başlamadan düzgün temiz olduğundan emin ol. Resim2.1. Rolling Üretime başlanmaz GL
2
önce yapılması gerekenler işlemini geerçekleştirecek olan silindirlerin temiz veya SV haber ver.
olduğundan emin ol Resim2.2
UYGUN OLMAYAN PARÇALARDA:UYGUN OLMAYAN ÜRÜN KURALLARINA BAKIN (AKIŞ, STOP@DEFECT VEYA DİĞER GENEL/SPESİFİK KURALLAR)