Lecture (5) Woodworking in construction

AR 252
BUILDING TECHNOLOGY - 2
Fall - 2023
Dr. Mira I. Helmy
Lecture (5) Woodworking in construction

Course Content

Week No.1 Introduction & general review of Building Technology 1.


Week No.2 R.C systems for roofs (Slab & beam, Flat slab, Hollow Block slab)
√ Week No.3 R.C. Roofs (Waffle Slab and grid beam)
Week No.4 Pre fabricated systems(Units for roofs, floors, walls)
Week No.5 Wood floors systems (wood joist flooring)
Week No.6 Wood studs walls
Week No.7 Exam
Week No.8 Wooden roofing systems
Week No.9 Steel floor systems (wood joist flooring)
Week No.10 Steel wall systems
Week No.11 Steel roofs
Week No.12 Exam
Week No.13 Workshop (applying wooden construction systems)
Week No.14 Advanced construction and structural systems
Week No.15 General Review.
Lecture (5) Woodworking in construction

Woodworking in construction
1 2 3

Wood floors systems Wood studs walls Wooden roofing


(wood joist flooring) systems
Lecture (5) Woodworking in construction

Woodworking in construction
1 2 3

Wood floors systems Wood studs walls Wooden roofing


(wood joist flooring) systems

▪ Wood Joists ▪ Wood Stud Framing ▪ Wood Rafters

▪ Wood Joist Framing ▪ Stud Wall Sheathing ▪ Wood Rafter Framing

▪ Wood Beams ▪ Wood Columns ▪ Roof Sheathing

▪ Wood Subflooring ▪ Wood Post-and-Beam ▪ Wood Plank-and-Beam


Framing Framing
▪ Wood Post-Beam ▪ Wood Post-Beam
Connections Connections
▪ Wood Trusses
▪ Wood Trussed Rafters
Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
a) Wood Joists
▪ Wood joist floors are an essential subsystem of wood
light frame construction.
▪ The dimension lumber used for joists is easily
worked and can be quickly assembled on site with
simple tools.
▪ If properly engineered, the resulting floor structure
can serve as a structural diaphragm to transfer lateral
loads to shear walls
▪ Wood light framing is combustible, it must rely on
finish flooring and ceiling materials for its fire-
resistance rating.
▪ The susceptibility of wood light framing to decay
and insect infestation requires positive site drainage,
and ventilation to control condensation in enclosed
spaces.
▪ Lateral support required for joist ends
Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
a) Wood Joists
Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
a) Wood Joists

Span Ranges for Wood Joists


Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing
Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing

Wood joists may be supported by wood or steel beams. In either case, the elevation of
the beam should be coordinated with the perimeter sill condition and how the beam supports
the floor joists. Wood is most susceptible to shrinkage perpendicular to its grain. For this
reason, the total depth of wood construction for both the sill condition and the joist– beam
connection should be equalized to avoid subsidence of the floor plane.

Wood Beam Steel Beam


Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing

Wood joists may be supported by wood or steel beams. In either case, the elevation of
the beam should be coordinated with the perimeter sill condition and how the beam supports
the floor joists. Wood is most susceptible to shrinkage perpendicular to its grain. For this
reason, the total depth of wood construction for both the sill condition and the joist– beam
connection should be equalized to avoid subsidence of the floor plane.

Wood Beam Steel Beam


Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing

Wood joists may be


supported by wood or steel
beams. In either case, the
elevation of the beam should be
coordinated with the perimeter
sill condition and how the
beam supports the floor joists.
Wood is most susceptible to
shrinkage perpendicular to its
Wood Beam - Joist Steel Hangers
grain. For this reason, the total
depth of wood construction for
both the sill condition and the
joist– beam connection should
be equalized to avoid
subsidence of the floor plane. Wood Beam
Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing

Floor Projection ⊥ to Joists Floor Projection Parallel to Joists


Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
b) Wood Joist Framing

Floor Opening—Length ⊥ to Joists Floor Openings—Length Parallel to Joists


Woodworking in construction

1) Wood floors systems (wood joist flooring)


Wood Post-Beam
Connections

Continuous Post Continuous Post Continuous Post

Spaced Post Concealed Connection Interlocking Connection


Lecture (5) Woodworking in construction
1) Wood floors systems (wood joist flooring)
c) Wood Subflooring

Subflooring is the structural


material that spans across floor
joists, serves as a working platform
Subflooring is the structural material that spans
during construction, and provides
across floor joists, serves as a working platform
a base for the finish flooring. The
during construction, and provides a base for the
joist and subfloor assembly can
finish flooring. The joist and subfloor assembly can
also be used as a structural
also be used as a structural diaphragm to transfer
diaphragm to transfer lateral forces
lateral forces to shear walls if constructed according
to shear walls if constructed
to approved standards. Consult the building code
according to approved standards.
for requirements.
Consult the building code for
Panel Subfloor requirements.
Woodworking in construction

1) Wood floors systems (wood joist flooring)


Wood Decking

Types of Wood Decking

Surface Patterns for Exposed Ceilings


Lecture (5) Woodworking in construction

Thank You
Lecture (5) Woodworking in construction

Exercise#2

illustrate the workshop


details to flooring system
of following room using
wood, then draw Plan and
Section A-A in scale 1/10
With fall details.

Assume any data does not exist


‫)‪Lecture (5‬‬ ‫‪Woodworking in construction‬‬

‫شكرا ً جزيالً المتميزة د ميرا‬


‫موضوع الخشب من الموضوعات السهله جدا بإذن هللا‬
‫محتاجين تكرما نركز في االتي‬
‫اوال‪span :‬الفراغ ألن ده علي أساسه بيتحدد ابعاد قطاع ال ‪joist‬سواء ‪ ٤*٢‬أو ‪ ٦*٢‬أو ‪ ٨*٢‬أو ‪ ١٠*٢‬ونخلي بالنا أن ابعاد‬
‫االخشاب عامه بتكون بالبوصه فعلي سبيل المثال ‪ ٢‬بوصة معناها ‪٥‬سم تقريبا ً‬
‫ثانيا ً‪ :‬بعد تحديد ال ‪span‬وقطاع ال ‪joist‬بنبدأ بتقسيط المسافه بين ال‪joists‬وبعضها والزم تكون متساوية وانتم بقيتوا أساتذة في ده ‪،،‬‬
‫ال ‪spacing‬بتكون بدايه من ‪ ٣٠‬سم وبتوصل لحد ‪ ٦٠‬سم لكن المعقول بيكون متوسط ال‪ ٤٠‬سم بيكون كويس مش عايزين نبعد عن‬
‫الرقم ده‬
‫ثالثا ‪ :‬الزم تخلي بالنا من عالقه تثبيت ال ‪joist‬بالحائط ‪ ،،‬بنالحظ أن ال ‪joist‬بيترص في ال ‪Short direction‬وبيكون قاعد‬
‫علي حاجه فوق الحائط اسمها ‪sill plate‬وال ‪sill plate‬ممكن تكون ‪double‬‬
‫رابعا‪ :‬بنجد في ‪joist‬بيجي عمودي علي ال ‪flooring joists‬ده بنسميه ‪header‬‬
‫خامسا ً‪ :‬بعد كده بيجي التغطية اللي بتبقي فوق ال ‪joists‬عشان نقدر نمشي علي البالطه ونستخدمها واسمها ‪subfloor‬ودي ممكن‬
‫تكون الواح من الكونتر ابعادها بتكون في الغالب والشائع استخدامه ‪٢.٤٠*١.٢٠‬متر أو ‪decking‬بيتعشق في بعضه زي ما د ميرا‬
‫شرحت‬
‫سادسا ً‪ :‬لو ‪span‬الفراغ كبر عن ال ‪ranges‬اللي يقدر يتحملها اكبر قطاع ال ‪joist‬يبقي الزم هنستخدم كمره يا اما من الخشب أو‬
‫الحديد كفاصل نقدر نحمل عليه‬
‫سابعا ً‪ :‬لو ال ‪wood flooring‬احتاج دعامه رأسية بنضطر نحط ‪posts‬وفي المحاضرة معروض شويه فنون لعالقه ال ‪flooring‬‬
‫‪system‬بال ‪posts‬‬
‫ثامنا‪ :‬الزم نخلي بالنا ايه بيجي قبل ايه كمراحل تثبيت عناصر السقف الخشبي ألن ده الزم يكون واضح بالرسم ايه اللي ظاهر وايه‬
‫المختفي‬
‫تاسعا‪ :‬التمرين المطلوب تمرين بسيط لفراغ بسيط مش هتحتاج فيه ‪beams‬وال حتي ‪posts‬‬
‫عاشرا‪ :‬الزم نكتب كل البيانات والمقاسات علي ال ‪plan‬و ال ‪section‬وطبعا احترم مقياس الرسم المطلوب‬

You might also like