A B C D

C-1/ F-1 C-1/ F-1 STANDARD 90* HOOK


C-1/ F-2 COLUMN
TB-1 TB-1
1 NGL

ROOF BEAM

TB-1
TB-1 10 @ 75 MM

4 - 16 MM
C-1/ F-2 C-1/ F-2 C-1/ F-2
TB-2 TB-2
2
8 - 16 MM

TB-1
TB-1
8 - 16 MM

C-1/ F-2 C-1/ F-2 C-1/ F-2


3 CLASS B TENSILE LAP
TB-2 TB-2 SPLICE REQUIREMENT
TB-1 100 MM THK. WELL COMPACTED G1 GRAVEL BASED STEEL RATION ANY
SECTION WITHIN THIS
REGION SHOUL NOT
EXCEED 8%
4 TB-1
FOOTING DETAIL SECTION F1
C-1/ F-3 FINISH FLOOR LINE
TB-1

50MM THK. WELL COMPACTED


G-1 GRAVEL BASE
5 0.40 M (MIN.)
TB-1

0.10
10MMØ TRANSITION
C-1/ F-1 BARS SPACED @ 600 MM 0.C.
C-1/ F-1
FINISH FLOOR LINE

0.20
10MMØ HORIZONTAL BARS
SPACED @ EVERY THREE
LAYERS OF CHB
FINISH GROUND LINE

0.05
1.00

3 LAYERS CHB (MIN.)


0.90 M (MIN)
COLUMN
6" CHB
AS BS STANDARD 90* HOOK
0.16

AS BS
.20
1.00

6-16MM
DIAMETER
BAR B.W. 100 MM THK. WELL COMPACTED G1 GRAVEL BASED
0.10

0.40

WALL FOOTING DETAIL


SCALE

FOOTING DETAIL PLAN F1

ARCHITECT'S SEAL: PROJECT TITLE: APPROVED BY: SHEET CONTENT: DRAWN BY: SHEET NO:

GABRIEL J. GUANZON
DATE:
LA CONSOLACION COLLEGE BACOLOD
SCHOOL OF ARCHITECTURE, FINE ARTS & INTERIOR DESIGN INSTRUCTOR