SI No. NEOM OBSERVATION CORRECTIVE ACTION PHOTO EVIDENCE

Water station Provided water station on


1 need to be time
installed near
mess hall

Poor cleaning and


Manhole full of Removing water on daily
2 Water near to Basis from manhole
Washing area

Provide Ac Provided AC
3
inside washing
area

Curtain need to be
installed in the door Installed curtain
4 of washing area
Bad smell Cleaning ongoing on daily basis
Inside kitchen Inside kitchen area
5

Water drainage
manhole need to be
6 cleaned properly Properly cleaning on daily basis
inside kitchen

7 Chemical need to be Removed the chemical from the


removed from the kitchen
kitchen

8 Worker were not


sitting inside dining Now all worker sitting in
hall for eating dining hall for eating
9 No Smoke detector Provided smoke detector
Inside washing Area

In progress
10 All holes opening need In progresss
to closed in washing
area

Electrical DB In progress In progress


11 need to be replaced

12
No pest control
In kitchen area In progress
In progress

Need to be installed fly


13 catcher in washing area In progress
In progress
In progress In progress
14 Need to repair floor of
the kitchen area

In progress In progress
Juice dispenser need to
15 be replaced with a new
one

In progress In progress
16 Bad smell in around
kitchen area