(GOVERNMENT OF DUBAI
MATERIAL SUBMITTAL COMMENTS SHEET
co
polity Ly asdire
Subeictectictyatloter Puthory
[From: | Deputy Manager - MEP
[To:__] M/s. National Contracting CO. LTD Fax No: 02-6421701
ret: [DMMEP/Ms/SRK/23350/2020 Contract Ne:]P0#3761900018 _[Date:_[26/Aug/20
[Mat. Submittal Ref: MTS-T-19. Date: 20/Aug/20
uibstation: | LAYAN. Receipt to TED: | 20/Aug/20
Material Code: _ PO#3761900018/ LAVAN/ MS/ M/ 16/107
Re 1
T-SpecRef Name of Material ‘Source ‘Sample
‘ApprovalCode
15.3.9.5.0.02 - Light Fixtures. ‘As per attached schedule. a
Rev 02,
B
Location for usage: Multiple location as per approved drawings.
Material used for: Artificial llluminations.
‘Comments: -
Refer attached Schedule,
Yew 27/8/2020
‘SYED IRFAN HUSSAIN
‘Approved as per sample submited
Approved subject to full compliance with manufacturers instructions
‘Approved subject to fll compllance with comments. Resubmit fr record
Representative sample to be prepared at it for Final approval
Comments as indicated in the material comments sheet
[Not approved, Revise the submittal as par comments and resubmit for approval
Contractor's responsibilities for compliance with the requirements ofthe specification,
CC:_VP- T. Proj. /Amit Chauhan/Muhammed Abdul Raheem
Page tof