This checklist is used to inspect block work being done for the Construction and operate phase-1 Green Riyadh Nursery Project. It contains 12 items to check including roughening the concrete surface, having a mixer available to produce mortar, checking the alignment and leveling of blocks, filling cells around openings, curing done properly, and surfaces being ready for next activity. The inspector marks each item as compliant, non-compliant, or not applicable and can add comments. The checklist is signed by the contractor's quality control representative, site engineer, and consultant to verify the inspection was completed.
This checklist is used to inspect block work being done for the Construction and operate phase-1 Green Riyadh Nursery Project. It contains 12 items to check including roughening the concrete surface, having a mixer available to produce mortar, checking the alignment and leveling of blocks, filling cells around openings, curing done properly, and surfaces being ready for next activity. The inspector marks each item as compliant, non-compliant, or not applicable and can add comments. The checklist is signed by the contractor's quality control representative, site engineer, and consultant to verify the inspection was completed.
This checklist is used to inspect block work being done for the Construction and operate phase-1 Green Riyadh Nursery Project. It contains 12 items to check including roughening the concrete surface, having a mixer available to produce mortar, checking the alignment and leveling of blocks, filling cells around openings, curing done properly, and surfaces being ready for next activity. The inspector marks each item as compliant, non-compliant, or not applicable and can add comments. The checklist is signed by the contractor's quality control representative, site engineer, and consultant to verify the inspection was completed.
Project Name: Construction and operate phase-1 Green Riyadh Nursery Project INSPECTON DATE: Location: Part ID/BAR ID
No Description Compliance Comments/Date Requirement
Yes No () N/A 1. Roughen concrete surface adjacent to blocks ( ) 2. Mixer is available on site to produce the mortar for the block work. 3 First line of block is checked 4 Ensure that the blocks thoroughly dampened prior to placement. 6 Ensure mortar joints are of consistent thickness. 7 The verticality and horizontal alignment of block work checked. 8 Block work laid in true line and level in accordance with the drawing 9 Ensure cells of blocks around opening is filled
10 Check opening dimensions.
11 Check the curing done as per requirement. 12 Block work surfaces is ready to proceed with next activity