BILL OF ITEM

PEMBANGUNAN POS SECURITY BELAKANG TANJUNG ANOM

HARGA SATUAN JUMLAH HARGA


NO ITEM PEKERJAAN VOLUME
Rp. Rp.

I PEKERJAAN STRUKTUR

A Pekerjaan Tanah
1 Galian tanah m³ 3.00 40,000.00 120,000.00
2 Urugan kembali m³ 1.00 40,000.00 40,000.00
3 Buang tanah sisa galian m³ 2.00 100,000.00 200,000.00
4 Urugan pasir bawah pondasi batu belah m³ 0.30 475,000.00 142,500.00
5 Pondasi batu belah 1 : 5 m³ 3.00 700,000.00 2,100,000.00
Rp 2,602,500
B Pekerjaan Struktur Beton
1 Beton
a Sloof (dudukan kontainer + pagar) m³ 1.75 550,000.00 962,500.00
b Kolom Balok Pagar m³ 7.00 550,000.00 3,850,000.00
c Pot Taman m³ 1.00 550,000.00 550,000.00

2 Pekerjaan Bekisting
a Sloof (dudukan kontainer + pagar) m² 12.75 125,000.00 1,593,750.00
b Kolom Balok Pagar m² 24.00 125,000.00 3,000,000.00

3 Pekerjaan Pembesian
a Sloof (dudukan kontainer + pagar) kg 287.00 15,000.00 4,305,000.00
b Kolom Balok Pagar kg 199.00 15,000.00 2,985,000.00
Rp 17,246,250
II PEKERJAAN ARSITEKTUR

A Pekerjaan Container
1 Modifikasi kontainer, incl sbb : Ls 1.00 85,000,000.00 85,000,000.00
- Dinding gypsum
- Plafon Gypsum
- Toilet (1 kloset + keran)
- Lantai Vinyl
- Panel Titik Lampu dan Stop Kontak
2 Pintu Kaca Kusen Aluminium (incl accesories) unit 2.00 20,000,000.00 40,000,000.00
3 Set Kaca Kusen Aluminium uk 2,0 x 2,50 ( tampak depan) unit 1.00 15,000,000.00 15,000,000.00
4 Set Kaca Kusen Aluminium uk 2,00 x 2,00 (samping) unit 2.00 13,000,000.00 26,000,000.00
Rp 166,000,000
B Pekerjaan Pagar
1 Pagar Besi Hollow 40 mm x 40 mm m² 30.00 750,000.00 22,500,000.00
2 Pasangan Bata m² 24.00 125,000.00 3,000,000.00
3 Finishing Coating Dinding Bata Expose m² 24.00 50,000.00 1,200,000.00
Rp 26,700,000
C Pekerjaan Lain-lain
1 Cleanwater connection Ls 1.00 6,500,000.00 6,500,000.00
2 Instalasi septic tank biofil Ls 1.00 4,000,000.00 4,000,000.00
Rp 10,500,000

JUMLAH 223,048,750.00 Rp 223,048,750


BILL OF ITEM
PEMBANGUNAN BUS SHELTER
PT KAWASAN INDUSTRI KENDAL

HARGA SATUAN JUMLAH HARGA


NO ITEM PEKERJAAN VOLUME
Rp. Rp.

G Pekerjaan Rangka Atap


1 Pipa Ø 114.3 mm t = 3.6 mm kg
2 Pipa Ø 89.1 mm t = 3.2 mm kg
3 Pipa Ø 48.6 mm t = 3.2 mm termasuk regel kg
4 Gording C 200x75x20x3,2 kg
5 Jarum gording Ø 10 mm kg
6 Ikatan angin Ø 16 mm kg
7 Watermour Ø 16mm bh
8 Angkur M20 Fisher / hilti bh
9 Plat t=12mm kg
10 Plat t=10mm kg
11 Plat t=8mm kg
12 Baut Ø 12mm bh
13 Dynabolt Ø 12 mm bh
14 Zincromate + Cat finish baja kg

H Pekerjaan Lain - lain


1 Struktur MMT
c Pipa Ø 76.3 mm t = 3.2 mm kg
d Siku 40x40x4 kg
e Plat t = 10 mm kg
f Plat bordes t = 3 mm kg
g Angkur M10 bh
h Zincromate + Cat finish baja kg

A Pekerjaan Konstruksi Baja


1 Kolom & Rangka Atap
a Kuda - kuda IWF 200x100 kg
b Kolom IWF 250x125 kg
c Trackstang Ø 12mm kg
d Ikatan angin Ø 16mm kg
e Gording C 100x50x20x2,3 kg
f Siku dudukan gording 50x50x5 kg
g Angkur M20 bh
h Plat t=16mm kg
i Plat strip kg
j Zincromate + Cat finish baja kg

B Pekerjaan Finishing, Tampak & Atap


1 Kanopi Polycarbonate m²
2 Kisi - kisi Aluminium 15x15cm jarak 15cm bh

JUMLAH